Loading...
HomeMy WebLinkAboutDrainage Reports - 01/08/1996Final roved Report F. SHEAR YORTCOLLINS EKGMSM rut u' 't III Final Drainage and Erosion Control Report for LOTS 5 & 6, BLOCK 5, REPLAT (NO. 1) OF EVERGREEN PARK Fort Collins, Colorado Prepared for: Greg D. Fisher, Architect 3115 Clyde Street Ft. Collins, Colorado 80524 Prepared by: SHEAR ENGINEERING CORPORATION Project No: 1498-01-95 DATE: December, 1995 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1 November 27, 1995 Project'No: 1498-01-95 Basil Hamdan City of Ft. Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80524 Re: Lots 5 & 6, Block 5, Replat (No.1) of Evergreen Park; R. Collins, Colorado Dear Basil, Enclosed, please find the Final Drainage and Erosion Control Report for Lots 5 & 6, Block 5, Replat (No. 1) of Evergreen Park. The hydrology data and the hydraulic analysis presented in this report complies with the requirements of the City of Fort Collins Storm Drainage Criteria Manual; dated March, 1984, and the Erosion Control Reference Manual. The plan and report have been revised according to your comments dated October 26, 1995. We have also made the revisions that you recommended at our meeting on Tuesday; November 21, 1995. If you have any questions or comments, please call me or Mark Oberschmidt at 226-5334. Sincerely, Brian W. Shear, P.E. Shear Engineering Corporation BWS / meo cc: Greg Fisher, Architect Sierra Builders 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1 PAGE 1 Final Drainage and Erosion Control Report Lots 5 & 6, Block 5, Replat (No. 1) of Evergreen Park L H. GENERAL LOCATION AND DESCRIPTION: A. Location 1. Lots 5 and 6, Block 5, Replat (No. 1) of Evergreen Park is located in the Northeast One -Quarter of Section 1, T7N, Range 69 West of the 6th P.M., R. Collins, (Larimer County), Colorado. These are existing platted lots. 2. More specifically, Lots 5 and 6, Block 5, Replat (No. 1) of Evergreen Park are located on the east side of Blue Spruce Drive approximately 750 feet north of Conifer Drive in the Northeast part of Fort Collins, Colorado (See Vicinity Map). a. Blue Spruce Drive is an existing street with sewer, water, curb' and gutter and street paving installed. These improvements were installed with the final utility plans for Replat (No. 1) of Evergreen Park. 3. The initial phase of this project will consist of the following: * 2 - 200' x 60' buildings * An access drive and parking areas * stormwater detention facilities for the entire site The second phase will consist of the following: * 2 - 64' x 40' storage buildings * Additional parking and loading areas B. Description of Property 1. The site is currently undeveloped and primarily of native dry land grasses. 2. The site area is approximately 1.76 'acres. open. Existing ground. cover consists 3. There are no major drainage ways located on or within the project site. An existing regional detention pond (Evergreen West Pond) outfall channel is located east of this property (See Drainage and Erosion Control Plan in stuffer envelope). 4. There are no irrigation canals or systems located on or within 100' of the project site. i DRAINAGE BASINS AND SUB -BASINS: A. Major Basin Description 1. The site is situated within the Greenbriar-Evergreen Drainage Basin as designated on the City of Fort Collins Stormwater Basin Map. The Master Drainage Plan for the Greenbriar-Evergreen Basin is currently being amended. PAGE 2 Final Drainage and Erosion Control Report Lots 5 & 6, Block 5, Replat (No. 1) of Evergreen Park H. DRAINAGE BASINS AND SUB -BASINS: A. Major Basin Description (continued) a. The Basin fee rate for the Greenbriar-Evergreen Basin is $ 10,000 per gross acre according to the development fee section of the City of Fort Collins Development Manual. b. This may be reduced if detention is provided. B. Sub -Basin. Description 1. A majority of the site is situated within Basin 4U (undeveloped) as defined with the preliminary amended Greenbriar-Evergreen Basin Master Drainage Plan. This is the western portion of the site. See Exhibit from preliminary amended Greenbriar- Evergreen Basin Master Drainage Plan included with the Drainage and Erosion Control Plan in the staffer envelope. a. Page 20 of the draft of Greenbriar-Evergreen Basin Master Drainage Plan indicates the following: BASIN 4U. The basin was assumed to be completely developed for commercial use with an estimated imperviousness of 90 percent. On -site detention would be required for this basin. The allowable release from this basin is 17 cfs, or 0.47 cfs/acre. The designated release point for Basin 4U is the storm sewer and street along Conifer Street which convey flows easterly to Pond 5 (conceptual). The detention volume required for the basin, in order to meet the prescribed release rate, was estimated to be 6.4 acre feet. 2. The remainder of the site is situated within Basin 3B as defined with the preliminary amended Greenbriar-Evergreen Basin Master Drainage Plan. This is the eastern portion of the site. See Exhibit from preliminary amended Greenbriar- Evergreen Park Master Drainage Plan included with the Drainage and Erosion Control Plan in the stuffer envelope. a. Page 20 of the draft of the Amended Greenbriar-Evergreen Basin Master Drainage Plan indicates the following: BASIN 3B. The basin was assumed to be developed for 37 percent commercial use, and 63 percent residential housing at levels representing 11, 49 and 3 percent of the entire basin for high, medium and low densities, respectively. The result is a developed imperviousness of 63 percent. On -site detention to the existing Evergreen West Pond. Overflow from this pond would enter the existing outlet channel which would transport flow southerly to Pond 5 (conceptual). PAGE 3 Final Drainage and Erosion Control Report Lots ' 5 & 6, Block 5, Replat (No. 1) of Evergreen Park 1L DRAINAGE BASINS AND SUB -BASINS: B. Sub -Basin Description (continued) 3. Existing site grades indicate that historic flows are conveyed easterly towards the Evergreen West detention pond and outfall channel which are located within Basin 3B of the preliminary amended Greenbriar-Evergreen Master Drainage Plan. III. DRAINAGE AND EROSION CONTROL DESIGN CRITERIA: A. Regulations 1. All storm drainage design criteria from the City of Fort Collins Drainage Criteria Manual was followed. 2. Storm Drainage design criteria modification was considered based on data provided by City of Fort Collins Stormwater Utility personnel concerning conclusions presented with the preliminary amended Greenbriar-Evergreen Park Master Drainage Plan. 3. All erasion control design criteria from the City of Fort Collins Erosion Control Reference Manual. B. Development Criteria Reference and Constraints 1. Previous studies which were considered include: a. Greenbriar-Evergreen Park Master Drainage Plan; Engineering Professionals b. A draft of the Amended Greenbriar-Evergreen Basin Master Drainage Plan; Lidstone & Anderson, Inc.; Project No COTST05.4; dated September 6, 1994. 2. Blue Spruce Drive is developed and paved. There are no underground storm drainage facilities. Detention pond outfalls on the west side of the property are therefore, restricted to surface release to Blue Spruce Drive. 3. New American Disabilities Act (ADA) requirements affect the final parking lot grading design. Maximum allowable design grades for handicap parking, and access from the public right-of-way effect the drive and parking lot final grading which typically affects detention volumes. 4. Lot 7, which is located to to the south of Lot 6, is completely developed. The existing parking lot is paved up to the Lot 6 south property line. This restricts the . final grading along the common property line of lots 6 & 7. PAGE 4 Final Drainage and Erosion Control Report Lots 5 & 6, Block 5, Replat (No. 1) of Evergreen Park III. DRAINAGE AND EROSION CONTROL DESIGN CRITERIA: C. Hydrological Criteria 1. The Rational method (Q = CIA) was used to determine the pre -developed and post development peak flows for the 10 and 100-year storm events (commercial requirements). 2. The Cumulative Runoff Method was used to determine the required detention volume. a. The 100-Year storm was used as the design storm. 3. The release rate from the western detention pond is based on the requirements of the Greenbriar-Evergreen Basin Master Drainage Plan (0.47 cfs/acre). a. The area used to size the pond consists of that portion of the site and 1/2 ROW of Blue Spruce Drive which are located in Basin 4 as delineated on the Greenbriar-Evergreen Basin Master Drainage Plan. 4. The release rate from the eastern detention pond is based on the post development 100-year peak flow which would be produced by that portion of the site which is located in Basin 3B as delineated on the Greenbriar-Evergreen Basin Master Drainage Plan. a. Stormwater from Basin 3B is may be released undetained to the Evergreen West regional detention pond according to the Greenbriar-Evergreen Basin Master Drainage Plan. D.. Hydraulic Criteria 1. Orifice and weir equations and coefficients suggested by the City of Fort Collins Storm Drainage Criteria Manual were used. IN. DRAINAGE FACILITY DESIGN: A. General Concept 1. The stormwater from the site will be directed to the east and west by creating a high point near the center of the property. 2. Detention pond release from the western portion of the property (sub -basin Iw) will occur at two (2) locations a. The outlet will consist of curbed channel and sidewalk culvert to the flowline of the existing Blue Spruce Drive curb and gutter. b. Flows are conveyed southerly in the Blue Spruce Drive flowline to Conifer Street. PAGE 5 Final Drainage and Erosion Control Report Lots 5 & 6, Block 5, Replat (No. 1) of Evergreen Park IV. DRAINAGE FACILITY DESIGN: A. General Concept (continued) 3. A portion of sub -basin Ie (minor basin Ie,$) may be released undetained to the Evergreen West detention pond according to the Preliminary Amended Greenbriar- Evergreen Master Drainage Plan. Additional detention volume is provided to account for the portion of sub -basin Ie which is located in Basin 4U as delineated in the Greenbriar-Evergreen Master Plan. a. Detention pond release from the eastern portion of the property will occur via an inlet in sump condition with an outlet pipe to the Evergreen West detention pond. B. Specific Details 1. The westernmost detention storage areas have been divided between the two (2) parking areas located at the western end of the proposed buildings. The release rate is based on requirements of the Amended Greenbriar-Evergreen Master Drainage Plan. a. The runoff coefficient utilized with the Cumulative Runoff method for sizing both detention ponds is 1.00. 2. The area used to determine the release rate form the western pond consists of the 1/2 R.O.W. of Blue Spruce Drive and the western portion of the site (sub basins Irow, Iw & Ie4). The total area equals 1.51 acres. The release rate used in the design of the pond (0.71 cfs) is based on the requirements of the Amended Greenbriar/Evergreen Master Drainage Plan (0.47 cfs / acre) (Refer to page 3 in the calculations). a. The required detention pond storage volume according to the Cumulative Runoff method, utilizing a runoff coefficient of 1.00, is 6,939 cubic feet. Refer to Page 3, Appendix I for the detention pond volume calculations. b. The actual volume provided in the western detention pond is 10,120 cubic feet. Refer to pages 6 & 6a , Appendix I for the Stage -Storage calculations. c. The finished floor elevation for both buildings in phase 1, is set at an elevation of 70.50 feet. d. The estimated 100-Year Water Surface Elevation (W.S.EI.) in the west pond is 69.58 feet. e. The freeboard provided is 0.24 feet. f. The separation provided between the estimated 100-Year W.S.EI. and the finished floor elevations of the two (2) office / warehouse buildings, is 0.92 feet. PAGE 6 Final Drainage and Erosion Control Report Lots 5 & 6, Block 5, Replat (No.1) of Evergreen Park IV. DRAINAGE FACILITY DESIGN: B. Specific Details (continued) 3. The Cumulative Runoff Method was utilized to determine the storage volume requirements for the western detention pond. The following items outline the final design. details of the westernmost detention ponds. a. A berm will be constructed around the westernmost parking lots in order to define a detention pond high water elevation. i. The top of the berm along Blue S7ruce Drive will be set at an elevation of 69.82 feet. High curbs or landscape timbers are required on the south side of the south parking lot in order to achieve the required high water elevation. ii. The side slopes on the berths are 4:1. iii. The high point located in the entry drive and all the curb at the southern end . of the parking lot is set at an elevation of 69.82 feet. b. The two (2) outlets from the west parking lot detention pond will consist of the following: i. A 3 inch diameter orifice in a headwall located at the R.O.W. line. ii 10 LF of a 24" wide concrete channel at 0.5% from the back of the curb in the parking lot to the back of walk. iii. A 24" wide metal sidewalk culvert. c. The top of the headwall will act as an overflow weir. i. The top of the headwall is set at an elevation of 69.58 feet in order to ensure that the storage requirement is met. Refer to the stage storage curves in the calculations. d. The 3 (3") inch diameter orifice is sized to restrict the release rates from the ponds to approximately 0.355 cfs. This is one half of the allowable release rate (0.71 cfs) because the flows are directed towards two (2) separate detention areas 4. The high point in the entry drive and the high curb at the southern end of the parking area will act as emergency overflow weirs for the site. PAGE 7 Final Drainage and Erosion Control Report Lots 5 & 6, Block 5, Replat (No. 1) of Evergreen Park IV. DRAINAGE FACILITY DESIGN: B. Specific Details (continued) 5. An access, utility and drainage easement will be required due to the limits of the detention pond and because of joint access. Replat (No. 1) of Evergreen Park is a recorded plat. Therefore, the access, utility and drainage easement must be dedicated by separate document. The drainage easement exhibit is included with Appendix IV for reference. 6. Detention is also provided in the eastern portion of the site (Sub basin Ie). 7. We have to size the pond to store a portion of the developed 100-year storm from sub -basin Ie. a. The total area of sub -basin Ie is 0.94 acres. b. The release rate used in the design of the pond (3.07 cfs) is based on our discussions with the staff of the City of Fort Collins Stormwater Utility. i. It was agreed that the release rate for the eastern pond would be the peak 100-year flow developed by sub basin Ie,B (0.43 acres) using post developed conditions. ii. Sub basin Iem is the portion of sub basin Ie which is located in Basin 3B as delineated on the Greenbriar-Evergreen Basin Master Drainage Plan. c. The required detention pond storage volume according to the Cumulative Runoff method, utilizing a runoff coefficient of 1.00, is 2,364 cubic feet. Refer to Page 4, Appendix I for the detention pond volume calculations. d. The actual volume provided in the eastern pond is 7373 cubic feet. Refer to pages 7 & 7a , Appendix I for the Stage -Storage calculations. e. The estimated 100-Year Water Surface Elevation (W.S.EI.) in the east pond is 69.14 feet. f. The finished floor elevation for both buildings in phase 2 is set at an elevation of 70.00 feet. g. The freeboard provided is 0.68 feet. h. The separation provided between the estimated 100-Year W.S.EI. and the finished floor elevations of the two (2) future storage buildings is 0.86 feet. PAGE 8 Final Drainage and Erosion Control Report Lots 5 & 6, Block 5, Replat (No.1) of Evergreen Park IV. DRAINAGE FACILITY DESIGN: B. Specific Details (continued) 8. The Cumulative Runoff Method was utilized to determine the storage volume requirements for the eastern detention pond. The following items outline the design criteria and the final design details of the westernmost detention ponds. a. A berm will be constructed around the westernmost parking lot in order to define a detention pond high water elevation. i. The top of the berm along the eastern property line will be set at an elevation of 70.00 feet. An emergency overflow weir will be set an elevation of 69.30 feet. This elevation is set in order to insure that a maximum depth of flow in the pond of approximately 1.50 feet will not be exceeded. I The side slopes on the berms are 4:1. 9. The outlet structure for the eastern detention pond will consist of the following: a. an area inlet in sump condition, i. The grate elevation of the inlet is set at an elevation 67.80 feet. I The invert of the outlet pipe is set an elevation of 64.80 feet. iii. A orifice plate with a 0.60 foot diameter orifice is to be attached to the inside face of the area inlet to restrict the flows to 3.07 cfs. b. 104 lineal feet 18" ADS N-12 at 0.46%, i. The capacity of the pipe based on a Headwater to Depth ratio (HW/D) of 1.00 is 7.72 cfs . c. an emergency overflow weir in the berm along the eastern property line at an elevation of 69.30 feet. PAGE 9 Final Drainage and Erosion Control Report Lots 5 & 6, Block 5, Replat (No. 1) of Evergreen Park V. EROSION CONTROL: A. General Concept 1. Erosion control measures will be as identified on the Drainage and Erosion Control Plan. 2. An erosion control security deposit is required in accordance with City of Fort Collins policy (Chapter 7, Section C : SECURITY; page 7.23 of the City of Fort Collins Development Manual). In no instance shall the amount of the security be less than $1000.00. 3. According to current City of Fort Collins policy, the erosion control security deposit is figured based on the larger amount of 1.5 times the estimated cost of installing the approved erosion control measures or 1.5 times the cost to re -vegetate the anticipated area to be disturbed by construction activity. i The cost to install the proposed erosion control measures is approximately $1,035.00. Refer to the cost estimate attached in Appendix I. 1.5 times the cost to install the erosion control measures is $ 1,552.50. ii. Based on current data provided by the City of Fort Collins Stormwater Utility, and based on an actual anticipated net affected area which will be disturbed by construction activity (approximately 1.76 acres), we estimate that the cost to re - vegetate the disturbed area will be $1,144.00 ($650.00 per acre x 1.76 acres). 1.5 times the cost to re -vegetate the disturbed area is $1,716.00. The $650.00 per acre for re -seeding sites of less than 1 acre was quoted to us by the City of Fort Collins Stormwater Utility personnel. iii The erosion control deposit for Lots 5 & 6, Block 5, Replat (No. 1) of Evergreen Park will be $1,716.00. This deposit is refundable. VI. VARIANCE REQUEST: A. Variance from City of Fort Collins requirements 1. With this report, the developer is formally requesting the following variances from: a. the requirement that one (1') foot of freeboard be provided, b. the requirement that a foot and a half (1.5') of vertical separation between the 100-year water surface elevation and the proposed finished floor of the buildings be provided. We are requesting that the minimum separation be reduced to one half of a foot (0.5'), c. the requirement that the maximum depth of water in a parking lot be less than one (1') foot. We are requesting that the maximum depth be increased to one and a half (1.5') feet. PAGE 10 Final Drainage and Erosion Control Report Lots 5 & 6, Block 5; Replat (No. 1) of Evergreen Park VI. VARIANCE REQUEST: A. Variance from City of Fort Collins requirements (continued) 2. The. constraints on the grading caused by the site topography and the ADA requirements do not allow us to provide the required freeboard. 3. The detention requirements within the Evergreen - Greenbriar basin and the topography of the site do not allow us to meet the separation or maximum depth requirements. VIL CONCLUSIONS: A. Compliance with Standards 1. All drainage analysis has been performed according to the requirements of the City of Fort Collins Storm Drainage Criteria Manual and the City of Fort Collins policy. 2. All Erosion Control design complies with the City of Fort Collins Erosion Control Reference Manual and generally accepted practices. B. Drainage Concept 1. The drainage design for Lots 5 and 6, Block 5, Replat (No: 1) of Evergreen Park is in accordance with the City of Fort Collins requirements, except as noted in the variance requests, and the recommendations of the Amended Greenbriar/Evergreen Master Drainage Plan. 2. There will be no adverse downstream effects due to the development of the site. VIM REFERENCES: 1. Fort Collins Storm Drainage Criteria Manual 2. Urban Drainage and Flood Control District Drainage Criteria Manual 3 Greenbriar-Evergreen Park Master Drainage Plan; Engineering Professionals 4. A draft of the Amended Greenbriar-Evergreen Basin Master Drainage Plan; Lidstone & Anderson, Inc.; Project No COTST05.4; dated September 6, 1994 APPENDIX I Storm Drainage Calculations PLOW SUMMARY FOR LOT 5 & 6 EVERGREEN PARK DESIGN CONTRIBUTING AREA C2 C10 C100 Tc Tc I2 I10 I300 Q2 Q10 Q100 DESIGN POINT SUB 2,10 100 BASINS) ac. min. min iph iph iph cfe cfe cfe +rrrrrrrrrr+++rrrrrre+++rrrrrrrrr+++rrrrttrrrr+rrrrrrrttrrrrrrrtrrrrrrrrrrrttrr++++r+r++rrrrrtrrttrr++ A Iw & Ie4 1.33 0.20 0.20 0.25 35.50 33.50 1.31 2.36 3.93 0.35 0.63 1.31 HISTORIC GBWDPOND Ie3 0.43 0.91 0.91 1.00 10.00 10.00 2.54 4.45 7.14 1.00 1.75 3.070 REL. RATE ABBREVIATIONS GBWDPOND=GRBENBRIAR WEST REGIONAL DETENTION POND SHEAR ENGINEERING CORPORATION COMPOSITE RUNOFF COEFFICIENT FOR SUB BASIN Iw PAGE 1 PROTECT :LOT 5 AND 6 EVERGREEN PARK PROJ.NO. :1498-01-95 DATE: 11/22/95 LOCATION :EVERGREEN PARK BY: MHO FILE :PISHCOEB NOTES :PHASE 1 ON SITE ONLY RUNOFF SURFACE CORP. CHARACTERISTICS AREA C C*A (acres) STREETS ASPHALT 0.355 0.950 0.337 CONCRETE 0.010 0.950 0.010 GRAVEL 0.000 0.500 0.000 ROOFS 0.275 0.950 0.261 LAWNS SANDY SOIL FLAT < 2% 0.000 0.100 0.000 AVERAGE 2 - 7% 0.000 0.150 0.000 STEEP > 7% 0.000 0.200 0.000 LAWNS HEAVY SOIL PLAT < 2% 0.180 0.200 0.036 AVERAGE 2 - 7% 0.000 0.250 0.000 STEEP > 7% 0.000 0.350 0.000 TOTAL AREA 0.820 0.644 C2 CIO C100 COMPOSITE C VALUE 0.785 0.785 0.982 USE 0.79 0.79 0.98 HISTORIC C VALUE 0.20 0.20 0.25 THE 1/2 ROW AREA = 0.18 ACRES COMPOSITE C VALUE C2 CIO C100 0.86 0.86, 1.00 TOTAL AREA = 1.00 ACRES SUMMARY FOR SUB BASINS Iw & Irow HISTORIC COMPOSITE C VALUE C2 CIO C100 0.32 0.32 0.39 DEVELOPED COMPOSITE C VALUE C2 CIO C100 0.80 0.80 0.98 SHEAR ENGINEERING CORPORATION COMPOSITE RUNOFF COEFFICIENT FOR SUB BASIN Is PAGE 2 PROJECT :LOT 5 AND 6 EVERGREEN PARK PROJ.NO. :1498-01-95 DATE: 10/22/95 LOCATION :EVERGREEN PARK - BY: MHO FILE :FISHCOEF NOTES :PHASE 2 ON SITE ONLY RUNOFF SURFACE COEF. CHARACTERISTICS AREA C C*A (acres) STREETS ASPHALT 0.272 0.950 0.258 CONCRETE 0.020 0.950 0.019 GRAVEL 0.000 0.500 0.000 ROOFS 0.598 0.950 0.568 LAWNS SANDY SOIL FLAT < 2% 0.000 0.100 0.000 AVERAGE 2 - 7% 0.000 0.150 0.000 STEEP > 7% 0.000 0.200 0.000 LAWNS HEAVY SOIL FLAT < 2% 0.050 0.200 0.010 AVERAGE 2 - 7% 0.000 0.250 0.000 STHHP > 7% 0.000 0.350 0.000 TOTAL AREA 0.940 0.856 C2 C10 C100 COMPOSITE C VALUE 0.910 0.910 1.000 USE 0.83 0.83 1.00 SHEAR ENGINEERING CORPORATION PAGE 3 DETENTION VOLUME REQUIRED FOR WEST DETENTION POND OF LOT 5 & 6 EVERGREEN PARK PROTECT: PHASE 1 OF LOT 5 & 6 EVERGREEN PARK DATE: 11/22/9S PROJ.NO. 1498-01-95 FILE: PISHCUHP BY MHO NOTE: 1/2 ROW INCLUDED IN AREA CUMULATIVE RUNOFF METHOD FOR SIZING DETENTION PONDS DESIGN STORM: 100 YEAR RUNOFF COEFFICIENT 1.00 RELEASE RATE: 0.71 CPS AREA: 1.00 ACRES INITIAL TIME: 5 MINUTES TIME INCREMENT: 5 MINUTES INFLOW INFLOW RELEASE STORAGE STORAGE TIME TIME INTENSITY RATE VOLUME VOLUME VOLUME VOLUME min sec iph cfs cf cf cf ac-ft r rrr+r++r+r+rr+r+rrrrxt+rrrrrrrrrrrrrr rrrrrr+r+++trt+ttrrtrrrrrrrrrrrrrx 5 300 9.30 9.30 2790.0 213.0 2577.0 0.06 10 600 7.14 7.14 4284.0 426.0 3858.0 0.09 15 900 6.06 6.06 5454.0 639.0 4815.0 0.11 20 1200 5.21 5.21 6252.0 852.0 5400.0 0.12 25 1500 4.63 4.63 6945.0 1065.0 5880.0 0.13 30 1800 4.20 4.20 7560.0 1278.0 6282.0 0.14 35 2100 3.81 3.81 8001.0 1491.0 6510.0 0.15 40 2400 3.60 3.60 8640.0 1704.0 6936.0 0.16 45 2700 3.28 3.28 8856.0 1917.0 6939.0 0.16 50 30003.02 3.02 9060.0 2130.0 6930.0 0.16 55 3300 2.80 2.80 9240.0 2343.0 6897.0 0.16 60 3600 2.60 2.60 9360.0 2556.0 6804.0 0.16 65 3900 2.43 2.43 9477.0 2769.0 6708.0 0.15 70 4200 2.30 2.30 9660.0 2982.0 6678.0 0.15 75 4500 2.17 2.17 9765.0 3195.0 6570.0 0.15 80 4800 2.07 2.07 9936.0 3408.0 6528.0 0.15 rrrrr++r+rr+rrrrr+xr+rrrrrrrrrrr+rr++rr+rrrxttt++++rt+rrr+rr++r+rr+rr+r+ DETENTION VOLUME REQUIRED = 6939.00 cf DETENTION VOLUME REQUIRED = 0.16 ac-ft NOTE: RELEASE RATE BASED ON AREA OF 1.51 ACRES & 0.47 CFS/ACRE. THE AREA INCLUDES THE 1/2 ROW AND ALL OF THE SITE SITUATED IN BASIN 4 AS DELINEATED IN THE AMENDED EVERGREEN - GREENBRIAR DRAINAGE REPORT CONTRIBUTING AREA CONSISTS OF SUBBASINS Iw AND Irow ONLY SHEAR ENGINEERING CORPORATION DEVELOPED PAGE 4 FLOW TO REGIONAL DETENTION POND PROJECT: LOT 5 & 6 EVERGREEN PARK DATE 11/24/95 FILE: FISHRAT PROJ. NO.1498-01-95 NOTES: BY MEO AREA (A)= 0.430 ACRES CONTRIBUTES FLOW TO REGIONAL DETENTION POND ONSITB AREA IN BASIN 3B OF EVERGREEN GREENBRIAR DRAINAGE REPORT RUNOFF COEF. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.91 0.91 1.00 ASSUME 95/5 IMPERVIOUS/PERVIOUS TIME OF CONCENTRATION (Tc) OVERLAND TRAVEL TIME (Ti) NOT APPLICABLE LENGTH =NA FEET SLOPE =NA 4 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 0.00 0.00 0.00 NOT APPLICABLE TRAVEL TIME (Tt)=L/(60*V) FLOW TYPE L (ft) _? S (}) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (}) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (}) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (}) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (}) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (}) _? ? V (fps) _? Tt(min)= 0.00 L (ft) _? S (}) _? ? .V (fps) _? Tt(min)= 0.00 NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2 TOTAL TRAVEL TIME (min) = 0.00 Tc =Ti+TOTAL TRAVEL TIME ASSUME = 10 MINUTES DUE TO SIZE OF AREA AND TO BE CONSERVATIVE 2 YEAR 10 YEAR 100 YEAR Tc (min)= 0.00 0.00 0.00 USE Tc = 10 10 10 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR I = 2.54 4.45 7.14 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 1.00 1.75 3.07 CONCLUDE:USE QIOO AS RELEASE RATE FROM EAST DETENTION POND SHEAR ENGINEERING CORPORATION PAGE 5 DETENTION VOLUME REQUIRED FOR BAST DETENTION POND OF LOT 5 & 6 EVERGREEN PARK PROJECT: PHASE 2 OF LOT 5 & 6 EVERGREEN PARK DATE: 11/22/95 PROJ.NO. 1498-01-95 FILE: FISHCUHP BY MBO NOTE: EASTERN PORTION OF SITE CUMULATIVE RUNOFF METHOD FOR SIZING DETENTION PONDS DESIGN STORM: 100 YEAR RUNOFF COEFFICIENT 1.00 RELEASE RATE: 3.07 CPS AREA: 0.94 ACRES INITIAL TIME: 5 MINUTES TIME INCREMENT: 5 MINUTES INFLOW INFLOW RELEASE STORAGE STORAGE TIME TIME INTENSITY RATE VOLUME VOLUME VOLUME VOLUME min sec iph cfs cf cf cf ac-ft rrrr+r++r+++r+++w++r+wrwwxwwxwwwwwwwxrwwwwwrwwwxwrwwwrxwrwxwxwx rxxrxxrx+ 5 300 9.30 8.74 2622.6 921.0 1701.6 0.04 10 600 7.14 6.71 .4027.0 1842.0 2185.0 0.05 15 900 6.06 5.70 5126.8 2763.0 2363.8 0.05 20 1200 5.21 4.90 5876.9 3684.0 2192.9 0.05 25 1500 4.63 4.35 6528.3 4605.0 1923.3 0.04 30 1800 4.20 3.95 7106!4 5526.0 1580.4 0.04 35 2100 3.81 3.58 7520.9 6447.0 1073.9 0.02 40 2400 3.60 3.38 8121.6 7368.0 753.6 0.02 45 2700 3.28 3.08 8324.6 8289.0 35.6 0.00 w rwwxwwrwxwxxrwxxxxrxxrxxrrxrrxrxrrrrrrrwrrrrxrrrwwwrwwwrrxrwrwrwxwwxwwx DETENTION VOLUME RRQUIRBD = 2363.76 cf DETENTION VOLUME REQUIRED = 0.05 ac-ft NOTE: RELEASE RATE BASED ON DEVELOPED 100-YEAR FLOW FROM PORTION OF SUBBASIN Iw LOCATED BASIN 3B AS DELINEATED IN THE EVERGREEN GREENBRIAR DRAINAGE REPORT. REFER TO PAGE 4 CONTRIBUTING AREA CONSISTS OF SUBBASIN Ie ONLY SHEAR ENGINEERING CORPORATION AVERAGE END AREA METHOD FOR WEST DETENTION POND VOLUMES PAGE 6 PROJECT :LOTS 5 & 6 EVERGREEN PARK DATE: 11/22/95 PROD. NO:1498-01-95 LOCATION:BLUE SPRUCE DRIVE BY MRO NOTES :PHASE 1 POND FILE: PISHAVG CONSTANT: 64 - 1 SQ IN. FIRST EVEN CONTOUR 68.6 FEET INVERT 68.33 FEET TOP ELEV 69.62 FEET INCREMENT 0.2 FOOT SCALE: 1" = 30 FEET rrrrtrxr +t+*rrrr rrft++++ rtrrrrrr rtrtxr+! r+r*rrrr rxt+x**+ trrrrr!! ****rrrr STAGE BLEV PLANI- AREA AREA VOLUME CUM. CUM. CUM. METER, (Al) (A2) (V1) VOLUME VOLUME VOLUME ft ft READING aq in sq ft cf cf cy ac-ft t rrtf lff ft**trrt fl+lf+*f ttrrlxtR +lkf t**t tklT!!!! f!****r• t!!!!!f* *trlrVf! 0.00 68.33 0 0.00 0 0 0 0 0.00 0.27 68.60 68.5 1.07 963 130 130 5 0.00 0.47 68.80 167 2.61 2348 331 461 17 0.01 0.67 69.00 430.5 6.73 6054 840 1301 48 0.03 0.87 69.20 637 9.95 8958 1501 2803 104 0.06 1.07 69.40 780 12.19 10969 1993 4795 178 0.11 1.27 69.60 899 14.05 12642 2361 7156 265 0.16 1.49 69.82 1017 15.89 14302 2964 10120 375 0.23 FORMULAE:A1= (PLANIMETER READING)/CONSTANT A2= (A1)*SCALE SQUARED VOLUME REQUIRED WITH 1/2 ROW = 6939 CF WATER SURFACE ELEVATION REQUIRED = 69.58 FEET FINISHED FLOOR ELEVATION = 70.5 FEET SEPARATION PROVIDED = 0.92 FEET REQUEST VARIANCE BECAUSE < 1.5 FRET MAXIMUM WATER DEPTH = 1.25 FEET REQUEST VARIANCE BECAUSE > 1.0 FOOT PREBBOARD PROVIDED = 0.24 FRET REQUEST VARIANCE BECAUSE < 1.0 FOOT CONCLUDE:SET OVERFLOW HEIGHT AT 69.58 POND WILL BE ADEQUATE w J1�vi" u n Vp N Q. 0 tTA SHEAR ENGINEERING CORPORATION AVERAGE END AREA METHOD FOR EAST DETENTION POND VOLUMES PAGE 7 PROTECT :LOTS 5 & 6 EVERGREEN PARK DATE: 11/22/95 PROT. NO:1498-01-95 LOCATION:BLUS SPRUCE DRIVE BY MHO NOTES :PHASE 2 POND FILE: FISHAVG CONSTANT: 64 = 1 SO IN. FIRST EVEN CONTOUR 68 FEET INVERT 67.8 FEET TOP ELRV 69.82 FEET INCREMENT 0.5 FOOT SCALE: 1" = 30 FEET ####tlxt ####lfff xt##tltt f4f##!#! tft#x### tftfttkx #ltttttx #tltf4Rk t!tltftf STAGE ELEV PLANI- AREA AREA VOLUME CUM. CUM. CUM• METER (Al) (A2) (V1) VOLUME VOLUME VOLUME ft ft READING sq in eq ft cf cf cy ac-ft t rrrrr++ +rrrrt++ frf rf rr+ #+f rf x+r ++lf xrxx ###tlffx ♦#+##!fr ###+#!tr fxx#++l+ 0.00 67.80 0 0.00 0 0 0 0 0.00 0.20 68.00 10 0.16 141 14 14 1 0.00 0.70 68.50 88 1.38 1238 345 359 13 0.01 1.20 69.00 247 3.86 3473 1178 1536 57 0.04 1.70 69.50 578 9.03 8128 2900 4437 164 0.10 2.02 69.82 727 11.36 10223 2936 7373 273 0.17 FORMULAE:A1= (PLANIMETER READING)/CONSTANT A2= (A1)*SCALE SQUARED VOLUME REQUIRED = 2363 CF WATER SURFACE ELEVATION REQUIRED = 69.14 PEST FINISHED FLOOR ELEVATION = 70.00 FEET SEPARATION PROVIDED - 0.86 FEET REQUEST VARIANCE BECAUSE < 1.5 FEET MAXIMUM WATER DEPTH = - 1.34 FEET REQUEST VARIANCE BECAUSE > 1.0 FEET PREEBOARD PROVIDED = 0.68 FEET REQUEST VARIANCE BECAUSE < 1.0 FOOT CONCLUDS:SBT OVERFLOW HEIGHT AT 69.30 POND WILL BE ADEQUATE FA SHEAR ENGINEERING CORPORATION i PAGE 8 SOUTH PARKING LOT OUTLET STRUCTURE PROJECT: LOT 5 & 6 EVERGREEN PARK DATE: 11/22/95 PROJECT NO 1498-01-95 BY MEO PROJECT LOCATION :BLUE SPRUCE DRIVE FORT COLLINS FILE NAME: FISHOUT INPUT FOR OUTLET STRUCTURE STRUCTURE TYPE: ? WEIR TYPE BROADCRESTED LOWER ORIFICE DIAM. (ft) = 0.25 WEIR LENGTH (ft) = 2.00 LOWER ORIFICE INV. (ft) = 68.33 WEIR INVERT (ft) = 69.Sa LOWER ORIFICE COEF. (Cl) = 0.65 WEIR CORP. (Cw) = 2.60 UPPER ORIFICE DIAM.(ft) = NA TOP OF BERM (ft) = 69.82 UPPER ORIFICE INV. (ft) = NA INIT. DELTA (ft) = 0.27 UPPER ORIFICE CORP. (Cu) = NA DELTA HEAD (ft) = 0.20 2 YR. RELEASE RATE (cfe) = NA 10 YR RELEASE RATE (cfa) = NA 10 YR WSBL REQUIRED (ft) _ ? 100 YR RELEASE RATE (cfe)= 0.36 100 YR WSEL REQUIRED (ft)= 69.58 OUTLET PIPE DIAM. (ft) = NA OVER FLOW YES PIPE SLOPE (%) = NA WEIR TYPE BROADCRESTED MANNINGS n = NA WHIR LENGTH (ft) = 230.00 WEIR INVERT (ft) = 69.82 WEIR COEF. (CWO) = 2.60 NOTE: THE HUNDRED YEAR RELEASE RATE IS FOR PHASE 1 ONLY ****r*** rx*rr*rr ******** *OUTPUT* *****x** *****t** ******** ******** PIPE AREA (SF) = 0.00 WETTED PERIMETER = 0.00 FRET HYD. RAD (FT) = 0.000 FEET R^2/3 = 0.0000 OUTLET PIPE CAPACITY = 0.00 CPS LOWER ORIFICE AREA (A) = 0.0491 SQUARE 'FEET UPPER ORIFICE AREA (A) = 0.0000 SQUARE FEET ****+rr +x*r++* *tr**r* *OUTPUT* *+r*xtt r**rr+x r****+* xtx**** t***rr* +xtt*xr rrttx** ******* OVERFLOW SPILLWAY r*rr*rr +*xr*r* rttrr** *rtrxrr HEAD HEAD HEAD SUB HEAD ELEV. OVER LOWER OVER .UPPER OVER WEIR TOTAL OVER WEIR TOTAL ELEV. LOWER ORIFICE UPPER ORIFICE WEIR PLOW FLOW WEIR FLOW FLOW ORIFICE FLOW ORIFICE FLOW ft ft cfa ft cfa ft cfa cfa ft cfa cfa ft 68 33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 68.33 68.60 0.27 0.13 0.00 0.00 0.00 0.00 0.13 0.00 0.00 0.13 68.60 68.80 0.47 0.18 0.00 0.00 0.00 0.00 0.18 0.00 0.00 0.18 68.80 69.00 0.67 0.21 0.00 0.00 0.00 0.00 0.21 0.00 0.00- 0.21 69.00 69.20 0.87 0.24 0.00 0.00 0.00 0.00 0.24 0.00 0.00 0.24 69.20 69.40 1.07 0.26 0.00 0.00 0.00 0.00 0.26 0.00 0.00 0.26 69.40 69.60 1.27 0.29 0.00 0.00 0.02 0.01 0.30 0.00 0.00 0.32 69.60 69.80 1.47 0.31 0.00 0.00 0.22 0.54 0.85 0.00 0.00 1.07 69.80 69.82 1.49 0.31 0.00 0.00 0.24 0.61 0.92 0.00 0.00 1.16 69.82 69.58 1.25 0.29 0.00 0.00 0.00 0.00 0.29 0.00 0.00 0.29 69.5E 69.635 1.31 0.29 0.00 0.00 0.06 0.07 0.36 0.00 0.00 0.41 69.64 ORIFICE EQUATION: CA(29H)''1/2 WEIR FLOW EQTN. : CwLH^3/2 1 SHEAR ENGINEERING CORPORATION PAGE 9 NORTH PARKING LOT OUTLET STRUCTURE PROJECT: LOT 5 & 6 EVERGREEN PARK DATE: 11/22/95 PROTECT NO 1498-01-95 BY MEO PROTECT LOCATION :BLUE SPRUCE DRIVE FORT COLLINS FILE NAME: FISHOUT INPUT FOR OUTLET STRUCTURE STRUCTURE TYPE: ? LOWER ORIFICE DIAM. (ft) = LOWER ORIFICE INV. (ft) = LOWER ORIFICE COEF. (Cl) = UPPER ORIFICE DIAM.(£t) = ? UPPER ORIFICE INV. (ft) = ? UPPER ORIFICE COEF. (CU) = ? 2 YR. RELEASE RATE (cfs) = MA 10 YR RELEASE RATE (cfs) = NA 100 YR RELEASE RATS (cfs)= OUTLET PIPE DIAM. (ft) = NA PIPE SLOPE (t) = NA MANNINGS n = NA WEIR TYPE BROADCRESTED 0.25 WEIR LENGTH (ft) = 2.00 68.71 WEIR INVERT (ft) - 69.58 0.65 WEIR COEF. (CW) = 2.60 TOP OF BERM (ft) - 69.82 INIT. DELTA (ft) = 0.09 DELTA HEAD (ft) = 0.20 10 YR WSEL REQUIRED (ft) = ? 0.35 100 YR WSBL REQUIRED (ft)= 69.58 OVER FLOW WEIR TYPE WEIR LENGTH (ft) = WHIR INVERT (ft) = WEIR COEF. (Cwo) = rrr+++rr ***r***r rx*+rrr+ *OUTPUT* *rxr**rr *******t ******•* ******** PIPE AREA (SF) = 0.00 WETTED PERIMETER = 0.00 FEET HYD. RAD (FT) = 0.000 FEET R-2/3 = 0.0000 OUTLET PIPE CAPACITY = 0.00 CPS LOWER ORIFICE AREA (A) = 0.0491 SQUARE FEET UPPER ORIFICE AREA (A) = 0.0000 SQUARE FRET **+**** ******* ******* *OUTPUT* **r**** t****** *r+r+x+ x+++++r *+*tr+r rxr+rrr *+r*rr* rrrrrrr OVERFLOW SPILLWAY **+*rrr r+*+r++ *rr*rxr rrr+rrr HEAD HEAD HEAD SUB HEAD ELEV. OVER LOWER OVER UPPER OVER WEIR TOTAL OVER WEIR TOTAL ELEV. LOWER ORIFICE UPPER ORIFICE WEIR PLOW FLOW WEIR FLOW FLOW ORIFICE FLOW ORIFICE FLOW ft ft cfs ft cfs ft cfs cfs ft cfs cfs ft 68.71 0.00 0.00 0.00 0.00 . 0.00 0.00 0.00 0.00 0.00 0.00 68.71 68.80 0.09 0.08 0.00 0.00 0.00 0.00 0.08 0.00 0.00 0.08 68.80 69.00 0.29 0.14 0.00 0.00 0.00 0.00 0.14 0.00 0.00 0.14 69.00 69.20 0.49 0.18 0.00 0.00 0.00 0.00 0.18 0.00 0.00 0.18 69.20 69.40 0.69 0.21 0.00 0.00 0.00 0.00 0.21 0.00 0.00 0.21 69.40 69.60 0.89 0.24 0.00 0.00 0.02 0.01 0.26 0.00 0.00 0.28 69.60 69.80 1.09 0.27 0.00 0.00 0.22 0.54 0.80 0.00 0.00 1.02 69.80 69.82 1.11 0.27 0.00 0.00 0.24 0.61 0.88 0.00 0.00 -1.12 69.82 69.58 0.87 0.24 0.00 0.00 0.00 0.00 0.24 0.00 0.00 0.24 69.58 69.652 0.94 0.25 0.00 0.00 0.07 0.10 0.35 0.00 0.00 0.42 69.65 r+rrr+++ r+rr*r*r rrrrr*rx trrrx+++ +r+++r+r *rrr*rt* r*r*r*+r xr+++++* +r+rrrrr rrxrrr+r rrrrrrrr r++xrrrr ORIFICE EQUATION: CA(2gH)^1/2 WEIR FLOW EQTN. : CwLHA3/2 TOTAL RELEASE RATE FROM SITE AT 100 YEAR W.S.ELEV. = 0.53 < 0.71 SHEAR ENGINEERING CORPORATION PAGE 10 BAST DETENTION POND OUTLET STRUCTURE PROJECT: LOT 5 & 6 EVERGREEN PARK DATE: 11/22/95 PROJECT NO 1498-01-95 BY MBO PROJECT LOCATION :BLUE SPRUCE DRIVE PORT COLLINS FILE NAME: FISHOUT INPUT FOR OUTLET STRUCTURE STRUCTURE TYPE: ? WEIR TYPE ? LOWER ORIFICE DIAM. (ft) = 0.60 WEIR LENGTH (ft) =NA LOWER ORIFICE INV. (ft) = 64.80 WHIR INVERT (ft) =NA LOWER ORIFICE CORP. (Cl) = 0.65 WEIR COEF. (Cw) = 2.60 UPPER ORIFICE DIAM.(ft) _ ? TOP OF BERM (ft) = 69.82 UPPER ORIFICE INV. (ft) _ ? INIT. DELTA (ft) = 3.00 UPPER ORIFICE CORP. (Cu) _ ? DELTA HEAD (ft) = 0.50 2 YR. RELEASE RATE (cfe) = NA 10 YR RELEASE RATE (cfe) = NA 10 YR WSBL REQUIRED (ft) _ ? 100 YR RELEASE RATE (cfs)= 3.07 100 YR WSBL REQUIRED (ft)= 69.14 OUTLET PIPE DIAM. (ft) = NA OVER FLOW _ YES PIPE SLOPE (%) = NA WHIR TYPE BROADCRESTED MANNINGS n = NA WEIR LENGTH (ft) = 15.00 WEIR INVERT (£t) = 69.30 WEIR COEH. (Cwo) = 2.60 NOTE: THE HUNDRED YEAR RELEASE RATE IS FOR PHASE 1 ONLY r•+++++r xtxtxrr+ r+r+++++ *OUTPUT* r++rr+xt xrrxr+++ ++++x+xt rr+++++x PIPE AREA (SF) = 0.00 WETTED PERIMETER = 0.00 FEET HYD. RAD (FT) = 0.000 PRHT R^2/3 = 0.0000 OUTLET PIPE CAPACITY = 0.00 CPS LOWER ORIFICE AREA (A) = 0.2827 SQUARE FEET UPPER ORIFICE AREA (A) = 0.0000 SQUARE FEET +++t t+x xr+rrr: +xrtrrr *OUTPUT* rt++++r trtttxr r+xr++t rxrr+r+ ttrrr+r +ttxrxr rrxrxrr rr+rrr♦ OVERFLOW SPILLWAY rrr+r++ xxr+rrr rxrxr++ ++rrxrr HEAD HEAD HEAD SUB HEAD ELHV. OVER LOWER OVER UPPER OVER WEIR TOTAL OVER WEIR TOTAL ELEV. LOWER ORIFICE UPPER ORIFICE WEIR FLOW FLOW WEIR FLOW FLOW ORIFICE FLOW ORIFICE PLOW - ft ft cfe ft cfe ft cfe cfe ft cfe cfs ft 64.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.80 67.80 3.00 2.SS 0.00 0.00 0.00 0.00 2.55 0.00 0.00 2.55 67.80 68.30 3.50 2.76 0.00 0.00 0.00 0.00 2.76 0.00 0.00 2.76 68.30 68.80 4.00 2.95 0.00 0.00 0.00 0.00 2.95 0.00 0.00 2.95 68.80 69.30 4.50 3.13 0.00 0.00 0.00 0.00 3.13 0.00 0.00 3.13 69.30 69.80 5.00 3.30 0.00 0.00 0.00 0.00 3.30 0.00 0.00 3.30 69.80 69.82 5.02 3.30 0.00 0.00 0.00 0.00 3.30 0.00 0.00 3.30 69.82 69.14 4.34 3.07 0.00 0.00 0.00 0.00 3.07 0.00 0.00 3.07 69.14 t xrr+rrr +txrrrr+ +r++t ttt rrr++r+t txrrrrrt ttxxrxrr rrr+xxxx rxrrrx+r ttxrrrr+ rtx+x+rx rrttr+r+ +xxx+♦rr ORIFICE EQUATION: CA(2gH)^1/2 WHIR FLOW EQTN. : CwLHA3/2 SHEAR ENGINEERING CORPORATION HISTORIC PAGE 11 FLOW FROM PHASE 1 TO BLUE SPRUCE DRIVE PROJECT: LOT 5 6 6 EVERGREEN PARK DATE 11/22/95 FILE: PISHRAT PROJ. NO.1498-01-95 NOTES: BY HBO AREA (A)= 1.330 ACRES CONTRIBUTES FLOW TO BLUE SPRUCE DRIVE ONSITE AREA IN BASIN 4 OF EVERGREEN GREBNBRIAR DRAINAGE REPORT RUNOFF CORP. (C) 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 SEE SPREAD SHEET ATTACHED ON PAGE 1 TIME OF CONCENTRATION (TO OVERLAND TRAVEL TIME (Ti) LENGTH = 280 FEET SLOPE = 0.50 $ 2 YEAR 10 YEAR 100 YEAR C = 0.20 0.20 0.25 Ti (min)= 35.40 35.40 33.43 NOT APPLICABLE FOR HISTORIC CONDITIONS TRAVEL TIME (Tt)=L/(60*V) FLOW TYPE L (ft) _? S ($) _? ? L (ft) _? S ($) _? ? L (ft) _? S ($) _? ? L (ft) _? S ($) _? ? L (ft) _? S ($) _? ? L (ft) _? S ($) _? ? L (ft) _? S ($) _? ? NOTE: ALL VELOCITIES TAKEN FROM FIGURE 3-2, Tc =Ti+TOTAL TRAVEL TIME 2 YEAR 10 YEAR 100 YEAR Tc (min)= 35.40 35.40 33.43 USE Tc = 35.5 35.5 33.5 INTENSITY (I) (iph) 2 YEAR 10 YEAR 100 YEAR 1 = 1.31 2.36 3.93 NOTE: INTENSITIES TAKEN FROM FIGURE 3-1 RUNOFF (Q= CIA) (cfs) 2 YEAR 10 YEAR 100 YEAR Q = 0.35 0.63 1.31 CONCLUDE:FOR REFERENCE ONLY V (fps) _? Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 V (fps) _? Tt(min)= 0.00 TOTAL TRAVEL TIME (min) = 0.00 No Text APPENDIX II Erosion Control Calculations Erosion Control Sequencing schedule Erosion Control security deposit estimates No Text RAINFALL PERFORMANCE STANDARD EVALUATION PROJECT: -} S 4 6 13l0,k CUcrS`ec� P -k STANDARD FORM A COMPLETED BY: DATE: IQ 131 5 DEVELOPED ERODIBILITY Asb Lsb Ssb Lb Sb PS SUBBAgIN ZONE (ac) (ft) M (feet) M M Zou �Z_u Zoo � x=`�Z32 30U 1Z •�r -1 MARCH 1991 8-14 DESIGN CRITERIA EFFECTIVENESS CALCULATIONS PROJECT: ��i �} t311Z ew-ry STANDARD FORM B COMPLETED BY: DATE: U13 5� Erosion Control C-Factor P-Factor Method. Value Value Comment YZvv<�i. Usou N X 1+J U '\ O g-S A3"�7�=.`/.=o sore d',o\ I•:o 4`-i �i n.:. S v T N GL ' 1.1j 01% Sad - o .0 Ito MAJOR PS SUB AREA BASIN M BASIN (Ac) CALCULATIONS �2.3Z =W MARCH 1991 8-15 DESIGN CRITERIA CONST.SEQ. F-Client/Fisher/Erosion/Const.Seq 1498-02-95 Date:10/11/95 CONSTRUCTION SEQUENCE Phase 1 only PROJECT: LOT 5 AND 6 BLOCK 5 EVERGREEN PARK STANDARD FORM C SEQUENCE FOR 19 96 ONLY COMPLETED BY:MEO/Shear Engineering Corp. Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. Year 196 Month J F M OVERLOT GRADING WIND EROSION CONTROL * Soil Roughening Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation Nettings/Mats/Blankets Other *** *** A M J J A S O N D STRUCTURES: INSTALLED BY: OWNER MAINTAINED BY: OWNER VEGETATION/MULCHING CONTRACTOR: OWNER DATE PREPARED: 1011I 95 DATE SUBMITTED: 10 12 95 APPROVED BY THE CITY OF FORT COLLINS ON: November 27, 1995 Project No: 1498-01-95 Basil Hamdan City of Fort Collins Stormwater Utility P.O. Box 580 Ft. Collins, Colorado 80522 Re: Lots 5 & 6, Block 5, Replat (No. 1) of Evergreen Park Fort Collins, Colorado Dear Basil, Attached is the erosion control security deposit estimate for Lots 5 & 6, Block 5, Replat (No. 1) of Evergreen Park. ESTIMATE 1: 320 LF of Silt Fence Q $ 3.00 per LF $ 960.00 1 - Gravel Inlet Filter @ $75.00 each $ 75.00 TOTAL ESTIMATED COST: $ 1,035.00 x 1.50 S 1,552.50 ESTIMATE 2: re -vegetate the disturbed area of 1.00 acre at $650.00 per acre $1,144.00 TOTAL ESTIMATED COST: $ 1,144.00 x 1.50 S 1,716.00 In no instance shall the amount of the security be less than $1,000.00. Therefore, the total required erosion control security deposit for Lots 5 & 6, Block 5, Replat (No. 1) of Evergreen Park will be $1,716.00. If you have any questions, please call at 226-5334. Sincerely Brian W. Shear, P.E. Shear Engineering Corporation BWS / meo cc: Greg Fisher Dave Stringer, City of Fort Collins 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 FAX (970) 282-031 1 November 27, 1995 Project No: 1498-01-95 Re: EROSION CONTROL SECURITY DEPOSIT REQUIREMENTS: Lots 5 & 6, Block - 5, Replat (No. 1) of Evergreen Park Fort Collins, Colorado A. An erosion control security deposit is required in accordance with City of Fort Collins policy (Chapter 7, Section C: SECURrIY; page 7.23 of the City of Fort Collins Development Manual). In no instance shall the amount of the security be less than $1000.00. 1. According to current City of Fort Collins policy, the erosion control security deposit is figured based on the larger amount of 1.5 times the estimated cost of installing the approved erosion control measures or 1.5 times the cost to re -vegetate the anticipated area to be disturbed by construction activity. i The cost to install the proposed erosion control measures is approximately $1,035.00. Refer to the cost estimate attached in Appendix I. 1.5 tunes the cost to install the erosion control measures is $ 1,552.50. ii. Based on current data provided by the City of Fort Collins Stormwater Utility, and based on an actual anticipated net affected area which will be disturbed by construction activity (approximately 1.76 acres), we estimate that the cost to re - vegetate the disturbed area will be $1,144.00 ($650.00 per acre x 1.76 acres). 1.5 times the cost to re -vegetate the disturbed area is $1,716.00. The $650.00 per acre for re -seeding sites of less than 1 acre was quoted to us by the City of Fort Collins Stormwater Utility staff. CONCLUSION: The erosion control security deposit amount required for Lots 5 & 6, Block 5, Replat (No. 1) of Evergreen Park will be $1,716.00. 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970)'226-5334 FAX (970) 282-0311 APPENDIX III Backup Diagrams and Exhibits Table 3-3; Rational Method Runoff Coefficients for Composite Analysis Table 3-4; Rational Method Frequency Adjustment Factors Figure 3-2; Estimate of Average Flow Velocity for Use with the Rational Formula Figure 3-1; City of Ft. Collins Rainfall Intensity Duration Curve R-M-P Medium Density Planned Residential District — designation for medium density areas planned as a unit (PUD) to provide a variation in use and building placements with a minimum lot area of 6,000 square feet. R-L-M Low Density Multiple Family District — areas containing low density multiple family units or for one -family orther use in two family dwellings lings strict andth a9 000 square feet forminimum lot area of 00square multiple -family dwellings. M-L Low Density Mobile Home District — designation for areas for mobile home parks containing independent mobile homes not exceeding 6 units per acre. M-M Medium Density Mobile Home District — designation for areas of mobile home parks containing independent mobile homes not exceeding 12 units per acre. B-G General Business District — district designation for downtown business areas, including a variety of permitted uses, with minimum lot areas equal to 1 /2 of the total floor area of the building. B-P Planned Business District designates areas planned as unit developments to provide business services.while protecting the surrounding residential areas with minumum lot areas the same as R-M. H-B wiith a minimuusiness mstrict � m lot area equalto 112 ofthe total floorea of automobile-orientated a area of the building.busi- nesses B-L Limited Business District — designates areas for neighborhood convenience centers, including a variety of community uses with minimum lot areas equal to two times the total floor area of the building. C Commercial District —designates areas of commercial, service and storage areas. I-L Limited Industrial District —designates areas of light industrial uses with a minimum area of lot equal to two times the total floor area of the building not to be less than 20,000 square feet I-P Industrial Park District —designates light industrial park areas containing controlled industrial uses with minimum lot areas equal to two times the total floor area of the building not to be less than 20,000 square feet. 1-G General Industrial District — designates areas of major industrial development. T Transition District — designates areas which are in a transitional stage with regard to ultimate development. For current and more explicit definitions of land uses and zoning classifications, refer to the Code of the City of Fort Collins, Chapters 99 and 118. Table 3-3 RATIONAL METHOD RUNOFF COEFFICIENTS FOR COMPOSITE ANALYSIS Runoff Coefficient Character of Surface Streets, Parking Lots, Drives: 0.95 Asphalt.................................................................................. 0.95 Concrete ..................................................... ........................................ ......................... 0. 50 Gravel................................................... ..................... 0. 95 Roofs ......................................................................................... ................. Lawns, Sandy Soil: 0.1 Flat <2% 5 ................ Average 2 to 7% ................................................................. 0.20 Steep >7% ....................................................... ................................... Lawns, Heavy Soil: 0.20 Flat<2%............................................................................................. 0.25 Average 2 to 7%.........................................:........................................ 0.35 Steep >7%................................................ .........:................................ MAY 1984 3-4 DESIGN CRITERIA 3.1.7 Time of Concentration In order to use the Rainfall Intensity Duration Curve, the time of concentration must be known. This can be determined either by the following equation or the "Overland Time of Flow Curves" from the Urban Storm Drainage Criteria Manual, included in this report (See Figure 3-2). Tc=1.87 (1.1 —CC,) D1t2 —Sr/3 Where Tc =Time of Concentration, minutes S =Slope of Basin, % C = Rational Method Runoff Coefficient D = Length of Basin, feet CI = Frequency Adjustment Factor Time of concentration calculations should reflect channel and storm sewer velocities as well as overland flow times. 3.1.8 Adjustment for Infrequent Storms The preceding variables are based on the initial storm, that is, the two to ten year storms. For storms with higher intensities an adjustment of the runoff coefficient is required because of the lessening amount of infiltration, depression retention, and other losses that have a proportionally smaller effect on storm runoff. These frequency adjustment factors are found in Table 3-4. Table 3-4 RATIONAL METHOD FREQUENCY ADJUSTMENT FACTORS Storrs Return Period Frequency Factor (years) C, 2 to—, 0 1.00 11 to25 1.10 26 to 50 1.20 51 to 100 1.25 Note: The product of C times C, shall not exceed 1.00 3.2 Analysis Methodology_ The methods presented in this section will be instituted for use in the determination and/or verification of runoff at specific design points in the drainage system. These methods are (1), the Rational Method and (2) the Colorado Urban Hydrograph Procedure (CUHP). Other computer methods. such as SWMM; STORM, and HEC-1• are allowable if results are not radically different than these two. Where applicable, drainage systems proposed for construction should provide the minimum protection as determined by the methodology so mentioned above. 3.2.1 Rational Method For drainage basins of 200 acres or less, the runoff may be calculated by the Rational Method, which is essentially the following equation: Q = CICIA Where Q = Flow Quantity, cfs A = Total Area of Basin, acres CI = Storm Frequency Adjustment Factor (See Section 3.1.8) C = Runoff Coefficient (See Section 3.1.6) 1 = Rainfall Intensity, inches per hour (See Section 3.1.4) 3.2.2 Colorado Urban Hydrograph Procedure For basins larger than 200 acres, the design storm runoff should be analyzed by deriving synthetic unit hydrographs. It is recommended that the Colorado Urban Hydrograph Procedure be used for such ana!ysis. This procedure is detailed in the Urban Storm Drainage Criteria Manual, Volume 1, Section 4. MAY 1984 3-5 DESIGN CRITERIA DRAINAGE CRITERIA MANUAL RUNOFF 50 30 F- 20 z w 0 D: w 0. 10 z w a 0 5 W CO 3 0 U 2 M W I- 3 1 I E0119MM _MEMO" IMMENENI„I-A=r '- „��„'/"_: I I r /■■■■� �/��/I/Ii■■Ili � � �MII �AMFAN AIII1%/���i����� 2 .3 .5 1 2 3 5 10 20 VELOCITY IN FEET PER SECOND FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE WITH THE RATIONAL FORMULA. *MOST FREQUENTLY OCCURRING"UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. 5 -1-84 URBAN DRAINAGE & FLOOD CONTROL DISTRICT No Text APPENDIX IV Stuffer Envelope Grading, Drainage and Erosion Control Plan Easement dedication exhibit for Lots 5 and 6, Block 5 EASEMENT F-ctient/ Fisher/ Drainage/ EASEMENT EASEMENT DEDICATION Project No: 1498-01-95 Date: 11/27/95 Revised: 12/12/95 KNOW ALL MEN BY THESE PRESENTS: That the undersigned being the owner of record of Lots 5 & 6, Block 5, Replat (No. 1) of Evergreen Park, City of Fort Collins, County of Latimer, State of Colorado, as recorded in Latimer County records at Book 1157, Page 0128, Reception Number 85405, do hereby dedicate and convey to the City of Fort Collins for public use forever hereafter a drainage easement described as follows: Beginning at the Northwest corner of Lot 5, Block 5, Replat (No. 1) of Evergreen Park, said point being on the Blue Spruce Drive Right -of -Way line and being the TRUE POINT OF BEGINNING_ of this description. Thence continuing along the north property line of said Lot 5, North 90°00'00" East, 301.25 feet; thence leaving said north property line and continuing South 00°00'00" East, 50.50 feet; thence North 90000'00" East, 65.75 feet; Thence South 00°00'00" East 49.50 feet; Thence North 90000'00" West, 367.00 feet to a point along the Blue Spruce Drive Right -of -Way; North 00000'00" East, 100.00 feet to the TRUE POE -IT OF BEGINNING. Excluding the following area; Beginning at the Northwest corner of Lot 5, Block 5, Replat (No. 1) of Evergreen Park, said point being on the Blue Spruce Drive Right -of -Way line; Thence continuing along the north property line of said Lot 5, North 90°00'00" East, 79.00 feet; thence leaving said north property line and continuing South 00°00'00" East, 10.25 feet to the POINT OF BEGINNING of this description. Thence North 90°00'00" East, 200.25 feet; Thence South 00000'00" East 60.25 feet; Thence North 90000,001, West, 200.25 feet; Thence North 00°00'00" East, 60.25 feet to the POINT OF BEGINNING. Beginning at the Southwest corner of Lot 6, Block 5, Replat (No. 1) of Evergreen Park, said point being on the Blue Spruce Drive Right -of -Way line and being the TRUE POINT OF BEGINNING of this description. Thence continuing along the south property line of said Lot 5, North 90000'00" East, 301.25 feet; thence leaving said south property line and continuing North 00°00'00" East, 50.50 feet; thence North 90°00'00" East, 65.75 feet; Thence North 00°00'00" East 49.50 feet; Thence North 90000'00" West, 367.00 feet to a point along the Blue Spruce Drive Right -of -Way; South 00000100" East, 100.00 feet to the TRUE POINT OF BEGINNING. Excluding the following area; Beginning at the Southwest corner of Lot 6, Block 5, Replat (No. 1) of Evergreen Park, said point being on the Blue Spruce Drive Right -of -Way line; Thence continuing along the south property line of said Lot 6, North 90°00'00" East, 79.00 feet; thence leaving said south property line and continuing North 00°00'00" East, 10.25 feet to the POINT OF BEGINNING of this description. Thence North 90°00'00" East, 200.25 feet; Thence North 00000'00" East 60.25 feet; Thence North 90°00'00" West, 200.25 feet; Thence South 00000'00" East, 60.25 feet to the POINT OF BEGINNING. I EASEn[ENr F-client/ Fisher/ Drainage/ EASEMENT Project No: 1498-01-95 Date: 11/27/95 Revised: 12/12/95 It is understood by the undersigned that, by acceptance of this dedication, the City of Fort Collins does not have the duty to maintain the easement. Witness our hands and seals this day of Owner of record of Lots 5 & 6, Block 5, Replat (No.1) of Evergreen Park STATE OF COLORADO ) )SS COUNTY OF LARHSAER ) The foregoing instrument was acknowledged before me this day of 19 , by Owner of record of Lots 5 & 6, Block 5, Replat (No. 1) of Evergreen Park Witness my hand and official seal. My Commission Expires: Notary Public ATTORNEY'S CERTIFICATE This is to certify that on the day of , A.D. 19 , I examined the title to the property hereon described and established that the owners and proprietors of record of said property as construed in C.R.S. 1973, 31-23-111, are as shown hereon as of said date. Signature: Registration Address: