Loading...
HomeMy WebLinkAboutDrainage Reports - 06/13/2018t TAIT M'.$ 101.1 (w{UIHI p 970161311447 - -- laa Com November 8, 2017 Revised May 30, 2017 ' City of Fort Collins Engineering Division 281 N College Fort Collins, CO 80524 Drainage Letter for the Proposed Site Development located at 2610 E Harmony Road, Fort Collins, CO 80528 Lot 1, Front Range Village Second Replat Dear Rick Richter, Cily->of'trf:_Collins pprov d Plans Approved ey 6163 E Coum, Rood 16. l0•e10ftd, CO 00537 ' This drainage letter is to convey the proposed site development conforms to the overall report, which is titled Final Drainage and Erosion Control Study for Front Range Village, Fort Collins, Colorado prepared by Stantec Consulting Inc. 209 South Meldrum, Fort Collins, Colorado 80521 (February, ' 2007), and will hereafter be referred to as the Master Report. The subject property is currently an undeveloped lot. The lot is an 84,834 square foot (1.95 acre) site located in the southeast quarter of Section 32, Township 7 North, Range 68 West of the 61h Principal ' Meridian, City of Fort Collins, County of Larimer, State of Colorado, on the northwest corner of Harmony Rd and Corbett Drive. The subject property lies on Lot 1 of the Front Range Village Subdivision Second Replat. It is bound to the South by Harmony Road, to the east by an existing ' Compass Bank, to the north by a private access drive, and to the west by Lot 2 of the Pads at Harmony. Proposed improvements to the site include a building to be constructed on the south side of the site ' with a total footprint of about 14,350 square feet, consisting of a strip mall of two restaurants with a combined square footage of 8,670 square feet and four retail -stores with a combined square footage of 5,680 square feet. The site will have 98 parking spaces, including 1 ADA van accessible parking space ' and 3 ADA car accessible parking spaces, paved driveways, walks, parking stalls, a trash enclosure, utility services and landscaping. The site consists of Type C Soils, Nunn clay loams, and existing backfill. This site is located in flood Zone X, "Areas determined to be outside the 0.2% annual chance floodplain." ' Existing drainage patterns convey flows to the northeast corner of the property where there is an existing type R inlet on the north side of the private drive aisle. The Master Report was calculated using an overall imperviousness of 85-percent for this basin. The proposed lot is accounted for in the Final ' Drainage Report as a portion of Basins 100 and 150. Basin 100 has a total area of 3.83 acres. Basin 100 has a C100 of 0.85 and flows of Q10 =15.24 cfs and Q1oo=38.14 cfs. Basin 150 has a total area of 3.36 acres. Basin 150 has a C100 of 0.65 and flows of Q,o=8.10 cfs and Q1oo=23.09. Lot 1 has an area ' of 1.95 acres, 1.65 of which lies in Basin 100 and 0.30 of which lies in basin 150. The weighted averages of the flows for pre -developed Lot 1 are Clio = 7.28 cfs and Q100=18.48 cfs. The post developed site will discharge at flow rates less than or equal to these flows in the 10 and 100 year storm events. 1 The Master report calculated a C100 of 0.65 for Basin 150 to size the basin's inlet to accept 23.1 cfs. The as -built conditions for this basin has a C100 of 0.61 using the C values from the original report, resulting in a flow of 17.31 cfs generated in the as -built condition. Compass Bank and BJ's Brewhouse ' also accept 0.57 acres of flow from the Master Report's Basin 150. The combination of this acreage and the difference in C values for basin 150 result in a 11.35 cfs that was anticipated to enter design point 150 that is not currently draining there. The proposed conditions for Lot 1 utilize this credit by conveying some on site flows to this design point. ' Post -development drainage will be conveyed via a private, on -site storm drainage network which will be composed of a series of inlets and pipes that discharge to either the existing storm sewer system near ' the northeast corner of the site or the existing storm sewer south of the existing Compass Bank (Lot 2). After this, the runoff from the site will be conveyed to an existing detention pond within the Front Range Village system prior to the ultimate discharge of the runoff into the Cache la Poudre. Pipe sizing calculations are attached to this letter for reference. ' The post development property consists of ten on -site sub -basins and three off -site basins. Basin E generally flows to the northeast and basin F generally flows to the southeast See drainage sheet for additional information. Post -development Sub -basin E1 consists of 0.54 acres of parking lot and landscaped area on the northwest portion of the property. This basin is 69% impervious. Runoff from this basin drains into a ' proposed curb grate inlet that discharges to an 12" HDPE that spills to the east and continues existing drainage patterns. Sub -basin E1 discharges at a rate of 1.88 cfs in the 10-year storm event and 4.38 cfs in the 100-year storm event. ' Post -development Sub -basin E2 consists of 0.33 acres of parking lot and landscaped area on the northeast portion of the property. This basin is 79% impervious. Runoff from this basin drains into a proposed 4' curb inlet with vertical opening and connecting to a proposed 24" RCP storm drain pipe. The basin discharges to the existing infrastructure. Sub -basin E2 discharges at a rate of 1.27 cfs in the 10-year storm event and 2.83 cfs in the 100-year storm event. Post -development Sub -basin E3 consists of 0.14 acres of landscaping and paved walkway along the northeast corner and west edge of the property. This basin is 40% impervious. Runoff from this basin continues existing drainage patterns by discharging to the compass bank property. Sub -basin E3 discharges at a rate of 0.34 cfs in the 10-year storm event and 0.96 cfs in the 100-year storm event. Post -development Sub -basin E4 consists of 0.06 acres -of paved drive aisle and landscaping on the south side of the property. This basin is 61 % impervious. Runoff from this area sheet flows to the private drive aisle and continues existing drainage patterns. Sub -basin E4 discharges at a rate of 0.19 cfs in the 10-year storm event and 0.47 cfs in the 100-year storm event. Post -development Sub -basin E5 consists of 0.12 acres of paved patio area, paved walkway and landscaping on the southwest of the property. This basin is 31% impervious. Runoff from this area drains into proposed curb cut that drains to the existing private drive aisle. Sub -basin E5 discharges at a rate of 0.26 cfs in the 10-year storm event and 0.78 cfs in the 100-year storm event. Post -development Sub -basin F1 consists of 0.33 acres of proposed building rooftop. This basin is 90% impervious. Runoff from this basin drains to the south of the building where it spills via roof drains to tie into the 12" pipe that runs along the south side of the building. Sub -basin F1 discharges at a rate of 1.40 cfs in the 10-year storm event and 2.99 cfs in the 100-year storm event. Post -development Sub -basin F2 consists of 0.12 acres paved patio area, paved walkway and landscaping on the southwest of the property. This basin is 46% impervious. Runoff from this area flows to a proposed area inlet where flows are conveyed to the southeast. Sub -basin F2 discharges at a rate of 0.32 cfs in the 10-year storm event and 0.85 cfs in the 100-year storm event. ■ ' Post -development Sub -basin F3 consists of 0.05 acres of walkway and landscaping on the south side of the property. This basin is 37% impervious. Runoff from this area drains into proposed area inlet drain on the south side of the building and drains into the proposed storm drain infrastructure. Sub - basin F3 discharges at a rate of 0.12 cfs in the 10-year storm event and 0.34 cfs in the 100-year storm event. Post -development Sub -basin F4 consists of 0.05 acres of paved walkway and landscaping on the south ' side of the property. This basin is 37% impervious. Runoff from this area drains into proposed area inlet drain along the south side of the 5' sidewalk adjacent to the west side of the building and drains into the proposed storm drain infrastructure. Sub -basin F4 discharges at a rate of 0.12 cfs in the 10-year storm ' event and 0.34 cfs in the 100-year. storm event. Post -development Sub -basin F5 consists of 0.21 acres of driveways, paved walkway and landscaped boxes in the southeast portion. This basin is 81 % impervious. Runoff from this basin is conveyed via ' sheet flow and curb and gutter to a proposed 4' curb inlet with vertical opening and drains into the proposed storm drain infrastructure. Sub -basin F5 discharges at a rate of 0.81 cfs in the 10-year storm event and 1.78 cfs in the 100-year storm event. ' Post -development Sub -basin OFF1 consists of 0.14 acres of landscaping and paved walk along the south property line. This basin is 33% impervious. Runoff from this basin sheet flows onto Sub -basin E9 and follows the same drainage patterns as this E9. Sub -basin OFF1 discharges at a rate of 0.31 cfs in ' the 10-year storm event and 0.92 cfs in the 100-year storm event. Post -development Sub -basin OFF2 consists of 0.34 acres of landscaping and paved walk along the south property line. This basin is 38% impervious. Runoff from this basin sheet to an area inlet that ' conveys flows to the east. Sub -basin OFF2 discharges at a rate of 0.81 cfs in the 10-year storm event and 2.30 cfs in the 100-year storm event. ' Post -development Sub -basin OFF3 consists of 0.53 acres of landscaping and paved walk along the south property line. This basin is 45% impervious. Runoff from this basin sheet flows to an area inlet. or basin E5 to then falls into proposed drainage patters. Sub -basin OFF3 discharges at a rate of 1.39 cfs in the 10-year storm event and 3.75 cfs in the 100-year storm event. ' Basin E discharges at a rate of 9.42 cfs in the 100 year event, generating 7.01 cfs less than the allowable discharge for this portion of basin 100 from the master report, which is 16.43 cfs. Using the ' credit from the as built conditions, BJ's and Compass bank described earlier in this letter, Basin F has an allowable discharge rate of 11.35 cfs in the 100. year event. Basin F discharges at a rate of 6.29 cfs in the 100 year event, generating 5.06 cfs less than the allowable release rate. ' The overall post -development site imperviousness is 68%, compared to the 85% imperviousness that was assumed with the original drainage report. After improvements, the site will discharge at a combined rate of 6.69 cfs in the 10 year storm event, generating 0.59 cfs fewer than anticipated ' conditions, which was 7.28 cfs. In the 100 year event, the total site discharge rate will be 15.71 cfs, generating 2.77 cfs less than the anticipated conditions, which was 18.49 cfs. Water quality will be provided via sheet flow across landscaped areas in conjunction with the detention ponds that were constructed with the overall development. ' There is no req ' ed site as the overall imperviousness of the site will.be decreased from the c' to ns in the original drainage report for the subdivision. ,..I' H O •� Sinc y � <^'• s 703 ' A x HoP Vice P si ent �\ . RUNOFF COEFFICIENT CALCULATIONS Project Name: C013031 - Front Range Village - Lot 1 Calculated By: NE Check By: AH Date: 5/30/2018 RECOMMENDED RUNOFF COEFFICIENT AND PERCENT IMPERVIOUS' Runoff Coefficients C-value LAND USE %IMPERVIOUS 70 YEAR 1 100 YEAR LANDSCAPE 2 0.22 0.52 DRIVES AND WALKS 90 0.87 0.91 ROOFS 90 0.87 0.91 POST -DEVELOPMENT CONDITIONS: AREA DESIGN A(LAND.) AC A(D&W) AC A(ROOFS) AC A(TOTAL) AC C10 C100 % IMPERVIOUS E1 E2 0.131 0.04 0.29 0. 0.33 0.71 0.79 0.86 79 E3 E4 ES F1 F2 F3 F4 0.08 0.02 0.08 0.00 1 0.06 0.03 0.03 0.06 0.04 0.04 0.00 0.06 .02 0.02 0.00 0.00 0.00 0.33 0.00 0. 0.0 0.14 0.06 0.12 0.33 0.12 0.05 0.05 0.50 0.65 0.44 0.87 0.55 0.48 0.48 0.69 0.78 0.65 0.91 0.72 0.68 0.68 40 61 31 90 46 37 37 FS OFF1 OFF2 OFF3 0.02 0.09 0.20 0.27 0.19 0.05 6.14 .26 0.00 0.00 0.00 0.00 0.21 0.14 0.34 0.53 0.81 0.45 0.49 .54 0.87 0.66 0.68 0.7 81 33 38 45 TOTAL: 2.96 WEIGHTED: 0.80 59 TOTAL ONSITE: 1.95 ONSITE WEIGHTED: 0.81 68 TOTAL OFFISTE: - --1.01-""-- FFISTE WEIGHTED: -_-0.70'- 1 Runoff coefficients and percent impervious per Urban Drainage and Flood Control District, Volume 1 - Dated January 2016 *CONTRIBUTING OFFSITE AREAS DRAINING INTO DETENTION BASIN BUT OUTSIDE OF PROPOSED PROPERTY. 10-YEAR INDIVIDUAL BASIN FLOWS Project Name: C01303A - Front Range Village - Lot 1 Calculated By: NE Check By: AH Date: 5/30/2018 POST -DEVELOPMENT CONDITIONS: SUB -BASIN DATA DIRECT RUNOFF CONTRIBUTING BASINS BASIN AREA acre C10 EFFECTIVE AREA acre I in/hr SUB BASIN Q cfs E1 0.54 0.71 0.39 4.87 1.88 E2 0.33 0.79 0.26 4.87 1.27 E3 0.14 0.50 0.07 4.87 0.34 E4 0.06 0.65 0.04 4.87 0.19 E5 0.12 0.44 0.05 4.87 0.26 F1 0.33 0.87 0.29 4.87 1.40 F2 0.12 0.55 0.07 4.87 0.32 F3 0.05 0.48 0.02 4.87 0.12 F4 0.05 0.48 0.02 4.87 0.12 F5 0.21 0.81 0.17 4.87 0.81 OFF1 0.14 1 0.45 1 0.06 4.87 10.31 OFF2 0.34 1 0.49 1 0.17 4.87 1 0.81 OFF3 0.53 0.54 1 0.29 4.87 1 1.39 TOTAL: 9.20 TOTAL ONSITE: 6.69 MAX ALLOWED ONSITE: 1 7.28 Q10= C`I'A Intensity values from City of Fort Collins Figure 3-1A 100-YEAR INDIVIDUAL BASIN FLOWS ' Project Name: C01303A - Front Range Village - Lot 1 Calculated By: NE ' Check By: AH Date: 11 /8/2017 POST -DEVELOPMENT CONDITIONS: SUB -BASIN DATA DIRECT RUNOFF CONTRIBUTING BASINS BASIN AREA acre C100 EFFECTIVE AREA acre I in/hr SUB BASIN Q cfs E1 0.54 0.82 0.44 9.95 4.38 E2 0.33 0.86 0.28 9.95 2.83 E3 0.14 0.69 0.10 9.95 0.96 E4 0.06 0.78 0.05 9.95 0.47 E5 0.12 0.65 0.08 9.95 0.78 F1 0.33 0.91 0.30 9.95 2.99 F2 0.12 0.72 0.09 9.95 0.85 F3 0.05 0.68 0.03 9.95 0.34 F4 0.05 0.68 0.03 9.95 0.34 F5 0.21 0.87 0.18 9.95 1.78 OFF1 1 0.14 1 0.66 0.09 9.95 0.92 OFF2 0.34 1 0.68 0.23 9.95 2.30 OFF3 0.53 1 0.71 0.38 9.95 3.75 TOTAL: 22.68 TOTAL ONSITE: 15.71 MAX ALLOWED ONSITE: 18.48 Q100= C*I*A 1 1 Intensity values from City of Fort Collins Figure 3-1A Inlet Report tHydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, May 30 2018 Curb Inlet Basin E1 100 yr ' Grate Inlet Calculations 'Location Curb Length (ft) = Sag = -0- Compute by: Q (Cfs) Known Q = 4.38 Throat Height (in) = -0- Grate Area (sqft) = 4.33 Highlighted Grate Width (ft) = 2.95 Q Total (cfs) = 4.38 Grate Length (ft) = 1.47 Q Capt (cfs) = 4.38 Bypass (cfs) = -0- 'Q Gutter Depth at Inlet (in) = 8.55 Slope, Sw (fUft) = 0.083 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.039 Gutter Spread (ft) = 10.72 Local Depr (in) = 3.00 Gutter Vel (ft/s) = -0- Gutter Width (ft) = 1.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- anm =$'Mw II II an 10 9.72 ___.. _.... __.— Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3130 by Autodesk, Inc. Thursday, Nov 2 2017 Curb Inlet Basin E2-100 Yr ' Curb Inlet Calculations 'Location Curb Length (ft) = Sag = 4.00 Compute by: Q (Cfs) Known Q = 2.83 Throat Height (in) = 4.00 Area (sqft) = -0- Highlighted 'Grate Grate Width (ft) = -0- Q Total (cfs) = 2.83 Grate Length (ft) = -0- Q Capt (cfs) = 2.83 Q Bypass (cfs) Depth at Inlet (in) = -0- = 4.58 Gutter Slope, Sw (ft/ft) = 0.083 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.020 Gutter Spread (ft) = 15.93 Local Depr (in) = -0- Gutter Vel (ft/s) = -0- Gutter Width (ft) = 1.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- 'iL �immslons in Md 1 Inlet Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, May 30 2018 Curb Inlet Basin F5 100 yr ' Curb Inlet Calculations = Sag Compute by: Known Q 'Location Curb Length (ft) = 4.00 Q (cfs) = 1.78 Throat Height (in) = 4.00 Grate Area (sqft) Grate Width = -0- = -0- Highlighted Q Total (cfs) = 1.78 (ft) Grate Length (ft) = -0- Q Capt (cfs) = 1.78 Bypass (cfs) = -0- 'Q Gutter Depth at Inlet (in) = 6.77 Slope, Sw (ft/ft) = 0.083 Efficiency (%) = 100 Sx (ft/ft) = 0.030 Gutter Spread (ft) = 8.70 'Slope, Local Depr (in) = 3.00 Gutter Vel (ft/s) = -0- Gutter Width (ft) = 1.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- II Iaim.5,0.5 m it I 1 0 1.0 __ _..._ _.__.1] ______ _ Channel Report ' Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3DO by Autodesk, Inc. 12 inch Pipe Basin E1 ' Circular Diameter (ft) = 1.00 Elev (ft) = 100.00 'Invert Slope (%) = 2.00 N-Value = 0.013 ' Calculations Compute by: Known Q ' Known Q (cfs) = 4.38 1 I f Highlighted Depth (ft) Q (cfs) Area (sgft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) E ev (t) Section ' 102.00 1 ' 101.50 101.00 t100.50 100.00 ' 99.50 0 1 Thursday, Nov 2 2017 = 0.72 = 4.380 = 0.61 = 7.22 = 2.03 = 0.88 = 0.90 = 1.53 2 3 Depth (1 2.00 1.50 1.00 101-111 M1 -0.50 Reach (ft) Channel Report ' Hydraflow Express Extension for Aulodesk® AutoCAD® Civil 3D® by Autodesk, Inc. 12 in HDPE Basin F5 Circular ' Diameter (ft) = 1.00 'Invert Elev (ft) = Slope (%) = 100.00 0.75 N-Value = 0.013 ' Calculations Compute by: Known Q ' Known Q (cfs) = 1.78 ' EI ft Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) ev ( ) Section ' 102.00 ' 101.50 t101.00 ' 100.50 100.00 99.50 0 1 Reach (ft) Thursday, Nov 2 2017 = 0.55 = 1.780 = 0.44 = 4.00 = 1.67 = 0.57 = 0.99 = 0.80 2 3 Depth (1 2.00 1.50 1.00 0.50 -0.50 Channel Report ' Hydraflow Express Extension for Autodesk0 AutoCAD® Civil 3D0 by Autodesk, Inc. 18in HDPE Basins F1, F4, F5, and OFF3 ' Circular Diameter (ft) = 1.50 ' Elev (ft) = 100.00 tInvert Slope (%) = 0.75 N-Value = 0.013 ' Calculations Compute by: Known Q ' Known Q (cfs) = 8.52 ' Elev (ft) ' 102.00 ' 101.50 101.00 ' 100.50 100.00 1 1 99.50 0 1 1 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (fUs) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Section Thursday, Nov 2 2017 = 1.16 = 8.520 = 1.47 = 5.81 = 3.23 = 1.13 = 1.26 = 1.68 2 3 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk0 AutoCAD® Civil 3DOO by Autodesk, Inc. 12 in HDPE Basin F2 and OFF1 Circular Diameter (ft) = 1.00 Invert Elev (ft) = 100.00 Slope (%) = 1.25 N-Value = 0.013 Calculations Compute by: Known Q ' Known Q (cfs) = 1.77 f Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) E G L (ft) Elev (t) Section ' 102.00 101.50 101.00 ' 100.50 100.00 99.50 0 1 Thursday, Nov 2 2017 = 0.47 = 1.770 = 0.36 = 4.85 = 1.51 = 0.57 = 1.00 = 0.84 2 3 Depth (i 2.00 1.50 1.00 [I1&7i1 t+ e -0.50 Reach (ft) Channel Report ' Hydraflow Express Extension for Autodesk® AUtoCAD® Civil 3D® by Autodesk, Inc. 24in HDPE @ 1%to Existing Offisite Inlet Circular ' Diameter (ft) = 2.00 Invert Elev (ft) = 100.00 Slope (%) = 1.00 N-Value = 0.013 ' Calculations Compute by: Known Q ' Known Q (cfs) = 12.58 ' Elev (ft) Section t103.00 1 102.50 ' 102.00 101.50 ' 101.00 ' 100.50 ' 100.00 ' 99.50 0 1 1 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) 2 3 Reach (ft) Thursday, Nov 2 2017 = 1.07 = 12.58 = 1.72 = 7.32 = 3.29 = 1.28 = 1.99 = 1.90 Depth (ft) 3.00 2.50 mail] 1.50 Md41 0.50 M -0.50 4 '' Culvert Report ' Hydraflow Express Extension for Autodesk@ AutoCAD® Civil 3D® by Autodesk, Inc. 12 inch pipe F2 Off1 F1 ' Invert Elev Dn (ft) = 4944.85 Calculations Length (ft) = 138.00 Qmin (cfs) 'Pipe Slope (%) = 1.25 Qmax (cfs) Invert Elev Up (ft) = 4946.58 Tailwater Elev (ft) (in) = 12.0 'Rise Shape = Circular Highlighted Span (in) = 12.0 QtotaI (cfs) 'No. Barrels n-Value = 1 = 0.013 Qpipe (cfs) Qovertop (cfs) Culvert Type = Circular Corrugate Metal Pipe Veloc Dn (ft/s) 'Culvert Entrance Coeff. K,M,c,Y,k = Headwall = 0.0078, 2, 0.0379, 0.69, 0.5 Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) 'Embankment Top Elevation (ft) = 4949.72 Hw/D (ft) Top Width (ft) = 130.00 Flow Regime ' Crest Width (ft) = 1.00 ' Ela Irtl 99000 12 inch pipe F2 OH1 F1 a9a9 00 t. • K a9aB 00 _ ' 9NT 00 r a 4W W ' aW500 a9aa W ' 49l].00 0 10 20 l0 a0 50 BO 10 80 90 f00 110 120 130 IN 160 (AICIIIY GWYM MGL FmGnY 1 1 Wednesday, May 30 2018 = 3.32 = 3.32 = (dc+D)/2 = 3.32 = 3.32 = 0.00 = 4.50 = 5.06 = 4945.74 = 4947.36 = 4947.94 = 1.36 = Inlet Control 1. DoP01 A 342 242 1 42 Rocs 101 OQ 058 1M .2.m R Culvert Report ' Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. 12 inch pipe F2 Off1 F1 F3 Off2 ' Invert Elev Dn (ft) = 4943.69 Calculations Length (ft) 90.00 Qmin (cfs) tPipe Slope (%) = 1.26 Qmax (cfs) Invert Elev Up (ft) = 4944.82 Tailwater Elev (ft) 'Rise (in) Shape = 12.0 = Circular Highlighted Span (in) = 12.0 Qtotal (cfs) 'No. Barrels n-Value = 1 = 0.013 Qpipe (cfs) Qovertop (cfs) Culvert Type = Circular Corrugate Metal Pipe Veloc Dn (ft/s) 'Culvert Entrance Coeff. K,M,c,Y,k = Headwall = 0.0078, 2, 0.0379, 0.69, 0.5 Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) 'Embankment Top Elevation (ft) = 4948.62 Hw/D (ft) Top Width (ft) = 85.00 Flow Regime ' Crest Width (ft) = 1.00 ' g.. IRI 1919 00 12 Inch pipe F2 O117 F1 F3 OIQ 4W ao ' .N700 4WA Ott 4%6 co ' 4514,100 4943M ' waoo 0 10 m m w so eo m 90 ioo 110 GrcWv GAVM HGL Fmbne 1 Wednesday, May 30 2018 = 5.96 = 5.96 _ (dc+D)/2 = 5.96 = 5.96 = 0.00 = 7.63 = 7.59 = 4944.67 = 4947.06 = 4947.69 = 2.87 = Inlet Control RW DWI, in) 41e 31e 21e 1 to R 1e -on .1.0 .2.0 Red n (R) —4950-- — — --` —4950— �— 4949---`'494a--- --------------- ------ Lit ��ti Callbire COMPASS BANK SHEET DR Ca:,bre Eng=vnn. Ina DRAINAGE EXHIBIT SCALE: 1'=40' 8201 Soulpak Lane, una 200 — # �� �1br°�� �ng , °° ` DRAINAGE CONFORMANCE SAT MAY2011 oConwuc ion N.up. t CM Erpne g Surveynp . I ' I I L- - - - - - - - - - - - - _ ___ _--- —6BYY rt� —6BIPP -- -___ __-_-- PI{NATE DRNE_ _ _ —6r rr ---ir ---er — �-•�Yr -- -ior �br — b —ir Ap }.._- 0 AirA- tolz , - sL-0—IM _ o,s,�RES � L--' -E d.m s� Ofiq-DmcPs — OnOq - 19 CFS ` rrrr 9 aLRER2 A -aW (r qq- ,09[FS gtoq - am its O s-Dnm a-a•.Tx7 � r Lr - -� WAFFADRNN '%4� 2RAre_.IR w L - 4k� ,o�LAFA DR.ri PROPOSe7,453F raL®ro 1d15 RESTAURANT AleawsREs ty AND BREWHDUSE �Ding -IZI - OnOq - 30e CYS / i - C d 1TARCgIE A OMITp .. �/ \ TE -LWmlO r r+v...DLx-v / L-Sawn LM" If1F PAUO— �- TfTI-- d ,r LREAORNN dRXre-.B¢ae to.nEAbww -r Nv.. s+x.,2 T!• TE-.�s��, w I I ,D•NIWDRNN .1 t/WTE. aa.s/• rw.-4W= i -.ia .r nv.--•t- _mot •ai� L. .rrrrrrrrrr HARMONY ROAD 10 I I j I m I I 1 \ m I I t1 I I iI I ,Y I f UII 0 W I U I i I I I � i m I tare I I I I •4' 6 I �kF`KF m I � I I I I I I �4eW I s unofficial copy was downloaded on Oct-25-2017 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com -Fr-;0 of—. ,-„^..^. ra, ,. f Fne r..lt:n- t T.a:r.-. 90n w—A Rt -_, Pne rmu— rn eneon t Te e LEGEND nL STWG xTDDR -------- ^------- paOp•..'S[OCgrQ.R J B.pVE gv.Nu�F •c em,uzsTo%L --�-__ __ ST:,Eµ EL0af N1%PEa'X MN ,y NVA oTwv,c m nvsL,Xsl DRsiIPGE auBNp/. BOWMRf ■ - ■ ■ ■ - ■ ■ STORMWATER NARRATIVE ELS"WE m AVA N,. qnT PLDL TED Iv THE ProN[RPxcE LtLNOE MTEB ON T.E NLV OOPNERarcRBETr MVE LNO E waLYOnl wrrnr C0LLv4.M0ft p 0„YAEPI'rTEOMNRaE S�kETRB.BSO\ERW.O tO MV O.3"%. LMATWCXTHENq%NENDWn,EWL INESTORYR•L'CP e ,aiNfN xwEVEOTo THE EBIBYN6OTarAliaN BN1r LOuiEDwEsr 6 TTHEHE eR Pf W POSm IMPLEyyEIENfEME,O MNNINN iLE Fi1LRN10 CL'NWIL a/,-,fIM3 LNDCONEY9 C.14NNL i0'NE ELaTW0EiC1W,BtM[n SYSR4 T' LCOe101NREE.E EW W W,EIE A1IIlC TB: WER 91DE OF 1NEpRTO M°miwc N1E1an4NomN e[RrnasEC ME/. w.-NiEPROPp�DTo caLEEci wLIEP NAFpLiLY AOJLCENt 10 iNE BJE ENTIMFMT IREA16ROC/ nuNaPr ar:,NE SMIH Ff+G O[ INE sTE D_RENnG PaR Trcea[cTsrrE m iNC_UfiC N inf O�LRML [%i'i ruNGEN,UGE 3Nt ER STCPM SYSRY STORM STRUCTURE SCHEDULE Oi O M, G'?, EAS'NpEE pEILT2W Dt Gld BN4N SHET:T �1 cMlE-•oLxm cRNre-•Sam xy lw.w.•anxa ,r1w..13 M •2Iw OlR-pIIm ,r iNv Wour-m ,r LW. w•N}59 O] PR U,CH mX5w 1$EE DElNLSpY O PR OJDCN aLBW IEEE EEILI,$LN saEEr>s s,tFT 3J GRNTE-•E•a �0 Efure-•wcm le'iw.r-OYm +r wv.m-•u, zr e'iw. cut -.Ban le•rw °•a -LP•, rl TBNqueY ^'m-4 dl/IMgbN Ir.'MM DigjSafely. i-C�-LIZ•iYSi I,nDC.Diq �MaOMI rp ��Y•� O 2 O 10 p LB SCALE: 1" = 20.00' VWPARTNERS bend: Dperatlens : build SB ELRNITIIONc LVE tM ,RML G ".MB p•E,TJ].]eAT WOPLRTNERE com m— LU LU m = LU Ow LN wwLLZ� m (7000 �g��L) w f— J ZU; Q Z > W- Z Qaw OW O QU)jZU ~ W LLJQ F- WZ=OO NN LL - LL W CO = z REvpnr ■ ■ ■ ■ ■ ` ■ f>D ■ IL ■ a W h 2 a HYDROLOGIC SUMMARY TABLE tee 119 118 Ila 1 03 - 057 1 _ 0.92 .. 464 252 1027 567 120 _ 72O 059 1 _0.91~ 0.92 264 588 121 122 121 122 OA2 081 167 420 086 0.71 2.25 6.30 123 123 1 1.24 0.50 293 757 t24 124 0.11 1 0.95 0.53 +.14 in 125 031 084 1 /8 310 122 126 067 0.95 3 03 6.63 130 130 100 0.95 498 *072 131 1 131 OB1 0.67 2.64 675 132 1 132 023 0,25 1.05 226 : 123 133 0.14 1 095 0,65 140 134 134 0.82 095 1 379 015 139 135 0.39 0.70 131 3.35 ! 139 135 0.30 _ 995 _ 1 B5 1.55 137 137 047 095 219 1 4.71 178 15 134 091 819 +834 139 1 139 1.70 058 3.93 1063 140 1 140 0,38 1 0.05 1.15 310 141 _ 141 3.26 0 95 1506 3243 142 142 123 085 4.81 1227 143 _ 143 49D _ _I 0.76 180E 4613 160 y_150 335 085 BID 23.09 151 1 151 143 0.62 354 11.00 1% ISO 163 005 655 1623 161 161 097 OUT 3.77 9.82 182 1821 077 090 1 3.38 768 eel 163 0.65 i 095 2.39 I 0.44 164 i 766T1&S 164 1.50 O53 083 I S.Ji _ 1377 _ 091 I 241 542 I, POND SUMMARY TABLE 'Pane Total Vol. Ww. Vol. PMtd.d t%•Yr V/BEL - IWA) (ac11 Nl A 64 843 8 23 30 _� L% i6 23.12 M13.39 ----- RIGNr-a-wAr -..� PROPOSI'D RO.LME DUSTING CONTOURS �.o� NEW STORY MAN NM MANHCU: ENSRNG SON( OR. YROPOSFD SNAIE 4� PRgN)YO AVERAGE STREET SLOPE WRECmON OF ROw RESIGN PANT _ DRAINAGE BASIN BOUNDARY NO.. . BASIN NUMBER 1 AG. . BASIN AREA (N ACRES) FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED City Engineer Dote CHECKED BY: WAIN It Raete.alar Utility Dole CHECKED BY: St.m tw Utility Dale CHECKED BY: Port 4 Recwtion Dole CHECKED BY: TmtT:c Engineer Dot. CHECKED BY -.- Dow THESE PLANS HAVE BEEN RENEWED IT THE LOCH DIM FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE RENEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER OR THE LOCK ENTITY FOR ACCU li AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE. ME REVIEW DOES NOT IMPLY TIER OUANTMES OF ITEMS ON ME PLANS ARE THE FINAL QUANTITIES REGURED. ME REVIEW 5 NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FNV/CNL RESPONSIBUTY BY ME LOCH ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHowN THAT MAY BE RE00RE0 DURING ME DRNS1161Gf.0N RISE. ? w 0 �_ 5 z W H � a � o> LLI a 4a m� Of a3 � EL< LL �dm Pm ISed 100% PLANS NOT FOR CONSTRUCTION J.m ,y:i NRNH Nne... 1 IY Nnc C-tel Mr al. JAN 4i n., e.a oa WINLDD pe.t ma C-151 ReMNRD 9BB1 0 23 of 139 494 I I lEI i N} [] *PROPOSED MET 1 ii 12' HOPE � ❑ I ( S 1H tii4 i r - 1 PROPMg -%-- INLET / 1 / / 10 A` F 5 {. - / ❑B !9!J L CURB / 0 PEDESTRIAN EASEYENT I /5A !94g L - - % 4946. - _ L I , CJ s� %6 I 69 lr ♦� 0.3 79 LOT 2 I COMPASS BANK 4 � 4Y I aga'1 � I '} •i1 A:\ 1 DR�4. un n� T i91] I LC I / lD" 494E ❑ 2' CURB CUT 4g4g O 11 EASEMENT agAB 494E 5 4g4g 14z 1 I 1 1 _ E4 b I 2' CURB CUT h , 1 1 0.0 61 k I, 4 b 1 /949 VALT i .l 1W f„ 'i LL E5 I 0.1 319 77 ti I \ \ \\ 1 I r, 2 F5 1 .2 81 6:I / I i '2% F3 F4 i 0. PROPOSED AREA LNLET� I 0.0 379 .0 37 -lox' s ! 1 1 F , tI' HOPE 0.1 46- 1 % ' I2' HOPE 12' HOPE 7 PROPOSED PROPOSED CURB WIET 1 , AREA INLET ' 1 1 ' S 1 1 �� 1 PROPOSED AREA INLET _SC m' NODE 1 1 1 1 IY HOPE 2i HOPE -. 1 1 ' 1 OFF2 ' PROPOSED i MANHOLE 5„ OFF3 �S - �-SD SP 1 i 34 389 i 5 J 5 45- LEGEND -SO- PROPOSED STORM DRAW - - PROPERTY LINE --------- POST DEVELOPMENT ORAINACE BASIN A = BASIN DESIGNATION 6 � B =AREA IN ACRES C = % IMPERVIOUSNESS GENERAL NOTES DIMENSIONS ARE FROM ROW UNE TO FLOW UNE UNLESS OTHERWISE NOTED/SHOWN. CONTRACTOR TO ICRIFY AL HORIZONTAL DIMENSIONS WITH ARCHITECTURAL i PANS AND NOTE ANY DISCREPANCIES PRIOR 10 CONSTRUCTION. SEE ARCHITECTURAL SITE PLAN FOR ALL BUILDING AND STRUCTURE DETAILS. SEE INOMDUAL FOUNDATION PAM FOR ALL PRECISE BUILONG DIMENSIONS ALL SIGNS TO MATCH STYLE OF EXISTING 51CNS ON STE. STORMWATER RUNOFF NOTES: TOTAL LOT AREA: 1.95 ACRE TOTAL DISTURBED AREA 2.12 ACRE PRE -DEVELOPMENT ASSUMED z IMPERNOJS E5% nn POST -DEVELOPMENT z RHPERMDUS. 63% POST -DEVELOPMENT ORSTE O-YR STORM RUNOFF: 6.69 CFS POST -DEVELOPMENT ONSITE IOD-YR STORM RUNOFF Iz94 CFS �. 0 3 gqg � R 1qg� t` SUMMARY RUNOFF TABLE BASIN ID CONTRIBUTING AREA (ACRES)_(CFS) C VALUE 1001R PEAK 10YR PEAK IODYR (CFS) Et 0.54 0.82 1,88 4.38 E2 0.33 0.86 1.27 2.83 E3 0.14 0.69 0.34 0.96 E4 0.06 0.78 0.19 0.47 E5 0.12 0.65 0.26 0.78 Ft 0.33 0,91 1.40 2.99 F2 0.12 0.72 0.32 0.85 F3 0.05 0.68 0.12 0.34 F4 0.05 0.68 0.12 0.34 F5 0.21 0.87 0.61 1.78 OFF1 0.14 0.66 0.31 0.92 OFF2 0.34 0.68 0.81 2.30 OFFS 0.53 0.71 1.39 3.75 1 1 1 1 1 1 1 E HARMONY ROAD 1 1 1 33 It i � SCALE: t• • M -------------------- o -- z d LLJi 0 < IY 111 �W} z gWf j UJ EY LEl A x M 0UW Lu Z m O F F O -i PREPARED UNDER THE SUPERVISION OF TNT A ASSOCATES. NC. DIG, C D�DD a Fy pq8 m Poi `fib ) S�e�JIb S�Bg - AJEX HOWIE D R N 0