Loading...
HomeMy WebLinkAboutDrainage Reports - 06/27/2011 (2)North Star design 700 Automation Drive, Unit I Windsor, CO 80550 Phone:970-686-6939 Far: 970-686-1188 June 22, 2011 Mr. Glen Schlueter City of Fort Collins Stormwater 700 Wood Street Fort Collins, Colorado 50521 Re: Buckingham Street Design Proj: 110-19 Dear Glen: City of Ft. ,Colli ,� pp ed Plans Approved BY. N This letter is accompanying the 50% design plans for Buckingham Street from lst Street to 3`d Street. The original design plans for this section of Buckingham Street that were submitted (but not approved) with the New Belgium Brewery Canning Hall indicated that the detention for this portion of Buckingham would be provided at the southwest corner of the intersection of Buckingham and I't Street. This detention required a complex storm piping design and rerouting of site runoff which was determined to be undesirable and not cost effective. With this redesign, the proposal is to route runoff from the north half of this portion of Buckingham to the existing detention pond located south of the Canning Hall. This pond currently has sufficient capacity to accommodate runoff from the existing development on site and this portion of Buckingham. Calculations to support this will be provided with the next submittal. This pond also provides water quality extended detention with the outlet structure that exists at the pond outfall. We continue to consider additional water quality measures that may be located within the parkway adjacent to this portion of Buckingham Street. If these measures are desired and are able to be implemented with the existing grades on site, they will be designed and shown on the 90% street design submittal. I appreciate your time and consideration in reviewing the submittal. Please call if you have any questions or need additional information for this 50% submittal of the project. Sinc , Patricia Kroel North Star Design, Inc.