Loading...
HomeMy WebLinkAboutDrainage Reports - 04/14/1995RMINC. Engineering Consultants 209 S. Meldrum Fort Collins, Colorado 80521 303/482-5922 FAX: 303/482-6368 April 13, 1995 Mr. Basil Hamdan City of Fort Collins Utility Services, Stormwater 235 Matthews Street Fort Collins, Colorado 80522 LFhaLA r Is •i ;11 RE: Addition of a Storage Shed Oakridge Business Park, Sixteenth Filing (a.k.a Simpson Sheet Metal) Dear Basil: This letter and the attached memorandum and blueline copies are intended to satisfy the City of Fort Collins requirements for Drainage and Erosion Control regarding the addition of a storage shed at the Simpson Sheet Metal Site. Computations in this report comply with those in the City of Fort Collins Storm Drainage Design Criteria. Included here is also an erosion control plan and erosion control security obligation. The Final Drainage and Erosion Control Study for the Simpson Sheet Metal Site was approved by the Stormwater Utility in March of 1993. This report shows that the building addition will have no effect on the existing conveyance system. We appreciate your time and consideration in reviewing this submitted document. Please feel free to call us if you have any questions. RBD Inc. Engineering Consultants Prepared by: FM �.. Om .• ineer cc: Bob Ross, Simpson Sheet Metal Greg Fisher, Architect Reviewed by: Roger �. Curtiss Project Manager Denver 303/458-5526 DRAINAGE STUDY FOR STORAGE SHED ADDITION AT THE SIMPSON SHEET METAL SITE I. GENERAL LOCATION AND DESCRIPTION A. Location The Simpson Sheet Metal site is located within the Oakridge Business Park and is adjacent to and east of Innovation Drive, south of the WYCO Mechanical and Industrial Park (Oakridge Business Park, Seventeenth Filing), currently under construction, and west of the Union Pacific Railroad Right of Way. More particularly, the site can be described as being located in the Northeast Quarter of Section 6, Township 7 North, Range 68 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. B. Description of Property The Simpson Sheet Metal site is presently developed. The proposed improvements include the addition of a 9000 square foot.storage shed directly to the east of the existing Simpson .Sheet Metal building. The addition is to be phased,with 4500 square feet being added upon. approval of these revisions, and the remaining 4500 square feet to be added in the future. There is also an existing open channel running along the east line of the property. II. DRAINAGE BASINS A. Major Basin Description The proposed additions lie entirely within Basin 200 of the Oakridge Business Park Master Drainage Plan, as prepared by RBD Inc. Engineering Consultants dated June 22, 1990. An open channel (Conveyance Element 20) runs from north to south along the easterly boundary of Basin 200, and conveys flows from Basin 200 to the Regional Detention Pond located in the southeast corner of Oakridge Village 7th Filing. Per the Master Drainage Study, developed flows from Basin 200 will be free release and detained in the Regional Detention Pond. A copy of a portion of the Overall Drainage Plan is included with this report. 1 Ill. DRAINAGE FACILITY DESIGN A. Regulations The City of Fort Collins Storm Drainage Design Criteria is being used for the subject site. Specifically, the Final Drainage and Erosion Control Study for the Simpson Sheet Metal Site and the one for Oakridge Business Park, Seventeenth Filing will be used in conjunction with the calculations in this report. B. Development Criteria Reference, Constraints, and Comparison As taken from the Simpson Report, the. 10 and 100 year developed storm runoff from the site will be routed to an open channel running along the east property line to the Regional Detention Pond. The runoff from the Simpson Sheet Metal site was conservatively calculated using a runoff coefficient of 0.8 for the 10 year condition (1.0 for the 100 year), to be consistent with the Oakridge Business Park Master Drainage Plan. As figured through composite 'c' value calculations, the actual runoff coefficient for the site was 0.58, thereby making any increase to this value still acceptable as far as the channel size is concerned, as long as it would not exceed 0.8. With the addition of the aforementioned 9000 square feet of building area, the runoff coefficient increases to 0.61. The design capacity of the Regional Channel is 133 cfs and the runoff from the Simpson Sheet Metal site was calculated to be 51.92 cfs. This regional channel received certification in September, 1993. With the proposed additions, runoff values from the site still fall under 51.92 cfs, since this figure was calculated using the conservative 'c' value. Runoff from the roof of the Phase 2A , portion will be conveyed by downspouts and overland flow to a Swale running along the north property line. This swale, being constructed with the Oakridge Business Park, Seventeenth Filing, has a depth of 1.4' and lies entirely within an easement on.the Oakridge Seventeenth property. The roof of this shed will contribute an additional 0.9 cfs to this swale. Per the approved Final Drainage and Erosion Control Study for the Oakridge Business Park, Seventeenth Filing, this swale was sized with enough freeboard to accommodate this additional runoff. Calculations are, included in the back of this report. Runoff, from the roof of Phase 2B will sheet flow across the gravel storage yard to the regional channel. 2 IV. EROSION CONTROL A. General Concept The erosion control plan for this addition assumes that the building will constructed within 3 months of grading the area. If this does not happen, then the area will be covered once again with gravel similar to that already in place at this site. It will also be necessary to place straw bales in the Regional Channel and near construction activity to control any sediment movement induced by grading. Since the development is to be phased, the erosion control escrow amount listed below applies only to Phase 2A. Upon application for a the Phase 2B building permit, it will be necessary to supply a second erosion control security deposit in the amount of the one used for Phase 2A. The erosion control plan for Phase 2B will be identical to that for Phase 2A. The performance standard for this erosion control plan is greater than that for the site, as computed in the Final Simpson Report. There will be approximately 0.25 acres disturbed, including the future Phase 2B. Using the city criteria of $1300 per acre for construction sites less than 10 acres, and using a 150% contingency, the total obligation of Simpson Sheet Metal for a security deposit would be: (0.25 acres) x ($1300.00 per acre) x 1.5 = $487.50 A cost breakdown of these erosion control measures is listed below: Gravel Mulch to be applied at 135 tons per acre (10.00 per ton) = $330.00 Straw Bale check dams (6 @ $150 apiece) = $900.00 TOTAL x 1.5 = $1845.00 Therefore, the larger amount, or the amount of security deposit obligation should be in the amount of $1845.00 CONCLUSIONS A. Compliance with Standards All computations that have been completed in this report are in compliance with the City of Fort Collins Storm Drainage Design Criteria Manual. In addition, all figures are in conjunction with the Final Drainage and Erosion Control Studies for the Oakridge Business Park, Sixteenth and Seventeenth Filings. 3 DRAINAGE I DAD / 7 I AREA i i IS' DIA.RCP t wLtis _4 !L i_�OAKRJDGE % 1 w BUSINESS PARK 1 ' Y a FCP 9.TH'FILING : IeD14.IlCP- i I > j p+ OAKRIDGE V BUSINESS PARK �., / .4 f %�� "%iQ�Yfz�DC�C �uSlils=55�o 1 200 /',• I �JIMi"�-0'J JUccT �ET/il.� , IJ PA RCP•-� /• j +,210 r R751' 21 j z0 IO INLET •��I'VIA, RCP I ' ~ -1 INLET \ 1 \I 1 I(; • 1.98 1 I 'I 44 go If I 011 i j:eEw•♦ �. IDO L ; 90 13. 12 _ r 10 / /O i ) REGJONAL " •' YD��•'DEYENTION ; POND LEGEND MANHOLE 44 ­ 4I FLARED END SECTION STORM DRAIN PIPE SUB -BASIN LINE -�- FLOW DIRECTION j00 BASIN DESIGNATION 2$.32 BASIN AREA IN ACRES O100 YR COWVEYANCE ELEMENT NOTE5: I. THE PIPC 51ZES SHOWN ON TH15 PLAN WERE TAKEN FROM DE516N PLAN5. DRAINAGE Z/7 �� CLIENT 51�..APSOtJ SHEHT METAL JOB NO. --- C�Z ■��INC PROJECT �Irn ShU , _ CALCULATIONSFOR - �Y1 P • Engineering Consultants MADESYpG DATE.�6 CHECKED BY DATE SHEET OF N II �� DRAINAGE 3/7 x a w aC Jam• o t!i U 7_ O L1 r E- T H � U r. U -- V •� O N G, Ld WCL0) o 0, J co co 0 : 0 G` m z J W --- > ' a � n I n I 0 � —• � W I ~ F- z z — d _ l U M L z v) QQ Q Q] F- W u N � � a ,. N c coo N fn F W' � O U z z cc W W z z r c1 0 DRAINAGE hill 11011111 Hill ni�i"i�iiiunui%i�� 1 I1 1=1IIIIoIIo i����w��niiiinrii°ii°n' IIIIIIIIIIIIII MINIMUM 111111111111i�i 11 11111111111 11 I NOR III ILE IIIIIIIIIII Min, 1 lnio lloll �ii1 � M` It 1 � 11 u1iii�i�� iiiiiu iiiini . OR uoljojjumo i i� �i mi�inii��nniRii jo OW11, iiiiiiiiui 1 111111111 MON. I m MINu iii6� 0 � 4/7 RBD INC. ENGINEERING CONSULTANTS CHANNEL RATING INFORMATION SECTION F OAKRIDGE 17 DRAINAGE Bonn cn.�et - c a.P• ,_I��l-1 . _ GHPiJt•�E7� GA-I.GS r�'C_ 6\\�1L� 1-AE tJTto1JED th1 SE2.. �$ ��1'-• 3 Q.o = Q.25 CIcS STA ELEV ..... ...... p,� = 10,03 cos 0.00 20.00 Q�A� = 13.34 GFS 20.00 15.00 21.00 15.00 41.00 20.00 . IN' VALUE SLOPE (ft/ft) 0.035 0.0050 ELEVATION AREA VELOCITY DISCHARGE FROZE (feet) (sq ft) ------- (fps) ........ (cfs) ......... NO. ...... --------- 15.50 1.5 1.3 1.99 0.43�_ 16.00 5.0 2.0 9.99 0.47 Q`w @ 1 16.50 10.5 2.6 26.91 0.50 17.00 18.0 3.1 55.2.3 0.53 17.50 27.5 3.5 . 97.18 0.54 18.00 39.0 4.0 154.83 0.56 18.50 52.5 4.4 230.12 0.57 19.00 68.0 4.8 324.98 0.59 19.50 85.5 5.2 440.86 0.60 20.00 105.0 5.5 579.74' 0.61 I. 1' Q16 O•�o � 9.8' • EROSION CONTROL ` _/7 EFFECTIVENESS CALCULATIONS PROJECT: STANDARD FORM B COMPLETED BY: DATE: 03.00, 95 Erosion Control' C-Factor P-Factor Method Value Value Comment C:124,VEL_ MVLC4A p.CS I.00 - US1✓ MUI..C.F-1 IF . SUII�INCaS AL''� tJD-T 3 r.no>J-7N S � MAJOR PS SUB AREA BASIN ($) BASIN (Ac) .CALCULATIONS Zc)0 79 8 0 ' Z_S EFF>E=L"f I�iE1JESS = C •I - C G * P�� C to0> PE2i oe nn Ar.�G� S 7 A I.IOp Q� pot S17E P VZo" SIMPSOtJ L'cPO�T �S` 74.8�% PHIS - ADO1Z1QtJ V& S A t"�� OF I-T IS IQ - MARCH 1991 8.15 DESIGN CRITERIA t EROSION CONTROL �7 I INv. BLzv. 99.65 &96►4 %&TIOH A -A t96t. ---- --- ---- -- g� _ 4961I_x _ - _ _ _ age.• X _ 4960 1 i a— ---- -- .,.•. U96s _ • a' k�i � � �� .�� COL �b1 �Si fo�Q . f PUTTS w6 rt POWER MJTMOfM EASEYEW �,b fveA OH----QH------�- -- --------------i — - / 7p^/� f� .�' .lb co -0' A96< _ d1 i o1 >y ,eIcer?oo - 2 IL�. j �2oi:F OL 6 1 ti b I i 4� fQbti �� fob. l 10 ' Q 0 Q I sv f9e1 , Q 1 i N It tt 40 , e Roy h JI .'L-1