Loading...
HomeMy WebLinkAboutDrainage Reports - 05/18/2000..�. North Star �Awww design fy I :iIR!L� March 20, 2000 Mr. Basil Hamdan City of Fort Collins Storm Water 700 Wood Street Fort Collins, CO 80522 Re: New Belgium Brewery Administrative Change #3 Revision of the approved Office Addition (Phase III) Basil; This letter is intended to be an update to the Final Drainage and Erosion Control Report for New Belgium Brewery First Filing prepared by JR Engineering, Ltd. dated December 23, 1997. Previous updates by North Star Design were completed for the Wastewater Treatment Shed addition (dated October 19, 1998) and the Phase III Warehouse revision (October 28, 1998). The plans completed for New Belgium Brewery by JR Engineering dated December, 1997 and approved by the City of Fort Collins showed an office addition on the southwest side of the existing building as Phase III. The office was proposed as 2400 square feet and was contained in Drainage Basin A. New Belgium Brewery has reassessed their needs and determined that a larger office area is needed. The proposed office addition is shown on the attached Grading, Drainage and Utility plan. This revised office addition is 5500 square feet and encroaches on the existing Detention Pond A. Also, based on existing conditions as surveyed, Basin A will reduce in size and Basin E will increase in size by 0.13 acres (not previously accounted for in Basin E). Because of the basin changes, the increased office area in Basin A and the reduction of Detention Pond A, the hydraulic calculations for Basins A and E were revised and are attached to this letter. The required detention for Pond A was recalculated and the stage -storage curve was revised. These calculations are also attached to this letter. The proposed increased area in Basin E causes an increase of the c-value from 0.61 to 0.62. The runoff from the 10 year event increases from 7.3 cfs to 7.7 cfs and the runoff from the 100 year event increases from 27.0 cfs to 28.6 cfs. This causes the required 1194 W. Ash Street, Suite B Windsor, Colorado 80550 970-686-6939 Phone 9.70-686-1188 Fax detention to increase from 0.81 acre-feet to 0.85 acre-feet. Utilizing the same stage - storage curve as the original report, the HWEL increases from 4948.89 to 4948.96. The proposed changes in Basin A cause an increase of the c-value from 0.78 to 0.82. The runoff from the 10 year event increases from 2.3 cfs to 3.8 cfs and the runoff from the 100 year event decreases from 10.1 cfs to 9.5 cfs. This causes the required detention to change from 0.177 acre-feet to 0.125 acre-feet. The detention pond has been reconfigured and accommodates the required volume at an elevation of 4951.8. The top of the overflow is at 4951.9 and the top of the berm between the detention pond and the irrigation ditch is 4952.15 which provides a freeboard of 0.35 feet. The City of Fort Collins Storm Drainage Criteria requires a minimum of V of freeboard, therefore a variance is being requested for this situation. The pond, if the outlet clogs, will overflow into the irrigation ditch and will be conveyed downstream in this ditch. The detention pond is very small and receives a minimal amount of runoff which, if conveyed downstream, will have very minimal impact. Because of the office addition, runoff from a portion of Basin A (patio near the entrance) will need to be collected in an inlet and routed in a pipe to Detention Pond A. These proposed storm facilities are shown on the attached Grading, Drainage and Utility Plan. The existing concrete pan will be removed from the bottom of Detention Pond A. The slope of the bottom of Detention Pond A is proposed to be 1.0%. This proposed change is based on the desire of New Belgium Brewery to maintain a landscape with a minimal of concrete drainage structures. This also allows for more detention volume than would be provided by a 2% slope. Proposed erosion control for this project is shown on the Grading, Drainage and Utility Plan and is similar to the Phase III erosion control proposed on the JR Engineering plans. This includes straw bale barriers in Detention Pond A and silt fence along the irrigation ditch to prevent sediment from entering the ditch during construction. Note that all of the calculations in this update were completed utilizing the rainfall criteria that was in place when the original project was approved (prior to March 16, 1999) I appreciate your time in reviewing this submittal. Patricia Kroetch, w § ) 0000 R> 0 LL )( §§)§§§ j� <z 5 LL }0 »§ §§ /± k$ § §) «m/=ww <§ .c � \p QE/ ƒ$ k< §I§ §` �)q 4<= 0 ) R i L i oa z�Fw oz C V A .4 u w N Y w N N N j N S N N Ip O N m 01 O Cl « t+l N m � M ? E N - V Q u m « O W p 2 J N N b N =Q 10 •y^+N U � u � m m r v m m m m m m ; co o� of of r ao O J E LL �J maw mr a,r W y V m o _ x > am _ U r o 0 0 0 0 0 0 p 0 K m Q N N O V m N< Oo N O O O O O m N w tN�l A N O N b O Q Z K J r m m m E = o O o 0 0 O L N N N N c x U o 0 o c o 0 U � W O 4N0 {{pp N yy T O m N o 0 0 0 0 0 0 � 2 � U N l7 N M N m O O N r N M zr c� Z W a. ¢ m U Wt a l 0 Z N I 1 ¢ m U O O co a _ �a N O O U r 0 LL O U O M N O) LL O N r C n m t w L c0 7 O' Q w N m G C C x 0 G r : , r a O Y f W o w N N 01 O O 00 p N < J � N O 0 th z E 0 M N p N N b N i ? E m « O Y In 0 0O o 0 OI U � OR q Of v n �� a oimom u + ai 0e w OR m 3 C � Ci r CA N A fti 0 � E LL W N O O m Y 0 0 _ > 2 U a mm c co �cmo C .� a o 0 0 0 0 0 0 O c c n E o 0 o c o wF F N N V p N O N O O 6 0 6 m at m W F N O M 0 O N O O O N p Op L N b N WQ �Ch C � IL J ty (O O tV O C .. 0 0 0 0 0 O O O O O O o N G Cl tV Cl O O I(i N N L N N N N c < J O O O (n V1r Of IA N A (O A M n, U W Q N a7 0 Yl N O O O N O R N o O O O O O � 2 N 0 N oinAry N N m Z F zp m a m U Q W LL w a Q z a m m z ma N O A z zw �a •• Li L o A w 0 A N �a D W - H 0 Ul oa 3 x a x 064 oQ z o g F h N Y Q aa)i 0) a N w d d ' O N ao �rnncy ii of 0rr0 L MA V r Cl) N < < N N N CV C W m O U E (o of 1, 04 U II O ONO 1) m to N U U o 6 0 o 66 W 1� N. (� a INO 0 0 0 0 0 0 0 U N m o M N m Q O O N h N cn O O CJ C y Q m U 0 w LL LL Q a) 0 LL 0 z U w G m o Q m U 0 w LL o a 'o z � Q V O C7 v W aoa W + W 0 i,K U ) o W d CA LU x W oz 0 F O W z � F W 0In F F d U O A U A N Y N N w m d cc x N N N O M b m d DI L6 V CM N O L O O O N O Cl) O Cl) to O N M C O1 1� a0 ti t0 C O O 00 m N V: 'E ,� 0 o ri 0 fro O f') UU� moo.-000 N N (J GND a)/ND 000000 U N M IN M ID 00 a 00 to Ih N M c m y a m U 0 W LL a 0 LL LL 0 z z U w ' a m U 0 W LL o ap 0 DETENTION E 'DETENTION VOLUME CALCULATION - FAA METHOD Detention Pond E (100-YEAR) LOCATION: NEW BELGIUM BREWERY PROJECT NO: COMPUTATIONS BY: PPK SUBMITTED BY: NORTH STAR DESIGN DATE: 1/14/00 Equations: A trib. To pond = 5.25 acre Qo = CIA C (100) = 0.77 Vi = T C I A= T Qo Developed C A= 4.0 acre Vo = QPo T QPo = 1.15 cis S=Vi -Vo 1 Rainfall intensity from City of Fort Collins OF Curve Storm Duration, T (min) Rainfall Intensity, I (in/hr) Qo (cfs) Vol. In Vi (ft) Vol. Out Vo (ft) Storage S (ft'') Storage S (ac-ft) 5 9.00 36.4 10915 345 10570 0.243 10 7.28 29.4 17658 690 16968 0.390 20 5.18 20.9 25128 1380 23748 0.545 30 4.08 16.5 29688 2070 27618 0.634 40 3.40 13.7 32987 2760 30227 0.694 50 2.93 11.8 35534 3450 32084 0.737 60 2.58 10.4 37547 4140 33407 0.767 70 2.32 9.4 39390 4830 34560 0.793 80 2.11 8.5 40942 5520 35422 0.813 90 1.93 7.8 42131 6210 35921 0.825 100 1.79 7.2 43416 6900 36516 0.838 110 1.67 6.8 44556 7590 36966 0.849 120 1.56 6.3 45405 8280 37125 0.852 Required Storage Volume: 37125 ft 0.85 acre-ft Page 1 New Belgium Brewery Detention Pond E - Stage/Storage LOCATION: NEW BELGIUM BREWERY PROJECT NO: COMPUTATIONS BY: PPK SUBMITTED BY: NORTH STAR DESIGN DATE: 1/14/00 V = 1/3 d (A + B + sgrt(A*B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour Stage (ft) Surface Area (ft) Incremental Storage (cu-ft) Total Storage (cu-ft) Total Storage (ac-ft) 4946 0 0.00 0.00 0.00 4947 8150 2716.67 2716.67 0.06 4948 18710 13069.51 15786.18 0.36 4948.96 25804 21275.88 37062.06 0.85 4949 26100 22302.74 38088.92 0:87 Required volume = 0.85 acre-feet Total volume = 0.87 acre-feet @ 4949 100 yr HWEL = 4948.89 Volume Provided = 0.85 acre-feet @ 4948.96 Page 1 ------------------------------------------------------------------------------ ------------------------------------------------------------------------------ DETENTION POND SIZING BY FAA METHOD Developed by Civil Eng. Dept., U. of Colorado Supported by Denver Metro Cities/Counties Pool Fund Study Denver Urban Drainage and Flood Control District, Colorado ------------------------------------------------------------------------------ ------------------------------------------------------------------------------ PROJECT TITLE: New Belgium Brewery Office Addition **** DRAINAGE BASIN DESCRIPTION BASIN ID NUMBER = A BASIN AREA (acre)= 1.06 RUNOFF COEF = 0.82 ***** DESIGN RAINFALL STATISTICS DESIGN RETURN PERIOD (YEARS) = 100.00 INTENSITY(IN/HR)-DURATION(MIN) TABLE IS GIVEN DURATION 5 10 20 30 40 50 60 80 100' 120 150 180 INTENSITY 9.0 7.2 5.2 4.2 3.5 3.0 2.6 2.1 .1.7 1.5 1.2 1.0 ***** POND OUTFLOW CHARACTERISTICS: MAXIMUM ALLOWABLE RELEASE RATE _ .85 CFS OUTFLOW ADJUSTMENT FACTOR = .98 AVERAGE RELEASE RATE _ .8330001 CFS AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT FACTOR. ***** COMPUTATION OF POND SIZE RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED DURATION INTENSITY VOLUME VOLUME STORAGE MINUTE INCH/HR ACRE -FT ACRE -FT ACRE -FT ----------------------------------------------------- 0.00 0.00 0.00 0.00 0.00 5.00 9.00 0.05 0.01 0.05 10.00 7.20 0.09 0.01 0.08 15.00 6.19 0.11 0.02 0.09 20.00 5.18 0.13 0.02 0.10 25.00 4.68 0.14 0.03 0.11 30.00 4.17 0.15 0.03 0.12 35.00 3.84 0.16 0.04 0.12 40.00 3.50 0.17 0.05 0.12 45.00 3.25 0.18 0.05 0.12 50.00 3.00 0.18 0.06 0.12 55.00 2.80 0.19 0.06 0.12 60.00 2.61 0.19 0.07 0.12 65.00 2.47 0.19 0.07 0.12 70.00' 2.34 0.20 0.08 0.12 75.00 2.20 0.20 0.09 0.11 ----------------------------------------------------- THE REQUIRED POND SIZE _ .124924 ACRE -FT THE RAINFALL DURATION FOR THE ABOVE POND STORAGE= 45 MINUTES NEW BELGUIM BREWERY Detention Pond A - Stage/Storage LOCATION: PROJECT NO: COMPUTATIONS BY: SUBMITTED BY: DATE: 100-yr WSEL- Overilow elev New Belguim Brewery 110-03 twc NORTH STAR DESIGN 1/14/00 V= 1/3d(A+B+sgrt(A'B)) where V = volume between contours, ft3 d = depth between contours, It A = surface area'of contour Stage (ft) Surface Area W) Incremental Storage (ac-ft) Total Storage (ac-ft) 49.62 0 50 482 0.00 0.00 51 4085 0.05 0.05 51.8 4324 0.08 0.125 51.9 4350 0.09 0.134 Total required detention = 0.125 Ac. Ft. detention.xls Cost Est EROSION CONTROL COST ESTIMATE Project: New Belguim Brewery Office Addition Prepared by: 110-03 ITEM IQUANTITY JUNIT COST/UNIT ITO=ST Silt Fence 290 LF $3 $870 Straw Bale Barrier 2 EA $150 $300 Gravel Inlet Filter 0 EA $150 $0 Construction Entrance 0 EA $550 $0 Subtotal Contingency (50%) Total $1,170 $585 $1,755 CITY RESEEDING COST Reseed/Mulch 0.47 ACRE 1 $650 $306 Subtotal Contingency (50%) Total $306 $153 $458 EROSION CONTROL ESCROW AMOUNT $1,755 Page 1