HomeMy WebLinkAboutDrainage Reports - 08/07/20020 r r Final Drainage Report for Spanjer Office Building Fort Collins, Colorado July 1, 2002 NORTHERN NE ENGINEERING SERVICES, INC. 1 1 1 1 1 1 Final Drainage Report for Spanjer Office Building Fort Collins, Colorado July 1, 2002 Prepared For: Spanjer Construction Corp. PO Box 9644 Office 5731 Bueno Drive, #C Fort Collins, Colorado 80525 Prepared By: NENORTHERN ENOINEERINO ':1gavlem INC. Northam Eglneedng Sendces, Inc 420 S. Howes, Soho 202 Fort Collins, Colorado 80521 Phone:(970) 2214158 Project Number: SPA (01-042) Final Submittal I NORTHERN NE ENGINEERING SERVICES, INC. ' July 1, 2002 1 1 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Spanjer Office Building Fort Collins, Colorado Proj ect.Number: 01-042 Dear Staff: Northern Engineering Services, Inc. is pleased to submit this Final Drainage Report for the Spanjer Office Building site for your review. We understand that review by the City of Fort Collins is to assure general compliance with standardized criteria contained in the Storm Drainage Design Criteria and Construction Standards. This report was prepared in compliance with technical criteria set forth in the City of Fort Collins Storm Drainage Design Criteria and Construction Standards manual. If you should have any questions or comments as you review this report, please feel free to contact us at your convenience. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Q „�_ Kimberly J R �� �`- Project Engineer 27362 ' Project ManagerNice President ig 420 SOUTH HOWES, SUITE 202 / FORT COLLINS, COLORADO 80521 / 970.221.4158 / FAX 970.221.4159 ' Table of Contents VICINITY MAP Page ' I. SITE LOCATION AND DESCRIPTION 1.1 Site Location.................................................................................... 1 1.2 Site Description................................................................................ 1 II. PRE -DEVELOPMENT CONDITIONS 2.1 Historic Drainage............................................................................. 1 2.2 Historic Basins............................................................................... 1 1 III. 2.3 Pre -development Drainage Patterns ................................................ POST -DEVELOPMENT CONDITIONS 2 3.1 Post -development Conditions.......................................................... 2 3.2 Design Criteria and References....................................................... 3.3 Hydrologic Criteria.......................................................................... 2 2 3.4 Hydraulic Criteria............................................................................ 2 ' 3.5 Drainage Patterns............................................................................ 3.6 Detention.......................................................................................... 2 4 IV. WATER QUALITY V. 4.1 Water Quality Measures and Criteria .............................................. EROSION CONTROL PLAN ' 4 5.1 Erosion Control Criteria................................................................. 4 ' VI. 5.2 Rainfall Erosion Control Plan .......... :............................................... CONCLUSIONS 5 6.1 Compliance with Standards............................................................. 5 REFERENCES.......................................................................................... 6 APPENDICES APPENDIX A- Hydrology Calculations ' APPENDIX B - Water Quality Calculations APPENDIX C - Street Capacity Calculations APPENDIX D- Erosion Control Calculations APPENDIX E- Weir, Swale, and Riprap Calculations I [1 1 1 1 1 �T VICINITY MAP lv 1 "=2000' I 1 _ Final Drainage Report ' for Spanjer Office Building Fort Collins, Colorado July 1, 2002 I. SITE LOCATION AND DESCRIPTION 1.1 Site Location The Spanjer Office Building site is Lot 7 of Cameron Park, located between Cameron Drive and the Frontage Road within the Cameron Park Development. The site can also be described as a portion of Section 2, Township 6 North, Range 69 West of the 61b ' Principal Meridian in the City of Fort Collins, County of Larimer, State of Colorado. This site is also located within the Fossil Creek major drainage basin. 1.2 Site Description The Spanjer Office Building site is approximately 0.45 acres and has historically been undeveloped. The site consists mainly of native grasses, and generally slopes from the north to the south at approximately 6%. Plans for this site include a commercial building with associated parking. ' IL PRE -DEVELOPMENT CONDITIONS 2.1 Historic Drainage As mentioned above, the site is presently undeveloped, and consists mainly of native ' grasses and vegetation. Cameron Drive along the westerly side of the project has been built, as well as the Frontage Road along the easterly boundary of the project. A church has been built on Lot 6, south of this project, and a small office building and parking lot ' has been built on Lot 8, north of this project. 2.2 Historic Basins The site was broken into 2 historic basins, designated as H-1 and H-2. H-1 represented the westerly end of the site, which presently sheet flows generally towards the Church and Cameron Drive. H-2 represents the easterly end of the site, which also generally sheet flows to from the northwest to the southeast across the existing Church and to the Frontage Road. Both the Frontage Road and Cameron Drive have existing 24" culvert under College Ave. The developer of the Fossil Creek Office Park has obtained a 60' ' drainage easement from the termination point of the Frontage Road to Fossil Creek for the purposes of conveying stormwater runoff thereby eliminating the need for onsite detention. It is our understanding that this existing 60' wide drainage easement is for all ' the lots in Cameron Park. ' Final Drainage Report Northern Engineering Services, Inc Spanjer Office Building July 1, 2002 2.3 Pre -development Drainage Patterns The existing topography is such that Lots 9 & 15 generally sheet flow across this site (shown in the appendix as historic basins H-3 and H-4). The owner is concerned about not blocking their historic runoff, and will provide an interception swale along the northeasterly boundary of his site, and will allow runoff around his storage structure and through his parking lot to the existing Frontage Road. He would be willing to grant a drainage easement to the owners of these lots should the need ever arise. ' Lot 8 was developed into a small office complex with an attached parking lot south of the building. Drainage from this site is directed to the southeast across this parking lot, and directed by curb and gutter to a small concrete drainage pan that allows flows to enter the existing curb and gutter of the Frontage Road. ' III. POST -DEVELOPMENT CONDITIONS 3.1 Post -development Conditions The Spanjer Office Building development will include the following: ' • Storage Facility; • Commercial Building; • new attached walk along the west side of the Frontage Road; ' • drainage improvements and utility services. Portions of the asphalt surface of the Frontage Road near the property boundary will be replaced with this development. 3.2 Design Criteria and References Drainage criteria outlined in both the City of Fort Collins Storm Drainage Design Criteria Manual, (SDDCM) and Storm Drainage Criteria Manual by the Urban Drainage and Flood Control District have been referenced for this study. ' 3.3 Hydrologic Criteria The Rational Method has been used to estimate peak stormwater runoff within the developed site. The minor 10-year and major 100-year design storms have been used in the design of the proposed drainage system. Rainfall intensity data for the Rational Method has been taken from Figure 3-1a updated by the City of Fort Collins in 1999. ' 3.4 Hydraulic Criteria The City of Fort Collins SDDCM has been referenced for all hydraulic calculations. 3.5 Drainage Patterns The site has been broken down into eight smaller sub -basins, a copy of the layout has been included in the appendix of this report. Sub -basins D-1, 2, 3, and 8 generally drain from northwest to southeast, and to the Frontage Road. Sub -basins D-5 and D-7 generally drain from northeast to southwest, and to Cameron Drive. Sub -basins D-4 and D-6 represent a small area of the site that will sheet flow to the existing Church. ' Final Drainage Report Northern Engineering Services, Inc Spanjer Office Building ' July 1, 2002 3.5.1 Sub -basin D-1 Sub -basin D-1 represents 0.066 acres of the site, bounded by the high ' point of the site entrance from the Frontage Road, the Frontage Road attached walk, and the Frontage Road centerline. Flows will be conveyed by existing curb and gutter south to the existing creek. ' 3.5.2 Sub -basin D-2 Containing 0.123 acres, D-2 conveys flows from a swale along the ' northerly property boundary to a 3' curb opening and pan, through another 3' curb opening, around the commercial building to Water Quality ' Capture Volume Pond A, having a volume of 163.9 cubic feet and high water elevation of 4956.90. The pond's outlet structure releases flows to a 2' sidewalk chase, then to the curb and gutter of the Frontage Road. ' 3.5.3 Sub -basin D-3 Representing a very small section of the site, D-3 is 0.010 impervious ' acres that directs flows to an area drain and sump pit (by others) then to Water Capture Volume Pond A. pumped Quality [1 1 1 [l Flows from sub -basins D-1, 2, 3, and 8 are conveyed by the Frontage Road curb & gutter to the existing creek, and will have combined release rates of 0.775 cfs and 1.991 cfs for the 10- and 100-year storm events, respectively. 3.5.4 Sub -basin D-4 Sub -basin D-4 is a very small grassy area of 0.012 acres. Stormwater will sheet flow from north to south to the existing Church. 3.5.5 Sub -basin D-5 D-5 is the largest of the sub -basins at 0.370 acres. Bound from the north by the existing parking lot of Lot 9, water will sheet flow around the storage building to the curb and gutter on the north side of the entrance off Cameron Drive. Flows are then conveyed to a concrete pan and curb and gutter, through a curb opening, and into Water Quality Capture Volume Pond B. Pond B has a volume of 328.8 cubic feet with a high water elevation of 4958.95, it's outlet structure releases to a 2' sidewalk chase conveying flows to the existing curb and gutter of Cameron Drive. 3.5.6 Sub -basin D-6 Having a pervious nominal area of 0.003 acres, water sheet flows north to south, to the existing Church. 11 ' Final Drainage Report Northern Engineering Services, Inc Spanjer Office Building ' July 1, 2002 3.5.7 Sub -basin D-7 Also bound from the north by the parking lot of Lot 9, the 0.200 acres of sub -basin D-7 include the east side of Cameron Drive, the attached walk of Cameron Drive, and part of the entrance off said street. Runoff will sheet flow to Cameron Drive, to then be conveyed by curb and gutter to ' the existing creek. Both D-5 and D-7 release to the curb and gutter of Cameron Drive, creating 10- and 100-year event flows of 1.076 cfs and 2.794 cfs, respectively. 3.5.8 Sub -basin D-8 The 0.024 acres of Sub -basin D-8 are bound from the north by the parking lot of Lot 8 and bound from the south by the curb of the Frontage Road entrance. A small, grass -lined swale begins at the west end of the sub - basin and continues east to a 3' curb opening. Swale calculations are ' included in the appendix of this report. 3.6 Detention As mentioned above, the master drainage plans for this area do not require detention. Therefore, the entire site will be released un-detained to the existing creek north of Fossil Creek. A 60' wide drainage easement has been obtained to provide access to this existing ' drainage -way. Also, the impacts of this development do not significantly increase the flows downstream. IV. WATER QUALITY 4.1 Water Quality Measures and Criteria Two on -site water quality capture volumes (WQCV) are proposed to remove sediment ' and other pollutants from developed runoff. Sub -basins D-2 and D-3 drain to WQCV Pond A at the east side of the site, sub -basin D-5 drains to WQCV Pond B at the west end of the site. Based on criteria for a 40-hour dry extended detention basin outlined in the Urban Storm Drainage Criteria Manual, Volume 3 — Best Management Practices by the Urban Drainage and Flood Control District (September 1999), the required water quality capture volume for Ponds A and B were determined to be approximately 163.9 and 328.8 ' cubic feet, respectively. These required WQCVs are achieved at an elevation of 4956.90 for Pond A and 4958.95 for Pond B. A steel orifice plate with vertical perforations will be built into both pond outlet structures to control the water quality capture volumes. V. EROSION CONTROL PLAN ' 5.1 Erosion Control Criteria This site lies within the Moderate Rainfall Erodibility Zone, and the Moderate Wind Erodibility Zone, per the City of Fort Collins zone maps. The desired effectiveness goal ' for this site was estimated to be approximately 78%. The erosion control plan presented here is intended to control both wind and rainfall erosion. The Erosion Control Reference Manual for Construction Sites (ECRM), City of Fort Collins, has been referenced for this erosion control plan. I Final Drainage Report Spanjer Office Building July 1, 2002 I I 1 Vl. 1 1 1 Northern Engineering Services, Inc 5.2 Rainfall Erosion Control Plan The intent of the erosion control plan for this site includes the following guidelines. As these measures can vary depending on the time of year construction activities take place, as well as the construction window involved, we would look to the contractor to work closely with the City to insure the intent of the plan is generally complied with. The proposed rainfall erosion control plan during construction will consist of temporary structural erosion control measures. A straw -bale sediment trap will be placed north of the 3' curb cut and concrete pan located in the entrance off the Frontage Road. A straw - bale dike will be place just north of WQCV Pond A. Gravel Outlet Filters will be installed at the outlets of both WQCV Ponds so the ponds can act as sediment traps during construction. Silt fencing will be installed along the southern property boundary and along both Cameron Drive and the Frontage Road to prevent runoff particulates and windblown sediment from migrating off -site. It is our intent to restrict construction vehicular traffic to Cameron Drive. The measures proposed above will control surface erosion during the construction process, and prevent sediment from leaving the site. These structures are to remain in place until paving is completed and foundations and landscaping have been established. The proposed erosion control plan after construction will consist of all open space areas being revegetated as specified on the Landscape Plan. D 1110WIMITiN&I 6.1 Compliance with Standards All drainage design considerations are in accordance with the City of Fort Collins Storm Drainage Design Criteria Manual and the Urban Drainage and Flood Control District's Drainage Criteria Manual. The drainage system proposed within this report and the supporting construction documents provide adequate conveyance and water quality enhancement for the developed stormwater runoff from Spanjer Office Building. 11 1 1 1 1 1 1 1 Final Drainage Report Northern Engineering Services, Inc Spanjer Office Building July 1, 2002 REFERENCES 1) Drainage Criteria Manual, Urban Drainage and Flood Control District, Wright Water Engineers, Inc., Denver, Colorado, Updated June 2001. 2) Erosion Control Reference Manual for Construction Sites, City of Fort Collins, Colorado, Hydrodynamics, Inc., January 1991. 3) Storm Drainage Design Criteria and Construction Standards, City of Fort Collins, Colorado, Updated April 1999. 59 p 1 1 1 1] i i 1 1 11 i i 1 1 1 0 1 1 i %I14A J! F.-L CF 61.Of s � fyt�t3q;p A- 5 -o EL.4951.60' n 1 � � 1 > - 3 ems, z4 1 o' 4. 1+-4 0- I-7 Imo' �.C-m00% 8i I e i i 4 to Yet - 11. m>. i 10 t44 -Z 1 r,1'.1 4D.I C.Z��C 1.7� Cam. 14c 1 q ioZ? -1-I-4 1 l-'-Cam Ci��s? 1 I 1 1 [1 1 1 1 1 1�f i�i-Ul .tu C: ,ppgE 0 0 r YyF�F4` ct ^ ti" 31, do owu,—m nmv mm� O O O O O O O O rr°45O '�iJ4zS',}wkyi aV�`, m N ml n rO- N 0 0 N Go O u ?� O �0 Ff 0 0 0 0 0 0 0 a y,i IL- E �;,� u:ovo moon ;q W,aui'"u p 0 0 0 0 0 0 0 R i Sr Y�qi+: \ij W'. U i61jm 0000 000 V o000 00 ,0000 tm� 000 rY z:'$ V p : 'r 00000000 ytQ�iJaTr � p [jP' 1hxK�C Vl N- p S N n �v�l�S' YV b`RYt.:;�u.:0 0 O 0 0 V 0 p 0 0— k3 in c �T'3� ° 00000000 �v a V S�"t'sX4Y: C �k h U) aa�r.3 U� LI�JCC��i 1�S ItCf) m 0 0 Mn O n cn $pkrye, „%3 � 00000000 0 0 0 0 0 O N a £'�R� � y tU ��tly3w•t; its `a�*��jiYekj f' s+a"f 0 y IVDOONt" 000 41 ILt4 1f �Q'. V" O L U U 0 ' b; N 1 1 I 1 Y4'rSJa:J. O r, �. o V 000000000� S:Yk�.�)` V O �• - � �aammm�,ss�� R M1 U N— Y V' V R Y d' tt1 Y nl uj ui v1 vi 6 ass ;2A0s O O N N O O N t\�R i� OVI�-- 0 0 0 --____— 0 0 0 yji [u •.i lY N — a3333321 ld Mjlpl +2 ,I, .,;,$88g3888888 F -:o O O m uj O O O O O O �'W u w N 88ma888888 0 o o Omnj O 000 Op Y 0 0 0 U-M OP^ 0000 00OO ¢ m Vl Al s' E 0 0 0 0 3 3 0 3 0 O oo>'mmaP88�8vOi too tjks' Ofp R y G m m N N O O m 0 0 nj 0 0 Id 0 ^j 4,OZ-A —i; 2 10080 �q�� M N — N •'� �' E iR rvNOa 0,66 O_v L Y�tO N bm^�mm a AO 'J V y $�nfi u $,�N NpOul tonnes^ o } J ( (1 y T3 U N Ul Hl Yl m m N ^t N V1 00000000000 2 rySsy N o—mNm n m YsnmvmmN — pdod6ddO0dd d:�N 0aj tppo Nopm BO m Y Q � �00dOdd00dp 4 J V S'tpy l' m U u n—NNOm e m u 000N n0 .,2'ip�,d - ^a nop0Npo i' N "'{ p II M y D 0 yN � o—�NNmaysmnn I 1 1 F; `�"'�l' o inn ONN-om o O0 ! c ,vg%1.:, ,3;n1E3i t4f{.x N � y` -m c ai ai vi of ain aimK T+ C V aE' c 000 O O Om0 m% Y?3 3 E V V E �fl V1 N Vl m t0 m O 0 aid C �, O b OON NO mN p� .^ 0 � I m 0 0-- _ 0 0- _ 0 0 _ _ iffi'n, i y 0 0 0 0 6 0 o i 6 m U O m m m 0 Q (n7,� ' f= E33oOz3333�2 t� a 0 0 0 0 0 0 0 0 0 0 N� fQy "OOmm000000 � Y ��F� +tO � m x�0 OO O N Vk00 tti ^100 O000 0000 5 y O O ri^ 0 0 0 0 OF FSILJ' 0 - , y a 2 EOodo 333do d h �L'1Nl M wh S� )Q o >ff �cri ^i ^itid6aid cid^i > y �� p�N ty v Y ���yti 00 m00�1 ��k s ("ljf '' aff NOOOOTmT O10 fn .X' K'7 7 �'=m akR$oo OONO w a — �" •'�" N ry Zn to �F�(�{ ` .' U0006-00000 tn N $O p p n p ¢¢�� W; W :aS�y 1rs CO N nm" U-oao-00o00 Np 60m ';.�'�M'•N E' � N tD 1 U a u Q N-� OOm O Nh �( J rL 1> C2 O L I �J Table 3-3 RATIOML METHOO R@tOrr Cdr{TIC,NTS iOR C010?08 I7! 2 AIALTSIS Character Of Surface Runoff Coefficient Streets, Parking Lots, Drivest Asphalt.. 0.95 Concrete........ .. 0.95 Gravel ............ ........ ...... 0.50 Roofs................. Lawns, Sandy Soil: Flat <2{.. Average 2 to�7{.............................. 0.10 Steep >7{....... 0.15 0.20 Lawns, Heavy Soil: Flat <2{........... Average 2 to 7{.......� �.........' 0.20 -- Steep>7{............. ....................... 0.25 . ....................... 0.35 Table 3-4 RATIOIAL l9±THOD F=QUZ 7CI ADJOSIlCHT FA=MS Store Return Period Frequency ractor (Years) 6 2 to 10 1.00 11 to 25 1.10 26 to 50 1.20 51 to 100 1.2 Notes The product of C times C, shall not exceed 1.00 0 No Text I City of Fort Collins Rainfall Intensity -Duration -Frequency Table for using the Rational Method (5 minutes — 30 minutes) Figure 3-1a �.--.�— ��mr�r��rrrr.......u..�rrrr...r.�•���r. ��.��rr�rrrree■■■■■■I�rlrre■■ll.���err ee�rrle�er ml��rr■cell■/■■■1 el�rrer■Ir /���■���� err r�rr mmmrlelr■ role■■■■1■rlrl rr rrlll■ er/e� mm ee�=e■ =mmmmmon=womanWHee■■erilmelrr■■e',■■rr/eeemeerl rralr�ral arl���rl�■■reeeeerll rl rl No am PH agr�I�mmee �e�e■��■���nete7elnl�■��rruel�r■rl mm mmmm■■el■Eemilli spill ■■WEMr,1111Vmmmm■ e�eele■�■■■■■eeeltlillll■■�■►�elr,le�e■��■ IMMMON ESPON Milli 11111wil Own IF 11 imcneOW■ ����■■■111111111111■■fir/11/111����■ ����■■■■111111111111■■Iilfl►.1111��0�■ ■■�����III1111111111�I,11�11111����� ■�����11111111111111►,11� IIIIII����S m��rr�rr�mrrrlllu■uurr..1=1Zr0.::: �rm��rr�r...rrrru...v..�rrr_sr eel/r�����arraeoun■n ��rr ■llu■re�e�■�el lr r�r■��aaereeer�raaar.eeor reaorrrreeeerrrrl■srre/ r�r■��eaa�■■aaaa',eeer,i��elerrraeeor�r���er m�mr�s��rmrrr .roe oorr..m.rr.um�mr—�� �r�rr�r�rrrrlre.■ u■.r�rrrrr....m�.��m.r m�r�rr��r■�rrrrrlll� o■u ��mr ee l.u�m��■�■r r�e�e���r�rreaee/■■n■I m mN o■■■■■ e�e■rrrlrm eeel �erel er���el ell.eee'r■eA■Il ale ■elHIM ■■■■eeryeel eel e�ese�������/re•neurer■�rreeune�e�e��� e�e�e�er��w,ru /neonl��rrer■■eeee�r���� �a mmm NNW A nm r.eer a loll r mmm rare It a a al�mmm e���■I■■■Ike'�e11111111■el��eelllle�e■�■■ ewe■��■I1��I.ee�1111111■el■■ee1111e�e■�■■ ��� /I/111111111■■■■��Illle���o■ ��■ • I11111111111■■■1111111����■ 1111111111111Noll 111111 WOMEN �! / �1111111111111�111111111����� Mosul 611111111111111111111111110111111 e�ee1l1���■■■��eelllllll■el■■ee1111e�ee1��■ ��II�II ■■■11/111111111■�■�Illlll���i■ �/.�/,0■■■�I1111111111■■■�111111����■ ■r������lllllllllllllnilllllll����� �►I �11111111111111111111111111����1 I 1 1 1 1 1 u I 1 1 I H DesicIn of Dry Extended Detention Basins for Water Quality Reference: Urban Storm Drainage Criteria Manual, Volume 3 - Best Management Practices, Urban Dramage and Flood Control District, September 1999. Project: 5panjer Office Building Location: Water Quality Pond A I ) Determine the Required Water Quality Storage Volume: 1.1) Determine Basin Imperviousness: 1.2) 1.3) Basin Parameters Basin Area (acres)— 0. 156 Basin Imperviousness (%)= 61 .5 Irroutary Areas Imperviousness Katio (i = la/100) = 0.615 Use a 40-hour detention time for extended detention basins; Determine the Water Quality Capture Volume (WQCV) from Figure EDB-2; WQCV= 0.241 watershed inches 1.4) Determine the Required Storage in ac-ft; Required Storage = (WQCV/I 2)'(Area)' 1 .2 Area = the tributary dramage area upstream of the water quality enhancement facility (ac) Required 5torage = 0.004 ac-ft = 163.85 cu-ft 2) Design the Outlet Works: 2.1) Outlet Type: Water Quality 5tructure Built Into Wall 2.2) Determine Depth at the Outlet: From the 5tage-5tora3e Table for Water Quality Pond, at 163.85 cu-ft; Elevation = 4956.90 ft Invert Elevation at Box = 4955.55 Depth at the Outlet (Dw, or H�xv, feet) = 4956.90 — 4955.55 = 1.35 2.3) From Figure ED15-3, Required Area per Row= 0.017 in' 2.4) From Figure 5: • Use 1/8" diameter holes drilled into 144" thick steel plate • 5pace holes at 4" O.C. vert. (4 rows high, I column wide) Total Outlet Area, A. = 0.05 in 3) Design the Trash Rack: 3.1) From Figure 7, open area needed, A, = 0.5 ' (RATIO) ' A, = 0.5 - 75.82 ' 0.05 = 2 in 3.2) From Table 6a-I, Wca,c.= 3" 3.3) From Figure 4, W,,ATE = 9" 3.4) From Table 6a-2: U5 Filter 5tainle55 Steel Well -Screen Trash Rack (or approved equal) 5creen #93 VEE with 0. 139" wire slot openings # 156 VEE support rods at 3/4" on -center spacing 3/8" x 1 .O" flat bar carbon steel frame 1 1] 11 1 11 1] 1 1 Desicln of Dry Extended Detention Basins for Water Quality Reference: Urban Storm Drainage Criteria Manual, Volume 3 - Best Management Practices, Urban Drainage and Flood Control District, September 1099. Project: 5panjer Office Building Location: Water Quality Pond B 1) Determine the Required Water Quality Storage Volume: 1.2) 1.3) Determine Basin Imperviousness: Basin Parameters Basin Area (acres)= 0.370 Basin Imperviousness (%)= 49.5 fributary Area's Imperviousness Ratio h = la/1001 = 0.495 Use a 40-hour detention time for extended detention basins; Determine the Water Quality Capture Volume (WQCV) from Figure EDB-2; WQCV= 0.205 watershed inches 1 .4) Determine the Required 5tora0e in ac-ft; Required Storage = (WQCV/I 2)'(Area)• 1 .2 Area = the tributary drainage area upstream of the water quality enhancement facility (ac) Required Storage = 0.008 ac-ft = 328.7E cu-ft 2) Design the Outlet Works: 2.1) Outlet Type: Water Quality Structure Built Into Wall 2.2) Determine Depth at the Outlet: From the 5tage-5torage Table for Water Quality Pond, at 328.7E cu-ft; Elevation = 4958.95 It Invert Elevation of Box = 4957.04 Depth at the Outlet (D . or Hwo v, feet) = 4958.95 — 4957.04 = 1.91 ft 2.3) From Figure ED13-3, Required Area per Row= 0.02 1 in' 2.4) From Figure 5: Use 5/32" diameter holes drilled into i/4" thick steel plate Space holes at 4" O.C. vert. (C rows high, 1 column wide) Total Outlet Area, A. = 0. 12 in 3) Design the Trash Rack: 3.1) From Figure 7, open area needed, A, = 0.5 ' (RATIO) ' Aa = 0.5 ' 75.52 " 0. 12 = 4 in 3.2) From Table Ga-I, Wco,.= 3" 3.3) From Figure 4, W AT, = 9" 3.4) From Table Ga-2: U5 Filter 5tamles5 Steel Well-5creen Trash Rack (or approved equal) 5creen #93 VEE with 0. 139" wire slot openings # 156 VEE support rods at 3/4" on -center spacing 3/8" x 1 .0" flat bar carbon steel frame 1 1 1 1 Water Quality Pond Volume Calculations Pond volume calculated using the prismoidal formuL b (A1+A2+ A1xA2)Depth 3 Pond A Area Within Contour Contour Contour Change in Elevation Elevation Interval Depth Storage Storage (ft) (sq. ft) (ft) (ft) (acre-ft) (acre-ft) 4955.55 0.00 0.0 0.000 0.45 11.647 4956.00 1 77.65 1 0.4 11.647 1 167.422 1 4957.00 1 277.76 1 1.4 179.069 Required Water Quality Capture Volume = 163.85 cu-ft WQCV Water Surface Elevation = 4956.90 ft* Pond B Area Within Contour Contour Contour Change in Elevation Elevation Interval Depth Storage Storage (ft) (sq. ft) (ft) (ft) (acre-ft) (acre-ft) 4957.04 0.00 0.0 0.000 0.96 68.449 4958.00 1 213.90 1.0 1 68.449 1 275.041 4959.00 1 341.10 2.0 1 343.490 Required Water Quality Capture Volume = 328.76 cu-ft WQCV Water Surface Elevation = 4958.95 ft* * numbers marked with an asterisk have been Interpolated from computed values 1 1 1 1 STRUCTURAL BEST MANAGEMENT PRACTICES DRAINAGE CRITERIA MANUAL (V. 3) WQGV'Q*(0-910-1.19I,-0.-18L) 0.45--....----.....------- - 0.40 --- n 0.35 Y4a m i 0.30 — 6-hr drain lirne a - 0.7 _ v 12-hr drain lime a = 0.9 7a0 - .e 24-hr drain lime a e 0.9 C 0.25 — 40-hr drain time a -1.0 0.20 0.15 - ---- 0.10 — --- - 0.05 le 00 0.00 S-42 Drain Time Delenrion and Porous Landscape Dolenlion 12-hour Dmin Time 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 Total Imperviousness Ratio (I e 1 .,1100) FIGURE EDB•2 Water Quality Capture Volume (WQCV), Bllla Percentile Runoff Event 9-1.99 Urban Drainage and Flood Control DisWd DRAINAGE CRITERIA MANUAL (V.3) 10 s.� 4! 2. ' 0.6 0.4 0.2 ' 0.1 ' 0.0 ' 0.0 0.02 0.01 0 STRUCTURAL BEST MANAGEMENT PRACTICES MOEN i q_. no 'j VAA 601 A I FF W, EXAMPLE: DWO = 4.6 It I EMtZA900 0 # WMAJIN WCCV = 2.1 acre-foot Row 1.75 In. j FJOA. FA i 40 In which, 9� MAN M ®r 0. 0 .0.60 1.0 2.0 4.0 6.0 Required Area per Row,a (in? ) FIGURE EDB-3 Water Quality Outlet Sizing: Dry Extended Detention Basin With a 40-Hour Drain Time of the Capture Volume I-1-99 Jrban Drainage and Flood Control District S-43 1 1 1 1 Orifice Plate Perforation Sizing Circular Perforation Sizing Chart may be applied to orifice plate or vertical pipe outlet. Hole Die (in) • Hole Die (in) Min. % (in) Area per Row (sq in) n=1 n=2 I n=3 1 4 0.250 1 0.05 0.10 0.15 5 16 0.313 2 0.08 ' 0.15 0.23 3 8 0.375 2 0.11 0.22 0.33 7/16 0.438 2. 0.15 0.30 0.45 1/2 0.500 2 0.20 0.39 0.59 9/16 0.563 3 0.25 0.50 0.75 5/8 0.625 3 0.31 0.61 0.92 11 16 0.688 3 0.37 0.74 1.11 3 4 0.750 3 0.44 0.88 1.33 13 16 0.813 3 0.52 1.04 1.56 7 8 0.875 3 0.60 1.90 1.80 15 16 0.938 3 0.69 1.38 2.07 1 1.000 4 0.79 1.57 2.36 1 1 16 1.063 4 0.89 1.77 2.66 1 1 e 1.125 4 0.99 1.99 2.98 1 3 16 1.188 4 1.11 2.22 3.32 1 1 4 1.250 4 1.23 2.45 1 3.68 1 5 16 1.313 4 1.35 2.71 1 4.06 1 3 8 1.375 4 1.48 2.97 4.45 1 7 16 1.438 4 1.62 3.25 4.87 1 1 2 1.500 4 1.77 3.53 5.30 1 9 16 1.563 4 1.92 3.83 5.75 1 5 8 1.625 4 2.07 4.15 6.22 1 11 16 1.688 4 2.24 4.47 6.71 1 3 4 1.750 4 2.41 4.81 7.22 1 13 16 1.813 4 2.58 5.16 7.74 1 7 8 1.875 4 2.76 5.52 8.28 1 15 16 1.938 4 2.95 5.90 8.84 2 2.000 4 3.14 6.28 9.42 n = Number of columns of perforations Minimum steel plate thickness _ 1/4 5/i6 ' 3/e • Designer may interpolate to the nearest 32nd inch to better match the required area. if desired. Rectangular Perforation Sizing Only one column of rectangular perforations allowed. Rectangular Height = 2 inches Rectangular Width (inches) = Required Area per Row (sq in) 2" Urban Drainage and Flood Control District Drainage Criteria Manual (V.3) Re: Det.h.dng Rectangular Hole Width Min. Steel Thickness 5" 1 4 6" 1 4 7" 5/32 " 8" 5/16 " 9" 11/32 " loll 3/8 " >10" 1/2 „ Figure 5 WQCV Outlet Orifice PerforationSizing I Note: Vertical WQCV Trash Racks are shown in Figures 6, 6—a, and 6—b for suggested standardized ' outlet design. Adverse —Slope Trash Rack design may be used for non —standardized designs, but must meet minimum design criteria. Structural Steel Channel Formed Into Concrete. We, See Figures 6—a, 6—bA F A—"7 Stainless Steel Bolts or Intermittant Welds, See Figures 6—a, 6—b H Varies 2'-0" to 6'-0* B 2'-4• (minimum) � I A WQCV Trash Racks: Elevation 1. Well —screen trash racks shall be stainless steel and shall be attached by intermittant welds along the edge of the mounting frame. 2. Bar grate trash racks shall be aluminum and shall be bolted using stainless steel hardware. 3. Trash Rack widths are for specified trash rack material. Finer well —screen or mesh size than specified is acceptable, however, trash rack dimensions need to be adjusted for materials having a different open crea/gross area ratio (R value) ' 4. Structural design of trash rack shall be based on full hydrostatic head with zero head downstream of the rack. Overflow Trash Racks: ' 1. All trash. racks shall be mounted using stainless steel hardware and provided with hinged and lockable or boltable access panels. ' 2. Trash racks shall be stainless steel, aluminum, or steel. Steel trash racks shall be hot dip galvanized and may be hot powder painted after galvanizing. 3. Trash Racks shall be designed such that the diagonal dimension of each opening is smaller than the diameter of the outlet pipe. 4 Structural design of trash rack shall be based on full hydrostatic head with zero head downstream of the rack. Urban Drainage and Figure 6 Flood Control District Suggested WQCV Outlet Standardized Drainage Criteria Manual (V.3) Trash Rack Design No Text I 1 1 1 1 [1 1 Table 6a-1: Standardized WQCV Outlet Design Using 2" Diameter Circular Openings. Minimum Width (W ,o,,.) of Concrete Opening for a Well -Screen -Type Trash Rack. See Figure 6-a for Explanation of Terms. Maximum Dia. Width of Trash Rack O emn o�<. Per Column of Holes as a Function of Water Depth H of Circular Opening (inches) H=2.0' H=3.0' H=4.0' H=5.0' H=6.0' Maximum Number of Columns < 0.25 3 in. 3 in. 3 in. 3 in. 3 in. 14 < 0.50 3 in. 3 in. 3 in. 3 in. 3 in. 14 < 0.75 3 in. 6 in. 6 in. 6 in. 6 in. 7 < 1.00 6 in. 9 in. 9 in. 9 in. 9 in. 4 < 1.25 9 in. 12 in. 12 in. 12 in. 15 in. 2 < 1.50 12 in. 15 n. 18 in. 18 m. 18 in. 2 < 1.75 18 in. 21 in. 21 in. 24 in. 24 in. 1 21 in. 24 in. 27 in. 30 in. 30 in. 1 Table 6a-2: Standardized WQCV Outlet Design Using 2" Diameter Circular Openings. US FilterTM Stainless Steel Well -Screen' (or equal) Trash Rack Design Specifications. Max. Width of Opening Screen #93 VEE Wire Slot Opening Support Rod Type Support Rod, On -Center, Spacing Total Screen Thickness Carbon Steel Frame Type 9" 0.139 #156 VEE '/4" 0.31' /; k1.0"flat bar 18" 0.139 TE .074x.50" 1" 0.655 '/4"x 1.0 angle 24" 0.139 TE.074"x.75" 1" 1.03" 1.0"x 1Y2'an le 27" 0.139 TE.074"x.75" 1" 1.03" 1.0"x 1'/,"an le 30" 0.139 7E.074"A.0" 1" 1.155" 1'/4`kIVY'an le 36 0.139 T0 " 1.155" 1'/4`k1Yn"an le 42 U 0.139 TE .105"xl.0' 1" 1.155" 1 '/4`k 1 Y2"angle S Ftlter, at. Paul, Minnesota, USA DESIGN EXAMPLF: Given: A WQCV outlet with three columns of 5/8 inch (0.625 in) diameter openings. Water Depth H above the lowest opening of 3.5 feet. Find: The dimensions for a well screen trash rack within the mounting frame. Solution: From Table 6a-1 with an outlet opening diameter of 0.75 inches (i.e., rounded up from 5/8 inch actual diameter of the opening) and the Water Depth H = 4 feet (i.e., rounded up from 3.5 feet). The minimum width for each column of openings is 6 inches. Thus, the total width is W ,o,-= 36 = 18 inches. The total height, after adding the 2 feet below the lowest row of openings, and subtracting 2 inches for the flange of the top support channel, is 64 inches. Thus, ' Trash rack dimensions within the mounting frame = 18 inches wide x 64 inches high From Table 6a-2 select the ordering specifications for an 18", or less, wide opening trash rack using US ' Filter (or equal) stainless steel well -screen with #93 VEE wire, 0.139"openings between wires, TE .074" x .50" support rods on 1.0" on -center spacing, total rack thickness of 0.655" and x 1.0" welded carbon steel frame. Table 6a I 1 Orifice Perforation Details A--QF--] Structural Steel Channel Formed Into Concrete, To Span Width Of Structure. See Figures 6-o, 6-b of o_lo O 01 0 100 4' B WPlote = Wcona. + 6 inches (minimum) (see below) HT Permanent Water Surface Circular Openings: Wcanc.Obtained From Table 6a-1 ' Rectangular Openings: Wcanc. = (Width of Rectangular Perforation W) + 12" Rectangular Openings: Wopening (see Figure 6-b) Obtained From Table 6b-1 Sc, see Sa, see t figure 5 Figure 5 W 0 0 0 0 0 0 0 0 0R o O O O O 000 0 0 0 0 000O 000o0 0 0 000 ' 0 0 0 ff.000 0 0 0 0 0 0 0 o o 0 0 O 0 O O 0 0 0 0 0 o ' Example Perforation Patterns I Note: The goal in designing the outlet is to minimize the number of columns of perforations that will drain the WQCV in the desired time. Do not, however, increase the diameter of circular perforations or the height of the rectangular perforations beyond 2 inches. Use the allowed perforation shapes and configurations shown above along with Figure 5 to determine the pattern that provides an area per row closest to that required without exceeding it. Urban Drainage and Flood Control District Drainage Criteria Manual (M) nle: aet.RsA.g Figure 4 Orifice Details for Draining WQCV 1 � ƒ , ® � � S 4 J � � � 222E � ! ƒ # � / � ] / � Y § § f � � � 222E � ! ƒ # � / � ] / � Y § § f ! ƒ # � / � ] / � Y § § f I I k I I t ----------------------------------------------------------------------------- UDINLET: INLET HYDARULICS AND SIZING ' DEVELOPED BY DR. JAMES GUO, CIVIL ENG DEPT. U OF COLORADO AT DENVER SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD ------------------------------------------------------------------------------ tSER:Northern Engineering Services -Ft Collins Colorado ....................... N DATE 01-25-1999 AT TIME 11:40:51 ** PROJECT TITLE: CAMERON LOT 7 *** CURB OPENING INLET HYDRAULICS AND SIZING: ' INLET ID NUMBER: 5 1_] 1 11 1 1 INLET HYDRAULICS: IN A SUMP. GIVEN INLET DESIGN INFORMATION: GIVEN CURB OPENING LENGTH (ft)= HEIGHT OF CURB OPENING (in)= INCLINED THROAT ANGLE (degree)= LATERAL WIDTH OF DEPRESSION (ft)= SUMP DEPTH (ft)= Note: The sump depth is additional STREET GEOMETRIES: STREET LONGITUDINAL STREET CROSS SLOPE STREET MANNING N GUTTER DEPRESSION GUTTER WIDTH 2.00 6.00 0.00 2.00 0.23 depth to flow depth. SLOPE (.) = 1.00 (.) = 2.00 = 0.016 (inch)= 1.00 (ft) = 1.00 STREET FLOW HYDRAULICS: WATER SPREAD ON STREET (ft) = 9.03 GUTTER FLOW DEPTH (ft) = 0.26 FLOW VELOCITY ON STREET (fps)= 2.49 FLOW CROSS SECTION AREA (sq ft)= 0.89 GRATE CLOGGING FACTOR (s)= 50.00 CURB OPENNING CLOGGING FACTOR(.)= 20.00 INLET INTERCEPTION CAPACITY: IDEAL INTERCEPTION CAPACITY (CfS)= 4.47 BY FAA HEC-12 METHOD: DESIGN FLOW (cfs)= 2.20 FLOW INTERCEPTED (cfs)= 2.20 CARRY-OVER FLOW (CfS)= 0.00 BY DENVER UDFCD METHOD: DESIGN FLOW (cfs)= 2.20 FLOW INTERCEPTED .(CfS)= 2.20 CARRY-OVER FLOW (cfs)= 0.00 I too M M oo N �D a\ a -"-a, N d M. 00 r d Q M N b � d O M �D r r h D\ 00 d r vi Q• .. O d d o0 W �O d o0 .. N N O o0 �D d eNtl a p U O N N N N N N N N N N N N N N N N N N N N N N N N N N N N N d d d d d d d O d d It It It It ItIt It d d o r��c���r�rrrc�rc��rr�rrrrr�r��r� A o RX �h��hr�����hhhhv nv nv nnnvvnnvv It It It d d d It d It d d d d d d d It It d It d It d It It It It It It N N N N N N N N N N N N N N N N N N N N N N N N N N N N N a � C 5f U ati+ vi aD a\ O N N O O o0 00 V O 3 ; ^y� -% N N fV fJ tJ M Ni t�i t�i to d d d d a yV M ^0 C� a M .r. r Cl! a en OC? el? "� 3 e�iht�l�00000:o ---------^ q P43 �^, ......�� 6,6 s a z W M M M M M M M M M M M M M M M M M M M M M M M M M M M M M C d d d d d d d d d d d d d d d d d d d d d d d d d d d d d n v � a w O_ a Q Q O �n O O O O O O O O O 00 tD d N D\ M O oo d N O` b d N 0 0 0 On Do ao mao Qo 00 oD o000 r rrr nd V It v It It0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U a 1 ' RESIDENTIAL W/ 6" VERTICAL- 100 YEAR ' Worksheet for Irregular Channel Project Description ' Project File c:\drainage\haestadlfmw\street c.fm2 Worksheet RESIDENTIAL LOCAL W/ 6" VERTICAL Flow Element Irregular Channel ' Method Manning's Formula Solve For Discharge 1 Input Data Channel Slope 0.004000 ft/ft ' Water Surface Elevation 100.50 ft Elevation range: 99.57 ft to 100.50 ft. Station (ft) Elevation (ft) Start Station End Station Roughness ' 0.00 100.50 0.00 15.50 0.016 0.00 100.00 15.50 21.00 0.035 13.00 99.74 21.00 25.50 0.016 ' 15.00 99.57 25.50 37.00 0.035 15.00 100.07 15.50 100.07 ' 21.00 100.18 25.50 100.27 37.00 100.50 Results Wtd. Mannings Coefficient 0.025 ' Discharge 28.93 cfs Flow Area 14.72 ft' Wetted Perimeter 38.01 ft ' Top Width 37.00 ft Height 0.93 ft Critical Depth 100.33 ft ' Critical Slope 0.010940 ft/ft Velocity 1.97 fus Velocity Head 0.06 ft ' Specific Energy 100.56 ft Froude Number 0.55 ' Flow is subcritical. 01/25/99 FlowMaster v5.13 04:39:57 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 H I 1 1 1 1 C I 1 1 L I I I I I I I 1 1 1 1 1 1 RAINFALL PERFORMANCE STANDARD EVALUATION 5TANDARD FORM A PROJECT: 5panjer Office Building MAJOR BASIN: All Areas CALCULATED BY: KJW TOTAL BA51N AREA (Ab) : 0.807 acres DATE: December 21, 2001 DEVELOPED 5UB-BASIN -ERODIBIL11Y ZONE Aeb (acres) Lsb (ft). {46 x 4y' 51b (`%) .. A; x 5,6'; Lb .5y P5 DI MODERATE 0.066 114.8 7.6 3.43 0.23 D2 MODERATE 0.150 173.8 26.1 3.51 0,53 D3 MODERATE 0.006 35.5 0.2 5.92 0.03 D4 MODERATE 0.012 25.6 0.3 3.00 0.04 D5 MODERATE 0.370 211.2 78.2 3.96 1.47 DG MODERATE 0.003 1 4.7 1 0.0 1 10.00 0.03 D7 MODERATE 0.200 1 142.8 1 28.5 9.53 1.90 TOTAL .: ` 0.807 1, 141.0 ' , : 4.22 . 175, .5.23 77.5 I(Lb X Lb _ / Lb A b PS (during construction) = 77.5 (From Table 5.1) PS (after construction) = 91.2 _ (Ssb X Lb Sb A 6 1 1 1 1 EFFECTIVENE55 CALCULATIONS STANnAzn FnenA R PROJECT: Span)er Office Building MAJOR BASIN: All Areas CALCULATED BY: K1W TOTAL BASIN AREA (Ab) : 0.807 acres DATE: December 21. 2001 CONSTRUCTION PROCESS: Dunn . ..":'. C-FACTOR P-FACTOR.. .' EROSION CONTROL METHOD VALUE VALUE .'--,.COMMENT- - Sediment Basin /Trap 1.00 0.50 at north curb opening of Fronta a Rd entrance Straw Bale Barrier 1.00 0.80 on north side of WOCV Pond A Gravel Inlet Filter 1.00 0.80 not aPplicable Asphalt / Concrete Pavement 0.01 1.00 all roads, Parking lots, walks, etc. Erosion Control Mats / Blankets 0.10 1.00 not applicable Silt Fence Barrier 1.00 0.50 alonq Property boundary Temporary Vegetation / Cover CroFs 0.45 I AO not a Iic—ble Sod Grass 0.01 I .00 not a livable May or Straw Dry Mulch (From Table 5.2) 0.17 1.00 1 not applicable -:MAJOR PS AREA.. ,• �CALCULATIONS' BASIN.— .. (%) .. � .SUB-BA51N• �.� .(acres) . PLAN INTENT: see Sheet 4 of 8 entitled 'Grading'EErosion Control All Areas 77.5 0.807 Plan' from the set: Utility Plans for Spa�er Qffic& Buildine Roads: Impervious 0.425 Walks: all pervious areas have been grouped together Parking: Pervious 0.382 Dry Mulch: not applicable Sod Grass: C„ , = 0.01 Pe = 0.20 EFF = 99.97. aV.Vio � 11.070, tnererore. the during construction erosion control measures ARE effective EQUATIONS: C...r— Ab P1e=PIXP=xPI... EFF=[I—(CxP)]xIO0 ' 1 1 t 1 1 1 1 1 1 1 EFFECTIVENESS CALCULATION5 STANDARD FORM B PROJECT: Spanjer Office Building MAJOR BASIN: All Areas CALCULATED BY: KJW TOTAL BASIN AREA (A,) : 0.807 acres DATE: December 21, 2001 CONSTRUCTION PROCESS: After C-FACTOR P-FACTOR ",ERO51014 CONTROL METHOD VALUE -.: VALUE . COMMENT Asphalt/ Concrete Pavement 0.01 1.00 all roads, parkinq lots, walks, etc. Established Native Grasses (Figure 5.1) 0.34 1.00 not applicable Sod Grass 0.01 1.00 all on -site landscapinzj MAJOR. P5 -.-. .AREA - BA51N. (t) 5UB-BA5IN '(acres) CALCULATIONS '.�. PLAN INTENT: see Sheet 4 of 8 entitled 'Grading 6 Erosion Control All Areas 91.2 0.807 Plan' from the set: Utility Plans for 5pa�er Office Buddma Roads: Impervious 0.425 Walks: all pervious areas have been grouped together . Parlang: Pervious 0.382 Native Grass: none Sod Grass: on -site landscaping Cut = 0.01 P , = 1.00 EFF = 99.0% therefore, the after construction erosion control measures ARE effective ' EQUATIONS: �(A xC� � A P..=P, xP2 xP,... EFF=[1—(CxP)x100] 1 6 1 1 1 1 1 (b 20 o ; § \ \ % e > (b / § \ !®22\n e=3 z ~ \< ��\ 0#§ / �(° ®5 \}k { 22 ® 0 ( o 70 S \ } \ �)\\ / \\\ < \ /o \ j . / 2\S 9 QL 7 \ rTl� � / N) 7 " 2 \ % * DR. \ -S e°en°c ° \ \ / / m & r §_ \ o--\ ®W3 7/ Cb t = / ; 2 LZ ( 77 } \ 1!0U 4 R ; + >[ \ / i00000 \k \ \ \f\\\0(b j \ \§\\\\ COLLEGE AVENI J� L _ _ _ _ _ i i I - GE ROAD m _ T + t - A mN�NC MIIDA s. FRONTAGE _ I -1FOF VIIIM1 495�6 MIL11T -0.i5e Das-�j 15.50, _ - -__- -(� ' _ _ _-�,___T ______ ____ _____aim ------ - IFNI _ - - _ - _ _ x 11 .. - RID Dun orcx9'm¢"'"E F-- FIRM L 9R N�E D NL ANT ' � ' : I. ORB .+ m cew a .� �Twn rwuxEm _ i a ,J 3 DREW xC sN •�Ww '�1^'•_'••-/'��� s' UOLm u3UAExM1-+ 3' cola 3 D9 ` S/ ell mxc I Li DREwM SYNP IF PNMP I a + 01O UTILITY FASEMCUTILITY To MV SO 0 L_ (m OVHal RI a I ` C l .QN / A. NIDS a_� l Coll / 3 C90sE 1, BRANIFF / I A &o,, H-2 I�oil - Dv a I - I I III NOVI Dmz O �I I i � I I e 1 y 0.12 R - wOcv POND 6 lQL. 32e0 Cu-Fy 895/ m A.. O.00J G / 3013 / oL r ♦ A REE NEX 6 WIFO ♦ IW W00 SEE CCOJ SML6 m IF ♦ IF EWA 20 o 20 0 Eo FBI IN FEET) 1 MIFF - 70 .:. DEVELOPED RUNOFF TABLE CALL UTILITY NOTIFICATION CENTER OFFCOOLORADOO 1-800-022'=7 OR Cq4-B%W IOENATIR CALL 2 BUSINESS M+5 IN ADVANCE amRE YOU DO. wtt. ON EXCAVATE OR THE MMENEEIIR UNUIECERGROuxD rI0>1 bIr 9Ase QUID (ON ovo PO on ovIR1AmN ANSI Ooul 1 Di 0.066 0.3 OJ 091 TO FRDNTACE ROW 1 D1. 02, D3 0.222 0.8 19 079 TO FACNIAGE BOW 2 Dz 0.123 0.4 1.1 0.71 To FBI POND AN FRENNI ROAD 2 D2. D3 OASIS 0.5 1.2 0.23 TO WCCV BONG A. ITHONTAGE ROAD 3 W 0010 0.05 0.1 0.95 SUMP PUMP TO WOF POND A 4 D4 0.012 0.01 E02 0.15 OrPSITE 5 D5 0.370 0.7 19 0.54 TO WOLY Po 0. CONTAINER IXthE 6 D6 0.003 0.00 0.01 0.15 OBI 7 W M200 0.4 1.0 0.49 TO CAMETR N DRIVE W D] 090 1.1 2.8 0.52 W CAMERON DMUE e OR 6.024 O92 O.W .015 TO WOCV RIND AF FRONTAGE ROW H-1 0.12 DA1 0.24 0.20 HISTORIC H-z 0.33 6.25 0.52 0.20 HISTORIC 60 DRNWGE MOMENT-7 SEE SHEET 10/10 OFFSITE DRAINAGE PLAN FOR FOSSIL CREEK OFFICE PARK EAST by Stewart 8 Assoclates PLAN *03 1677 ( EXISRUG GI sw.vE 9 17X E q I C0N8TRUCTI0N SEQUENCE SEQUENCE fM 2002 CONPLETO BY UJD W1E: AM 3002 IMF W1M w9E N OE< Nrz9 UPRNUC ON WERCOT GRADING WOMEN p.wRRa. fi [STINCEM ��.. CM�IAYL _OF mmm 4GUO = D'S' SUR KNOWN, WO POND SLINIFIARY TABLE PCYO CFYR V! 1mOePM O PROOFV rEG11R® tlIY WOCV POND A 163.9 CU- 4956.90 1.25 CBS 49 .55 WOCV POND B 132&8 OUl,FTI 4956.95 199 C 49 .04 III III u 1W�WY � mNr Nx. �MMA SUFFER, KID E- DECrt6 FARM G- SUFF ; ARB IN Aoo Qcan rem e SRAE SECTKIx rv4ft FORT GOWNS/LDVELAND WATER DISTRICT SOUTH FORT COLLINS SANITATION DISTRICT UTILITY PLAN APPROVAL m City of Fort Collins, Colorado UTILITY PLAN APPROVAL VR01D: rt1l��� CHECKED Bt:-TaTe-r,r r CHECKED BI:�� r CHECKED BYE No DRUM CHECKED CHECKED BY 8Mt