DRAINAGE REPORT
For
COACHLIGHT PLAZA P.U.D.
INTRODUCTION.
Engineering Professionals, Inc. was retained by Evergreen Park 2
and Hvolboll-Johnson, owners of property in and/or near the
Evergreen Park development in northern Fort Collins, to prepare
a master drainage plan for the Evergreen Park area. Coachlight
Plaza P.U.D., being a part of Evergreen Park, is included
in the master drainage plan. Therefore, the developers of
Coachlight have also retained Engineering Professionals, Inc.
to assure that the grading and drainage plan for Coachlight is
in conformance with the master drainage plan for Evergreen Park.
The master drainage plan for Evergreen Park Drainage Basin is
approximately 30 days away from completion. However, a drainage
improvements plan has been formulated and the hydrology and
hydraulics of the plan have been analyzed to the extent that
the plan is known to be realistic. From this point on, only
minor deviations, which will not affect Coachlight Plaza,
will be.made to the master plan before it is finalized.
BASIN DESCRIPTION
The Evergreen Park Drainage Basin is generally located in the
western half of Section 1, Township 7 North, Range 69 West and
the southern half of Section 26, Township 8 North, Range 69 West,
and it consists of approximately 380 acres. Figure 1, included
herein, shows the general outline of the drainage basin.
The Eaton Ditch traverses the basin along the northerly boundary
and the Lake Canal traverses along the southerly boundary of
the basin. Although no detailed study of the Eaton Ditch has
been made by this office, general investigations indicate that
no overflow of the ditch due to storm runoff has occurred between
•-1-
North College Avenue and North Lemay Avenue. Storm runoff
intercepted by the ditch west of North College Avenue would
appear to spill at the location where Dry Creek intercepts the
Eaton Ditch. Runoff generally flows north to south through the
basin. Ground slopes range from 2% in the northern -most
portions of the drainage basin to 0.2% in the southerly portions.
Historically the basin was agricultural, but it is currently
being developed as a combination of single family residential,
multi -family residential, commercial, and light industrial.
The Dry.Creek flood plain encompasses the southerly portion of
the Evergreen Park Drainage Basin as indicated by the final
report prepared by Gingery Associates, Inc. for the City of
Fort Collins. However, Coachlight Plaza is. not in the 500
year flood 'plain as indicated by the report.
PROCEDURE
The Colorado Urban Hydrograph Procedure (CUHP) was used to develop
hydrology for the drainage basin. The basic design criteria
used was that the 2 year peak rate of runoff, assuming no
development, would be'the maximum rate of discharge during a
100 year storm, assuming full development. Detention facilities
were sized to assure that this criteria would be met. Routing
procedures illustrated in the U.S. Bureau of Reclamation's
"Design of Small Dams" were used to size said facilities.
A system of open channels and culverts was planned to connect the
detention facilities and to direct runoff around the various
developments, including Coachlight Plaza., to assure no offsite
exposure to the 100 year, developed design storm.
HYDROLOGY AND HYDRAULICS
Pond No. 3 serves as the detention facility for Coachlight Plaza.
and subareas 3, 6, and 7 which affect Coachlight Plaza
Therefore, only the hydrology and hydraulics through Pond No. 3
j will be discussed in detail.
-2-
l Subarea No. 7 currently drains into the Eaton Ditch. However,
f policy currently being developed between the City of Fort Collins
and the Larimer and Weld Ditch Company, owners of the Eaton
Ditch, dictate that once the subarea begins to develop, no storm
runoff, either historical or developed, will be allowed to
discharge into the ditch. (With said policy, further assurance
is given that the Eaton Ditch will not spill in the future in
the vicinity of Coachlight Plaza.) Therefore, it was assumed that
runoff would be transported below the ditch, through a culvert
at the 2 year, undeveloped peak rate. The runoff would then
be carried by open channel into Pond No. 3 as indicated on Figure 2.
Area 60 Acres
100 Year, Developed Peak Rate of Runoff 211 c.f.s.
2 Year; Undeveloped Peak Rate of Runoff 35 c.f.s.
Required Detention Volume 9.8 Ac.-Ft.
Surface Area (Assumed 3.Ft. Depth) 3.5 Ac.
1 Subarea No. 6 currently drains to a low area in the southeasterly
corner of the subarea bounded by Willox Lane and the Eaton
Ditch. A 25" X 16" corrugated metal pipe arch currently carries
the storm runoff under`Willox Lane.and to the south side of the
entrance to Sundance Hills. The runoff is then discharged and
allowed to flow overland. For purposes of sizing a detention
facility, it was assumed that the 25" X 16" corrugated metal
pipe arch would be replaced by a 45" X 29" horizontal elliptical
reinforced concrete pipe. The 45" X 29" HERCP was chosen because
it provided the maximum carrying capacity within the limited
height restrictions available. An open channel will be sized to
transport runoff from the 45" X 29" HERCP down the east side of
Blue Spruce Drive into Pond No. 3 as indicated in Figure 2.
The open.channel will be trapezoidal with a 12 ft. bottom width,
3:1 side slopes, and a minimum depth of 2 ft. It will be
constructed at a slope of 0.25%.
-3-
Area 38 Acres
100 Year, Developed Peak Rate of Runoff 151 c.f.s.
2 Year, Undeveloped Peak Rate of Runoff 38 c.f.s.
Detention Outflow Rate 80 c.f.s.
Required Detention Volume 3.0 Ac.-Ft..
Surface Area (Assumed 1.5 Ft. Depth) 3.9 Acres
Subarea No. 3 currently drains in a southerly direction. Storm
runoff from the minor. storms is directed east along Bristlecone
Drive and south along Blue Spruce Drive. A storm sewer system
in Blue Spruce Drive and Bristlecone Drive intercepts the minor
storm runoff and directs it easterly into Pond No. 3. However,
the system is not large enough to intercept the major storm
runoff. Therefore, an open channel is proposed along the south
side of Bristlecone Drive to direct the 100 year storm runoff into
Pond No. 3. The 100 year, developed storm runoff from the area
in Sundance.Hills and the Sundance. Hills, Second Filing will be
carried in an open channel along the southeasterly boundary
of Coachlight Plaza. into Pond No. 3. The open channel will be
trapezoidal with.a 12 ft. bottom width, 3:1 side slopes, and a
minimum depth.of 2 ft. It will be ':constructed at a slope of 0.25%.
As indicated on the grading plan for Coachlight, storm runoff,
major and minor, will be transported overland to either the
south between buildings 11 and 13 and directly into Pond No. 3
or to the northeast between buildings 7 and 9 into the drainage
channel for Sundance Hills. Curb cuts with grates over the
sidewalk will be constructed at said locations to transport the
minor storm runoff. The curb cuts shall be a minimum of 6 ft.
wide. The major storm runoff will be allowed to overtop the curb
at said locations. For the drainageway between buildings 11 and
13, the developed 100 year and 2 year peak rates of runoff are
18.5 c.f.s. and 5.6 c.f.s. respectively. For the drainageway
between buildings 7 and 9, the developed 100 year and 2 year
peak rates of runoff are 17.0 c.f.s. and 5.1 c.f.s. respectively.
The overall.parameters for area 3 are as follows: .
-4-
Area 80 Acres
100 Year, Developed Peak Rate of Runoff 321 c.f.s.
2 Year,Undeveloped Peak Rate of Runoff 68 c.f.s.
100 Year'.Peak Inflow (Areas 3,6 & 7 441 c.f.s.
Contributing)
Detention Outflow Rate 99 c.f.s.
Required Detention Volume 20.0 Ac.-Ft.
Surface Area (Assuming 4 Ft. Depth) 5.4 Ac.
Maximum Water Surface Elevation 4966.0
RECOMMENDATIONS
Storm drainage improvements discussed herein and shown on Figure 2
should generally be constructed as indicated. Final hydrology
and hydraulics should be completed for the master plan as well
as final sizing of facilities. Once the final report is approved,
construction drawings should be prepared and storm drainage
facilities should be constructed in an order of sequence as
indicated in the final report.
Coachlight Plaza P.U.D. should be constructed in accordance with
the grading and drainage plan included in the submittal package.
Minimum finished floor elevations should be at or above
.elevation 4968.60. Although minor deviations in the hydrology
and hydraulics could occur before the overall Evergreen Park
Master Drainage Plan is completed, Coachlight Plaza P.U.D.
will suffer no exposure to the 100 year offsite design storm.
-5-
ly'i (� ! +'� _ :�• 1 —5050
M- Renyor)�Corner
325 10 t .'�p.o •o Ste` 01*u.
;Ili °
OJ ell
I l• .G - ( fig J e 4
• ee v 1 `t2 ee ° n g.
26
p r
{i1 fS a473g
° O
5076
.. .. . •• '\./ p '� ; , II1I� ram\ __ q j O
.\.o.Ell• tr: . A I t I i� �'`� if - Cours
^� t ; �.l \ • y. ` 1 \`�J ° i O •/�1 Ohm a
011,
-500�e � �'a O
�la,e• 7
I .
m
✓ _avail �� Ya tl.... � � ice.. `s!� 1.�� � �4t: � .
Z r..•:. CI�; J7. , 6.1 �aa.` ��i. !. �<..
J
ssa.:
o a _ Qocr
9 . , - a 5A. _...... .
•C
In
Setting
V Basin
_ _ •• 9
1t1VEft:
r- _:000
p .� �-- \I \ 'h, �• 'i'`ayEs �. � \ OLEO
I�pe
7Rrve � �H. _...� sSo; •-.' NorthlYa,
-7 sort . l ,'� r .. •.:,�i .•'"- - _ems_ L COLORADO
p-r1%' g �•o. aas uinq.. h .Anderson'ville '
7_! �_1"�1i—
IY� ilY - T@,�lyl • ucki r am'
4950 X
LaIiP°rtl l srh 4._J,-�-p L�J 985 p \ 'A' Ili i ..L. 7 I :: .
• I� / ram. �--, - -�' ��'. 0• .9sr I !:
—i �Lr '4I���
17
i Gr brt
�� K'ashie m , �i. ''i�l-�;' //��I If ' 1'�ie I r If( i/ '�.�i l I� g �!