Loading...
HomeMy WebLinkAboutDrainage Reports - 02/23/2018TAIT 0111r45 1p •wo tMAuIw45 December 27'h, 2016 City of Fort Collins Engineering Division 281 N College Fort Collins, CO 80524 1 6163 E. County Rood 16, to l..d. CO 80s37 i p:970161311d47 r.rAol.Gom w:. ..^� y Drainage Letter for the Proposed Site Development located at Harmony Rd and Ziegler Rd, Fort Collins, CO 80528 Lot 13, Front Range Village Dear Rick Richter City of Ft. Collins pro d Plans Approved By_ Date This drainage letter is to convey the proposed site development conforms to the overall report, which is titled Final Drainage and Erosion Control Study for Front Range Village, Fort Collins, Colorado prepared by Stantec Consulting Inc (February, 2007), and will hereafter be referred to as the Master Report. The subject property currently consists of drive aisles, an undeveloped building pad, and the Front Range Village Dog Park. The area of disturbance for these improvements is 65,340 SF (1.540 acres). The development is located in the southeast quarter of Section 32, Township 7 North, Range 68 West of the 61h Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado, on the northwest corner of Harmony Rd and Ziegler Rd. The subject property lies on Lot 13 of Front Range Village. The site is bound to the west by existing parking lot and commercial retail, to the north by Council Tree Avenue, to the east by an existing drive aisle, and to the south by Lot 7 (Famous Dave's BBQ). Proposed improvements for this lot include a building constructed on the north side of the site with a total footprint of 13,880 square feet, consisting of a strip mall with restaurant, retail, and office space. The site consists of Type C Soils Nunn clay loam, and existing backfill. This site is located in flood Zone X, "Areas determined to be outside the 0.2% annual chance floodplain." ' Existing drainage patterns on the west side of site direct flows to either a curb inlet or an area inlet in the drives. The east side of the site spills into the parking lot to the east where it sheet flows to an inlet across the parking lot. Master Report was calculated using a minimum overall imperviousness of 84-percent for ' this basin. The proposed lot is accounted for in the Final Drainage Report as includes a portion of basin 201, along with basins 202, 203, 204, 206, and 209. These basins have a combined Clio of 6.27 cfs and Q1oo of 13.98 cfs. The post developed site will discharge at rates less than or equal to these flows in the 10 and 100 year storm events. ' Post -development drainage will be conveyed via sheet flow and curb and gutter to a combination of existing inlets and a couple of proposed inlets. See drainage plan sheet at the end of this letter for additional information. The post development property consists of nine on -site sub -basins. See drainage sheets for additional information. Post -development Sub -basin C1 consists of 0.48 acres of drive aisle, parking lot and landscaping along the southwest side of the site. This basin is 68% impervious. Runoff from this basin drains via sheet flow and curb and gutter to an existing area inlet in the parking lot. Sub -basin C1 discharges at a rate of 0.91 cfs in the 10-year storm event and 3.86 cfs in the 100-year storm event. ' Post -development Sub -basin C2 consists of 0.23 acres of parking lot, sidewalk and landscaped area on the northwest side of the site. This basin is 82% impervious. Runoff from this basin generally sheet flows ' to a curb inlet on the east side of the parking area. Sub -basin C2 has a discharge rate of 0.91 cfs in the 10-year event and 2.00 cfs in the 100-year storm event. Post -development Sub -basin C3 consists of 0.01 acres of paved walkway and landscape area near the ' northwest corner of the building. This basin drains to an existing grate inlet in the landscape area. This basin is 46% impervious. Sub -basin C3 discharges at 0.03 cfs in the 10-year event and 0.07 cfs in the 100-year storm event. Post -development Sub -basin C4 consists of 0.02 acres of paved walkway and landscaped area on the near the northwest corner of the building. This basin drains into a proposed grate inlet in the landscape area. This basin is 46% impervious. Sub -basin C4 discharges at 0.05 cfs in the 10-year event and 0.14 ' cfs in the 100-year storm event. Post -development Sub -basin C5 consists of 0.01 acres of paved walkway near the northwest corner of the building. This basin drains into the street to the north to continue existing drainage patterns. This basin is 90% impervious. Sub -basin C5 discharges at 0.04 cfs in the 10-year event and 0.09 cfs in the 100-year storm event. ' Post -development Sub -basin C6 consists of 0.03 acres of paved walkway and patio. This basin drains into a proposed trench drain inlets on the north side of the building. This basin is 90% impervious. Sub - basin C6 discharges at 0.13 cfs in the 10-year event and 0.27 cfs in the 100-year storm event. Post -development Sub -basin C7 consists of 0.32 acres of the proposed building. This basin drains into all surrounding sub -basins and follows the drainage patterns of those sub -basins. This basin is 90% impervious. Sub -basin C7 discharges at 1.36 cfs in the 10-year event and 2.90 cfs in the 100-year storm event. Post -development Sub -basin C8 consists of 0.27 acres of paved walkway, parking lot, and landscape area. This basin drains to the southeast corner of the proposed parking spaces to a proposed storm drain inlet, which connects to the existing storm drain system in the drive aisle on the west of the site. This basin is 80% impervious. Sub -basin C8 discharges at 1.05 cfs in the 10-year event and 2.33 cfs in the 100-year storm event. Post -development Sub -basin C9 consists of 0.03 acres of landscaping. This basin drains to the private drive aisle on the south side of the property. This basin is 2% impervious. Sub -basin C9 discharges at 0.04 cfs in the 10-year event and 0.18 cfs in the 100-year storm event. Post -development Sub -basin C10 consists of 0.08 acres of landscaping and sidewalk. This basin drains to the private drive aisle on the east side of the property. This basin is 54% impervious. Sub -basin C10 discharges at 0.25 cfs in the 10-year event and 0.63 cfs in the 100-year storm event. The overall post -development site imperviousness is 75%, compared to the minimum 85% previously designed conditions. After improvements, the site will discharge at a total rate of 12.49 cfs in the 100- year storm event, generating 1.49 cfs less than existing conditions, as determined in the master drainage report. See drainage plan for additional information. The overall drainage concept for this site is to convey flows via sheet flow and curb and gutter to a number ' of inlets throughout the site. The drainage patterns and flow rates generally conform to the original design intent. ' Since Alex ' Direc RUNOFF COEFFICIENT CALCULATIONS Project Name: C01303C - Front Range Village - Lot 13 Calculated By: NE Check By: AH Date: 12/27/2016 RECOMMENDED RUNOFF COEFFICIENT AND PERCENT IMPERVIOUS Runoff Coefficients, C-value LAND USE °k IMPERVIOUS 10 YEAR 100 YEAR LANDSCAPE 2 1 0.22 0.52 DRIVES AND WALKS 90 0.87 1 0.91 ROOFS 90 0.87 0.91 POST -DEVELOPMENT CONDITIONS: AREA DESIGN A(LAND.) AC A(D&W) AC A(ROOFS) AC A(TOTAL) AC C10 C100 % IMPERVIOUS C1 0.12 0.36 0.00 0.48 0.71 0.81 68 C2 0.02 0.21 0.00 0.23 0.81 0.88 82 C3 0.01 0.01 0.00 0.01 0.55 0.72 46 C4 0.01 0.01 0.00 0.02 0.55 0.72 46 C5 0.00 0.01 0.00 0.01 0.87 0.91 90 C6 0.00 0.03 0.00 0.03 0.87 0.91 90 C7 0.00 0.00 0.32 0.32 0.87 0.91 90 CS 0.03 0.24 0.00 0.27 0.80 0.87 80 C9 0.03 0.00 0.00 0.03 0.22 0.52 2 C10 0.03 0.05 0.00 0.08 0.61 0.75 54 TOTAL: 1.49 WEIGHTED: 0.84 75 1 Runoff coefficients and percent impervious per UDFCD Stormwater Design Manual 10-YEAR INDIVIDUAL BASIN FLOWS ' Project Name: C01303C - Front Range Village - Lot 13 Calculated By: NE Check By: AH Date: 12/27/2016 ' POST -DEVELOPMENT CONDITIONS: SUB -BASIN DATA DIRECT RUNOFF CONTRIBUTING BASIN EFFECTIVE I SUB BASIN BASINS AREA acre C10 AREA acre in/hr Q cfs C1 0.48 0.71 0.34 4.87 1.65 C2 0.23 0.81 0.19 4.87 0.91 C3 0.01 0.55 0.01 4.87 0.03 C4 0.02 0.55 0.01 4.87 0.05 C5 0.01 0.87 0.01 4.87 0.04 C6 0.03 0.87 0.03 4.87 0.13 C7 0.32 0.87 0.28 4.87 1.36 C8 0.27 0.80 0.22 4.87 1.05 C9 0.03 0.22 0.01 5.87 0.04 C10 0.08 0.61 0.05 4.87 1 0.25 TOTAL: 1 5.50 I per City of Fort Coillins stormwater design standards. Q10= C*I*A 1 100-YEAR INDIVIDUAL BASIN FLOWS ' Project Name: C01303C - Front Range Village - Lot 13 Calculated By: NE ' Check By: AH Date: 12/27/2016 POST -DEVELOPMENT CONDITIONS: SUB -BASIN DATA DIRECT RUNOFF CONTRIBUTING BASINS BASIN AREA acre C100 EFFECTIVE AREA acre I in/hr SUB BASIN Q cfs C1 0.48 0.81 0.39 9.95 3.86 C2 0.23 0.88 0.20 9.95 2.00 C3 0.01 0.72 0.01 9.95 0.07 C4 0.02 0.72 0.01 9.95 0.14 C5 0.01 0.91 0.01 9.95 0.09 C6 0.03 0.91 0.03 9.95 0.27 C7 0.32 0.91 0.29 9.95 2.90 C8 0.27 0.87 0.23 9.95 2.33 C9 0.03 0.52 0.02 10.95 0.19 C10 0.08 0.75 0.06 1 9.95 1 0.63 TOTAL: 12.49 1 I per City of Fort Coillins stormwater design standards. Q100= C'I'A Channel Report ' Hydraflow Express Extension for Autodesk® AutoCADO Civil 3D® by Autodesk, Inc. 6 inch Roof Drain Circular Diameter (ft) Invert Elev (ft) Slope (%) N-Value Calculations Compute by: Known Q (cfs) Elev (ft) 11.00 10.75 1 10.50 ' 10,25 10.00 ' 9.75 Highlighted = 0.50 Depth (ft) Q (cfs) Area (sqft) = 10.00 Velocity (ftls) = 99.00 Wetted Perim (ft) = 0.013 Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Known Q = 2.90 0 1 Monday, Nov 21 2016 = 0.26 = 2.900 = 0.10 = 27.97 = 0.81 = 0.50 = 0.50 = 12.42 Section Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® AutoCADO Civil 3D® by Autodesk. Inc. 12 Inch PVC ' Circular Diameter (ft) = 1.00 Invert Elev (ft) = 100.00 Slope (%) = 1.50 N-Value = 0.013 ' Calculations Compute by: Known Q Known Q (cfs) = 3.12 ' Elev (ft) Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Section ' 102.00 101.50 101.00 v ' 100.50 100.00 99 50 0 1 1 Reach (ft) I Wednesday, Dec 21 2016 = 0.63 = 3.120 = 0.52 = 5.98 = 1.83 = 0.76 = 0.97 = 1.19 3 Depth (ft ..00 1.50 1.00 1 11 -0.50 Channel Report ' Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. <Name> ' Circular Diameter (ft) = 1.50 Invert Elev (ft) = 100.00 tSlope (%) = 1.50 N-Value = 0.013 'Calculations Compute by: Known Q Known Q (cfs) = 4.90 1 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Wednesday, Dec 21 2016 = 0.65 = 4.900 = 0.74 = 6.65 = 2.16 = 0.86 = 1.49 = 1.34 Depth I 2.00 0 1 0 1 0 1 Section 2 3 4 1.5C 1.0C 0.5C O.00 -0.5 1 Reach (ft) --- 3 -4-HAS - k1 I I L. ,N �� II p iz, PW POORMAYN �1► I I 1 I 1 I N I I. I 1 I /I I / I 1 I I / 1 / p 1 f p \/> �w 0 GENERAL NOTE: MY FUTURE UND DISTURBANCE. INCREASE IN IMPERNWS AREA MD/OR CHANGE IN RUNOFF CONDITIONS ON THIS 511E MAY REQUIRE MDITU)NAL STORM WATER MANAGEMENT PER FORT CQ1NS REQAANXIS IN PUCE AT THAT TINE (INCLUDING TOTAL LND OSNRBAJICF AND/OR IMPERVIOUSNESS ADDED W THIS PLAN). STORMWATER RUNOFF NOTES TDTM DISTURBED AREA: 1.49 ACE PRENOUAY APPROVED DEVELOPMENT X IMPERNWS: 85 POST -DEVELOPMENT X IMPERNWS: 25 POST -DEVELOPMENT 10-YR STORM RUNOFF: 9.50 CFS POST -DEVELOPMENT 100-YR STORM RUNOFF: 1149 CIS A = BASIN DESIGNATION 6 � B =AREA IN ACRES C = X IMPERVIOUSNESS SUMMARY RUNOFF TABLE CONTRIBUBASH D AREA (ACRES) C N1WE . ROOM 1PEmM (CRS) P� (OS) Cl 0.411 O.D 1.0 3.86 CZ 0.23 ON 0.91 2.00 C3 0.01 On 0.03 0.07 04 O02 en 0.05 0.14 CS 0.0 E91 0.N 0.W CS 0.03 E91 0.13 0.27 C9 0.32 0.91 1.36 29O N 0.28 1.05 1.05 112 N 0.0 0.52 ON 0.15 CIO 0.0N On 125 Do i --E-�� -- ------ y v" ♦ �_ p � I 1 R UNAUTHORIZED CHANGES & USES: r ,TQI I; p p 40 BENCH YARN: � O `! THE ENGINEER PREPARING THESE PUNS Mill NOT BE RESPOMMWE FOR. OR UABFE FOR, UNAUTHORIZED ENGINEERS NOTE TO CONTRACTOR AIANGES TO OR ENGINEERS DATUM: NGVO29 UNAANSRD (CID CITY OF FMT GER DATUM) USES Of THESE PANS, ALL CHANGES OF THESE RUNS MUST BE IN MIRING AND MUST BE APPROVED F THE PREPARED?: *= W BENCHMARK /II-9C ALUMINUM CAP 300' HEST OF COIDETT GRIM ON 1W OF c OF THESE PUNS PRIOR TO CONSTRUCTION. CONSTRUCTOR CONTRACTOR AGREES THAT IN ACCORDANCE AFF GENERALLY CONCNEHE VIAL OF IRRIGATON STRUCTUR[ ELEVATOR 4950.01 ACCEPTED CONSTRUCTION PRACTCES, CONSTRUCTOR CONTRACTOR WLL BE REWIRED TO ASSUME SOFT AND COMPEER THE EYSIENLE AND LOCATOR Of ANY UNDERGROUND UTUTES, PIPE$ AND/DI SiRUCTNLS BENCHMARK 15-07: SOUTHEAST OWNER Of HARMONY ED. MD A QER ED. SO ifA RESPONSBIUTY FOR JOB SR CONDITONS DURING THE COURSE OF CONSTRUCTON OF THE PROJECT, INQADING SUETY OF SHOW W THESE PUNS RETIE WTANED BY A SEARCH OF AVAIUME REGORGS THERE MAYBE ♦ _ SOUTH OF THE EDGE OF ASPHALT ON THE WALL QI A DOME!WIGAMIN DROP ALL PERSONS AND PROPERTY. THAT THIS REWIREMSNT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE UNITED TO EDSTNG UTUUTES NOT SOW W THESE PUNS. THE CONTRACTOR SHAM ASCERT1 THE 10.UE / Y NORMAL "KING HWR% AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY ANI) HOD DENG4 VERTCM AND HORIZONTAL LOCATOR OF THOSE UNDERGROUND UTUTES TO BE USED POOR 10 THE BFAMNCS BASD QI THE SOUTH UNE Q TH7�M�ST SiRUMINE. ELENATON 492/.N9 FEET.NOM W NAAIL HARMUSS PROECT, MGM MY NG FIAD A- M9 t FRRE L ORAUFEGED, IN SOF£ NEWQNCOE E DEIGN PRCHLSSO�IALMMGE OF �TES,CSIONAND N OR HA BE RESPONSINFE FW ANY DAMAGE TO MY PUBLIC OR PRIVATE WAIN OF S TpN 32 AS BEMING NORTH N9' 26 If RANI M DATUM IS REWIRED FOR MY PURPOSE. TE FOUL EWATON SHG FIRM RAT Q FRONT RANGE VILLBE USFb. MONK = NGw29 UNADJUSTED i z20' ae< d zI.. J 0 IL 0 W Ir Q (L J Z WZ0 (r$a NZ❑ ❑ �_� Z LLKW W WWZ g�0W a b'a -j > W > W a 0 Z J Q U 4 Z 7 U F IL o PREPARED UNDER THE SUPERVISION OF TNT k ASSOCIATES, INC. \pnoucEN ti DRN _ ALEX.OME __