Loading...
HomeMy WebLinkAboutDrainage Reports - 07/10/2014MARTIN MARTIN CONSULTING ENGINEERS June 12, 2014 Revised July 2, 2014 Mr. Wes Lamarque Stormwater Engineer City of Fort Collins 281 North College Avenue Fort Collins, CO 80524 City of Ft. Collins Approved Plans Approved By Date Re: Avago Technologies — Building 4 West Annex Expansion and Site Development Drainage Report, June 12, 2014 Revision Martin/Martin, Inc Project No.: 13.0688 Dear Mr. Lamarque, This letter serves to inform you of the proposed changes to the approved "Avago Technologies — Building 4 West Annex Expansion and Site Development Drainage Report" by Martin/Martin, Inc. dated May 21, 2013. Specifically, the revised drainage report with a date of June 12, 2014 addresses the following revisions: • The size of Basin Al has been increased to account for the increase in proposed roof area for the Building 4 West Annex Expansion Building. • Basin Bl (previously landscaped area) has been eliminated. • Basin B2 boundary and overall imperviousness has been updated. • Basin Cl overall imperviousness has been decreased with the proposed removal of a portion of the existing asphalt parking lot. The removal of the asphalt parking lot will offset the increased overall site imperviousness due to the addition of roof area to Basin Al. • The resulting overall site imperviousness and composite "C" factors remain unchanged from the approved report dated May 21, 2013. The site imperviousness is 26% and the composite "C" factor is 0.43. The revised "Hydrologic computations— composite c-factor compliance" page taken from the revised drainage report dated June 12, 2014 is attached to this letter for reference. This condition has been accomplished by removing existing parking lot areas for new building and paved areas. • Hydraulic Calculations were revised to reflect updated flows per the revised rational method calculations. • Maximum flooding heights were revised to reflect updated hydraulic calculations. Please do not hesitate to call at 303.431.6100 or email at bsmith@martinmartin.com or pbuckley@martinmartin.com should you have any questions or concerns. Sincerely, Bret M. Smith EIT II MARTIN/MARTIN, INC 12499 WEST COLFAX AVENUE LAKEWOOD. COLORADO 80215 MAIN 303.431-6100 MART{NMARTIN.COM Peter Buckley, PE Senior Project Manager HYDROLOGIC COMPUTATIONS - COMPOSITE C-FACTOR COMPLIANCE PROJECT INFORMATION PROJECT NAME: BLDG 4 EXPANSION PROJECT #: 1 MARTIN / M RTI N 6/17/2 aI DATE: 6/17/2014 CONy LTIN• [N04Nf906 BLDG 4 REPORT APPROVED BASINS WITHIN PROPOSED DEVELOPMENT Basin Impervious Pervious A, Imp A, Pery A, total �, Imp %Pery Composite "C" C. C. ac ac ae 4 0.95 0.251 0.19 1.441 1,67 11 86 0.32 5 0.95 0.25 0.12 0.65 0.77, 16 84 0.36 6 0.95 0.25 0.00 6.75 6.75 0 100 0.25 14 0.95 0.25 0.25 0.18 0.43 58 421 0.66 17 0.95 0.25 0.56 1.40 1.96 29 711 0.45 18 0.95 0.25 0.05 0.85 0.90 6 94 0.29 19 0.95 0.25 0.10 2.75 2.85 4 96 0.27 20 0.95 0.25 0.08 0.30 _ 0.38 _ 21 790.40 22 0.95 0.25 0.79 0.22 1.01 78 22 0.80 22A 0.95 0.25 0.72 0.15 0.87 83 17 0.83 23 0.95 0.25 0.49 0.25 0.74 67 34 0.72 24 0.96 0.25 0.56 0.07 0.63 89 11 0.87 24A 0.95 0.25 0.35 0.02 0.37 95 5 0.91 24B 0.95 025 0.25 0.06 0.31 81 19 0.81 25 0.95 0.25 0.48 0.17 0.65 74 26 0.77 _ 25A 0.95 0.25 0.42 0.12 0.54 78 22 0.79 26 0.95 0.25 0.27 0.03 0.30 90 10 0.88 27 0.95 0.25 0.04 0.001 0.04 100 0 0.95 36 0.95 0.25 0.16 0.17 0.33 48 52 0.59 37 0.95 0.25 0.29 0.04 0.33 88 12 0.87 _ 38 0.95 0.25 0.23 0.09 0.32 72 28 0.75 40 0.95 0.25 0.05 0.01 0.06 83 17 0.83 39 0.95 0.25 0.00 2.02 0.00 100 SRE 1 6.49 17.74 24.23 27 73' BLDG 4 WEST ANNEX EXPANSION AND SITE DEVELOPMENT PROJECT BASINS Impervious Pervious A, Imp A, Pery A, total o Basin (ac) ac ac / Imp / Pery Composite "C" Al 0.95 0.251 0.83 0.00 0.83 1001 0 0.95 A2 0.95 015 0.05 020 015 19 81 6.38 A3 0.95 0.25 0.76 0.00 0.76 100 0 0.95 _ A4 0.95 0.25 0.07 2.18 2.26 3 97 0.27 AS 0.95 025 0.31 0.00 0.31 100 0 0.95 A6 0.95 0.25 0.09 1.70 1.79 5 95 0.29 A7 0.95 025 0.45 2.06 2.51 18 82 0.38 AS 0.95 0.25 0.19 0.03 0.22 88 12 0.86 A9 0.95 025 0.13 0.03 0.15 83 17 0.83 A10 0.95 0.25 0.16 0.03 0.19 86 14 0.95 All 0.95 025 0.22 2.18 2.40 9 911 0.31 B2 0.95 015 0.30 0.66 0.95 31 69 0.47 B3 0.95 025 0.46 1.35 1.81 25 75 0.43 B4 0.95 0.25 0.23 0.32 0.55 42 58 0,54 B5 0.95 025 0.07 0.19 025 27 73 0.44 B6 0.95 025 0.19 0.60 0.79 24 76 0.42 B7 0.95 0.25 0.19 0.471 0.66 28 72 0.45 Cl 0.95 025 0.75 0.27 1.02 741 26 0.77 C2 0.95 025 0.05 1.57 1.62 3 97 0.27 C3 0.95 025 0.29 1.68 1.97 15 Lo 0.35 C4 0.95 0.25 0.00 0.69 0.69 0 100 0.25 OS -A 0.95 025 0.57 1.68 225 26 74' 0.43 SITE E 6.35 17.89 24.24 Ir 26 74 0.43 1 J B. SMITH 12:48 PM6/17/2014 APPROVED BASIN COMPOSITE -MINOR AMENDMENT.xIs MARTIN/MARTIN INC.