Loading...
HomeMy WebLinkAboutDrainage Reports - 04/19/1990T3DINC Engineering Consultants 2900 South College Avenue Fort Collins, Colorado 80525 303/226-4955 April 12, 1990 Glen Schlueter City of Fort Collins Stormwater Utility Dept. P.O. Box 580 Fort Collins, CO. 80522 RE: SILVERPLUME ESTATES THIRD FILING REVISED FINAL DRAINAGE REPORT Dear Glen: This letter report is to outline the approach taken to design the drainage facilitie for the forementioned project. The develop- ment consists o 34 Ingle family residential lots and two deten- tion areas situa ed on 7.53 acres. The site is located northeast of the intersection of Swallow Road and Dunbar Avenue. The project site is bounded on the south by Swallow Road, on the west by Dunbar Avenue, on the north by the Silverplume Condominium development and on the east by the Peace with Christ Lutheran Church parcel. The site is bisected east and west by Silverplume Drive. The Second Filing of Silverplume Estates is situated in the middle of this filing along Silverplume Drive. Currently the site is covered by field grasses with the southwes- tern third of the site draining toward the intersection of Swal- low Road and Dunbar Avenue. A small portion of the site west of Silverplume Drive drains north into the Silverplume Condominium development. The portion of the site east of Silverplume Drive drains to the east. The entire site sets on a slight ridgeline, therefore no offsite flows are anticipated. In the original Silverplume P.U.D. development plan, the proposed site area was planned for multi -family development. Detention facilities were sized accordingly. The proposed single family development will be less intense, therefore the detention volumes have been recalculated. Overall drainage patterns will remain the same except in the area east of Silverplume Drive. In this area, flows from Basins E, F, G. and H will be directed south to two interconnecting ponds in the southeast corner of the site. These two ponds are connected by a 15" diameter storm drain pipe, thus act as one large detention pond. This substantially reduces the flows entering the Silverplume townhouse area to the north. \D Other Offices: Vail, Colorado 303/476.6340 • Colorado Springs, Colorado (719) 598-4107 The detention area in the southwest corner of the site has been sized to detain flows from Basins A and B. Flows are diverted into this pond through on grade sidewalk culverts in Dunbar Avenue and Swallow Road and a sump sidewalk culvert in Telluride Court. Flows from Basins C and D flow offsite and are detained in facilities in the Silverplume townhouse area. Basins C and D comprise 2.15 acres. This compares to 2.6 acres draining north in the original grading plan for the Silverplume P.U.D. It should be pointed out that the original plan (dated 7-10-79 - copy attached) called for six onsite ponds designated D. E, F, G, H, and I totaling 102,080 cu. ft. of detention volume. The original plan was revised in 1980 and 1982 to eliminate ponds D and H. The revised ponds were relocated and redesignated to ponds D. F, F-11 G, G-1, and I. These revised ponds totaled 166,420 cu. ft. of detention volume. The increase in detention volume along with the rerouting of flow mentioned earlier jus- tifies allowing Basins C and D to drain offsite without further analysis. Flows from Basins E, F, G. and H are diverted into the two con-� necting detention ponds in the southeast corner of e site through sump sidewalk culverts in Teller and Silverton Court and a on grade sidewalk culvert on Swallow Road. A small area (Basin I) in the northeast corner of the site drains offsite onto the Peace with Christ Lutheran Church parcel. This basin area consists of merely the backyards of two lots and is graded in this manner to better match the adjacent area. Flows from this area are negligible when compared to the historic runoff pattern. Historically, runoff from approximately 3.7 acres of land east of Silverplume Drive would flow on to the Church's parcel as compared to the proposed 0.27 acres of land area from Basin I. This comparison results in 4.35 cfs for his- toric runoff and 1.20 cfs for the developed runoff assuming the 100 year storm frequency. The attached calculations reflect the approach outlined above. The City of Fort Collins standard detention and drainage con- veyance criteria should be maintained with the approach outlined within this report. Should you have any questions, please feel free to contact us. Sincerely, RBD, Inc. ', Stan A. Myers P E. cc: 367-002 SVLRPL#3.DGE POND CALCULATIONS MASS DIAGRAM METHOD +or - DETENTION VOLUMES PROJECT: SILVERF'LUME - THIRD FILING COMMENTS:100 YEAR DETENTION VOLUMES SOUTHWEST DET. POND BASINS A °- B MAXIMUM ALLOWABLE RELEASE (CFS) RATIONAL EQUATION: 0 = CIA ✓ AC C+C+= 0.625 A(area) = 4.08 TIME OF CONCENTRATION = 16.2 V I N. TIME CA I INFLOW OUTFLOW STORAGE (min) (ir7/hr) (cu +t) (cu +t) (cut •ft) (ac +I_) J 2.55 9.00 6985 ----------------------- 321 6564 0.151 10 a 2.55 7.30 11169 642 10527 0.242 15 2.55 6.00 1.3770 963 13449 0.309 20 2.55 5.20 15912 1284 1.4628 0.336 25 .55 4.60 17595 .1605 15990 0.367 30 2.55 4.15 190A 9 1926 18728 0. 43.0 35 2.55 3.80 20349 2247 18102 ii.4.16 40 • . J..l 2 5C C ', JO �.14 �_0 21420 2 •• �68 25 5i 188J 0.433 45 2.55 3.25 22�76 2889 19487 0.447 ={•a 2.55J 3.00 22950 3210 19740 0.453 cc 2.55.,J 2.80 r_r62 .-_.,c_1 20031 0. 460 60 2.55 2.60 2:?;&)68 3852 20016 ✓ 0.460 2.55 2.730 24633 4494• 179 0.462 80 •y 5 • .5 • . UJ 2 5 2 L 2 Jia9 • .,136 5 C 199J6 C 0. 4.,8 90 2.55 1.85 25475 5778 19697 0.452 100 2.55 1.70 26olO 6420 19590 0.450 110 2.55 1.55) 26007 7062 19i)25 0.437 120 2.55 1.43 26622 7704 18910 i a . 4 : 4 130 2.55 1.32 26255 8346 17909 0.411 140 2.55 1.24 26561 8988 17573 0.403 150 2.55 1.19 27311 96:0 17681 0.406 160 2.55 1.13 27662 1 i a272 17390 i a . 399 170 2.55 1.09 .29351 10914 17437 0.400 120 2.55 1.05 2891.7 1.1556 17361 0.'99 REQUIRED DETENTION VOLUME - MAXIMUM VOLUME = 20139 CU.FT.V"l MAXIMUM VOLUME = 0.46 AC.FT. MASS DIAGRAM METHOD for DETENTION VOLUMES PROJECT: SILVERPLUME - THIRD FILING COMMENTS:100 YEAR DETENTION VOLUMES SOUTHEAST DET. FOND BASIS E.F,G,H MAXIMUM ALLOWABLE RELEASE (CFS) = RATIONAL- EQUATION: Q. = CIA C= o.s0 2 c,cT= 0.625 ev TIME of CONCENTRATION = A(area) = 10.00 MIN. Lƒ AC TIME CA I INFLOW ouTELOW STORAGE imin, (in/hr) ice ft) ico -ft.) (ce ft) rac It, 5 2.32 9.00 6261 369 5892 0.135 !0 2.32 7.30 10156 738 9418 0.216 15 2.32 6.00 12521 1.107 !2l52 0.279 20 2.32 5.20 14469 1476 12993 0.298 25 2.32 4.60 !� 99 l845 14ls4 0.325 30 2.32 4.15 17321 221.4 16952 0.389 35 2.32 3.80 18504 2583 l592! 0.3 40 2.32 3.50 19478 2952 16526 0.379 45 5n 2.2. z ..25 \.00 20}47 20869 3321 \690 l7026 17179 & 3,91 0.394 s§ _. :\r,2 2.30 214254os9 l6' /.399 60 2.� 2.60 2l704® 4428 17276® 0.39773 70 2.32 2. 30 .2399 5166 0.396 80 2.\2 2:.05 2281.7 5904 16913 0.388 90 2.22 l.es 23164 6642 16522 0.379 1.00 2 2 1.70 2=651 7380 16271 0.374 I10 2.32 1.55 23721 e118 15603 0.358 120 2.32 1.45 2420E oG56 15752 0.352 I3o 2.32 1.32 2. 9594 I4280 0.328 140 2.32 1.24 24152 10332 13C.20 0.317 Iso 2.32 1.19 24834 11070 13764 0.316 160 2.s2 I.13 25-154 11e0e 13346 0.306 170 2.32 1.09 257eo 12546 1 234 0.304 !80 2.32 1.os 26295 1. 4 l3011 0.299 REQUIRED DETENTION VOLUME - MAXIMUM VOLUME _ 17366 CU.FT.� MAXIMUM VOLUME = 0.4o AC. FT. � SYN: 87020229 ^ Elevation (ft) 77,53 78.00 79.00 79.67 80.00 SILVERPLUME - THIRD FILING SOUTHEAST DETENTION POND CALCULATED 04-04-1990 14:08:08 DISK FILE : B:SLPLMSEP.VOL Planimeter scale: 1 inch = 208.71 ft, Planimeter Area (sq.in,) (mg.ft,) 0.00 0.00 3^420,00 3,419.99 12,380.00 12,379.96 *I* 16,136.82 � 18,170°00°' 18,169.94** * A1+A2+sqr(A1*A2) Volume Volume Sum ( sg.ft) ----------------------------------- < co,ft> ( cu. ft) 0. 00 0.00 0.00 3"419.99 535.80 535.80 22,306.82 7,435.61 7^971.41 42,650.89 9,525.34 17^496.75 45,548.01 15,182.67 231154.0B^* Interpolated area from closest two planirrieter readir%-gs. 2 IA = (sq.rt(Area1) + ((Ei�E1)/(E2�E1))*(sq.rt(Area2}�s�.rt(Area1>)) where.- E1, E2 = Closest two elevations with planimeter data Ei = Elevation at which to interpolate area Area1,Area2 = Areas computed for E1, E2, respectively IA = Interpolated area for Ei * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2--EL1) * (Areal + Area'_;' + sq,rt.(Area1*Area2)> where: EL1, EL2 = Lower and upper elevations of the increment Area1~Area2 Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 `^ QOND-2 Version; 2.30 S/N: S7020229 SILVERPLUME -- THIRD FILING SOUTHWEST DETENTION POND CALCULATED 04--04~1990 16-17-05 DISK FILE : B:SLPLMSWP.VOL Planimeter scale: 1 inch = 208.71 ft. Elevation Planimeter Area (ft) (sq.in.) ( og.ft) 72.50 0.00 0.00 74.00 5`292.00 5,291.98 76.00 9,162.00 9,161.97 76.34 *I* 9,952.73 77.50 12,897.00V 121B96.96 A1+A2+sqr(A1*A2> * Volume Volume Sum (sg^ft,) ( cu.ft, ) ( cu. ft, ) 0.00 0.00 0°00 5,291.98 2,645.99 2.645.99 21,417.07 14,278.05 16,924.S4 28,663.87 3,2 48.54 �/ 20,172. 59 32~929.15 16,464.57VI 33,388.6rw� | ~ � � Interpolated area from closest two planimeter readings. 2 IA � (sq.rt(Ar�`a1) + ((Ei-E1)/(E2�E1))*(sq.rt(Area2)-sq.rt(Area1))) ^ where: E1, E2 Closest two elevations with planimeter data Ei Elevation at which to interpolate area Area1,Area2 = Areas computed for E1' E2, respectively IA = Interpolated area for Ei * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume -x- (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1^ EL2 = Lower and upper elevations of the increment Area1,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 CLIENT /'FaFI-S 4,cx t +O /11;2fm r---? { JOB NO. NG PROJECT f LeAt"O'f CALCULATIONSFOR cJ Z,J, PONd (.),C Engineering Consultants MADE BY DATE 72Z_ CHECKED BY DATE SHEET / OF _ C �,r�� 1 d C7 G+ %f7 4V r- S I— Peel' ej( L-C. t ri•, '0'r, L Ae(=(a GCi -ram ,,U T 9,r 78 '77•S /�,�9 /L Y(rS 333se 0 13 — !rJO.4/,2 PbrloiAJG 6j,4-r- 4 -5( -AI_�c ��JiSF F CUr-Lu6 h�t%-�.li�1t c-tis�� ail ���<.a r1cFl Q 7G..34 0 7 cts N. -Va7,3 EA N- 74,34-72,6 - .?1s�Z 1 = 1.05 0-7 O/� CLIENT �'u-'�a`' JOSNO. TMINC PROJECT U CALCULATIONS FOR Engineering Consultants MADESY'f? DATE C / ^ C T CHECKED SV DATE SHEET OF 67.6-/;) 4 �Z_ 77,T- J - i 3,? cis ? C� o. , _ �3 e%<s o k_ le- AREA AND INLET CALCULATIONS HYDROLOGIC RUNOFF CALCULATIONS RATIONAL METHOD REFERENCE: CITY OF FORT COLLINS STORM DRAINAGE DESIGN MANUAL PROJECT: SILVERPLUME JOB #: 367-002 ENGINEER: TMO DATE: 07-Mar~90 CALCULATE THE 10 __________________________________________________ & 100 YEAR DEVELOPED STORM RUNOFF Q = CfCIA WHERE.- Q = RUNOFF (CFS) C = RUNOFF COEFFICIENT Cf = RUNOFF COEFFICIENT FACTOR A = BASIN AREA (AC) I = RAINFALL INTENSITY (IN/HR) S = BASIN SLOPE (%) BASIN INPUT =========== L = BASIN LENGTH (FT) NAME: A A = 2.68 C = 0.50 Cf = DEPENDANT ON THE STORM FREQUENCY L = 640 FT I = TO DETERMINE "I" FROM FIG. 3-1: RAINFALL INTENSITY DURATION CURVE. CALCULATE ''Tc"- TIME OF CONCENTRATION Tc = Tov + Tg WHERE: Tov = OVERLAND FLOW TIME or To = SHALLOW GUTTER FLOW TIME Tc = (1.87*(1.1-Cf*C)*L^0.5>/(S^0.33) FOR Tov, FIND THE OVERLAND SLOPE AND LENGTH Sov = 1.75 % Lov = 40 FT FROM FIG. 3-1: OVERLAND TIME OF FLOW CURV[--"S (ATTACHED" Tov = 8,00 MIN FOR Tq, FIND THE GUTTER SLOPE AND LENGTH AND VELOCITY Sg = 1.07 % Lg = 600 FT FROM FIG, 3~2: ESTIMATE OF AVERAGE FLOW VELOCITIES (USDDC MANUAL) V = 2.2 FPS To = Lg/(60*V) Tg = 4.55 MIN BASIN OUTPUT Tc = 10 MINUTE MINIMUM REQUIRED 10 YEAR DEVELOPED STORM 100 YEAR DEVELOPED STORM Cf = 1.00 Cf = 1,25 Tc = 27.51 MIN Tc = 21.78 MIN I = 2.75 IN/HR I = 5.00 IN/HR / Q = 3.69 CFSu/ Q � 8.3S CFS v HYDROLOGIC RUNOFF CALCU/.ATI�NS RATIONAL METHOD REFERENCE: CITY OF FO9[ CbLLINS S�ORM DRAlHA8� DESIGN MAN�AL PROJECT: Sl\VERPLUME JOB #: 367�002 ENGINEER: TMO DATE: 15-Mar~90 CALCULATE THE 10 & 100 YEAR DEVELOPED STORM RUNOFF Q = CfCIA WHERE: Q = RUNDFF (CFS) C COEFFICIENT Cf RUNOFF COEFFICIENT FACTOR A AREA (AC) I RA[NFALL INTENSITY S = BASIN SLOPE (%) BASIN INPUT L BASIN LENGTH (FT) ��o�� oox� uus�r��pp NAME: A1 A 0.11 C = 0.85 Gf = DEPENDANT ON THE STORM FREQUENCY S = 2.00 % L 120 FT I = TO l)ETERMINE ''I/' FROM FIG. 3~1: RAINFALL INTENSITY DURATION CURVE~ CALCULATE /'Tc»-- TIME OF CONCE;',ITRATION Tc Tov + Tg WHE�E: Tov = OVERLAND FLOW TIME or Tg � SHALLOW GUTTER FLOW TIME Tc = (1.87*(1.1-Cf*C)*L^0.5)/(S^0.33) FOR Tov, FIND lHE OVERLAND SLOP'E AND LENGTH Sov = 0.00 % Lov 0 FT FROM FIG. 3-1: OVERLAND TIME OF FLOW CURVES (ATTACHED) Tov = 0.00 M.lN FOR Tg, FIND THE GUTTER SLOPE AND LENGTH AND VELUCITY Sg = 2.0 % Lg = 120 FT FROM FIG. 3-2: ESTIMATE OF AVERAGE FLOW YELOCITIES <USDDC MANUAL> V = 2~5 FPS Tg Lg/(6(..)*V) Tg � 0.80 MIN BASIN OUTPUT Tc � 10 YEAR DEVELOPED STURM Tc = 10.00 MIN I 4.50 IN/HR Q � 0.42 CFS w/ 10 MINUTE MINIMUM REQUIRED 100 YEk�:ik DEVELUP6D SITORM Cf � 1,25 Tc = 10.00 MIN I 7.10 IN/HR � Q 0.83 CFS *, HYDROLOGIC RUNOFF CALCULATIONS RATIONAL METHOI) REFERENCE- CITY OF F'(::)RT COLLINS STORM DRA:INAGF.. DESIGN MANUAL_ PROJECT: SII-VERPLUME ?RD FILING JOB #: 7_-,67-002 ENGINEER: TMO DATE. 05—Apr-90 CALCULATE THE 10 & 1(.m) YEAR DEVELOPED STOR 1 RUNOFF 0 = Cf C I A WHERE-- G? == RUNC.IF'F= (CFS) C = RUNOFF COEFFICIENT Cf = RUNOFF COEFFICIENT FACTOR A = BASIN AREA (AC) I = RAINFALL INTENSITY (IN/HR) S BASIN SLOPE_ (%) BASIN INPUT L BASIN LENGTH (FT) NAME: B A = 1.40 C = C3.51C7 Cf = DEPENDANT ON THE STORM FREQUENCY S = 1.71 L_ = 475 FT I = TO DETERMINE "I" FROM FIG. -1: RAINFALL INTENSITY DURATION CURVE. . CALCULATE "Tc "•-- TIME 01: CONCENTRATION Tc Tcry -I• Tq W+ 41;:.RF^ l'ov == O.VERL...AND FL...OW -1 T.ME: or, Tg rz SHALLOW GLITTER FLOW TII`11= Tr =(.1.87#(1.1-CfCT�•L,'.t7.`i)/(S''Ci.E.?) FOR Tov, FIND THE OVERLAND SLOPE AND LENGTH Sov = 1.79 Lov = 145 FT FROM FIG. 3-1- OVERLAND TIME OF' FLOW CURVES ' ATTACl-4ED ) Tov = IS.Cip MIN FOR Tq. FIND THE GUTTER SLOPE AND LENGTH AND VELOCITY Sri = :L . 46 % Lq = Teti FT FROM FIG. 3-2. ESTIMATE OF AVERAGE FLOW VELOCITIES (USDDC MANUAL', V = 2.5 FPS Tq _. L.q/ (6O*V) Tq = 2.20 MIN BASIN OUTPUT Tc = 10 MINUTE MINIMUM REDUIRED 1CU YEAR DEVELOPED STORM Cf = I. C) C) Tc = 2("Y. A.9 MIN vo I - .21) IN/HRV _ ^•.. 24 CFS v 1.00 YEAR DEVELOPED STORM Cf 1.25 / Tc. = 16. 22 MIN I 80 INI/HR n 5.07 CFS �% HYDROLOGIC RUNOFF CALCULATIONS RATIONAL METHOD REFERENCE: CITY OF FORT COLLINS STORM DRAINAGE DESIGN MANUAL PROJECT: SILVERPLUME JOB #: 367-002 ENGINEER- TMO DATE, 07-Mar-90 CALCULATE THE 10 & 100 YEAR ___________________________ Q = CfCIA WHERE: BASIN INPUT NAME: E A = 0.66 C = 0.5O Cf = DEPENDANT ON THE STORM S = 1.18 % L = 360 FT - -- DEVELOPED STORM RUNOFF Q�= RUNOFF (CFS) C = RUNOFF COEFFICIENT Cf = RUNOFF COEFFICIENT FACTOR A =BASIN AREA (AC) I = RAINFALL INTENSITY (IN/HR) S = BASIN SLOPE (%) L = BASIN LENGTH (FT) FREQUENCY I � TO DETERMINE "I" FROM FIG, 3~1: RAINFALL INTENSITY DURATION CURVE. CALCULATE "Tc''- TIME OF CONCENTRATION Tc = Tov + Tg WHERE: Tov = OVERLAND FLOW TIME or Tg = SHALLOW GUTTER FLOW TIME Tc = �-------------------------------------------------------------------------- FOR Tov, FIND THE OVERLAND SLOPE AND LENGTH Sov = 2.00 % Lov = 40 FT FROM FIG. 3-1t OVERLAND TIME OF FLOW CURVES (ATTACHED) Tov = 8.00 MIN FOR Tg~ FIND THE GUTTER SLOPE AND LENGTH AND VELOCITY So = 1.18 % Lg = 360 FT FROM FIG" 3-2: ESTIMATE OF AVERAGE FLOW VELOCITIES (USDDC MANUAL) V = 2.2 FPS To = Lg/(60*V) Tg = 2.73 MIN BASIN OUTPUT Tc = 10 YEAR DEVELOPED STORM Cf = 1.00 Tc = 20.16 MIN I = 3.25 IN/HR Q = 1-07 CFS 10 MINUTE MINIMUM REQUIRED 100 YEAR DEVELOPED STORM Cf = 1.25 Tc = 15.96 MIN I = 5.80 IN/HR Q = 2.39 CFS HYDROLOGIC RUNOFF CALCULATIONS RATIONAL METHOD REFERENCE: CITY OF FORT COLLINS STORM DRAINAGE DESIGN MANUAL PROJECT: SILVERPLUME 3RD FILING JOB #: 367-002 ENGINEER: TMO DATE: 04-Apr-90 CALCULATE THE 10 & 100 YEAR DEVELOPED STORM RUNOFF Q CfCIA WHERE: Q. = RUNOFF (CFS) C = RUNOFF COEFFICIENT Cf = RUNOFF COEFFICIENT FACTOR A BASIN AREA (AC) I RAINFALL INTENSITY (IN/HR) S BASIN SLOPE <%> BASIN INPUT L = BASIN LENGTH (FT) =========== NAME: F A 0.67 C 0.50 Cf DEPENDANT ON THE STORM FREQUENCY S = 1.65 % L = 335 FT I = TO DETERMINE "I" FROM FIG. RAINFALL INTENSITY DURATION CURVE, CALCULATE "Tc"- TIME OF CONCENTRATION Tc = Tov + Tg WHERE: Tov = OVERLAND FLOW TIME or Tg = SHALLOW GUTTER FLOW TIME Tc = (1.87*(1.1-Cf*C)*L^0.5)/(S^0.33) FOR Tov, FIND THE OVERLAND SLOPE AND LENGTH Sov = 2.40 % Lov = 160 FT FROM FIG. 3-1: OVERLAND TIME OF FLOW CURVES (ATTACHED) Tov = 17.00 MIN FOR Tg, FIND THE GUTTER SLOPE AND LENGTH AND VELOCITY Sg = 1.10 % Lg = 175 FT FROM FIG. 3--2: ESTIMATE OF AVERAGE FLOW VELOCITIES ((JSDDC MANUAL) V = 2.0 FPS Tg = Lg/(60*u) Tg = 1.46 MIN BASIN OUTPUT Tc = 10 MINUTE MINIMUM REQUIRED ============ 10 YEAR DEVELOPED STORM Cf = I. 00 Tc = 17.41 MIN + I = 3.50 IN/HR Q � 1.17 CFS 100 YEAR DEVELOPED STORM Cf 1.25 /~ ^� Tc = 13.78 MIN ~ . I = 6.10 IN/H�R *' .� Q 2.55 CFS � HYDROLOGIC RUNOFF CAL.CUL...A-1":EONS RATIONAL METHOD REFERENCE: CITY OF FORT COLLINS STORM DRAINAGE DESIGN MANUAL PROJECT- SILVERPLUME :'RD FILING JOB 1#: :67-00i 21 ENGINEER: TMO DATE- 04-Aci -90 CALCULATE THE IC) $< l(K) YEAR DEVELOPED STORM RUNOFF 0. = CfCIA WHF...:RF: — f.•? = RUNOFF (CFS) C = RUNOFF COEFFICIENT' Cf = RUNOFF COEFFICIENT FACTOR A = BASIN AREA (AC) I = RAINFALL INTENSITY (IN!HR) S = BASIN SLOPE (%) BASIN INPUT L _ ?:BASIN LENGTH (FT) NAME: G A = 1.41 C = 0.50 Cf = DEFENDANT ON THE STORM FREQUENCY S -- 2.50 % L = 220 FT 1 = "1"0 DETERMINE "I" FROM FIG. .3--1:: RAINFALL INTENSITYt' DURATION CURVE, CALCULATE "Tc"-- i'll"IE OF' CONCENTRATION Tc = Tov + -Fa WHERE: Tov = OVERLAND FLOW 'TIME or, 'T q = SHALLOW GUTTER FLOW TIME Tc =(1.t37•(1.1.-CfYf.:i#L_"0.5)!(S"0. ) FOR Tov, FIND THE OVERLAND SLOPE AND LENGTH Sov = ?-.50 Lov = 220 FT FROM FIG. .3--1: OVERLAND TIME OF FLOW CURVES (ATTAC;l-IEL.-) Tov = 2O.(3C) MIN FOR Tg , FIND THE GUTTER SLOPE AND LENGTH AND VEI....0C I TY Sg = O. ()0 Lq - C) FT' FROM FIG. 3-2: ESTIMATE OF AVERAGE FLOW VELOCITIES (USDDC MANUAL) V = C), O FPS Tg = Lg/ (6.Q+V) Ta = O.OG MIN BASIN OUTPUT T= = 10 MINIT"I'E MINIMUM REQUIRED 10 YEAR DEVELOPED STORM Cf = ].. (aft Tc = iC..:7, MIN / 1 = 4. CMG IN/HF; v Q = 2.89 CFS 10"O YEAR DEk"'E:LOPED S-fOF.M Cf _ 1.25 lr_ = 1(>.Gt) MIN T = 7.10 INiHR t� Q _ 6. _'9 CFS V HYDROLOGIC RUNOFF CAI.-.CUI....ATIONS F;ATIONAI_ METHOD REFERENCE: CITY OF FORT COLLINS STORM DRAINAGE DESIGN MANUAL PROJECT. SILVERPLUME 'RD FILTNG JOB #:=67-0C)^ ENGINEER: TMO DATE: 04--Apr---9(_) CALCULATE THE 10 ?, 1.00 YEAR DEVELOPED STORM RUNOFF 0 = CfCIA WHERE: 0 = RUNOFF (CFS) C = RUNOFF COEFFICIENT Cf = RUNOFF COEFFICIENT FACTOR A = BASIN AREA (AC) I = RAINFALL INTENSITY (IN/HR) S = BASIN SLOPE (%) BASIN INPUT L- = BASIN LENGTH (FT) NAME: H A -- C J. 7 C = C). SCa Cf = DEPENDANT ON THE STORM FREQUENCY c = 1.00) % L = 560 FT I = TO DETERMINE "I" FROM FIG. -1. RAINFALL. INTENSITY DURATION CURVE, CALCULATE "Tc"-- TIME OF CONCENTRATION Tc = ', ov + Tq_ WHERE: Tov = OVERLAND FLOW TIME or- 7Tg == SHALLOW GUl-TER FL -OW TIME Tc FOR Tov, FIND THE OVERLAND SLOPE AND LENGTH Sov = t.40 Y. Lov = 160 FT FROM FIG. .3-1: OVERLAND TIME OF FLOW CURVES (ATTACHED) Tov = Ia.00 MIN FOR Tg, FIND THE GUTTER SLOPE AND LENGTH AND VELOCITY Sq C).3�f Lg - 400 FT FROM FIG. 3-2. ESTIMATE OF AVERAGE FLOW VELOCITIES (USDDC MANUAL) V = 1 . 8 FPS Tg = L-.g/ (6(-'*V) Tg = -.70 MIN BASIN OUTPUT Tc = IC) MINUTE MINIMUM REQUIRED 10 YEAR DEVELOPED STORM Cf = 1 . C)0 Tc = 21.70 MIN ✓/ I = -'.10 IN/HRV 0. = 1.19 CFS v 100 YEAR DEVELOPED STORM Cf = 1._'5 Tc = 21.02 MIN I = 5. pi(-) II\I/HR G? _2.41 CFS HYDROLOGIC RUNOFF CALCULATIONS RATIONAL METHOD REFERENCE: CITY OF FORT COLLINS STORM DRAINAGE DESIGN MANUAL PROJECT: SILVERPLUME ..SOB # : 367-0 iC ENGINEER: TMO DATE: 07-Mar-90 CALCULATE THE 10 8: 1.00 YEAR DEVELOPED STORM RUNOFF -- ----------- a = CTCIA WHERE- 0 = RUNOFF (CFS) C = RUNOFF COEFFICIENT C{ = RUNOFF COEFFICIENT FACTOR A = BASIN AREA (AC) I = RAINFAL.L INTENSITY (IN/HR) S = BASIN SLOPE (%) BASIN INPUT L = BASIN LENGTH (FT) NAME: I A = C).27 C .- U . 50 Cf = DEFENDANT ON THE STORM FREQUENCY L 65 FT I = TO DETERMINE "I" FROM FIG. 3-1: RAINFALL INTENSITY DURATION CURVE, CALCULATE_ "Tc"- TIME OF CONCENTRATION Tc = Tov + To WHERE: Tov = OVERLAND FLOW TIME or To = SHALLOW GUTTER FLOW TIME Tc = (1 . 87* (1 . 1-Cf *C) *L"•0. 5) / (S^O..33 ) ----------------------------------------------------------------- FOR Tov. FIND THE OVERLAND SLOPE AND LENGTH Sov = 6.30 % Lov = 65 FT FROM FIG. 3-1: OVERLAND TIME OF FLOW CURVES (ATTACHED) Tov = 9.00 MIN FOR To, FIND THE GUTTER SLOPE AND LENGTH AND VELOCITY So = 0 % Lq = i) FT FROM FIG. ,— : ESTIMATE OF AVERAGE FLOW VELOCITIES (USDDC MANUAL) V = 0.0 FPS To = Lq_ / (6Ci*V ) To = U., MIN BASIN OUTPUT Tc = 10 MINUTE MINIMUM REQUIRED 10 YEAR DEVELOPED STORM 101.-) YEAR DEVELOPED STORM Cf = 1 . O() Cf = I.. 25 Tc •- 10.00 MIIV Tc = 1c), ii) MIN I = 4.50 IN/HI; I = 7„ 10 IN/HR G! = 0.61 CFS V 0. = 1. 20 CFS �/ HYDROLOGIC RUNOFF CALCULATIONS RATIONAL METHOD REFERENCE: CITY OF FORT COLLINS STORM DRAINAGE DESIGN MANUAL PROJECT: SIL-VERPLUME - 'RD FILING JOB #: 367-002 ENGINEER: TMO DATE. 09-Apr--90 CALCULATE THE 10 & 100 YEAR DEVELOPED STORM RUNOFF Q = C•fCIA WHERE: 0 = RUNOFF (CFS) C = RUNOFF COEFFICIENT Cf = RUNOFF COEFFICIENT FACTOR A = BASIN AREA (AC) I = RAINFALL INTENSITY (IN/HR) S = BASIN SLOPE (%) BASIN INPUT L = BASIN LENGTH (FT) NAME: EAST OF SILVERPLUM'1E DRIVE (HISTORIC RUNOFF) f1 = , / 0 C = 0. 20 Cf = DEPENDANT ON THE STORM FREQUENCY S = 1.75 Y. L. _ 340 FT I = TO DETERMINE "I" FROM FIG. 3-1: RAINFALL INTENSITY DURATION CURVE, CALCULATE "Tc:"-- TIME OF CONCENTRATION Tc = Tov + Tg WHERE: Tov == OVERLAND FLOW TIME or, Tg SHALLOW GLITTER FLOW TIME Tc FOR Tov, FIND THE OVERLAND SLOPE AND LENGTH - Sov = 1.75j % Lov = 40 FT FROM FIG. 3-1: OVERLAND TIME OF FLOW CURVES (ATTACHED) Tov = 27.0o MIN FOR Tg, FIND THE GUTTER SLOPE AND LENGTH AND VELOCITY Sig = i;, 0(:) % Lg = O FT FROM FIG. T- : ESTIMATE OF AVERAGE FLOW VELOCITIES (USDDC MANUAL) V = 0.0 FPS Tg = Lg/ (60.X.V) Tg = 0.0(-.) MIN BASIN OUTPUT Tc = 1i; MINUTE MINIMUM REQUIREI} 10 YEAR DEVELOPED STORM Cf = 1.00 Tc = 25. pig MIN I = 2.80 IN/HR Q = 2.07 CFS 100 YEAR DEVELOPED STORM Cf = 1. 25 Tc = 24.37 MICA I _ 4.70 IN/HR Q _• 4.35 CFS NC Engineering Consultants CLIENT C e A T-- 7 tc"TC-en &".3 JOB NO. 24-7 -4=2 PROJECT 511-VEM F,/JAA67 CALCULATIONSFOR MADE BY-`�i(/\ DATE 3-/ CHECKED BY -DATE SHEETOF A--): C AA, t 7- 1III . . . . . . . . . . . IN-, 7' STED q q 7. 7j 1A lt�� 6. T-1 t. -T- T., L -4 ...... 41 ........ .. IAII ------- --- -- ........ ... _7 4- 1-4 -A ........ .. X� 1.0 12 5 .9 II 10 4 8 10 6 3 .8 9 2 oa 4 - t�- .7 tL 8 w 3 �� z a. - - 1. 5, .6 7 ��b -mow 2� Po X o /fey � � : ,.,-----•,_ � I , Ce � . Z �Ni� ai •iC7F'F� F 0 Z .5-- _ _ _Port a_ I. I z .9 -.8- _ w 5.5 ? ----- o .8 w w 0 U- w 5 x z o .7 tL .4 Z iz :4 x 4.5 z. a. .3 cD .6 w t ' ti x 0 4 0 .2 0 .5 z CD 3: ~ z Cr w .3 3.5 w a w �. 4 0 a. -r I i` w a .08 w 0 .25 3 0 0 _ = o .06 (D .3 ao z x 2 5= cr w .04 Cr25 .2 a .03 a 3 a .02 0 .2 2 a x U 1- a .15 01 0 .15 L tL 0 0 - - -- Yo a Ir 0=2" h .10 I 1.2 Figure 5-2 NOMOGRPAH FOR CAPACITY OF CURB OPENING INLETS IN SUMPS, DEPRESSION DEPTH 2" J Adapted from Bureau of Public Roads Nomograph MAY 1984 5-10 DESIGN CRITERIA RMINC Engineering Consultants CLIENT G_Ita./- 7Yod ' ArAtw JOB NO. _ 34::7 PROJECT *- r CALCULATIONS FOR MADEBYr-4- DATE `F CHECKED BY DATE SHEETOF 6 �� ✓� G�� - s.12 6 ,,-A - 4, -,z Z/3Q/c --7 t ) No Text DRAINAGE CR.11A MANUAL RUNOFF 0 soc 400 300 W LL �sS Z 200 Ltl U r}p 2 FQ- cn 0 100 • r ■r APO! VA 11010 FIGURE 371 OVERLAND TIME OF FLOW CURVES 171 70 60 50 0 W H Z_ 40 m Z W 30 ~ 5 -1-84 URBAN DRAINAGE 8 FLOOD CONTROL DISTRICT DRAINAGE CRITERF MANUAL RUNOFF :Yi7 30 1- 20 Z w U w °' 10 Z w a O 5 U w En 3 O co 2 W t- Q 1 5 �I■■ ' I ,■■ I I �■MEN ���� ■■■� ���� I■■■■NONE moll moll 04111 ,_�i-■■___....�■� �I��►IM►I0I.i��il ■■■���■■■■� _MWANFI■� I ■■■M IM■■■■� NI/N/,/1 I 111 MOORE •0 1 1•'t 2 s43 5 10 20 VELOCITY IN, 'FEET PER SECOND FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY. FOR USE WITH THE RATIONAL FORMULA. *MOST FREQUENTLY OCCURRING°UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. 5 -1-84 URBAN DRAINAGE & FLOOD CONTROL DISTRICT DRCOG T:§D,NC Engineering Consultants CLIENTr—�T- r-� PROJECT MADE BV/o DATE/,.CHECKED BV _ DATE JOB NO. _36- _ OF �te + * l I. '. � , Q�s� t;S,�c7 GF �;-W--•.. �� 4 e�.n.(.�,� ,��/�ca..i �.... 'JJ: I - f CLIENT /p JJO�-B�NO. RMINC PROJECT CALCULATIONS FOR (J� ��- Engineering Consultants MADE 02LfZ DATE y SCHECKEDBY DATE SHEET-2OF 7 a a CLIENT � "'� DJOBN-O. RMINC PROJECT �Y/�.'^,i CALCULATIONS FOR Engineering Consultants MADE BYT t` DATE 4 CHECKED BY DATE SHEET 3 OF No Text Sx (Cross Slope) STREET 4 S_j Longltudinai Slope) SIDE B A44� ov 0 Q L (Gutter Flow) t- � CARRY 3 OVER Froude No. at This Pointy _ 4Fw �`'urb r r i QI B (Intercepted Flow) (Length of Opering) I A 4j PLAN 3Icr �' '-- G utter Depression at Inlet P C SECTION A —A 0 n H O Na iS C V li U 4 VUI Im SECTION B-B SECTION B-B (Straight Cross Slope) (Fort•CollirsStandard 6"Vertical CaG) NOTE: THE FORT COLLINS STANDARDS HAVE GUTTERS WITH CROSS SLOPES STEEPER THAN SX. FIGURE 5-4 STANDARD CURB -OPENING INLET MAY 1984 5-12 DESIGN CRITERIA %DINC Engineering Consultants CLIENT __ C/�seJOBNO. S67 -022 tom/ C PROJECT CALCULATIONS FOR/7i.t-t-<.( 121 4 MADE By'T74/� DATE �� CHECKED BY- SHEET ( OF x o. o I U• i3 S cFs Q�pR,.- - 13.-1 x p.o% " v. 13T c FS h