HomeMy WebLinkAboutDrainage Reports - 03/23/2006 (2)Sinai Approved Report a �� :i� Date 3 �231 bC FOIL? Co '�rnrrP 90% DESIGN DRAINAGE STATEMENT FOR LEMAY AVENUE WIDENING (2006) Prepared for: CITY OF FORT COLLINS 281 North College Avenue Fort Collins, Colorado Prepared by: North Star Design 700 Automation Drive, Unit I Windsor, Colorado 80550 (970)686-6939 January 30, 2006 NSD Job Number 203-24 � I North Star ,Al`. design, inc. January 30, 2006 ' Mr. Basil Hamdan City of Fort Collins Stormwater Utility ' 700 Wood Street Fort Collins, Colorado 80522-0580 RE: 90% Design Drainage Letter for Lemay Avenue Widening (2006) Dear Basil, ' Please accept this letter as the 90% Drainage Design Statement for the above project. Attached are all of the drainage calculations for the project as well as your redlines from ' the 50% review. Attached to this letter are four appendices.- * Appendix A — Vicinity Map ' • Appendix B — Project Hydrology • Appendix C — Inlet and Street Capacity Hydraulics • Appendix D — Drainage Plan This project is going to widen Lemay Avenue between Carpenter Road and Nassau Way (1/2 mile). Curb will be added to the east side of the street; the west side will remain unchanged. Lemay Avenue between Carpenter Road and Trilby Road has one major sump (500' ' north of Carpenter Road), and one major ridge (1,900' north of Carpenter Road). There is an inlet at the sump and also inlets at the intersection of Lemay Avenue and Nassau Way. A new intersection (Mountain Home Drive) will be installed at the ridge. All ' water from this stretch of Lemay Avenue drains to Stanton Creek. Lemay Avenue is bounded on the west by Provincetowne PUD and on the east by Emerson Acres, the future Lemay Estates, and Stanton Creek Subdivision. The existing road (constructed in 1985), Provincetowne Filing 1 and 2, Emerson Acres, ' and Stanton Creek were all designed and built when Stanton Creek was a "free release" basin (no detention was required). Because of this, there is presently no detention provided for any of Lemay Avenue and there is no logical place to provide any detention at this time (this project will just widen the existing street with no reasonable opportunity to change the drainage scheme). The project has been divided into six basins for analysis.. Basins 1, 2, and 3 have no appreciable change from existing conditions. Basins 4, 5, and 6 include the areas that will be widened with the project. 700 Automation Drive, Unit I Windsor, Colorado 80550 970-686-6939 Phone 0 970-686-1 188 Fax ' Basin 1 — includes the west half of Lemay north of the ridge (Mountain Home Drive). This basin does not change substantially from existing conditions. It drains to the north to the inlets and storm sewer at Nassau Way. Basin 2 — includes the west half of Lemay south of the right. This basin drains south to ' the existing 10' Type R inlet at the sump. Again, the drainage does not change substantially, there is drainage from the west the flows into the street and has been ' accounted for in the calculations. The street capacity has been checked in this area — the center lane is free from water during the 100-year storm and the existing inlet can take the 100-year storm without topping the new crown of the street. ' Basin 3 — includes the west half of Lemay south of the sump. Carpenter Road will be widened and slightly more flow will result, to the sump. As shown for Basin 2, street ' capacity and the existing inlet capacity are acceptable. Basin 4 — includes the west half of Lemay north of Mountain Home Drive. This portion of Lemay will drain north to the inlets at Nassau Way. Basin 5 — includes the east half of Lemay between Mountain Home Drive and the sump. ' The south portion of this site (adjacent to Emerson Acres) will only have curb and gutter installed at this time. The addition of sidewalk will likely wait for the redevelopment of the existing lots. A 10' Type R inlet is proposed at the sump and it has adequate capacity for the improvements. The existing pipes in the sump will be extended to the new toe of slope and the existing riprap will be moved down the existing channel. There are no off site flows to the street in this area as the land to the east all drains directly to Stanton ' Creek. This section of street easily meets the minor street capacity and the calculations show that it will also easily meet the major storm street capacity once sidewalk is installed on the east side of the street. Basin 6 — includes the east half of Lemay south of the sump. This is a very small area that drains in the new curb and gutter to the north and into the new inlet at the sump. ' I appreciate your time in reviewing this information and the 90% plans. It is our intent to review the Erosion Control Plan with Bob Zakely directly and not provide erosion control ' design calculations in the final report (similar to what was done on the Timberline Project). Please call me if you have any questions or need any additional information. ' Sincerely, North Star Design, Inc. i---- - P"'J( Michael Oberlander, P.E., L.S.I. Appendix A — Vicinity Map PROJECT LOCATION VICINITY MAP SCALE: 1" = 1.000' ' Appendix B — Project Hydrology 1 § _ 2 LU $ / / /§ 6k /\ ) � �t \ ° )k S ( $ �E \ § a E \Jg) )§ (§32 !I o g tE = \ )c \\( -SR.. rr )#)( §§ 528E ƒ) a ¥ 0 ` 0)0) ƒ )( �\ £ 0+e \§§f§§ /f ƒ0 LU \/k \\((/° \§ 5 )(( 0__,__ }$\ ___\__ 0_ §aF EEl== +mow&; :; )$a //k \}/\\\ }} j$\ \/\}o \4 0 s < =6 )\cl \ ( e m 0 0 { ()/j �{\k \ �0 ¥�o< < )\ 0 \ \ w 2 / ) Q W } O r N � w Z 20 O F LL O � F O Z z W U u~i Z O U U. O W 2 H O O O O O O 00 0 Y Q W K m m O m N O m M J M N m O O N N O LL OMMMMO M M O _ C a C2 _ E m 0 Y N N r 0 0 0 N n o W Z ¢ J N O O O M m m m m N M M i0 O M N M _ m 6 u 7 m m O m N m m M �� .".. U ♦ M N O O O Q N O m T M P M 0 C o M E r m v In m th m m LL J `' N N N N 2 U m m m m m m m m m O c L c c m o 0 0 0 0 0 0 0 c m o o 0 0 0 0 0 o 0 W � ~ Q O O O N O O N '- � W t om v0i 0m0 m 00 J L m N m m N P N J Z N W C .-. 10 Q Q N N � Q - E 0 o O o 0 0 0 0 d N N N N (V N N N L P N M P P N P � C Q 0 z a, 0 0 0 0 0 0 O O W 0-() n J ¢ W F � z_ f, ry (O r o Q Q Q m Z m QM m N N m z Z F C7 mf NO �rvMQv�m w a N C e C J U U / U z z O n w c ¢ « (J U w C U M c w U Q 6 LL } O r N ' LL Z w 0 K F- og � F a Z 0 W Q U Z H O U IL 0 cW G F D 0 0 0 0 0 0 Y Q f W 0.' Q V C Q _ E — IY o m m m m o In m o vin v vnci rn i w m E U W V �2m N f0 m •- N O n N U t mminmvm m e 3 r m n m m v m m O n E� rya vrmci moi IJL W Q U rn mo�nm min rom 0 O L c o' 'o o o 0 0 o o 0 0 o o 0 0 0 00 0 m w W � H O O O O N O O N N of lD O t0 tO O t0 (O O O � N W = o o o o o o 00 J L a0 N f0 W N< N N Z J F r N V N m m N m C� < m C) 0 0 t7 O 0.00000 a o doF O IU N N N N N N N N N r O O O N n O V N t7 m Q Q N O a C < 0 .r J N 0 o A 0 0 (r0 O Ij o 0 0 0 � 0 � U 5 W O N l0 n c0 ONi N ON 'o 000000 00 J « U Q W �f 2 F e m N o m m o m N ro n o v v m 0 O Q N N Q " z m m + N N m Z N — N m V N N 00 Q Q 0' Iwo O N Z L_s U > Y IL O N � i0 L U O � C N w m E C N j � a c e E E Ln O J C > `o E U E U E z c 0 E cq W 11 D u C7 ° V n u 10 w W O U O LL LL O 21 Ma W Y } a N W a O LU cW C J a Z O H w 0 0 0 0 0 0 00 rn Y K Q W Q: 0 m n J F a a H a U LU W 0 > C E rn c Q,-oa U � mn Icil 0 O N N N N N N N N C m m O m IA O m Ci O 'E m N m O O N N O U nvcmmin om v vl in n m m vl m U o 0 o c o 0 0 0 U V m N Q Cl m O m Q O N m n O O Q CO p n � LL 0 C Z p L d N h U K C m c — N t7 O N m 00 p a 0 z 7 U LL U E w O C Vl m a)N L U E C C 0 -0 r m c U O N m Q U O a N 'C rn — m c N O O' 2 ,C o & m C m C Co a U K N II 11 II 11 CJ U I m m U Q m Q m iL U `o U � m I I C3 A a N c H 0 Z N a N O LL m F II U IZ � 0 N z d d zz¢ p r Up O O 0 0 0 0 0 0 co N Y K Q LU W K 0 O^ N V) O fp O n g M M d 0 H � N U d > E m ° v cr a a o U 0 N N O fD O n g M M `u M N M co O N w m d t m o M m m n o co _ M Nmrn co M. C V1 t0 O m N O N M u 'E M N m 0 0 uj N O n V V IO N v co U vNv>n com cq N W U 0 0 0 0 0 0 .0.0. V N N v M O o m Q N tp n O V V < W Q � LL O o > ` 7 N 9 M � d N N U N W o: 0 C C N V) 00 o a Z U LL oC U C O w C m N N C N 7 v O O N N cu U N C d M 0 C Q N O U C N � Y O A N C rn aC C N gym`• II II II II m N Q 9 LL U c 0 U N II d � � C N C W O Z O_ 0 x 3 w U LL w W Z LL LL O� Z w } Y ' W o w a 0 O 2 w Cw G J Q Z O ' Q O 0 N W b O N to Q C N i1cL-� N o O .W.I ON LC II U E O N z a F U � L UO O o ¢ .aa.U❑ 0 0 0 0 0 cc 0 0 0 0 o g 00 0 0 0 0 0 o d 0 N Y C Q LU w K 0 p w Q n O) N N Q O N 0 o I- O N `u K o LU 0 O Y E rn c W O N O a ` o a U d o ry Qom m ry m cF_ �rni acn of nn C N t0 OI E N O � N u E N r Ol m VI m n n N 010 n o U Nf0(Omoo ro0 U 0 0 0 0 T 0 Q W N Q f�1 co O m Q N tD I� O Q Q Q ep N LL 0 z Q N N N � U w 0 Q 0 NMVOW 00 a O O b Appendix C — Inlet and Street Hydraulics IF ..... ... . .. ....... - . ..... .INLET OR SAO. LOCATION. ....... .... .. .... . . ... . Project .. ........ �....vLEMAY.n0v .... ... . . . .. ......... . EXISTING . .. ....... .... .. Inlet ID FXIS.-MG IV. INLET Witst... Waning � 'I , Lo (C)I H-Curb H-Vert c, LolGl Design Information (input) Type of Inlet Type = cbOT:Type R Curb Opening, Local Depression (in addition to gutter depression'a'from'Q-Allow) aw,6 : -3.00 inches Number of Unit Inlets (Grate or Curb Opening) No 2 Grate Information Length of a Unit Grate L, (G) :N/A: feet Width of a Unit Grate W N/A feet Area Opening R ado for a Grate (typical values 0. 15-0.90) Ag. N/A' Clogging Factor for a Single Grate (typical value 0.50) Cf (G) N/A' Grate Weir Coefficient (typical value 3.00) C„ (G) NIA Grate Orifice Coefficient (typical value 0.67) C, (G) WA Curb Opening Information Length of a Unit Curb Opening L, (C) .5.00 feet Height of Vertical Curb Opening in Inches H.d = 1 6:00 inches. Height of Curb Orifice Throat in Inches H,.j - :::5:96 inches Angle of Throat (see USDCM Figure ST-5) Theta 63-4 degrees Side Width for Depression Pan (typically the gutter width of 2 feet) W, 400 feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cf (C) 0 10 Curb Opening Weir Coefficient (typical value 2.30-3.00) (C) .2 30. Curb Opening Orifice Coefficient (typical value 0.67) C, (C) 67 Resulting Gutter Flow Depth for Grate Inlet Capacity in a Sump Clogging Coefficient for Multiple Units Coef Clogging Factor for Multiple Units Clog As a Weir Flow Depth at Local Depression without Clogging (0 cfs grate, 21.5 cfs curb) cl� WA. inches Flow Depth at Local Depression with Clogging (0 cfs grate, 21.5 cfs curb) d. NIA inches s an Orifice Flow Depth at Local Depression without Clogging (0 cfs grate, 21.5 cfs curb) cl inches Flow Depth at Local Depression with Clogging (0 cfs grate, 21.5 cfs curb) cl„ WA inches Resulting Gutter Flow Depth Outside of Local Depression inches Resulting Gutter Flow Depth for Curb Opening Inlet Capacity in a Sump Clogging Coefficient for Multiple Units Coef = 12 56 Clogging Factor for Multiple Units Clog = Curb as a Weir, Grate as an Orifice Flow Depth at Local Depression without Clogging (0 cfs grate, 21.5 cfs curb) d 9i4i inches Flow Depth at Local Depression with Clogging (0 cfs grate, 21.5 cfs curb) cl.� 9 6 inches 'Curb as an Orifice, Grate as an Orifice Flow Depth at Local Depression without Clogging (0 cfs grate, 21 .5 cfs curb), cl� �:i: .i� 11.4; inches Flow Depth at Local Depression with Clogging (0 cfs grate, 21.5 cfs curb) cl 1.15 inches. Resulting Gutter Flow Depth Outside of Local Depression n ches Resultant Street Condition Total Inlet Length - L feet Total Inlet Interception Capacity (Design Discharge from Q-Peak) 0. :21;5: cfs Resultant Gutter Flow Depth (based on sheet Q-Allow geometry) d 6.5 inches Resultant Street Flow Spread (based on sheet Q-Allow geometry) T feet Resultant Flow Depth at Maximum Allowable Spread dSPREAD inches Waming 5: Outter flow depth isgrtattn than the 6 inches allowed for the MINOR STORM (set shett'2-Allov;'; INLETS.xis, Inlet In Sump 01130/2006, 7:24 AM INLET IN A: SUMPOR SAG LOCATIONsq Project Inlet ID ,F—Lo (C) I �ASi+�S 5-�-4 Design Information llngutl Type of Inlet Type CDOT Type R Curb Opening Local Depression (in addition to gutter depression'a' from'D-AIIoW) a„ a 3.00inches Number of Unit Inlets (Grate or Curb Opening) No ............ ........i Grate Information ........................... Length of a Unit Grate L, (G) N/A` feet Width of a Unit Grate W N/A: feet ea Opening Ratio fora Grate (typical values 0.15-0,90) haeo ..... .... WA-: Clogging Factor for a Single Grate (typical value 0.50) - C, (G) WA. Grate Weir Coefficient (typical value 3.00) G. (G) NIA: Grate Orifice Coefficient (typical value 0.67) C, (G) :N/A Curb Opening Information Length of a Unit Curb Opening L, (C) 5 00. feet Height of Vertical Curb Opening in Inches H,,,, 6 00 inches Height of Curb Orifice Throat in Inches He,- a 5:96. inches Angle of Throat (see USDCM Figure ST-5) Theta 63;A. degrees Side Width for Depression Pan (typically the gutter width of 2 feet) W, 2.00' feet Clogging Factor for a Single Curb Opening (typical value 0.10) Cr (C) 0,10'. Curb Opening Weir Coefficient (typical value 2.30-3.00) C. (C) 2i30! Curb Opening Orifice Coefficient (typical value 0.67 Co (C) 0,67 Resulting Gutter Flow Depth for Grate Inlet Capacity in a Sump Clogging Coefficient for Multiple Units Coef SAY: Clogging Factor for Multiple Units .......................... Clog NPA As a Weir ........................... Flow Depth at Local Depression without Clogging (0 cfs grate, 15.1 cfs curb) ........................... ........................... inches Flow Depth at Local Depression with Clogging (0 cfs grate, 15.1 cfs curb) d,„, ,,....:.� :::Nip! inches As an Orifice Flow Depth at Local Depression without Clogging (0 cfs grate, 15.1 cfs curb) d WA': inches Flow Depth at Local Depression with Clogging (0 cfs grate, 15.1 cfs curb) d„N..fA: inches Resulting Gutter Flow Depth Outside of Local Depression..::.NIAi Inches Resultina Gutter Flow Depth for Curb Opening Inlet Capacity in a Sum ..................... ........................... . Clogging Coefficient for Multiple Units ........................... ........................... Coef =:#i35i Clogging Factor for Multiple Units Clog =0.06I Curb as a Weir, Grate as an Orifice ........................... ........................... Flow Depth at Local Depression without Clogging (0 cfs grate, 15.1 cfs curb) ........................... ........................... d„, inches Flow Depth at Local Depression with Clogging (0 cfs grate, 15.1 cis curb) ci„ k!6! inches Curb as an Orifice, Grate as an Orifice ........................... ........................... Flow Depth at Local Depression without Clogging (0 cfs grate, 15.1 cfs curb) ........................... .......................... d ��: '6:5' inches Flow Depth at Local Depression with Clogging (0 cis grate, 15.1 cfs curb) d„ .:;:.70 inches Resulting Gutter Flow Depth Outside of Local Depression d,z,,,, 4:6 inches Resultant Street Conditions Total Inlet Length L 10.0� feet Total Inlet Interception Capacity (Design Discharge from O-Peak) Q. 151> cfs Resultant Gutter Flow Depth (based on sheet Q-Allow geometry) d— .............:......:4:8: Inches Resultant Street Flow Spread (based on sheet Q-Allow geometry) T =;.,,;,;,,,.�!:_;,;,,.; 1?;H: feet Resultant Flow Depth at Maximum Allowable Spread dzree,,e = 0 Inches INLETS.xis, Inlet In Sump OV30/2006, 7:24 AM LOCATION: LEMAY 2006 ITEM: STREET CAPACITY COMPUTATIONS BY: MPO SUBMITTED BY: NORTH STAR DESIGN INC. 10-year design storm Design in accordance to "Storm Drainage Design Criteria and Construction Standards" City of Fort Collins, May 1984. Street with 74' Roadway, vertical curb and gutter no curb topping, flow may spread to crown of street calculate for channel slopes from 0.4% to 7% Theoretical Capacity: use revised Mannings eq. Allowable Gutter Flow: Q=0.56-Z/n-S12'y&' Qall=F'Q where Q = theoretical gutter capacity (cfs) F = reduction factor (Fig. 4-2) Z = reciprocal of cross slope (ft/ft) Qall = allowable gutter capacity (cfs) n = roughness coeff. S = channel slope (ft/ft) Q = Qa - Qb + Qc y = depth of flow at face of gutter (ft) sec. A FL Z n ya S Q. 12 0.013 0.5 0.40% 5.15 12 0.013 0.5 0.50% 5.76 B 12 0.013 0.5 0.60% 6.31 12 0.013 0.5 0.80% 7.28 12 0.013 0.5 1.00% 8.14 12 0.013 0.5 1.50% 9.97 12 0.013 0.5 2.00% 11.51 12 0.013 0.5 3.00% 14.10 12 0.013 0.5 4.00% 16.28 12 0.013 0.5 5.00% 18.20 12 0.013 0.5 6.00% 19.94 12 0.013 0.5 7.00% 21.54 Spr. R Z n yb S Qb 12 0.013 0.33 0.40% 1.70 12 0.013 0.33 0.50% 1.90 12 0.013 0.33 0.60% 2.08 12 0.013 0.33 0.80% 2.40 12 0.013 0.33 1.00% 2.69 12 0.013 0.33 1.50% 3.29 12 0.013 0.33 2.00% 3.80 12 0.013 0.33 3.00% 4.66 12 0.013 0.33 4.00% 5.38 12 0.013 0.33 5.00% 6.01 12 0.013 0.33 6.00% 6.59 12 0.013 0.33 7.00% 7.11 SPr r q �-- yb=y°= 0.33ft ya= 0.5 ft Z. = 24"/2" = 12 Zb = 2472" = 12 Z° = 1 /0.02 = 50 Both sides n = n= - nh + nr of CIrPPI Z n Y. S Q° Q F Qan Clan 50 0.016 0.33 0.40% 5.76 9.20 0.50 4.60 9.20 50 0.016 0.33 0.50% 6.44 10.29 0.65 6.69 13.38 50 0.016 0.33 0.60% 7.05 11.27 0.80 9.02 18.04 50 0.016 0.33 0.80% 8.14 13.02 0.80 10.41 20.83 50 0.016 0.33 1.00% 9.10 14.55 0.80 11.64 23.29 50 0.016 0.33 1.50% 11.15 17.83 0.80 14.26 28.52 50 0.016 0.33 200% 12.87 20.58 0.80 16.47 32.93 50 0.016 0.33 i l)0% 15.76 25.21 0.72 18.15 36.30 50 0.016 0.33 4.00%1 18.20 29.11 0.60 17.47 34.93 50 0.016 0.33 5.00%1 20.35 32.54 0.48 15.62 31.24 50 0.016 0.33 6.00%1 22.29 36.72 0.40 14.69 29.38 50 0.016 0.33 7.00%1 24.08 38.51 0.34 13.09 26.18 SlrtcaplAs 1 of 1 LOCATION: LEMAY 2006 ITEM: STREET CAPACITY COMPUTATIONS BY: MPO SUBMITTED BY: NORTH STAR DESIGN INC. 100-year design storm Design in accordance to "Storm Drainage Design Criteria and Construction Standards" City of Fort Collins, May 1984. Street with 74' Roadway, vertical curb and gutter - collector street depth of water over crown not to exceed 6", buildings shall not be inundated at the ground line calculate for channel slopes from 0.4% to 7% Theoretical Capacity: use Mannings eq. Allowable Gutter Flow: Q=1.486/n-R' -S1n'A Qall =F'Q where _Q = theoretical gutter capacity (cfs) F = reduction factor (Fig. 4-2) n = roughness_ coeff. Qall = allowable gutter capacity (cfs) R= A/P A = cross sectional area (ft) Q = Qa + Qb P = wetted perimeter (ft) S = channel slope sec. A sec. B A = 11.20 A = 2.25 P = 33.80 P = 15.30 R= 0.33 R= 0.15 n = 0.016 n = 0.035 Both sides of ctroot S Qa S Qb Qtot F Qall Qall 0.400/6 31.59 0.40% 1.69 33.28 0.50 16.64 33.28 0.50% 35.32 0.50% 1.89 37.20 0.65 24.18 48.36 0.60% 38.69 0.60% 2.07 40.75 0.80 32.60 65.21 0.80% 44.67 0.80% 2.39 47.06 0.80 37.65 75.29 1.00% 49.94 1.000% 2.67 52.61 0.80 42.09 84.18 1.50% 61.17 1.50% 3.27 64.44 0.80 51.55 103.10 2.00% 70.63 2.00% 3.77 74.41 0.80 59.53 119.05 3.00% 86.51 3.00% 4.62 91.13 0.72 65.61 131.23 4.00% 99.89 4.00% 5.34 105.23 0.60 63.14 126.27 5.00% 111.68 5.00% 5.97 117.65 0.48 56.47 112.94 6.00% 122.34 6.00% 6.54 128.88 0.40 51.55 103.10 7.00% 132.14 7.00% 7.06 139.20 0.34 1 47.331 94.66 FL CL all 0.63' 0.17' Area A = (0.15')(23') + (2"/12)-(2')-(1/2) + (5.52"/12)'(2') + (5.52"/12)'(23')'(l/2) = 9.83 sq. ft. Area B = (14')`(3.36/12)'(1/2) = 1.96 sq. ft. ' Strtcapl.xls 1 of 1 LOCATION: LEMAY 2006 ITEM: STREET CAPACITY COMPUTATIONS BY: MPO SUBMITTED BY: NORTH STAR DESIGN INC. Note: Design flows and street capacities are given for one side of the street unless otherwise indicated Des. Street Name Roadway Slope 10 yr Design flow meets 100 yr Design flow meets Width- (°/,) Capacity Q(10) criteria? Capacity Q(100) criteria? Point (ft) (cfs) (cfs) (cfs) (cfs) 2 WEST SIDE LEMAY 74 0.5 6.7 3.0 yes 24.2 13.1 yes 5 EAST SIDE LEMAY 74 0.5 6.7 2.7 yes 24.2 11.4 yes 1 of Appendix D — Drainage Plan I !1 gf Olt JIMIT/ I I uji � I i ii I t s pl ONE ALw .T �I LEQEID t— FLOW DIRECTION EXISTING PIPES ® 60 ]0 0 60 130 PROPOSED STORM PIPE . PROPOSED INILET LOCATION SCALE: ,' = 60 1♦- - - - - - - - EXISTING 5' CONTOUR ♦------- EXISTING Y CONTOUR CALL UTILITY COLORADON PROPOSED s CGNTWR 1-800 922-1987 t H]s — PROPOSED V CONTOUR CALL 3 DAYS Al I t / Q BEFORE IOU M. SMAX. CW EXXC�V R CUSI N P T FOR M MAIMING 0' UNOURCR MID MWBEP U,II➢ES. t �Pw1 COOIOEM t vNrv¢ ul[ OD Q pUNpE [C({ilGfNl (CIO) AREA N ACRES PRELIMINARY _ — _ _ SAtrot FM CCY. 2" NAV ndY RM eOMNDANY JANUARY, 200a I t I' t ♦ ¢ m »r, Cffl' R FORT 16 ''• sT �`•a Will ••�A m �J•IN IN In INWill Am w w ON wmim, wo asullamoll as 1111101 I �aat mW`Wx D'A It IT __ —_-_ _ »Nn__ __. _ _ ______ ___ ______ ______ -- / L LBMY i �l LLl a M �\—�-- _ _ l_ _____ _____ f, N SON - - �� 1 1 amM avu uvo J J� LOT ) �__ •, �I LOT a LEMAY AvlM£ ESTATES LOT a LOT ) �' IPoP APPROVED) I LOT • EAbNUIMMi _ EIFABCW ABBAS A,N,.�-...lnrryLNw e..aNIr If WII I' I I _••�•••• RRovncer no Fuws ° ___--_-_ ••• WIN•Will All Am m __--- TRACT D TRACT —J.� B ® ♦ 1 =— z- — __ = __ ' _ _ -- - ----- MA Y t , p g wiEo EXIIII ®Tres mot vAMENUE WETnA� 1 — oEEIGNEO DY DRA APPROVED BY SOUTH EMAY AVENUE WIDENING (2006)lHLEI — CITY OF FORT COLLINS, COLORADO MPO I MPOI - _-- - lifirT.AI^� SCALe DATE - cNECBED DY: DNTC - 90% SUBMITTAL or -- ENGINEERING DIVISION �> �°^ 1"=60' 1/19/06 _- DRAINAGE- PLAN _— I