Loading...
HomeMy WebLinkAboutDrainage Reports - 04/16/2018FINAL DRAINAGE REPORT Boardwalk Office Building City of Fort Col 'ns Approved Plans Approved by: liZ Date: Prepared for: r4 Architects 226 Remington Street, Unit #3 Fort Collins, CO 80528 (970)224-0630 Prepared by: Interwest Consulting Group 1218 West Ash, Suite A Windsor, Colorado 80550 (970)674-3300 February 23, 2018 Job Number 1326-069-00 INTERWEST M CONSULTING G R O U P February 23, 2018 Ms. Heather McDowell City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 8052 2-0580 ' RE: Final Drainage Report for Boardwalk Office Building Dear Heather, 1 am pleased to submit for your review and approval, this Final Drainage Report for the ' Boardwalk Office Building development. I certify that this report for the drainage design was prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. City review comments dated February 13, 2018 have been addressed in this report. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. ' Sincerely, Reviewed By: ' Erika Schneider, P.E. Michael Oberlander, P.E., LEED AP Colorado Professional Colorado Professional Engineer No. 41777 Engineer No. 34288 'AO �41K-W 288�0� �Ilts/0►uni EN�\� 1218 WEST ASH, SUITE C WINDSOR, COLORADO 80550 Lei. 970.67e.3300 • FAX. 970.674.3303 TABLE OF CONTENTS TABLEOF CONTENTS............................................................................................................ iii 1. GENERAL LOCATION AND DESCRIPTION................................................................ 1 1.1 Location...........................................................................................................................1 1.2 Description of Property................................................................................................. 1 1.3 Floodplain Submittal Requirements............................................................................. 1 2. DRAINAGE BASINS AND SUB-BASINS.......................................................................... 2 2.1 Major Basin Description................................................................................................ 2 2.2 Sub -basin Description.................................................................................................... 2 3. DRAINAGE DESIGN CRITERIA...................................................................................... 2 3.1 Regulations......................................................................................................................2 3.2 Directly Connected Impervious Area (DCIA) Discussion .......................................... 2 3.3 Development Criteria Reference and Constraints...................................................... 4 3.4 Hydrological Criteria..................................................................................................... 5 3.5 Hydraulic Criteria.......................................................................................................... 5 3.6 Floodplain Regulations Compliance............................................................................. 5 3.7 Modifications of Criteria............................................................................................... 5 4. DRAINAGE FACILITY DESIGN....................................................................................... 5 ' 4.1 General Concept............................................................................................................. 5 4.2 Specific Details................................................................................................................ 6 ' 5. CONCLUSIONS....................................................................................................................7 5.1 Compliance with Standards.......................................................................................... 7 5.2 Drainage Concept........................................................................................................... 7 ' 6. REFERENCES...................................................................................................................... 8 ' APPENDIX VICINITY MAP AND DRAINAGE PLAN.............................................................................. A HYDROLOGIC COMPUTATIONS..........................................................................................B ' HYDRAULIC COMPUTATIONS.............................................................................................. C WATER QUALITY AND LID INFORMATION.................................................................... D SOILS INFO, FEMA INFO, AND REFERENCE MATERIAL..............................................E ' 1. GENERAL LOCATION AND DESCRIPTION ' 1.1 Location ' The Boardwalk Office Building development is located in Fort Collins. It is located in the Northwest Quarter of Section 36, Township 7 North, Range 69 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. Please refer to Ithe vicinity map in Appendix A. The project site is located at the northeast corner of JFK Parkway and Boardwalk Drive. JFK Parkway bounds the property on the west, Boardwalk Drive on the south, Tract 9, Block 1 of Landings Office Park PUD on the east and Landings Bay FDP on the north. The development consists of Tracts 8 and 10, Block 2 of Landings Office Park PUD. ' 1.2 Description of Property The property consists of 0.55 acres of land. The project will include construction of a new building, sidewalks and new parking with drive aisles. The proposed development is very similar to the original approved 1995 design of the property. The site generally slopes in a southerly direction at approximately 5% to 7%. The land is ' currently vacant. There is no offsite flow contributing to the site. Soils on site consist of Tassel sandy loam, 3 to 25 percent slopes classified as Type D hydrologic soil group. According to FEMA Panel 08069CO987G (effective 05/02/2012) there are no mapped ' FEMA Floodways on this property. Please refer to Appendix E for hydrologic soil and FEMA information. 1.3 Floodplain Submittal Requirements Because the project is not within any FEMA or City of Fort Collins mapped floodway, a ' Floodplain Submittal is not required and a "City of Fort Collins Floodplain Review Checklist for 50% Submittals" has not been included with this report. 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description The proposed development lies within the Mail Creek Master Drainage Plan. Outfall for this site is the Larimer County Canal No. 2. The site was previously studied in the "Final Drainage Report for Landings Office Park P.U.D." by Northern Engineering Services, Inc., dated October 27, 1995 (Landings PUD) and is a portion of sub -basins D3, D5 and D7. Please refer to Appendix E for reference material. 2.2 Sub -basin Description Today, the entire site sheet flows onto JFK Parkway and Boardwalk Drive where the curb and gutter conveys the flow to either the East Detention Pond of ShopKo or Detention Pond D1 of the Landings PUD located at the northwest corner of Boardwalk Drive and Landings Drive. 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations ' This report was prepared to meet or exceed the "City of Fort Collins Storm Drainage Design Criteria Manual' specifications. Where applicable, the criteria established in the ' "Urban Storm Drainage Criteria Manual' (UDFCD), developed by the Denver Regional Council of Governments, has been used. ' 3.2 Directly Connected Impervious Area (DCIA) Discussion ' Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainageways and implementing long-term source controls. The Four Step Process applies to the management of smaller, frequently occurring events. 4 1 Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). Runoff for the eastern portion of the site will be routed through vegetated areas through sheet flow thereby reducing runoff from impervious surfaces over permeable areas to slow runoff and increase the time of concentration and promote infiltration. Runoff from the parking lot and the eastern portion of the building shall drain directly into a pervious paver system thereby slowing runoff and also promoting infiltration. Runoff from the western portion of the building roof shall drain directly to a storm system that will release to a swale that will slow runoff and increase the time of concentration and promote infiltration. Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release Once runoff has been minimized, the remaining runoff shall be treated through the pervious paver system that allows for settlement of sediments. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate and volume of runoff during and following development. Because the site will drain to an existing detention pond, bank stabilization is unnecessary with this project. Step 4: Implement Site Specific and Other Source Control BMPs The proposed development will provide the pervious paver system feature which will ' eliminate pollution that had previously been exposed during weathering and runoff processes. The proposed project will proactively control pollutants at their source by ' preventing pollution rather than removing contaminants once they have entered the stormwater system as compared to historic conditions. 1 3 ' 3.3 Development Criteria Reference and Constraints ' The runoff from this site has been routed to conform to the requirements of the City Stormwater Department. Because water quality capture volume from this site is not ' included in the development's detention pond, water quality facilities are required for the new construction proposed on the site. The site's water quality will be met through the use of a pervious paver system that includes 12" of storage in the voids below the pavers. Please note that a portion of the site (Basin D) drains directly to JFK and Boardwalk as ' shown on the previously approved Landings PUD. This design matches the previously approved condition. ' The site has been designed to maximize water quality treatment but the handicap ramp area to Boardwalk and the west and south side of the site cannot drain to the pervious ' paver system. The entire site's required water quality capture volume is 0.01 ac-ft and will be contained in the 12" of storage in the voids below the pavers. Please refer to Appendix D for supporting information regarding water quality. If the pervious paver system is completely saturated or overwhelmed, water will overtop into the Single Curb inlet then be conveyed east to the existing Detention Pond D1 of the Landings PUD. Runoff reduction practices (LID techniques) are also required. No less than fifty percent of any newly added impervious area must be treated using one or a combination of LID techniques. New impervious area is 16,449 sf. Basins A and B contain the porous paver ' system. Using this LID technique, 15,560 sf of new impervious area (95%) will be treated which exceeds the 50% requirement. No less than twenty five percent of any newly added pavement areas must be treated using a permeable pavement technology. The project adds 10,434 sf of new pavement ' area. This project will incorporate 3,790sf of porous pavers which is 36% of the newly added pavement which exceeds the required 25%. ' The pervious paver system is oversized and provides full water quality volume for the site. Please refer to Appendix D for LID calculations and information. ' 4 4. 3.4 Hydrologic Criteria Runoff computations were prepared for the 2-year and 10-year minor and 100-year major storm frequency utilizing the rational method. All hydrologic calculations associated with the basins are included in Appendix B of this report. Standard Form 8 (SF-8) provides time of concentration calculations for all sub - basins. Standard Form 9 (SF-9) provides a summary of the design flows for all Sub - basins and Design Points associated with this site. A variance to use the pervious paver system for the water quality capture volume is included in Appendix D. 3.5 Hydraulic Criteria All hydraulic calculations will be presented in the final drainage report and prepared in accordance with the City of Fort Collins Drainage Criteria. 3.6 Floodplain Regulations Compliance The project is not within any FEMA or City of Fort Collins mapped floodway; therefore, Floodplain Regulations Compliance is not required. 3.7 Modifications of Criteria There are no Modifications of Criteria for this development. DRAINAGE FACILITY DESIGN 4.1 General Concept The majority of the proposed development will be collected and conveyed to the proposed storm drain system where it will be treated for water quality via a pervious paver system before being released into the proposed system that conveys water east to the existing Pond D1 of the Landings PUD. 61 4.2 Specific Details A summary of the drainage patterns within each basin is provided in the following paragraphs. Please refer to Appendix A for the drainage plan. Basin A is 0.09 acres and contains the north drive aisle and parking. This basin is calculated to have a 10-year discharge of 0.4 cfs and a 100-year discharge of 0.9 cfs. Flows from Basin A are captured by the porous paver system and will discharge to the 8- inch storm pipe around the north and east sides of the site. This system releases the treated water into the Single Curb inlet and 12-inch storm pipe located at design point B. Basin B is 0.26 acres, contains about 60 percent the roof (east portion) and the east drive aisle and parking. This basin is calculated to have a 10-year discharge of 1.0 cfs and a 100-year discharge of 2.5 cfs. Flows from Basin B are captured by the pervious paver system. The treated water is released into the Single Curb inlet and 12-inch storm pipe located at design point B. Basin C is 0.04 acres and contains the remainder of the roof (about 40%). The basin is calculated to have a 10-year discharge of 0.2 cfs and a 100-year discharge of 0.4 cfs. Flows from this basin will be conveyed to the 6-inch perimeter drain that wraps around the west and south of the building. This drain will release flow to the sidewalk chase located on the southeast side of the building. This chase will direct the flow to Basin B's pervious paver system for treatment. The treated water is released into the same Single Curb inlet located at design point B and is then released to an outfall swale that conveys flow to the existing pond. 100 percent of the roof is treated in the pervious paver system. Basin D is 0.13 acres and is calculated to have a 10-year discharge of 0.2 cfs and a 100- year discharge of 0.4 cfs. This basin consists of the west and south landscape area adjacent to the building. Flows from this basin will continue current conditions and sheet flow onto JFK Parkway and will remain untreated as was planned in the Landings PUD approved drainage plan. ' Basin E is 0.03 acres and is calculated to have a 10-year discharge of 0.1 cfs and a 100- ' year discharge of 0.2 cfs. This basin consists of the handicap ramp adjacent to the north side of the building. Flows from this basin will drain to a sump inlet and the 8-inch storm pipe around the north and east sides of the site. This system releases the untreated water into the Single Curb inlet and 12-inch storm pipe located at design point B. The percent impervious weighted average of the entire site is 58% which is below the 70% imperviousness that was assumed in the approved Landings PUD; therefore, ' detention is not required. Basins A, B, C and E correlate to 100% of sub -basin D7 and about 67% of sub -basin D5 of the approved Landings PUD. The minor storm runoff of basins A, B, C and E is 0.9 cfs which is less than the assumed minor storm runoff of 1.1 cfs from the Landings PUD. The major storm runoff of basins A, B, C and E is 4.0 cfs which is less than the assumed major storm runoff of 4.2 cfs from the Landings PUD. Please refer to Appendix E for excerpts from this drainage report. 5. CONCLUSIONS ' 5.1 Compliance with Standards All computations that have been completed within this report are in compliance with the City of Fort Collins Storm Drainage Design Criteria Manual. 5.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans ' adequately provides for stormwater quantity and quality treatment of proposed impervious areas. Conveyance elements have been designed to pass required flows and ' to minimize future maintenance. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit will be required. 1 7 6. REFERENCES 1. City of Fort Collins, "Fort Collins Stormwater Criteria Manual Amendments to the Urban Drainage and Flood Control District Criteria Manual", adopted December 2011. 2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated June 2001, and Volume 3 dated November 2010. 3. Northern Engineering Services, Inc., "Final Drainage Report for Landings Office Park P.U.D.", dated October 27, 1995. 8 L�l I 1 1 1 1 1 1 APPENDIX A VICINITY MAP AND DRAINAGE PLAN A w a w 0 w J J O U OM LE DO BOARDWALK OFFICE BUILDING VICINITY MAP SCALE: 1 "=500' ,r I1 / I / I 1 1 1 I I I I 1 I 1 I I1 /11 1 APPRDp( LIMITS OF &AWWT� !I 24' WAOPLAST OUT �`� W/ STANDARD 0RATE� I , 1 ' I ' I ' I / I ' I ' / I ' i 1 ' I I f I • Ilk LAND/NGSBAYFOP TRACT 13, BLOCK 2 (UIXIM LRAwACE 'i"AAO ALYXSS EA"ENT) I A, ii _�; �LI `�rApl, OFF '�- ImaN T ODEi_ ss I I B Buxom TRAM AMT 1>.Tr 1 I aw D. Il—iJl 0.2e an I ' 1 I , PROPOSED D BUILDING 0.13 a FF=5055.35 I I 1 PERMORUS PAVE SYSTEM SIN l � D STEPS 7'C PRELIMINARY NOT FOR CONSTRUCTION PERIMETER: GRAN ROOF DRAINAGE TO THIS PPE I / it LAND/NGSOFF/CE PARKPUD 774.4CT9, BLOCK 1 (ACaSC UTWTY AWD DWAAVACE EASEW71(r) I II I_- r� ` 5- PERFORATED PALER l uwERDRAN To MET I SINGLE CURB MET I I I \ & I J L I \ I I \ tY fris R \ S -- 1 I STG3' SCOUR STOP � � ,1 I \ \ 1 I ` \\ \ DRAINAGE SUMMARY TABLE M.N. IbYA TdMla,, WRWp Area bdnW Gil" Cltaq klloj k(I"I .% gaNN ,IN Godow m g1aEKm IBIAIagI A A GAa 081 1a0 50 So 02 Oa 09 PERVIOUS PAVER SYSTEM B & 021 an age 50 50 a6 1D 25 PERVIOUS PAVER SYSTEM C C OW an 1.00 50 &0 a1 02 0.4 TOV ROOF DRAM SYSTEMTOPERVIODS PAVER SYSTEM D D 010 ate oat So so 01 02 04 FLOWS TO NK AND BOARDWALK - PART OF LANDINGS DI E E am O50 an 5.7 50 00 01 02 TO 2V ADS AREA INLET E ME O.tt OTa ON 50 5.0 Da 04 It TO r PERIMETER MAIN e B,C Oast an OW 50 5D DT I1 2R T01&-PPEANDTOPOIO 20 10 0 20 40 SCALE. 1"= 20' NOTES I. ANYp GEDCURB.GUTTERMOSIDEWALKE%ISTINGMR MCONSTRUCTION,AS LAS STREETS. SIOEWAI-NS. CURBS AND GUTTERS. DESTROYED. DA1 AGED OR REMOJEO DUE TO CONSTRUCTION OF TNIS PROJECT. SHALL BE REPLACED OR RESTORED TO CITY OF FORT COtI INEI STANDMOS AT THE DEVELOPER'S EXPENSE PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS MD/OR PRIOR TO ME ISSUANCE OF THE FIRST CE RDFICATE OF OCCUPANCY. LEGEND EXISTING MI NOR CONTOUR ,,,, G MAJORCONTOUR �w.awT PROPOSED MINOR CONTWR PROPOSED MANOR CON TOLIt PROPOSED DIRECTION OF WFIIAND FLOW N PROPOSED DRAUNAGE BASIN DMDE LNI7 A PROPOSEp DRAINAGE BASIN MINOR STORM RUNOFF COEFFICIENT DRAINAGE BARN MFA ACRES QDESIGN RNM UD Table SO%Or Slte Trevirriert bV LID Re rem rit Newlm IvinuSAma 16449 if Required %4ni u IMPINNIOUS Area to be Treated 8.225 sf Treabnent 41- PMiwS Pavers lBlRn Ai Treatlrlent el- kriperious Area Treated lRninA SL9 3,%B at of resttoentll- Run-on REM 3:1&ts. 3.0 Ttmttarnf0 Predmir Powen Rrinfl Treavitentl2-I MOus Area Treated Basing & C 11,632 f Tfeatorent R2- RIn-dn Ratio 3:1 Mail 3.2 TOW ARA-reated 15,ie0 if Aaual %of Impervious Area On Site Treated by UD g5 25%Porous Pavement Requiremem New Pavement Area m434 f Required Animum Area of Ptrviwo Pavement Area 0f PLMOvs Pavers Prodded 2,Epg 3 TBO if f Actual %al Perv�Oas Pavemt It P,Uviaed 36 a8H _0 r�e 3 m y If)N in O F DIAO O ON ZU It x 0 Ui d IL V �Zm W Z — d ¢ 12: 0 to X N LL 0- N O 13 J m W lL {L 0 J 3 0 m 5 (L W Z 9 13 CALL UTKITY NO7FICA71ON CENTER OF COLORADO 811 w 7 I� a ruI 2-BUSINESS DAIS N ADVANCE z Z Y GRATE. ID EXCAVATE BEFORE YOU DICMARKING FOR THE 4ARKING OF UNDERGRpap n I� I C D W m MEUBER UMIRES ra G W W a J w J = to o U U CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED: �yom.REOYS.! g�0WE' On ENGINEER DALE [Y�ATy' 90 CHECKED BY: WATER A WASTEWATER VR 1Y DATE P CHECKED BY: ..........~ STMURATER UTILITY' DATE YDNAL CHECKED BY: PARKS A RECREATION DATE PROJ. NO. 1326O69e0( CHECKED BY: 111 O ENGINEER DAIS C V CHECKED BY: [NNRDNIIENTAI 0..WIER DATE APPENDIX B HYDROLOGIC COMPUTATIONS 12 W J r M�M i � Q ' m M CO) W ' Q Z a ' wo >z WZ wz > J aLL Z) F- O¢ Y Era w a a� O¢ F wF-F-< z jjim�ma- wwwozo0 ¢¢?Z-¢�- ww¢¢ww0 »QY¢F- Z ¢ ¢ O LL ¢ w ¢ ¢ aWWOOo 00¢oiCO wwQQQQ Er � - a a F- LL Fwa-Q F- Fa 0 p m O Y m O ci N a O v O N m N O O N O u O o c o 0 0 0 N N U Q N O t0 O 7 O 7 O O O m O n O 0 o c Y o 0 0 0 0 0 0 O E O vi O ui O ui O N m ui O ui O ui c U o m o N m m n O m n n m N N n n U o o c o 0 0 0 y0 Y Q m O C N G O G G O G G Ci G Z � � b ¢ m U O w Q m F y C mp ¢ m U 0 w w m o n 11 d N a [� ) ) §§})00 o �f ;- };; ,� E§,;,r§■!§ ]§| §§ !§°°`!!°!! |§| §° °§!°��!°!! |! )§| §\§!!§|§|§ || 0) !§ \; Q } 0 C m N wo 0 r N N w N O N Z Z ❑ 0 w z Z W O O 0r r O ¢ ¢ N > a a Y Q ¢ w . 0 �3 3 F w a z a� y r z w w� m W� a > N N N❑ Z_ 0 00 < ¢ r < ¢ w w a > ><ZOM > m Y Q Ci<LLO w a a LL l N N O O o r Q a 0 0 r r >> 00m0 O Q w% LL' 00 a m w ¢LL w p rurrr 0 0 0 0 00 LL IJi J 0000cloo N N N N N VI N � o n 0 11 E - + Ti m ❑ W Q W Y N N = N O + 3 J LL SS 0 0 0 O CO? 0 0 N n 0 coo O m W 'Y'N 0 O N O Cl N N 0 N N N N V M 0 m N N b b b b b b O O Cm O O O O O O O O O O m O YiN VI O NNNhN O O O b 0 NN N w P O^ ^ m O O^ 0 w c Pn' Q J r N Y 10 N 0 0 Y - 0 o �N b of O O �ri NHNI'i O O b O vi O b N�'i O C F e J J ` Z. ai 0 b u�n N m J V Q p N C 00000000 W r g 4X A N m w W m ¢ m U❑ W OWL) Q O+ m N a C y_z Q m Q 0 0 Z w a Q m U❑ W W m m m j Q ❑ Iwo Z _O F Q N N H Z W w Z 00 a U m LL a0 ~ cW L P �o 0 N z z mo 0 O ¢ ¢ a O a a ¢ m Z Z m Z i w W Q a� W O a¢ >>¢Y¢�-ZYO Q a O LL a W a LL N m O O o Q a 0 0 H F 00¢ 00 O a W 6 wwo°o00 3H,m LL 4 f LL f oo33 F f LL LL 2 � O O O O O O O N O E 4 N O N N O N O OO m W= J 6t ♦O N N N m WON m 11 O N ^ O N N O N F J g O N u + 3 J LL`' J a E N h O O O N h O G� W N V N N N N N N [V N N N d [') N N N N U O1 N 10 f0 ID f0 10 f0 1D /O m C L x m c O o O O 0 o O O c o O O 0 0 O O 0 0 w O VI N O lV fV O O fV fV O N N fV O fV CJ FWOW -- -a3-2 a J f � E '= � h N N o 0 N N 0 o N N N o Cl N o N N l7 fi t 0 J 8�8N�W0^l;� O U .=o--000000 Q U 6 7 O J a W U m m 000000000 ^n ` p H O N O O (00 d m N O O O O O O O 10 Zw Q m a m U O W W U Iwo + Z Z N Z0 0 t a m U O W W m m m I R N G E U LL LL O E Z O 7 � N Y y W N a 0 c O = F=- UY W 2 O J LL Z O O Q U 2 W � o f � � Z z � Z Z cr 0 0 Q QQ WO 0 0¢ cc a cc IL w Y Y 0. OQ ~ >J >a> 3: go og FW-FN0I-ZOO a~i (n co`"o z o Oocn ¢¢?z-r ¢ zi w w¢¢ W w o¢¢ >> W Y H Z Y O w 0 U U U 0 0 a 0 0 7 7 F F x 00¢cnaCL C/)w ob i� L o o 0 0 0 0 0 a i r N u O - o 0 0 0 0 0 0 0 0 O r N_ O � 0 m E PIE m = o a U Q u o 0 0 0 0 o a o 0 i m m m m n m m uNi m c o 0 0 m o o- d U m n m N vdi n n n � U o 0 0 0 0 o a o 0 Q A o O V C O O O O O O LL 0 O C w Q m U O w♦ a S a U w 0 c o o a Q m U O W W m m m a 0 0 0 a c N C O U N 2m C m C LL LL Z 0 D O 2 to Q ! W IL in N 0 F O W C.) M r Q LL Z O O Q U w ❑ ❑ F m (n V) Z z cr ❑ LLI CL UO 0 OCc ¢ a ¢i way 03 3 �ujLU❑ ❑uj LLJU) w01-�00� yy>m�¢am> Cl) mm`o❑z❑0❑(n ccQ3z—¢Fz2 wwaaWw❑« >> Q Y¢ F z Y 0 as❑MQwa'N U m000cc F❑ S 00 F F 7 00¢34a 7 > > 6 .. o3� — m w w 0�000�� ¢ d LL F LL F F F LL LL J `g O^ x d O N C41, F O O O V d O > c E w c ¢ o 0 U U O 0 0 0 0 0 0 - n 6 n 6 n n 6 6 o n 6 e n o d d n a V L E O N O m O O N O O O U H 9, n {i n� O U c c c o c c d d a 6NB6"d 6066660,60 LL o E C W G 9.9 ¢ m U O W Q F w H N Q 0 c a n O a D 0 C7 c c N 0 O U N d N LL 0E Z 0 Y > W 0 a C 0 .__ cW U L J LL Q Z O 0 T F r Q U w 0 0 U) U) U C7 Z C7 Z LL C O w Z Z Q J Q LL LL LL UO 0 OC C a a w Y J Y J O Q Q ww�a Zz¢w y}>m�DEaO.mi COW oz000(n Ir(L Z Z - �F Z 2 u1 w Q Q w w 0 Q C LL Z O 0 0 0 LL Q2Q-,cn w LL a_ 0- c)u)00U) N »OF'QwLLrr x O_Ooccn_ a_ cn. Q 7 _ � <O � It- m a: w ccw w 0� 0 0 0�� ¢ LL LL F LL F- H H LL LL 0 0 0 "- O m N v v N m in o H ¢ N 0 ¢ o 0 U 0 Q _ t � m ai m ai m of m ai m ai m of m ai o ai m m V - E O vi O vi O vi O vi O vi O vi O vi IA �ri O vi '. U O b o O N o M 0 C'I 01010101 n n t0 Q O O O O O O O O O LL LL z W z = m '� ¢ n'I U ❑ ul ¢7 a ¢+ m O m F U ❑ + 0 m _o O a Q m U❑ W w ¢1 m m p � Q) a 0 L N 3 L L p � O LO pCZ L p U m 0 V N -0 C C (� U II 0 APPENDIX C HYDRAULIC CALCULATIONS C Interwest Consulting Group 1218 W. Ash, Suite C Windsor, CO 80550 Inlet Flow Calculation for Single Curb Inlet Project: Boardwalk Office Building Job Number: 1326-069-00 Calculations by: es Date : 2/6/2018 Objective: to find the number of grates required for area inlets in grassy areas WSEL Geometry at inlet: Grate Open Area and information: Square Feet Open (A): 1.8056 sf 35% F, OA includes Grate and Curb Opening. If overflow does Reduction Factor (F): 35% < occur with completely clogged condition, it will safely flow over the curb and into the swale. Grate Flow: DP B Use the orifice equation Q, = C*A*SQRT(2*g*H) to find the ideal inlet capacity.* 'See Hydraulic Design Handbook by McGraw-Hill for verificaiton of equation use and C value C = Orifice discharge coefficient= 0.67 A = Orifice area (ft) - open area of grate g = gravitational constant = 32.2 ft/s2 H = head on grate centroid, ponding depth (feet) Then multiply by the reduction factor for the allowable capacity. QG = Q * (1-F) O = 4 cfs Q 100 H = 0.5 ft A= 1.81 ft2 Q;= C*A`SQRT(2*g*H) 6.86 cfs Qc= Q*F = 4.46 cfs OK Pagel 4 TON P-52 SL ANCHORS FOR SETTING PLAN VIEW N. T. S. FRAME & GRATING NOT SHOWN GRATING (SEE DETAIL, THIS DRAWING) ER IS REQUIRED THE IS POURED WITH A -LAP" JOINT. ISOMETRIC VIEW N.T.S. O M SIZE, SHAPE AND J VARIES I I I SECTION A —A N.T.S. 4 TON P52 SL ANCHORS NOTES: 1. EAST JORDON IRON WORKS CURB INLET 7030 (OR EQUAL) TYPE M2 GRATE AND T1 BACK COMBINATION. OPEN AREA: 260 SO. IN. WEIGHT: 560 LBS 2. DESIGNED FOR AASHTO HS-20 LOADING 3. DESIGNED ACCORDING TO ASTM C857-87 AND ASTM C858-83 GRATING DETAIL N. T. S. LEGEND VA SECTION LINE A -A (ARROWS POINT IN DIRECTION SECTION IS VIEWED) .c of CITY OF FORT COLLINS UTILITIES —' ` C""`ins S P.O. BOXTORMWAT 80, FORT COL INS, ER CONSTRUCTIN CO. 80T 2I2 S (970) 221-6700 GRATING (SEE DETAIL, THIS DRAWING) M.A. STEPS 012" O.C. (NUMBER REQ'D VARIES WITH HEIGHT) SECTION B—B N. T. S. LIFTING NOTES: 1) 4 TON P-52 SL ANCHORS (8 REO'D) DESIGN NOTES: 1) DESIGN LOADINGS: A. AASHTO HS-20-44, W/ IMPACT B. SOIL WEIGHT = 120 PSF C. EQUIVALENT FLUID PRESSURE = 45 PCF D. 80 PSF LATERAL LIVE LOAD SURCHARGE 2) CONCRETE 28 DAY COMPRESSIVE STRENGTH SHALL BE 4500 PSI (MIN.) 3) STEEL REINFORCEMENT: A. REBAR, ASTM A-615 GRADE 60, MIN. OF 2" CLR. B. MESH, ASTM A-497 GRADE 80 4) CEMENT: ASTM C-150 SPECIFICATIONS SINGLE CURB INLET DRAWN BY: T. COX DATE DRAWN: 3/3/05 CAD FILE NAME: D43.d DETAIL D-43 Inlet Flow Calculation for Area Inlet (24" ADS Inlet) Project: Boardwalk Office Building Job Number: 1326-069-00 Calculations by : es Date : 12/12/2017 Objective: to find the number of grates required for area inlets in grassy areas WSEL Geometry at inlet Grate Open Area and information: Square Feet Open (A): 1.145 sf Reduction Factor (F): 50% Grate Flow: ' DP E Interwest Consulting Group 1218 W. Ash, Suite C Windsor, CO 80550 Use the orifice equation Oi = C'A'SQRT(2'g'H) to find the ideal inlet capacity.' 'See Hydraulic Design Handbook by McGraw-Hill for verificaiton of equation use and C value C = Orifice discharge coefficient= 0.67 A = Orifice area (ft2) - open area of grate g = gravitational constant = 32.2 ft/sz H = head on grate centroid, ponding depth (feet) Then multiply by the reduction factor for the allowable capacity. QG = QI * (1-F) Q = 0.2 cfs 0100 H = 0.1 ft A= 1.15 ftz Q; = C'A'SQRT(2'g'H) 1.95 cfs QG = Qi ' F 0.97 cfs OK Pagel W J Z m U W J F- W J H E E 7 N d 1 C O II la 1. 3 n n V n n �p n V II II II II II II I I F n W n n a �J II p •• a II J� O II d iV 'O a-H.di w Ni x u Q H m ro W (7Z H 3 m u (d ro El)u d C 3 z �C o d d d U a b N W n w w rn ' II 01 O1 n I A C o 7 3 O V] II o N W U z o w w w II 1-I H H H U 11 GA A A d A A A a ' II y A A A U i 1 O O d O O 4J V A w i o 0 a b i cc d ro 00 V d V L ii W 1 0 0 a Ell 1 >, 00 u d C I o 0 j -Q a u w faEwv U w I w 1 00 0 o 0 I -I 3 ro M O m l O o u ro + w I O W U 1 E I [Q 1 1 0 0 d 00 1 U U O W 1 O S1 U I F d W 4 C I H 1 i d W r-I R?•I 1Ci F CO w 00 00 H H 41 H H ro ro W W A A U U .i ..{ H f-I v v C C 0 0 4J a d v c � H H U u .H -H >4 L4 d d C C Cd7 Cd7 1 r w r o 1 u ro I N m o m 1 d ?+ I m m o 0 1 ;3 T3 4J V roromwl I }4 j4 9 " I >p o x ca I � N frotl 14 i wwfonM 4J� ro�4 > I I I � i I m If1 N N i ro U\ N M M M I i4 O 11 U I N N N r r d r W -H 4J I s>' m m r 0 >v 0ro0-- eommo� ro ro 11 I w w w N N --- — -- -- i La S+ d w I ro C9 C E 0 0 0 o -.a I rl d 3^ I H H H ro 4J. O N I I 4.1 N rl W I d' H H H I ---------- O ?I a U 1 E W I 1 U I I -H i~. 1 C m 0 m 0 ,C 1 00 0 0 1 f6 f0 d 11 I v v fn N N 4l .-. I r m m H I P it C w I a I — — -- --- -- 1 C 1 O N N M 0 o 1 O m mH N I ro ro ro ro � b O d I '-I In N In N In v rt I U U U U I O> w I U .Li I it F4 it it 1 }4 d I vm UI 1 pH N I U U U U I W 1 oo000 d 3 I o o ,-I H .-I d U U U 1 N I ro i4JO M 4J L N .'I I H ('. C N ri W I C d' rl H HU •ri •.iI -.i -H H 0 a U I (v E/IN E- ) fq H m m m I -- -- i I i i E N I ri H 'i ri i i W C 7 H N 4, v o A W O aJ 4 H H z v I I d I N I/CJy mH I I ro I U H [E1] ---- ---- a Ew00z W aWEf)H d I a jj I H N M C 1 1� z c e c Z ftl I I I I I I I H N N I.j I ---- , a a a a 1 I I ---------- N Q m H H N d d c c W 0 a` / \\ k\ � IV — \jƒ m - e r §§ $ % \2 _ / 7{{�CD = j --- \_ ._�\72\$\ 0. LO cl k �E¥ ) ) f }§�=G 25t/// $ —2/��. , j72%/\ / / § 3 CLo . f2 � df O 0; _ 7 •! k! /\/\\§ ƒ �\ j//§\\ � {q$ \ / . _ \CN CN /§E / _$ �\ § ` o 3$\$\LO aEm §} / $ £«3 u/wo m k \\E ' uEm @ L { \k/ LO kE: k uE$ ; j0 k\\ k) �k! ® 6fR rxo Worksheet for V SW Chase Project Description Flow Element: Rectangular Channel Friction Method: Manning Formula Solve For: Discharge Input Data Roughness Coefficient: 0.013 Channel Slope: 0.02000 ft/ft Normal Depth: 0.50 ft Bottom Width: 1.00 ft Results Discharge: F 3.21 Capacity of one ft3/S Flow Area: 0.50 chase ft' Wetted Perimeter: 2.00 ft Top Width: 1.00 ft Critical Depth: 0.68 ft Critical Slope: 0.00882 ft/ft Velocity: 6.41 ft/s Velocity Head: 0.64 ft Specific Energy: 1.14 ft Froude Number: 1.60 Flow Type: Supercritical GVF Input Data Downstream Depth: 0.00 ft Length: 0.00 ft Number Of Steps: 0 GVF Output Data Upstream Depth: 0.00 ft Profile Description: N/A Profile Headloss: 0.00 ft Downstream Velocity: 0.00 ft/s Upstream Velocity: 0.00 ft/s Normal Depth: 0.50 ft Critical Depth: 0.68 ft Channel Slope: 0.02000 ft/ft Critical Slope: 0.00882 ft/ft Cross Section for V SW Chase Project Description Flow Element: Rectangular Channel Friction Method: Manning Formula Solve For: Discharge Section Data Roughness Coefficient: 0.013 Channel Slope: 0.02000 ft/ft Normal Depth: 0.50 ft Bottom Width: 1.00 ft Discharge: 3.21 ft3/s 0.50 R —1.00 n V. 2 L H: 1 I 0ww1011/:1611 WATER QUALITY AND LID INFORMATION 1 0 ' Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Project Name: Boardwalk Office Building ' Project Number: 1326-069-00 Company: INTERW EST CONSULTING GROUP Designer: ES Date: 10/17/2017 1. Basin Storage Volume ' A) Tributary Area's Imperviousness Ratio (i=la/100) B) Contributing Watershed Area (Area) C) Water Quality Capture Volume (WOCV) (WOCV=1.0-(0.91'i3-1.19'i2+0.78i)) ' D) Design Volume: Vol = WOCV/12' Area' 1.2 la = 58 % i = 0.58 A = 0.55 acres WQCV = 0.229636 watershed inches Vol. = 0.013 ac-ft LID Table 50% On -Site Treatment by LID Requirement New Impervious Area 16,449 sf Required Minimum Impervious Area to be Treated 8,225 sf Treatment #1- Pervious Pavers (Basin A) 989 sf Treatment #1- Impervious Area Treated (Basin A) 3,928 sf Treatment #1- Run-on Ratio (3:1 Max) 3.0 Treatment #2 - Pervious Pavers (Basin B) 2,801 sf Treatment #2 - Impervious Area Treated (Basin B & C) 11,632 sf Treatment #2 - Run-on Ratio (3:1 Max) 3.2 Total Area Treated 15,560 sf Actual % of Impervious Area On -Site Treated by LID 95 % 25% Porous Pavement Requirement New Pavement Area 10,434 sf Required Minimum Area of Pervious Pavement 2,609 sf Area of Pervious Pavers Provided 3,790 sf Actual % of Pervious Pavement Provided 36 % APPENDIX E EXCERPTS FROM REFERENCE REPORTS E r Aft d"NOMPANE 3 Hydrologic Soil Group—Larimer County Area, Colorado 3 (Boardwalk Office Building) 40° 31'5FN 40- 3157 N 493710 493M AIMM 493740 49i7575D 3 H Map Scale: 1:458 E printed on A pm0at (8.5' x 11') sheet N Metes 0 5 10 20 30 Feet 0 27 40 80 120 Map pigemon: web Monitor Comer madmites: WCSB4 Edge tics: UfM Zore 13N WGS84 usDAA Natural Resources Web Soil Survey 211111111111 Conservation Service National Cooperative Soil Survey 0 40° 33'SB'N 40- 31' S4 N 49'. M 4MM 3 P V 8/17/2017 Page 1 of 4 Hydrologic Soil Group—Laflmer County Area. Colorado (Boardwalk Office Building) MAP LEGEND Ana of keanat (AOR Area of Interest(AO1) sods Soil Rating Polygons O A Q AID B Q BID o D 0 Cm Q D Q Not rated or not available Sol] Rating Lines . e A N AID N B BID M C N CID . i D . . Not rated or not avadab]e Soil Rating Points O A � aD � B BD I,aA Natural Resources -01111111 Conservation Service C ® C/o 13 D o Not rated or not available Water Features Streams and Canals Transportation iyy Rails ti Interstate Highways US Routes Major Roads Local Roads Background 0 Aerial Photography Web Soil Survey National Cooperative Soil Survey MAP INFORMATION The soil surveys that compose your AOI were mapped at 1:24,0D0. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used If more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS centfied data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 11, Sep 23, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Cate(s) aerial images were photographed: Mar 20, 2015-0ct 15, 2016 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shilling of map unit boundaries may be evident. 8/17/2017 Page 2 of 4 ' Hydrologic Soil Group—Larimer County Area, Colorado Boardwalk Office Building Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit— Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 106 Tassel sandy loam, 3 to 25 percent slopes D 0.6 100.0% Totals for Area of Interest 0.6 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method. Dominant Condition Component Percent Cutoff: None Specified Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 8/17/2017 Page 3 of 4 Hydrologic Soil Group—Larimer County Area, Colorado Boardwalk Office Building Tie -break Rule: Higher LISDn Natural Resources q— � Conservation Service Web Soil Survey National Cooperative Soil Survey sn nzui i Page 4 of 4 u Final ApprolOd ! r�::.l1.1%� Final Drainage Report for Landings Office Park P.U.D. City of Fort Collins, Colorado October 27, 1995 Prepared For: Lagunitas Company Prepared By: Northern Engineering Services, Inc: 420 South Howes, Suite 202 Fort Collins, Colorado 80521 (970)221-4158 Fax (970)221-4159 Project Number. 9516.00 Fourth Final Submittal ,an'd BIN10.1 H04H qIi a , tri DEVELOPED DRAINAGE LANDINGS OFFICE PARK P.U.D., Fort Collins, CO. File Number: DSNPNTD5.WQ1 15-Mac-95 Ca1cs Bv: MBW DESIGN POINT D5: (Includes Basin 135) TOTAL AREA = A (ac)= 0.45 RUNOFF COEFFICIENTS: (From Table 3-3) Area of Roofs (ac)= 0.1720 C for Roofs = 0.95 Area of Concrete & Asphah(ac)= 0.1610 C for Concrete = 0.95 Area of Gravel Parking (ac)= 0.0000 C for Gravel = 0.50 Area of Lawn (ac)= 0.1170 C for Lawn = 0.25 COMPOSITE RUNOFF COEFFICIENT: C = 0.95(0.172+0.161ac)+0.25(0.117) = 0.77 0.45 Cf = 1.00 (Frequency Adjustment Factor; Storm Return Period of 2 & I0 - Years) Cf = 1.25 (Frequency Adjustment Factor. Storm Return Period of 100- Years) OVERLAND FLOW: (Across Parking Lot) Total Overland flow length = 131' TZ& T10 1.87 (1.1 - CCf) SQRT(L) = 2.0 min L (ft)= 131 CUBRT(S) S (%) = 54.0 - 48.84 = 3.94 T100 = 1.97 (1.1 - CCf) SORT(L) = 1.4 min 131 CUBRT(S) C = 0.95 GUTTER FLOW: L (ft)= 19 S (30) = 48 84 - 4&54 = 19 V(fps) = 2-50 SWALE FLOW: (From L (fl)= u17 S(°k)= 48.54-42.0= ]07 V(fps) = 3.70 2 & 10 -YEAR TIME OF CONCENTRATION: _ 100-YEAR TIME OF CONCENTRATION; Tc100 = RAINFALL INTENSITY: FROM FIGURE 3-1: i2(in/hr)= QI0(cfs) = CCf x i2 x A= 20 Q2(cfs) = CCf x i2 x A = 1.1 Q100(cfs)= CCf xil00xA= 3.9 Tt = L = 0.1 1.58 60(V) (From Figure 3-2) TI = L = 0.5 min 6.11 60(V) (From Figure 3-2) 2.6 min (Use 5-minutc minimum) 2.0 min (Use 5-minutc minimum) 3.29 i100(in/hr)= 9.0 i10(in/hr)= 5.7 l' DEVELOPED DRAINAGE LANDINGS OFFICE PARK P.U.D., Fort Collins, CO. File Number: DSNPNTD7.WQ1 DESIGN POINT 137: (Includes Basin TOTAL AREA = A (ac)= 0.185 Area of Roofs (ac)= 0.0000 Area of Concrete & Asphalt(ac) 0.1310 Area of Gravel Parlang (ac)= 0.0000 Area of Lawn (ac)= 0.0540 COMPOSITE RUNOFF COEFFICIENT: RUNOFF COEFFICIENTS: (From Table C for Roofs = 0.95 C for Concrete = 0.95 C for Gravel = 0.50 C for Lawn = 0.25 C = 0.95(0.131ac)+0.25(0.054) = 0.75 0.185 Cf = 1.00 (Frequency Adjustment Factor; Storm Return Period of 2- Years) Cf = 1.25 (Frequency Adjustment Factor-, Storm Return Period of 100- Years) OVERLAND FLOW: Calcs Bv: MBW Total Overland flow length = 13.5' 72 = 1.87 (1.1 - CC() SORT(L) = 4.6 min L (ft)= 13.5 CUBRT(S) S (%) = 54.57 - 54-3 = 2.00 TI00 = 1.87 (1.1 - CCf) SORT(L) = 4.3 min 13.5 CUBRT(S) C = 0.25 OVERLAND FLOW: Total Overland flow length = 104' L (ft)= 104 S (%) = 54.3 - 49.3 = 104 C = 0.95 RAINFALL INTENSITY: FROM FIGURE 3-1: U(inft)= 3.00 02(cfs) = CCf x i2 z A nO4Q100(cfs)=CCfxi]OOzA T2 = 1.97 (I.1 - CCf) SQRT(L) = 1.7 min CUBRT(S) 4.81 T100 = 1.87 (L1 - CCf) SQRT(L) = 1.1 min CUBRT(S) i100(inRtr)- 9.00