Loading...
HomeMy WebLinkAboutDrainage Reports - 08/07/1997r- MAY 15 1997 D u� THIS FINAL STORM DRAINAGE STUDY AND REPORT FOR SOUTH SHIELDS STREET IMPROVEMENTS (RECONSTRUCTION AND WIDENING BETWEEN WAKE ROBIN DRIVE NORTH OF HARMONY ROAD AND HORSETOOTH ROAD) WAS PREPARED BY LAND DEVELOPMENT SERVICES USING THE CITY OF FORT COLLINS STORM DRAINAGE DESIGN CRITERIA, dated May, 1984. The results of this drainage study are reported in the enclosed text and supporting documents, and are shown in further detail on the Utility Plans submitted concurrently with this report. Signed this j5JE-!day-g£—May, 1997. Dennis L. Donovan, P.E. Land Development Services 309 W. Harmony Road Fort Collins, Colorado 80526 Phone (303) 225-9244 FINAL STORM DRAINAGE REPORT FOR SOUTH SHIELDS STREET IMPROVEMENTS WAKE ROBIN DRIVE DRIVE TO HORSETOOTH ROAD I. GENERAL INFORMATION The portion of South Shields.Street that is the subject of this storm drainage and erosion control report is between Harmony Road and Horsetooth Road in southeast Fort Collins, Colorado. A general Vicinity Map of the area is provided at the end of this report. The street extends north and south, while natural storm runoff patterns are from west to east. The arterial street is to be totally reconstructed and widened from approximately 1,000 feet north of Harmony Road to the south side of the Shields Street and Horsetooth Road intersection, a distance of about 4,200 feet. Stationing of the reach to be reconstructed extends from —6+00 on the south end closest to Harmony to +36+20 on the north end on the south side of Horsetooth. This method of stationing was chosen to match a set of construction drawings previously prepared for a lesser project that would have been several hundred feet shorter in length. All of the street plan and profile sheets, cross—section information, detail sheets and traffic lane striping plans are not included as exhibits to this report, but are on file with the City. Sheet 6 of 17 (Storm Drainage and Erosion Control) is included as Exhibit A to this report. Exhibit A shows the storm drainage subbasin locations, hydrologic characteristics, directions of flow, storm drainage facilities, finished contours,intersection locations, erosion control, etc. Exhibits B and C are also included with this report. They are plan and profile sheets for separate storm sewers at the south and north ends of the street improvement area. There are two City Master Drainage Basins that cross Shields in this stretch of improvements — the McClleland Mail Creek Basin for the southerly two thirds and the Foothills Basin for the northerly one third. Within the limits of this construction project are existing intersections with Shields Street. Troutman Parkway exists to the east near the south end; Wabash Street exists to the west about 1,300 feet South of Horsetooth, and Arbor Drive exists to the east about 500 feet south of Horsetooth. As a part of this reconstruction project, the west side of Troutman Parkway will be constructed to the back of the curb returns, as will be the Wabash Street intersection east of Shields — again to the back of the curb returns. There is no current plan to construct an intersection on the west side of Shields at the Arbor Drive location. The developer of Mountain Ridge Farm agreed to work with the City of Fort Collins to design and construct Shields Street in this area. Other property owners are being asked to provide { FINAL STORM DRAINAGE REPORT FOR SOUTH SHIELDS STREET IMPROVEMENTS WAKE ROBIN,DRIVE DRIVE TO HORSETOOTH ROAD right of way and easements as necessary to allow for the improvements to be constructed — and in some cases to participate directly in the costs of the widened areas. ROW and Easements are currently being sought by the City. The developer of Mountain Ridge Farm also agreed with the City's Storm Water Utility to complete the design of and construct Regional Storm Water detention, storm sewer, and other improvements. Those improvements (which included several crossings of Shields Street at Mountain Ridge Farm) are basically complete now, and the reconstruction of the street itself sould be ready to begin. There are no active irrigation ditches crossing or within the construction limits of this street construction project. Wabash Street drains a small subbasin within Mountain Ridge Farm that will be the only location that surface runoff onto the street improvement area will occur from off —site. As reported in the MRF 1st filing Storm Drainage Report by this office, a total area of only 2 plus acres is planned to drain onto Shields at Wabash Street. Two other development projects that are completed or underway contribute storm runoff to and are a part of the drainage solution for this South Shields Street improvement project. One is Cobblestone Corners P.U.D., which is an existing patio home project north of Wabash Street. Cobblestone provides on site detention for its own needs and a portion of MRF, allowing a release during the 100 year storm of only 1.2 cubic feet per second. This release will flow directly into the northerly storm sewer that is a part of this design — it temporarily daylights into an existing borrow ditch on the west side of Shields. The second is Westfield P.U.D., which is located 900 or so feet west of Shields. That project is also proposing significant detention facilities to minimize ultimate major flood flows to Shields Street. Currently there are no storm drainage crossings under Shields Street except the recently completed improvements at Mountain Ridge Farm. Consequently, if a major storm were to occur, ponding along the west side of Shields would occur along the southerly and northerly portions of the roadway. II. PROPOSED STORM DRAINAGE SYSTEM The east side of Shields is developed from Station —6+00 to about Station 13+00 with curb, gutter, sidewalk and landscaping. It is not anticipated that those improvements will be reconstructed. However, the design does call for removal and replacement of all existing pavement structure in this area. ia4 e Z FINAL STORM DRAINAGE REPORT FOR SOUTH SHIELDS STREET IMPROVEMENTS WAKE ROBIN DRIVE DRIVE TO HORSETOOTH ROAD There is some existing curb and gutter from Station —5+00 to Station —3+30 on the west side of Shields that will need to be removed and reconstructed to accommdate adequate drainage. In this reach the design calls for creating a high point on the west side of Shields at about Station —2+00 to allow adequate curb and gutter slope northerly to Detention Pond # 247 within MRF. There is no positive drainage on the west side -of Shields, either to the north, south or east at Station —3+00, so a 15 inch storm sewer has been designed to carry storm runoff to Pond #247 paralleling the west side of Shields. Again all of the existing asphalt pavement section is to be removed and replaced from Station — 6+00 to Horsetooth Road on both sides of the road. Median landscaped islands are to be incorporated in the improvements. These are also designed to accommodate traffic turning movements; and there are deceleration, acceleration and bike lanes within the new roadway as well. Design of the proper street cross slopes for the median inclusions leads to drainage subbasins having varying widths and characteristics as to amount of pervious surfaces. Using Exhibit A as a visual tool, the following description of the storm drainage subbasins along Shields Street is provided: SH-1 & SH-2 will flow to the south toward Harmony Road. SH-3 & SH-4 will flow to an existing curb chase on the east side of the street. SH-5 & SH-6 will flow northerly to existing Troutman Parkway, where they will drain off of Shields to the west and east respectively. SH-7,.SH-8, SH-9 and SH-10 flow both northerly and southerly to two 10 foot Inlets in the low point of Shields adjacent to MRF. Runoff from 7 and 8 will flow from the easterly inlet into the newly constructed SD manhole on the east side of Shields — and from there easterly in the storm sewer system. Runoff from 9 and 10 will flow from the westerly inlet directly into Detention Pond # 247. Storm runoff from SH-11 will flow northerly to future Wabash Street and easterly to the east side of the newly constructed intersection — and then onto the existing undeveloped ground. SH-12 will flow from south of the existing Wabash intersection across the intersection and all the way to an existing inlet at the southwest corner of the Shields/Horsetooth Intersection. At Wabash, runoff from MRF will also enter the curb and gutter and flow to the same destination. Subbasin SH-13 will flow to Arbor Drive and then easterly away from Shields into the street section of Arbor. SH-14 will drain from the north side of Arbor to the southeast corner of Shields and Horsetooth and then easterly in the southerly gutter of Horsetooth. pe;q Q 3 FINAL STORM DRAINAGE REPORT FOR SOUTH SHIELDS STREET IMPROVEMENTS WAKE ROBIN DRIVE DRIVE TO HORSETOOTH ROAD A typical cross section of the improved Shields Street contains 2 feet of planted area behind the sidewalk, 8.5 feet of same between walk and curb, and a varying amount of planted median area within the particular subbasin. New driveway accesses are to churches in the southwest corner intersection and at the southeast regional storm drainage crossings be provided for the existing of the Shields/Horsetooth corner of the newly constructed of Shields from MRF. The Hydrologic Characteristics for the sub —basins associated with this street improvement project filing, as well as for the combined sub basins at Design Point #Is I thru VII are included on the following page as Table 1. RoL 4- 4 TABLE 1 HYDROLOGIC CHARACTERISTICS SOUTH SHIELDS STREET RECONSTRUCTION WAKE ROBIN DRIVE TO HORSETOOTH ROAD 0 10 YEAR 100 YEAR BASIN AREA C VALUE TIME OF TIME OF i 10-YR i 100-YR 0 10-YR 0 100-YR DESIGN DESIGNATION CONCEN- CONCEN- TRATION TRATION (ACRES) (MIN) j(MIN) (in/hr) (in/hr) (CFS) (CFS) SH-1 0.45 0.85 10.0 10.0 4.5 7.2 1.7 3.2 SH-2 0.23 0.85 10.0 10.0 4.5 7.2 09 1.7 SH-3 0.31 0.85 10.0 10.0 4.5 7.2 1..2 2.2 SH-4 0.24 0.85 10.0 10.0 4.5 7.2 0.9 1.7 SH-5 0.85 0.85 10.0 10.0 4.5 7.2 3.3 6.1 SH-6 0.60 0.85 10.0 10.0 4.5 7.2 2.3 4.3 SH-7 0.96 0.85 10.7 10.0 4.3 7.2 3.5 6.9 SH-8 1.15 0.85 10.7 10.0 4.3 7.2 4.2 8.3 SH-9 0.72 0.85 10.0 10.0 4.5 7.2 2.8 5.2 SH-.10 0.72 0.85 10.0 10.0 4.5 7.2 2.8 5.2 SH-11 0.44 0.85 10.0 10.0 4.5 7.2 1.7 3.2 SH-12 2.16 0.85 20.4 18.4 3.2 5.4 5.9 11.7 SH-13 0.92 0.85 11,.7 10.0 4.2 7.2 3.3 6.6 SH-14 0.72 0.85 10.0 10.0 4.5 7.2 2.8 5.2 COMBINED FLOWS SH-3 a SH-4 0.55 0.85 10.0 10.0 4.5 7.2 2.1 4.0 I SH-7 aSH-10 1.68 0.85 10.7 10.0 4.3 7.2 6.1 12.1 II SH-8 a SH-9 1.87 0.85 10.7 10.0 4.3 7.2 6.8 13.5 >;II MRF 11 9 12 2.08 0.47 12.7 11.8 3.2 6.8 3.1 8.8 'IV CC-1 10.3 Detained and Released at 1.2 V WF-i ? Allowable in 36" RCP is 10.3 VI SH-12 a MRF 4.24 0.66 -26.4 1 -:'4' -}-$ e'Q i}Q. 48 .rt9 VII a�s11a12 S14 Uo,8 2.8 y"5 7.9 7 NOTE: "C" VALUES ARE WEIGHTED BASED ON 0.25 FOR PLANTED AREAS AND 0.95 FOR IMPERVIOUS ROADWAY SURFACES FINAL STORM DRAINAGE REPORT FOR SOUTH SHIELDS STREET IMPROVEMENTS — WAKE ROBIN DRIVE TO HORSETOOTH ROAD The Time of Concentrations were determined using the equation for overland flow in the City design manual, and then by adding the time of concentrated gutter flow. The time of concentrated'flow was estimated using Figure 3-2 "Estimate of Average Flow Velocity for Use with the Rational Formula" provided in the "Urban Hydrology for Small Watersheds" Technical Release No. 55, USDA, SCS January, 1975. The formula for overland flow Time of Concentration is: Tc = [1.87 (1.1 — CCf) D1/23 / S1/3 The subbasins in the South Shields Street reconstruction and widening project are relatively small. The maximum time of concentration for any of the individual subbasins is just 20.4 minutes for a 10 year storm and 18.4 for a 100 year storm in Subbasin SH-12. A 10 minute minimum time of concentration was used for most of the other subbasins, since combined overland and concentrated flow times were at or less than 10 minutes. The Time of Concentration for Subbasin 12 is estimated by assuming minimal overland flow (i.e. 15 feet) and a time of 2.4 minutes, with 1620 feet of flow concentrated in the curb and gutter. That flow is estimated at 1.5 feet per second in the 0.4 to 1.0 percent slopes along the gutter, which equates to a time of concentration of 18.0 minutes. So 20.4 minutes is the total time. Time of Concentration for Combined Subbasin flows at the Design Points is determined using the longest time of concentration for any of the subbasins contributing to that point. The longest time of concentration was 27.7 minutes at Design Point VII, which is at the inlet in the southwest corner of the Horsetooth intersection. At that point runoff from MRF combines with SH-12. MRF subbasins travel an additional 1,350 feet along the west side of Shields before reaching design point VII. At 1.5 fps, the time is increased from 11.7 to 27.7 minutes (26.8 minutes for the 100 year storm). III. DESCRIPTION OF STREET FLOWS AND DRAINAGE IMPROVEMENTS Due to the relatively small area of the subbasins that will contribute storm runoff from the Shields Street improvement project, the concentration of discharges in the street gutters will be relatively minor. The largest flow in a gutter will be from Subbasin SH-12 and the MRF subbasins as it approaches the Horsetooth inlet. There a 10 year design discharge of 7.8 cfs is estimated, and a 100 year "major" design discharge of 15.7 cfs is estimated. The slope of the street at that location is 0.44 percent. P��� 5 FINAL STORM DRAINAGE REPORT FOR SOUTH SHIELDS STREET IMPROVEMENTS - WAKE ROBIN DRIVE TO HORSETOOTH ROAD According to Figure 4-1 of following criteria: Cross Slope 50; a Roughness Coefficient (n) factor of Z/n of 3,125; and an gutter of 6 inches during a two gutter capacity is 19 cfs. the design manual and using the of 2 %, so a Reciprocal (Z) of of 0.016 from Table 4-3, so a allowable depth of flow in the year storm; the theoretical Allowing for design purposes an actual gutter capacity of fifty percent of theoretical (per Figure 4-2 of the reference), the gutter must carry about 9.5 cfs before exceeding City criteria for the 10 year storm. The 7.8 cfs actual flow will be 5 or so inches deep in the gutter, or 1 or so inches below allowable. The allowable capacity for the 100 year storm discharge at Design Point VII (the 100 year discharge of 15.7 cfs means that a design amount of 31.4 cfs with 50 percent reduction factor should be used) will pond at a depth of less than 7 inches - allowable is 1.0 feet. Obviously, street gutter flows in are well within City of Fort Collins criteria. Storm drainage facilities, or improvements, for this Shields Street reconstruction include cross pans at the intersections of Troutman Parkway west, Wabash Street west, Arbor Drive east and the driveways into the church properties at the southwest corner of Horsetooth and across from MRF. Also they include the inlets and storm sewers at the low point (Station 13+75) on both sides of the street as previously discussed. The inlet at the low point in the proposed curb and gutter that drains into the detention pond in MRF is to be a 10 foot Type R inlet. Figure 5-2 of the City Drainage Criteria manual shows a theoretical capacity to accept storm runoff of 1.2 cfs per foot of length within the allowable 6 inch depth and 6 inch height of opening for a 10 year storm. A Reduction Factor of 80 percent shows 0.96 cfs per foot actual capacity. The ten (10) foot inlet will accommodate 10 times 0.96, or 9.6 cfs. This allowable capacity is more than the combined flows of Subbasins SH-8 and SH-9 on the east side of the street. The 10 year storm discharge for the two subbasins is 6.8 at the inlet, which is well within the criteria. At the other 10 foot Type R inlet on the west side of the street which drains into Detention Pond #247, Subbasins SH-7 and SH-10 contribute a ten year storm of 6.1 cfs and a 100 year storm of 12.1 cfs. The approach slope and other capacity factors are the same, so the inlet is obviously adequate for the two year storm. The 100 year storm will pond to a depth of only 7 to 8 inches while entering the inlet, which is well below the 15 inches allowed according to City Criteria. Fa�ea FINAL STORM DRAINAGE REPORT'FOR SOUTH SHIELDS STREET IMPROVEMENTS — WAKE ROBIN DRIVE TO HORSETOOTH ROAD In summary, the proposed storm drainage system and improvements for the Shields project is.rather minor in scope, and generally consistent with the Master Plans (subject to the modifications described above), and the resulting storm drainage system should adequately protect life and property on the site. Page-7 I THIS FINAL EROSION CONTROL PLAN REPORT FOR SOUTH SHIELDS STREET IMPROVEMENTS (RE —CONSTRUCTION AND WIDENING BETWEEN WAKE ROBIN DRIVE AND HORSETOOTH ROAD) WAS PREPARED BY LAND DEVELOPMENT SERVICES USING THE CITY OF FORT COLLINS EROSION CONTROL REFERENCE MANUAL for Construction Sites, dated January, 1991. The results of this erosion control study are reported in the enclosed text and supporting documents, and are shown in further detail on the Utility Plans submitted concurrently with this report. Signed this 15th day of May, 1997. Dennis L. Donovan, P.E. Land Development Services 309 W. Harmony Road — Unit B Fort Collins, Colorado 80526 Phone (303) 225-9244 I FINAL EROSION CONTROL PLAN REPORT FOR SOUTH SHIELDS STREET RECONSTRUCTION AND WIDENING IMPROVEMENTS FROM WAKE ROBIN DRIVE TO HORSETOOTH ROAD NOTE: NORMALLY, AN EROSION CONTROL COST ESTIMATE AND ACCOMPANYING SECURITY IS REQUIRED. IN THIS CASE, THE CITY OF FORT COLLINS, CITIZENS, AND OUT OF TOWN VISITORS ARE THE PRIME BENEFACTORS OF THE IMPROVEMENTS. ADJACENT PROPERTIES WILL ALSO BENEFIT AND WILL CURRENTLY, OR ULTIMATELY PARTICIPATE IN THE COSTS ON A FRONT FOOTAGE AND BENEFIT EVALUATION. IN THIS INSTANCE, THE NEED FOR AN EROSION CONTROL COST ESTIMATE AND ADDITIONAL SECURITY IS NOT WARRANTED. General Information: The erosion control concepts and general design considerations for this Shields Street reconstruction project are outlined in the following paragraphs and shown in further detail on Exhibit A. The exhibit is the same as for the storm drainage report, which is Sheet 6 of 17 of the Construction Drawings titled SHIELDS DRAINAGE & EROSION CONTROL PLAN. Subbasins SH#'s 1, 29 3, 4, 6, and the southerly two thirds of 7 will just have the pavement reconstructed and no runoff is anticipated that would create a need for erosion control measures. Subbasins SH#'s 5, 8, 9, 10, 11, 12, 13, and the north one-third of 7 will be widened and the back of walk will be at a higher elevation than the existing ground, necessitating a fill slope of 4 to 1 to make up the vertical difference. The curb and gutter exists on the downhill side of subbasin SH-14, and no runoff is expected to affect the adjacent property (i.e. Poudre Valley Plaza). That property is under development, and it is our understanding that they will be installing the detached walk and providing for erosion control down to there existing parking lot. The vast majority of the finished project will be hard surfaces (i.e. asphalt pavement and concrete sidewalk). The medians and parkway areas between the curb and sidewalk are to be planted and irrigated upon finished grading. The side slopes from the sidewalk down to existing grade are to be seeded and mulched upon final grading. The small amounts of disturbed areas that will result from this project - even during construction - make it questionable as to the need for hay bale or silt fence barriers. If it is desirable to have no sediment transport onto adjacent properties, than silt fence outside the toe of slope and construction area should be installed. It might be desirable during construction to place a gravel inlet filter at the existing storm drain inlet at the southwest FINAL EROSION CONTROL PLAN REPORT FOR SOUTH SHIELDS STREET RECONSTRUCTION AND WIDENING IMPROVEMENTS FROM WAKE ROBIN DRIVE TO HORSETOOTH ROAD corner of the Horsetooth intersection. Also, after construction, the same.measure could be installed at the inlet on the east side near Station 14+00. The other inlet drains into the regional pond which acts as a huge settling basin. Since these filters are not desirable adjacent to bicycle and vehicular traffic, especially on arterial streets, it is not recommended that a filter be installed there. There is very little utility work associated with the project. The current schedule calls for concrete and paving to be completed by late -September, and landscaping should follow quickly. During construction, adequate watering of haul roads and areas being graded should be provided to keep down dust. These measures will easily achieve the City's required Performance Standards. It GWI p 'Gf Cory SH \' SH-5 5,(, �`05 wos wNL 0.85 Oc ��QP((✓✓�� (mows ual II s. w,L ""`��00 3e 1c1i, P FUTURE TROUTMAN PARKWAY Lw r .:w S - -- w.m9.; ^�n?ol -- �,.,>,..1,PAT ry wti _-1111- n i • m 12) SH-8 - M z �Epl (91 R k s 0.J !N CIO 2 P �- + aoc ea n9 �- TO 1 I `.. \ .. - __ -_ ON wri a ban BEELI (YET SH-2 SH-3 0 >. SH-4 SH-6 Ili 'I••.•., A = 0.24 cc A - 60 cc In III SH-� SH-H ° = 0.23 cc A - 0.31 cc 010 = OA CIA 010 2.3 cls III III I, CIO = 0.9 CIS 010 IS 1.2 CIA 0100 It 1 J On Ol pp = 43 THIS III III A = 0.96 Oc 2 e A - 1,15 cc c".O = 1J ciz 0100 - 3.3 cis TROUTMAN PARKWAY 010 = 35 OR 3 " 010 - 4.2 Its 0-00 - IIA cis 0100 83 cis SH-9 A B MOUNTAIN RIDGE FARM P.U.D. 1ST FILING T p rv,.""IL' 010 0 2.cc C e cro TABLE 1 3 G AMC, A av Ie.. san11 9trw 0100 NET 5.2 ON3 F o-Nn.Le bNn bEnwry f*,F3 it v s+pw stWw 1 IT x,pROL00If CHARACTERISTICS n• - • / I SOUTH SHIELDS STREET RECONSTRUCTION ' VANE ROBIN DRIVE TO HMSFTOOIN ROM IO YEAR IW YEAR -- - .• J - ~- LVl _ a - 1 C 2 + • \•` _ :a BASIN MM L VALUE TINE OF TIM OF 110 YR 100-YA 0 10-YR 0 1001 NSTON (ee) LO LM 1V]' OESION611M Cd CEN- COR POINT lErl` J� _ )RATION tPATIM IF 1 I•- INS � !e] ' IMRE51 THIN] ("IN) Im/or$ IIn/AN IEF51 IOF61 leg IM1 % 11 0q (61. My 1_ _ --- -- aN-1 0.05 0.05 10.0 10.0 4.5 7.2 1.7 3.2 T� SN GLVOC IN LeT ---- M-i 9.21 0.05 10.0 10.0 4.5 SIB 0.9 1.1 TL£H613 u Sx-] 0.31 MISS 10.0 10.0 6.9 7.2 1.2 2.2 DETg1L SH-• 0.21 0.1115 10.0 10.0 1.5 7.2 0.9 1.7 y\taN WN<�L" O•mnn9a been Sn.mmrt OYP I ' I w SI SPLC a ^ GELLED . CL wH ... Sx-5 0.05 0.95 10.0 10.0 6.5 vi 3.3 6.1 �E 1{`IGLVOI; E RD CE EXIST. CHURCH I - SH-6 0.60 0.0 10.0 10.0 I.S 7.2 2.3 4.5 PLE DySilLVC41CN $EAJEN I qj P- b SH-1 nx-] 0.96 d.n mn 10.0 •s T.: vs e.9 ES o� sS a. $ILAY awea x Is If et. MlNF' M-S 1.15 0.85 m. ] 10.0 e.3 vi 4.2 6.3 NDT SH-7 NLG` FW' A IS 0.72 cc SH-v ani 0.95 10.0 no 4.5 zi z• 9.2 \oN 010 - 2.6 cts PLEgyE INCy]pE M-so 0ni 0.05 m.0 10.0 e.5 ).i 2.6 5.2 A = 0.96 Etc O1 pO = 5.2 c19 CRI APUBE NS MIMKY SH-11 OJB 0.85 10.0 10.0 4.5 ).i 1.) 3.2 010 - 3.5 cis MRF 11 AND 12 SH-12 zl6 9.Ss 20.0 u.1 3.2 5.6 5.9 11.7 tl 0100 - 6.9 cis �bN FWOVg54� qEi SH-13 0.92 0.SS 11.7 10.0 6.2 ).i 3.3 6.6 A - 2.06 Oc QRPfL\'T{ OF TM SIN-11 0Ai o.65 10.0 1a.0 1.5 7.2 2.9 5.2 050 - La ds COBBLESTONE CORNERS P.U.D � mnetwo 0100 = 6.8 CIS FLOWS p WABASH STREET , L / Y 8 sx-] 6 M-e 0,55 0,05 to 10.8 es vz ze Lo 1 9H-9 5. MOUNTAIN RIDGE FARM P.U.D. 1ST FILING �}{. ( Pull SH-1 E 9`N t `R SAL-) aSSH-60 SULE? 1.97 0.05 111. ] 10'0 0.3 7.2 6.1 13.1 11 l C 11. I (1 f.5 - k; F INF it & tz ] 0. 05 10.] 0.0 4.3 7.2 6.9 1].5 I,IV _. A - i.'6 0 11 1 1l 0 '0.6] 12.] 11.0 ].3 6.0-+.CBS. II 2 P 010 - 5.9 C/s 1 Ip (` II p 1? CC -1 10.3 0 tained end Released eL 1 .2 V 5 weaeq bas Swnean R»d 0100 = 11 7 CS I 1_ Y S Q J- IIF'1 ] Al10NaDla 36 10� VI 1 1 less 9N-12 L XRG 5.20 0.66 0.1 IB.4 3.2 L� 9.U'T£.91 VII XIe 11 S 12 /� UL Ns LEGEND c'L-- 7&Ess C4tR qCo oro.To ,.a.. ,TMe Y •`I NYSE -c- VALUES ME VEIONTEO BASED ox O.n FM BLMTEO 6 9�4 Y•Y`£N ` ITN, Ee �$ �1 AREAS MO 0.9 FOR IMFRYI WS ROADVAY 9VRGALE9 v>n ASCII IMl !b' rb POI'3' PACE IN,ry o . NN. m¢. 1 � (bl IN rm _ w n �lMI hJ W I - 1M1 - se0an CLEAT aC p Rs.19 C,=,N 1 1 EM1 •• � ,_ -° I � ^_ EROSION CONTROL NOTES: 1 1 1. All disturbed Knee. e _ --- ore iK be sea0e0 and mu¢netl permenmt q u to)b \ TEST enn .Ka9ee A.naE aeao�, 1 l le•s�K 2. The grading imsc CONCOU9 SH eAL 9 operation if to M monitored on also. . Addli m during Soldiers " ` - Dmlmge ban ANNE RVR) III for sedimentoth rmleasu s should Ind be use ON abK. Addifion0l nmR Gaolers, 9In PLEA IMCO 0/ Olne/ m00luma enOYld Od used O! nNdeeOry. ARS ON SH-10 T L FOUR SEASONS P.U.D. SH-11 SH-1SNL H = p.n a WABASH STREET N 9 In9� 010 = 5 2 c A= 0.44 O 010 IS 3 3 as F Q I I II 11 11 I I osEo Cee•wo -un 01 CO i3s OIO IS 17 CIA 0100 IN 6.6 Is�It 11 � LJ_ Ea SPOT ECn.�an .eX. 0100-3.2 OR AGENT SEEN AI wa n n 11 1r- /bs'ew A=2.16 ae I I II Im ' ME �ma" oi Q10D IN 111.731 EXIST. BUILDING Ilan a 11 1 , I N I I � 1 ®caww Yeee.1 " 9aoe.e w A = 216 cc 'N ^/ 11 Ed, LISPn =10 / SIm za1 III I I III MITTILDELESSce Sol 1 / ex 010 5.9 cis ]� nc'"I'°K<Y e I H I I �I I IT 0100 - 1 t ] cCIS Nor -� - ii� e1 I Ka9L 90 e I, I. PEACE 11 Iw nVel walmq SPAIN Ovol 1 -N 11 II u _ - - - ar -_ ... - R TED CySE. . fe.l w -1,.e -- -=ro) __ _- • Cltt OF FORT COLLINS, Cc e.UTILITY PLAN ROVAL U) On ApPRavEo: ' 156W �+ n9 ble WE CHECKED EPT a Rotor Old WGIN I m'y On, IS n Rro3 � II � ' II • +_ -"- N e 11 N H GHECNEO BY: $ SH-13 J I� 11 60 ]o a w M s1.Iln.n. WIN m1. R SH- IPoI 1 I d 140 CHECKED Sit jig A - 0.92 Cc 0 lµ ii a ii j SCA 9„9. and P.Il.xmn 2�1. 010 = 3.3 cis 1 P-, , A - OJ2 Kc II �7 II 1 1gR1z: I- - M' CHECKED BY: 0100 - 6.6 cts 010 - 2.B eh 11 a II I I 0d4 POUDRE VALLEY PLAZA 0100 - 5.2 cf9 ARBOR AVENUE M RSETOOTH ROAD cxccKEp BY one SHIELDS DRAINAGE AND EROSION CONTROL PLAN SHEET 6 OF 17 P-93-2293 �X tflBi7 S t 6i 8 A p R § TROUTMAN PARKWAY 5" � (FUTURE) o ¢,.._ Su. ♦.qzn AN c o E �R.�¢¢x ♦ orr s_ vca - po.w Z IA ' m .52 ,., ,..__ D cz♦DE swas ro oaury oErzxnTA PONT i 9 m ¢ �^ (Nwxrux noeE vw e.uD el 3 w LEE c5 T ♦c' .ER n�-...'.wEs Dx.E' b E n S ieo dins x n L rue[o Exo sE pox Bss w e ACUTE5 ro e[ DOMED RET € S c gaBCaD a�iww eeLL ea 58 T AND (c LVI°* Dcw c+T Du UR� TjCT = . - �. .•' 4w `� _ p� N II I 11 r _ _ _ _ _ _ _ _ - _. _ iesuL Bn Lr IS ws x Iz EoORM SEWER KBA IDEAArR 4♦' ® J - �l REMOVE 112 rn n NO _ _ Lwj 42 naer- 1 . _._ a R px az Rzn I ____, w .. • • • ___ G r _ _ � I, ♦:i ___--__ _=_ _ ___ — EXISTED z s CURB AMID OU-TER r ... + • 1 .... r E ( EI SN:I z 5. -exe +xo cU-rEe ,vv; o ,.. I £ i EE II II �Px II UTILITY PLAN APPROVAL I IT ' I Cltt DE FORT COLLINS, COLORADO APPROVED. Din[M: °I Enpinfrinq h�Y aoa. TROUTMAN PARKWAY CHECKED BY. (EXISTING) WEE" old woen.me. UNITY Dme CHECKED BY slo.m.Rl¢ UN Iy Ome 50 O J 0 CHECKED By vam °nB Renwaon Wb SCALE HONE CHECKED BY: ART - s Dob CHECKED BY: o°. 1 5105 5105 5100 5100 e 5095 5095 - ¢g E% STING GRqUA D ABC1 S W E%ISTI L GRIUMD BKWE EEPE 5090 — — METAL BYTOM LF 11 AN N '] 0 .!BS 5065 5065 _ _ _ 5 i Y 3 ¢ I \ g 5080 a6o p A Y e ® 5075 075 7 g i5 5070 5070 5065 [50655060 0+00 1+00 2+00 }+00 4+00 5+00 6+00 7+00 8+0 9+00 10+00 11+DO —3+00 —2+00 —1+00 SOUTH SHIELDS STREET -SHEET 7 OF 17 STORM SEWER PLAN AND PROFILE P-93-2293 FV H 1 3IT B WABASH STREET SKYLINE ACRES 'IV m 11 X I I :1 I I' w ryl { 9 i 5B.0' 11 / x LeftI r--- \ COBBLESTONE CORNERS P.U.O. { p { b orgy, I \ p (Lil tl to E.:l � \ \ M It Ml Sere, �M rce �o•'1 l 5 G 5.�15951 —i i I. y A I^V 3q \ 1 B ACT 19 I TRACT 18 d i O g TRACT 15 TRACT 1ST TRACT 13 RACT 12 O TRACT 11 II I £ 1 1 --- } TRACT 1] t TRACT 16 O a J t Z .. II^ " 1 1 i4 > xo..a ux 0' a - �o l.ln I sxe J.B999x 00i TL 11 I R 1 �B s 2311050 s)41 STORM GWx ux • III s 2 1251 / Br Do' un g g .,, "/ m ]J B1.0]' fell 5If p fOEa si e eco '� r LINE E IST L 15' RCF C IMim p 51 29 )NM Br W' 1eN C IB2.)9T c,Ft lop of ./ 01.0 1 H V ]5 BDL 1 Fu {nR 1 AFn II 1 mot it 5 )9.6 5 i III (WI �. 15) Bl]] 6 ]] 7 ]TM s. ]eo 631RIM 17 J Y 66 ii .. Y �I R L IM o1nm) ____� —� sex IT,w se ______ _ • --m Ytii iIN o I BSN a 8461 - - •.. nfu bl.am �.l �s1! g eO.N ' B3+9 02.W l.B BS.J] 039J r r _ --_ _ es.ra ee 6e' fil Ose1 se".e -- _ _.. — . _. s mew ,5, _ _ .. .._ -- r: a e7:w - n w.m try..w .. ,,.00 �,..mI a LID, irttrit— LF LII Iti UTILITY PLAN APPROVAL __Crr. OF FORT COLLINS, COLORADO - - II I N fll, OIr'AON I oPPROtrD'. _ pi,..m, of E,vmeen,v pm° Ip ' ARBOR AVENUE POUDRE VALLEY PLAZA III pp it CNEGHEJ B' ,of., ow woelerom Gill > pm. � I ryp I IN CHECKED BE 5lmmwmn Utility Oob i5 25 50 0 50 p0 HORSETOOTH ROAD CHECKED B• F,M, a„a R.e,.ml<.. pal. SCALE: MORE . 50' CHECKED I HECTF or r S:CS ITT 5105 5t00 5100 5095 5095 ------------ 5090 5090 S EFIS NG IS No Al PIPE e S 15rmTIM E .' CO Cl £ 5085 R v _ b 5065 _ _ _ _ l pl 5080 JBx pT _ 5080 - uz .ap' •� O 5075 6 e 5075 E a 5 0 s FILL -5070 IF figor No i - 5065 p -5065 5060 30+00 31+00 32+00 }}+00 34+ 00 35+SOUTHTH 36+00 }]+00 24+00 25+ 26+00 27+00 28+00 29+00 22+00 23+00 5 STREET SHE 8 OF 1] STORM SEWERR PLAN AND PROFILE PLAN P-93-2293 EXlIit C