Loading...
HomeMy WebLinkAboutDrainage Reports - 03/16/2012 (2)Final Drainage Report Colorado Iron & Metal CALCULATION OF A PEAK RUNOFF USING RATIONAL IETHOO Project THIG CM Catchment ID: Basin A, 100-year Discharge 1. Catchment Hydrologic Data Catchment ID = A Area = 3.18 Acres Percent Imperviousness= B6.00 % NRCS SoilType= BA, B, C. or j O. Rainfall Information I(IncNFr)= C1 I P11(C2• Tdr C3 �\ Design Storm Return Period, Tr= 100 years (input return period fordesign storm> C1= 2850 ( nput the valu a of C 11 C2= 10.00 (Input the Yalu a of C 2) C3= 0.793 (input the value of C 3) P1= 2.91 inches (input one-hr preapaahon—see Sheet "Design Ink" 8L Analysis of Flow Time(rimeof Concentration) fora Catchment Runoff Coefhciern, C = 0.76 Ovende Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient. C c = 0.67 _- Overide 5-yr. Runoff Coefficient. C = arter an ovende C-5 value ifdesired, or leave blank to accept calculated C-5. ) ttlustratkm rV. Rexh 1 Dsv Huh ` .1 L7 SeZiw� _ Flan- Dirrrtia. Caartuwewl anaaLes 40---S Land Hevy Tillage Shut Newt Grassed Pwmd Pressa Type frkadvv 11 �ieki Pastor. Dwe Swales Shalkw P�Swdes LLrrs Ground Ni sterwa (Shed� .roe 2 5 7 10 15-1 �Flan t— Calculations: Reach Sim" Length 5-yr NRCS Flow Flea' ID 5 L Runoff cmvey- Veksdy Tare Codl arsrs V Tf Poa It cz fm minutes input input output input output cutpui Overland 0.0200 25 0.67 0.13 3.09 1 0.0050 540 20.00 1,41 6.3E 2 3 4 5 Sum 565 C omputed Tc = 9 4c Regional Tc= 13.14 Peak Runoff Prediction using Computed Tc Kliction using Regional Tc Rainfall Intensity at Tc. 1= 7.88 in dtlltr Rainfall lntensityatTc, l= 6.87 inchhtr Peak Flovrate, Op= 19.10 cfs Peek Flovaate, Op= 16.64 cfs UD Rational- Basin A 100yr.)ds, Tc and PeakO 4202011. 10:D7 AM