HomeMy WebLinkAboutDrainage Reports - 07/18/2005i' 1 North Star �*a., de -sign, inc. May 23,2005 Basil Hamdan City of Fort Collins Stormwater 700 Wood Street = Fort Collins, CO 80522-0580 RE: Drainage Report for Liberty Common School Track Project Proj : 205-02 Dear Basil, inal Raplx4t Date ., 7)i��6 The Liberty Common School (LCS) is proposing to build a track and field adjacent to March Court and Riverbend Court in Prospect Industrial Park. This: project -will construct the track and field, relocate the private drive connection to Midpoint Drive (from March Court), and build some additional parking. March Court will be reconstructed with the project under a separate plan' set. This letter and attached calculations show the existing and proposed drainage conditions for the area and will serve as the drainage report for the project. An Erosion Control Plan has been included in the plan set for City comment, no erosion control calculations have been prepared. This letter will demonstrate that drainage conditions will be improved with this project. Existing Conditions: the area to undergo construction activities,,, there are three distinct. -,drainage basins. These basins are shown on the "Existing Drainage Basins" exhibit. Basin EXl is in the northwest portion of the project and drains north to the existing Liberty Common School parking area on the west side of the building. There is an existing curb inlet in the parking lot that will remain as the outfall for this area. This area has a private drive and the remaining portion of the basin is impervious. Basin EX2 is in the northeast portion of the project and drains overland to March Court. From March Court, runoff flows east to Sharp Point Drive and the ponds to the east of Sharp Point Drive. This basin includes a portion of the private drive, and the portion of March Court that will be rebuilt with the project. The remaining portion of the basin is impervious. Basin EX3 includes the south portion of the project. This basin consists of Lot 3 and Lot 6 of Prospect Industrial Park which are presently undeveloped. This basin presently drains southeast to Lot 7, Prospect Industrial Park. There is an underground drainage system on this lot, but it is unknown if the system was sized to accept any flows from .Lots 3 and 6. During the Utility 700 Automation Drive, Unit I Windsor, Colorado 80550 970-686-6939 Phone 9 970-686-1 188 Fax A Coordination Meeting for this project, it was stated that the City would prefer that this area drain to Riverbend Court. Proposed Conditions: _ This project will add impervious area to the overall project area. The drive, parking and track will be paved with asphalt. The existing private drive and a portion of March Court will be removed with the project.: The overall flow to the three design points will be reduced with the construction of the project because of the reduction in drainage area from Basin 1 and Basin 2 and the use of the track and field area as a detention pond for Basin 3. These basins are shown on the "Proposed Drainage Basins" exhibit. A more detailed description of each basin follows: Basin PI - is in the northwest portion of the project and drains north to a curb inlet in the existing Liberty Common School parking area on the west side of the building. The new parking area and a portion of the new drive are within this basin. Drainage from this basin will continue to flow north, but the basin size has been substantially reduced. The amount of paved area in this basin has also been reduced. There is no possible location to add water quality -facilities to this basin; but because the paved area is reduced, technically, the existing water quality should be improved. Basin P2 is in the northeast portion of the project and includes the remaining portion of the new private drive, a paved play area, and the reconstructed portion of March Court. It is proposed that this area will drain in a concrete trickle pan to a new sidewalk culvert and into March Court. It is City standard to not allow substantial drainage over the public sidewalk, and the proposed sidewalk culvert will accomplish this. Drainage from this basin will continue to its historic location (March Court), but the basin size has been substantially reduced. The amount of paved area in this basin has also been reduced. There is no possible location to add water quality facilities .to;this basin; but because the paved area .is reduced, technically, the existing water quality should be improved. Basin P3 includes the entire proposed track and field. Tracks are designed with no longitudinal slope (the entire inside edge of the track is at the same elevation). To provide for drainage, tracks have a subsurface drainage: system on this inside perimeter. This site does not have any adjacent subsurface storm drainage system to tie to, so the only option for an outfall is to find the lowest existing surface outfall. It is the City's desire for this area to drain to Riverbend Court, so it is proposed to install a sidewalk culvert into the cul-de-sac, and have the track drainage system outfall to this point. A gravel trench drain with two 4" perforated pipes (at about 0.15%) will be installed around the inside of the majority of the track. At the north end of the track a sloping PVC trench drain in a concrete header will be installed. This will provide very slow, but positive drainage for the track and field to Riverbend Court. The track cross slope is inward at 1.5% toward the trench drain and the field will have a 2% crown draining to the trench drain as well. In large storms, when the drainage system cannot convey the rainfall, water will pond staring at the trench drain and then up onto the track and the field. This, by default, will create detention for the area. It has been calculated that the volume between elevation 4996.35 (the top of the trench drain) and elevation 4996.70 (the outside edge of the track) is 0.21 acre-feet. The FAA Detention Method was iterated to find the pond discharge for the track's C value and the available detention volume. It was found that if the pond release is 2.5 cfs, the detention volume will be utilized. A 10" PVC pipe at 0.68% has a capacity of 2.6 cfs and has been used for the outfall from the track to Riverbend Court. This basin is larger than the existing Basin 3 and will have more impervious area than existing conditions, but because of the detention provided, the peak flow will be reduced and will no longer be routed through Lot 7. ' No water quality facilities are proposed for this basin, but all runoff will flow through several hundred feet of very flat gravel trench drain, and the asphalt track, unlike an asphalt parking lot, will not have any vehicles on it spilling oil, etc. The only issue with this "pond" is that there will not be a spillway. If the track were completely overwhelmed, it would spill evenly over the entire perimeter of the track (more that 1,000 feet) at a very shallow depth. Based on this, no damage to any adjacent facilities or properties would be anticipated. All of the runoff and_ detention pond calculation are attached to the back of this report.,,...A summary of the 'ezisting and proposed drainage conditions are provided in the table below: BASIN EX 1 P1 EX2 P2 EX3 P3 AREA 0.54 Ac. 0.30 Ac. 1.33 Ac. 0.65 Ac. 1.86 Ac. 2.85 Ac. "C" 100 0.56 0.60 0.52 0.82 0.25 0.58 " " 100 2.2 cfs 1.8 cfs 5.6 cfs 4.7 cfs 3.3 cfs 11.1 cfs* * - Basin P3 peak flow is reduced to 2.5 cfs with 0.21 acre-feet of detention storage. In summary, peak flows; will be reduced with this project to the three receiving points. Basin 3::_> will be rerouted to the public right of way rather than through Lot 7 of Prospect Industrial Park. If you have any questions, please feel free to call me. Sincerely, Michael Oberlander, P.E., L.S.I. - / - I 1 I �, wmvr Xr �' \ ♦ �r eXsr ' t ♦ EX2Q. 1.33 0.41 _ loll"� C (MINOR) — -(0.54 0.44 t AREA (TYP) �:✓ - /� -1;\ �f y . 10 low no Sao mow no- so o- j ' >/ ora cr NYXRIAu[ PA \ . , 3 -- 1. Lorr Pnomtcr 100 SO 0 100 200 SCALE: 1 " = 100' North Star design, inc. _ 700 Automation Drive, Unit I Windsor, Colorado 80550 Phone: 970-686-6939 Fax: 970-686-1188 LIBERTY COMMON SCHOOL TRACK* PROJECT EXISTING DRAINAGE BASINS 5-23-05 ------------ 00 50 0 100 200 North Star design, inc. 700 Automation Drive, Unit I Windsor, Colorado 80550 Phone: 970-686-6939 Fax: 970-686-1188 i„/ rj toi ws PKgSQcr '.M1 YGY/SAbK PI,K 0 LIBERTY COMMON SCHOOL TRACK PROJECT PROPOSED DRAINAGE 13;4SINS 5-23-05 � m _o � U c W o a e C c od _ c ° o (A Y U a Z a O G W E LL o U CJ LL O N U m ui Z C 0 v `off Z u. ) E 0 aZ5 d' U } E a O j m o o E N C h N E N O_ U Z 0 m E c E z of 0 a a m 0 E-F aci 4 C[ O O OOan'Ua wx 0 o_ c 00 O O) O O) O N O m n E C C U I� U m m m M N m o 0 0 0 0 O U 0 0 , , Z F Z K Y Y j O O O N a Y 0 S F V O Q OJ Q S a W m W 00 Q N N 3 W W w W w Z 0 O O N J O E E LL LL LL U Z O 0 0 0 0 0 0 � v w a y W Q 0. N Q 8 O T :7 Z 5 > a s g� Q 000 pOp LL a Z W H O O O O O O Y Wc O O O O O O y q _ O 0 O a f N N p C Ld N N 0 M O m CI t0 (O O Q Z Z O aQ N t„f N C1 m 0 w w w a a a � y N W N a m 0 0 E U N O N y .L.. u � a N N 3L. N L p U cc 4) c N a 3 d � m 0 U j O V O O O U 0 r. N a)0 y a C E Q 2 o II II C II c o �UQ cQ oi3 Q c �? mW U II OU U U v N r O � � U U i O r N I U) Z 20 u p CCC F O W U H Z O U LL O LU U a O O x U rn z O O U } � O � [t7 O] vl O N ..7 N .�• vl } rn z O E zza D O F- P: U a UOF =m Oce0 o'�a an Un E U N H L t O C 0 Zo3 IE N Y f W C n m m o rn LL n - m m O C N N O N Q i m � M a-i E m ti .. p Y N 00 O O O i to � Z N `. U � F u � N m n In m rn u � N N O � r grim m m m Cl! 01 O .Eo ovi� � LL J 0 O W Q W O W m N O N ZZ Q = m m m o m m m U K = o 0 0 0 0 0 Q K W 0 0 0 0 0 0 0 O O O O O m N W ~ N M N M A L t7 W Z J aD m O I� m O E 00o min In o e N p o 0 0 0 o N O M B N N N c C Q W W r � Z _ f Q In M t7 m W. o M m to m W 13 z � N M m www aaa m D N z z r < lu) N M (V M Q W a N p O c m C 2) N N N _C O U LZ O r U O Cl) d 7 O) LL O N c O o. N d U I I N 3 L O Y LL N - t0 L r U O w m E N L c N j m (m n C c Ln \ m I I N O � V } ci m C_ > o E U U E I E - n co y 11 u m c � w U O 3 0 LL Y. K f- R' } O O r N I dZ N � 0 O O H W Z Q U LL O W 2 U Q F O O y z O O r N II U Y m Z O z z < E �7 O�j F ti c F LU ` rnOo UO�E"' OG'O Q O p a U 0 U 19 0 N � L Q y N f K vl m m 0 0 J u m N N V V = E LL "' O C N N O N V Z m E N iti o Y N g 0 0 O o In = a ry Yam" N U � 0 O 11 V � I,ql,p 7 W N mom lo N N A M N m m m N - NW On- LL N fV G fV Z_ > Q 2 V m m m o m m m C c c IC!o 0 0 0 go O K 2 � 000 o 00 ko g o 0 o N 0 GG d m Cl!6 m H ci O B O O W goo O pp o W �sn r � = E m 0 0 0 U N N 9 lV (V � = ��pp N NO ONE 5 � aaa o00 � U W O O N P m Y J o 0 0 0 0 0 r 2 C Inm m O nu�m N m H Or- O O N Gy z a s m w w w N z r a 'C N O 10 a o a N O N Z - L � Y LL � O N 0 U C N H a .E m N o C N m O 9 C G � c n O ` C l7 � t9 11 ^ O + > c E U E E cn p n E + 00 Q I (7 U It N W « w 0 0 r c IIW�I� ■iu■n�n �n��nn■n am Z U IL 0 o — E m _o C ` N w o t .U.. E C U N C 2 7 C d L co a) U N N ta N V C C U l0 C Q w C CL f4 II II II 11 C7 U U �I Q N d N 3 O LL Y LL LL O z w ui Y y' Q o W a O w J Q z O 9 c 7 O N Y f W R' O QF� p N T N G7 n A V 0 O f O N U {4 � Q _ W > C E .2) c K o � 'o a o U O N N <h t t+f M t0 O NO N O N C t0 O o T U 'E of .:,: ui ui v U a v, N OV BOO v U o o Gi o o Gi O M m M N Q GOD LL 0 ` 2 z N 0: as aaN `a www w z 0 c c 'p N t7 N C'1 a o a� Z U LL V Q 0 U E O C ` N N O C U y C j .co m cu U m m N Un'O U N U C C m m m ro c C_ y C N C 6 O_ II II II It Q O z O_ d Lo N c 7 I,I�vAllll�l 2 L) U LL 0 E 0 w L N c Co rn — to DU a) Co N U C 41 U CI co 0 N C C aIt l9 O II II ` II C7 U 0 0 O TRACK OUTLET PIPE 10" PVC Worksheet for Circular Channel Project Description Project File d:\haestad\fmw\culvert.fm2 Worksheet CULVERT Flow Element Circular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.009 Channel Slope 0.6800 % Diameter 10.00 in Discharge 2.50 cfs Results Depth 7.8 in Flow Area 0.46 ft2 Wetted Perimeter 1.81 ft Top Width 0.69 ft Critical Depth 0.70 ft Percent Full 78.43 Critical Slope 0.005957 ft/ft Velocity 5.45 ft/s Velocity Head 0.46 ft Specific Energy 1.11 ft Froude Number 1.17 Maximum Discharge 2.81 cfs "Full Flow Capacity 2.61 cfs Full Flow Slope 0.006241 ft/ft Flow is supercritical. 05/20/05 , FlowMaster v5.15 09:22:00 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 MINIMUM DETENTION VOLUME REQUIRED FAA METHOD (100-YEAR) LOCATION: LIBERTY COMMON SCHOOL PROJECT NO: 205-02 COMPUTATIONS BY: MPO SUBMITTED BY: North Star Design DATE: 5/20/05 Equations: Qo = CiA V; = T*CiA = T*Qp Vo = K*QPo*T S=V; -Va Rainfall intensity from City of Fort Collins IDF Curve A trib. To pond = Cioo = Developed C*A = QPo = K= 2.85. acre 0.58 1.7 acre 2.50 cfs 1 (from fig 2.1) Storm Duration, T (min) Rainfall Intensity, i (in/hr) Qo (cfs) Vol. In V; (ft3) Vol. Out Vo (ft3) Storage S (ft3) Storage S (ac-ft) 5 9.95 16.4 4934 750 4184 0.10 10 1 7.72 12.8 7657 1500 6157 0.14 20 5.60 9.3 11108 3000 8108 0.19 30 4.52 7.5 13449 4500 8949 0.21 40 3.74 6.2 14837 6000 8837 0.20 50 3.23 5.3 16018 7500 8518 0.20 60 2.86 4.7 17019 9000 8019 ` 0.18 70 2.60 4.3 18051 10500 7551 0.17 80 2.34 3.9 18566 12000 6566 0.15 90 2.17 3.6 19370 13500 5870 0.13 100 1.99• 3.3 19737 15000 4737 0.11 110 1.87 3.1 20401 16500 3901 0.09 120 1.75 2.9 20828 18000 2828 0.06 130 1.66 2.7 21403 19500 1903 0.04 140 1.57 2.6 21800 21000 800 0.02 150 1.48 2.4 22018 22500 -482 -0.01 160 1.42 2.3 22534 24000 -1466 -0.03 170 1.35 2.2 22762 25500 -2738 -0.06 180 1.29 2.1 23030 27000 -3970 -0.09 Required Storage Volume: 8949 ft3 0.21 acre-ft PROPOSED POND VOLUME LOCATION: LIBERTY COMMON SCHOOL _ PROJECT NO: 205-02 COMPUTATIONS BY: MPO SUBMITTED BY: North Star Design DATE: 5/20/05 10-Year Detention required = 100-Year Detention Required = Total Detention Required = 100-Year WSEL 0.00 ac-ft 0.21 ac-ft 0.21 ac-fit Stage (ft) Surface Area (ft2) Incremental Storage (ac-ft) Total Storage (ac-ft) 4996.35 0 4996.4 7400 0.003 0.00 4996.5 22400 0.033 0.04 4996.6 37300 0.068 0.10 4996.7 52100 0.102 0.21