Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - 7515 CONSULTING ENGINEERING SERVICES FOR FUTURE WATER WW & SW FACILITIES CAPITAL IMPROVEMENTSCHANGE ORDER NO. 1 PROJECT TITLE: WQ and PC Labs Environmental Study - Hazardous Materials Assessment CONTRACTOR: LT Environmental P.0. NUMBER: 9172458 VENDOR NUMBER: 551459 CHARGE NUMBER: 334000.562020 DESCRIPTION In preparing change orders show inorder as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time 1 . Additional scope: Roof sampling added by Owner 2 Addition of 80 roof samples for environmental assesment 3. $ 1,380.00 4. 30 days (June 30th) (Attach additional sheets as required) ORIGINAL CONTRACT COST $7,441.50 TOTAL APPROVED CHANGE ORDERS $0.00 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $1,380.00 TOTAL % OF ORIGINAL CONTRACT, THIS CO: 15.6% TOTAL % OF ORIGINAL CONTRACT, ALL CO'S: 15.6% ADJUSTED CONTRACT COST $8,821.50 (Assuming all change orders approved) ACCEPTED BY: ___________________________________________ DATE: ________________ Nick Talocco - Senior Engineer REVIEWED BY: ___________________________________________ DATE: ________________ Eileen Dornfest, Project Manager REVIEWED BY: ___________________________________________ DATE: ________________ Jason Graham, Water Reclamation & Biosolids Manager APPROVED BY: ___________________________________________ DATE: ________________ Owen L. Randall, Chief Engineer APPROVED BY: ___________________________________________ DATE: ________________ Carol Webb, Water Resources & Treatment Operations Manager DocuSign Envelope ID: 4F9113D5-523F-4BA1-84DC-92619C3E9A48 6/23/2017 6/23/2017 6/23/2017 6/26/2017 6/26/2017 LABOR TECH PROJECT STAFF CADD/ DIRECTOR SCIENTIST SCIENTIST I/CABI GIS CLERICAL TASK 1 - ADDITIONAL ACM SURVEY OF ROOFS AT PCL AND WQL 8 TOTAL HOURS 0 0 8 0 0 LABOR RATE ($) $143.00 $102.00 $73.00 $65.00 $56.00 LABOR COST $0.00 $0.00 $584.00 $0.00 $0.00 LABOR SUBTOTAL $584.00 OTHER DIRECT COSTS QUANTITY UNIT COST MARKUP (10%) TOTAL VEHICLE (SITE INSPECTION) 1 $110.00 $110.00 ACM LABORATORY ANALYSIS 78 $8.00 $8.80 $686.40 ODC SUBTOTAL $796.40 PROJECT TOTAL $1,380.40 TABLE 1 CHANGE ORDER #1 HAZARDOUS MATERIAL ASSESSMENT POLLUTION CONTROL AND WATER QUALITY LABS FORT COLLINS, COLORADO CITY OF FORT COLLINS