Loading...
HomeMy WebLinkAboutDrainage Reports - 07/27/1995June 30, 1995 Mr. Basil Hamdan Stormwater Utility City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 Dear Basil: STEWART& SSOCIATES Consulting Engineers and Surveyors This letter is regarding the storm drainage for the proposed Brueggers Fresh Bagel Bakery, which is situate on a part of Lot 2, Campus West Shopping Center. The site is at the Northwest comer of West Elizabeth Street and South Shields Street intersection. The historic site contained a convenience store and gasoline sales. The area of the site after right-of-way was taken for the Shields Street widening is 0.1929 acres. The historic impervious area is 7259 square feet, and the developed impervious area will be 7304 square feet. The 45 square feet increase of hard surfacing is 0.5% of the total area and is well within the allowable increase that does not cause the need of detention. There will be no onsite storm water detention on this site. The drainage pattern for the site will not change. The adjacent property to the North of the site partially historically sheet flows across the site. That pattern will not change. The parking lot for Brueggers Bakery will sheet flow from North to South and will discharge through the driveway to the Elizabeth Street North gutter and then East 48 feet to an existing curb inlet. The East half of the building and the outdoor patio area will drain into fifteen 6-inch diameter area inlets in the landscaping area and the storm water will be carried in a 4-inch diameter perforated P.V.C. pipe to the existing curb inlet in Elizabeth Street. The erosion control that will be provided is the foundation which will be constructed as soon as the existing building and existing pavement are demolished. Base material will be left or replaced in part of the parking area to preclude erosion. A silt fence will be constructed along the East and part of the South property lines. The erosion control calculations are included with this letter. Also, the cost of erosion control is enclosed. if you have any questions regarding this site, please call. Sincerely, �...� a. Richard A. Rutherford, P.E. & .S. President rsc enclosures James H. Stewart and Associates, Inc. _ . 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382 STEWART$,6SSOCIATES Consulting Engineers and Surveyors June 30, 1995 Mr. Basil Hamdan Stormwater Utility City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 Dear Basil: The following is the cost estimate for erosion control facilities for Brueggers Fresh Bagel Bakery at the Northwest comer of West Elizabeth Street and South Shields Street. 1. Silt Fence 140 L.F. @ $2.00 $280 2. Reseeding 8404 S.F. @ $.0298 $250 The collateral will be the $1000 minimum fee. If you have any questions regarding this cost estimate, please call. Sincerely, - Qom(,'' Richard A. Rutherford, P.E. & L.S. _. President . rsc James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382 CONSTRUCTION SEQUENCE PROJECT: B Fie rH $a_ -4BaK6Rr STANDARD FORM C SEQUENCE. FOR 19 9S ONLY COMPLETED BY: .e A 2 DATE: J &mg 79i i��s Indicate by use of a bar line or symbols when erosion control measures will be installed Major modifications to ..an approved schedule may_require submitting a new schedule for approval by the -City Engineer. 99St YEAR I MONTH j I F I M I A-I-_M_I_.1-I-J--I A --I s -1 o_-I N__ o ---------------------------- -------------- OVERLOT GRADING I _ I WIND EROSION CONTROL I Soil Roughing Perimeter Barrier Additional Barriers ! Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Plantinc Sod Installation Nettings/Mats/Blankets Other --------------------------------- +---- 4---- }---- +•---- ------ STRUCTURES: INSTALLED BY MAINTAINED BY VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED HOI/SF-C:1989 APPROVED BY CITY OF FORT COLLINS ON. JANUAR•i 1991 8-20 DESIGN CRITERIA EFFECTIVENESS CALCULATIONS ------------------------ - --------------- =----------------------------- PROJECT: 13FvaGGEres FgEsH BAe6c BAKegy _,STANDARD FORM B !I COMPLETED BY: R q p -DATE: J+ee 2,frif�r I I Erosion Control C-Factor P-Factor Method --------- - Value Value Comment ! ------- ------------------------------ 15A2.E ,50iz_- /.00 --------- boo. FovAIDATioAI 0.01 .1.00 O�0579At. SILT FENCE /.00 OSD 13:ASS MATe F_/4j p.os 1. o-fl o• 04s? Ac. ----------------- 1 PS SUB AREA BASIN (%) BASIN (Ac) CALCULATIONS ----- TQ ACT ' ° 7s g /o T--- %ACT ----- -------------------------------------------- AL, W T C C= �.089/x/,00) 1 (0,osm x o.or)+ �a4s�xo.os W70 C. = a48 wT„ P = 0-S0 F F = �I -- io,98,c • SU� x /oo = 76 o ok ---------------------------------------------------------------------- HDI/SF-B:1989 RAINFALL PERFORMANCE STANDARD EVALUATION I------------------------.---------------------------------------- PROJECT: Bjeu6aaEies Fre6.rH t3,aGec 1341cr,ey STANDARD FOI COMPLETED" BY: RAX DATE: ,love ----------------------- =------------------ —---------- -----------• DEVELOPEDIERODIBILITY Asb Lsb Ssb Lb Sb I SUBBASIN ZONE (ac) �(ft) (%) (feet) (q) -- TO%AL. ire- MOOLotArer O IgZ9/IC. Id3, / z7 --- - � ?I --� i I inn