Loading...
HomeMy WebLinkAbout109420 HYDRO CONSTRUCTION CO INC - CONTRACT - RFP - 8286 CONSTRUCTION CONTRACTOR FOR PROJECTS AT THE W (16)CONTRACT DOCUMENTS FOR Filters 18–23 Rehabilitation Contractor assistance to construct build containment for the removal of spent filter media, clean and blast the filters, then inspect and investigate the filters for repairs, complete repairs on identified issues, coat the filters and surrounding areas, then place new media order by WTF staff, and finally test and aerate the filters before placing back in operation. Construction estimated to begin October 2017. The substantial completion date of the project is April 30, 2018. August 2017 ch2m 200 East 7th Street, Suite 314, Loveland CO 80537 ch2m Fort Collins Utilities 700 Wood Street Fort Collins CO 80521 Hydro Construction Company, Inc. 301 East Lincoln Avenue Fort Collins CO 80524 DocuSign Envelope ID: EBF54E16-FCAE-41EB-86AA-EF5FC98ED125 WTF 00525-1 Work Order, Notice of Award and Bid Schedule SECTION 00525 WORK ORDER, NOTICE OF AWARD AND BID SCHEDULE TO: Hydro Construction W. O. No. SCP-WTF-Filters18-23-072717 PURCHASE ORDER: TITLE: WTF Filters 18-23 Rehabilitation OWNER’S REPRESENTATIVE: Sue Paquette Original Bid/RFP Number & Name: RFP 8286, Construction Contractor for Projects at the Water and Wastewater Treatment Facilities (BU 5026310065) Commencement Date: August 15, 2017 OWNER: CITY OF FORT COLLINS (hereinafter referred to as OWNER) 1. WORK. You are hereby notified that your bid dated July 20, 2017, for the above Work Order has been considered. Pursuant to your AGREEMENT with OWNER dated June 20, 2016, you have been awarded a Work Order for this Work Order Description: A. See Section 01100 – Summary of Work. 2. CONTRACT PRICE, BONDS, AND CERTIFICATES. The price of your Work Order is Four Hundred Eighty- Four Thousand Two Hundred Twenty-three Dollars ($484,223.00). Pursuant to the AGREEMENT and the Contract Documents, Performance and Payment Bonds and insurance are required. 3. CONTRACT TIMES. Pursuant to the AGREEMENT and the Contract Documents, the date for Substantial Completion of this Work Order is April 30, 2018, and after Substantial Completion, the number of days for Final Payment and Acceptance is 60 Calendar days. 4. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 3 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expenses and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as penalty) CONTRACTOR shall pay OWNER the amounts set forth hereafter. 1) Substantial Completion: Five Hundred Dollars ($500.00) for each calendar day or fraction thereof that expires after April 30, 2018 until the work is Substantially Complete. 2) Final Acceptance: After Substantial Completion Two Hundred Dollars ($200.00) for each calendar day or fraction thereof that expires after the 60 calendar day period for Final Payment and Acceptance until the Work is ready for Final Payment and Acceptance. 5. EXECUTION. One electronic copy of this proposed Work Order & Notice of Award, and accompanying amendments or supplements to the Contract Documents (except any applicable Drawings) incorporated herein, are provided. Sets of any applicable Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within fifteen (fifteen) days of the date of this Notice of Award, that is, by August 30, 2017. DocuSign Envelope ID: EBF54E16-FCAE-41EB-86AA-EF5FC98ED125 WTF 00525-2 Work Order, Notice of Award and Bid Schedule A. You must deliver to OWNER one fully-executed electronic counterpart of this Work Order, including all amendments or supplements to the Contract Documents incorporated herein. The electronic Work Order must bear your signature as provided. B. You must deliver with the executed Work Order the Contract Security (Bonds) and insurance, as specified in the Agreement. Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid abandoned and to annul this Work Order & Notice of Award. Within ten (10) days after you comply with those conditions, OWNER will return to you one (1) fully-signed electronic counterpart of this Work Order with any amendments or supplements to the Contract Documents attached. CONTRACTOR’S NOTICE OF AWARD REPRESENTATION & EXECUTION: CONTRACTOR agrees to perform the services identified above, in accordance with the terms and conditions contained herein and in the AGREEMENT dated June 20, 2016 and the NOTICE OF AWARD dated August 15, 2017 between the parties. In the event of a conflict between or ambiguity in the terms of the AGREEMENT or specific Work Orders, the AGREEMENT shall control. CONTRACTOR: Hydro Construction By: Date: Name: Title: OWNER’S ACCEPTANCE & EXECUTION: This Work Order and the attached Contract Documents are hereby accepted and incorporated herein by this reference and the attached Notice to Proceed is hereby given. Submitted: Date: Sue Paquette, Special Projects Manager Reviewed By: Date: Pat Johnson, Senior Buyer, Purchasing Reviewed By: Date: Mark Kempton, Water Production Manager Reviewed By: Date: Owen L. Randall, Chief Engineer Reviewed By: Date: Carol Webb, Water Resources and Treatment Operations Manager Acceptance: Date: Gerry Paul, Director of Purchasing (over $60,000) DocuSign Envelope ID: EBF54E16-FCAE-41EB-86AA-EF5FC98ED125 8/9/2017 8/9/2017 Jim Eurich COO 8/9/2017 8/10/2017 8/10/2017 8/17/2017 City of Fort Collins Water Treatment Facility, Filters 18-23 Coating and Media Replacement Hydro Construction Company, Inc. - Scope of Services Provide personnel and equipment to complete removal and replacement of electrical equipment consisting of the following; Remove and Replace Media Construct containment walls enclosing all filters. Remove existing media and deposit on site. Prior to media placement conduct underdrain testing. Per WTF staff, in 2011 Filter 622 suffered damaged to the underdrains due to a mechanical failure. Under this work the underdrains in filter 621, 622, and 623 will be inspected and repaired as necessary. Place media (provided by City) in lifts, with skimming as needed (minimum; once on sand layer, twice on anthracite layers) to remove fines. Sample and test media upon completion. Filter Coatings Filter Walls: Construct second layer of containment and protect existing under drains. Concrete surfaces to be coated shall be abrasive blasted per SSPC-SP13 Surface Preparation of Concrete to a profile of ICRI CSP 3-5. Points of termination for the surface preparation will be the floor-to-wall intersection and the original slab joint on the top of the basins. The interior walls of the basins will be completely blasted and coated. A visual inspection will be performed to make sure all areas have been properly prepared and are ready to receive coating. If any structural repairs need to be completed and re-blasting has to occur, the additional scope will be performed on a time and material basis. Spent blast abrasive and debris shall be removed from the basins and placed into containers for disposed. The surfaces of the concrete walls shall be coated with Cemtec Silatec MSM form ½” to 1 “, depending on the degradation of the concrete. Apply one (1) prime coat of Sherwin Williams Duraplate 235 PW primer at 4.0 – 8.0 mils DFT. Apply one (1) finish coat of Sherwin Williams Sherplate NSF epoxy at 18-22 mils DFT. The wet film thickness shall be inspected at periodic intervals in accordance with ASTM D4414. The lined surface shall be inspected per “holidays” or voids in accordance with NACE SP0188. Influent Valve/Stem and Pipe: Prepare surface as follows: Cast Iron/Ductile Iron: Per NAPF 500-03-05 “Surfaces Preparations Standard for Abrasive Blast Cleaning of Cast Ductile Iron Fittings” to a cleanliness level defined in the Section titled Ductile Iron Fitting Blast Clean #1. Steel: Grit blast to SSPC SP10. Apply three (3) 3 coats of SW Durplate 235 PW at 3 MDFT per coat. Color to match existing. Surface Wash Piping: Spot repair areas to remove damaged paint and corrosion per SSPC-SP11, Power Tool Cleaning to bare metal. Apply one (1) spot prime coat with SW Durplate 235 PW at 3 MDFT. Apply one (1) finish coat over the entire pipe with SW Durplate 235 PW at 3 MDFT. Filter Gallery Floor: Spot repair areas to remove damaged paint per SSPC-SP11. Apply one (1) spot prime coat with SW Durplate 235 PW at 3 MDFT. Apply one (1) finish coat over the entire floor area with SW Durplate 235 PW at 3 MDFT. Total All Items (see attached) $484,223.00 DocuSign Envelope ID: EBF54E16-FCAE-41EB-86AA-EF5FC98ED125 Standard Estimate Report Page 1 FCWTF Filter Media Replac 7/20/2017 8:58 AM Project name FCWTF Filter Media Replac Labor rate table Labor - Bare Equipment rate table Equipment Report format Sorted by 'Prop Item#' 'Detail' summary Allocate addons DocuSign Envelope ID: EBF54E16-FCAE-41EB-86AA-EF5FC98ED125 Standard Estimate Report Page 2 FCWTF Filter Media Replac 7/20/2017 8:58 AM Item Description Takeoff Qty Labor Amount Material Amount Subcontract Amount Name Equipment Amount Other Amount Total Amount 01 General Cond 20 Bonds 1.00 ls - - - 8,717 8,717 14 Project Manager 10.00 wk 12,070 - - 1,000 - 13,070 14 Project Foreman 10.00 wk 19,880 - - 2,500 - 22,380 18 Telephone Charges 1.50 mo - - - 196 196 20 Temporary Toilets 1.50 mo - 0 - - 245 245 14 Safety 1.00 ls - - - 2,500 1,631 4,131 16 Misc. Tools 1.00 ls - - - 1,850 - 1,850 01 General Cond 31,950 7,850 10,788 50,588 800.00 Labor hours 800.00 Equipment hours 02 Filters 10 Staging 1.00 ea 1,704 - 0 0 1,304 3,008 10 Remove Media 1.00 ls 0 - 46,550 272 46,822 -sub Sub - Coatings Basin Walls 1.00 ls - - 265,000 - - 265,000 -sub Sub - Coatings Basin Piping 1.00 ls - - 10,000 - - 10,000 -sub Sub - Coatings Filter Gallery Floor 1.00 ls - - 45,000 - - 45,000 100 Place Media 1.00 cf 11,360 - 1,508 1,957 14,825 100 Inspect Underdrains 1.00 cf 994 - 0 0 994 02 Filters 14,058 366,550 1,508 3,533 385,649 48.000 Labor hours Estimate Totals Description Amount Totals Hours Rate Cost Basis Cost per Unit Percent of Total Labor 46,008 848.000 hrs 9.50% Material Subcontract 366,550 75.70% Equipment 9,358 800.000 hrs 1.93% Other 14,321 2.96% 436,237 436,237 90.09 ##### Profit & Overhead 47,986 11.000 % T 9.91% 47,986 484,223 9.91 ##### Total 484,223 DocuSign Envelope ID: EBF54E16-FCAE-41EB-86AA-EF5FC98ED125 WTF Notice to Proceed 00530-1 SECTION 00530 WORK ORDER NOTICE TO PROCEED Description of Work: WTF Filters 18-23 Rehabilitation To: Hydro Construction This notice is to advise you: That the contract covering the above described Work has been fully executed by the CONTRACTOR and the OWNER. That the required CONTRACTOR's Performance Bond and Payment Bond have been received by the OWNER. That the OWNER has approved the said Contract Documents. Therefore, as the CONTRACTOR for the above described Work, you are hereby authorized and directed to proceed within fifteen (15) calendar days from receipt of this notice as required by the Agreement. Dated this August 15, 2017. The dates for Substantial Completion and Final Acceptance shall be April 30, 2018 and June 30, 2018, respectively. City of Fort Collins OWNER By: Sue Paquette Title Special Projects Manager ACKNOWLEDGMENT OF NOTICE Receipt of the above Notice to Proceed is hereby acknowledged this ___ day of ____________, __________. Hydro Construction________________ CONTRACTOR By: ____________________________ Title: DocuSign Envelope ID: EBF54E16-FCAE-41EB-86AA-EF5FC98ED125 WTF Performance Bond 00610-1 SECTION 00610 PERFORMANCE BOND Bond No. KNOW ALL MEN BY THESE PRESENTS: that (Firm) Hydro Construction (Address) ___________________________________ (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) ______________________________________ (Address) _____________________________________ hereinafter referred to as "the Surety", are held and firmly bound unto City of Fort Collins, 300 Laporte Ave, Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as the "OWNER", in the penal sum of Four Hundred Eighty-Four Thousand Two Hundred Twenty-three Dollars ($484,223.00) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated June 20, 2016, a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins project, WTF Filters 18-23 Rehabilitation. NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Agreement during the original term thereof, and any extensions thereof which may be granted by the OWNER, with or without Notice to the Surety and during the life of the guaranty period, and if the Principal shall satisfy all claims and demands incurred under such Agreement, and shall fully indemnify and save harmless the OWNER from all cost and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and expense which the OWNER may incur in making good any default then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this ____ day of ________________. DocuSign Envelope ID: EBF54E16-FCAE-41EB-86AA-EF5FC98ED125 WTF Performance Bond 00610-2 IN PRESENCE OF: Principal By: Title Address (Corporate Seal) IN PRESENCE OF: Other Partners By: By: IN PRESENCE OF: Surety By: Attorney-in-Fact By: Address (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. DocuSign Envelope ID: EBF54E16-FCAE-41EB-86AA-EF5FC98ED125 WTF Performance Bond 00615-1 SECTION 00615 PAYMENT BOND Bond No. KNOW ALL MEN BY THESE PRESENTS: that (Firm) Hydro Construction (Address) __________________________________ (an Individual), (a Partnership), (a Corporation), hereinafter referred to as the "Principal" and (Firm) ______________________________________ (Address) ___________________________________ hereinafter referred to as "the Surety", are held and firmly bound unto the City of Fort Collins, 300 Laporte Ave., Fort Collins, Colorado 80522 a (Municipal Corporation) hereinafter referred to as "the OWNER", in the penal sum of Four Hundred Eighty-Four Thousand Two Hundred Twenty-three Dollars ($484,223.00), in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Agreement with the OWNER, dated June 20, 2016, a copy of which is hereto attached and made a part hereof for the performance of The City of Fort Collins project, WTF Filters 18-23 Rehabilitation. NOW, THEREFORE, if the Principal shall make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the Work provided for in such Agreement and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such Work, and all insurance premiums on said Work, and for all labor, performed in such Work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the Work to be performed thereunder or the Specifications accompanying the same shall in any way affect its obligation on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the Work or to the Specifications. PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied. PROVIDED, FURTHER, that the Surety Company must be authorized to transact business in the State of Colorado and be acceptable to the OWNER. IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts, each one of which shall be deemed an original, this ____ day of _________________. DocuSign Envelope ID: EBF54E16-FCAE-41EB-86AA-EF5FC98ED125 WTF Performance Bond 00615-2 IN PRESENCE OF: Principal By: Title Address (Corporate Seal) IN PRESENCE OF: Other Partners By: By: IN PRESENCE OF: Surety By: Attorney-in-Fact By: Address (Surety Seal) NOTE: Date of Bond must not be prior to date of Agreement. If CONTRACTOR is Partnership, all partners should execute Bond. DocuSign Envelope ID: EBF54E16-FCAE-41EB-86AA-EF5FC98ED125 WTF Summary of Work 01110-1 SECTION 01110 SUMMARY OF WORK PART 1 GENERAL 1.01 SECTION INCLUDES A. Site location and description. B. Project description. C. Scope of work and work sequence. D. Underground utilities. 1.02 SITE LOCATION AND DESCRIPTION A. WTF Filters 18-23 Rehabilitation The work is located at the City of Fort Collins Water Treatment Facility (WTF), Fort Collins, Colorado. The project involves contractor assistance to construct build containment for the removal of spent filter media, clean and blast the filters, then inspect and investigate the filters for repairs, complete repairs on identified issues, coat the filters and surrounding areas, then place new media order by WTF staff, and finally test and aerate the filters before placing back in operation. Construction estimated to begin October 2017. The substantial completion date of the project is April 30, 2018. 1.03 PROJECT DESCRIPTION A. General Conditions - Provide: 1. Mobilization & Field Overhead 2. Traffic Control (By CoFC) B. Stormwater Management - Provide: 1. Erosion & Settlement Control Allowance 2. SWMP Inspections C. Landscaping – Provide and Install as per the bid schedule. D. Miscellaneous Work Items & Allowances – Provide and Install as per the bid schedule. 1.04 WORK SEQUENCE A. The Work Sequence is to be submitted as part of the construction schedule required in Section 01320 (Construction Schedules) and Section 01330 (Submittals). Construction of the project shall begin within seven (7) calendar days of the date of Notice to Proceed. Please see the City of Fort Collins Master Specifications for these and other DocuSign Envelope ID: EBF54E16-FCAE-41EB-86AA-EF5FC98ED125 WTF Summary of Work 01110-2 Division section requirements, including Division 1 – General Requirements and Division 2 - Site Work. 1.05 UNDERGROUND UTILITIES A. It shall be the responsibility of the CONTRACTOR to verify the existence and location of all underground utilities along the route of the work and to coordinate the construction schedules with these utility owners. See Section 01180 for a list of Utility Sources. B. Known utilities and structures adjacent to or encountered in the work are shown on the Drawings. The locations shown are taken from existing records and the best information available from existing utility plans, however, there may be some discrepancies and omissions in the locations and quantities of utilities and structures shown. Those shown are for the convenience of the CONTRACTOR only, and no responsibility is assumed by either the OWNER or the ENGINEER for their accuracy or completeness. C. The CONTRACTOR shall field verify all utilities and coordinate construction with utility owners prior to starting construction. The CONTRACTOR shall be responsible for protecting utilities during construction and scheduling utility adjustments to eliminate conflict with progress of the work. Any damage to existing utilities shall be repaired at no additional cost to the OWNER. D. The CONTRACTOR shall notify the ENGINEER immediately of any field condition not consistent with the contract documents. PART 2 PRODUCTS (Not Applicable) PART 3 EXECUTION (Not Applicable) END OF SECTION DocuSign Envelope ID: EBF54E16-FCAE-41EB-86AA-EF5FC98ED125