Loading...
HomeMy WebLinkAboutDrainage Reports - 12/19/2013)UDRE RIVER DOWNTOWN PROJECT kLITATIVE GEOMORPHIC ASSESSMENT OF THE CACHE LA POUDRE RIVER, IIELDS STREET TO MULBERRY STREET ANdERSON CONSULTING ENGINEERS, INC Civil • Water Resources • Environmental POUDRE RIVER DOWNTOWN PROJECT QUALITATIVE GEOMORPHIC ASSESSMENT OF THE CACHE LA POUDRE RIVER, SHIELDS STREET TO MULBERRY STREET Prepared For: City of Fort Collins Natural Areas Department 215 N. Mason Street Park Planning and Development 215 N. Mason Street Utilities, Stormwater Department 700 Wood Street Fort Collins, Colorado 80521 Prepared By: Anderson Consulting Engineers, Inc. 375 E. Horsetooth Road, Building 5 Fort Collins, Colorado 80525 z� ` December 19, 2013 G TABLE OF CONTENTS BACKGROUND..................................................................................................................................1 11. OVERVIEW........................................................................................................................................3 III. QUALITATIVE BED AND BANK MATERIAL CHARACTERIZATION.......................................................4 IV. QUALITATIVE GEOMORPHIC ASSESSMENT......................................................................................6 V. GEOMORPHIC -BASED REACH RECOMMENDATIONS.....................................................................16 LIST OF FIGURES Figure 1.1 Cache la Poudre River Downstream of Shields Street.........................................................2 Figure 1.2 Cache la Poudre River Upstream of Mulberry Street..........................................................2 Figure 2.1 Poudre River Downtown Project Study Reach, with Geomorphic Subreaches ..................4 Figure 3.1 Typical Cobble Bed Material................................................................................................5 Figure 3.2 Heavy Cobble Bank Deposit near McMurry Natural Area...................................................5 Figure 4.1 Enlarged Cobble Bar Opposite the Eastern McMurry Pond................................................6 Figure 4.2 Mature Forest on Right Bank in Lee Martinez Park, Across from Salyer Natural Area ....... 7 Figure 4.3 Pool Upstream of the Lake Canal Diversion .......................................... :............................. 8 Figure 4.4 Pool Upstream of the Coy Ditch Diversion..........................................................................9 Figure 4.5 Incised Channel Reach Upstream of Lincoln Ave ............................. :................................ 10 Figure 4.6 Looking Downstream at Riffle in the EPA Removal Action Reach, Below theBNSFRR........................................................................................................................11 Figure 4.7 Heavy Sand Deposit Downstream of a Cobble Bar Adjacent to the Udall Natural Area ... 12 Figure 4.8 Main River Channel at the Head End of the Island Adjacent to the WWTP .....................13 Figure 4.9 Stable Left Bank Just Below Confluence Downstream of the WWTP Island.....................14 Figure 5.1 Concrete Rubble and Erosion of Left Bank along McMurry Natural Area ........................16 Figure 5.2 Concrete Wall along Right Bank near the Coy Diversion Structure..................................17 Figure 5.3 Concrete Rubble along Right Bank at the Pickle Plant Site...............................................18 Figure 5.4 Concrete Slab along Toe of Left Bank along the Woodward/Link-n-Greens Site .............19 LIST OF APPENDICES Appendix A: Observed Poudre River Features, Shields Street to Mulberry Street Appendix B: Photographic Documentation ' COFC18_PRDP_Geomorph.docx i ANdERSON CONSUITINC{ ENGINEERS, INC. BACKGROUND This qualitative geomorphic assessment was undertaken to support the planning process associated with the Poudre River Downtown Project for the river reach from Shields Street to Mulberry Street. This assessment was conducted to identify river characteristics and behavior on a system -wide basis, with the goal of developing recommendations regarding planning -level direction for the Poudre River Master Plan with respect to geomorphic processes and natural river function. While this study was not intended to produce a detailed geomorphic evaluation, detailed geomorphic analyses may be required in the future to support the formulation and design of specific projects identified in the Poudre River Master Plan. The flood of September 13, 2013 appears to have sent a peak flow of 8,120 cfs through the City of Fort Collins along the Cache la Poudre River (provisional data from the USGS at the Lincoln Avenue gage); with a sustained flow exceeding 7,000 cfs for a period of about 14 hours. The peak discharge for this flood is slightly larger than a 25-year flood event on the Poudre River in Fort Collins, and is the largest discharge ever recorded at the Lincoln gage where stream flows have been measured since 1975. At the Canyon Mouth, approximately 11 river miles upstream of the Lincoln Gage in Fort Collins, where stream flows have been measured since 1882, a peak flow of 10,400 cfs is reported by City staff for the September 2013 Flood. This is the third highest discharge ever recorded at the Canyon Mouth which corresponds to a flow between a 25-year and 50-year event at that location. The difference between the discharges at the Canyon Mouth and the Lincoln gage is due to the interception and diversion of flows by intervening irrigation canals, as well as flood peak attenuation along the reach, particularly through the numerous remnant gravel pits. As a result of this major flood flow, the geomorphic site evaluation conducted in October 2013 provides a unique opportunity for garnering insight into the current and potential future behavior of the ' river for the reach between Shields Street and Mulberry Street during large flow events. The aerial photography used as base mapping during the field reconnaissance effort, and shown on the site features mapping, was exposed on October 30-31, 200 w�Ten the discharge recorded at the ' Lincoln stream gage was between 100 cfs and 110 cfs. The western portion of the geomorphic site evaluation, from Shields Street to just below the Lake Canal Diversion, was conducted on the afternoon of October 24, 2013 when the Lincoln gage was measuring a flow of about 110 cfs. The eastern portion of the current field reconnaissance effort, from the Lake Canal Diversion to the eastern end of the Udall Property, took place on the afternoon of October 25, 2013 when the Lincoln gage was reporting a flow t of nearly 150 cfs. The far eastern section of the field reconnaissance work, from the Udall Property to Mulberry Street, was completed on the morning of October 26, 2013 with the Lincoln gage reporting a flow of just over 200 cfs. ' Field observations made of channel features and behavior, including identification of which reaches are considered drops, riffles, runs or glides, and pools can be highly influenced by flow levels at ' the time of observation. Consequently, variability between studies which identify pools, riffles, bar dimensions, etc. can be expected for streams such as the Poudre River through Fort Collins with highly variable flows. Observational differences imply neither inconsistencies nor inaccuracies between ' COFC18_POP_Geomorph.doa 1 ANd ERSON CONSUhiNG ENGINEERS, INC. studies; rather these are simply a result of varying water levels associated with changing flow conditions. Conclusions provided below which indicate changes that appear to have occurred during the September 2013 Flood were made based on evidence identified during the October 2013 geomorphic site evaluation and comparisons to the October 2012 aerial photography. Between exposure of the October 2012 aerial photography and initiation of the September 2013 Flood, the maximum mean daily flow at the Lincoln gage was less than 1,300 cfs, indicating a relatively low spring snowmelt runoff peak along the Poudre River which would not likely have caused significant erosion or other changes to features in the river channel. Consequently, it is likely that changes to river features between October 2012 and October 2013 can be attributed almost exclusively to the flood of September 2013. Recommendations are provided for each reach that reflect suggested river management practices based primarily on river health and function, with considerations made for existing land use, infrastructure, and property ownership. It is understood that alternate management approaches may need to be adopted in specific areas to accommodate future land use and infrastructure needs. It is noted that the recommendations provided herein do not represent the entire list of improvements which may be identified as part of the Poudre River Downtown Project. As with all photographs provided in this report, Figures 1.1 and 1.2 are post-2013 Flood photographs of the Poudre River through Fort Collins. Figures 1.1 and 1.2 illustrate a representative comparison of the river character at the upstream and downstream ends of the current study reach. Other figures in this report are not specifically mentioned in the report text, but all are intended to provide examples of the river conditions or characteristics described in the accompanying text. Figure 1.1 Cache La Poudre River Downstream of Shields Street. Figure 1.2 Cache La Poudre River Upstream of Mulberry Street. C0FC18_PRDP_Geomorph.docx 2 ANdERSON CONSUITINq ENGINEERS, INC. I L t II. OVERVIEW The geomorphic field reconnaissance was conducted on October 24 through 26, 2013; this work included the 2.9-mile reach from Shields Street to Mulberry Street, along with the 0.1-mile split flow reach adjacent to the City's Waste Water Treatment Plant. The field reconnaissance effort revealed that the study reach can be generally subdivided into the following four distinctive subreaches: 1. Shields Street to 400 feet upstream of the Hickory Pedestrian Bridge (4,000 feet); 2. Upstream of the Hickory Bridge to the Boat Chute, below the Coy Diversion (3,200 feet) ; 3. Boat Chute to the west end of the WWTP property (6,100 feet); and 4. West end of the Mulberry Wastewater Treatment Plant (WWTP) to Mulberry Street (1,900 feet). The location and extent of these four reaches are shown in Figure 2.1. Reach No. 1 — from Shields Street to upstream of the Hickory Bridge — generally exhibits natural channel behavior and function; this natural function is somewhat limited due to the presence of a number of manmade lateral controls in the form of the Shields Street Bridge, the McMurry Bridge, and channel bank stabilization measures. With the exception of a 500-foot reach downstream of the Lake Canal Diversion, Reach No. 2 — from upstream of the Hickory Bridge to the Boat Chute, the rock structure located downstream of the Coy Diversion — is subject to pooling and backwater caused by the Boat Chute, the Coy Diversion and the Lake Canal Diversion. Virtually no natural geomorphic function was observed in this reach due to these vertical channel bed controls, as well as the lateral constraints (riprap bank protection, concrete walls, and abutments for a pedestrian bridge, the UPRR Bridge and the College Avenue Bridge) that have been imposed. Reach No. 3 — from the Boat Chute to the west end of the WWTP property — exhibits limited natural geomorphic function due to the presence of numerous manmade lateral controls, including three bridges (BNSFRR, Linden Street, and Lincoln Avenue), an abandoned diversion facility, and extensive channel bank protection measures. At least partially due to these anthropogenic influences, the river channel has incised down to bedrock over an approximately 1,100-foot reach stretching upstream and downstream of Lincoln Avenue. The river is also constrained against a naturally -occurring (but artificially armored) high right bank between Linden Street and Lincoln Avenue, and again at the downstream end of this reach adjacent to the Pickle Plant Site. Natural geomorphic function is present with some limitations through Reach No. 4 - from the west end of the WWTP property to Mulberry Street — where a wider riparian corridor, including the split flow path adjacent to the WWTP, has been preserved relative to the narrow river corridor which is present upstream (through Reach Nos. 2 and 3). The channel bed in this reach is controlled by the at - grade concrete encasement of two utility crossings located directly upstream of Mulberry Street, while lateral constraints are provided by isolated bank stabilization measures at a few locations, as well as by the Mulberry Street Bridge. COFC18_MP_Geomorph.doa 3 ANdERSON CONSUhINq ENqiNEERS, INC. 'ONj 'S833NIbN3 5NlllnSNOO NORI3PNV b x:)op•ydjowoag dC1Hd 8T:)jOJ Z �� SHIELDS ST T r m m cDi � Z� o . f 1 r COLLEGE AVE. III. QUALITATIVE BED AND BANK MATERIAL CHARACTERIZATION Bed and bank material samples were not collected as part of this field reconnaissance effort; as a result, textural analyses of the bed and bank materials were not conducted. Consequently, the following brief characterization of bed and bank materials is provided based on visual observations made during the detailed field investigation. Through the entire study reach, the river bed material generally consists of cobble interspersed in some locations with gravel. Two TT•, notable exceptions are upstream of both `• xm ,, the Lake Canal Diversion and Coy Ditch Diversion where the bed material is primarily sandy silt. Two additional exceptions are noted in the vicinity of Lincoln Avenue and near the Udall Natural Area where the channel has incised down to bedrock. In a limited reach upstream and downstream of Lincoln Avenue, bedrock appears to be intermittent, indicating that the alluvial bed material observed may only represent a veneer of isolated cobble and gravel deposits. Figure 3.1 Typical Cobble Bed Material. Bank material through the study reach, is largely sandy silt particularly in the upper stratum. In the lower bank horizon, this sandy silt material is interlaced with gravel and cobbles, with some areas in the upper portion of the study reach (specifically upstream of Lee Martinez Park) containing heavy cobble deposits. Throughout the study reach, recent heavy deposits of sand were noted covering selected low banks and terraces. Upstream of College Avenue, these sand deposits tend to be relatively isolated. Between College Avenue and Lincoln Avenue, these sand deposits are generally not present, primarily due to the incised nature of the channel through this area. Downstream of Lincoln Avenue, sand deposition along low banks and terraces was observed to be frequent and extensive. Figure 3.2 Heavy Cobble Bank Deposit near McMurry Natural Area. ' COFC18_PRDP_Geomorph.docx 5 ANd ERSON CONSUITINg ENgiNEERS, INC. I I' IV. QUALITATIVE GEOMORPHIC ASSESSMENT I' Detailed site observations from the field reconnaissance work are identified on the observed river features sheets attached as Appendix A. Due to the extensive channel bed activity through the ' western portion of the study reach, the stable channel banks are generally not noted on the river features observation sheets in this area. Through the more constrained reaches through downtown, both erosive and non -erosive channel banks are generally identified. Corresponding photographic ' documentation is included in Appendix B. The following discussion summarizes the detailed information provided on the observed river features sheets and in the photographic documentation. Reach No. 1 Reach No. 1 consists of a series of riffles and pools, as well as alluvial channel features (both active and stable bars and islands), and vertical and cantilevered banks at the low water line, that indicate healthy river function and natural aquatic habitat. Riffles vary in length from about 50 feet to more than 200 feet, while the pools are much longer, typically exceeding 300 feet in length. Several sections of the river through this reach can be characterized as runs, where flow depths are generally consistent but not as shallow as flow depths across the riffles, and flow velocities are moderate with considerably more stream power than observed through the pools. Most bars through this reach enlarged considerably during the 2013 Flood, with increased bar heights estimated to be as much as two feet or more. Most bars show evidence of elongation through this reach, often exhibiting considerably longer tails (relative to pre -flood conditions) which consist largely of sand. The tail end of one right side terrace, approximately 300 feet west of Wood Street, exhibits sand deposits of up to more than three feet. Many bars also enlarged laterally, with one new, low (and poorly organized) cobble bar having developed primarily in response to erosion of an adjacent cobble bank along the McMurry Natural Area. The sharp right hand bend in the river at the downstream end of the McMurry Ponds became even more acute as the opposing cobble and gravel point bar expanded riverward (to the north) by what appears to be as much as 20 feet; while the alternate side channel south of the island is now largely obstructed by cobble deposits. Smaller bars typically consist of medium to large cobble. Head ends of the larger bars are generally comprised of medium to large cobble overlaying smaller cobble, gravel and sand; while the tail ends of the larger bars appear to consist primarily of sand, in some cases including a gravel component. Figure 4.1 Enlarged Cobble Bar Opposite the Eastern McMurry Pond. ' COFC18_PRDP_Geomorph.docx 6 ANdERSON CONSUITINq ENCiiNEERS, INC. Bank vegetation on river right is generally mature and continuous, ' consisting of trees, grasses and willows. One exception to this is the exposed rock riprap present on the right bank at the left hand bend in the river across from ' McMurry Ponds; this riprap was installed in response to bank erosion and loss of the Poudre River Trail at that location ' during the 1999 Flood. The right bank through this reach is generally stable, ' except at the left hand bend adjacent to Salyer Natural Area where instability of the right bank appears to be a response to the significant lateral growth of the opposing point bar. Figure 4.2 Mature Forest on Right Bank in Lee Martinez Park, Across from Salyer Natural Area (on left). Along the left bank, installed channel bank stabilization measures consist of stable rock riprap, as well as both intermittent and continuous concrete rubble and concrete slabs. The concrete materials ' are providing sporadic stability for the left bank, but exhibit signs of failure in some locations. Vegetation along the left bank is inconsistent, leaving many areas with little to no coherent vegetative protection. Consequently, a number of areas of significant bank erosion are present along the left bank, generally corresponds to areas of limited vegetation. Both the McMurry and Salyer Natural Areas border the north side of the river through this reach, while the forested portion of Lee Martinez Park abuts the south side of the river through the eastern one-third of Reach No. 1. Land use on the south side of the river west of Lee Martinez Park is a combination of pasture and corrals associated with large private properties, and a property that is slated for a housing development that is currently planning to preserve a 300-foot buffer to the river bank. Overbank flows were present during the 2013 Flood through both the McMurry and Salyer Natural Areas. Flood flows which traveled through the McMurry Ponds returned to river, at least in part, at the southeast corner of the eastern pond, with the overtopping flows exacerbating local bank erosion at that location. There is evidence that flood flows entered the west side of the Salyer Natural Area and returned to the river approximately 500 feet downstream, scarring the overbank with a number of lengthy rills cut into silty topsoil. Although there was considerable alluvial channel feature activity through Reach No. 1 during the 2013 Flood, it appears that the bed level through this reach experienced neither general raising nor lowering as result of this extended high flow. This qualitative observation has not yet been confirmed by field survey. Considering the river's behavior during the 2013 Flood, as well as previous flood events, in Reach No. 1 the river appears to be trying to lengthen its path by moving into the McMurry Natural Area ' C0FC18_PRDP_Geomorph.docx 7 ANd ERSON %ONSUITINq ENGINEERS, INC. at two right hand river bends (which put erosional pressure on the left bank), one each at the east and west ends of the property. The river is constrained from moving south at the one left hand bend opposite of the McMurry Natural Area by rock riprap placed after the 1999 Flood to protect a sanitary sewer line and the concrete Poudre Trail which are both located in close proximity to the south channel bank. All of this being said, bank erosion through this reach is generally intermittent and localized as a result of the 2013 Flood. The one exception to this observation is an approximately 700-foot reach of the left bank along the upper portion of the McMurry Natural Area where bank erosion is not severe but fairly pervasive. Reach No. 2 Reach No. 2 is characterized primarily by the presence of two extensive pools which are formed by the vertical obstructions caused by the Lake Canal Diversion Structure and the Coy Ditch Diversion Structure. There is also a short (less than 100-foot long) pool located between the Coy Ditch Diversion and the rock -lined Boat Chute. There are three abrupt drops in the channel bed at the Lake Canal Diversion, the Coy Ditch Diversion, and the Boat Chute which either mostly or completely obstruct fish passage. The Lake Canal Diversion Structure in particular is virtually non -navigable by most boaters and floaters. The Lake Canal Diversion, a large concrete structure, creates a pool that is approximately %-mile long, extending nearly 500 feet upstream of the Hickory Pedestrian Bridge. No bars or other alluvial channel features were observed in this X-mile reach, along with no identifiable natural geomorphic function. The south bank through this reach is vegetated t with large trees and is generally stable where grass and shrubs are present. Isolated areas of erosion and ' degradation of riparian habitat were observed along the north bank where ' heavy recreational use is evident. Most of the north bank between the Lake ' Canal Diversion and the Hickory Bridge is stabilized with riprap that is partially overgrown with grass, willows and other shrubs. Figure 4.3 Pool Upstream of the Lake Canal Diversion. The first 500 feet downstream of the Lake Canal Diversion exhibits a relatively steep bed slope as the channel transitions from the diversion structure to the downstream pool formed by the Coy Ditch Diversion Structure. This short reach exhibits riffles, short pools, and active bars consistent with perturbed but generally natural geomorphic function. No alluvial bed features are present throughout the remainder of Reach No. 2, with the exception of a few small bars in the vicinity of the College ' COFC18_PRDP_Geomorph.docx 8 ANdERSON CONSULTING ENGINEERS, INC. 1 Avenue Bridge which appear to have formed in response to the presence of the bridge piers. Channel banks downstream of the Lake Canal Diversion are generally fairly well to well -vegetated with a mixture of grasses, willows, shrubs and trees. Consequently, the channel banks in this are generally stable with the following exceptions: (a) at the west training wall of the Lake Canal Diversion; (b) a 100- foot section of the right bank a short distance downstream of the Lake Canal I' Diversion; (c) several isolated locations along the right bank at and upstream of ' the UPRR Bridge; and (d) along the upper right bank through the Boat Chute. It does not appear that the 2013 Flood significantly impacted Reach No. 2, except for the growth of the head end of Figure 4.4 Pool Upstream of the Coy Ditch Diversion. the island (cobble deposition) just downstream of the Lake Canal Diversion and two cobble bars in this same area, the transport and clearing of post -High Park Fire silty deposits previously present upstream of the Coy Ditch Diversion, and exacerbation of upper bank erosion and possible destabilization of a portion of the riprap along the right bank at the Boat Chute. The Salyer Natural Area, Legacy Park, and River's Edge Natural Area border the north side of the river, while south bank of the river abuts Lee Martinez Park, west of College Avenue. East of College Avenue, land use north of the river consists of private property and the un-rehabilitated western portion of the Gustav Swanson Natural Area, while the CSU Engines and Energy Conversion Laboratory is located south of the river. The paved Poudre River Trail is located along the south bank of the river between College Avenue and the BNSFRR, tucked between the river and the Engines Lab. Overbank flows were present during the 2013 Flood through both Salyer and River's Edge Natural Areas, as well as Legacy and Lee Martinez Parks. Flood flows encroached on College Avenue north of the river due to flows which became trapped in the far left overbank which may have been exacerbated by the collection of large amounts of woody debris on the UPRR Bridge. Flood flows also inundated the north overbank between College Avenue and the BNSFRR, including several private properties. In Reach No. 2, the river is constrained from moving laterally by three bridges, riprap bank protection and a concrete wall. The river is also held vertically by two irrigation diversion structures and a rock drop structure. These features preclude virtually any possibility of natural geomorphic function in this reach. ' COFC18_PRDP_Geomorph.docx 9 ANd ERSON CONSULTING ENC{iNEERS, INC. Reach No. 3 Reach No. 3 consists of several riffles and a number of lengthy pools, but with very few channel features, indicating minimal healthy river function and natural aquatic habitat. Riffles are typically about 200 feet long but vary in length from about 100 feet to more than 300 feet, while the pools are much longer, typically exceeding 300 feet in length and extending up to 700 feet. River runs are prevalent through this reach, often located between pools, in some instances making differentiation between pools and runs being difficult. As shown on the observed river features sheets, runs in this reach range up to 400 feet or more in length, indicating a relatively uniform bed slope over considerable portions of this reach. Indeed, one of the longer runs corresponds to the lengthy section of intermittently exposed bedrock the channel bed upstream of Lincoln Avenue. Alluvial channel features present within this reach are limited to an island at Linden Street, a mid -channel bar/small island located 400 feet downstream of Linden, a mid-channel/point bar combination east of Lincoln Avenue, and sand bar adjacent to the Udall Natural Area. The first four of these five bars/islands generally added height during the 2013 Flood, consisting primarily of cobble and gravel at their head ends and sand over their tails. A substantial sand deposit (in terms of both length and depth) is evident along the lower right bank terrace adjacent to the Udall Natural Area, as well as along the lower left bank in the upper portion of the Woodward/Link-n-Greens Site. With Reach No. 3 exhibiting only a relatively small number of active alluvial features, it appears that the supply of cobble and gravel -sized sediments is out of balance with the transport capacity of these materials; with sediment transport capacity exceeding the available cobble and gravel supply. It appears that this reach is over -straightened and confined, which has lead to focused stream power and channel incision. Indeed, bedrock is present in the channel bed, at least sporadically, from about 500 feet downstream of Lincoln Avenue to nearly 600 feet upstream of Lincoln Avenue. The alluvium that is present through this nearly %-mile reach spanning Lincoln Avenue may represent only a relatively thin veneer or pockets of gravel and cobble. Figure 4.5 Incised Channel Reach Upstream of Lincoln Ave. Another short (50-foot) length of bedrock is exposed in the channel bed near the downstream ' end of the Udall Natural Area, across from the upper portion of the Woodward/Link-n-Greens Site. This portion of the channel also shows evidence of historic incision, but not nearly to the degree that the reach has incised upstream near Lincoln Avenue. COFC18_PRDP_Geomorph.docx 10 ANd ERSON CONSUITINq ENCiNEERS, INC. One would normally expect these incised conditions to be commensurate with extensive bank erosion and retreat. However, bank erosion is controlled through this reach largely by the presence of concrete rubble, concrete slabs, and concrete slag (waste) on banks along outside bends extensively on the right bank, and to a lesser degree along the left bank. Largely on the inside of bend, vegetation has ' established on banks in the form of trees, shrubs, willows and grasses. These banks are generally stable with intermittent, local erosion but no significant areas of bank retreat. Over a 500-foot reach ' downstream of Linden Street, a relatively heavy stand of large trees has grown up around the concrete slabs and concrete slag placed along the right bank. The result is a supply limited reach with respect to cobble and gravel materials caused by both a ' minimal local supply of gravel and cobble from the channel bed and banks within Reach No. 3 and the extensive pools in Reach No. 2 which limit the upstream supply of these larger bed sediments. The lack ' of sediment supply, combined with a straightened and laterally confined channel, result in a tendency toward channel bed incision and a lack of natural geomorphic function. This is particularly evident in the reach upstream of Lincoln Avenue where the channel bed has eroded down to bedrock. ' Between the BNSFRR and Linden Street, the Gustav Swanson Natural Area borders the left side of the river, while the right side of the river is bounded by Heritage Park, a commercial building, and a new apartment building. In 2005, most of this reach was subjected to channel bed and right bank reconstruction and stabilization as part of an EPA Removal Action in response to contamination of bedrock underlying the channel bed and right bank by a non -aqueous phase liquid plume and concentrations of organic compounds which exceeded water quality criteria. ' Consequently, further improvements and enhancements of the channel bed and right bank of the reach from the t BNSFRR to nearly Linden Street are essentially prohibited. ' From Linden Street to Lincoln Avenue, the FEMA-certified Oxbow Levee is setback from the left bank. ' The right bank is a high bank supporting commercial use within the currently ' developing Block One Development and industrial use by Ranch -Way Feeds on the immediate right overbank. Figure 4.6 Looking Downstream at Riffle in the EPA Removal Action Reach, Below the BNSFRR. (Note heavy vegetation on right bank.) Downstream of Lincoln Avenue along the right bank, the river is bounded first by the Udall Natural Area, which includes several water quality ponds, followed by the high bank along the abandoned Pickle Plant Site. Downstream of Lincoln Avenue along the left bank, the Poudre River Trail is located both adjacent to and set back from the bank, separating the river from both industrial and commercial land uses. Farther downstream, left bank land C0FC18_PRDP_Geomorph.docx 11 ANdERSON CONSUITINci ENGINEERS, INC. 1 use transitions to the Woodward/Link-n-Greens Site whose river frontage is being donated to the City Natural Areas Program and is in the process of being improved to enhance the riparian corridor. The ' near bank portion of this area is being lowered to encourage floodplain connectivity and overbank flood flows on a more frequent basis. Riprap toe and bank protection will be installed along the relatively sharp bend near the upstream end of the site (near the downstream end of Reach No. 3) to protect a nearby sanitary sewer line and the Poudre Trail. II II 1 Primary impacts of the 2013 Flood on Reach No. 3 include: (a) transporting and clearing of sandy sediment from the channel bed along the left bank adjacent to Gustav Swanson Natural Area; (b) erosion and removal of a small, mid -channel island between Linden Street and Lincoln Avenue; (c) extensive sand deposits along both banks downstream of Lincoln Avenue; and (d) increase in the height of the few bars/small islands present within the reach. With the exception of a portion of the Udall Natural Area, overbank flows did not occur along the right bank through Reach No. 3 during the 2013 Flood. Near overbank flows were present along the left bank between Linden and Lincoln during the flood; however, these overbank flows were relatively minor and only spread a short distance from the channel bank. The same is true for the left overbank flows downstream of Lincoln through the industrial/commercial area. This reflects the incised condition of the channel through a significant portion of Reach ' No. 3, its resulting increased capacity to carry flood flows, and a lack of floodplain connectivity. Extensive left overbank ' flows were experienced during the 2013 Flood through the Woodward/Link-n- Figure 4.7 Heavy Sand Deposit Downstream of a Cobble Bar Adjacent to the Udall Natural Area. ' Greens Site. In Reach No. 3, the river is constrained from moving laterally by three bridges, concrete remnants from a failed diversion facility, and extensive channel bank protection measures. In addition, ' the channel has incised down to bedrock over nearly 20 percent of the middle portion of this reach, resulting in a significant vertical control with the channel bed having reached a base level in this middle ' section. Coupled with the lack of both local and upstream supply of gravel and cobble -sized sediment, these features preclude most natural geomorphic function in this reach. ' Reach No. 4 Reach No. 4 was observed on a morning when the river flow was just over 200 cfs, making ' accurate assessment of the extent and character of riffles, pools and runs somewhat more difficult than ' COFC18_PRDP_Geomorph.doa 12 ANd ERSON CONSUITiNq ENGINEERS, INC. on the two previous days when the remainder of the study reach was examined. This relatively short reach is predominately characterized by a large island with mature vegetation which bifurcates river flows adjacent to the middle portion of the Mulberry Wastewater Treatment Plant (WWTP). The main river channel, which runs along the left side of the island, is narrow with flows running relatively fast and deep. Depending on flow levels, the main river reach along the island can be described as a riffle/run with no alluvial features. Upstream of the island is a pool/run which extends approximately 700 feet west up to what appears to be an abandoned concrete diversion structure. The only alluvial feature observed in this upper portion of the reach is a narrow sand bar which has formed in the now shadow of the old concrete structure along the left bank. Downstream of the island, is a pool/run with the grade of the channel bed held by concrete encasement protecting two utility crossings at the downstream end of the reach, just upstream of the Mulberry Street Bridge. One large bar is present in this lower portion of the reach, located just upstream of Mulberry Street along the right side of the channel. This bar consists primarily of cobble and gravel overlain by sand, and has a small side channel running along the landward side of most of the bar. Figure 4.8 Main River Channel at the Head End of the Island Adjacent to the WWTP. The secondary channel which runs along the right side of the island provides the outlet for WWTP effluent. This channel exhibited significant alluvial activity during the 2013 Flood, beginning at the head end of the channel where a cobble deposit now precludes low flows from entering the channel. At the time of the field reconnaissance work, river flows were not entering the secondary channel at a river discharge of slightly more than 200 cfs. Two days later, with river flows between 400 and 500 cfs, roughly 50 cfs was entering the secondary channel. This channel experienced significant deposition during the flood with the enlargement of three large cobble bars. The island itself was also subject to considerable changes as a result of the 2013 Flood. Cobble deposits are evident over the upstream portion of the island, with heavy cobble deposits and de - vegetation concentrated at the head end of the island, covering roughly''/< acre. Heavy sand deposits are present of the lower portion of the island, with the vegetation having suffered some damage but still largely intact. Reach No. 4 is generally situated on a long, sweeping right hand bend of the channel, which tends to put erosional pressure on the left bank. Even with this channel geometry, the left bank is predominately stable where continuous tree cover exists. Stability of the left bank is supported by the ICOFC18_PRDP_Geomorph.docx 13 ANd ERSON CONSUITINC{ ENGINEERS, INC. II II II presence of large boulder toe protection in one isolated location, along with concrete slab toe protection over a more than a 100-foot section; elsewhere a vertical toe is present. In many areas without tree cover, the upper bank shows evidence of recent erosion but in no case is the bank erosion severe in this reach. The right bank, which is situated on the inside of the long, mild bend, is generally well -vegetated through this reach with little evidence of bank erosion. Throughout Reach No. 4, the Woodward/Link-n-Greens Site borders the left side of the river, while the right side of the river is bounded by the ' Mulberry WWTP. The river frontage along the Woodward/Link-n-Greens Site ' is being donated to the City Natural Areas Program and is in the process of being improved to enhance the riparian ' corridor. Through this reach, the near bank portion of the left overbank is i' being lowered to encourage floodplain connectivity and overbank flood flows on a more frequent basis. In addition, targeted removal of non-native trees has Figure 4.9 Stable Left Bank Just Below Confluence Downstream of the WWTP Island. occurred in this reach. As work continues on this site, existing concrete slab toe protection along the left bank will be removed. Through the lower portion of this reach, set -back riprap protection will be placed up to 70 feet behind the existing bank to protect against future bank retreat beyond this installation, while allowing the river to adjust its alignment and promote at least limited natural river behavior. Primary impacts of the 2013 Flood on Reach No. 4 include: (a) deposition of cobble at the entrance to the secondary channel near the WWTP which prevent low flows from entering that channel; (b) significant growth of the cobble bars along the secondary channel; and (c) avulsion (to the west) of the small side channel that runs along the landward side of the large bar located just upstream of Mulberry Street. It is notable that despite the high sustained flows associated with the 2013 Flood and the general lack of installed bank erosion protection measures, left bank erosion was minimal through this reach. With the exception of the extreme downstream portion of the reach directly upstream of Mulberry Street, adjacent to the WWTP, overbank flows did not occur along the right bank through Reach No. 4 during the 2013 Flood. Extensive left overbank flows were experienced during the 2013 Flood through the Woodward/Link-n-Greens Site. In Reach No. 4, the river is constrained from moving laterally by the Mulberry Street Bridge, as well as boulder and concrete slab toe protection at two locations along the left bank. In addition, the heavy concentration of mature trees along the lower and mid -bank through the downstream portion of ' COFC18_PRDP_Geomorph.docx 14 ANdERSON CONSUITINg ENgiNEERS, INC. this reach effectively controls bank erosion and retreat. In addition, the channel is constrained vertically at the downstream end of the reach by the two transverse concrete encasements which provide protection for two utility crossings and are currently located at bed level. Due to only limited anthropomorphic features influencing this reach, along with the generally wider riparian corridor (relative to Reach Nos. 2 and 3), Reach No. 4 exhibits improved (albeit limited) natural geomorphic function compared to the two upstream reaches. ' COFC18_MP_Geomorph.doa 15 ANd ERSON CONSUITINC{ ENgiNEERS, INC. I ' V. GEOMORPHIC -BASED REACH RECOMMENDATIONS Recommendations provided below reflect suggested river management practices and specific action items based primarily on river health and function, with considerations made for existing land ' use, infrastructure, and property ownership. It is understood that alternate management approaches may need to be adopted in specific areas to accommodate future land use and infrastructure needs. It is noted that the recommendations provided below do not represent the entire list of improvements which may be identified as part of the Poudre River Downtown Project. ' Reach No. 1 Based on the presence of open space and publicly -owned natural areas along this reach of the river, and also considering the river's response to the recent flood, the following actions are recommended for Reach No. 1: (a) remove the concrete rubble and slab material from the channel banks; (b) contour the newly exposed banks underlying the removed concrete materials, as well as all currently unvegetated, eroding banks, and revegetate with native grasses, willows and trees; (c) install biostabilization measures at the toe of erosion -prone banks — these features may be sacrificial during high flow events, but would be intended to buy time for new vegetation to establish; (d) avoid or at least minimize the installation of rock riprap and, where necessary, use buried rock toe protection ; (e) dress the exposed right bank riprap with a native gravel/sand mix, cover with top soil, and vegetate with native grasses, willows and shrubs; 1 1 (f) remove the McMurry Pedestrian Bridge and, recognizing the need for a pedestrian crossing at this location, replace with a longer span bridge set above the 100-year water surface elevation; and (g) lower a broad swath of the overbank through Salyer Natural Area to support the establishment of riparian vegetation, perhaps including a cottonwood forest, and promote floodplain connectivity by activating conveyance of flood flows through the left overbank at a lower level than is currently supported —this will take pressure off the eroding right bank in Lee Martinez Park and substantially widen the riparian corridor in this area. Figure 5.1 Concrete Rubble and Erosion of Left Bank along McMurry Natural Area. ' COFC18_PRDP_Geomorph.docx 16 ANd ERSON CONSUITINq ENGINEERS, INC. Adopting the recommendations identified above will maximize the river's ability to behave naturally through Reach No. 1, but will require periodic maintenance to remove fallen trees that may create hazards, realign/repair soft trails that may be damaged by retreating banks, and perhaps repair retreating banks that impinge on soft trails that can otherwise not be relocated farther from the river bank. Reach No. 2 Recommendations for Reach No. 2 consider the presence of publicly -owned parks and natural areas along the river west of College Avenue, the proximity of private property east of College Avenue (including a natural gas pump station operated by Xcel Energy), and the presence of a railroad and major arterial roadway/highway. Considering these features, along with probable limitations associated with removing or making significant modifications to the Lake Canal Diversion Structure, the following recommendations are offered for Reach No. 2: (a) continue the Salyer Natural Area improvements identified for Reach No. 1, including vegetative enhancements to the north river bank primarily in the form of shrubs, willows and native grasses; (b) lower the north bank along Legacy Park and relocate vehicle parking away from the river; (c) rehabilitate the north bank along Legacy park by either removing the riprap bank protection and replacing with alternate toe erosion protection or burying the existing riprap, in either case revegetate the bank with grasses and shrubs along with trees planted on the upper bank; (d) lower the area of high ground in the open field of the northern portion of Lee Martinez Park (the 'tree dump' area) to support the conveyance of flood flows during 5-year to 10-year flow events; (e) install low level cobble/gravel bars in the river channel upstream of the Lake Diversion to diversify channel bed habitat in this area; 1 (f) II II II II create fish and boating passage at the Lake Canal Diversion by modifying a portion of the existing structure to allow passage of native fish species and boating/tubing users while reducing, to the extent possible, the extent of ponding upstream of this structure (this would be preferable to a bypass channel at this location, which is a viable option, but one that would require local dry -up of the river to support the bypass channel function); (g) remove both the Coy Diversion Structure and the rock Boat Chute, including all associated riprap bed and bank protection, and replace with sloping rock structures and pools that allow Figure 5.2 Concrete Wall along Right Bank near the Coy Diversion Structure. ' COFC18_PRDP_Geomorph.docx 17 ANdERSON CONSUITINq ENGINEERS, INC. passage of native fish species and boaters/floaters while reducing, to the extent possible, upstream ponding; and (h) remove the concrete wall on the south bank adjacent to the Coy Diversion and implement streambank habitat improvements along both banks by creating low and mid -level terraces, thereby narrowing the low flow channel, and revegetate with grasses, shrubs and trees. Given existing infrastructure, property ownership, land use and topographic constraints within Reach No. 2 there is limited potential for re-establishing natural geomorphic function within this reach. The recommendations identified above are intended to minimize the adverse effects of the recognized constraints on riparian habitat and river function. Reach No. 3 Recommendations for Reach No. 3 consider the EPA Removal Action project and its consequent constraints, the presence of natural areas along portions of the river, the Oxbow Levee, the proximity of private properties at a number of locations, and the presence of a railroad and two roadway crossings. Considering all of these features, the following recommendations are provided for Reach No. 3: (a) remove the concrete slag, rubble and slab material from the channel banks throughout the reach; (b) contour the newly exposed banks underlying the removed concrete materials, as well as all currently unvegetated, eroding banks, and revegetate with native grasses, willows and trees; (c) remove the exposed, permanent turf reinforcement mat (TRM) from the right bank upstream of the BNSFRR, and install cohesive riprap toe and buried bank protection in this area; (d) remove the exposed TRM from the left bank in the Gustav Swanson Natural Area, along with the rock slabs along the bank in the Gustav Swanson Natural Area that were previously installed to provide a shady overhang/refuge for fish (half of these slabs have failed), and replace with willow plantings; (e) lower the left overbank between Linden and Lincoln, following the Poudre River Enhancement Plan (PREP), in order to promote floodplain connectivity by activating the conveyance of flood flows through the left overbank at approximately a 5-year flood level; (f) implement right bank improvements between Linden and Lincoln pursuant to the PREP, with enhanced habitat restoration measures to the extent possible; (g) along the right bank along the west end of the Udall Natural ' Area, remove the concrete rubble bank protection, lower and re - contour the bank, to the extent ' possible, and stabilize as indicated in Item j (below); Figure 5.3 Concrete Rubble along Right Bank at the Pickle Plant Site. ' COFC18_MP_Geomorph.docx 18 ANdERSON CONSUITiNci ENGINEERS, INC. (h) terrace the high bank along the Pickle Plant Site to create low and mid -level terraces that would convey flood flows during frequently -occurring and moderate flood events, respectively, lay back the upper bank, and stabilize as indicated in Item j (below); (i) remove all other concrete rubble bank protection within this reach, and stabilize as indicated in Item j (below); (j) pursuant to Items g, h and i (above) install toe rock/boulders and biostabilization measures along erosion -prone and all newly -graded banks, and revegetate with a combination of grasses, shrubs/willows and trees, as site appropriate; (k) remove all old concrete members from the channel bed, including the failed diversion structure remnants located at the downstream end of the reach; (1) remove and replace, as necessary, all failing and/or compromised erosion protection measures at bridge abutments; and (m) continue with the on -going improvements at the Woodward/Link-n-Greens Site to lower a broad swath of the overbank to support the establishment of riparian vegetation, including a cottonwood forest, and activate conveyance of flood flows through the left overbank at a lower level than is currently supported. Adopting the recommendations identified above will minimize the potential for erosion along the river to adversely impact existing infrastructure and both public and private property, while also providing opportunities for enhancing riparian habitat, including vegetative cover, to the extent possible through Reach No. 3. Reach No. 4 Considering the on -going riparian modifications within the Woodward/Link-n-Greens Site, the following recommendations are provided for Reach No. 4: (a) remove the concrete slab material from the left channel bank; (b) commensurate with the Woodward/Link-n-Greens Site Plan, it is recommended that as many left bank trees as possible are allowed to remain to continue providing both stream edge habitat and canopy cover, as well as bank erosion protection; (c) allow the secondary channel to make natural adjustments to the extent possible, performing only the minimum required maintenance to sustain the WWTP outfall; and (d) continue with the on -going improvements at the Woodward/Link-n-Greens Site to Figure 5.4 Concrete Slab along Toe of Left Bank along the Woodward/Link-n-Greens Site. ' COFC18_MP_Geomorph.docx 19 ANdERSON CONSUMNq ENGINEERS, INC. lower a broad swath of the overbank to support the establishment of riparian vegetation, including a cottonwood forest, and activate conveyance of flood flows through the left overbank at a lower level than is currently supported. Adopting the recommendations identified above will maximize the river's ability to behave naturally through Reach No. 4, but will require periodic maintenance to remove fallen trees that may create hazards. COFC18_PRDP_Geomorph.doa 20 ANdERSON CONSUhINq ENGINEERS, INC. i� .0 13 m 3 G. APPENDIX A OBSERVED POUDRE RIVER FEATURES, SHIELDS STREET TO MULBERRY STREET REACH NO. 1 r� McMURRY NATURAL AREA MEDIUM TO LARGE CONCRETE RUBBLE WITH BE LOW COBBLE BAR COBBLE BED MATERIAL INTERMITTENT BANK SLOUGHING EXTREMELY LARGE BAR- DMAX 12'+) INTERMITTENT WITH MINIMAL GRAVEL MEDIUM -SMALL COBBLE SURFACE = 7NDERLAIN WITH SAND, TALLER ' CONCRETE RUBBLE �y3 -LARGE SLAB THAN PRE -FLOOD HEIGHT AS _ CONCRETE RUBBLE -OWER PORTIONS OF SAPLINGS '� y ARE BURIED (-2'+)/ Q4�` CONCRETE RUBBLE SLOUGHED CONCRETE RUBBLE INTO CHANNEL 'i r S� ERODED BANK. ERODING BANK, NEAR lryaj 1 "yo `,1 POOL SLOUGHED VERTICAL UPPER BANK 1 j RIPRAP i i 2 (SAND, SILT (SAND, SILT AND GRAVEL) AND GRAVEL) SLOUGHED COBBLE BANK +' LOWER 2 3 OF BANK i r RkFF ( ) LOW BATR EROSION; .� OP 1 ti5 ��� 7�9ti� R14Rpp 1736 73 DE RFAILEIS CAUGHTONWOODY ROOTS �11 a DROP POOL Q �' ( RUN /1rI737 OF STAN)ING TREE �I 1 i j �b9 -�' PHOTO ID, LOCATION SAND DEPOSITION �,a )�3_�RLFFLE ON BANK AND BEARING (TYP.) M RIPRAP GOW COBB� SAND BEACH - _ _ ' 1743 (MEDru BAR COBBLE RIFFLE INTERMITTENT RIPRAP / COBBLE vi J " f ' LE 'E UNDERCUT BAVK WITH S EXPOSED ROOTS POOL FROM TREE STUMPS STABLE LOW BANK o (WILLOWS AND GRASSES) '+r'I I j f r I / STABLE RIPRAP W I , CANTILEVER BLOCK FAILURE, i WITH 10" WILLOW TREE FALLING AICTIVE CHANNEL LFROM INTO CHANNEL 2 FT SAND DEPTH LOCAL DRAINAGE OUTFALL Q w w - AT LOCAL DRAINAGE OUTFALL RIPRAP ON UPPER BANK, w LANDWARD OF SIDE CHANNEL SAND DEPOSITION ' (- 4' DEPTH ON RIGHT BAHK sAT DOWNSTREAM END OF TCRRACE) O D w O Q 1 :J Q AERIAL PHOTOGRAPHY DATED OCTOBER 30-31, 2012. POUDRE RIVER DISCHARGE RECORDED AT THE LINCOLN ! AVENUE GAGE WAS 100-110 CFS. i REvt cords rnw POUDRE RIVER DOWNTOWN PROJECT REV2 o eo' Loa �„s, �,,,,,,�: OBSERVED RIVER FEATURES REVS OEOM EArup ANdEmN CONSUMIN EN INEERS, INCREVA RIVER FEATURES GJK/JDD 4 9 SHIELDS ST TO MULBERRY ST THURSDAY AFTERNOON OCT 24, 201311 1 ' 100' Ch/l - Wmer Rasoumv EnvlranmenW REVS wn:*m a: me e. n�.umnxa,4 �e,e. rm �nm.w win FORT COLLINS, COLORADO 0 = 111 CFS (LINCOLN GAGE) REV6 f 0/29/20/3 GJK REACH NO. 1 McMURRY NATURAL AREA BANK RETREAT, NEAR BANK RETREAT, VERTICAL BANK (•6' HT), SLOUGHING OF SILT AND SAND ('PITH GRAVEL AND COBBLE SOME GRAVEL AN) BANK MATERIAL COBBLE INTERMIXED) (PARTIALLY DUE TO FA'.LED TREE LAYING OVERTOPPING FLOW ACROSS CHANNEL FROM POND) AND 2ND TREE AL)NG BANK SMALL COBBLE BAR IN SHADOW OF DOWNED TREE MINOR BANK EROSION RV 1766 17 7� 1771 1774� o RIF~F E POOL---, lr 772 r �n6 �4/F SAND DEPOSITION ON 77 MID -LEVEL BANK �/ �,1779 SMALL AREA OF p p�4 SAND DEPOSITS CANTILEVERED BANK ,GRAVEL'DEF ON ISLAND AT BASE OF MULTI -TRUNK PHOTO ID, LOCATION ti62 17��� COTTONWOOD AND BEARING (TYP.)�`,17 P �l —_ — ►<1yj7 ` 004 McMURRY / MINOR UNDERCUTTING PEDESTRIAN Q6 - OF ISLAND, LOW BANK; CL4 STABILIZED BY WILLOW BACKWATER IN BRIDGE r SIDE CHANNEL ROOT MASS SIDE CHANNEL =/I Pool- LARGELY OBSTRUCTED oTJ BY COBBLE DEPOSITS Jo ,- LARGE COBBLE BAR OOV JJ \ (^3' HT) SMALL -MEDIUM '.SAND BAR UPSTREAM COBBLE (WITH SOM _ OF WINGWALL 9 17g1j/ / t758 LARGE COBBLE) 1758 COBBLE BAR WITH INTERMITTENT WOODY INTERMITTENT/PARTIAL DEBRIS DAMS 7�1755 ` -2' DROP SAND SURFACE 1 \ 6a LOCAL PEE ' . ` (UNDERLAIN WITH COBBLE) \\� 7 5 / IB• L1 CANTILEVERED CALVING` 175 DROP „2' DROP BANK BEHIND BAR 175 MID -LEVEL COBBLE BAR; '_; _ - .h.1+s,F - J},r-• - MEDIUM -SMALL COBBLE (WITH GRAVEL INTERMIXED) I I SAND DEPOSITS AT DOWNSTREAM END a y AERIAL PHOTOGRAPHY DATED OCTOBER 30-31, 2012. f"-' POUDRE RIVER DISCHARGE RECORDED AT THE LINCOLN 2 '+le AVENUE GAGE WAS 100-110 CFS. p[VISIBNS: MNOJLR MVNRp: DRAWN B�: REV1 CGFCIa 7AVY sNm REV2 U SO wo' rM p� POUDRE RIVER DOWNTOWN PROJECT OBSERVED RIVER FEATURES REVS CEOMORPN— RIVER FEATURES GJK/JOD AndE N COl UlliNG EngiNEEn, INC SHIELDS ST TO MULBERRY ST THURSDAY AFTERNOON OCT 24, 2013 Q REVS y.100' Clwl - WwR'Resources • E.'4m nmml REVS B.R: LimG JK TBN.IIo,,,1,N wd.N.Bd„p11,N�,WNW. MROM FORT COLLINS, COLORADO Q = 111 CFS (LINCOLN GAGE) REVS /O/29/2013 REACH NO. 1 REACH N0. 2 0 U `McMURRY / PEDESTRIAN / BRIDGE o4 f °0. oc , 11� i ez �Ri� e CANTILEVERED CALVING BANK { BEHIND BAR 17e4 ERODING BANK (-6'-B' HT), SLOUGHING OF PRIMARILY COBBLE MATERIAL; VERTICAL SILT/SAND UPPER BANK SALYER NATURAL AREA rPHOTO ID, LOCATION AND BEARING (TYP.) MID -LEVEL COBBLE BAR; MEDIUM -SMALL COBBLE '!/5� f i1 gg OLF. (WITH GRAVEL & INTERMIXED) N'f SAND DEPOSITS AT'i ,e DOWNSTREAM END Ages 1(o,� q ti LARGE TREE FAILED AND MOVED FROM LEFT BANK, CAUGHT ON BED MID -CHANNEL Igo' NEAR HEAD OF RIFFLE �F LARGE (3'-4' HT) COBBLE BAR, MEDIUM -SMALL COBBLE, TRANSITIONS TO MOSTLY GRAVEL WITH SAND NEAR TOP OF BAR � �g5 s� RON ERODING BANK LOWER 2/3 SLOUGHING COBBLE WITH VERTICAL AND CANTILEVERED UPPER BANK (SILT); SEVERE FAILING TREES LOW (_2' HT) BAR; MEDIUM COBBLE AT HEAD END LR Ja 1601 *TOSAND . �04—_—_�{�� ERODED BANK, CANTILEVERED, HELD BY TREE ROOT MATTING BANK 'CUT BEHIND LARGE WILLOW. WITH LARGE SNARL OF WOODY DEBRIS LEE MARTINEZ PARK mjw xWq[Ih apYM m coatis TAW H 0 ST 100' — — oowxm m C GEOM AndEa o uly1 ER iwm, IRO RIVER FEATURES GJK�JOD G 1'=10a mm cx[cnm n: CA71 -Wa[n R..m. • EnWmmmtal 1012912013 GJK mn.x�mou,xm,x iemxxf, P.nconx�roeonf LEGACY PARK HICKORY PEDESTRIAN BRIDGE �MINOF BANK EROSION AND EXPO"ED RIPRAP AT ABUTMENT POUDRE RIVER DOWNTOWN PROJECT SHIELDS ST TO MULBERRY ST FORT COLLINS, COLORADO STABLE RIPRAP BANK WITH WILLOWS/SHRUBS AND SAPLING GROWTH POOL LOW STABLE BANK WITH TREES, GRASS AND SOME SHRUBS AERIAL PHOTOGRAPHY DATED OCTOBER 30-31, 2012. POUDRE RIVER DISCHARGE RECORDED AT THE LINCOLN AVENUE GAGE WAS 100-110 CFS. OBSERVED RIVER FEATURES THURSDAY AFTERNOON OCT 24. 2013 3 Q = 111 CFS (LINCOLN GAGE) REACH NO. 2 1 1 1 1 d I RIVER'S EDGE NATURAL AREA STABLE RIPRAP BANK WITH WILLOWS/SHRUBS AND SAPLING GROWTH LOW STABLE BANK WITH TREES, GRASS AND SOME SHRUBS WOODLAWN DRIVE MEDIUM COBBLE BAR (-2'-3' HT) SMALL —LARGE COBBLE IV y�J COBBLE BAR (-4'-5' HT) MEDIUM COBBLE TO GRAVEL GREW IN HEIGHT BY 2'-3' AT HEAD END DURING FLOOD P DRo 4' HT COBBLE BAR GREW BY �1X2-2' HT DURING FLOOD MEDIUM —SMALL COBBLE (UNDERLAIN WITH GRAVEL) SEVERE BANK EROSION AROUND DIVERSION STRUCTURE GUIDE WALL ERODED BANK OF LAKE CANAL DUE TOL OVERTOPPING FLOW FROM RIVERL �h ^0, 1c MINOR BANK EROSION LOCAL SANK EROSION ��---FAILING (SPARSE) RIPRAP AND COUBLE/SAND/SILT BANK 1B�-- RC .� rLOW COBBLE BA I BANK EROSION VERTICAL BANK HELD BY TREE LEE MARTINEZ PARK RIVER'S EDGE NATURAL AREA Gy7O ~lp Aq Ix Z'poy 0 (-2'-3' HT) GRASSED LOW BANK, GENERALLY STABLE WITH LOW VERTICAL BANK AT WATERLINE SAND DEPOSITS ON STABLE LOW BANK (-•2' HT) UPPER BATIK \ SAND DEPOSITS BARE SOIL, MILDVERTICALBE CUT ON UP TO OUTSIDE OF MILD BEND (STABIUZED BY TREE ROOTS) 140WES STREET OUTFALL ` (—I' THICK) (36'7 RCP AND 30'1 HERCP ) �\ 0 AERIAL PHOTOGRAPHY DATED OCTOBER 30-31, 2012. POUDRE RIVER DISCHARGE RECORDED AT THE LINCOLN AVENUE GAGE WAS 100-110 CFS. RIEV!"= "`� ��° " OBSERVED RIVER FEATURES '"m REvt cor-cla raw POUDRE RIVER DOWNTOWN PROJECT REV2 _ _ Q� o so. 100' aeo n:[: owo�m n: THURSDAY AFTERNOON OCT 24, 2013 REVS I ANdERSON COMUtTIN EN INEERS, INC REV4 RIVER FEATURES CJK/JOO 4 4 SHIELDS ST TO MULBERRY ST O = 111 CFS (LINCOLN OAGD 4 REVS P�100' ytt: cx[c«ro rt: Crop - WawResn.r ' - EnW/m mm[d FORT COLLINS, COLORADO FRIDAY AFTERNOON OCT 25, 2013 115 a xo�.mwn xw0. nmw�ny vmCon::.. wb REVS 10/29/2013 GJK _ O = 147 CFS (LINCOLN GAGE) REACH NO. 2 REACH NO. 3 oR��6 ,4A4 O FAILED, DEAD COTTONWOOD LAYING IN CHANNEL; LOCAL G'S BANK EROSION AROUND FALLEN TREE (MINOR) Y y F LOW (1'-2' HT) BANK 100 VERTICAL, BARE SOIL HELD 00 BY ROOT MATRIX (GRASSES) v0 GRASSED BANK (^-3' HT) MID CHANNEL APPEARS STABLE, MAY HAVE COBBLE/GRAVEL BAR NEW SAND LOW UNDERCUTTING BUT DEPOSITS GENERALLY STABLE GUSTAV SWANSON NATURAL AREA (WEST) xCEL GAS (PUMP STATION COY DITCH DI VERSION -LARGE GROUTED ROCK RIPRAP ALONG TOE OF DIVERSION AND WINGWALLS GROUTED ROCK TRAINING WALLS _L--� AND SILL (-1'-1.5' HT) LARGE SAND LENS COBBLE TO GRAVEL ON BAR ON BAR GRASS BANK, APPEARS SMALL ' (D TO BE STABLE, GRAVEL---i pn MAY BE MINOR -A� VERTICAL UNDERCUT BAR Na ccgy4a' TRAINING {-2'-3' HT) �2i6p6)• BOULDERS GRASSED LOW BANK, GENERALLY STABLE LARGE WITH LOW VERTICAL BANK SAND BAR T �04g AT WATERLINE (3'-4' HT) T 1a49 �g4? \ LOWJ P00( aUN COBBLE BAR ELONGATED �g";g3g BAR; SAND PHOTO ID, LOCATION �g°P SAND AND BEARING (TYP.) > DEPOSIT J aye '?C& BOULDERS J gy, PLAIN RIPRAP eyo BANK PROTECTION SAND BAR (1'-2' HT) -BOAT CHUTE STEEP, STABLE SILT BANK WITH SOMEWHAT SCATTERED, BUT GRASS AND TREE VEGETATION; FAIRLY CONSISTENT SLOPING LOW VERTICAL BANK LARGE RIPRAP BED PROTECTION RECENT EROSION OF LIMITED EROSION OF A0i I `\ 6' HT BANK; SILTiY UPPER BANK � (FROM 7-10' HT); TOTAL HEIGHT -14'4 _' i 1 ` �� POOL ` ga--j1. Na>,ga`" — EXPOSED UPPER BANK, RECENT EROSION (6'-8' HT), APPEARS LARGE RIPRAP BANK HAS SLOUGHED LRIPRAP BANK PROTECTION CONCRETE RUBBLE AND SLAB BANK PROTECTION; EROSION/CALVING OF HIGHLY SCATTERED UPPER BANK AND INCONSISTENT SLOPING/STEPPED LARGE RIPRAP BED PROTECTION C.SU ENGINES AND " Ef4ERGY CONVERSION LABORATORY LOW TO MID HEIGHT BANK LOCAL BANK SCOUR, (^-1'-3' HT) GRASS & BARE VORTICES AROUND SOIL, STABLE STANDING TREE GRASSED BANK (-S' HT) EROSION ALONG BIKE TRAIL, NEAR VERTICAL, UNDERCUT CONCRETE TRAIL CANTILEVER 1' VERTICAL AND 1' HORIZONTAL BLOCK FAILURE STABLE LOW BANK (^-2' HT) SEVERE BANK EROSION BARE SOIL. VERTICAL CUT ON (-4' HT) BEHIND AND UPSTREAM OUTSIDE OF MILD BEND AND DOWNSTREAM OF PIER (STABILIZED BY TREE ROOTS) (COBBLY/GRAVELY SILT) aNQJECI NY.tlCP'. CO ORP D 50 100, T. nEE: _ GEOMOATUR � RIVER FEATURES 1' = 100' wTE: 10/29/2013 TAW DNED m: GJK/JDD ANIEUSON CONSUMING ENC,INEERS, In DNED tlr: Civil xo,.wan- Water Resources • Environmmiat ne D. No.y vwiewaxe, von con�n.. co weu GJK EXPOSED TRM PLACED ON ROCK AND RUBBLE; UPPER BANK EROSION/RETREAT (6'-8'HT); SEOERAL TRAIL FENCE POSTS HAVE FAILED OR ARE IN DANGER OF FAILING POUDRE RIVER DOWNTOWN PROJECT SHIELDS ST TO MULBERRY ST FORT COLLINS, COLORADO UPPER BANK FAILURE EXPOSED COBBLY/GRAVELY SILT (-12' HT) IN PIPE Aaay ea STORM DRAIN EXPOSED MANHOLE RISER FAILED UTILITY PIPE, ACTIVELY FLOWING (STORM DRAIN?) SLAB REFUGE ROCKS ON LOW BANK WITH LARGE ANCHOR BOULDERS AT U/S AND D/S ENDS. HALF OF SLABS (4 OF 8) HAVE TILTED DOWN AND REST ON CHANNEL BED; EXPOSED TRIM ABOVE ENTIRE LENGTH OF SLABS 8 g6 l � RIPRAP TOE PROTECTION WITH WILLOW GROWTH Ng'I AERIAL PHOTOGRAPHY DATED OCTOBER 30-31, 2012. POUDRE RIVER DISCHARGE RECORDED AT THE LINCOLN AVENUE GAGE WAS 100-110 CFS. NLET OBSERVED RIVER FEATURES FRIDAY AFTERNOON OCT 25, 2013rj 0 = 147 CFS (LINCOLN GAGE) REACH NO. 3 P t Ey. SEVERE BANK EROSION/RETREAT " AROUND TREE/ROOTS (-5'-E' HT) OXBOW LEVEE RIPRAP AND INTERSPERSED G U S TA V S WA N S O N PHOTO ID, LOCATION CONCRETE RUBBLE BANK NATURAL AREA AND BEARING (TYP.) PROTECTION; MINOR RIPRAP BANK LOW COBBLE BAR; UNDERCUTTING AT WATERLINE PROTECTION (^'1'-2' HT) ILL -FORMED STABILIZED BY LINE OF WILLOWS AT UPS?REAM END n� FAILED SAPLINGS CONCRETE SLAB ON BANK; ; MI R LOW (-2' HT) VERTICAL BUT UPPER BANK EROSION STABLE LOW GRASS BANK 7� ALONG LOW BANK; MINOR STABLE; UPPER BANK IS STEEPLY SLOPING WITH INTERMITTENT MINOR r EROSION OF GRASSY BANK SHOWING SIGNS OF INSTABILITY, SANDY BEACH WITH (^"4' HT) SANDY SILT UNDERCUTTING ~— ERODING AROUND CONCRETE. ANCHOR BOULDERS _, �_� o1Be1 ! AT UPSTREAM AND SAND DEPOSIT -_��_ tw�,i` THIS BANK IS BADLY IN NEED DOWNSTREAM ENDS ON LOWER BANKIRIFFLE OF CLEANUP AND REPAIR. I` RIPRAP TOE a /-/r ��� iggg lgga RUN \ I r SLOPING DROP SAND DEPOSIT a, n °E' 1 B' HT PROTECTION w h e0 i/ i r r l �T. �"—�-- POOL (� ) ON RIPRAP 1 � � �� r • _ n i--- J87z -.��h �_ /� - .,fie 190 f9O� 1 pp --'�+RIFFLE `STABLE .LOW TEMPORARY COFFER DAM FOR eop \ �8 n� a`•r,� --► GRASS BANK, BLOCK 1 CONSTRUCTION II, WITH MINOR UNDERCUTTING (COBBLE/GRAVEL PUSHED UP J \ BLOCK 1 BANK \A SAND DEPOSIT \\ FROM BAR ,ALONG SECONDARY BARE, ERODING CONSTRUCTION R -- ON RIPRAP I `-GROUTED ROCK CHANNEL) LOW BANK STORM DRAIN (-3' HT) SILT TAIL OF BAR STILL COBBLE BAR ADDED HEIGHT RIPRAP TOE PROTECTION RUNDOWN WELL -VEGETATED WITH DURING FLOOD AND MINIMAL WITH WILLOW GROWTH COBBLE/GRAVEL BAR »4' HT WILLOWS AND SMALL TREES WIDTH. MATERIAL WAS AT UPSTREAM END SECONDARY RE -ARRANGED WITH SOME CHANNEL DEPOSITS OF COBBLE -SAND OVER ENTIRE BAR; VEGETATION RIPRAP BANK PROTECTION; KNOCK OVER AND REMOVED LARGE PORTION ERODED AND SLOUGHED INTO CHANNEL / I f UNDER BRIDGE STEEP EARTHEN BANK •� WITH INTERMITTENT CONCRETE / a SLAG; GENERALLY STABLE, HELD--", MOSTLY BY PERVASIVE -TREE ' l ROOTS ONLY. LIMITED CONCRETE CLEANOUT COULD BE DONE ON THE BANK AS MUOF THE CONCRETE IS EMBE DED IN BANK HERITAGE PARK AND INTERLOCKED WITH TREE ROOTS t AERIAL PHOTOGRAPHY DATED OCTOBER 30-31, 2012. POUDRE RIVER DISCHARGE RECORDED AT THE LINCOLN AVENUE GAGE WAS 100-110 CFS. xLVI510x5: VHOICR xYMB[P'. Wx tli. LI[[I RE v1 COFC18 raw POUDRE RIVER DOWNTOWN PROJECT OBSERVED RIVER FEATURES REV2 _ _ 0 50' too' .e.o rne: oesiox� FRIDAY MORNING OCT 25, 2013 6 REV3 GEO MORPH— ANdER50N (",ONSUIiIN EN INFERS, INC RIVER FEATURES cJK JOG �+ G SHIELDS ST TO MULBERRY ST REV4 1"=100' CMI - Wale Reoa es • Environmental FORT OLORADO 0 = 147 CFS (LINCOLN GAGE) REVS once: excenw er: lnnxnxelomxwy exndmaas, exn cxnnx.roaons COLLINS,, REVS 1012912013 GJK ct REACH NO. 3 I I I I 1 CONCRETE SLAB ON BANK; LOW (�21 HT) VERTICAL BUT STABLE; UPPER BANK IS SHOWING SIGNS OF INSTABILITY, SLOPING DROP ERODING AROUND CONCRETE. (-18„ HT)� THIS BANK IS BADLY IN NEED OF CLEANUP AND REPAIR. SEE NOTE ON PREVIOUS SHEET UNDERCUT TREES LOW BANK (-18- HT) OXBOW LEVEE CONCRETE RUBBLE -BANK EROSION UP TO 5'-6' HT, ON UPPER BANK (TOTAL BANK HT 9'-10'); EXPOSED TREE ROOTS, GRAVEL AND SOME COBBLE INTERMITTENT CONCRETE RUBBLE AND RIPRAP ON BANK (NOT PROVIDING 'OPEN' CONCRETE RETAINING WALL WITH CONCRETE SLAG STR ON BANK ABOVE AND BELOW WALL A1920 � `�h MID -CHANNEL LOW (<7' HT) MUCH, IF ANY, COBBLE/GRAVEL BAR MID -CHANNEL PROTECTION) Y/ L COBBLE/GRAVEL BAR m` POOL r9rs r� 0 N 1 RUN ----------- COBBLE PORTION OF BAR ADDED HEIGHT DURING ---FL60D BUT MINIMAL WIDTH. i MATERIAL WAS RE —ARRANGED WITH SOME DEPOSITS OF COBBLE —SAND OVER ENTIRE BAR; VEGETATION KNOCKED OVER AND - REMOVED; VEGETATION ON -TOE OF BAR REMAINS t CONCRETE SLAG BANK ARMORING _.. 4 THIS BAR IS NO ROCK DROP LONGER PRESENT (-l' µT) CONCRETE RUBBLI BANK PROTECTION 1 � _ SEVERE BANK EROSION l EAM GAGE AND -20' OF BANK - RETREAT BEHIND 'OPEN' COBBLE/ RETAINING WALL BANK EROSION BEHIND PIER (UP TO TRAIL) a CONCRETE RUBBLE BANK PROTECTION by BEHIND PIER PHOTO ID, LOCATION _ CONCRETE SLAB AND BEARING (TYP.) �ON BANKS CONCRETE SLAB AND �� 1926 `10„g RUBBLE BANK PROTECTION PjFR_, 0- OLD STREAM STREAM GAGE 192—J LARGE BOULDERS OR POOL .°jW9 1 1930932 \ CONCRETE SLAG UNDER WATER, \MID -CHANNEL CREATING A SMALL DROP (<1' HT) CONCRETE SLAB TERRACE (�3'-4' SANDY MID -LEVEL HT) CONCRETE F ABUTMENT PROTECTION BANK NOTE: INTERMITTENT BEDROCK IN CHANNEL BED FROM APPROXIMATELY 500 FEET DOWNSTREAM OF LINCOLN TO APPROXIMATELY 600 FEET UPSTREAM OF LINCOLN. UDALL NATURAL AREA AERIAL PHOTOGRAPHY DATED OCTOBER 30-31, 2012. POUDRE RIVER DISCHARGE RECORDED AT THE LINCOLN AVENUE GAGE WAS 100-110 CFS. REVS — COFC18 TAW POUDRE RIVER DOWNTOWN PROJECT REvz 0 s0 100• µ'.V.m oow„.,,: OBSERVED RIVER FEATURES REVS GEOm GRPH— ANdEAiOn CANSUIIIN EN INFERS, INC REV6 RIVER FEATURES GJK/JOD 4 4 SHIELDS ST TO MULBERRY ST FRIDAY MORNING OCT 25, 2013 *=10a' Cfvif Waterllrsmucer EnvWnmenm/ FORT COLLINS, COLORADO O = 147 CFS (LINCOLN GAGE) REVS nrt� cxccrzm o: sn e.xa...�xxo.a, nu,m,xn. va, un,e,,roxoss REV6 70/29/2013 GJK GRASSY BANK (-3'-5' HT) CANTILEVERED SLIGHTLY, LIMITED EROSION, HELD BY WILLOWS AND GRASSES SMALL COBBLE -GRAVEL BAR M BANK (^•3' HT) UNDERCUT BUT RELATIVELY STABLE COBBLE -GRAVEL BAR (^-I' HT) VEGETATION KNOCKED DOWN COBBLE -SAND REARRANGED; SAND DEPOSIT (-3' HT) COBBLE/GRAVEL BAR ^i VERTICAL BANK (-4' HT), GRASS SURFACE ON TOP EXPOSED COBBLE/GRAVEL FLOOD WASHED OVER AREA EXPOSING COBBLE AND DEPOSITING SAND ACTIVE COBBLE BAR (-2'-4' HT); ENLARGED WIDTH AND INCISED HEIGHT DURING FLOOD; MOSTLY COBBLE WITH SAND DEPOSITS AND TAILSAND MID -CHANNEL COBBLE BAR (-l'-2' HT); DISORGANIZED AT UPSTREAM END RIPRAP BANK/POND OUTLET PROTECTION (-4' HT) CONCRETE RUBBLE/SLAB BANK PROTECTION CONCRETE SLAB/RUBBLE BANK PROTECTION I_ REACH NO. 3 WOODWARD/LINK—N—GREENS SITE 5� INTERMITTENT BANK EROSION; SLOUGHED, VEGETATED BANKS; GRASS ABOVE UDALL NATURAL AREA WOODWARD BANK CONSTRUCTION; TREES REMOVED PHOTO ID, LOCATION AND BEARING (TYP.) f �yAr� SAND BAR (-3'-4' HT) A �s 796 SHALE BEDROCK EXPOSED IN BED n�re� rP c n�� GA V G` V O p P� �J SELECTED TREE REMOVAL BY WOODWARD CONSTRUCTION CONCRETE RUBBLE BANK PROTECTION SILTY, GENTLY SLOPING BANK; GRASS WITH LIMITED RECENT SAND DEPOSITS (-5'-7' TOTAL BANK HT) HEAVY SAND DEPOSITS ON MID LEVEL TERRACE; STABLE SLOPING GRASSY BANK (-4'-5' HT OF TERRACE) 463 CAR BODY ONJ CONCRETE SLABS LOWER BANK (OLD) AND BLOCK BANK PROTECTION ON STEEP, BANK (50' HT); FAIRLY HEAVY TREE COVER AERIAL i PHOTOGRAPHYDATED OROI O pRI� o DSCHARGERECORDEDATTHELINCOLN AVENUE a GAGE WAS 100-110 CFS. RIVER5I�E 0 60• too• 1•-100• , coFcre rnw oowxm x.: GJK/JDD ANdaww CONSUITINf ENGINEERS, INC chil W.WR..w • RnNmnmertlal mnxu.omnxrgnww��s, voxmni�mmess POUDRE RIVER DOWNTOWN PROJECT SHIELDS ST TO MULBERRY ST FORT COLLINS, COLORADO OBSERVED RIVER FEATURES FRIDAY AFTERNOON OCT 25, 2013 Q = 147 CFS (LINCOLN GAGE) SA0 = 204 MORNING OCT 28, FE) Q = 204 CFS (LINCOLN GAGE) 8 REVI R REV2 �cxo mu _ RIVER FEAivNEs REVS REV4 REVS wn: 1 O/29/2013 nxttxm m: GJK REV6 "c REACH NO. 3 I lk. CH NO. 4 I 1 1 1 I 1 II 1 1 SELECTED TREE REMOVAL ALONG THE NORTH BANK BY WOODARD CONSTRUCTION (ENTIRE SHEET) LOCAL BANK EROSION AND RETREAT (•-4' HT) INTO COBBLY, GRAVELLY, SILT BANK HEAVILY VEGETATED WITH GRASSES AND WILLOWS HEAVY SAND DEPOSITS ON MID LEVEL TERRACE; STABLE SLOPING GRASS BANK (-4'-5' HT OF TERRACE) STABLE SLOPING. SILTY GRASSED BANK WITH RECENT SAND DEPOSITS; (-6'-9' TOTAL BANK HT) WOODWARD/LINK-N-GREENS SITE SCOURED BACKWATER AREA BEHIND CONCRETE STRUCTURE LOCAL BANK EROSION; SILTY GRASS BANK ABANDONED (-4' HT) SLOUGHED DIVERSION (T) I STRUCTURE \ 75 974 1 )P� 7975 1972 \ � 7 1976 o(19 ' 1971 POOL Y RUN-�j 1970A� �] SHORT RIFFLE APPEARS TO BE VERY LARGE FORMED BY PIECES CONCRETE OF FAILED CONCRETE BLOCKS STRUCTURE UNDER CONCRETE SLAG WATER IN BED .00AL UNDERCUTTING INCLUDED WITH OTHER OF CONCRETE SLABS CONCRETE MATERIALS ON BANK CONCRETE SLAB AND BLOCK BANK PROTECTION ON STEEP, 50' HT BANK; FAIRLY HEAVY TREE COVER PICKLE PLANT SITE F NARROW SAND BAR (-i'-2' HT); SEPARATED FROM BANK BY 10'-15' SLOPING SILTY, GRASS BANK (-3'-5' HT) STABLE WITH MINOR VERTICAL EDGE •(1977 MINOR UPPER BANK EROSION HT); POSSIBLY DUE TO RETURN FLOW TO RIVER; GRAVEL TO SMALL COBBLE WITH SILT UPPER BANK 4 1979 STEEP BARE TO GRASS BANK (-6' HT) WITH SCOUR HOLES/SCALLOP EROSION PATTERN AROUND LARGE TREES - 1980 PHOTO ID, LOCATION) AND BEARING (1YP.) GENTLY SLOPING GRASSED AND BARE BANK, HEAVILY TREED f'.. AND STABLE Of rlrz *N �S %, C✓1=� 1 4 FORT COLLINS :s WWTP SEMI -STABLE TO FAILED LARGE BOULDER TOE PROTECTION (INTERMITTENT), UPPER BANK EROSION, SLOUGHING AND STEEP GRASS BANK WITH LIMITED BANK RETREAT VERTICAL LOWER EDGE (-7-8' HT) AND MINOR SLOUGHING ALONG U?PER BANK (-8'-10' HT) BANK EROSION (-B' HT) VERTICAL TOE AND SLOUGHED UPPER BANK (SILT TO LARGE COBBLE IN BANK) It 19B3 �— RIFFLE ----� ZUUb , a 004 i i THIS PORTION OF LOW— COBBLE/GRAVEL BAR (-1'-2'HT) IS OBSTRUCTING SPLIT LOW CHANNEL (NO FLOWS ENTERING CHANNEL AT -200 CFS, WOULD LIKELY REQUIRE -400 CFS TO ACTIVATE SPLIT FLOW CHANNEL) COBBLE/GRAVEL BAR WWTP OUTLET / ERODING 6ANK,(-6' HT) — SLOUGHING OF GRAVEL/COBBLE FROM LOWER 4' OF BANK VERTICAL SILT' UPPER BANK '1984 LARGE SCOUR HOLE BEHIND TREE COBBLE DEPtS N HEAVY SAND < 'f DEPOSITS 12 COBBLE/GRAVEL ACROSS ,t 2ox0 BAR WITH SAND LOWER PORTION OF r �. (�4-5 HT) ISLAND N s � 72a1e p00<; RIPRAP BANK - PROTECTION RIFFLE (STABLE) LARGE COBBLE BAR WITH SAND DEPOSITS (••-3'-4' HT) AERIAL PHOTOGRAPHY DATED OCTOBER 30-31, 2012. POUDRE RIVER DISCHARGE RECORDED AT THE LINCOLN AVENUE GAGE WAS 100-110 CFS. REV! OOFCIH TAW REV2 _ 0 Stl 100' .tin nu: pnwwm n: POUDRE RIVER DOWNTOWN PROJECT OBSERVED RIVER FEATURES REVS � RIVER FEATURES GJK JDD AN U - Wa CONSUImI ENGINEERS, INC (� REV` — 1'=100. / CIv4 •Water Racourcev Envlronmenfd SHIELDS ST TO MULBERRY ST SATURDAY MORNING OCT 26, 2o1s REVS - "" eNmem "' mun xa.4 mmwwn. P,�m.�wJv FORT COLLINS, COLORADO 0 = 2D4 CFS (LINCOLN GAGE) REVS 10/29/2013 GJK REACH NO. 4 WOODWARD/LINK—N—GREENS SITE LOCAL SCALLOP PATTERN BANK EROSION BETWEEN TREES; CONCRETE SLAB TOE PROTECTION VERTICAL LOWER BANK BUT (LAID IN NEATLY) WITH RIPRAP BANK GENERALLY STABLE PROTECTION ABOVE CONCRETE (-8' HT) WITH ERODING UPPER BANK GENTLY SLOPING BARE BANK EROSION (-8' HT) EARTH AND ROOT VERTICAL TOE AND SLOUGHED LOWER BANK STABLE UPPER BANK (SILT TO LARGE COBBLE IN BANK) 4 m 200, RUN RffFLE-� 00 0 �\ rvo S IARGE SCOUR 1 SLOPING ` HOLE BEHIND TREE GRASS/WILLOW BANK WITH PHOTO ID, LOCATION AND BEARING (TYP.) MODERATELY SLOPING BARE EARTH AND ROOT LOWER BANK WITH OCCASIONAL VERTICAL EDGE, w GENERALLY STABLE a A CANTILEVER BANK FAILURE �991^ j POOL 5PNR055 SAND DEPOSITS; S STABLE. i O�fA� p,C N\ON _ GENTLY SLOPING GRASS pOSF.R pO „ilh / BANK WITH SAND DEPOSITS (LOCALLY HEAVY); STABLE I � TRANSVERSE GRAVEL/SMALL COBBLE BAR; LOW FLOWS COVERING BAR BLE/GRAVEL m GENTLY SLOPING GRASSY `1 N BANK WITH SAND DEPOSITS WITH SAND .� L��!, (LOCALLY HEAVY); STABLE -5' HT) o ' —} " s' AN `RIPRAP BANK ERODING BANK (-•6' HT) SLOUGHING OF GRAVEL/COBBLE FROM VERTI _ BAR HT) LARGE COBBLE BAR WITH SAND DEPOSITS (-3'-4' HT) COBBLE/SAND BAR (-3' HT) NEW SPLIT CHA FLOOD FILLED OLD SPLIT CHANNEL WITH COBBLE, GRAVEL AND SAND AND CUT NEW PATH TO WEST (AS SHOWN) CUT BANK, NEAR VERTICAL (-4'-5' HT) WITH EXPOSED SMALL COBBLE AND GRAVEL IN SANDY/SILTY BANK MEDIUM TO SMALL COBBLE BAR WITH FEW LARGE COBBLES (-1 '-1.5' HT); POORLY FORMED ALONG RIVER'S EDGE CONCRETE CAP FOR UTILITY LINE ACROSS BED (-6' WIDTH) SANDY BANK ALONG PIER WITH CONSIDERABLE EROSION q`FNUF „ FORT COLLINS a WWTP , ... ,,;• 1 AERIAL PHOTOGRAPHY DATED OCTOBER 30-31, 2012. POUDRE RIVER DISCHARGE RECORDED AT THE LINCOLN r AVENUE GAGE WAS 100-110 CFS. LLY1901O: - m(c: eJMuI oP.wx B1: sxa REV1 0 60 1 W COFCiH 7AW POUDRE RIVER DOWNTOWN PROJECT OBSERVED RIVER FEATURES REV2 xuo me REVS GEOMORPM— RIVER FEAiVRES oopxm m: GJK�JDD ANdl - WaComum - vimnm, MC G 4 C1Wl • WorerResourcer EnWi nwwld ���"rl°^^ " uwNmx xf, non c.m�mwm SHIELDS ST TO MULBERRY ST FORT COLLINS, COLORADO SATURDAY MORNING OCT 26, 2013 q = 204 CFS (LINCOLN GAGE) 10 REV6 REVS Dort: 1012912013 cxe�ao m, GJK REV6 1 ' APPENDIX 8 ' PHOTOGRAPHIC DOCUMENTATION r Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 u F c 0 w v N Ul 0 O l0 C d m E CD 0 n 0 U UI 0 v C N E m m CL a E w0 E m d u, c 0 0 v rn c 0 0 0 J COFC18_Geomorph_Fieldwork_Photos FINAI.docx 1 ANdcasm Cmutrinq ENgWcm, INc. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 E9 COFC18_Geomorph_Fieldwork_Photos FINAL.docx 2 ANdEmm CoNsubiNq ENfjIwm, IWc. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 _ ♦ Z1 • j � � N t a .r� m � ry ^�` N 4 0 CL O y M COFC18_Geomorph_Fieldwork_Photos FINALdocx 3 ANdEnsm CawsuldNq ENglrwEn, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 N 01 0 O C N E m a� N 0_ 7 E 0 E m d N c 3 0 v rn c 0 O O J N N 0 C Ul E l9 N CO E 0 E m v C0 C 0 O O J Y C a C O U) 0 O U (0 E m 0 u, 0 0 v C C 0 0 J COFC18_Geomorph_Fieldwork_Photos FINAL.docx 4 MdEnm CoNsuMeq EnginEEas, Inc. ' Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 N N O U C N E m 0 N 3 0 v E 0 E m m N O. rn c 0 O O J N # N O C C N E N N C 0 0 a E O E m d y C O O) C 0 O O J COFC18_Geomorph_Fieldwork_Photos FINAL.docx 5 ANdERm CoNsulriNq EKINEERs, INC. Poudre River Downtown Project Photographic Documentation - Geomorphic Evaluation Fieldwork October 24-26, 2013 Y yn :� c •�� C ` � � 3 a o o ! ua _ J LL I � COFC18—Geomorph_Fieldwork_Photos FINALdocx 6 ANdERm CamtriNCr ENgimum, Inc Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 COFC18_Geomorph_Fieldwork_Photos FINAL.docx 7 ANdEnm CoNsultiNG ENGINEERS, INc. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 of d E: w 0 v C N N y 3 0 a E 0 E m d a rn c Y O O J COFC18-Geomorph_Fieldwork_Photos FINAL.docx 8 AWmsm CExvwtdNG ENgiNEE•m, INc. � K oE �. II Rit r li 4 dd�l• M���, "` 1IV % 1 I r VI.. LL IZ ti Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 m `o U/ E m d a E 0 w E m U/ N C 3 0 m C 0 O O J w �I aw `0 U C N E m m N a E O E 0 G1 N a rn c 0 O O J `m n I COFC18 6eomorph_Fieldwork_Photos FINAL.docx 10 Andcuon Consulfinq ENgjNEm, INC. Poudre River Downtown Project Photographic Documentation —Geomorphic Evaluation Fieldwork October 24-26, 2013 M �I m m E N 0 O U COFC18_Geomorph_Fieldwork_Photos FINAL.docx 11 ANdERSON CONSUITING ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 COFC18_Geomorph_Fieldwork_Photos FINAL.docx 12 ANdERSON GmsuhiNft ENgiNEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 L6 N 0 D C N E N N 3 0 E O E m N y 0 rn C 0 O O J (6 N 0 C N E (0 v N a E 0 E m m N a rn c 0 O O J COFC18_Geomorph_Fieldwork_Photos FINAL.docx 13 AWEVAN CoNwlfiNq ENgiNEM, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 ........,..._............._................-.�-�.. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 a COFC18_Geomorph_Fieldwork_Photos FINAL.docz 15 ANdERSON CONsuhiNq ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation - Geomorphic Evaluation Fieldwork October 24-26, 2013 COFC18_Geomorph-Fieldwork_Photos FINAL.docx 16 ANdmsca CoNsultimcl ENCrINEm, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 COFC18_Geomorph_Fieldwork_Photos FINAL.docx 17 ANdERSON CUNSUIIINCi ENCjiNEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 06 0 'O C N E f0 N N C O E O E m N 0 rn c 0 O O J COFC18_Geomorph_Fieldwork_Photos FINAL.docx 18 AN&RSON CONs1IrINq ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 l0 a w C 0 a, a 0 0 U COFC18_Geomorph_Fieldwork_Photos FINAL.docx 19 ANdERSON CONsuhiNq ENgiNEERS, INC. ' Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 ' _ N N N N _ 0 C O _ E C N w E ' yn � Ea E ,: C 3 o x o ' E m E o ul r V - �33 ' U 0 ❑ o ; II O 0 ' a1 J LL LL m u Y 0 m O u J ' X O r O � J 0 J � ♦ N Q � O N Co N N o a v � y � E 01 0 11 o d v o m E mE _ •�: 0 C t O 0_ 0 3 00 O O w J LL d LL Q J , u O j n u O O ' COFC18_Geomorph_Fieldwork_Photos FINAL.docx 20 ANdEmm C.ONwbINq ENgiNEERS, Inc. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 COFC18_GeOmorph_Fieldwork_PhotoS FINAL.docx 21 ANdERSON CONSULTING ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 COFC18_Geomorph_Fieldwork_PhotosFtNAL.docx 22 Miduson CoNsuhinc EnciwEn,Inc. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 C 0 �N N IM1 0 E (0 UI U N C � O j O � N � n C M _O 0 L° m m > E o NN C f0 cU 0 m O Y v m � J C 0 O 0 J ' COFC18_Geomorph_Fieldwork _Photos FINAL.docx 23 ANdERsm UmultINq ENONEm, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 0 ac 2 Ir'I M N COFC18_Geamorph_Fieldwork_Photos FINAL.docx 24 ANCIMON Consultinq ENgineeas, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 COFC18_Geomorph_Fieldwork_Photos FINAL.dooe 25 ANdER50N CONwlting ENgiNEEns, Inc. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 m 0 w v N E m N C 3 O L E 0 E m m N O. 3 O) C Y O O J 7 COFC18_Geomorph_Fieldwork_Photot FINAL.docx 26 ANdEnm CoNSUITINq ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 7 Y C t0 COFC18_Geomorph_Fieldwork_Photos FINAL.docx 27 ANdERSON CONSUIIINCj ENfjINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 1! f O a N F _ z U N �f n _ w • {i N II 0 �t O J G COFC18_Geomorph_Fieldwork_Photos FINAL.docx 28 ANAE850N CONSUITiNq ENgINEEAS, INC Poudre River Downtown Project Photographic Documentation - Geomorphic Evaluation Fieldwork October 24-26, 2013 YA COFC18-Geomorph_Fieldwork_Photos FINAL.docz 29 ANdER" CoNwhiNq ENgINEERs, INc. ' Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 ' o m25 , C $ _ O +� E C _ c L I z o m E Z E V k F i o N i N M O N N LL a �r Y LL I rr Y ' i O O O m O t ` O W y "n 2 rn N C y E _ O J rv'li n f e g Y Co O f6 u N �. ti r41 0 C) ' COFC18_Geomorph_Fieldwork_Photos FINAL.docz 30 AWERSON CoNsuhlNG ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 1 COFC18_Geomorph_Fieldwork_Photos FINAL.docx 31 ANdEnoN CONSUITING ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 ai COFC18_Geomorph_Fieldwork_Photos FINAL.docz 32 ANdERSON CONSUbING ENgiNEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 Ed IA COFC18_Geomorph_Fieldwork_Photos FINAI.docx 33 ANdExsoN CoNsu%1iNg EwJNEEes, Inc. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 COFC18_Geomorph_Fieldwork_Photos FINAL.docx 34 ANdEwsoN CONwhiNq ENgiNEERs, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 M a d 0 0 w COFC18_Geomorph_Fieldwork_Photos FINAL.docx 35 ANdERSON CoNSuhINq ENgiNEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 M 01 O C N E N IA O. E 0 E 0 d C0 m C 0 O O J m VA COFC18_Geomorph_Fieldwork_Photos FINAL.docx 36 ANdERsoN CONSUItINq ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 _N N C O C N E N N CC 3 0 v E 0 w E m a� a c 3 0 v rn C Y O O J N U/ O v C m E m m 0 0 v E Q E m LD N a 0) C Y O O J COFC18_Geomorph_Fieldwork_Photos FINAL.docx 37 ANdERsoN CoNsul#mG ENGINEERS, INc. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 7Y, COFC18_Geomorph_Fieldwork_Photos FINAE.docx 38 ANdERSON CONSUMING ENGINEERS, INC Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 T Ol 0 a C N E t0 N N a 0 E N N O 3 0) C 0 0 J V # COFC18_Geomorph_Fieldwork_Photos FINALdocx 39 AWERsoN C.ONsuliiNq ENgiNEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 I A E W COFC18_Geomorph_Fieldwork_Photos FINAL.docx 40 ANdEwoN CONSUITINq ENgiNEM, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 COFC18_Geomorph_Fieldwork_Photos FINAL.docx 41 ANdERSON CONSUITiNq ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 N w O a c m E 10 N N C 0 0 v E 0 E l0 N N O rn C Y O O J COFC18_Geomorph_Fieldwork_Photos FINAI.doa 42 ANdERSON Cor4suhlNCj ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 u COFC18_Geomorph_Fieldwork_Photos FINALdocx 43 ANdEwoN CoNsuhiNq EmjNEERs, INc. Poudre River Downtown Project Photographic Documentation —Geomorphic Evaluation Fieldwork October 24-26, 2013 w d 0 O C N E f0 N N a E 2 m w (N a rn c Y O O J 7 COFC18_Geomorph_Fieldwork_Photos FINAL.docx 44 ANdER50N Comuh[Ny ENgiNEERs, INc. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 0 N O COFC18_6eomorph_Fieldwork_Photos FINAL_docx 45 ANdERSON CONSUIliNG ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 E O COFC18_Geomorph_Ffeldwork_Photos FINAL.docx 46 MdEnm CoNsubiinq ENcJNEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 A16 COFC18_Geomorph_Fieldwork_Photos FINAL.docz 47 ANdERSON CONSUITINq ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 COFC18_Geomorph_Fieldwork_Photos FINAL.dooc 48 ANdERSON CONSUITINq ENgiNEERS, INC. 1 1 1 1 1 1 Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 u ti COFC18_Geomorph_Fieldwork_Photos FINAL.docx 49 ANdERSON Comuhiny ENgiNFERs, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 d n d N C O U C J O t a� w L_ O C O N O W COFC18_Geomorph_Fieldwork_Photos FINAL.docx 50 ANdERSON C OUITiNq ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 ■ COFC18_Geomorph_Fieldwork_Photos FINAL.docx 51 ANdERsoN CONwiriNq ENgirlmrs, Inc. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 a COFC18_Geomorph_Fieldwork _Photos FINAL.docx 52 ANdER50N CoNsuhinq ENgiNEEBS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 L6 u E, N O C C N E m U1 h C O U E 2 E m m U1 3 0 w C Y O O J ' COFC18_Geomorph_Fieldwork_Photos FINAL.docx 53 ANdERSON CONSUMING ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 W COFC18_Geomorph_Fieldwork_Photos FINAL.docx 54 ANdERSON CONSUIiiNy BgNEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 T N 0 a C N E Co m c 0 0 a E 0 E m a� N a Ol C 0 O O J COFC18_Geomorph_Fieldwork_Photos FINAL.docx 55 ANdER50N Consulrinq ENgineerss, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 COFC18_Geomorph_Fieldwork_Photos FINAL.docx 56 ANdERSoN CONSUMING ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 COFC18-Geomotph_Fieldwork_Photos FINAL.docx 57 AmdlmsON ComuiTINq 54gi um, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 0 COFCSB_Geomorph Fieldwork_Photos FINAL.docx 58 ANdEmm ComuhiNq ENgir4Em, INc. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 0 `o v c w E m 0 N Q 3 E O E M N N C 0 0 a M C 0 0 O J COFC18_Geomorph_Fieldwork_Photos FINAL.docx 59 ANdERsoN CanwhiNq EwJNEErs, INe. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 COFC18_Geomorph_Fieldwork_Photos FINAL.docz 60 ANdEn m CoNsuhiNq ENyINEERs, Inc. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 Mk COFCIR_Geomorph_Fieldwork_Photos FINAL.docx 61 ANdEmm CassultiNq ENONEERs, INc. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 6 COFC18_Geomorph_Fieldwork_Photos FINAL.docx 62 ANdERSON CONSUITING ENgiNEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 ' COFC18_Geomorph_Fieldwork_Photos FINAL.docx 63 AWERSON L"MITINy tNGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 COFC18_Geomorph_Fieldwork_Photos FINAL.docz 64 ANdEmon Cmsulrinq ENgiNEEes, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 0 N b N O o6 C C @ E @ N 4J C 3 0 v E O E @ N N 2 OI C Y ❑ J COFC18_Geomorph_Fieldwork_Photos FINAL.docx 65 ANdERSON CoNsuhiNG ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 W it _W O U N E @ N 3 0 v E 0 m C 3 0 v rn C Y O O J ►] COFC18-Geomorph_Fieldwork_Photos FINAL.docx 66 ANdERsoN ComulriNq ENgiNEERS, Inc. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 z `w J 0 ❑ 0 U ❑_ O1 O J COFC18_Geomorph_Fleldwork_Photos FINAL.docx 67 ANdERsoN CONSUITINq ENgiNEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 u 4 COFC18_Geomorph_Fieldwork_Photos FINA A= 68 ANdERSON GUNSUIiINq ENgiNEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 Ifr N U C N pl COFC18_Geomorph_Fieldwork_Photos FINAL.docx 69 ANdERSON CoNSUlllNq ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 c 0 0 w U C N N E 0 4- N C C (0 L U C E 6 E d w C 0 0 v rn c 0 O O J Q. N r' E o w 0- UI IN U J N D1 l0 � E t0 'O E N O 3� 0 v 0, C s 0 0 J COFC18_Geomorph_Fieldwork_Photos FINAL.docx 70 ANdERSON CONSUhING ENGINEERS, INC. Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 `m n c 0 a, n 0 0 U N O D. N E E m 0 m E a N COFC18_Geomorph_Fieldwork_Photos FINAL.docx 71 ANdERSON CONSULTING ENgiNEERS, INC. '31NI 'SN33NIbN3 IJNI1lnSNOj NOSN3PNV ZL X30P'IVNl3 So;oyd IloMplali 4diowoag 8SJdOJ �w r' 0 0 z 7 c N w 3 c v o 3 d a 3f N � � f/1 f 3 a m m � 0 0 0 0 o- c m o- m m 0 m, 0 a m o. v m x c a y m m 3 0 13 m v c N Ol 3 a 0 0 f v m £i0Z 'gZ-t Z jagop0 lliomplaid uol;enlen3 3I4d.lowoaa — uope;uawn3oa 3l0e-180304d PafoJd umoJumoa JanlL ajpnod NEW-71A ':)NJ '5133N15N3 5NI1ffKNOO NOSa3PNb' bL X30P'IVNld sologd liomplalj gdiowoag 817do:) o. 0 E 7 n 0 f 7 m m 3 0 3 c o N E r. m v 3 m 3 �(b n 0 m N 7 3 7 r 0 0 5 c a m 'm d 3 0 3 N C v .o m o m 3 v 3 m (D �7 n 0 m C a N N 01 ETOZ '9Z-VZ jagol:)o lioMplai j uopenlen3 aigdjowoao — uoileluawn:)od 3igdeA201oyd 13afoad umolumod aania ajpnod Poudre River Downtown Project Photographic Documentation — Geomorphic Evaluation Fieldwork October 24-26, 2013 c N OJ 5E ' COFC18_Geomorph_Fieldwork_Photos FINAL.docx 75 ANdERSON CONSUITING ENGINEERS, INC.