HomeMy WebLinkAboutDrainage Reports - 07/02/2018 (2)North Star design 700 Automation Drive, Unit I Windsor, CO s0550. Phone: 970-686-6939 Fax: 970-686-11H April 30, 2018 Heather McDowell City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522-0580 City of Fort Coll ns Approved Plans ee "Mimed by. Date: 13E; Drainage Addendum to the "Final Drainage Report for the Seventh Filing of the Centre for Advanced Technology" 700 Centre Avenue Dear Heather, I am pleased to submit this drainage addendum in conjunction with the minor amendment for this site for your review and approval. This drainage addendum serves to summarize the drainage design of the Summitstone Health Partner project. This letter will detail the effect of the proposed improvements for the site and show that the site complies with the drainage concepts and designs presented in the.previous studies for this site. This addendum has been prepared in conformance with the Fort Collins Stormwater Criteria Manual with exceptions made for the circumstance that this project is being processed as a minor amendment. I certify that this report for the drainage design was prepared 'in accordance with the Master Plan and the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Patricia Kroetch, P.E The Summitstone Health Partners project is a Minor Amendment to the Centre for Advanced Technology Seventh Filing which was designed and detailed in the plans and report completed by RBD Engineering Consultants dated August51 1988. This site -is located on Tract of that original plat. In the time since those plans were approved, changes have been made to the site design on Tracts A and C which have been detailed in multiple plan sets and drainage reports and addendums most notably, Amended Master Drainage Plan for the Centre for Advanced Technology (dated February 1987), The Centre Avenue Residences (A replat of Tracts A and C) by Northern Engineering dated October 13, 2009, The Arrowhead Cottages (a replat of Centre Avenue Residences) by Northern Engineering dated August 2016, and The Centre for Advanced Technology Fourteenth Filing. The drainage plan for this proposed project will conform to these previously approved reports. Historically, the majority of the site sheet flowed north and west to an existing detention pond located in the northwest portion of the site. The proposed site will follow similar drainage.patterns as the historical drainage patterns. The majority of the site basins will be collected in the parking lot and routed to the detention pond via pans and curb openings or direct discharge into the detention pond as has historically occurred. A summary of the onsite basins continue below. Basin A is the east half of the existing parking lot. This basin is being modified slightly as 3 additional parking stalls are being added in the northeast comer of the parking lot. The runoff will flow to a 2' curb opening as it has historically done and enter the detention pond. Basin B is the west half of the existingparking lot. This basin is being modified slightly as the loading area is being removed from the northwest portion of the parking lot. The runoff will be 1 collected in a 4' concrete pan and flow north to a 2' curb opening and enter the detention pond as it has historically done. Basin C is the west most portion of the site which includes all of the existing building on site and the proposed building addition. The flow patterns for this basin are around the west side of the ' building and flowing north into the detention pond. This drainage pattern will be maintained with the roof runoff from the proposed addition being collected in underground pipes and conveyed to the detention pond. Basin D is the undeveloped area of the site that contains the New Mercer Ditch. Runoff from this basin enters the New Mercer Ditch and does not enter the detention pond. No changes to this basin are proposed. Stomiwater detention is provided by an existing detention facility constructed with the Seventh Filing of the Centre for Advanced Technology and certified with the Final Drainage and Erosion Control Report for Centre Avenue Residences. This pond is shared with the Arrowhead Cottages site which is adjacent to the west of this site and the CAT Filing 14 site which is northwest of the Arrowhead Cottages. The original design for this pond included a total area of 7.81 acres which includes Basins D2, D3 and Worthington Circle with all basins having a minor C-value of 0.71 and a major (100 year) C-value of 0.89 (0.71*1.25). The revision to the drainage report included with the Arrowhead Cottages development shows a composite minor C-value of 0.51 and a major C-value of 0.72. The Summitstone site has an existing minor C-value of 0.62 and a major C-value of 0.77. The proposed site will have an increase of 1,753 square feet of imperviousness which will increase the imperviousness from 48% to 50%. These values were used to compile revised composite C-values for the 7.81 acres (Basins D2 and D3) contributing to the detention pond. The revised composite values for the 7.81 acres area 44.4% impervious and a.major c-value of 0.72. These values were then used to recalculate the required water quality capture volume and the detention volume for the pond. The water quality increases from 0.147 to 0.150 acre feet and the detention volume remains the same at 1.44 acre feet which are negligible changes in the required volume for this pond. For this reason, no increase to the existing detention pond sizing is proposed. The proposed construction will disturb approximately 8,840 square feet which is below the threshold of 10,000 square feet at which.additional erosion control design is required. The detention pond will be modified to accommodate the building addition as a portion of this addition encroaches on the existing detention pond. In order to minimize the impact of this encroachment, a small landscape wall is being proposed along the portion of the building that is adjacent to the pond.. The pond will also be expanded in two small areas in order to compensate for the storage volume that is being removed for the building addition. It is anticipated that the pond volume will remain at 1.44 acre feet at an elevation of 5046.35 NAVD 88 (elevation 504335 NGVD 29) as was determined in the Arrowhead Cottages drainage report. Calculations are included at the end of this letter that show the impact of the increased imperviousness and the modification of the existing pond. In summary, the impact of the proposed building expansion and modifications to the site will have very minor impacts and the pond has been modified to accommodate the encroachments. In conclusion, this. addendum has been prepared. in accordance with the Fort Collins Stormwater Criteria Manual and conforms to design completed with previous utility plans and drainage reports. APPENDIX A PROJEC LOCATIO VICINITY MAP M ►1 HYDROLOGY CALCULATIONS k J $ } z ): � ))LU :a § \\ LL 2 z ; ,A )k . ±k /\\} )`o J0 3{ / \E :( %\ ¥;» k« - ([&� k§ /c jucl )J {)\ \(£ �!m m :3 f§2§§§ §§ DO- ®{ §K227! j} I (k{ \ 0w k\°`)° / \ ql ! ;e »§ w 0 }}\;) & ±/ (§0 !f§S!§ !2 }} § )«mo=lu Yl o w � I:2 /t§2 ! \\\} ? \ ! 16 _ #_! { | (§£ ff$\&\ \* /\ k° } Fv L II Z3 Y z Sa°°a o�az �0 0.0 J C V M S C fp ..Vi LL O N q E� In Cr? a N m O w S N u f.7 +• Y 1'.IS C.N IOVh�. J LL z E� N C'i z Q th N -- O St •emoo W:Z .- F J W L ¢i C. <NMN g2-ez 0000 N N N y� Lu v ~ J F U O IQ N t0 cq 1l O N 0 0 0 0 0 0 !0 - m� N O N O h t0 N � m O •O C• N Q p 0 Z N y m Q W o¢ m U 0 Qa co¢ N T z y ¢ m U ❑ Oa J O Y 0 ao F LL Q O � H Z. c W � U m Z o U LL. O W f H Y C Q a a a C K ; H H F f J QD c 'E�p OOOaO 2.. j6j q N LL O Z t N W 1�Wy Ij Z V a r� m N V N N N O 3 II t0 pl N (O G uy� n ritOn J W C' 2 O d' th N O rn E t o m o 0 w C k = @ 0 S � o c; 0 0 0 06 U' W yn N O W U J c n N g N L J F F rj �rorin r r o m r n Z U oo.- o 00 () (7 O f0 N t0 O m r r O (O h N N .-. � N O 1t) O 1!) t0 N {7 WO N ym a ~ 0 v N 2 Z N w5 m Q W Q Q m U 0 N ZF � Z Oa L t a a 5 C o � E. c rev o E ooY� •- VI ran 4 C II � y z 0— N zza U "0 F 0 nY 0 O rc ¢ g d O m O u O a3i Z K Hlo-HH J a s IA Q F O U 0 fO 0 l7 0 t7 0 Q O O Ti �Em� Lgm(' oa aa} N N N t7 O O N C CV Cl � U C_ O V 0 E N_ IG�N LL O K U O t0 N w N Or r 0 wN h F U o G C o G o W R' 0¢ V O � O h f0 N 1n t7 O f0 O� N m �yy-000O q � N O y ¢ Q m 6 61 U 0 d a A� Y K W Ix C c C d Sa°a� 'm v v O z OOZ 1�-HH H o 0 � U fV l7 Cl G r a w U oa t U m.o oa 0 N f7 (V C a t — � r N r N Q of m O O> A N H U. C O O O D �E W LL Z K _ U r r o m r n oo�000 VU C o U o w 00 Q N l0 O N c N y o QO)UO J J Q J Q 0 0 APPENDIX C DETENTION POND MODIFICATIONS MODIFIED DETENTION VOLUME REQUIRED FAA METHOD (BASINS D2& D3,100-YEAR) LOCATION: Summitstone Health Partners PROJECT NO: 378-01 COMPUTATIONS', BY: PPK SUBMITTED BY: North Star Design, Inc. DATE: 4/30/2018 Equations_: A trib. To pond = 7.81 acre Qo = CiA CIDO = 0.72 "* see below V; = T"CIA = T*Qn Developed C*A = 5 :6 acre V. =K*QPo*T QPo = 1.4 cfs S=V; -Vo K= 1 (from fig 2.1) Rainfall intensity from City of Fort Collins IDF Curve Storm Duration, T (min) Rainfall Intensity, i (in/hr) Qn (cfs) Vol. In Vi (ft) Vol. Out -- V. (f f') Storage S (4) Storage - S (ac-ft) 5. 9.95 56.0 16785 -420 -16365 0.376 10 7.72 434 26047 840 25207 0.579 20 5.60 31.5 37788 1680 36108 0.829 30 4.52 25.4 .45750- 2520. 43230 0.992 40--_-.. _ .-3.74 .21.0 50474 3360 47114 1.082 50 3.23 18.2 54489 4200 50289 1.154 60 2.86 16.1 57896 5046 52856 1.213 70 2.62 _ _ _ ._ 14.7_ -_ __ - - . 61878 5880, 55998 1.286 80 2.38 13A 64239. __6720-- - -57519 1.320 90 2.22 12.5 67411 7560 59851 1.374 100 2.05 11.5 69165 8400 _ _ ._ 60765_ _ 1395 110__-__ _ _-1.93 - _ _ 10.9. 71628 9240 62388 1.432 120 1.80 10.1- 72877 10080 62797 1.442 130 1.60 9.0 70178 10920 59258 1.360 140 1.40 7.9 66129 11760 54369 1.248 150 1.20 6.7 60731 12600 48131 1.105 160 1.15 6.5 62080 13440 48640 L117 170 1.10 62 63092 14280 48812 1.121 180 1.05 5.9 63767 15120_ _ _ 48647 _ 1.117__ Required Storage Volume: 62797 f? 1A42 acre-ft * * (1.5 acres at 0.77 + 6.31 acres at 0.71) / 7.81 acre: = 0.72 cc / - - q 2m [. % ) CD CY 9 _ - co\\Y / ®` CO) & ) 4'f cn )}�\\ m z -v � � W E ( E = f. .\ 0-6 \ >ca Z \ E(/ ._ ; w/)° A § . \)f { w f CD L e E uay 0/3\�z 5x LL Lo > )Ir Icy G o \ a ° { # c;§ \�� CO ®£\ \ _ J)2 t f (\ \k 1 ' STAGE -. STORAGE TABLE (100-YEAR) LOCATION: Summitstone Health Partners PROJECT NO: 378-01 'CALCS BY: PPK SUBMITTED BY: North Star Design, Inc. DATE: 4/20/2018 EXISTING POND WQC Volume Required= 0.147 100 yr Detention Volume Required = 1.446 (On NGVD 1929 datum) Stage (ft) Surface Area (ft) Incremental Storage (ac-ft) Total Storage (ac-ft) 5039.20 645.33 _ _ 5039.40 2450.42 0.007 -0'.007 5039.60 5291.24 0.017 0.024 5039.80 7639.85, _ 0.030 _ 0.054 _ 5040.00 9359.05, 0:039 0.093 5040.20 10856.29 -0.046 0.139 5040.23 11008.61 0.608 0.147 5040.40. 11808.30 0.052 0.191 5040.60 12559.23 0.056 0.247 5040.80 13148.15 0.059 0.306 5041.00 14013.52 0.062 0.368_ 5041.20 14680.01 0.066 0.434 5041.40 15433.82 - 0.069 0.503 5041.60 16171.07 0.073 0.576 5041.80 17156.13_. _ 0.076.-. _ 0.652 5042.00 18654.88 0:082 0.734 5042.20 20134.80 0.089 0.823 5042.4.0 21217.82 0.095 0.918 5042.60 22292.83 --0:100K1.445 5042.80 23490.37 _ 0_105_ _5043.00 24775:61 0.1115043.20 26171.89 0.117 5043.35 27239.15 0.0945043.40 27557.94 0.123 -=WQCV 100 yr HWEL MODIFIED POND WQC Volume Required= 0.149 100 yr Detention Volume Required = 1.442 (On NAVD 1988 datum) To convert from 1929 datum_ add 3.19' Stage (ft) Surface Area (ftZ) ldcremefiti Storage _ (ac-ft)_ --Tota1 Storage _ .(ao-ft) 5042.38 . - 645.33 5042.58 2450.42 0.007 0.007 5042.78 5291.24 0.017 0.024 5042.98. 7639.85 0.030 0:054 5043a-18 9359105 0.039 0.093 -5043.38 10856.29 0.046 0.139 5043.42 11046.69_ - 0.010 0.149 5043.58 11808.30 0.052 0.191 5043.78 12559.23 0.056 0.247 5043.98 13148.15 0.059 0.306_ _ 5044.18 14013.52 0.062 0.368 5044.38 14680.01 0.066 0.434 5044.58 15433.82 0.069 0.503 5044.78 _ 16171.07 0.073 0.576 5044.98 17156.13 0.076 0.652 5045.18 18654.88 0.082 0.734 504538 20134.80 0.089 0.823 5045.58 21217,82 0.095 0.918 5045.78 22292.83 0.100 1.018 5045 98 :.. 23703.95 ;; 0406 = .. 1.124- 5046 18. -:. 24861.31':' : _. 0.111 "" 5046 38! "; 26018.68 : G 0 117 2:5046.53 26909:85 0.094 ' :" :;1:446 .504658.'<2717604_i . 0122__ :_. 1474 Modified values, (dueto.ret wall),have been shaded c=WQCV =100 yr HWE Final Drainage and Erosion Control Report for Centre Avenue Residences (Being a Re -plat of Tract A and Tract C, Centre for Advanced Technology P.U.D., Se nth Filing) Fort Collins, ColoOb of Ft Coffinsp, Mans Approved By PRO PMTY 07F Date p=-r eojj2?.«YT, j1TyQpPPO 3, 2009 Prepared for Mr. Stan Everitt Everitt Companies 3003 East Harmony'Road, Suite 400 Fort Collins, Colorado 80528 Prepared by: NORTHERN ENGINEERING 200SO=C011epAwm. Swm 100 FW. Cu ins, Calm do 80524 P .e 970.221.4158 F.;970.221.4159 ...Mmmwwneomig;�nm Project Number: 110-034 ,loaded on 1 1 1 1 Detention and Water Quality Cakulations 1� �I 1' III 1 f '1 f i� 1� If 1� 1� 1 1 1� I leis unn0 iciA copy was downloaded on Sep-13-2017 from the, City of Fort CAMS Public Kecoids WeMrte hap 'citydc cs fcgov com E Q . � 3 A \ - IL2 \ \ )13- ! I q N/ml �' q }i��ƒa% - LL. o k���� &� 2 \ �#} 8 - . - }Jk \ kr- z! - 2 % . {) / « Rom■ \ � - % ` 2 - u q - � MO ` " $ ) 2 - q j w ` VC4 - % o 14 , / d u' w O H N N m Q m ill .� n m 0 w tl1 C N N N N M N w Q� O O O O O T Q Vf N lO n W 01 O H N m Q � E 000ccoocoocic00000H�-i,-inH a � 0 m wwN E 0 0 0 moCD�nmomm�e0wmom0 m o O m �*+ o ni ao ao ri vi o v m M oo v 7 m N m m Qj m n .+ )O m O u1 h m O 9 OR V N N H r O t0 N N w Q H H n W n r` Ol OWONM MQ U 9 m sf M O O to N m O H n, O mm vnM mN N OO m 0m E w . O Q WO N mm Q O N l0 m - N w a w w m ul m m N w m m n m N H m m �O n m ul r o e 0 w m 0 is o 0 O H N N N N N N N T T M T Q Q a Vl Vf WE C V 3 U O C > m> ' m..Q W M h n w w n N n e N m n .y �D M e N �D n 0 t0 � m w w N WS y m C? N v Owl w O O n M inif ti ON m M )n O O w W H m m w NO. E j O l00 9m0 H H t00 H Om0 H W R- twit W N N N m Q Q Q lf1 tD q u > w n o f m M )O vl Q n ui w m rry y w �n Q r n .�+ m m v, r -,.i m N O ,�" m O M m H l0 lG O l0 m rl O N w w Vf H w N Q N. O n m m N t0 M n H �O .i w m of n m V/ n pppp qqtt n c E. E O rl n N N N N N N T M T m C O Q II'1 JI w j O C a m t O N N N N N N N N N N N N N N N N N N N N N 0 a 0 0 0 O 0 0 V � 0 C 1° v m o N m o o m w w m e m m N rm.) re Ili vNi oNo gym+ omo. ul O m m t6 w m w m O T ti w O Q n N O a LA m T Jl Ifl p N Q H w m n tlf Vt T r-f m. m n r N N O .0 )O O N N u1 r- r m Oi w C) w rT to N H M O Q t0 e O ul kD .-1 n l6 00' eel O N � N N Q M n st H 1p I n '0 `--' C u O N Q w w H N Q tD w NO N e 1p w T N Q m m m m g O 6 0 0 Q H H H H `f N N N N Q O mC m O '- VI VI N VI ul N U1 )(l Y1 Jl �11 �1) ✓1 ttl Yl N Vt III C j V� u APPENDIX D EROSION CONTROL SURETY Erosion and Sediment Control Escrow/Security Calculation for The City_ of Fort Collins Project: SUMMITSTONE HEALTH. PARTNERS Disturbed Acres: 0.21 EROSION CONTROL BMPs Units Quantity Price Price Silt Fence L.F. 302 $3.00 $906.00 Rock Sock each 6 $85.00 $510.00 Rock Berm each 0 $220.00 $o.ob Vehicle Tracking Control Pad each 1 $1,500.00 $1,500.00 Concrete Washout each 1 $1,200.00 $1,200.60 Inlet Protection each 0 $210.00 $0.00 Sub -Total: $4,116.00 1.5 x Sub -Total: $6,174.00 Amount of security. $6,174.00 " Reseedln g Amount Total Acres x Price/acre: $252.00 Unit Price of Seeding per acre: $1,200.00 Sub -Total: $252.00 1.5 x Sub -Total`. $378.00 Amount to Re -seed: $378.00 Minimum escrow amount: "The amount ofthe security must be base/ on one and one-half dines the es imale ofthe cast to install the approved measures, or one and one-half times the cost to re -vegetate the disturbed land to drylandgmases based upon unit cost determined by the City'sAnnual Revegetadon and Stabilzadon Bid, whichever lsgreoter. In no instance, will the a amount afsecurlty be fens than one thoumnd five hundred d0Bars($1,500) for residemial developmem or three thousand dollars ($3,000) for commercial development" 10/26/2017 3:54.PM NM7M1 summusmmloi�napelEmabnsiaw.x, APPENDIX E EROSION & SEDIMENT CONTROL REPORT O EROSION & SEDIMENT CONTROLS 1.0 Written Analysis An Erosion and Sediment Control Plan is included herewith It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall Qupdate the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions n at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices froth the Volume 3, Chapter 7 - Construction BMPs will be utilized. n Measures may include, but are not limited to, silt fencing along the disturbed perimeter, �A gutter protection in the adjacent roadways and inlet protection at proposed storm inlets. a Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading, and Erosion Control Notes can be found on Sheet 2 of the Utility Plans. In addition to this report and the plan sheets, the Contractor shall be aware of and adhere to the applicable requirements outlined all Development Agreements pertaining to this property. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division - Stormwater Program, before commencing any earth disturbing activities. The Contractor shall also develop a comprehensive .Storm Water Management Plan (SWMP) confonning to applicable requirements including descriptions of the ongoing activities, inspections and maintenance - . of construction BMPs. QThe site is approximately 1.50 acres and approximately 9300 square feet of which will a undergo earthmoving operations. The existing site has an existing building, parking lot and landscaping cover approximately 75% of the site and an irrigation ditch that covers approximately 20% of the site. Runoff from this site currently discharges into an existing detention pond and the improvements will continue this runoff pattern. a The soils on this site are classified by the USGS Soil Survey as Nunn Clay Loam and are classified in the hydrologic group C. These soils are characterized as having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. The rainfall erodibility is deemed to be moderate and the wind erodibility is deemed to be moderate to high. The site is surrounded by developed sites including streets, buildings and paved areas. The construction shall utilize silt fence around the perimeter to control sediment transport from rainfall and from wind. The silt fence that is located in the proposed pavement areas will 0 be removed prior to placing new pavement. Rock socks will be utilized in the existing curb and detention pond to capture sediments that are not fully contained by the silt fence placement. The locations of the rock socks will be in the areas of concentrated flow such as in the existing curb and on the concrete pans. The site will also utilize a vehicle tracking control pad to minimize sediment from being tracked onto adjacent pavements. Sediment that is tracked will be removed and placed Within the site or permanently disposed of offsite. A concrete washout.will be used on.site during the concrete placement. All hardened concrete will be disposed of offsite. These BMP's have not been located on the site map due to the fact that the site is very small and these BMP's will need to be placed by the contractor in locations that are most beneficial and will minimize disruption of adjacent traffic. Permanent erosion control consists of covering the soils with a building, concrete walks, concrete pavement, recycled asphalt pavement and sod. No soil will be left exposed to erosion after the construction is complete. Refer to the landscape plan for areas of and instructions for placement of sod and soil amendments required prior to placement of sod. Refer to Appendix D for the Erosion Control Surety calculations. 2.0 SWMP contact information Permit holder: Name: Address: Phone Number: Email Address: APpoifited agent: Name: Address: Phone Number: Email Address: 3.0 Identification and location of all potential pollution sources Potential Pollutant Source'Acttvrty^ 7777 Potential Poili}tant -- Generated Apphca6le to —this project Control Measure Disturbed Areas Sediment X Silt Fence, RockSocks Soil stockpiles Sediment X Silt Fence; Rock Socks Travel to adjacent public streets Tracked sediment X Tracking Pad; street sweeping Contaminated soils Sediment, chemicals Possible Remove contaminated'soils from site ** Loading and unloading chemicals Chemicals Unloading of building materials Trash, debris X Trash dumpsters, Waste Management Firm Outdoor storage of chemicals Chemical's On site equipment maintenance Oil, grease On site equipment fueling Diesel, gasoline X Containment berm ** Dust generating activities Particulates, sediment - - - X Water (ruck Use of fertilizer, pesticides, herbicides Fertilizer, pesticides Use of detergents, solvents, oils Detergents, solvents, oil X If spilled, remove contaminated soils from site *s Waste dumpsters, waste piles Chemicals, trash, debris X Waste Management Firm Concrete washout Concrete, sediment, wash water X Remove hardened concrete, dispose of offsite ** On site equipment washing Detergents, oil On site asphalt batch plant Asphaltic cement, sediment On site concrete batch plant Cement, sediment Portable toilets Domestic sewage X Waste Management Firm ** Refer to Section 1.5.2 for additional Materials Handling & Spill Prevention BMP 4.0 Best Management Practices (BMP's) for Stormwater Pollution Prevention Structural Practices for Erosion and Sediment Control Structural practices for the site will consist mainly of silt fence and rock sock filters and are described in detail in the following paragraphs. These BMP's are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMP's are in place and/or removed at the appropriate time in the construction sequence. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Silt fence and rock sock filters shall be in place prior to commencement of construction activities, During clearing and grubbing necessary for silt fence installation, all cleared material shall -be placed -on the -uphill side so that if erosion occurs from the "cleared material, the sediment will be trapped and not transported downstream. Rock socks shall be implemented in the existing curb line as shown on the Drainage & Erosion Control Plan. All BMP's shall be installed per the details shown on the construction plan set QTemporary & Permanent Structural BMP's: Structural BMP m Approximate IocaUon on site Apphcable'to this', Project.:; ' Silt Fence Site perimeter, refer to site map X Straw bale dams Rock Socks At existing sidewalk culverts, in existing gutters, refer to site map X Earthen -diversion dams Vegetated swales Sediment trap/pond Pipe slope drains Geogrid Inlet/outlet protection In the detention Pond X Culverts Refer to site map X Riprap Erosion control mats Inlet protection Vehicle Tracking Control Pad At site entrance, refer to site map X Concrete Washout To be located by Contractor X Non -Structural Practices for Erosion and Sediment Control: Soils exposed during the earthwork phase and landscape prep phase shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control is installed. No large amount of soils (in excess of 15 yards) will be allowed to be stock piled on site. Overburden from the utility pipe trenching Will be piled adjacent to trenches upstream of sediment controls and will be replaced in the trenches within 12 hours. Excess excavated materials from the demolition and grading phases of the project that cannot be reused on site will be exported as it is. excavated. This includes any asphalt pavement from the existing site that is to be removed. A vehicle tracking pad will be installed at a location most beneficial to the site construction as determined by the contractor. Vehicles will not be permitted in the excavated area if soil is muddy. Gravel sub base will be placed and compacted in the areas indicated for pavement following excavation. In the current pre construction state the site enables tracking of silt onto the adjacent streets during wet conditions. During construction activities the street will be monitored for foreign debris tracked out of the site and mechanical sweeping and clean up will be performed as needed. u No area shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, li etc.) is installed, Temporary & Permanent non-structural BMP's: Non -Structural BMP A ioximate location on site's pp Apphcalile t6 this ," Prolecf Surface roughening Soil stockpile height limit (less than -- 10') ' Perimeter vegetative buffer All boundaries of site X Minimization of site disturbance Mulch - Seed & mulch stockpiles after 30 days Stockpile toe protection (silt fence, wattles or ditch) Preservation & protection of existing All boundaries of site X vegetation & trees Good site housekeeping (routine Entire Site X cleanup of trash & constr debris) Sweeping & scraping of hardscape On and off site pavements X areas Heavy equip staged on site, properly maintained & inspected daily (no Staging area X onsite maintenance) I5.0B..MP Implementation 5:1 Phased BMP Implementation BMP's are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMP's are in place and/or removed at the appropriate time in the construction sequence. A construction sequence schedule has been included on the Drainage & Erosion Control Plan and included in the construction plans lans for this site. All BMP's shall be inspected and repaired or replaced as required to satisfy the conditions of the Stormwater Discharge Permit. All BMP's must be maintained and repaired as needed to assure continued performance of their intended function. Refer to Appendix E for the BMP schedule and estimated costs.. 5.2 Materials Handling and Snill Prevention- Materials Handling & Spill Prevention BMP Approximaterlocidon on site AOpli6abl6'to V. , hi * t sPrb , ject:--,, Portable toilets, anchored & located away from drainages Contractor to determine X Fuel storage located in bulk tanks with secorkdary containment & spill kit Mobile fueling performed at least 200 feet away from drainages & fully attended Contractor to determine X Fertilizers, form oil, solvents, cleaners, detergent stored in 55 gal or smaller containers, kept in storage Contractor to determine X units Dumpsters containing used chemicals containers & liquid wastes kept covered Contractor to determine X Equipment cle*ng (on site) uses no detergents & flows to onsite retention basin In case of a rele6e of fuel or other chemicals, absorbent booms or earthen berms will be immediately' - - constructed to contain the spill & Location of spill X prevent runoff to adjacent surface waters MSDS sheets for onsite chemicals will be kept at the construction trailer to facilitate spill response & Contractor to determine X cleanup 5.3 Dedicated Asphalt or Concrete Batch Plant: Not proposed with this development 5.4 Vehicle Tracking Pad: Vehicle tracking control pad shall be installed wherever construction vehicle access - - --- - -- - _ _. _ -- -- -- - - - routes intersect paved public roads. Vehicle tracking control pads shall be installed to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Any mud tracked to public roads shall be removed on a daily basis and after any significant storm that causes sediment to be transported. It is unlawful to track sedimentimud onto public streets and may be enforced by the City of Fort Collins, by the State of Colorado or by the EPA. 5.5 Waste Management and Disposal: Portable toilets will be anchored & periodically maintained by waste management company.Dumpsters on site will be covered & periodically emptied by waste management company. Concrete waste will be allowed to harden and then will be removed from site. No washing activities will occur on site. ' Location of the concrete washout is shown on the site map. The washout will be sufficiently deep to accommodate all anticipated concrete truck wash water. Waste concrete will be allowed to harden and be removed from site periodically as the washout reaches 50% of its capacity. Truck wash water will not be allowed to reach the curb & gutter or any other water course. 5.6 Groundwater and Stormwater Dewatering:. No groundwater was encountered during soils exploration therefore ground water is not anticipated to be an issue: If groundwater is encountered a groundwater discharge permit shall be obtained and a detailed report shall be completed describing the location and the route of where pumped groundwater will be conveyed and the measures taken to prevent the transport of any pollutants to downstream waters. 5.7 Inspection & Maintenance. It is required that routine site inspections are performed to effectively address maintenance and repair of Best Management Practices (BMP's). The site inspections are to performed t by the contractor or an inspector designated by the administrator at a minimum of once every fourteen (14) calendar days on active construction sites and after any significant storm event (an event causing runoff). As part of the site inspections the inspector is required to keep documentation of all inspections and BMP maintenance, including an updated Site Map indicating new BMP's or the removal of BMP's since the previous ' inspection. ' Any maintenance, repair, or necessary installation of BMP's that are noted during the inspection must be completed within seven (7) calendar days from the date of the inspection.