Loading...
HomeMy WebLinkAboutDrainage Reports - 01/05/2018HCI ENGINEERING A division of HABERER CARPENTRY INC. December 29, 2017 Attn: Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 !City of Ft. Collins rov Plans Approved By---8- `'gate — — Re: Drainage Conformance Letter for Ziggi's Coffee — Fort Collins A Portion of Lot 2 — C.O.L. College and Trilby Subdivision Summary The following letter is written on behalf of Ziggi's Coffee — Fort Collins to demonstrate that the proposed site improvements are in conformance with the drainage design outlined in the Approved "Drainage and Erosion Control Report for Northwest Corner of College Avenue and Trilby Road .Eckerd Drug", dated 12/23/2003, prepared by North Star Design, Inc. — hereafter referred to as 'Report 1'. Lot 2 is 1.63 acres or 71,003 square feet, however, the area encompassed by the limits of site improvement changes is approximately 17,376 square feet. The existing site consists of a detention pond, paved parking and drives, concrete walks, and landscape areas. The existing total impervious area within the limits of site improvement changes is 11,825 square feet, or 0.27 AC. (Impervious Area = 68%). Proposed improvements will affect Basins 3, 4, and 6 from Report 1 and will generally follow existing drainage patterns. These basins have been reanalyzed for the areas impacted by site improvement changes within the limits of construction utilizing design criteria from Report 1. The proposed total impervious area within the limits of site improvement changes is 8,775 square feet, or 0.20 AC. (Impervious Area = 50%). Basin 4 Runoff within the improved portion of Basin 4 will continue to sheet flow to an existing area inlet before being conveyed north via 'Storm 2' to the existing onsite detention pond (Pond 1). Proposed improvements within this basin include removing and replacing existing parking and walks with ADA parking and walks, which results in a minor increase in the overall area and impervious area for the basin. Basin 3 ` Runoff within the improved portion of Basin 3 will generally continue to sheet flow to concrete v-pans and curb and gutter then to an existing combination inlet before being conveyed north via 'Storm 2' to the existing onsite detention pond (Pond 1). Runoff generated by the concrete drive-thru lane has been designed to drain inward to a proposed rain garden, which is connected to 'Storm 2'. Furthermore, runoff generated by the patio area will sheet flow to a v-pan then to a swale before discharging throw a curb cut and being conveyed west in the existing curb and gutter to the existing combination inlet. Demolition activities within this basin include the removal of a portion of the existing eastern parking area, landscape islands, and associated walks. Proposed improvements include; increased landscape area, approximately 492 square feet of building area, and a 621 SOLITHPARK DRIVE, SUITE 1600- LTTTLETONCO 86120 (720) 252-3484 - FAx (303) 979-1675 EMAIL: COLEH@HABERERGROUP.COM 1 concrete drive-thru lane, a rain garden located at the low point within the drive-thru lane, patio, walks, curb and gutter, and v-pans. The change in site improvements results in a decrease of the impervious area for the basin. The overall area of the basin has also decreased based on the proposed ADA improvements now being tributary to Basin 3. Basin 6 Runoff Wjthin thee-impOve""d'Iportion"lo 'Basi 6 will continue sheet flow offsite undetained before being captured by the existing inlet at1the\comer41of the north access drive and S. College Avenue. Proposed improveme'n`ts within the basin include removibg and replacing a concrete walk and a portion of the concrete patio, which- results'in'a-minor increase in the impervious area. The majority of the basin will remain as landscape area. . Observations The total impervious area within the limits of site improvement changes has been decreased by approximately 3,050 square feet from the existing (11,825 SF) to the proposed (8,775 SF) conditions. The 100-year peak runoff to Design Point 4 in Basin 4 slightly increased from 1.66 CFS in the existing conditions to 1.71 CFS in the proposed conditions due to an increase in the overall area and impervious area of the basin. However, the existing area inlet has the capacity (2.70 CFS) to completely capture the additional runoff. The total 100-year peak runoff generated by Basin 3 has been decreased from 16.27 CFS in the existing conditions to 15.89 CFS in the proposed conditions due to a decrease in the overall area of the basin, increased pervious landscape areas, and Report 1 anticipating 4,500 square feet of future building to occupy space within Basin 3. However, the proposed building will. now only occupy 492 square feet. In the proposed conditions Basin 3 has two Design Points: 3-RG and 3-EX. Design Point 3-RG is located at the rain garden and will treat runoff within its tributary area (7,312 SF) and 61% of the new impervious area (3,735 SF) within Basin 3. Runoff will flow to the rain garden until the ponding limits are reached and overtops the low point at an elevation of 5033.35 and continues downstream to the existing combination inlet at DP 3-EX. The remainder of Basin 3 that is not tributary to DP 3-RG flows directly to exiting combination inlet at DP 3-EX. I The 100-year peak runoff to Design Point 6 slightly increased from 0.63 CFS in the existing conditions to 0.71 CFS in the proposed conditions due to increased concrete area by the encroaching patio. The approved hydrological calculations and calculations based on proposed improvements are attached for refence. Volume -based water quality mitigation actions for Basins 3 and 4 were originally analyzed as part of Report 1 and are provided for by the existing onsite extended detention basin (Pond 1). Basins 1 through 5 are tributary to Pond 1. Per Report 1, the required total storage volume for Pond 1 is 39,814 cubic feet and includes the required 100-year detention volume (35,937 CF) plus the required water quality capture volume (3,876 CF). The required water quality capture volume has been reanalyzed utilizing proposed conditions for modified Basins 3 and 4 along with approved volumes for the unchanged Basins 1, 2, and 5. The composite percent impervious for the tributary area to Pond 1 (Basins 1 through 5) decreased from the approved value, 74.0%, to the proposed value, 69.1%. This decrease in the composite percent impervious results in a direct decrease in the required water quality capture volume from the approved conditions (3,876 CF) to the proposed conditions (3,616 CF). Therefore, Pond 1 provides 3,920 CF of storage for the required water quality capture volume and is adequately sized to treat the proposed runoff from Basins 3 & 4. 621 SOUTHPARK DRIVE, SURE 1600- LRTLETON, CO 80120 - (720) 252-3484 - FAX (303) 979-1675 EMAIL: COLEH@HABERERGROUP.COM 2 Additional water quality is provided within Basin 3 by the increased pervious landscape areas and the use of a rain garden. Level 1 - Low Impact Development treatments (LID) will be implemented to direct runoff as sheet flow over pervious landscape areas which will increase Travel Time and help to trap suspended solids prior to runoff reaching the storm sewer system (Storm 2). This same LID measure will be utilized for Basin 6, where runoff is released offsite undetained over proposed sloped grass buffers. An LID Volume Based Treatment Variance Letter which further discusses the implementation and constrictions of LID treatments has been prepared and is included as an attachment. The project site is located within Sub -Basin 319 of the Fossil Creek Drainage Basin. Furthermore, the proposed project meets the release requirements as analyzed in Report 1 and as set forth by the Fossil Creek Basin Master Drainageway Planning Restudy, by ICON Engineering, Inc., dated 2001. Conclusion The proposed project has been analyzed utilizing the approved conditions set forth in Report 1. This drainage letter and associated calculations are limited to the project shown by the attached Drainage Plan. Based on the above findings and attached calculations HCI Engineering finds the proposed development to be in compliance with the drainage criteria set forth in Report 1. No negative impacts are anticipated as a result of this development to adjacent properties or downstream. Sincerely, H ::GFC. ,��, AeFy S.O i 43259 9 9• Cole C Haberer, P.E. - HCI Engineering 621 SOUTHPARK DRIVE, SUITE 1600- LITTLETON, CO80120 - (720) 252-3484 - FAx (303) 979-1675 EMAIL: COLEH@HABERERGROUP.COM 3 ATTACHMENTS 621 SOUTHPARK DRIVE, SUITE 1600= LITTLETON, CO 90120 - (720) 252-3484 - FAx (303) 979-1675 EMAIL: COLEH@HABERERGROUP.COM HCI ENGINEERING A division of HARERER CARPENTRY INC. Project: 17_13 Ziggrs Coffee Project Number: 1713 Date: 9/26/2017 Soil Type: C & D NRCS Hydrologic Soil Type (Per Geolech) Modified Basins for Proposed Conditions Racin: 3 Land Use or Surface Characteristics Area SF % ImpC Value Value CIO Value Cl Value Paved se 100% 0.95 0.95 0.95 0.95 Roofs 492 90% 0.95 0.95 0.95 0.95 Lawns, sandy soil 16810 0% 0.25 0.25 0.25 0.25 Total/ Compsite 70980 76.2% 0.73 0.78 0.78 0.73 Rasin: 3 to Fx_ Inlet Land Use or Surface Characteristics Area (SF) %Imp. Ci Value Cs Value CIO Value CTwValue Paved 50275 100% 0,95 0.95 C 5 0.95 Roofs 253 90% 0,95 0.95 1 0.95 0.95 Lawns, sandy soil 13233 0% 0.25 0.25 1 0.25 0.25 Total/Compsite 63762 79.Z% 0.80 0.30 of 0.59 Basin: 3 to Rain Garden Land Use or Surface Characteristics Area SF %Imp. C Value !C, Value CoValue C,,Value Paved 3496 100% 0.95 0.95 0.95 0.95 Roofs 239 90% 0.95 0.95 0.95 0.95 Lawns, sandy soil 3577 0% 0.25 0.25 0.25 0.25 Total/ Campsite 7312 50.8% 0.61 0.1,1 0.61 0.61 Rasirr 4 Land Use or Surface Characteristics I Area (SF) %Imp. IC, Value I Cs Value I CIO Value C,,Value Paved 7090 100% 0.95 0.95 0.95 0.95 Roofs 0 90% 0.95 0.95 0.95 0.95 Lawns, sandy soil 414 0% 0.25 0.25 0.25 0.25 Total/ Compsite 7504 94.5% 0.91 0.91 0.91 0.91 Raclin- 6 Land Use or Surface Characteristics Area (SF) % Imp. IC, Value IC, Value JC,o Value IC,.Value Paved 129 100% 0.95 0.95 0.95 0.95 Roofs 0 90% 0.95 0.95 0.95 0.95 Lawns, sandy soil 7231 1 0% 0.25 0.25 0.25 0.25 Total/ Compsite 7960 9.2% 0.31 0.31 0.31 0.31 PROPOSED COMPOSITE IMPERVIOUS AND RUNOFF COEFFICIENT CALCULATIONS FOR AFFECTED BASINS Formula: IlArea)IC Value)+(Area)(C Value)+IArea)(C Value)]/(Total Areal L, = 1,00 Ly = 1.UU U, = 1.UU L , = 1.LS Basin 1.06 Total Area SF Total Area Acres Composite Composite Runoff Coefficient, C %Impervious C2 C5 CIO Cloo 3 to Ex. Inlet 63761 1.46 79.2% 0.80 0.80 0.80 1.00 3 to Rain Garden 7312 0.17 50.8% 0.61 0.61 0.61 0.76 3 70980 1.63 76.2% 0.78 0.78 0.78 0.98 4 7504 0.17 94.5% 0.91 0.91 0.91 1.00 6 7960 0.18 9.2% 0.31 0.31 0.31 0.39 Total: 1 86444 1 1.98 1 71.7% 0.75 0.75 0.75 0.93 C, = Coefficient Frequency Factors from Report 1 Runoff Coefficient (C) cannot be greater than 1.00 HCI ENGINEERING A division of HABERER CARPENTRY INC. Project: Project Number: Date: 17_13 Ziggi's Coffee 1713 9/26/2017 PROPOSED CONDITIONS DIRECT RUNOFF 10-YR STORM Area Design Area (ac) Runoff Coeff tc (min) C x A (AC) Intensity (1) in/hr Q (cfs) 3 to Ex. Inlet 1.46 0.80 5.80 1.18 4.62 5.44 3 to Rain Garden 0.17 0.61 5.80 0.10 4.62 0.47 3 1.63 0.78 5.00 1.28 4.87 6.22 4 0.17 0.91 5.00 0.16 4.87 0.76 6 0.18 0.31 5.00 0.06 4.87 0.28 Cfro = 1.00 tc Intensity (1) From Report 1 From Report 1 From Report 1 Runoff Coefficient (C) cannot be greater than 1.00 HCI ENGINEERING A division of HARERER CARPENTRY INC. Project: Project Number: Date: 17_13 Ziggi's Coffee 1713 9/26/2017 PROPOSED CONDITIONS DIRECT RUNOFF 100-YR STORM Area Design Area (ac) Runoff Coeff tc (min) C x A (AC) Intensity (1) in/hr Q (cfs) 3 to Ex. Inlet 1.46 1.00 5.00 1.46 9.95 14.56 3 to Rain Garden 0.17 0.76 5.00 0.13 9.95 1.27 3 1.63 0.98 5.00 1.60 9.95 15.89 4 0.17 1.00 5.00 0.17 9.95 1.71 6 0.18 0.39 5.00 0.07 9.95 0.71 Chao = 1.25 tc Intensity (1) From Report 1 From Report 1 From Report 1 Runoff Coefficient (C) cannot be greater than 1.00 HCl ENGINEERING A division of HABERER CARPENTRY INC Project: 17 13 Ziggi's Coffee Project Number: 17_13 Date: 8/2/2017 Soil Type: C & D NRCS Hydrologic Soil Type (Per Geotech) Approved Basins & Modified Basins for Proposed Conditions iRacin• 1 Land Use or Surf ace Characteristics Area SF %Imp' C Value Cs Value C" Value CI ,Value Paved 13550 100Yo 0.95 0.95 0.95 0.95 Roofs 0 90% 0.95 0.95 1 0.95 0.95 Lawns, sandy soil 505 0% 0.25 0.25 1 0.25 0.25 Total/Compsite 14055 95.4% 0.92 0.92 0.92 0.92 Ravin• 2 Land Use or Surface Characteristics Area SF % Imp. Cr Value Cs Value C, Value C,ao Value Paved 1 0 1 100% 1 0.95 1 0.95 1 0.95 1 0.95 Roofs 14500 90% 0.95 1 0.95 0.95 0.95 Lawns, sandy soil 0 0% 0.25 1 0.25 0.25 0.25 Total/ Campsite 14500 90.07. 0.9S U.95 U.95 U.95 2Racin- 3 Land Use or 5urtace Characteristics Area SF) %Im . Ci Value Cs Value Cr Value C V21 Paved 53678 100% 0.95 0.95 0.95 0.95 Roofs 492 90% 0.95 0.95 0.95 0.95 Lawns, sandy soil 16810 0'% 0.25 0.25 0.25 0,25 Tobi Compsite 70990 76.2% 0.78 0.78 0.78 0.78 211 A Land Use or Surface Characteristics Area (SF) % Imp. C, Value C Value C'O Value C Value Paved 7090 100% 0.95 0.95 0.95 0.95 Roofs 0 90% 0.95 0.95 0.95 0.95 Lawns, sandy soil 1 414 0% 0.25 0.25 0.25 0.25 Total/ Compsite 75M 94.5% 0.91 0.91 0.91 0.91 1Raain• 5 Land Use or Surface Characteristics Area SF % Imp . C, Value Cs Value Cte Value C Value Paved 0 S00% 0.95 0.95 0.95 0.95 Roofs 4500 1 90% 1 0.95 0.95 0.95 0.95 Lawns, sandy soil 21392 1 0% 1 0.25 0.25 0.25 0.2S Total/ Compsite 25892 15.6% 0.37 0.37 0.37 0.37 COMPOSITE IMPERVIOUS AND RUNOFF COEFFICIENT CALCULATIONS Formula: IlAreal(CValuelHArea)lCValue4(Area)(C Value)VRotal Areal C12=1.00 Cr.,=LOD Clue =1.00 Cnuu=1.25 Basin I.D. Total Area (SF) Total Area (Acres) Composite Composite Runoff Coefficient, C %Impervious Ct Cs Go Cwo 1 14055 0.32 96.4% 0.92 0.92 0.92 1.00 2 14500 0.33 90.0% 0.95 0.95 0.95 1.00 3 7D980 1.63 76.2% 0.78 0.78 0.78 0.98 4 7504 0.17 94.5% 0.91 0.91 0.91 1.00 5 25892 0.59 15.6% 0.37 0.37 0.37 0.46 Total: 132931 3.05 69.1% 0.74 0.74 0.74 0.88 Cf= Coefficient Frequency Factors from Report 1 Runoff Coefficient (C) cannot be greater than 1.00 'Basin information per approved Report 1 2Basin information under proposed conditions A dmumP of NA9ERER CARPENTRY INC. Project: 17_13 Ziggi s Coffee Project Number: 17_13 Date: 8/2/2017 Water Quality Capture Volume for Approved Basins & Modified Proposed Basins 'Req. Storage (in. -Dwo Req. Vol. Req. Vol. 'Req. Basin I.D. Tributary Area Composite of runoff from WQCV WQCV'1.2 WQCV'1.2 area/row (Acres) % Imp ervious Fig, EDB-2 (ac-ft) (ft) (ac-ft) (cf) (in / row) 1, 2, 3, 4,&5 1 1 (Pond 1) 3.06 69.1% 0.29 0.069 1.00 0.083 3616 0.65 'Information per approved Report 1 'Information under proposed conditions WQCV = a(0.9113 — 1.191' + 0.781) V=(W1)A Table 3-2. Drain Tutor Coefficients for WQ" Calcelatlont Drain Twee bn Coefficient. a 2 hours 0.8 24 hours 0.9 40 hours 0 DRAINAGE AND EROSION CONTROL REPORT FOR NORTHWEST CORNER OF COLLEGE AVENUE & TRILBY ROAD ECKERD DRUG Prepared by NORTH STAR DESIGN, INC. 700 Automation Drive, Unit I Windsor, CO 80550 970-686-6939 Project # 23 - Reviewed By�� �,� l2 U Enpinearmp J at15 B Prepared for lamm�ng Daie APProved By - L } . � Hunt Douglas 'SLO 5100 W. Kennedy Blvd., Suite 225 Tampa, FL 33609 November 4, 2003 Job Number 192.008 q \ B ± d ( 02 / \ (k § 6 -! E / ®a k )2 ) LL ° \ k/ , § Q #/ ) .. & ( �.. § §( \)\§ IJ { ! la7� £ 2/§q a=ay L3 ! / k ) \ \ §K -k , ..■�e - .,� 2»� .Ci 7§\ # ■,§#� ■■ #■# � - _ �� ne= t §§k $ ||§§K §) ))7 �a- , „ ■%� ,n �!m I k ,j — O C ? 000 mo O O C) 0 9 U .co c_ C EO Z a O O r LL LL T O F .. Y w O o a VT N c L O U F o U W a J lL a w E~ O w 2 !L O w a... ti 0 O < d r 0 N M C N J U r o 0 O N U O (Y W 0 o > E Pc V N d r N NI d N N! U O0 r O (V d c7 t rNrrn r Noc-� _ 2 map min m mrnn v vv d V v v�i ni U C_ O m O W O m N m E 6,6 m m M N r oyi d V 6 o 0 0 0 0 w 0 0 0 U M NI r O m O tD m Q O m m i r N O - 0 0 O11 a—" LL LL N _ NM N m d N m A b O O O U ~ N tt 0 0 IIO L D O C _ 00 m o Q O (o C_ O O Z Q O O r LL LL T O E Z O H c a> Q o ao, 0 U o N G = O o W U a 2 r a J O ILL f- Z O O °p A Q U 2 u 0 w.-.a.- m Z zoo a 0 0 N I O N IilEll�l�mmill 1111111111111 ICY Il��l Lm L= U C7 rnP C o Z w m N E O U r 0 LL 0 U _o N N L o> t c ca m a) a - rn Y tiz — co O C o C C N O. ' It u u Ci U jiwci G (®E f 00 / § -- > j k >u -~ Lu \ \\ C 2 (ƒU { ) . ( \ \ \�E� k } ° } ) % % c \j j® \\ & /4 \ f co a q/ ®/ o =e u MZ 6 $ 7 \) oo \ _ o \) ®�(\* \ ° ) )\#a) \ �\ e Z/\\ \\ ; : \ %# t, \) )§ ` <� -�� ~ o\� Smg=A 1 j/ 2$\ PROPOSED DETENTION POND STAGE - STORAGE TABLE (100-YEAR) LOCATION: College & Trilby (NW comer) PROJECT NO: 192-08 COMPUTATIONS BY: ppk SUBMITTED BY: North Star Design, Inc. Water Quality Volume Required = 3,876 CF DATE: 11/11/03 100-yr Detention Volume Required = 35,937 CF Water Quality Volume Required = 0.089 acre-feet 100 yr Detention Volume Required = 0.825 acre-feet 100-yr WSEL - top of berm - Total 100 yr Volume Required = 0.914 Total 100-yr Volume Required = 39.814 CF acre-feet �iTli . � t7.E51• ��srai�.LL� �1• — Provided WQCV = 3,920 CF IN A SUMP Project = Eckerd at the Northwest Corneeof<College & Trilby Inlet ID = 192-08 W= Wo o Ic LCloyed L Curb Gutter iglh of a Unit Grate L, = 3.00 ft ith of a Unit Grate W. = 1.50 ft a Opening Ratio for a Grate (typical values = 0.6-0.9) A = 0.60 gging Factor for a Single Inlet (typical value = 0.5) Co = 0.50 6ce Coefficient (typical value = 0.67) Ca = 0.67 .ir Coefficient (typical value = 3.00) C„. = 3.00 al Depression, if any (not part of upstream Composite Gutter) alooy = 1.0 inches al Number of Units in the Grated Inlet No = 1 32city of Grate Inlet In a Sumo (Calculated) :Ign Discharge on the Street (from Street Hy) Qo = 1.7 cfs ter Depth for Design Condition Ya = 4.1 inches al Length of Grated Inlet(s) L = 3.01ft a Weir )acity as a Weir without Clogging Q� = 3;6 cfs gging Coefficient for Multiple Units Coef = 1 Ad,' gging Factor for Multiple Units Clog = 0:50i )acity as a Weir with Clogging Q. = 2.74 cis an Orifice )acity as an Orifice without Clogging Qoi = 85,' cfs )acity as an Orifice with Clogging Q. = 4'.2 cfs )acity for Design with Clopping Q. _ tjj. cfs rture Percentage for this Inlet = % / Qo = c%. _ --' „t)+�;-xWV—W1 % Note: Unless additional ponding depth or spilling over the curb is acceptable, a capture percentage of less than 100% in a sump may indicate the need for additional inlet units. Area Inlet.xls, Grate-S 11/11/03, 8:36 PM N U 1-4CDOT GENERAL NOTES: (Pertain to all construction within College Avenue Right of Way) 1. All material, equipment, Installation. construction, and deign. Including the auxiliary lone(s) and Intemectlon Improwment(s) wlthln the Stat Hlghwoy ROW (existing and any portions dedicated with this access permit) shall be In mcordon" with the fallowing Department standard relemnces as applicable; M A. State Highway Ambise Code, 2 CCR 601-1 B. Roadway Design Manualial I C. Maters Manual (' D. Construction Manual E. Standard Specifications for Road and bridge Construction, latest edition F. ApolcmIle pro -date special PMVISIMs G. Standard Plan (M&S Standards) H. Manual an Uniform Traffic Control Devices (M.U.T.C.O.) for Streets and Highway. and the Colorado Supplement thereto I. A policy an Geometric Design of Highwoye and simet4 American Association of State Highway and Transportation Officials (MSRTO), latest edition 4 AASHTO Roadside Design Guide K. Institute of Transportation Engineers' Trip Generation Manual, 6M Edition Please not. that same of the reference material listed allow (A thru E) may be purchased from: Cdorada Department of Transportation Old Plan. Room 4201 East Arkmws Avenue Donver. CO $0222-3400 (303) 757-9313 The Stale Highway Access Cods may be purchased from The Public Records Corporation 1565 Lafayette $treat PO Box 18185 Denver, CO OWES (303) 832-8202 or NoMdea upon rod.. t by Tess Jonas (970) 350-2153 or Gloria Hlce-idler (970) 350-2148. The "belt* address is: wrw dWLotate.co.us/business/acoseemgt/ 2. Access coniMucon within highway ROW and all nlghway improvements shall comply with complete Access Per mit and Notice to Proceed (NTP). A copy of that Permit and NTP shall be awflabl. on the cansbuctlon site at all time. The "penes of all features and roadway Improvements shall be borne by the Parmitt" at no cost to COOT. All changes as shown w me plane Mail IN, completed by the Pemnittes, including find signing and striping. 3, A Colorado re atemd profismanal engir m employed by the Parmittes shill certify materials testing. One signed copy of all materials test results and certification of the R-wluo of wbgrado and embankmert within the highway ROW shall be provided to the Access Manager within tow weeks of construction Polhill . Upon completion of the access Mprowment, certMcatim of materials and canstmakin Mdl be prowl to me Access Manager. 4. The Permitter Moll coordinate with the Region Access Manager to obtain opprowl of an attptabie Pphalt/eanenb mix design. 5. Proof robing is recommended as an Indicator of proper Preparation of wbgro" prior to paring. Proof -idling Mall not wWlltute for standard material testing. 6. The project shall be completed during a single construction swoon and all actldti" within the CDOT ROW an to be completed within a 45 day thnehame. 7. Psrinitt" Moll designate a carolled Traffic Control Supervisor (TCS) to manage construction Manage and safety of operations during activRles within COOT ROW. TCS Mall be owilable wher.wr work Is In program. & Not Used 9. Permiltee or contractor shall procure and maintain general public and auto IlonAlty, and property domoge inwronce cowling the operation under me Permit In the mounts speciRsd In Section 23-10-114, C.R.S. Policies Mall name me State of Colorado as additional Insured party and SWI Include the name of the deneopment/subdlWelon. Like coverage Mall be furI by or on behalf of any subcontractors. Certificates of Insurance Mowing compliance with timms provisions Mall be provided and *11 be attached to and made a part of this pmm8s. (A copy of the Insurance policy shall be provided to the CDOT Access Manager far attachment to the Albania Permit / Notice to Proceed prior to beginning any work within the highway ROW. 10, Dewlpment of this site and accees construction Mall not negatively Impact other properties or the Stab Highway ROW. The historical drainage run-off rate Mall not be exceeded by changes. All drainage Issues Mall be resolved prior to Issuance of permit. n. No featuro (Le. landscaping or Mgne) Mall Impoir required sight distance at any highway acts". 12 Net Used 13. Utility piano are net reviewed or outhorlxed by the Access alaR and must be submitted to the Region Utility Office. The Permttte. snail Iocatea all utilities with In "feting ROW and any area Alan may be .ffeoted by acrmo Or roadway knprovem.nts. Plane Mall conform to Section 2.3(ilxf) of the State Highway Access Cod.- The Ponnitt" Mall contact the Region Utility Office. (970) 350-2158, 14. As -Built structure plans shall be provided to the Amass Manager upon completion of access. 15. Landscaping within or near the State Highway ROW troy mcuke the Permittw to obtain a COOT Landscaping Permit from the Maintenanw Sactlan. The occeee permit don not authorise that activity, although o proposed landscaping plan Md1 be Included In the access permit document. Irrigation of features within or near the ROW may require the PenNttw to Inrtall o subsurface dram In accordance with CDOT Standard M-605-1 or other approved system. The Permutes shall contact Don Miller of the Lowland Mclntwance Office, 970-667-4650 to review the don and to obtain the Landscaping Permit 16, Soli preparation. seeding. mulching and mulch tadtifier Will be roqulred for estimated 0.60 aor" a1 disturbed area within the ROW limits that on, not surfaced The following types and rota shop W used: COMMON NAME BOTANICAL NAME APPLICATION RATE Pounds ple/Acre Western wheotgran Poscopyrum emlthll 'Arribo' &0 Sidaoato aroma ewteloua curtipandula 'Vaughn' 3.0 Green neeolegroes SUPO vIndNO %odovn' 3.0 BuHalogrom Suchln dactNddes 'Texaka' 5.0 91.0 gruma Soutdwa gracile 'HaMlta' 1.5 Little Blumt.m Schixachyrium acpanum'PaeWra' is Send Dropsesd SporobeWs cryptandrus 0.1 Got. A.0.01N. 3.0 TOTAL: 25.1 Seeding ppilcoliam Drill said 0.25- to G5T Into the topaog. In areas mat are not =0 ible to a drill, hand broadcast at triple the dbow rate and rake 0.25" to GW Into the topsoil Muiching application: 1.5 two of aartiOed wood free hay par Pars to be mechanically crimped Into the topsoil In combination with an organic mulch tockifier per Standard specification 213 Mulching. Special R.quire I Due to dry conditions hydroamoing and/or hydramulahing will not W allowed 17. All certifications. material test report% and any required 'As Bully plans Mall be provided to the Access Inpector prior to Mal acceptonce. Throe documents wql be Incorporated In the Permit file. PUBLIC IMPROVEMENT CONSTRUCTION PLANS FOR ECKERD DRUG AT COLLEGE & TRILBY SITUATED IN THE SOUTHEAST QUARTER OF SECTION 11 TOWNSHIP 6 NORTH, RANGE 69 WEST OF THE BTH PRINCIPAL MERIDIAN CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO DECEMBER 3, 2003 PROJ LOCA VICINITY MAP I' - 20M VERTICAI DARIN, NOVO UNADJUSTED (CITY OF FORT COLLINS) SITE SM IS THE MANHOLE LOCATED NEAR THE NORTHEAST CORNER OF THE SITE. HAVING AN ELEVATION OF 5DOZ63 BASED ON THE CITY OF FORT COWNS DATUM USING BENCHMARK 0 48-94. BASIS OF SEARNGS: THE EAST UNE OF THE SOUTHEAST ONE-OIARTER OF SECTION 11, TOWNSHIP 6 NORTH, RANGE 69 WEST, BEING MONUMENTED AT THE SOUTH AND NORTH ENDS BY 3-1/4- BRASS CAPS STAMPED 'COLO DEPT OF HIGHWAYS'. IS ASSUMED TO BEAR NOO.31.13-F WITH A DISTANCE OF 2646.15 FEET BETWEEN SAID MONUMENTS. CALL UTIUTY NOTIFICATION CENTER OF COLORADO 1-800.922.1987 f : WLNES Tun IN ADRMa BEEUPE YW NC, Qll [ OR E.CA01E rm ME MARNNG Of UNDOICROUND uEuR R Unulrcs. SHEET NO, INDEX OF SHEETS i COVER SHEET 2 STANDARD PLANS LIST 3 GENERAL NOTES 4 DEMOLITION PLAN 5 OVERALL UTIUTY PLAN 6 GRADING PLAN 7 DRAINAGE & EROSION CONTROL PUN B STORM PIPE PROFILES 9 SANITARY SEWER PROFILES 10-12 COLLEGE AVENUE PLANS AND CROSS SECTIONS 13-15 TRILBY ROAD PLANS AND CROSS SECTIONS 16 TRILBY ROAD AND COLLEGE AVENUE STRIPING 17-21 DETAILS I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER MY DIRECT SUPERVISION, IN ACCORDANCE YAM ALL APPLICABLE CITY OF FORT COLLINS AND STATE OF COLORADO STANDARDS AND STATUTES. RESPECTIVELY; AND THAT I AM FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS. AND RECORD CONDITIONS THAT 1 HAVE NOTED ON THESE PUNS. ECKERD DRUG STORE PROJECT NO. 192-06 SHEET 1 OF 21 OWNER'S REPRESENTATIVE: HUNT DOUGLAS 113 CORONADO CT. UNIT A-2 FORT COLUNS, CO 80525 PHONE: (970) 282-09168 FAX: (970) 282-8653 INDEMNIFICATION STATEMENT, THESE PLANS HAVE BEEN LOCAL ENTITY FOR CONCEI THE BY FOR NOT BE ACCEPTANCE V ty-A �, d Star 1� design, inc. ,u ° 700 Automation Drive, Unit I Windsor, Colonsdo 80550 Phone: 970-68&6939 Fax: 970-686-1188 w M 0 CO 0 Q w Y w C-5 1xi7/ 'r.\\ (S. COLEF`8 VENUE) -•.` 1.36 64 I4I'- if �- �� RR� - \` II��® -�i-Nib -�iyY'-�r�-�r��F� �- �-t•� -�r!l� -� ��Y� -f-�� IT IM- ,/ ,,e I u n fill i I) u DRAINAGE SUMMARY TABLE DESIGN AREA AREA CID CIoo Tc (10) TO (10o) 0 (10) 0 (100) II II POMT DESIG. ACRES YIN MR7 CFS CFS 1 1 0.72 0.92 Lao MIN 5.0 1.45 3.2 DETENTION POND SUMMARY TA 3 3 1.53 0-86 1.00 5.8 6.0 6.49 18.3 ♦ 4 0.17 0.97 1.00 5.0 5.0 0.7t 1.7 6 6 0.18 0.28 AA 1 GAS 1 5.0 1 5.0 0.25 0.8 61 1 OS/ 1 0.70 1OJS1 0.91 I S.B 1 QO 236I 8.4 02 1 052 11.36 O.B4 1.00 9.2 7.5 4.491 11.7 03 1 OS3 1 2.25 0.431 0.54 1 13.9 1 It9 I 3.23 1 64 DETENTION REQUIRED o83 AC. FT. WATER QUALITY REQUIRED 0.09 AC. IT. VOLUME PROVIDED 0.914 ACTT. MAX RELEASE RAZE 0.20 C£S UTILITYCALL CENIEROF COLORADOIOI 1.800.922.1987 I" ¢-rvseca MYS IN Alrvwrs EETare YW N4 RAZE. IF E%f WTI FOI i IWNIRG R UMEERR61IA1 I[19E9 UTSL[EES Y� U con sag 21 -r w 0 Y m W Q 30 IS 0 30 60 SCALE- V - 30' \ 1 DESIGN POINT BASIN CRITERIA • \ 44HAREA � \ 5 YR RUNOFF COEFFICIENT IN ACRES ( 4 GLOW DIRECTION � I • � 011111 NO BASIN BOUNDARY (1 1 U 54T FENCE I 1 CE ® CONSTRUCTION ENTRANCE j I EROSION BALES r ' ) I O INLET PROTECTION • r / 7 ST SEDIMENT TRAP 1 • I =_____-= EfOSiHNG PIPES / T PROPOSED STORM PIPE City of Fort Collins, Colorado -WILiTY PLAN APPROVAL dC as �PADVED•-D�e- ECKED BY: ua -�- MGM BY:MCKED BY: TNIr ERSF �s BY: Ile FLARED END SECTION ■ PROPOSED INLET LOCATION - -'-�- - -- EXISTING 5' CONTOUR FASTING 1' CONTOUR -AM PROPOSED 5' CONTOUF PROPOSED V CONTOUR RIPRAP ALL M WAIN YE LY1MS111UCi[D M K,(pgMR -M VAYpI COUNn S:AIOMO 9PEOiX'JiNR15 AS FROVOFO BY >IE 1:gINTr DN@. c T AS none. LARBfJU COUNTY AffROVAL BLOC( APPROVED FOR vEdER =WN . ml dum DAM.. nTIL tlS APggYED FOR UAAIEA C n, mmR 6c DArz n11£ z Q J a ~ CO 0 J Q C7 o F- U 00 W CC YW Ltj J � O w W()a z a a [ET 7 7 OF 21 No. 192-08 n 7 1 00') VARIANCE LETTER 622 SOUTHPARK DRIVE, SUITE 1600- LITTLETON, CO 80120 - (720) 252-3484 - FAx (303) 979-1675 EMAIL: COLEH@HABERERGROUP.COM HCI ENGINEERING A division of HABERER CARPENTRY INC. MEMORANDUM TO: City of Fort Collins, Water Utilities Engineering, Wes Lamarque PREPARED BY: Zane Hall, Engineer I PROJECT: Ziggi's Coffee — Fort Collins (6533 S. College Avenue) DATE: December 29, 2017 SUBJECT: LID Volume Based Treatment Variance SUMMARY The following memo is written .on behalf of the Owner to request relief of providing volume based LID treatment for 75% of the new impervious area. Through discussions with the City, LID volume based treatment for Basin 3 has been requested. The owner is seeking consideration on this matter by reducing the total impervious area within the limits of site improvement changes and in the form of providing volume based LID treatment for 61% of the new impervious area within Basin 3, which includes the majority of the new drivable surface area. The following information and accompanying Drainage Plans and calculations for Ziggi's Coffee — Fort Collins (hereafter referred to as the "Site") are provided to support the request of a variance from the requirement of providing LID volume based volume based treatment for 75% of the new impervious area within Basin 3. Existing vs Proposed Conditions The existing site within the limits of site improvement changes consists of asphalt paved parking, concrete sidewalks, and landscape and has approximately 11,825 SF of total impervious area. Under the proposed conditions the total impervious area is 8,775 SF. This difference results in the total impervious area being reduced by approximately 3,050 SF. The decrease in impervious area is largely due to the parking area being replaced by a concrete drive-thru lane surrounded by a greater amount of landscape area. LID Treatment �' ^ Site improvement changes affect drainage Basins 3, 4, and 6 as shown:on.-the previously Approved Drainage Plan for Eckerd Drug, dated 12/23/2003, prepared by North Star Design, Inc'. and`on the reanalyzed Drainage Plan for the Site. Copies of the Drainage Plans are attached for reference.: Proposed improvements within Basin 4 consists of removing and replacing existing parking and walks with ADA parking and walks. However, LID treatment for Basin 4 is not possible due to runoff sheet flowing directly over the parking area and immediately entering the onsite storm sewer. Based on this constraint, LID treatment is not required for Basin 4, per discussion with our Development Review Engineer, Wes Lamarque. 621 SOUfHPARN DRNE, SURE 1600- Lrrr ETON, CO 80120 - (720) 252-3484 - FAx (303) 979-1675 EMAIL: COLEH@HABERERGROUP.COM 1 Proposed improvements within Basin 6 consists of regrading existing landscape slopes to fit the proposed Site grading, removing and replacing a concrete walk, and the minor addition of concrete by a portion of the proposed patio area. Most of the proposed basin is covered by landscape area, therefore, LID treatment for Basin 6 is provided by the basin acting as a grass buffer. Per discussion with our Development Review Engineer, Wes Lamarque, this is an acceptable form of LID mitigation for Basin 6. Demolition activities within Basin 3 include the removal of a portion of the existing eastern parking area, landscape islands, and associated walks. Proposed improvements include; increased landscape area, approximately 492 square feet of building area, and a concrete: drive-thru lane, patio, walks, curb and gutter, and v-pans. The change in site conditions results in a decrease of the impervious area for Basin 3. A Rain Garden has been sized to treat the required water quality capture volume generated by the tributary area (7,312 SF) within Basin 3 which consists of the entire concrete drive-thru lane (3,496 SF), roof (239 SF), and landscape areas (3,577 SF). The resulting composite percent impervious is 51%. The design was performed utilizing the most current UDFCD software template (UD-BMP_v3.06, November 2016). The drive-thru lane has been graded to drain inward and the rain garden is located within the drive-thru loop. A 6-inch PVC outlet pipe connects the rain garden to the existing onsite storm sewer. The below table provides a breakdown of the percentage of new impervious area within Basin 3 being treated by the rain garden. BASIN 3 - RAIN GARDEN SURFACE CHARACTERISTICS AREA (SF) % OF TOTAL TREATED NEW IMPERVIOUS AREA 3,735 61% UNTREATED NEW IMERVIOUS AREA 2,399 39% Total/ Compsite 6,134 100.0% CONCLUSIONS As shown by the above information and the attached Drainage Plans and calculations, the total impervious area within the limits of site improvement changes is reduced by 3,050 SF, under the proposed conditions, and the rain garden will treat runoff generated by the entire concrete drive-thru lane, which is the majority of the new drivable impervious surface area. Based on the information presented above, it is the opinion of HCI Engineering the proposed development is sufficiently applying LID volume based mitigation practices by treating 61% of the new impervious surfaces areas within Basin 3. HCI feels that 61% is an acceptable percentage considering the area with the highest pollution potential, the drive-thru lane, is being treated by the rain garden and that by reducing tl ;@@pl impervious area, overall water quality for the Site is improved. Sincerely,432 Cole C. Haberer, PE FSSONAL HCI Engineering 621 SOUTMPARN DRIVE, SUITE 1600- LITTLETON, CO 80120 - (720) 252.3484 - FAx (303) 979-1675 EMAIL: COLEHCa HABERERGROUP.LOM 2 Design Procedure Form: Rain Garden(RG) Designer: Company: Data: project: Location: Zane Hell MCI Engineering September 26, 2017 Fort Collins 3.06, November 2016) Sheet t of 2 i. Basin Storage Volume A) Effective Imperviousness of Tributary Area, I, ID = 51.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (I = I,/100) = OZ10 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.17 watershed inches (WQCV= 0.8 - (0.91- 1'-1.19' 1'- 0.78' l) D) Contributing Watershed Area (Including rain garden area) Area = 7.312 so It E) Water Quality Capture Volume(WQCV) Design Volume = cub Vol = (WQCV / 12)' Area F) For Watersheds Outside of the Denver Region, Depth of it, = 0.43 In Average Runoff producing Storm G) For Watersheds Outside of the Denver Region, Vwocv ona:s = 101'9 cu If Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vwocv usm= cuff (Only If a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-Inch maximum) D,.,,, v = 6 in B) Rain Garden Side Slopes (Z = 4 min., hoHz. dist per unit vertical) Z = 4,00 it l ff (Um'0' If rain garden has vertical wags) C) Mlmlmum Flat Surface Area Ati = 75 sq 0 D) Actual Flat Surface Area A,,., = 1D4 al) it E) Area at Design Depth (Top Surface Area) ATDD = 308 aq 0 F) Rain Garden Total Volume VT= ROD'; cu ff (Vr ((A,. - A w.,) / 2)' Depth) 3. Growing Media Choose One ® 18" Rain Garden Growing Media O Other (Explain): 4. Underdraln System A) Are underdrains provided? C1WDIa Oft •'MS ONO B) Underdram system critics diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage Y. 0.6 1t Volume to The Center of tfre Orifice II) Volume to Drain In 12 Hours Vol„= 102 cu ff III) Orifice Diameter, 3/8' Mlnlmum Do = 2/7 In LESS THAN MINIMUM USE DIAMETEC 17 13 Rain Garden UD-BMP v3.06.xlsm, RG 9126/2017. 7:53 PM Design Procedure Form: Rain Garden(RG) sheet 2 sl 2 Designer: Zane Hall Company: HCI Engineering Date: September 26, 2017 Project: 17 13 Ziggfs - Fort Collins Location: 5. Impermeable Geomembrane Liner and Geoleatile, Separator Fabric IIIr [Leese One O A) Is an impermeable liter provided due to proximity O ND ND of structures or groundwater contamination? 6. Intel / Outlet Control r Chasse One ® Sheea Flow No Energy Dissipation Required A) Inlet Control I O Concenhated Flow- Energy Dissipation Provided Choose One 7. Vegetagun O Seed (Plan for frequent weed control) ® PentLgs O Sand Grown or Enter High InOltratbn Sod 6. IMgatian Choose One ® TES NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be Pageant? O NO Notes'. 1713 Rain Garden UD•BM1p_v3.06.x1sm, RG 9/26/2017, 7:52 PM FRONT RA'V(.E L AIIED PARTNERiHIP AI : [cr- 6,'; I Dlhcs ou`rv�F R C M1 J y O 24i? _ _ r _ _ 5[Z9 — — — — — — — _ 5 -50J1- --_—__ ___---��-----_ __ - - - - _ -C ---- - I,\------------ I — — — — — — -- �:�� ��� — POND l — — — — — — — — — — — — — — — _ � I I I - (EX. OfTFNTION POND} — — — — — — — _ — — — — — _S . �, -{O • \ I I EX RIPRAP I / Ti fjRAIJAC�f / AN \ 1 I EN. CONCRETE ORAINACE PAN 11 I I I 1 h I"•-50.TI IRILHY' SUBDIVISION , _ — — - — REC NO 2005CO25J65 1 St0/�1� ' I�I� " - - - — -50J2- — — — Y - 1 1 ADDRESS' 6541 5 COLLEGE AIfNVE I/ I I ` — -� — — — — — — — 5033- — — — ti _ _ — ONNER SOUTH GATE CHURCH INC /F I b _ — — — -I PIN. 9611432901 — — — — — 5034— — L LOT l 1 82,686 50. FT, ■ I 1 OR L898 ACRES II � r III 11 �II 01>Dai_v' o 4A 1 1 } 3 I 1 z-•� I jTf�_ /, - VACANT LOT DO O L'-✓ - SPILL C11,%L � O L. COLLEGE A/ u r -I-- J 2' I 1 ■..- II� - CAD \ \ I PIN. 9671432002 W_ ETE I I 2 1 1 p_ zCONC 1L022 SO.. FL, SD3A 1 1 h AN I -- -I • 1 L OR i.63C ACRES I Emw L u, � ,6 �LOPLAr.9T p�gAW BA -SW -- ♦ � { 2a WISCUOCOVER04201 EXIOIROP W14 SHALL; OW STORM MH WIFUITOP �, TOM LF V 39.51 LF-1Y PVC C900 \ \ 'T I 1� `)y /2'PVC CB00 RIIBBUUTARYYAAREA —1 II tET L I • — _ (7.312 SF) CATCH CAD Y'X COIdAI.'JA I/C{h' _ JV N \ __1 L 11 • 3En �, .VAPAN� (TYP) �/ ,. •/ni, R 4 , ' •1Y NYLOPLBAS AST DRAIN IN P 6 q WI STANDARD GRATE a • 1' l I. `FONDING LIMITS' 6- PVC CLEANOUT WI WATER TIGHTLID ELEV. = 503020 I' ' 0.78 //1' CURB lR 3.50 - rn •8' PE OTTED \PLR ° \ ., OC •WSE=503263•�, •/i,•.11 .I L Me- ■ � �IJJJJJIIFI L _ate. — - -4 6 _ B' PVC CLEANOIIE W/WATER t" LID RANI diRDEt!—. ,5p33'—�y— } Mt MEDIA AREA _ 1B.BO LF 8'PVC CONNECTION FITTING EIEV,=6032.12 _- _5032- — - 8'SLOT1EDjDPEPIPE. SOUTH COLLEGE AVENUE (HIGHWAY 287) (FLO W. REC. NO.2006002682 a BGCa laEd PAGE 184 S BOOK 1059 PAGE 402) Ek. INLET DRAINAGE LEGEND E3y, DESIGN POINT BASIN ID B3-6 DRAINAGE BASIN 2.80 0.47 CIO 0.76 EA All C100 - - - - LIMITS OF SITE IMPROVEMENT CHANGE — — — — - LIMITS OF CONSTRUCTION ■ so r in / BASIN BOUNDARY EX. MAJOR CONTOUR so; - EX. MINOR CONTOURR, M. MAJOR CONTOUR H21 M. MINOR CONTOUR FLOW ARROW NOTES: 1. THE SITE UES WITHIN THE FOSSIL GREEK DRAINAGE BASIN. FOSSIL CREEK IS LOCATED APPROXIMATELY 1.35 MILES EAST OF THE SITE. ORMNAGE SII.TMARY TABLE DFSIGN POINT BASIN AREA ACRES [10 CHID 3 E1( 3 146 0.80 L00 3RG 3 0.11 0.61 a76 tQ47�127 3 3 163 On a98 4 4 0,17 M91 LOG6 6 a75 031 0.39 WDCV SUMMARY APPROVEDREELWDCV 1 II3111 PROPOSED REEL WOCV 3616 OF PROVIDED WQCV 3MU BASIN 3 - RAIN GARDEN SIIRFACECHAMCFERISO[S1 AREA SF % TOTAL TREANONEW IMPERVIOUS AREA I 3,T35 1 61% UNTREATTDNEWIMERVIOUSAREA 1 Z399 1 39N Total/Com Ne 6,M N&M BENCHMARK', PROJECT DATUM: HAWK BENCHMARK: NATIONAL GEODETIC SURVEY BENCHMARK %408'; BRASS CAP LOCATED ON THE EAST RIGHT OF WAY LINE OF SOUTH COLLEGE AVENUE -1000' SOUTH OF THE INTERSECT" OF WEST TRILBY AVENUE AND SOUTH COLLEGE AVENUE. ELEVATION 5038.43 PLEASE NOTE: THIS PLAN SET IS USING NAVDS8 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REWIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED NGV 29 UNADJUSTED =NAVD88-3,18'. BASIS OF BEARINGS: THE GPS DERIVED EAST LINE OF THE SOUTHEAST QUARTER OF SECTION 11. TOWNSHIP 6 NORTH, RANGE S9 WEST OF THE 6TH PRINCIPAL MERIDIAN AS EVIDENCED BY THE SOUTHEAST CORNER FROM WHENCE THE EAST 1/4 CORNER BEARS 400.40231 . A DISTANCE OF 2640 60 FEET WITH ALL BEARINGS HEREIN RELATIVE THERETO, MONUMENTS FULLY DESCRIBED HEREIN. �-Z 0' 20' 40' 60, SCALE: 1" = 20' CITY OF FORT COLLINS, COLORADO UTIL TY PUN APPROVAL APPROVED: ntr au;R16m —SO—E CHECKEDBV: W..LFRA WASTEWATp1 Ut4rtY pitE CHECKED BY: new T6Te ulam w1F CHECKED BY: PAaa aaErPxwTwN oaTE CHECKED BY: 6N-- GiNgqMIT CHECKED BY'. ENVRON.IENI4P �� MC' A DIVISION OF RlC. HABERre� aA �NTitV wnarouco. wlm oaimarneAwww.coH FeOW Lail Sebre you 4g Call be omyo 4 CALL 811 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADEOR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. Z J J O O Z <m � a.0 z ww U P: 1 L� L O v N REVISIONS: Na. Data: D"alptioa: 1 SR7117 IFOP SUBMITTAL Mt 2 12)1&1 FDPSUB1MITTAL62 Project No: 17_13 0. By. ZAH Checked By: CCH Date lanuad. 12/05QO17 Sheet Name: DRAINAGE PLAN Sheet Numher. C1.6 DESIGN FONT AREA DESIG AREA ACRES CIO CIDO TIC (10) MIN To (100) MIN O (10) CFS GOOD) CFS 1 1 0.]2 0.92 LOO 5.0 500 1.45 3.2 2 2 O.JS 0.25 1.00 5.0 &0 1.54 3.3 3 31 1.63 Dias 1.00 5.8 5.0 6.49 16.3 4 ! 0.17 0.91 1.00 5.0 5.0 0.74 1.7 5 5 0.69 0.37 0F46 5.9 5.6 7.02 2.6 6 8 0.16 0.28 0.35 5-0 5.0 0.25 0-6 7 7 0.]5 0.285 0.32 5.0 5.0 0.69 1.8 Ot O51 0.70 0,73 0.91 5.8 5.0 2.36 6.4 02 052 1.36 0.54 1-00 9.2 7.5 4.49 11.7 OJ 053 228 0.43 0.54 13.6 129 3.23 1 5.4 O Y Ol W K 30 15 0 30 60 r SCALE, 1- • 30' 4 SIMON aN(Tr) 1- 1\ \ I I II ♦ I �� 1\, (TSI L\ \ ♦ \ \ \ (IFI ] 4I \\ Ql DESIGN POINT I �1 tx \ ` 1 \ I \ `\ BASIN CRITERIA 1 I 5 YR RUNOFF COEFFICIENTI� ' I I T I ♦ I4--AREA IN ACRES DI `� : ♦ II I 1 I I I rtAu WM . `♦ I WM (TAP) � i I ii � i ; I FLOW DIRECTION �I (TrP1 ♦ ♦In\� _ _ 1 I 1 00 BOB 0111 111111 BASIN BOUNDARY I \ I I I I 3 '' w ♦ � I % I I I s ' I I i i ; 1.63 O.B6 `,\I ..\ '.•♦♦ II / 1\ II I W ; 11 O SILT FENCE i I I 1 ♦ J/ �_ 1 Ii r 1 I I PAN II I I O® CONSTRUCTION ENTRANCE EROSION BALES I 1 1 I I � z wlpeEte \ � I c 1 r I ► I I I J/ PAx •os _ - O - II1� -- J'\ I O INLET PROTECRON ji -- I N ♦ _J SEDIMENT TRAP �•�\ IV` / Ex1511NG PIPES - ---- _. .r /. ► I ,` J PROPOSED STORM PIPE I I _ 1•]6 e4 n I'��I t'+. - ♦4W.6 FLARED END Do, SECTION PROPOSED INL ET LOCATION ON _ _ _______________ - - Q��-- EXISTING S' CONTOUR -'- ---(---- ` HIGHWAY N 287 ----------EXISTINGNc I* CONTOURS. C E AVENUE) PROPOSED 5' CONTOUR ♦/JIII I, \ �\♦ - .. _.``_r`` \ ```_ \` `-� II I \ PROPOSED V CONTOUR iiIiImm,�� -�T� --�/11 n f- \ -� RIPRAP �. r n Il " -- ---c-= a II City of Fort Co11in6. Colorado II -UTILITY PLAN APPROVAL r DRAINAGE SUMMARY TABLE i I 1 - "11 APPgDVEp II II r SCALE, 1- • 30' 4 SIMON aN(Tr) 1- 1\ \ I I II ♦ I �� 1\, (TSI L\ \ ♦ \ \ \ (IFI ] 4I \\ Ql DESIGN POINT I �1 tx \ ` 1 \ I \ `\ BASIN CRITERIA 1 I 5 YR RUNOFF COEFFICIENTI� ' I I T I ♦ I4--AREA IN ACRES DI `� : ♦ II I 1 I I I rtAu WM . `♦ I WM (TAP) � i I ii � i ; I FLOW DIRECTION �I (TrP1 ♦ ♦In\� _ _ 1 I 1 00 BOB 0111 111111 BASIN BOUNDARY I \ I I I I 3 '' w ♦ � I % I I I s ' I I i i ; 1.63 O.B6 `,\I ..\ '.•♦♦ II / 1\ II I W ; 11 O SILT FENCE i I I 1 ♦ J/ �_ 1 Ii r 1 I I PAN II I I O® CONSTRUCTION ENTRANCE EROSION BALES I 1 1 I I � z wlpeEte \ � I c 1 r I ► I I I J/ PAx •os _ - O - II1� -- J'\ I O INLET PROTECRON ji -- I N ♦ _J SEDIMENT TRAP �•�\ IV` / Ex1511NG PIPES - ---- _. .r /. ► I ,` J PROPOSED STORM PIPE I I _ 1•]6 e4 n I'��I t'+. - ♦4W.6 FLARED END Do, SECTION PROPOSED INL ET LOCATION ON _ _ _______________ - - Q��-- EXISTING S' CONTOUR -'- ---(---- ` HIGHWAY N 287 ----------EXISTINGNc I* CONTOURS. C E AVENUE) PROPOSED 5' CONTOUR ♦/JIII I, \ �\♦ - .. _.``_r`` \ ```_ \` `-� II I \ PROPOSED V CONTOUR iiIiImm,�� -�T� --�/11 n f- \ -� RIPRAP �. r n Il " -- ---c-= a II City of Fort Co11in6. Colorado II -UTILITY PLAN APPROVAL r DRAINAGE SUMMARY TABLE i I 1 - "11 APPgDVEp II II DETENTION POND SUMMARY DETENTION REWIRED .83 AC. FT. WATER WAUTY REWIRED.09 AC. FT. VOLUME PROVIDED .1114 ACAT. 3.20 CALL UTILITY NOTUWATBTN 100 YR RWEL 027.54 CENTER W CULMADO MAX RELEASE RATE CFS 1.800-9221987 L'L rW n wTs IN A9vaa W W r1u o14 MM. M eI ATF :NECIQED BY: Rla -�- 2' C BY: 2ECJ® BY: MMED BY: NECKED By Mi Marc sNAu R CON51RUC1[D IN Afll mm wn. IARWER Cp1Ntt SNgMp SPEOI1Gnik15 AS PRONOp Bf 1ME Cp1NT' p9NCER. ExCO'T AS NOTED, LARINIR COUNTY APPROVAL BLOCK APPII9Vm FOR L.IMIEA CQMTY, COl01AW Jim] nnE: us APFRO1c0 roR cAxwrn cOtW1r. uL.6RA9p Br OA2 - nnE: H m 0 Q J C7 Q o =f-U Er Q°.2 W V) Q W LLI it Y _j w WUa Z Q 0 I (: 7 7 OF 21 m No. 192-08 n 1007