HomeMy WebLinkAboutDrainage Reports - 12/14/1989NC
Engineering Consultants
2900 South College Avenue
Fort Collins, Colorado 80525
303/226-4955
December 14, 1989
Ms. Susan Hayes
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522
RE: AMENDED ESAB FINAL DRAINAGE REPORT
Dear Susan:
We are pleased to submit to you this Amended Final Drainage
Report for the ESAB site.
Please call if you have questions.
Respectfully,
RBD, Inc.L�
�,rtJIO�C
Cort Nickel, P.E.
cc: 033-014
YJ250 f 4
Other Offices: Vail, Colorado 303/476-6340 9 Colorado Springs, Colorado (719) 598-4107
r
Engineering Consultants
2900 South College Avenue
Fort Collins, Colorado 80525
303/226-4955
December 14, 1989
Ms. Susan Hayes
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado 80522
RE: AMENDED FINAL DRAINAGE REPORT FOR ESAB AT OAKRIDGE BUSINESS
PARK, FOURTEENTH FILING
Dear Susan:
The ESAB site is located at the northeast corner of the Oakridge
development. The ESAB site is bounded on the north by Harmony
Road (State Highway No. 68), the east by the Union Pacific Rail-
road and is bounded on the southwest corner by Innovation Drive.
The site is located within the McClellands Major Basin of South
Fort Collins, Colorado. The attached vicinity map shows the
project site.
The site is currently covered with natural grasses and slopes to
the Southeast at approximately 1% where it is redirected south by
the Union Pacific Railroad embankment; which runs north to south.
It is then detained by a regional ponding facility located in the
southeast corner of the Oakridge development. This regional pond
is sized for selected sites within the development as more fully
explained in the "Master Drainage Study for the Oakridge Business
Park", by RBD Inc., September 27. 1989. This report specifies
that storm flows on the ESAB site shall be detained by use of on -
site storm drainage detention facilities and shall release at a l/
rate not greater than 0.5 cfs/acre for the 100 year storm condi-
tion and 0.2 cfs/acre for the 10 year storm condition.
The ESAB site is divided into two drainage basins; as shown on
the attached drainage plan. In general, Basin "A" includes the
northwest quarter of the building extended to Harmony Road along
with the western parking lot, while Basin "B" includes the
remaining roof area, the South and East parking lots and all
other areas, bounded by Harmony Road on the North and the Union
Pacific Railroad on the east. Offsite flows from Harmony Road
will be prevented from entering the site by the required Harmony
Other Offices: Vail, Colorado 303/476-6340 • Colorado Springs, Colorado (719) 598-4107
Road berming as shown on the plans. Flows from the area west of
this site will be negligible and no flows are anticipated from
the south or east. The above described sites were measured for
total area, impervious area and pervious area. Once determined,
a composite runoff coefficient was calculated. The following
table more fully explains those calculations.
Basin Total Pervious Impervious Composite C100 =
Area Area Area/ C Cx1.25
(acres) (acres) (acres)
A 2.84 .79 2.05 (.79x.2)+(2.05x.95) = 0.741 0.927
B 6.41 2.73 3.68 (2.73x.2)+(3.68x.95)= 0.631 0.788
6.41
Using the information above, and maximum allowable release rates
of 0.5 cfs/acre and 0.2 cfs/acre, the required pond volumes were
determined using the Mass Diagram Method. A staged release rate
for the initial 10 year storm will be accommodated for each_of
the Pon areas. The staged release for Pond A will be b�l. facilitated by future offsite improvements as required upon 111044
completion of the Oakridge Business Park Master Drainage Plan. 1AM
The staged release for Pond B will be constructed with the pond �p
through the designed outlet structure. YYY
Computer printouts of the Mass Diagram Method are enclosed in the
Appendix for your reference. As shown, Pond "A" and Pond "B"
require 19,640 ft3 and 36,095 ft3 of storage for the 100 year
storm; respectively. For the 10 year storm, the storage volume
for Pond A was not computed because of the above mentioned
reason; the storage volume for Pond B was computed to be 25711
ft3 Each detention pond has been graded to achieve these volumes
(reference calculations in Appendix). Pond "A" utilizes the
western parking lot to achieve this volume and drains into an ex-
isting storm drain system in Innovation Drive. Pond "B" utilizes
the undeveloped tract on the South side of the site and drains
into an existing drainageway on the eastern edge of the Oakridge
Development. The discharge from these systems drains into the
regional detention pond mentioned earlier. The grading results
in a parking lot depth of 1.33 ft. for Pond "A" and a depth of
2.90 ft. in Pond "B". (Reference calculations in the Appendix).
If the depth in either pond should rise slightly greater than the
depths shown above, the ponds will overflow to the south and dis-
charge will be carried by sheet flows in the direction of the
regional pond. A summary table displaying the results and
analysis follows this report.
Erosion control measures have been incorporated into the accom-
panying drainage plans to reduce adverse impacts related to
offsite discharge. ESAB's operations do not adversely effect
water quality. Waste from their operations are filtered and
monitored and outfall into the sanitary sewer system. For these
reasons no need is
measures.
seen for special water quality filtration
When the recommendations from this report are.implemented, along
with the City of Fort Collins drainage criteria, this site will
drain stormwater in a safe and controlled manner.
If you have any questions or comments, please feel free to call.
Sincerely,
RBBD, Inc.
t dZ
44'Cort Ni el, P.E.
Project Engineer
cc: 035-012
HORSETOOTH ROAD!:..
L r.
Sri < '.
�� `�. 1 n- v; non
warrenPaiki i / I ;COUNTY ROAD 40 0
• N
• .. r cc
NCollindate
I '\
v , .
NOV
�. \ • , , <u `�I ;� •_•ho`dott .Course
s L eke
ozr
Ul LA.
32
(114
Virat;w Park, I, ���.•�.. \ 1 i Vf ; 11 I Trait Park i \I
_ � I ' 1 � - �I. • _I' � II � \1 `.I . � ! I �— it ` `�.
HARMONY ROAD`_-:
/., • c_vsl ��: i. • ...'i— i a: �J" Il:u,nry,./ I�•.•'�a-'.�..�W.y,.�-`�
til
COUNTY ROAD 38
"'t i c��✓ % I o
Z i • . 'mac•., �: // 1 I ' . t d/�
~� << • a �.: -' JEGT,SIfE I /
rye_ .�QEE J \) REGIONALr
DETENTION �; )
10
r' \� a
U is
VICINITY MAP
NO SCALE
BSAB - 100 YEAR STORM FLOW CONDITION
MAX
DETENTION DETENTION BASIN RELEASE RATE ORIFICE
POND VOLUME DEPTH AREA 0.5 cfs/ac DIAMETER
A 19,640 cf 1.33 ft 2.84 ac 1.42 cfs 5.25 in
B 36,095 cf 2.90 ft 6.41 ac 3.20 cfs =34.0 in
= Weir length around proposed standpipe.
BSAB - 10 YBAR STORM FLOW CONDITION
MAX
DETENTION DETENTION BASIN RELEASE RATE ORIFICE
POND VOLUME DEPTH AREA 0.2 cfs/ac DIAMETER
A 13,820 cf 1.20 ft 2.84 ac 0.57 cfs =:
B 25,711 cf 2.56 ft 6.41 ac 1.28 cfs 5.5 in
:: Future facilities will accoo®odate this flow
APPEND 2 X
MASS DIAGRAM METHOD
+o
DETENTION VOLUMES
PROJECT: ESAB SITE
COMA NTS:BASIN A
MAXIMUM ALLOWABLE RELEASE (C S) = 1.42
RATIONAL EQUATION: O = CIA
c,c«» 0.927 A(area) ® 2.84
TIME of CONCENTRATION =
TIME CA
(min)
s 2.6326B
10 2.6326G
15 2.6326B
20 2.6 68
25 2.63268
30 2.6326e
35 2.63268
40 2.6326B
45 2.63269
50 2.6326e
55 2.63268
60 2.63269
70 2.63268
BO 2.63268
90 2.63268
100 2.63268
110 2.63268
120 2.63268
I
INFLOW
OUTFLOW
STORAGE
(in/hr)
(ca ft)
ccu !t)
(cu !t)
(ac ft)
9
7108.236
426
66e 6
i \ \
7.3
11531.17,
852
10679.13
0.245159
6
14216.47
1278
12938.47
0.297026
5.2
16427.92
1704
1.4723.92
0.338014
4.6
19165.49
2130
16035.49
0.368124
4.15
19666.11
2556
1711.0.11
0.392794
3.8
2I008.7e
2992
18026.7a
0.41sese
3.5
22114.51
340e
18706.s1
0.429442
23101.76
3834
19267.76
0.4427,27
3
23694.12
4260
19434.12
0.446146
2.8
24325.96
4&g6
19639.96
0.450e71
2.6
24641.GB
5l12
19529.9e
0.448344
2.3
25431.68
5964
19467.63
0.446916
2.05
25905.57
6816
19089.57
0.438236
1.85
2630o.47
7666
18632.47
0,427742
1.7
26853.33
8520
18333.33l
0.420875
1.55
26932.31
9372
17560.31
0.407,129
1.45
27485.17
10224
17261.17
0.396262
MASS DIAGRAM METHOD
for
DETENTION VOLUMES
PROJECT: ESAB SITE
COMMENTS:BASIN B
MAXIMUM ALLOWABLE RELEASE (CFS) _
RATIONAL EQUATION: 0 = CIA
C*Cf= 0.788 A (area) _
TIME OF CONCENTRATION =
TIME CA
(min)
5
5.051C.)8
10
5.051OG
15
5.05108
20
5.05108
25
5.05108
30
5.05108
5
5.05108
40
5.05108
45
5.05108
50
5.05108
55
5.05108
60
5. c_?5108
70
5.05108
80
5.05108
90
5.05108
100
5.05108
110
5.0511?G
120
5.05108
3.205
6.41
I
INFLOW
OUTFLOW
STORAGE
(in/hr)
(cU ft)
(c)_) ft)
(ciI ft)
(ac ft)
9
13637.91
961.5
12676. 4.1
0. 291 i )1 C )
7.3
2212'.7,
1923
20200.73
0.46'744
6
27275.83
2884.5
24.391.33
0.559947
5.2
31518.73
3946
27672.73
0.63-5278
4.6
34852.45
4807.5
30044.95
0.689737
4. 15
3,7731 . 56
5769
31962.56
0. 7:=59
3.8
40307. 61
6730.5
33577.11
0.770924
3.5
42429.07
7692
34737.07
0.797453.
3.25
44•323.22
8653.5
35669.72
0.818864
3
45459.72
9615
35844.72
0.822881
2.9
46671.97
10576.5
.36095. 47.
0. 8286� 8
2.6
47278.10
115.38
35740.1'0
0.82048
2.3
4B793.43
13461
35332.43
0.811121
2.05
49702.62
15384
34318.62
0.787847
1.85
50460.28
177-07
33153..2b
0.761094
1.7
51521.01
.19230
32291.ol
0.741299
1.55
51672. 54
21153
3- 0519. 54
0.700632
1.45
52733.27
23076
29657.27
o.6EO937
DATE: 12/12/89
PROJECT: ESAB
JOB NUMBER: 033=014
DESIGN ENGINEER: TMO
BASIN DESIGNATION = BASIN B
DETERMINE EXISTING 0 FOR l0 YEAR STORM
HISTORIC RUNOFF COEFFICIENT .2
BASIN SLOPE: .96 PERCENT
BASIN LENGTH 800 FEET
AREA: 6.41 ACRES
HIST TC = 1.871(1.1-( 1 } .2
))*SQRROOT 800 ))/ .96
1/3 = 49.25395 MINUTES
HISTORIC OUTFLOW IS SUPERCEDED BY: 1.3 CUBIC FEET PER SECOND
DETERMINATION OF DETENTION POND VOLUME FOR DEVELOPED CONDITIONS
DEVELOPED STORM:
10
YEAR STORM
DEVELOPED RUNOFF COEFFICIENT
.78B
CCFAC _ .789
+
1
}
6.41 =
5.05108
DURATION
GROSS VOL.
OUTFLOW VOL.
DETENTION VOL.
MIN
CU. FT.
CU. FT.
CU. FT
5
8546.427
390
8156.427
10
13274.24
780
12494.24
15
16911.02
1170
15741.02
30
23457.21
2340
21117.21
45
27275.83
3510
23765.83
60
29639.73
4680
24959.73
90
32731
7020
25711
120
33822.03
9360
24462.03
IGO
36549.61
14040
22509.61
360
41459.26
29080
13379.26
REQUIRED DETENTION
VOLUME IS
25711
CU. FT. OR
.5902433
ACRE FEET
DATE: 12-12-09
PROJECT: BSAB
JOB NUMBER: 033-014
DESIGN ENGINEER: TKO
BASIN DESIGNATION = BASIN A
DETERMINE RIISTING Q FOR 10 TEAR STORM
---------------------------------------------------------------------
---------------------------------------------------------------------
HISTORIC RUNOFF COEFFICIENT .2
BASIN SLOPE: 1.6 PERCENT
BASIN LENGTH 180 FEET
AREA: 2.84 ACRES
MIST TC = 1.87t(1.1-( 1 t .2
)1tSQRR00T ISO W 1.6
1/3 19.3085 MINUTES
HISTORIC OUTFLON IS SUPBRCRDRD BY: .6 CUBIC FEET PER SECOND
DETERMINATION OF DETENTION POND VOLUME FOR DEVELOPED CONDITIONS
DEVELOPED STORM:
10
YEAR STORK
DEVELOPED RUNOFF COEFFICIENT
.927
CCFAC = .927
t
1
2.84 =
2.63268
DURATION
GROSS V06.
OUTFLON VOL.
MIN
CU. FT.
CU. FT.
5
4454.495
180
10
6918.683
360
15
8814.212
540
30
12226.17
1080
45
14216.47
1620
60
15448.57
2160
90
17059.77
3240
120
17628.42
4320
180
19050.07
6480
360
21609.04
12960
REQUIRED DETENTION
VOLUME IS
13819.77
.3172582
ACRB FEET
DETENTION VOL.
CU. FT
4274.495
6558.683
8274.212
11146.17
12596.47
13288.57
13819.77
13308.42
12570.07
8649.035
CU. FT. OR
TDINC
Engineering Consultants
CLIENT JOBNO.
PROJECT CALCULATIONS FOR ?tj VSO � L&,� r-T
MADE BY I_�DATE -LArs, CHECKED BY DATE -SHEET I OF I
'T_
4
L
L
f...
LEr.
T
A-1
---
4;_
L!� 1-L
-L
L
7t
F17-M T
1- 1 1
4-H-1-14-
-
1 77
-T1
1 F
4 -IF
Z_
MIH
-4-T
L!
L
T�;
ITS
J_
4-1-
T-
tr
-4`2
......
-4
+-L
......
!--1-
7-1
t
_Tj
-- ---
---
L
_7 F`T_
T
L
_F_1
14
4
-4---
-4-
Ll_--
1 L
J
4..
A
-
T_
J
14
1+
-----
-- ---r f
. .... .
7 ILI
4
-4-
L
L! 1 Li 1
-F 1
A_
I LL
-4 1-
4-! -1-,-4- 4--
CLIENT JOBNO. 13-0131-4
INC PROJECT -CALCULATIONS FOR potto k 66 Kc-r,
Engineering Consultants MADE BY r7'%D DATE CHECKEDBY-DATE -SHEET OF
*eN 7
, '- 14 1 �
_i , i f�
14 I
1'
{
1:1
1+
�rj
I� I _ I
L
{
j t
i} I I I
1 1
L
-
r I IL ���
�U_
t
-1 4-1i
........
- -- IL
T_
.... . ... ....
i 41._t
L
41
F7
--
---- -- --
............ ...
r
LL
`7
1-41
T
TL
F "7
L
'b
.- L i.
77
07-
JI
L
RWINC
Engineering Consultants
CLIENT
NO.
PROJECT 6S&R CALCULATIONS FOR ,:ip-jr;Lc
MADEBYE•. DATE11.j CHECKED BY DATE -SHEET 2 OF
r
1
It
ti
t
III
lilt
I IF
�_T
t
it
I
_Ll
1
114-11
T_
-T
H-A
t-4-1
1
6
T-. FT L
L.-L
L i
77- -1--
7--lt
I tt
I
i
F
17
....
. ... ..
- - ------- ----
. .... .. ...
M-MEE
dL
7
. .. ....... I
If ....... . ....
--j:J
. .
........
----- -
4,
- ------
-A
4- 4-
A.
7
IT
. . . . . .
. . . . . .
Mi
T_ _7
LJ
_4_
11 T r
_J -1 J_ 4-4-
LL LL
4
_1 L
Ti
L
�L' LLLI
A
_4
L
1 it It I
1 it
I
T_
L
_J
4-1
-7-
L L I
+ it
4 4
...... I
A.
-A
0
ir d
CLIENT JOB NO.
RMINC PROJECT AIR CALCULATIONSFOR ?6_*-� %
Engineering Consultants MADEBY13ha-DATE CHECKED BY DATE -SHEET -3 OF -!V--
P itfil
+++-T
-
L -1 L
tJOt
2
_j
TIM
�4
-4
. . . . . . - - - -
-
----------
F i",
k
44
T
ALI
t
LH
T
I
_1 J_
T
Lrdt
6
L
L
i
7
T-1
ILI_ 1
i-A-1
-
L
4-
L
A
T-1
-A
LTI
LA, ..... .
-T
r
.......
J------
I
L
k"6
1K
-.4- A-1---
FA-T
LLE
i
T
_I 44-
j,
+
L 1 1
L
r
I
44144
11 i i i
I r T I I
�_i
J
1� +-{-
F� I
JDJ_
/r '
�-
�I
�I
-I- +� 1
-i-
-�' -r,
T_
Fri TT i
-T-
F+-
7 R
L.L�_i_L_
A
14 Ij
__T__
_7
----- ------
- -
+-
- - -------
_L4
F-
T
C)
7:
oe 01
TMINC
Engineering Consultants
CLIENT
PROJECT 6_15 J&IR CALCULATIONS FOR J?6 I-S 0 R
MADE BYE DATE CHECKED BY —DATE —SHEET--A/'—OF
IjEt
T-H,
4-4-
L FI "
_
! r
4-
4
-3f -
3911
L
_Ii-I" LLLL
L-L i
-I-!-
1 rF-4-1
_77
1 if
L e
_ILL LLLL:
. . . . . . . . . .
------ -- --
SQ
Ail—
L
U-!
0p, 3-
.
. . . . . . . . . . .
Ll
L.—,— L
L
4
77
T-T-4--
L__4
7-
Li
_7
L
T
......
T
-El
F__
+1
1111
if r=:1=h
TTI
if
HE
F_�:I+H-1
�__4 _14-
L
LL
-L-
_L��
. .. .
....
-A
I '
'
a_
i__L_.,
I
}
I
{ j
I {{'-
1
..
r-i _ I � � ~
_
I
- r r __i_ �
(--:_
� {
—F
}.. }
�
I
1
L
I.
: _,
v
It
E
17
r
-4
j_1
t
.-I
L
L
I
U