Loading...
HomeMy WebLinkAboutDrainage Reports - 05/18/2018City of Ft. Collins Approved Plans AlfprovecfB�olfins roved Plans Date ved B _.._ September 11, 2017 Project No. 2936-01-17 City of Fort Collins Stormwater Engineering 700 Wood Street Ft. Collins, Colorado 80521 Attn: Wes Lamarque Re: Lot 12, South 13 Subdivision (5720 Bueno Drive); Fort Collins, Colorado Drainage Memo Dear Wes, Lot 12, South 13 is an existing 9,800 square foot developed lot with an existing pre-engineered 45'x75' (3,375 square foot) steel building built in 1999. In 1999, a pavement section from Bueno Drive to the building was installed. With today's proposal, 382 square feet of pavement will be reduced and converted to pervious area. The rest of the site will remain unchanged from a pervious / impervious area standpoint. Contact: Wes Lamarque, 970-416-2418, wlamarque(a)fcgov.com Topic: General Comment Number: 2 Comment Originated: 08/16/2017 08/16/2017; Please submit a drainage memo for this proposal documenting the increase, or decrease, of impervious area and the proposed improvements. Response: Please refer to drainage memo provided with this re -submittal. Existing pavement will be removed reducing the impervious area by a total of 382 .square feet and increasing the pervious area by 382 square feet. If you have any questions, please call (970) 226-5334. �pp�pNF E �R`'.1 tp*.�v "1Q 20262 M. X. to Jtf Brian W. Shear, P.E. Shear Engineering Corporation attachments cc: Arlo Pannell Realarchitecture Ltd / Unrealconstruction Llc 4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearengineering.com