Loading...
HomeMy WebLinkAboutDrainage Reports - 06/19/1985FINAL DRAINAGE REPORT HORSETOOTH ROAD AND LEMAY AVENUE ROADWAY IMPROVEMENTS ARIX, Engineers, Architects By James N. George, P.E. June 19, 1985 Drainage Analysis - South Lemay Near Ticonderoga The purpose of this drainage report is to determine the design flows along the north side of the Golden Meadows II Subdivision. It is necessary to determine this drainage to properly size and position storm drainage improve- ments to be implemented by the Lemay Avenue Roadway Project. Drainage reports on file at the Public Works Department, City of Fort Collins, show that detention is provided for the majority of development -1- bordering Lemay Avenue. The Landings' drains primarily toward the. Harmony Reservoir located west of South Lemay. 'Golden Meadows' drains easterly toward a detention basin constructed north of Harmony near the Union Pacific Railroad. There are four remaining drainage areas that will contribute runoff to the proposed drainage channel located north of Golden Meadows II. 1. South Lemay Avenue _ The existing roadway on South Lemay drains from Wheaton Drive down to the northwest corner of Golden Meadows II. The length of the sub -basin is 2,000'±. Assume a width of 200'± to account for incidental.runoff adjacent to the curb. Refer to -calculation sheets. 2. Harbor Walk Subdivision — Q2 (Developed) = 1.8 cfs Q100 (Developed) = 7.5 cfs Source: Storm Drainage Report, Exhibit "B" January 22, 1985 Taranto, Stanton & Tagge 3. South Lemay Avenue - The proposed roadway improvements will drain southerly from a point 1,000' north of Golden Meadows. Assume a width of 100' to account for incidental drainage. Refer to calculations sheets. 4. Ronald Bockman property — The remaining seven acre parcel drains from west to east.and will require some detention facility if developed. Detention for this parcel is not.addressed in this report and would require future consideration by the developer. Currently, runoff is very .near the historic rate. -2- Two inlets.are provided to accommodate the flows shown concentrating at the northwest.corner of Golden Meadows II. This flow will be carried in earthen channels along the south edge of the Collindale Golf Course. A crossing of the Warren Lake Ditch will be accomplished via an 18" steel pipe. The flow will then enter the Golden Meadows drainage system via an'18" R.C.P. into an inlet. The discharge.from.the A nlet is an existing 15" R.C.P. The earthen channel capacity is 32 CFS at 4 ft/sec. (Source: Design charts for Open -Channel Flow, Dept. of Commerce, Chart 17). Since the ditch is 1,400.±/long, the minimum delay is 6 minutes before the water enters the Golden Meadows system at the north end of Sherman CowEt. The total delay is: 21 (from hydrograph) + 6 = 27 minutes. The lag time should allow the'peak flow from the subdivision to pass out the Golden Meadows subdivision. We have contacted M&I to determine: the hydrologic characteristics of Golden Meadows. Their personnel that analyzed the subdivision are no longer with the firm - they suggested that I research City records. The report on file with the City did not have a hydrograph or detention analysis included since an existing basin was used. Due to the significant lag time and the minimal flows involved, it is assumed that the existing basin will handle the additional flows. -3- C� 0 CUEm'r Joe NO, PROJECT LA CALCUTIONSFOO ARIX MADE py�) r VI.DATE -4/2-'lT'—(A-,iHECKEO BY DATE— SHEET or ---TTT Ir Lj . ... . ..... t c- OIL 11:5, 04. lo ;' I + 4— ... I. ........ . ...... . . . . ........... .... (f TV A .. .... ... ... _j .. ........ . ....... ....... I . .... ....... . ►Hull ' ARIX • • CLIENT JOB NO. PROJECT CALCULATIONS FOR MADE BY DATE CHECKED BY DATE SHEET OF I -' ir'.'r�, •' U !�/1 ('• "•• �•�'...:: i •:1 t .� ��lI,i I)r. i i -- l - I 4 jI I - --=-- -I- - - I I gyp. 1 -- 1 • � .'y ._, i ( i ..... L �._.- -. 1 I_. - -- -- 1 i -r- -i- - .-- t I - i-1 I �_ 14 0 CV M CLIENT JOB NO. PROJECT CALCULATIONS FOR MADE 8V-',jjAq OArE ECKED 9* oAre_ smEET- OF T- 7 e:L ol ...... n- I e.lZ V U5� 1-1-tt-.�-T! 1 tztoe- e eL4 6a�tf-?o .-L, I r) Drainage Analysis - South Lemay & Horsetooth Analyze flows at intersection of South Lemay & Horsetooth Reference: Foothills Basin Drainage Master Plan (1981) by.Resou me Consultants, Inc. Basin. Characteristics: Flow is received. from 3 potential sources (refer to p. 5, ref.) - overland flow from the southwest and Warren Park - concentrated flow from the south and the Warren Lake spillway - concentrated.flow from the southwest and subdivision west of Warren Lake. Computed Peak'Flows: intersection S. Lemay & Horsetooth Existing Q2 - 25 CFS Q10 - 75 Q25 - 110 Q50 - 140 Q100 -160' j Recommendations (p..27 ref..): Fully Developed (P.29 ref.) 26 CFS 72 100 120 160 Install two - 36" culverts from southwest quandrant of intersection to north side of Horsetooth. Check: Using Department of Commerce Capacity Charts for Hydraulic Design of Highway Culverts, p.10-39 Assume: inlet control, groove edge entrance w/4' H.W.D. capacity - 55 cfs ea. pipe combined capacity of 2 pipes could handle Q50 fully developed storm and allow overtopping on more intense storms. -1- Installation: - Southeast and southwest corners of Horsetooth and South Lemay: Future inlets could possibly service 2000' of Lemay, south of the intersection, in addition to flows from 1500' west and 500' east of Horsetooth. Q = CIA C. = 0.9 I = 3 in/hr -.5 year design storm ( )c = 2000' @ 2 ft/sec = 16 min) A = (2000 + 1500 + 500) x (60) 43560 = 5.5 acres Q=0.9x3x5.5=15CFS * Install 10' wide inlet at each corner using criteria from Storm Drainage Design Criteria City of Fort Collins Fig. 6 - 11 * Add,4' wide at Horsetooth Road side of southwest quadrant to protect pedestrians from nuisance flows beginning 1500 ' to the west. . - Overtopping the inlets would pass flows into Warren Park oe the Collindale Golf.Course. The minor flooding in either area would be inconsequential.