Loading...
HomeMy WebLinkAboutDrainage Reports - 10/24/1990DRAINAGE REPORT FOR THE BRIDGES II P.U.D. PREPARED BY STEWART & ASSOCIATES. INC. OCTOBER 18, 1990 SITE LOCATION: The Bridges II P.U.D. is a Replat of Part of Lot 1 of the Bridges P.U.D., First Filing, situate in the Northwest ', of Section 22, Township 7 North, Range 69 West of the Sixth P.M., Fort.Collins, Larimer County, Colorado. All construction in the Bridges P.U.D•, First Filing, lying above the New Mercer Canal has been completed including the required detention pond below the ditch. The purpose of the Bridges II P.U.D. is to create two building sites in place of three building sites as shown on the First Filing. SITE DESCRIPTION: The site consists of native grasses, gravel, and dirt. The slope of the existing ground is North to South and the grades vary from 10% away from the New Mercer Canal to 0.40% over the Southerly part of this project. There is to be no construction below the Larimer County Canal No. 2 or above the New Mercer Canal except for the 24 foot wide access road. There is no offsite drainage onto the property. PROPOSED DESIGN: The original drainage report was designed for a developed site of 8.5 acres and an undeveloped site of 4.3 acres of .the total site area of 12.8 acres. Our development of these two buildings is a reduction of the original design by one building. The detention required for the site was 60,480 cubic feet. A copy of the original report is included with this, report. The runoff from the West building drains to the inlet in the cul—de—sac. The runoff from the East building drains to a corner of the parking area and then in a concrete pan to an inlet at the angle point between the 15 inch P.V.C. and the flume across the Larimer County No. 2 Canal. These two flow systems keep runoff from entering directly into the No. 2 Canal. Both buildings have 4 inch perforated sub —drains designed to encompass each building. The sub —drain discharges a maximum of 0.35 c.f.s. into the upstream inlet. The flume will carry 8.0 c.f.s. across the No. 2 Canal. The runoff from the site in a 100 year frequency storm is 7.9 c.f.s. The detention pond has a 1.0 foot freeboard and has a 15 inch outlet pipe. The 0.35 c.f.s. of sub —drain water can be accommodated through the pond. Calculations have been made and are included with this report for the sizing of the drain Swale, pipe, and area inlets. Franklin D. Blake, P.E. & L.S. ';° J t61 Stewart & Associates, Inc. :' �•�, n 7339 F "'�F OF CQ COMPUTATIONS:,' James H. Stewart & Associates, Inc. 214 N. Howes St. Ft. Collins, CO 80521 (303)482-9331 By: Date Z-0�19 Client: al--:, Sheet No. of Chkd By: Date- Project: 7Ze2 /45 py0 -Job No. Subject 00 00 I ' i! i` i i �. I .�. I � i '. i. f X A4 4tOMPUTATIONS James H. Stewart & Associates, Inc. 214 N. Howes St. Ft. Collins, CO.80521. (303) 482-9331 By:. Z�9G Date Z 8 Client: Sheet No..of Z Chkd By: Date Project:'ii�3 rw0 Job No. Subject No Text COMPUTATIONS James H. Stewart & Assoc. Fort Collins, Colorado By: T• A Date ` ?- F/' Client: S N P r Sheet No. Z of Chkd By: Date Project: TN 2 Job No. Subject 4k � J -� Yam'• �C .°._:....- -•.._ ..-.__. .- �o cMtc ;cdd��ce 7 lZrve,.! Z. X e.5 = 27• G THE R e ! ^ E _ WILL. Ai 4 Y E _'.H 1 ✓ r. r,_; �`� C F - { t. NAVE ALL O F 7-H` J /E! /✓E'4'-\l.v AS OP-17;V aG"' T^E S7TORA% :U4T.=P_ ZUVOFF WILL, 3E GAGE',: D --)!I-,a U/VDE/e- -TyE /VE6U �'�F_p_G;_L CAVA(— -k VD C•i "dam S T 0 .2 /Y I D A /.0 AND O,U wL• T.i i ✓ ri v =•U - - L J7UZM _%A� 41V 71:VE OAD CU,V�VAS-- .� •V T : T U vUAS !7E lt�.0 c=D 7-4) CAee% r'E Qtl<./0TIT/E:. !/.a c.FS, /s THE < tUA.G'ITy E.VTZAlIvG CATCH 9Sl,U IN T.4E /00 18.4 C.FS, I Qua ;'.e. .4T AAJ D ZO C.F',S. )S Q �r, ye. f�T M. ;�. =' No Text James H. Stewart and Associates, Inc. Consulting Engineers and Surveyors 214 North Howes Street P.O. Box 429 Fort Collins, Colorado 80522 (303)482-9331 March 28, 1986 Mr. Tom Gathmann Storm Drainage Department City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Dear Tom: Laboratory: 301 Lincoln Court P.O. Box 429 Fort Collins, Colorado 80522 (303)484-6309 This is regarding the revised storm drainage report for the Replat of Part of Tracts 1 and 2, The Bridges P.U.D. First Filing. The basic changes in the plan are that an additional building is being proposed below the New Mercer Canal and a vehicular bridge is being built to access the buildings below the Canal. The twenty foot wide driveway that was originally proposed between the New Mercer Canal and the Larimer County Canal No. 2 will not be needed for emergency access. Therefore the runoff should be reduced by a small amount because the impervious surfacing is being reduced by a small amount. We are, therefore, not proposing any changes in the storm drainage system for the development. The detention pond and the underground storm drain system have been completed. Not all of the concrete pan has been con- structed at this time. If you have any questions regarding this matter, please call. Sincerely, JAMES H. STEWART AND ASSOCIATES, INC. Richard A. Rutherford, P.E. & L.S. President cls ���