Loading...
HomeMy WebLinkAboutDrainage Reports - 06/25/2018A CTION CIVIL ENGINEERING LL C City of Ft Col�r'rr pr ed Plans Approved By Date FINAL DRAINAGE REPORT Fort Collins Jeep Dealership Fort Collins, Colorado Project #PDP170013 April, 2018 PREPARED FOR: Commercial Building Services 7561 S. Grant Street, Suite A-4 Littleton, CO 80122 Contact: Steve Morel (303) 730-3001 PREPARED BY. - ACTION CIVIL ENGINEERING 11600 Whooping Crane Drive Parker, CO, CO. 80134 (720) 260-0433 ACE Project No. 16-018 ITable of Contents I. GENERAL LOCATION AND DESCRIPTION............................................................. 2 A. 'Site Location.................................................................................................................... 2 B. Description of Property.................................................................................................... 3 C. Floodplain Submittal Requirements................................................................................. 4 II. MAJOR DRAINAGE BASINS AND SUB -BASINS ...................................................... 4 A. Major Drainage Basins..................................................................................................... 4 B. Sub-basins........................................................................................................................ 4 III. DRAINAGE DESIGN CRITERIA.................................................................................. 6 A. Regulations.......................................................................................................................6 B. Directly Connected Impervious Area............................................................................... 6 I C. 'Development Criteria Reference and Constraints............................................................ 6 D. Hydrologic Criteria.......................................................................................................... 6 E. Hydraulic Criteria ............................................ :................................................................ 7 ■ F. Floodplain Regulations Compliance................................................................................ 7 G. Modifications of Criteria.................................................................................................. 7 IV. DRAINAGE FACILITY DESIGN................................................................................... 7 IA. General Concept............................................................................................................... 7 B. Specific Details................................................................................................................ 8 V. CONCLUSIONS................................................................................................................ 8 ' VI. REFERENCES...................................................................................................................8 Appendix A — Vicinity Map, Soils Map, Floodplain Checklist Appendix B — Hydrologic Computations Appendix C — Hydraulic Calculations Action Civil Engineering LLC Page 1 I. GENERAL LOCATION AND DESCRIPTION A. Site Location ' Fort Collins Jeep Dealership is located on a site currently containing 4.48 acres northwest of the intersection of South Mason Street and West County Road 38 in the City of Fort Collins, Larimer County, Colorado. The site lies in the Southeast 1/4 of Section 35, Township 7 North, Range 69 ' West of the 5t' Principal Meridian. It is bounded on the north by an existing car dealership (Pedersen Volvo), on the east by South Mason Street with existing commercial development beyond, on the south by existing West.County Road 38, with existing educational development ' beyond, and on the west by existing bus road, with railroad with existing railway, greenbelt and residential area beyond. 1 Action Civil Engineering LLC Page 2 f 0 b w 6 ► .10 SITE 41.1 i i � ... � R Myt • . Y v _ - 41 17 VICINITY MAP NO SCALE B. Description of Property The existing site was built as a lumber yard, but has not been used for that purpose for some time. Detention appears not to have been required for the site when it was built in 1974, as none is in evidence. Action Civil Engineering LLC Page 1 The current area of the project site is 4.48 acres. However, South Mason Street is slated for "midtown" redevelopment, and an additional 0.13 acres of additional right-of-way is being requested by the City of Fort Collins to expand South Mason Street. ' A lot to the west of the project site, separate from the project site but owned by the same owner, is 0.87 acres, and contains of two structures and a parking lot consisting of soil and vegetation. No development, staging, or storage of materials will occur on this lot as related to this project. The main building of the site will remain (will be remodeled), with two areas of expansion, one on the west side of the building, and one on the north. An outdoor lumber storage area on the east side of the existing building will be removed, as well as a raised concrete loading dock on the west side of the site and other concrete pad areas. The aging pavement on the site will be removed and replaced. The proposed use is car dealership. Soils on the site, according to USDA National Soil Conservation website, consist of Nunn clay loam- Hydrologic Soil Type C (94% of site) with a small area of Altvan-Satanta loams (6%) — Hydrologic Soil Type B, in the northeast corner of the site. Fort Collins Jeep Dealership is located outside the 100-year floodplain, according to FEMA FIRM map panel 08069C1000F (Map Panel Not Printed.) C. Floodplain Submittal Requirements Fort Collins Jeep Dealership is located outside the 100-year floodplain, according to FEMA FIRM ' map panel 08069C 1000F (Map Panel Not Printed). See "City of Fort Collins Floodplain Review Checklist 50% Development Review Submittals" in Appendix A. II. MAJOR DRAINAGE BASINS AND SUB -BASINS A. Major Drainage Basins The site is located within the Mail Creek Basin, a basin of approximately 1,676 acres in southwest Fort Collins. To the east of the site is College Avenue, which runs north -south and consists of commercial development along the length. The remainder of the basin consists of mixed -use residential development. The basin generally drains west to east to the confluence of Mail Creek and Fossil Creek, and ultimately to Fossil Creek Reservoir. (City of Fort Collins 2017) B. Sub -basins The current drainage pattern consists of a large shallow swale within the west parking area of the site, which directs runoff south to W. County Road 38 via an existing sidewalk chase. The east side of the site slopes to the east from the east side of the main building, towards South Mason Street via a drive entrance located near the south end of the South Mason Street frontage. Both streets drain to the intersection of South County Road 38, and South Mason Street to an existing 10' Type R inlet located on the South Mason Street side of the intersection. This inlet will be moved west approximately 7' to be in line with the proposed street widening of South Mason Action Civil Engineering LLC Page 4 Street There is also a low area in the southwest corner of the site, with no apparent outlet. Proposed Sub -basins The proposed grading will follow a similar pattern. The entrance locations will both change. The W. County Road 38 entrance will be reduced in width to accommodate a bus pullout proposed to be built immediately west of the drive (eliminating traffic hazard from buses stopping in the lane of this busy street.) The South Mason Street entrance will be moved approximately 300 feet north to near the northeast comer of the site. The runoff which previously drained to the entrance will be re-routed to South ' Mason Street with a small channel and chase section located near the southeast corner of the new proposed parking lot. A low area in the southwest corner of the site, with no apparent outlet, will be raised such that the runoff can be directed to the sidewalk chase at the low point in the parking area east of the West County Road 38 drive entrance. Proposed Basin A (0.22 acres of pavement) sheet flows to a 2-foot wide concrete pan which directs runoff to Bioretention Pond A. Proposed Basin B (0.33 acres of pavement) sheet flows to a 2-foot wide concrete pan which directs runoff to Bioretention Pond B. Proposed Basin C (1.72 acres of pavement and roof) sheet flows to a 2-foot wide concrete pan which directs runoff to Bioretention Pond C. Proposed Basin D (0.15 acres of pavement) sheet flows to a 2-foot wide sidewalk chase which ' directs runoff to the north flowline of West Harmony Road. Runoff then flows east to the relocated Type R inlet at the NW corner of West Harmony Road and South Mason Street. ' Proposed Basin E (0.39 acres of pavement and roof) sheet flows to a 2-foot wide sidewalk chase which directs runoff to the west flowline of South Mason Street. Runoff the flows south to the relocated Type R inlet at the NW corner of West Harmony Road and South Mason Street. Proposed Basin F (0.42 acres of pavement and roof) sheet flows to a 2-foot wide sidewalk chase which directs runoff to the west flowline of South Mason Street. Runoff the flows south to the relocated Type R inlet at the NW corner of West Harmony Road and South Mason Street. Proposed Basin G (0.56 acres of pavement and roof) sheet flows to a 2-foot wide sidewalk chase which directs runoff to the north flowline of West Harmony Road. Runoff then flows east to the relocated Type R inlet at the NW corner of West Harmony Road and South Mason Street. ' Existin¢ Off -site Sub -basins Existing Basin H (0.08 acres of soil and vegetation) is within the lot to the west of the site. The sub -basin is ungraded, and runoff sheet flows to the northeast and offsite toward the railroad track. No development will occur within Basin H as a part of this project. Action Civil Engineering LLC Page 5 Existing Basin I (0.49 acres of soil and vegetation) is within the lot to the west of the site. The sub - basin is ungraded, and runoff sheet flows to the east and southeast offsite, and eventually to a low point adjacent to the railroad track. Most runoff is collected by a channel to the east of the basin ' and flows south to the low point. The remainder of runoff flows directly to the low point. No development will occur within Basin I as a part of this project. ' Existing Basin J (0.09 acres of soil and vegetation) is within the lot to the west of the site. The sub - basin is ungraded, and runoff sheet slows to the south offsite, to West Harmony Road, and eventually to the 10' Type R inlet at the intersection of West Harmony Road and South Mason St. ' No development will occur within Basin J as a part of this project. ' III. DRAINAGE DESIGN CRITERIA ' A. Regulations The design of the proposed stormwater management system was done in compliance with Fort Collins Amendments to the Urban Drainage and Flood Control District, Urban Storm Drainage Criteria Manual Volumes 1, 2 and 3. (UDFCD 2017) When improvements are proposed to an existing developed site and there is an increase in impervious area greater than 1000 square feet, onsite detention is required. The existing site impervious area is 158,473 square feet and the proposed impervious area is 159,188 resulting in a net increase in impervious area of 715 square feet therefore detention is not required. Low Impact Development (LID) requirements are required on all redeveloped property. 75% of all newly added or modified impervious are must be treated by LID techniques. There is 122,865 square feet of redeveloped area onsite and 75% of this area is 92,149 square feet or 2.12 acres. This area will be treated with three onsite Rain Gardens aka Bioretention Ponds. The Bioretention Ponds will drain to the 10' Type R Inlet at the SE corner of the site via a common 6" HPDE outfall pipe. B. Directly Connected Impervious Area The existing site will be redeveloped with a minimum increase in Directly Connected Impervious Area. The increase in impervious area is 715 square feet, a 0.45% increase. C. Development Criteria Reference and Constraints The existing site has no stormwater management infrastructure, and drains undetained off --site. The proposed stormwater management improvements meet Low Impact Development requirements and will improve water quality and impact. D. Hydrologic Criteria ' Action Civil Engineering LLC Page 6 I Design rainfall values from "Table RA-8 — City of Forst Collins Rainfall Intensity -Duration - Frequency Table for Use with the Rational Method" were used for the design rainfall. (Fort Collins 2016) The Rational Method was used to determine peak runoff from sub -basins A, B, and C, for which the methodology and tables as presented in the Urban Storm Drainage Criteria Manual were used to determine Rational "C" coefficients, and time of concentrations. Calculations can be found in ' Appendix B of this report. ' E. Hydraulic Criteria The UDFCD spreadsheet titled "UD-Detention" (Version 3.07, February 2017) was used to ' calculate both the required water quality capture volume for the three rain gardens and the geometry of the rain gardens. In accordance with LID requirements, Water Quality will be provided for 75% of the redeveloped area, 2.12 acres. The Water Quality Volume is calculated on ' a per basin basis. The calculations can be found in Appendix C of this report. Autodesk Hydroflow Express was used to calculate the sizing of the rain garden underdrain. The tcalculation can be found in Appendix C of this report. ' F. Floodplain Regulations Compliance Fort Collins Jeep Dealership is located outside the 100-year floodplain, according to FEMA FIRM ' map panel 08069CI000F (Map Panel Not Printed). See "City of Fort Collins Floodplain Review Checklist 50% Development Review Submittals" in Appendix A. G. Modifications of Criteria No modifications of the criteria are proposed. ' IV. DRAINAGE FACILITY DESIGN ' A. General Concept The general. drainage concept is to capture 75% of the redeveloped impervious area and treat it by LID techniques via rain gardens. Sub -basins A, B, and C have been designed to total this area. Runoff will drain to these three rain gardens, where it will be treated. Treated water will discharge via a 6" HPDE storm pipe to the existing storm sewer at West County Road 38 and South Mason Street. Sub -basins D, E, F, and G will not be detained or treated and will drain off -site. No development will occur within Sub -basins H, I, and J as a part of this project. Action Civil Engineering LLC Page 7 B. Specific Details Surface runoff from sub -basins A, B, and C will sheet flow over pavement to concrete pans, then collect in rain garden bioretention BMPs. The rain gardens are individually sized to the water quality capture volume (WQCV) of their associated basins. The three rain garden bioretention BMPs will be constructed with an impermeable liner on the ' bottom, a 4" slotted PVC under -drain pipe embedded in a 6" thick layer of CDOT Class B filter material, and an 18" layer of filter media on top. The 4" under -drain will have 4" cleanouts to provide maintenance access. A concrete outlet structure will have inlet(s) to receive discharge from ' the under -drain pipe(s) to receive discharge from the WQCV and an inlet grate to receive discharge in excess of the WQCV. A 6" HDPE outlet pipe will discharge from the outlet structure to a proposed 10' Type R Inlet at the intersection of West County Road 38 and South Mason Street. The storm water will then discharge to the existing storm sewer via a proposed manhole constructed on the existing storm sewer. ' In accordance with the LID techniques pertinent to the site, only the WQCV must be detained and treated, and only for 75% of the total redeveloped area. Runoff in excess of the WQCV will pond and discharge into the outlet structure inlet grate. If the ponding capacity is exceeded, the runoff ' discharge off -site to West County Road 38. Sub -basins D, E, F, and G will not be detained or treated and will drain off -site. These areas do ' not require detention or treatment, as the LID requirement is satisfied by the rain garden bioretention BMPs for sub -basins A, B, and C. Sub -basins D and G will discharge to West County Road 38 via a curb cut. Sub -basins E and F will discharge to South Mason Street via the driveway ' at the northeast corner of the site. ' No development will occur within Sub -basins H, I, and J as a part of this project. The sub -basins will continue to drain as per the existing conditions. ' V. CONCLUSIONS ' The stormwater management system for the site has been designed in compliance to the Fort Collins Amendments to the Urban Storm Drainage Criteria Manual Volumes 1, 2, and 3. Low Impact Development (LID) requirements were followed to determine BMP requirements. The development of the site will increase the impervious area of the site from 158,473 square feet to 159,188 square feet, an increase of 715 square feet. The stormwater management system will capture and treat stormwater in accordance with the above criteria, and overall will improve the water quality of stormwater and reduce the discharge off -site into the roadway. VI. REFERENCES City of Fort Collins, 2017. Mail Creek. Retrieved July 17, 2017, from https://www. fcgov. com/utilities/what-we-do/stormwater/drainage-basins/mail-creek- Action Civil Engineering LLC Page 8 ' basin 2. Urban Drainage and Flood Control District (UDFCD). 2017. Drainage Criteria Manual, Volumes 1, 2, & 3, Urban Drainage and Flood Control District. 3. City of Fort Collins, 2016. Fort Collins Amendments to the Urban Drinage and Flood Control District Criteria Manual. Action Civil Engineering LLC Page 9 Appendix A — Vicinity Map, Soils Map, Floodplain Checklist I a VICINITY MAP NO SCALE I r. toot J2 .,r . 4 31' 31' N Hydrologic Soil Group—Larimer County Area, Colorado 3 a :r 4931M 493190 4SV10 49=0 493250 Map Sole: 1:1,010 if printed on A pmQalt(8.5" x 11") sf»et. �Mdes N 0 10 20 40 � � 80 Feet 0 45 90 180 Z70 A Map projection: Web Mercator Comer 000rdirkatn: WGS84 Edge tics: UTM Zone 13N WGS84 Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 4P,70 4MM 40° 31'31'N 40'31'WN 490310 3 1 /12/2017 Page 1 of 4 z O Q O LL z IL 0 z w 0 W .J a ° N'0 N O N m Q m 0 a� m dr19d _m 3�0 m C ,0 V a .V 0 V O N m N p C av @�0 E y an.oNEv C y N c0) a 0) Eo C 0 U � @ '- a a) o O a N — �° 0( O m E °p m CL ° O n 0 a) jo- U `o E a U o d ° m Z a°° 0 (D o Q , `• y 3 m E o 3 L m m C7 0O, 0 Z p U N w -EIa _ O 0 Q O OQ r C y ��pp (a0 E p a. U W y y N m m O r CO �N m 'O n3 ycy m U M aL N m 0 = a `° U a N C na O a) Q >` ° T m tOn N E y n N w m N O p O m 0 L m a1 Im a- m a N U T` O U £ O c O m T m a � m OL ° O a� 2� ° a° 'o oa U � v ra aE � E d E o v m m ° ,yY-i U) a) v� d m y d a°y T 4)w� dma° nym0 0 0 ate' 0,,. oar o a)v, Euo 0 � m 3 In 0 «° E O .0 Q °U C J N 0 N 0 m a) y E�FN Z ° ��0Em C vim oro mm E �. OCDTc oc yN @�� "c Qm am 2 'o cn cmdN d E m T O �_ N 2 3�t0c°i � �` d� :E� � 0 `° aci Lc a m a E N O °> E L N O m O C y�� or 0 t� O O °> Z a l0 O y V C .0 Of C a {` lC m m m a°� U (n =0 O }i c N l� cl r0 = `n m p E p 41 p D N •a 0l 01 r N � 2 C N c O 0 wE_0y 0 0 aE 7 O a) O cn3U m O N— 0 2avQm .0 ,r ro O 7 U) U) 0 lO U) m oN �C- E m ._ ~c� 0 a m y a1 c c a5 a Dc ° y 9 y O v y m �° 0 a U U a Z t0 y d Ul O L" O rT f0 J 9 Q A c ® o ■ 0 a d m 9 as N m O C O c N C O 0 Q O T m A C SD 1 O a m m o p Z j a O p m U d O O a `m y C ma m C U o Z mQ m C 1,{ 1 `r `j ♦f N4 \ l l 4 \ y a � �Iq O O N N N 0 d m z Hydrologic Soil Group—Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 4 Altvan-Satanta loams, 3 to 9 percent slopes B 0.2 5.0% 74 Nunn clay loam, 1 to 3 percent slopes C 4.4 92.1 % 75 Nunn clay loam, 3 to 5 percent slopes C 0.1 2.8% Totals for Area of Interest 4.7 100.0% Description . Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and VD). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for. undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. USDA Natural Resources Web Soil Survey 1/12/2017 211111111111111 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Larimer County Area, Colorado Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 1/12/2017 Conservation Service National Cooperative Soil Survey Page 4 of 4 City of Fort Collins Floodplain Review Checklist 50 % Development Review Submittals Instructions: Complete this checklist by marking all boxes that have been adequately completed. Put an "NA" next to any items that are not applicable to this particular submittal. Any boxes that are left blank and do not have an "NA" marked next to them are considered incomplete. Date of Review: Reviewer's Name: Plat Map ❑ The following required items are on the plat: ❑ 100-year floodplain boundary ❑ City ❑ FEMA ❑ Floodway boundary ❑ City ❑ FEMA ❑ The benchmark number and elevation of benchmark ❑ These items match the FIRM. (FEMA Basin) ❑ These items match the Master Plan. (City Basin) ❑ The benchmark number and elevation match with those published in the City of Fort Collins benchmark system. Site Plan The following required items are on the site plan: ❑ 100-year floodplain boundary- FEMA and City ❑ 500-year floodplain boundary (if proposed structure is a "critical facility" and a 500-year floodplain is mapped) ❑ Floodway boundary ❑ Erosion buffer zones ❑ Restriction related to use (i.e, critical facility or no residential use of lower floor if floodproofed mixed -use structure) Drainage and/or Grading Plan (or a separate Floodplain Sheet if it is too cluttered on Drainage and Grading Plan) The following required items are on the drainage and/or grading plan: ❑ 100-year floodplain boundary- FEMA and City ❑ 500-year floodplain boundary (if proposed structure is a "critical facility" and a 500-year floodplain is mapped) 0 Floodway boundary t❑ Erosion buffer zones ❑ Cross-section locations ' ❑ BFE lines ❑ Regulatory Flood Protection Elevation for individual lots or groups of lots if structures are to be built in the floodplain. ❑ The floodplain and floodway boundaries are in the correct location and labeled properly. ❑ The cross-section and BFE lines are in the correct location and labeled properly. ' ❑ Elevations are referred to the appropriate datum: ❑ FEMA basins — list in both NGVD 29 and NAVD 88 ❑ City basins — list only in NGVD 29 ' 0 Floodway regulations have been met. ❑ No fill in the floodway unless a hydraulic analysis shows "no -rise". ❑ No manufactured homes, except in an existing park, can be placed in the floodway. ❑ No changing a nonconforming non-residential or mixed use structure to a residential structure. ❑ Landscaping meets requirements for no encroachment in the floodway without a hydraulic analysis to show "no -rise". ❑ No storage of materials or equipment. ❑ Critical facilities regulations have been met: ❑ 100 year— No life safety, emergency response, or hazardous material critical facilities ' ❑ 500 year Poudre — No life safety or emergency response critical facilities ❑ Any items in the floodway that can float (Example: picnic tables, bike racks, etc.) are noted as being anchored. ❑ Erosion Buffer Zone requirements have been met: ' ❑ Design of any allowed development minimizes disturbance to channel bed and banks. ❑ No structures allowed. ❑ No additions to existing structures allowed. ❑ Any fencing is split -rail design and break -away, but cabled. Must be oriented parallel to general flow direction. ' ❑ No detention or water quality ponds. ❑ No bike or pedestrian paths or trails except as required to cross streams or waterways. ' 0 Road, bicycle and pedestrian bridges must span erosion buffer zone. ❑ No fill. 0 No outdoor storage of non-residential materials or equipment. ❑ No driveways or parking areas. ❑ No irrigated vegetation and non-native trees, grasses, or shrubs. ' ❑ No utilities except as necessary to cross streams or waterways. ❑ No grading or excavation except as required for permitted activities in erosion buffer zone. ' ❑ No construction traffic except as required for permitted activities in erosion buffer zone. ❑ Any construction in the erosion buffer zone shows that it will not impact the channel stability. 1. ❑ Any necessary floodplain modeling has been submitted and approved. All modeling ' must follow the City's floodplain modeling guidelines. ' Special Poudre River Regulations tions 0 Poudre River Floodway Regulations have been met. ' 0 No construction of new residential, non-residential or mixed -use structures. ❑ No redevelopment of residential, non-residential or mixed -use structures. ' ❑ No additions to residential, non-residential or mixed -use structures. ❑ No fill unless hydraulic analysis shows "no -rise". ❑ Poudre River floodplain regulations have been met ❑ No construction of new residential or mixed -use structures ❑ No additions to residential structures ' ❑ No additions to mixed -use structures if there is an expansion in the residential -use area of the structure. ❑ No floatable materials on non-residential sites ' Information Related to Structures in the Floodplain ' ❑ The regulatory flood protection elevation shown on the plans is at least 2 ft above the BFE for the Poudre River and at least 18" above the BFE for new development and redevelopment, 6" above the BFE for additions, substantial improvement and accessory structures for all other floodplains. ❑ A note is on the plans that the lowest floor (including basement or crawl space) and ' HVAC will be required to be elevated above the regulatory flood protection elevation. Non-residential structures can be floodproofed instead of elevated to the regulatory flood protection elevation. ' ❑ A typical drawing detail is included for each foundation type proposed (slab -on - grade, basement, crawl space) showing the elevation of the HVAC and lowest floor ' elevation (which includes bottom of the basement or crawl space) relative to the BFE. tl: , ❑ If garages are not going to be elevated to the regulatory flood protection elevation, then a note is included stating the following requirements: ' ❑ There shall be 1 square inch of venting for every 1 square foot of enclosed area. ❑ The bottom of the venting shall not be higher than 1 foot above grade. ' ❑ The venting shall be on at least two sides, preferably on upstream and downstream sides. (Does not have to be divided equally). 0 For manufactured homes, a note is included stating that all submittal requirements on separate sheet titled "Installation of a Mobile Home Located in a Floodplain: ' Submittal Requirements" shall be met. ' ❑ A note is on the plans stating that a floodplain use permit will be required for each structure and each site construction element (detention ponds, bike paths, parking lots, utilities, etc.) in the floodplain. 0 A note is on the plans stating that a FEMA elevation or floodproofing certificate will be completed and approved before the CO is issued for any structures in the floodplain. This is required even if property is only in a City floodplain. Drainaee Report ❑ The site is described as being in the floodplain. Floodplain name and if the floodplain ' is a FEMA or City -designated is described. Any floodway or erosion buffer zones on the site are described. ❑ The FEMA FIRM panel # and date and/or the Master Plan information is cited. ❑ A copy of the FIRM panel with the site location marked is included in the report. ' ❑ If a floodplain modeling report has been submitted, that report is referenced. The reason for the floodplain modeling report is described. ' ❑ If a FEMA CLOMR or LOMR is going to be needed, the reason for the CLOMR or LOMR is described. ' ❑ If a FEMA LOMR is required after construction, this is stated in the report. ❑ The location of the structures relative to the floodplain is described. If there is both a FEMA and a City floodplain on the site, the location of the structures relative to both is described. 1 0 The use of the structures is described. This is to determine if the structure is residential, non-residential, or mixed -use. Also, structures in all 100- year and Poudre ' River 500-year floodplains cannot be used as a critical facility. (See Chapter 10 of City Code for definitions.) ' ❑ The report describes how the development will be in compliance with the applicable floodplain regulations (Chapter 10 of City Code). (Examples: elevation of lowest floor above regulatory flood protection elevation, floodproofing, floodway ' regulations, erosion buffer zone regulations, no -rise, etc.) ❑ The type of foundation construction for the structures (i.e. slab -on -grade, crawl space, ' basement, etc.) is discussed in the report. ' ❑ The type of foundation matches with the details shown on the grading plan. ❑ The report states that the lowest floor (including basement or crawl space) and HVAC ' will be required to be elevated above the regulatory flood protection elevation. Non- residential structures can be floodproofed instead of elevated to the regulatory flood protection elevation. ❑ If garages are not going to be elevated to the regulatory flood protection elevation, then a note is included stating the following requirements: ' ❑ There shall be 1 square inch of venting for every 1 square foot of enclosed area. ❑ There bottom of the venting shall not be higher than 1 foot above grade. ' ❑ The venting shall be on at least two sides, preferably on upstream and downstream sides. (Does not have to be divided equally). ❑ If a non-residential structure is to be floodproofed, then a note is included stating that all requirements on separate sheet titled "Floodproofing Guidelines" shall be met. (Floodproofing guidelines can be obtained at http://fcgov.com/stormwater/pdf/f`p- floodproofing.pdf) ❑ For manufactured homes, a note is included stating that all submittal requirements on ' separate sheet titled "Installation of a Mobile Home Located in a Floodplain: Submittal Requirements" shall be met. (Mobile Home guidelines can be obtained at http://fcgov.com/stormwater/pdf/fp-mobilhome.pdf) ' ❑ The report states that a floodplain use permit will be required for each structure and each site construction element (detention ponds, bike paths, parking lots, utilities, ' etc.) in the floodplain. ❑ A note is in the report stating that a FEMA elevation or floodproofing certificate will be completed and approved before the CO is issued. ❑ In the compliance section, Chapter 10 of City Code is listed. FEMA CLOMR Approval ❑ If a FEMA CLOW is required, the necessary modeling has been submitted and approved by the City. 1 Additional Comments: Updated 11/29/2007 Terms to Note Lowest Floor Elevation — Elevation of the lowest floor of the lowest enclosed area ' (including bottom of basement or crawlspace). This is not the same as finished floor. The lowest floor should be distinguished from finished floor on plans and reports. ' Regulatory Flood Protection Elevation — For all floodplains except the Poudre River, the regulatory flood protection elevation is eighteen (18) inches above the base flood elevation. For the Poudre River floodplain, the regulatory flood protection elevation is twenty-four (24) inches above the base flood elevation. If there is both a FEMA and a City BFE, the higher BFE should be used to determine the regulatory flood protection elevation. ' Additional floodplain terminology is defined in Chapter 10 of City Code. NOTE: Issues specific to individual sites may arise that result in additional requirements. These will be discussed during initial meetings with the applicant. Appendix B — Hydrologic Computations O O O O e C 00 M ... N M e O U O �a g�N00 p U U o 6 oo 0 � 0 a 0 r o O z v � z, o u r U 00 00 0000 or 0000 Cd u E U o c o o d c 3 c � � F E A 3 rQ H 0 U r 00 M 00 o 00 00 00 o 0 0 0 0 Y �U Q c v 7 ^ N M N O O O O e 0 0 r p r e p O z� Z wo V FBI [ ON 00 p �o r V O G C $ y Q ti O ' •- Or0 � Or0 .r .,i � p n a W U 091, G4 � �$q� 00 M O ^ e ^ O 67 C O C O y V 6I Q .... p 0 0 O ^�i N h�oop O U � �'! e b M o b �000a ��. C4 o e��tn - V 9��+ u e e V �`Ci p C7Q y %Oi'i UUU yb'g a 2 —NMvv r zoA �Qa °c < N W W a w F w A u g Gz E CC) -a QmULI W ra.Cjx---, O u &&2 u 000 \ } §2� § E� / \2)2 ƒ k } a § ® ■ ® z k w � ®i-0:q g = § )ƒ0Iein r . ! / )�)\k�\Ru§((I 2frb�; % "()(� / z k/)� 2� u� . a ^i a - W o L lj (6dj) N W > A10013A Z Oil H.LJN3'1 (ul) 3Z1S 0 Mid y 3dOIS (gJ�)MO'Id Z �yi NOIS3Q w 13HUIS Q O N " 3d07S (via) 17 C6 O N ox e a .. F w ('wul) A a a 1 05 LAC e: Ci O P o Q w (j9/ul) F d Q O - 5 z oZ F z F. (Ulm) 31 m o a x •r. V W C cO d330J AdON(1N o o c Ov) N N msvg NO1S3O a m u _ J.NIOd 3 NOIM - z-=y 3NI7 WHOIS W V i S A r, r (ul W ) ' N t fWa (sdI) e^ e > AUJOTAA H.LON3'i F (ul) 3ZIS 3d1d (%) F F a 3d07S — [Z� OC NJ1s3Q W i� (6J3),4A073 v W ,L338.LS C idols °a F a z (jwol) LT. a t C � � NO r4 h Q Cw7 (jn/ol) y d �q4y t 00 M M (as)v.J A O C (olw) �J .. r O °J dd30J « f d30Nf1N o 0 0 C ° (Jv) e o e v3Nv d NiSvti - = _ .LN1Od 4 Noma �f w srN S < m G Z ? W Cz ? � 3NI'I I1t2101S L au (E ) (i A113013A Z (a) H19N31 = (uU 37IS ` 3dld 3d01S (SJ3)M013 g W NO►S34 d 133HIS N) aCa o C UO1S e c (v.a)3 a� Z (Ulw)n o C U � V (SA V g g T °p r r e F G7 (U'tu)�I o 0 vi oc r O ooi� d330J « � ., ddONRN o e d A - Ov) ry n r V3HV y N n r NISVH E N01S3a a m LNIOd '- � A NOIS3Q N �r s J �-a x� Appendix C — Hydraulic Calculations DETENTION BASIN STAGE -STORAGE TABLE BUILDER UG-Detention, Version 3,07 (February 2017) Project16.D1B Fon Collins 490P Seem ID'. Bioratenlion Pond A i I^ - .m.a .. _-0 :•2: Dann n. °�� _ ep� Example ZonerConHguratron (Retention Pond) Required Volume Calculation Salecstl BMPType= 1 wMersMn Nee = 'A'.. red Len - welenneo S`.PB- Wel.mneo lnpervloueneee- Perunmige Hyd W,n, Son Group A = Pe2enl... HydmbOlc Soll Group 8 ° Penoemag. Hydmloglc Sol Groupe CM ° Denmd WOCv Drain Tine = Lone... for l.hr Rainfall Depina = Wemir Duality CapWmivol.ni, CVI• E. Uman Rowff V.Iulle (EURV)- 2-yr Runoff Valwis g m) (P1 = 0.a° m byr Runoff Volume (Pt a 1 1 ) • 30.yr Rulwff Volume (Pt a 1 A in) • 2 yr Runoff Volume, (P1 ° I in.) • ' S0-yr Runoff Volume (P1 - 2151n) ° 100-yr Runoff Volume (P1 ° 2.BB In 1 ° S00.y1Runoevolume(P1a3.89m)= AoPnonmami 2-y1 Dominant, Volume° Pppronmele Syr Delenlwn Volume= on volume = ' Awproanme 10.yr Dnanom pmpoanete 25-yr parent Volume - AoproPmele 50-yr Detention Volume= M id raffle 1W.yr Debmlon Volume - RG c'. 11 rcenl roan. rcenl nm oum Po.4. ne P. 1. si sui cm.ln fa rele cmfa te.1. cm -la fixin mIM .In 0 ] 178 0005 90.00% 0.0% 00% 1000% 12.0 U9er In ut OW6 CO20 0.016 0.019 0 02e 0.035 0.038 0.052 0073 C.Ots 0Otl 0.023 0.029 0029 0 03S Stage Sftmdgs Ulculadcn ' Zane 1 Volume (WDCV) Select zone 2 Slorage Volume (Optional) • salon zom 3 sto.ge vowrm (opaomeu Tptel IHIenWn Basin VduIM • mein Sunmarge Vamp 4V). ' mdlal Sumnege D.pm OSDI ° Tmel..Iladls Detention Depth (Ha,.1)° Depth of TncXb Clan. (H.O- Sbpe 01 TrKLIe Chermel (S.r) S xM of Main Bann Bwea (S,.,,,) Bann Lapm.to.WidM Ratio (R,ry.) a mnTl Sarcnerge Nea IAr.I • Sul idg, VPIume WIdM M") - DoxiiofBonn Floor III, )• Lenora of Beim Floor lL,wm)• Wldln of Brim Fl. (Wnoo•j' IWa of Basin Flog (A,00•) ° volume of Soon Fioor IV, op°) ° DMIM1 nl Main Baa1n (Hue•)° ' L.,M 01 Mnn Been (Luce) _ Wmm of Men BNIn IWuual - Nee of Main Saeln (A_1 _ Volume 01 Men Baeln IV_,) . Ulwrelsd Tam Bmin votumw tv,°u1) e Opnonm Deer Gvomde n-nmcipnnl.n., 00B ea t t0 nee 140 Incnee 1.98 Incnee 215 Incnee 2" Incnee ]B9 ncnee Tales deumlon aoluma In lean tM1en t00.yaar vplYma �elT'1ftdRT��i� �fli��� ��YI>♦t(:TLII� ' BWNwlpon POM Adam, [Wean t 1161301) 4[1 PM1I 0.a1 0m0 0.005 0000 0.00 DETENTION BASIN STAGE -STORAGE TABLE BUILDER UD.Detentb , Verson 3.07 (FeM ary 20171 0.w 2.00 5Mp(X) —Mpralel—W101h(el -- NW,q,s.l 0.50 2.00 Stye(k) nrn*W—volemepn.N) I .0 200 MWenli0n Pond&Err, B in 111Y 17.441 PM Detention Basin Outlet Structure Design uu-uetenxion, version a.Dy (hepruary zuiv) Project: 16-018 Fort Collin. Jeep Bailin ID-. Sioretentlon Pond A zovs� _.r Sara T 1 � Stage (k) Zone Volume (aok) Outlet Type YO1��sww=won' Zone 1(WQCV) 0.91 OA06 Filtration Medla auruw Zone m•e.axex/ Dance eswuusm-� aancea Zone 3 •O°' Eaample Zone Configuration (Retention Pond) 0.006 Total User Input: Orifice at Underdrain Outlet Itypically used to drain WQCV in a Filtration BMP) calculated Parameters for Underdrain Underdrain Orifice Invert Depth • 2.00 k (distance below the filtration media surface) Underdrain Orifice Area = 0.0 it, Underdrain Orifice Diameter • 0.38 Inches Underdrain Orifice Centroid - 0.02 set User Input: Orifice Pate with one or more odgces or Elliptical Slot Weir (typically used to drain WQCV and/or EURV In a sedimentation LIMP) Calculated Parameters for Plate Invert of lowest Orifice - h(relative to basin bottom at Stage •Oit) WgOrifce Area per Row=M/A Depth at top of Zone using Orifice Plate • h(relatWe to basin bottom at Stage• 0 k) Elliptical Half-Width=ar Orifice Plea: Orifice Vertical Spacing = inches Elliptical Slot Centroid=et Orifice Plate: Orifice Area per Row • Inches Elliptical Slot Area= Urn Input: Stage and Total Are of Each Orifice Stage of Ckr Can Chiles Aras (eq. Row 9 (optional) Row 10 (optional) Raw 11 (optional) Row 12 (optional) Row 13 (optional) Row 14 (optional) Row 15 o tlonel Row 16 o tlonel Stage of Orifice Centrold (it Orlfc, Area(K Inches User Input: Vertical Orifiu Circular or Rectangular) Calculated Parameters for Vertical Orifice Not Selected Not Selected Not Selected Not Selected Invert of Vertical Orifice= k(relative to basin bottom at Stage• 0 k) Vertical Orifice Area= ft, Depth at top of Zone using Vertical Orifice• h(relative to basin bottom at Stage •0it) Vertical Orifice Centroid• leer Vertical Orifice Diameter - Inches User Input: Overflow Weir (Drepboa) and Grate (Fat or Sloped) Calculated Parameters for Overflow Weir Not SelectM Not SaacLed Not Selected I Not Selected Overflow Weir Front Edge Height, He • It (reladve 1. basin bottom at Stage • 0 k) Height of Grate Upper Edge, H, = ifeet Overflow Weir Front Edge Length - feet Over Flow Weir Slope Length = feet Overflow Weir Slope= H:V(enter taro for flat grate) Grate Open Area /100-yr Orifice Area= should be 24 Horiz. Length of Weir Sides • feet Overflow Grate Open Area w/o Debris - it, Overflow Grate Open Area %• %, grate open area/total area Overflow Grate Open Area w/Debris = k' Debris Clogging %- % ' User Input: Outlet Pipe w/ Flow Restriction Plate (Circular Orifice, Restrictor Mate, or Rectangular Orifice) Calculated Parameters for Outlet Pipe w/ Now Restrictions Pate Not Selected Not Saletted 1 Not Selected Not Selected Depth to Invert of Outlet Pipe • I It (distance below bi aln bottom at Stage • 0 k) Outlet Orifice Area -1 k' Circular Orifice Diameter •I Inches Outlet Orifice Centrold = feet Half -Central Angle of Restrictor Plate on Plpe -1 N/A N/A radians User Input Emergency Spillway (Rectangular ar Trapeaoaal) Calculated Parameters for Spi" Spillway Invert Stage- It (relative to basin bottom at Stage -0k) Spillway Design Flow Depth - Spillway Crest Length - feet Stage at Top of Freeboard =L�J e Spillway End Slopes • H:V Basin Area at Top of Freeboard = acres Freeboard above Max Water Surface • feet Routed Hydrograph Resuks Design Storm Return Period One -Hour Rainfall Depth (In) Calculated Runoff Volume (eve-k) OPTIONAL Override Runoff Volume (acre-k) Inflow Hydmgraph Volume (aci Predevelopment Unit Peek Flow. A (olNecre) Predevelopmem Peek 0 (cfe) Peak Inflow 0 (cfa) Peek Outfow Q icls) Ratio Peak Outflow to PredavNopment 0 = Structure Controlling Flow Max Velocity through Grate i (Ipa) _ Max Velocity through Grate 2 (fps) Time to Drain 97% of Inflow Volume (hours) Time to Drain 99% or Inflow Volume (hours) Mnilmum Pending Depth (it) Area at Maximum Pending Depth (acres) Maximum Volume Stored (eve-ft) WQCV EURV 2Year 5year 30 Year 25 Year 50 Year 100Year 500 Year O.S3 1.07 0.99 1.10 1.40 1,99 2.is 2,86 3.89 O.DO6 0.020 0.016 0.019 0,024 0.035 0,038 D052 0.073 0.006 0.020 0.016 0.019 0.023 0.034 0,038 0.051 0.072 DOW DOD 0.01 0,06 0.19 0,58 0.73 1,15 1.53 0A 0.0 00 0.0 0.0 0.1 0.2 0.3 0.4 0.1 0.2 0.2 0.2 0.3 04 0.5 0.6 0.8 0.0 0.0 0.0 0.0 0.0 0.0 a 010 0.0 N/A N/A N/A 0.5 0.2 0.1 0.0 D.0 0.0 Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Flltratl0n Media Filtration Media Filtration Media Filtration Media N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 12 36 30 35 43 63 70 93 130 12 37 30 36 44 65 71 95 133 D 67 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.01 0.01 0.01 0.01 0.01 001 0.01 0.01 0,01 DOD'i 0.006 0.006 0.006 0.006 0006 O.D06 DA06 0.00 0e —won w 0.R — 0.7 - - 0.6 0.5 0.4 0.3 0.1 0.1 — — 0 0.1 13 wan —IOOrx 1 San 0.] Detention Basin Outlet Structure Design UD-Detentlan, Version 3.07IFebru2ry 2017) IC TIME lhrl 0 0.3 10 100 DRAIN TIME lhr) 3W 0 USer Arcalh^zl — Imemamd an IN^21 350 _ -♦--SvmmarvAm IN"11 Volume IN^3l ••�•• Summary Volume IR"31 �Outfl wlch) ••0•-Summary Outflow Ichl 6 I50 X 3 � 100 O.DO D.zO a.aa Dw am I.an VONMNO DEVrfI IN] S-A-V-D Chat Axle Override X-axis Left Y-Axis RI hl Y.Axle minimum baund�� maximum bamd 001 0.01 0.01 0.00 O aw 0 QD 0.00 0.DO 110 Detention Basin Outlet Structure Design Outflow Hydrograph Workbook Filename'. Storm Inflow Hydrographs UO-Detention, Version 3.07 (February 2017) 1^- anosl F,,,, l', nKy 1. ra! • veloce ,ri _ SOURCE WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK Time Interval TIME WQN)ds] EURV[efs] 2Year[ds) SYear)ds) 10Year)ds] 25Year[cfsl 50Year[cfs) 100Year[ds) 500Year)ds] 7.30 min 0:oO00 000 0.00 0W 0.W 0.m 0.on 000 am 000 0n7 12 ...... ....,. ___ Hydrograph 0:le 36 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 Conslant 033:56 0.00 001 001 0.01 0.01 0.02 002 0.03 0.01 0.685 0:29:12 0.01 003 0.02 003 003 005 0.06 007 0.In Detention Basin Outlet Structure Design LID -Detention, Version 3.07 (February 3037) Summary Stage-Area-Volume-Ohcharge geletlonahlpa i_�rr. i�_.. .'1Ir a :: 11•e 1. i re i':e�. iM1f emsi.r lR.. ,li will., n i i.i:.�iir <.0 .h 1 .I ,jai ill W, Ti, rary2.n n mrle In ma luu s-A-V .I) Ilib IB i r lrt I i, it C co l it r ,r . II 1-:J I 1s1On uoinK �'F., best Il Include the stages of all grade slope ISV and Flool ----_--(e.g. Sheet gal lrcl ude the Inverts of all (e.g. vertical orifice, grate, and spillway, applicable). ------Also - -----_outlets - ------overflow - -_----where - DETENTION BASIN STAGE -STORAGE TABLE BUILDER LID-Detenlion, Version 2.07 (February 2017) Praha'. eta Fort Collin Jean ,euw•I aural wwb t0 Example Sum Configuration IRatantbn Payroll Reginald Valid. C•kuingon Saleclw BMP Type = ' 'Natemnad Moo - Wammea Length Wanrenad Sop. = WeUnned Ngervbuaneee ' Pamaeelar HyErobgkS 11Gmup A= Note n" Hydroaeph:W Group S Panwaegt Rydrebgrc Sal Group• CID Oorred WOCV Gram Tim LO for 1-hr Rainfall OWN - Water OIAaIIy, Chain volurre (WOCV) ii ' Exeb Gal Runoff VaWm(EGRvI• 2yr Runoff Volum (Pt • 00In.) Syr Runoff Valuate (Pt • 1.1 In 10.yr Runoff Volume P1 • 14 In ]Syr Runoff volume IP1 • 1 N in ' 60W Rawff Va. IP1 • 215 to 1 My, Runaff Velum (P1 -2.88 m.) 500.yr Runoff voum (P1 • s.BT m.) Aooronraae 2-y, Detealon Volume fgproMrmle 5-yr Ghanaian Vol.. - ' Appronml610yr Deaenbn Volume• AVpM`dm a 25-yr Deaen 10 Volume Aodronrmaa 50-y1 Oaenhon Volum Appra4rmla IM" Gawuon'Nu" Sdrga-Stor•ge Calcuhtion Zone l volume mccC • Om cre-fear Salwl Zane 2 Storage voum (Opuonel) • re lba Select Zone 3 Store, Volume(Gphona(= redeol To,el Onanllon Baan V01.1- o,ogg (µ Intuil Surrh.,. VOIum (ISVI • WA Initial Sur ,. Dapm(ISO)- WA Tam AvNaele Nuirlan Dolan (H_.) • . Capp of Txkle Channel (H:_( • WA Sbpe of Tn Ii. Ch." lS.cl • WA Sopo of Man Beam Saw IS,,,.,I ` uea v Soon 1-8,1n.w.Wiah Ratio R�„ - uwr I1111m Sumner0e Ana, (A)rl• land Surcharge Va1um Length 0.nl. U. Sumoge Volume WMm May)` .1 Dwln of Sour Floor (Khoo.) ` Vbr Lenptn or Begin Floa("u—). W.am or Bean Floor full A93 pl Spam Floo,(Anpya)` V6er .urm or Bwm Floor (V...)• r n-3 Depth of Man Born (Hain) Length of Maln Swln (Lr„•l ` user Wu1m a Mein Sean Mu.nd • ubr Are• a Meat Born (Aw•)• uwr VdVrm pl Mom Begin (VVarJ• ub1 n� Caalmad Total Boom Vaum (Val„) • uW rwI Onuunm ulna Ova de u Pr —,rill un Goo nchb 110 nCMe 100 naMa 1 N raw 216 h,ma 286 naMh 387 non. Total attention volume It lob than 100-yotr yalume BVYannan Pond 6.dem. Spain 1lIG'2011, a 69 PM DETENTION BASIN STAGE -STORAGE TABLE BUILDER UD-Detentbn, Vom; n 3 07 (February 2017) t pI p,00 ' OA20 ' OA25 ' S 0.010 0:009 0.000 0.00 1 ' BianlanLOn Poll B.tlsm, Deem Op 1W slwlal —2erylelal—Amotlriel ax 1e0.a,l pu 2m sure 0el eraa lames—eolumeac-III L50 2F 300 200 Zap I 200 0.020 Dma 2.00 1120r2017, 4'43 P Detention Basin Outlet Structure Design UD-Detention, Version 3.07 (February 20171 Project: I&OIS Fort Collins Brain ID: Bloretentlon Pond - �Zp1EeNE e r a stage (k) Zone Volume(aak) Outlet type y=Iawwl ww Zonel(WQCV) 0.98 1 00(T9 I Filtration Media rroresx Zone i zuE t un z/ owncE rraa.xs.n-- awrxrs 2one3 Example Zone Configuration (Retention Pond) 0009 oral User Input: Orifice at Underdrain Outlet Itypkally used to draln WQCV In a FlNradom BMP) Underdrain Onfice Invert Depth= i.00 it(distance below the filtration media surface) Underdraln Ortflce Diameter= 0.46 inches User Input: Office Plate with one or more orfikes Invert of Lowest Orifice Depth at top of Zone using Orifice Plate Drdke Plate: Orifice Vertical Spacing OHfice Plate: Orifice Area per Row User Input: SLags end Total Am of Each Orifice Stage of Orifice Cenbdd (ft Oritics Area fact. Inches Slope of Orifice Centroid if Orifice Area(w inches Invert of Vertical Orifice Depth at top of Zone using Vertical Orifice Vertical Orifice Diameter (relative to basin bottom at Stage = 0 ft) (relative to basin bottom at Stage = 0 ft) Fr-1-1 en hinh-n Calculated Parameters Inv Underdrain Underdrain Orifice Area= 00 ft2 Underdrain Orifice Centroid= 0.02 feet W Q Orifice Area per Row Elliptical HalfWidth Elliptical Slot Centroid Elliptical Slot Area Rowt tonal) Row2 tonal Row3 tlonal Row4 tional RowS(0DU0ralJ R0.6iciplonall R0w7 'onal Row8 Oonal Row 9 tonal Row 10 a tional Row 11(optimal) Row 12 onal Row 13 (ciptioral Row 14 joptorall Row 15 'sxW Row 16 'oriel or Rectangular) Calculated Parameters for Vertical Orifice Nol Sakcted Not SelectedI Not Selected Not Selected fit (relative to basin bottom at Stage =oft) Vertical Orifice Area= I It it(relative to basin bottom at Stage =0fit Vertical Orifice Centroid =1 feet ' User Input: Overflow Weir(Dropbox) and Is (Flat or Sloped) Calculat Not Selected Not Selected Overflow Weir Front Edge Height, Ho= h(relative to bosun bottom at smile =0 h) Height of Grate Upper Edge, Hr Overflow Weir Front Edge Length = feet Over Flow Weir Slope Length ' Overflow Weir Slope= HM(enter zero for gat grate) Grate Open Area /100-yr Orifice Area Mainz. Length of Weir Sides = feet Overflow Grate Open Area w/o Debris Overflow Grate Open Area%= %, grate open area/total area Overflow Grate Open Area w/Debris Debris Clogging%= % ' User Input: Outlat Pipe w/ Flow Restriction Plate(Orcufar Orifice, Restrlctor Plate, or Rectangular Orifice) Calculated Parameters for Outlet Pi w/ Flow Restriction Plate Not Seleeted Not Selected Not Selected Not Sele!jf: Depth to Invert of Outlet Pipe = h (distance below basin bottom at Stage = 0 k) Outlet Orifice Area = Circular Orifice Diameter = inches Outlet Orifice Centroid = Half -Central Angle of Restrictor Plate on Pipe= N/A N/A ctions User Input: Emergency SpMway (Rectangular or Trapezoidal) Calculated Parameters tar SplYwey, SpillwayInvertstagn fret to basin bottom at Stage .0 ft) SpillwayDesignFlow Depth=�ean Spillway [rest Length= feet Stage at Top of Freeboard= eet Spillway End Slopes = H:V Basin Area at Top of Freeboardacres Freeboard above Max Water Surface - feet Routed Hydrograph Beau Design Storm Return Period = One -Hour Rainfall Depot (in) _ Calculated Runoff Volume (aae-fl) _ OPTIONAL Override Ruroff Volxne face-fl) _ Inflow HydrDgmph Volume (aae-ft) Pi edeveiopment Unit Peak Flow. p (cfaraere) _ Pnedmelognent Peak Q lots) = Peak Inflow Olds) = Peek Outflow 0 (c4) _ Ratio Peak Outflow to Predevelopmem 0 = Structure Controlling Flow - Max Voki through Grate 1 (fps) = Max Velocity through Grate 2 (fps) _ Time to Drain 97%of Inflow Volume froure) = Time to Drain 99%of Inflow Volume (houa) = Maximum Pointing Depth (A) _ Area M Maximum Pondi g Depth (aces) _ Maximum Volume Stored (ace-ft) = bez4 WQCV EURV 2Year 5Year 10 Year 25 Year 50 Year IOOYear 500 Year 0.53 1.07 0.99 1.10 1.40 1.99 2.15 2.86 3.87 0.009 0.029 0.024 0.028 0.036 0.053 0.058 0.078 0.108 O.ODS 0.029 0.023 0.027 0.035 0.052 0.057 0.078 0,108 0.00 0.00 0.01 0,07 0.21 063 0.80 1.24 1.96 0.0 0.0 0.0 0.0 0.1 0.2 D3 0.4 0.6 0.1 0.4 0.3 0.3 0.5 OJ 0.7 1'0 1.4 0.0 00 00 0.0 0.0 0.0 UO 0.0 00 N/A NIA N/A 0.4 0.1 0.0 0.0 0.0 0.0 Filtration Media Filtration Media FlRratlon Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media N/A N/A N/A N/A N/A N/A NIA N/A N/A NA NA NA NA NA N/A NA NA NA 12 37 30 34 45 65 71 96 133 12 37 31 35 46 67 72 98 136 0.73 100 1.00 1.00 1.0o 100 1.00 1.00 1.00 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0007 0.009 0009 0.009 O.OD9 0-009 0.009 0.OD9 0.009 t.0 3.1 1 0.8 OS 0.4 0.1 0 0.1 1.1 1 0.8 Detention Basin Outlet Structure Design uu-ueren[mn, version s.ur [re0ruary zulq smrx a E I 0 TIME Ihrl OMIN TIME Ihrl aso :� UserArcalMll s00 _ —IMerpdateeAm lh^ll _ -- ..a_wmm.rrara.lh^ll - 350 - —Valumc [h"3l •• 0 •• Summary Volume lh13l 301) —Duffi. l3lsl --0-- Summery Outflow Itfsl T e 150 Ei 300 SaC 150 3 100 50 — 0 0.00 0.10 0,x0 0.50 VONDING OEM Ihl B-A-V-D Chart Aela Ovaul0a x-axis Lett Y-Axis RI hl V-Aais minimum bou lMmum maxiCountf l0 too i� 0.03 0.01 0.01 0.00 0.00 0.00 0,R Detention Basin Outlet Structure Design Storm Inflow Hydrographs UD-Detention, Version 1.07 (Febmary 2017) - - .,'ated InOnx hydmomphs horn Ws w t-.0 WN Inflow h.. SOURCE WORKBOOK WORKe00K WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK Time InIm al TIME WQCV [dsI EURV(cfs] 2Year[cfsl SYear[cfs] 10Year(ds] 2SYe3r[cfsl 5OYear(ch] 100Year(ds] S00Yearids 8.78 min 0:00:00 0m o00 000 o00 0.00 0.00 ow 000 000 Hyd,oWeph 0:13:34 0.m ow000 CA Coo 0.00 0.00 2A0 0 constard 0:20:20 0.01 0.02 0.03 0.02 0.02 0.03 0.03 0.05 0.0000 0.737 0:2707 0.02 1 0.05 ON 1 004 006 1 ON O.W I0.12 0.16 Detention Basin Outlet Structure Design UD-Detention, Version 3.07 (February 2017) summary, StagMrea-volumtDlscharge Relationships 'File user can create a summary S-A-V D by nnlering the dI stage increrneols and the rernainGar of the table WII populate automatically The user shoulri lyaphlcally comoara the summary S-A-V-0 table to the full S A V D table In the chars In confirm II caidure, All Mev transillon points ®®®®®®® best results, Includethe of all grade slope changes (e.g. 5V and Floor) ------stages - ------- from the S-A-V table on Sheet 'Basin'. Also include the inwers; of all outlets (e.g. wil orifice, grate, and spillway, where applicable). ------erfl.. - ------- -IIIIIIIII_----- —IIIIIIIIIIIIIIIIIIII♦IIIIIIIIIIIIIIIIII■IIIIIIIIIIIIIIIIII■IIII—IIIIIIIIIIIIIIIIIIII,— —IIIIIIIIIIIIIIIIII■1111111111111111111111III---- —IIIIIIIIIIIIIIIIIIIII,IIIIIIIIIIIIIIIIIIIIII,IIIIIIIIIIIIIIIIIIII, IIIIIIIIIIIIIIIIIII♦1111111111111111111111111111111111111111111111 —IIIIIIIIIIIIIIIIII■ IIIIIIIIIIIIIIIIIII♦IIII—IIIIIIIIIIIIIIIIII♦IIIIIIIIIIIIIIIIII♦IIIIIIIIIIIIIIIIIIII♦ ---I---IIIIIIIIIIIIIIIIIIII♦ ----I—I—IIIIIIIII- ---IIIIIII—I--III- ---IIII---- --_IIIII--IIIIIIIIIIIIII-- ---IIIIIIIIIIIIIIIIII■ _—IIIIIIIIIIIIIIIIIIII♦ --IIIIII---IIIIIIIIIIIIIIIIII■IIIIIIIIIIIIIIIIIIII♦ ---II—IIIIIIIIIIIIIIIIII♦-- --IIIIIIIIIIIIIIIIII♦—IIIIIIIIIIIIIIIIII♦-- -IIIIIIIIIIIIIIIIII♦—IIIIIIIIIIII_IIIIIIIIIIIIIIII.—IIIIIIIIIIIIIIIIIIII■ —IIIIIIIIIIIIIIIIII■IIIIIIIIIIIIIIIIIII♦IIIIIIIIIIIIIIIIIII■IIIIIIIIIIIIIIIIII♦ II—IIIIIIIIIIIIIIIIIIII■ — IIIIIIIIIIIIIIIIIIIII,111111111111111111111111111111111111111111♦ IIIIIIIIIIIIIIIIII■ IIIIIIIIIIIIIIIIIIIIII, IIIIIIIIIIIIIIIIIIII■ ---IIIIIIIIIIIIIIIIII♦--- — IIIIIIIIIIIIIIIIII■ IIIIIIIIIIIIIIIIII■ 1111111111111111111111111111111111111111■ IIIIIIIIIIIIIIIIIIIIII, IIIIIIIIIIIIIIIIIIII■ —IIIIIIIIIIIIIIIIII■ IIIIIIIIIIIIIIIIII■1111111111111111111111111111111111111111■II—IIIIIIIIIIIIIIIIIIII■ --_--IIIIIIIIIIIIII_— ----IIIIIIIIIIIIIIIIII♦II-- DETENTION BASIN STAGE -STORAGE TABLE BUILDER UU-Detention, Verabn 3.D7 (February 2017) Protect'. 1e-0'IB Fon Colllne Jeoo Basin ID'. Blwabntlon Pone C w�wTT � 1 Ta�a an ro•/ w a Elu mpla lone CondlBumtlon (Retention Pondl Required Vol. Calculation B uvdd BMP NateSMU Welenneo slope• o0J5 n Warman. 4r nna m,iii • w wov It demand" Hydro"Id Sou Group A• 0.0% enl Pardenls,s HyCmbpK Soil Gmup B - 0 0% roam Pe damage Horologe Sall Grwpa CID = 100,0% mnt Came WDCV Own Time• 12.0 ours Loodmn for 1 m Remlen Dennis • Era weer, OupMy Cwlun Volume MCCV)• 0.042 Cafem Eve Urean Runoff Valume(EURVI- 0w wafeel 2yr Rulloll Volum(P1. 0 W in). D113 one fee 099 Imore. Syr Runde Volume (PI e 1 1 m) . 01M oreTeel 1 10 none. 1Dyr Runde Volume (P1 e l a in ) • 0171 —hall 1 ao hms 2Syr Ruroe Volume(PI =I 99 in I- 0MI age ful 199 none. 50-yr Pump VolurM(PI .215 in 1= 0.274 Cm feet 215 none. 100.yr Ruroe VOlume(PI -2.Bi11n 1- 0323 on. feel 2e5 none. 5 yr Rurofl Vch.re(PI -De9m.1- 0519 afeei 'none. OpprOnrrole 2.yr Deletion Vaimm 0.106 ae.leer Mmittrnle 6-r Common Volone, olzs deals( rppmamaer 10"Detention Volume 0150 c-fam aapmernme 2syr Deirmunn Velum • 0209 dra.lP.1 PDpIOnTBIe 5Dyr Delenuon Volume • 0IM R.leel Anon... 10Dyr Detention Vourro. ax51 .(eel BteBa-Btoropa Calculation Zone 1 Vaunt, n aW Select Iona 2 Storage Voume (dentate) Select Zone 3 storage Volume (optional) - Total Ownlmn Bum Volume = New surcharge wourns I IBV) - meial SurUBr9• Depth (IBD) - Total ArellBdN Deernndn Depth (K..,) - Depth of Thotie Crummil (Hk) - Sidpe of TrKele Chann t (Sh)- Sbpe. elf Mein Ben $We. (s vr) Basin LenOm.to-wiam Recto (R,w) e Kmat Sundmil Nee (qw) Summarpe wuma Lane", (L,a) suiwroe volume Width (w t) Depth 0f Henm Fbor Mr...) Lmdth .I Seem Floor(Lnoo.) WHN of B•.in Fmr (WI—) Nee of Ben Flow (N,o.J Volume or Iben Fbor (V.mo.) Noah of Mein Bean (HeuJ Length of Main Bum(Luux) Worm of Main BNIn W _) Mee M Met Bad. (A.,.,J voiuhva of Man Bwln (Vey.) Calculated Total Boen Volurne (V„„„,) B Tol.l e.bnildn volume i. I... than IDpyaer volume �e2.SiSl.1R•i��tll� �li��� �� •. BIwN.nlmn Pond C tam, Bean 11i6,2011. 4 40 PM o.m DETENTION BASIN STAGE -STORAGE TABLE BUILDER UD.DetenWn. Vami n 3.07 (Fsb ary 2017) snpinl —..Eh I An. (Iftl 1.ao SY (ft.) A.11.1..1 —V.1um.l.1-nl iw 00 wo 300 0 z.oa o.ws Y O.03o 0.015 l — o.wo 1.00 meNnnon Pond c 4.m Bello 11/B2017, d 40 PM 1 Detention Basin Outlet Structure Design Project: 16418 Fort Collins Jeep Baaln to: gioretendon Pond C Stage (k) Zone Volume(ac-k) Outlet Type area, Zone Zone I1WQCvj 0.96 0.042 Filtration Media Zone 2 Nf Wpl (MrKF IPAruMM dwicaa ione3 xw_ Example Zone Configuration (Retention Pond) 0042 tribal User Input: Orifice at Underdraln Outlet (typically used to drain WQCV In a Filtration SNIP) Calculated Parameters for Underdrain Underdrain Orifice Invert Depth= 2.00 k(distance below the filtration media surface) Undertlram Orifice Area= 0.0 Underdrain Orifice Diameter = 1.02 inches Underdrain Orlflce Commit! = 0.04 feet User Input: Orifice Plate with one or more orMkes or Elliptical Slot Weir (typically used to drat. WQCV and/or EUF Invert of Lowest Orifice • k(reiaClve to basin bottom at Stage =Olt) Depth at top of Zone using Orifice Plate = If,, tive to basin bottom at Stage =0k) Orifice Plate: Orifice Vertica l Spacing = inches Orifice Plate'. Orifice Area per Row = inches User Input Stage and Tool Area of Each Ortflce Stage of Orifice Centrold (h; Orifice Ana (q. Incheal Stage of Odgcs Centrold (it) Odgce Ares Haar inch") User Input: Vertical Drifts(CIr Invert of Vertical Orifice - Depth at top of Zone using Vertical Orifice - Vertlal Orifice Diameter - (relative to basin bottom at Stage - 0 fill (relative to basin bottom at Stage = 0 k) Mete VJQ Orifice Area per Row Elliptical Half -Width Elllimcel Slat Centrold Elliptical Slot Area Calculated Parameters for Vertical Or la Not Selected Not Selected Vertical Orifice Area - k' Vertical Orifice Centrold -I feet User Input: Overflow Weir (Dropboxl and Grate (Flat or Sloped) Calculated Parameters for Overflow Weir Not Selected Not Selected Not Selected I Not Selected Overflow Weir Front Edge Height, He- It(relative to basin bottom at Stage =Olt) Height of Grate Upper Edge, H,= feet Overflow Welr Front Edge Length - feet Over Flow Weir Slope Length = feet Overflow Weir Slope+ H:V(enter zero for flat grate) Grate Open Area /100-yr Orifice Area= should be a Hertz. Length of Weir Sides - feet Overflow Grate Open Area w/o Debris - ft I Overflow Grate Open Area %_ %, grate open areattotal area Overflow Grate Open Area w/Dews- k° Debris Clogging %+ % User Input: Outlet Pipe w/ Flaw Rosh etbn Mate (Circular Odfia. Restdctor Plate, or Rectangular Orifice) Calculated Parameters for Outlet Pipe w/ Flow Restriction Mate Not Selected Not Selected Not Selected Not Sesich d Depth to Invert af0utlet Pipe• IT (distance below basin bottom at Stage• 0 k) Outlet Orifice Area= kz Circular Orlflce Diameter • Inches Outlet Orifice Centrold =I I feet Half -Central Angle of Restrlctor Plate on Pipe -1 N/A I N/A radians User Input: Emergency Spillway (Rectangular or Trapazoldall Calculated Parameters for Spllhvay Spillway Invert Stage= 1t Initiative to basin bottom at Stage-0 k) Spillway Design Flow Depth= feet Spillway Crest Length= feet Stage at Top of Freeboard=feet Spillway End Slopes= H:V Basin Area at Top of Freeboard= acres Freeboard above Max Water Surface= feet Routed HVdrograph Results Design Storm Return Period One -Hour Rainfall Depth (In) Calculated Runoff Volume (aue-fa OPTIONAL Overrate Runoff Volume (Kre-ra Inflow Hydngraph Volume (sortrh) Predevelopment Unit Peak Flow, q (c(slacre) _ Pradevelopmenl Peak O (do) Peek Inflow 0 (do) Peak Outflow O (cfs) Rollo Peak Outflow to Pradevelopment O Structure Controlling Flaw Max Velocity through Orate 1 (fps) Max Velocity through Orate 2 (fps) Time to Drain 97%of Inflow Volume (hours) Tim, to Drain 99%of In0ow Volume (hours) _ Maximum Pending Depth (k)+ Area at Maximum POIMIno Depth (acres) _ Maximum Volume Stored (acrehi WOCV EURV 2Year 5Year 30 Year 25 Year 50 Year 100 Year 500 Year 0.53 1.07 0.99 1.10 t.40 1.99 2.15 2.96 3.89 0.042 0.140 0.113 0.133 0.171 0.251 0, 274 0.373 0.519 0.042 0.139 0.113 0.132 0,170 0.250 0.273 0.372 0.518 0.00 0.00 0.01 0,07 0.20 0.60 076 1.19 1.89 0.0 O.0 0.0 0.1 0.3 0.9 1.2 1.9 3.0 0.5 L7 1.4 1.6 2.0 3.0 3.2 4.4 6.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 OD NIA N/A N/A 0.5 0.1 0.0 0.0 0.0 0.0 Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media Filtration Media NA NA NA NA NA NA NA NA N/A N/A N/A NIA N/A N/A N/A N/A N/A N/A 12 36 30 34 44 64 69 94 130 II 37 30 35 45 65 71 96 133 O.75 1.00 I DO 1.00 1,00 1.00 1.00 1. GO 1.00 0.04 0.04 0.04 0.04 0.04 0.04 0,04 0.04 0.04 0.033 0.044 1044 DA44 0.044 a.044 0,0" 0.044 0.044 SOem IM SWI11 W\ IOg111M 6 5 _/ Y 3 l 0 0.] 1 0.6 e 10.6 0.4 0.2 0 0.1 I,s00 0 Veer ArealftA]1 — ImelMiatetl Area Ift"11 1♦ 5ummary Area Ift•S) 2,000 —V.I..itHl ••►• Summary Vdume M"3) —oudimi Id') aa.. Summary OuftO [ns] m 1,500 1,000 — C_ ig sa0 Detention Basin Outlet Structure Design uu-uerennon, version n.ui tre0ruary mlq EI 1 10 TIME Ihr) DIIAIN TIME IhrI 10 0.00 0.10 040 0.60 0.80 1.00 MNDING DEPIN Ift) S-A-V-D Chan Axis ovaMOa X-ads Left Y-Axis RI ht V-Axis minimum b ntl maximum Wuntl 100 0.05 005 0.0a 0.04 0.03 _ 0.03 001 0,02 0,01 0.01 0.00 1,20 ' Detention Basin Outlet Structure Design Storm Inflow XydnWaphs UD-Detention,Vemion3.07[Febr Vary -h5 '..ser can cremde the calculated -i nll.]w hydrn9ra0hs fmm this wvY 16velopBn in a 6eGar..l- SOURCE WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK WORKBOOK Tme lntwval TIME WOCV]<fs] EURV]ds) 2Year[ds] SYear[ds] 10Year[ds] 25 Year[ds] SOYear[ds] 1MYear[ds) 500Year[cfsl 7.07 min O:W:00 0.00 O.W O.W Um O.W O.W O.W O.W 0.W Hydrogrdph 0:16:08 0.W O.W 0.W CM OW 0.00 0.W 0.00 0.W ConslaM 0:21'13 0.02 0.08 0.06 0.0] 0A9 0.13 0,15 0.20 0.2] 0.707 0'.28:17 0.06 020 0.16 8.19 o25 0.36 0.39 0.53 OJ3 I Detention Basin Outlet Structure Design IJD�Detention, Version 3.07 (February 2017) Summary Stage -Area -Volume -Discharge Relationships l :gym oi ta,cr. ewe an„r aid b-A-V D b, et lemy tlo- de,eJ sl. rr s er er le ono the remainder of the table will poollot, ur t" ."'A' The r.l l rran Ilr mna e .he. S-A-V-5 lahlr. In the lull S-A V-D Inblc -r the chart In -nl t m I couture, all k.v tramton nninh, For best results, include the stages of all grade slope (e.g. ISV ad Floor) from the S-A-V table on ------clao,es - ------- include the irverts of all vertical orifice, !overflow grate, and spillway, here applicable). -------Mso ---_---'(e.g. ---_--0' - I , I III / II I I II it l II II I I I I I II I. mu L CW BEND ACREIFASE bTRUCnXRE V Ih 1 Ti i WQBIORETENTION BASIN B VOLUME REQUIRED = 0.009 AC -FT VOLUME PROVIDED = 0.009 AC -FT I I I n1 1 / n{ I�r'I I/ I n; II IS I I I I�9 I I 1 I Vq PEIEISE 3IRUCNiF s II E &III � / % 1P-e•NDIP I RARFD1OnUtlll // X41' i ill I r J III I II II, I I I I em•BEHn I I I 10 I l\/ I / 1I I I t �� a Runoff Analysis Date Table Best) ID C2 C100 02 (CIS) 0100 (Ma) A 0.87 0.95 &W 2.02 B 0.B3 0.0 0.76 2.94 C 0.80 0.89 3.33 12.96 i r -1 NNP - � DRAINAGE LEGEND M M M M PROPOSED BASIN BOUNDARY LINE 'S«a' - EX. MAJOR CONTOUR - EX. MINORCONTOUR �Saa— PR. MAJOR CONTOUR PL MINOR CONTOUR ummrw=o U. STORM P . STORM PROPOSED CONCRETE BASIN NAME II .SOT 9 'Lyi 1Wyl 3WC VALUE BASIN LABEL ppYC VALUE ---I 7 A F \, t 0.42 WA )PIPE I I a I O O I �� t I1 s WQBIORETENTION IN A ' r I VOLUME REQUIRED = 0.006 AC -FT I I I VOLUME PROVIDED = 0.006 AC -FT I _ I 1 ■ III. III. � C I _ LOT 1 1' P 1.72 :89 L B y e I 1 a 0.331.1 1 \\ \I 1 O I I I 0,56 WA WEE-, t� \ \ I I• `ooBaioTTEnRPE \ ' _. _L =' J \ AB ---c -L- 1. / sI I I r , WOIBIORETENTION BASIN C - l an`1M VOLUME REQUIRED = 0.042 AC -FT / I j VOLUMEPROVIDED=0.042 AC -FT /I I I vamc I aLOTTED PPE I T/ ♦ wonEiEAse s,nucTulE /�1 �L , 311E-C XI ■ IIII � •r WEST HARMONY ROAD BASN ACREAGE Qi DESIGN POINT �11 If it I II II II it II II II I, II II II II I II !I $ II I \ II II II II ---- II it 11 l N I I I BENCHMARK: iii BENCHIAINKPRWECT : .MANORS BENCHMARK IM&N. AN ALLOY CAP LOCATED ON THE RIM OF AN ELECTRIC S I I MANHOLE ON THE NORTH SIDE OF HARMONY ROAD. APPROXIMATELY SV \ I EASTOFTHESOUTH 1NCCRNERO1`SECT1CN35. \ ELEVATION =5 79 11 I BENCHMARKIM"l, APPROXIMATELYIn SWTHOFHORSETOOTHROAD, WESTOF COLLEGE AVENUE AT THE ENTRANCE OF BMNES AND NOBLE BOOKSTORE, IN THE NORTHEAST CORNER OF THEIR PARKING LOT, ONA CONCRETE CURB. I ELEVATION =3D35.T8 PLEASE NOTE: THIS PUN SET IS USING MAVENS) FOR AVERTICAL DATUM. IOP08EDAMLOAFLNNT SURROUNDING DEVELOPMENTS HAVE USED NGVD39 UMMUSTED FOR SFUT TOR STORM MANHOLE THEIRVERTCALDATUMS. I IF NOVI)n UNADJUSTED DATUM IS RECURRED FOR ANY PURPoSE, THE IF -CRAPE r_. .FIXLOWING EQUATION SHOULD BE USED: PROPoSEU I6 TYPE R NI£T NGV039 UNADJUSTED=NXV -3.19 IPNOPWEDAE CCIA 49MU TTOPSTORM4 MN11O£CONNECT AMP OUTIETTO E ISTING STORM SEVER —EMsnec sroRM SEWER 1Le below. CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL AFFRONTED. cm ENONEEa �Tf uE ED eY WA EflS WASTE Wpi —�� CHECKEDBY: MMW�N� CHECBEDBY: CHECKEDBY: TPMFK EXGINF R CHECKED": EWI E f w i US U O LL G 0 Z;m' WIrAE W 0 0 8 Z zam IN W Zoo 7 O O IsOU� U> Z3w a 0 ox_a F O Q G- Q lawns K Ha A a G1a