HomeMy WebLinkAboutDrainage Reports - 10/12/2017Final Development Plan (FDP) Final Drainage Report for Harmony 23 = - August 17, 2017 City of Fort Collins Approved Plans Approved by - Date: `042/2-0 TST, INC. CONSVLTING ENGINEER'. ■ 0 Harmony 25, LLC August 11, 2017 Mr. Dan Mogen, E.I., C.F.M. Development Review Engineer City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80521 Re: Harmony 23 Development To Whom It May Concern It is agreed that when the Harmony & 1-25 property develops it shall include the implementation of the required Low Impact Development Capture Volume, as per the City of Fort Collins criteria, that has been calculated with the approved final drainage report for the Harmony 23 project, but -not established within the boundary of that project. It is also agreed that the Harmony & 1-25 property development shall be required to detain any additional stormwater detention, as per the City of Fort Collins criteria, that has been calculated with the approved final drainage report for the Harmony 23 project, but not detained within the boundary of that project. As per the final approved drainage report for the Harmony 23 project: • The runoff from an additional 11 acres of impervious area shall be treated on the Harmony & I- 25 property using Low Impact Development techniques. • An additional 1.49 ac-ft. of stormwater detention (based on a 0.96 cfs, 2yr historic release rate) shall be included in the Harmony & 1-25 stormwater detention calculations. ,�. )D Padilla Harmony 25, LLC 144 North Mason St. Ste. 4, Fort Collins, Colorado 80524 (Office) 970-407-7808 (Fax) 970-407-7823 TST TST, INC. CONSULTING ENGINEERS August 17, 2017 Mr. Dan Mogen, E.I., C.F.M. Development Review Engineer City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80521 Re: Final Development Plan (FDP) for H23 Project No. 1219.0002.00 Dear Mr. Mogen: We are pleased to submit this Final Drainage Report for Harmony 23 (1-123). This report analyzes the developed stormwater runoff from the project and provides stormwater infrastructure and water quality management for runoff. This report has been prepared based on the City of Fort Collins Stormwater Criteria Manual and complies with the FDP submittal requirements for a final drainage report. Respectfully, TST, INC. CONSULTING ENGINEERS Derek A. Patterson, P.E. DAP/JFS/jrm 748 Whalers Way Suite 200 Fort Collins, CO 80525 970.226.0557 main 970.226.0204 fax ideas@tstinc.com www.tstinc.com Jon Sweet, P.E. CI Harmony 23 Final Drainage Report TABLE OF CONTENTS 1.0 Introduction Page 1.1 Scope and Purpose.....................................................................................................1 1.2 Project Location and Description.................................................................................1 1.3 Previous Studies......................................................................................................... 3 1.4 Limitations of Future Projections.................................................................................3 2.0 Historic/Existing Conditions.........................................................................................3 3.0 Developed Conditions Plan 3.1 Design Criteria for Hydrologic Analysis.......................................................................6 3.2 Drainage Plan Development....................................................................................... 7 3.2.1 Street Capacity.................................................................................................10 3.2.2 Inlet Design......................................................................................................10 3.2.3 Storm Sewer Design........................................................................................10 3.2.4 Channel Design................................................................................................11 3.2.5 Riprap Design...................................................................................................11 3.2.6 Detention Pond Design....................................................................................11 3.3 Low Impact Development..........................................................................................13 3.4 Floodplain Management............................................................................................14 4.0 Conclusion.......................................................................................................................15 5.0 References.......................................................................................................................16 Figures Figure1. Vicinity Map................................................................................................................... 2 Figure 2. Outfall to the Poudre River............................................................................................ 5 Appendices Appendix A: Rational Method Hydrologic Analysis Appendix B: Street Capacity and Inlet Analysis Appendix C: Storm Sewer Design Appendix D: Channel Design Appendix E: Riprap Design Appendix F: Detention Pond Design Appendix G: FIRM Maps and Original Floodplain Workmap Appendix H: Low Impact Development Appendix I: Proposed Drainage Maps INTSr. INC. CONSULTING ENGINEERS Harmony 23 1.0 Introduction 1.1 Scope and Purpose Final Drainage Report This report presents the results of a final drainage analysis for the Harmony 23 (1-123) project. This report has been developed in accordance with the City of Fort Collins Stormwater Criteria Manual requirements and complies with Final Development Plan (FDP) submittal requirements. 1.2 Project Location and Description The H23 project is a multifamily development situated on approximately 25 acres. The project is located in the northeast corner of Section 4, Township 6 North, Range 68 West, more specifically at the southwest corner of the intersection of Harmony Road and Strauss Cabin Road. The site is generally bounded by the following roadways: Strauss Cabin Road on the east, Harmony Road on the north, and the Fossil Creek Reservoir Inlet Ditch (FCRID) along the south and west. Surrounding properties include: The Arapaho Bend Natural Area on the north side of Harmony Road, the Harmony & 1-25 (1-125) Overall Development Plan (ODP) area to the east of Strauss Cabin Road, Brookfield Subdivision to the southwest, and undeveloped land to the west. The Boxelder Ditch cuts through the site starting north at Harmony Road and running south through the middle of the site where it crosses Strauss Cabin Road approximately 1600' south of Harmony Road. This development is located within the Cache la Poudre watershed and City of Fort Collins Poudre River drainage basin. This project site sits just west of. the FEMA regulated floodway but within the 500-yr floodplain, per FEMA FIRM Maps 08069CO994F LOMR dated December 15, 2014. The floodplain and floodways lines are shown in Figure 1 on the next page. TST. INC. CONSULTING ENGINEERS Page 1 Harmony 23 I Final Drainage Report SOXELDER ul DITCH �e 1 ` a+� HARMONY ROAD \ i G� 74 i� EXISTING +1`jf1 IRRIGATION POND (LINED) ��« a O O EX. > E a GRAVEL Y POND 01 Z p GRAVEL POND A2 f, Si9LYJi5K>. �. EX GRAVEL _ ND a3 . - 'l 1** tr } Nv' ` 'A*.: � - • - �# t' D Q ' —Sllf I nra � (LMED �1 i' YtflY . tcKECAD • +•�. iN1Y1N • _ v' y `tl awFc Figure 1. Vicinity Map TST. INC. CONSULTING ENGINCf - Harmony 23 Final Drainage Report 1.3 Previous Studies • ODP Drainage Report for Harmony & Strauss Cabin • North 1-25 EIS, August 2011 • Poudre River Drainage Basin Master Plan 1.4 Limitations of Future Projections The analysis and proposed stormwater improvements contained in this study are for the H23 project area. Assumptions have been made to account for future development adjacent to the site where developed flows and storm infrastructure from this project will influence future designs. In addition, assumptions were made to account for interim and ultimate tail water conditions downstream of this site. It is assumed that the outfall from the H23 site will connect to a future stormwater system, which will ultimately daylight into a regional detention facility for the 266-acre Harmony and 1-25 development. This regional detention facility is also assumed to be a non -potable irrigation pond. The final/ultimate water surface elevation in this future regional detention pond will need to be designed to not affectupstream developments. A master plan for the Harmony and 1-25 development is in progress, but has not been completed at the time of this report. In addition, this report also assumes that the H25 development will be constructed at some point in the future and that the Box Elder Ditch will be realigned through the site prior to H23 construction. For this project, the downstream interim 100-yr WSEL in the interim regional detention pond (Ex. Gravel Pond #1) is assumed to be a 4838.59, as this is the existing spill elevation currently observed out of this pond. This tailwater elevation was assumed to be the worst -case scenario, and was used for the H23 design and calculations. The ultimate/final water surface elevation in the regional detention pond is assumed to be equal to or lower than this elevation. Stream stability analysis, open water and wetlands mitigation are beyond the scope of this report and will be addressed separately or in a subsequent design report. 2.0 Historic/Existing Conditions Historically this area was undeveloped grasslands, that was eventually utilized for farming. The Boxelder Ditch which runs through the site was used for irrigation purposes. Today, this site is no longer used for farming and has returned back to undeveloped grasslands. The site generally slopes from the west to the east to the low point in Strauss Cabin Road. Slopes vary from 1:1 on the west end to basically flat on the east. TST. INC. CONSULTING ENGINEERS Page 3 Harmony 23 Final Drainage Report • According to the Natural Resources Conservation Service (NRCS) the project site is characterized by Type A, B and D soils. The NRCS soils data for this site can be found in the Appendix The historic stormwater runoff rate from this site was determined to be 0.165 cfs/acre (24.9 acres / 4.1 cfs). There are currently some wetlands, approximately 411 s.f., located on the project site. As stated previously wetlands will be addressed separately in a subsequent design report if required. TST. INC. CONSULTING ENGINEERS Page 4 Harmony 23 Final Drainage Report HARMONY ROND LIMITS OF i DEVELOPMENTi s FOSSIL CREEK I ✓ _ ` t_. 'W'�_ R SERVOIR INLET DITCH g_ �1 SPILLWAY FROM J�� 1 •. Fr . WEITZEL PIT MSIPT TON (NO DOYIA PT TAR A LP". STATE t CERI M EX RISERVpR c �RCP'^�c = CULVERT BELOW KECHTER ROAD -O' COLORADO YOOTF ISLAND LAKE J OUTDOORS qI �' FOUDR� RIFF t, CULVERT BELOW ii1 _ t_ IN, FOSSIL CREEK rG RESERVOIR !! OUTLET CANAL Figure 2. Outfall to the Poudre River TTfT. INC. CON.IULTING ENGINC[RS Harmony 23 Final Drainage Report 3.0 Developed Conditions Plan 3.1 Design Criteria for Hydrologic Analysis The drainage plan presented in this report has been developed in accordance with the City of Fort Collins Stormwater Criteria Manual and the City of Fort Collins submittal requirements for a Final Development Plan (FDP). The drainage plan presented is based upon the allowable developed stormwater release rates prescribed for the Poudre River drainage basin, that being the 2-year historic rate. The drainage basin presented in this report is less than 90 acres, therefore, the method used to analyze drainage for this project will be the Rational Method. Runoff calculations for both the 2-year and 100-year storms will be presented here. The Rational Method is given by: Q = C(Cf)IA where • Q is the maximum rate of runoff in cfs • C is the runoff coefficient • Cf is the runoff coefficient frequency factor adjustment • 1 is the rainfall intensity in inches per hour for a storm duration equal to the time of concentration • A is the total area of the basin in acres The runoff coefficient C has different values depending on the design storm recurrence interval. The runoff coefficient is also dependent on land use or surface characteristics/imperviousness. Runoff coefficients were assigned using Table RO-11 from the Fort Collins Stormwater Criteria Manual. The frequency factor adjustment, Cf, varies depending on the storm frequency and can be found in Table RO-12 of the Fort Collins Stormwater Criteria Manual. The rainfall intensity is selected from Rainfall Intensity Duration Frequency Curves for the City of Fort Collins (Tables RA-7 through RA-9 of the Fort Collins Stormwater Criteria Manual). In order to utilize the Rainfall Intensity Duration Curves, the time of concentration is required. The following equation is used to determine the time of concentration U=t;+t where • tc is the time of concentration in minutes • t; is the initial or overland flow time in minutes ImTST, INC. CONSULTING ENGINEERS Page 6 Harmony 23 Final Drainage Report • • tt is the conveyance travel time in minutes The initial or overland flow time is calculated with the UDFCD equation: _ 1.87(1.1—C*C,)� t 50.33 For design points requiring attenuation, the total area and area weighted average percent impervious were calculated. The time of concentration for the combined basins was assumed to be the maximum time of concentration for any individual basin. This time of concentration was used to obtain a rainfall intensity, which was multiplied by the composite runoff coefficient and total area to obtain an attenuated flow. 3.2 Drainage Plan Development The H23 project is proposed to be a multifamily site accompanied by parking areas, open space, and public roadway improvements. The site and associated storm sewer system has been designed to collect and convey a majority runoff from this project, including portions of the fronting 1/2 of the surrounding public roadways to the two separate ponds located onsite. Due to design constraints, a small portion of runoff from the project site will be collected and conveyed to an offsite detention pond where it will be detained and released. The release • structure for this pond will be designed and constructed with the future H25 development. Drainage to this offsite pond has been approved by both the adjacent developer and the City. Please refer to the attached letter provided by the H25 development group. For design calculations, the site was divided into several basins. All basins are further described below. Basin N-1, as shown on the Drainage Plan, is in the northern portion of the project site which includes open space, parking areas and building footprints. Runoff from this basin is conveyed via curb & gutter into the storm sewer system which drains into to Pond A. Basin N-2 is the northern most portion of the project site which includes open space, trails, and building footprints. Runoff from this basin is conveyed via grass swale into under sidewalk chases and into a storm culvert which drains into to Pond A. The basin includes Pond A. Basin N-3 is in the northern portion of the project site which includes open space, parking areas and building footprints. Runoff from this basin is conveyed via curb & gutter into the storm sewer system which drains into to Pond A. TST. INC. CONSULTING ENGINEERS Page 7 Harmony 23 Final Drainage Report • Basin N-4. is in the northwest portion of the project site which includes open space, parking areas and building footprints. This basin drains to a curb cut and into Basin N-2. Ultimately runoff from this basin is conveyed to Pond A. Basin N-5 is in the north half of the project site which includes open space and building footprints. This basin drains to several area inlets where it is ultimately conveyed via proposed storm sewer system and into Pond A. Basin S-1 is in the southern portion of the project site which includes open space, parking areas and building footprints. Runoff from this basin is conveyed via curb & gutter into the storm sewer system which drains into Pond B. Basin S-2 is in the southern portion of the project site which includes open space, parking areas and building footprints. Runoff from this basin is conveyed via curb & gutter into the storm sewer system which drains into Pond B. Basin S-3 is in the southern portion of the project site which includes open space, parking areas and building footprints. Runoff from this basin is conveyed via curb & gutter into the storm sewer system which drains into Pond B. Basin S-4 is the southern portion of the project site which includes open space, trails and building footprints. Runoff from this basin is conveyed via swale or sheet flow directly into Pond • B, or into the storm sewer system which drains into Pond B. This basin includes the extents of Pond B. Basin S-5 incorporates the southern fronting portion of Strauss Cabin Road to the back of the detached sidewalk. Runoff from this basin is conveyed via curb & gutter to a low point in Strauss Cabin Road where it is conveyed via the proposed storm sewer system and into Pond B. Basin S-6 includes a small portion of the south half of the site. Runoff from this basin is conveyed to a couple of area inlets then via the proposed storm sewer system and into Pond B. Basin U-1 incorporates fronting portions of Harmony Road and Strauss Cabin Road in addition to a portion of the project site. Runoff from this basin is conveyed via curb & gutter to a low point in Strauss Cabin Road north of a future drive access, where it is conveyed via the proposed storm sewer system south to the offsite gravel ponds. All storage for this basin will be handled in the offsite ponds. Basin U-2 incorporates the middle fronting portion Strauss Cabin Road in addition to a portion of the project site. Runoff from this basin is conveyed via curb & gutter to another low point in TST. INC. CONSULTING ENGINEERS Page 8 11 Harmony 23 Final Drainage Report • Strauss Cabin Road just south of the future drive access, where it is conveyed via the proposed storm sewer system south to the offsite gravel ponds. All storage for this basin will be handled in the offsite ponds. Basin U-3 incorporates the small area which drains to the curb cut located at the northern drive entrance for the project. Runoff from this basin is conveyed via curb & gutter to the curb cut and into Strauss Cabin Road, where it is conveyed via the proposed storm sewer system south to the offsite gravel ponds. All storage for this basin will be handled in the offsite ponds. The 100-yr runoff volume and WQCV for all "N" basins will be detained in Pond A, while all runoff and WQCV for all "S" basins will be detained in Pond B. The 100-yr runoff volume for all "U" basins will be detained in the existing gravel ponds located offsite. Additional offsite basins contributing to the H23 drainage design are described below. Basin ODP-1 is an offsite basin contributing to the proposed storm sewer system located in Strauss Cabin Road. This basin is a portion of the H25 ODP area. Runoff from Basin ODP-1 will drain to a low point on Strauss Cabin Road where it will be conveyed via the proposed storm sewer system designed with the H23 project and into the existing gravel ponds. Detention and water quality from this basin will need to be accounted for in the future with future development. Basin ODP-2 is an offsite basin contributing to the proposed storm sewer system located in Strauss Cabin Road. This basin is a portion of the H25 ODP area. Runoff from Basin ODP-2 will drain to a low point on Strauss Cabin Road where it will be conveyed via the proposed storm sewer system designed with the H23 project and into the existing gravel ponds. Detention and water quality from this basin will need to be accounted for in the future with future development. Basins 0-1 through 0-8 are offsite basins that will pass through the site. No water quality or detention will be provided for these basins as they are not part of the subject property. Basins 0-1 through 0-7 are the areas between the FCRID and the property boundary which consists of gravel access road and undeveloped open space. Runoff from Basins 0-1 through 0-3 will be routed through Pond A, and runoff from Basins 0-4 through 0-7 will be routed through Pond B. Basin 0-8 is the area just south of the project which consists of a small portion of undeveloped open space and a portion of Strauss Cabin Road. Runoff from this basin is conveyed via curb_ & gutter to a low point in Strauss Cabin Road where it will be routed through Pond B. IMTST. INC. CONSULTING ENGINEERS Page 9 Harmony 23 3.2.1 Street Capacity Final Drainage Report Street capacities have been analyzed using the Urban Drainage UD-Inlet spreadsheet, version 4.01. Street capacity was analyzed along Strauss Cabin Road on the west side where ultimate roadway improvements are proposed between Harmony Road and the south end of this project. Table ST-2 and ST-3 in the City of Fort Collins Stormwater Criteria Manual state inundation standards for the minor and major storms. These standards are summarized in the table below. Table 1. Street 1D Street Classification Minor Storm (2-yr) requirements Major Storm (100-yr) requirements Strauss Cabin Road 2-Lane Arterial No curb -overtopping, Depth of water must flow spread must not exceed bottom of leave at least 12' wide median gutter, 12" travel path in each max depth at gutter direction flowline, flow must be contained within ROW. For this project street capacity for Strauss Cabin Road was analyzed. It was determined the streets meet the applicable requirements and will function below the allowed capacities. The results of the street capacity analysis can be found with supporting calculations in Appendix B. 3.2.2 Inlet Design Inlets have been analyzed using the Urban Drainage UD-Inlet spreadsheet, version 4.01. CDOT Type R inlets are proposed to collect runoff and have been placed at the low points of the basins where infall, vertical curb & gutter is located and have been analyzed for a "sump" condition. In addition, Nyoplast area inlets have been placed within the open space throughout the project site. Sizing of these inlets is based on the capacity curves provided by Nyloplast. A majority of the inlets have been sized to capture the 100-yr storm. However, some inlets due to location and site constraints have been sized to carry the 10-yr event, with the 100-yr storm overtopping and spilling directly into the ponds. The results of the inlet analysis are provided in Appendix B. 3.2.3 Storm Sewer Design Storm sewer pipes have been analyzed using UDSEWER 2009, version 1.4. All storm pipes on this project site are designed to collect and convey the 100-yr storm runoff. The pipes have all Harmony 23 . Final Drainage Report • been sized to ensure that the hydraulic grade lines remain below the flowline elevation at inlets and below rim elevations at manholes. The results of the storm sewer analysis are provided in Appendix C. 3.2.4 Channel Design Proposed curb cuts and swales at this project site have been analyzed using Hydroflow Express Extension for Autodesk Civil3D. Swales have been designed to include 1-ft of freeboard above the normal 100-yr water depth in the channel. Where the 1-ft criteria isn't possible, the swales have been checked to make sure they can pass at least 133% of design flow. All curb cuts have been sized to convey the 100-yr event. The results of the channel design are provided in Appendix D. 3.2.5 Riprap Design Riprap has been proposed at all outlet pipes into the ponds. Riprap has been sized based on equations and figures provided in the Urban Drainage manual. Although the ST-01 C pipe outlet will discharge directly into groundwater filled pond, and the pipe outlet is anticipated to be underwater during an average day scenario, the groundwater in that pond may be lowered at any given time due to future construction activities at this site, so riprap has been proposed in this area as a ground stabilization measure. The results of riprap sizing are provided in Appendix E. 3.2.6 Detention Pond Design The existing conditions for this area was analyzed to determine the allowable release rate from • the site. The 2-yr historic discharge for the project area was determined to be 4.1 cfs for the 24.9 acres. This ends up being a release rate of approximately 0.165 cfs/acre (4.1/24.9), which is the allowable release rate used in this report. There will be two ponds utilized on this site for water quality and detention. Pond A on the northeast end of the site and Pond B on the south end of the site. Both are designed to treat and release the WQCV, and have been designed using a 40 hour drain time. Both ponds have been sized to capture and release the 100-yr developed runoff at the 2-yr historic rate. In addition, due to high groundwater levels, Pond A will be lined to prevent groundwater from being exposed and a portion of Pond A will be utilized for wetland mitigation. The Ex. Gravel Pond #1, as shown on the drainage map, will be utilized to detain the 100-yr TST. INC. CONSVLTING ENGINEERS Page 11 Harmony 23 Final Drainage Report runoff from Basins U-1, U-2 and U-3. Per conversations with the City stormwater staff, the existing gravel ponds can be used as a water quality feature. Therefore, the WQCV for these basins was not added into the total required volume being detained offsite in Ex. Gravel Pond #1. The UDFCD manual and equations were used to calculate the WQCV. Pond A is sized to collect the WQCV for all N basins, and Pond B is sized to collect the WQCV for all S basins. The WQCV is designed to be released in 40-hr as recommend by UDFCD. A mass -balance spreadsheet was used to calculate the overall 100-yr detention requirements for this site. The required 100-yr detention volumes for Pond A and Pond B calculated from this spreadsheet were determined to be 1.89 ac-ft, and 2.08 ac-ft respectively. An additional 20% was added to these volumes, per City Criteria, resulting in a total 100-yr volume of 2.27 ac-ft for Pond A and 2.49 ac-ft for Pond B. The total volume required in the ponds based on City Criteria is the 100-yr plus the WQCV. Therefore, the required total volume was determined to be 2.45 ac-ft for Pond A and 2.69 ac-ft for Pond B. The results for these ponds are provided in Table 2. Table 2. Pond Contri- 2-yr 100-yr Required Total Total 100-yr ID buting Historic Detention WQCV Required Provided Water Area Release Volume (ac-ft) Storage Storage Surface (acres) Rate (120%) (ac-ft) (ac-ft) Elevatio (0.165 (ac-ft) n cfslacre Pond A 9.76 1.61 2.27 0.18 2.45 2.53 4848.00 Pond B 1 11.40 1.88 2.49 1 0.20 1 2.69 1 4.06 1 4846.00 Total 4.87 0.38 5.14 6.59 Required A mass -balance spreadsheet was used to calculate the overall 100-yr detention requirement for Basins U-1, U-2 and U-3. The required 100-yr detention volume from these basins was calculated to be 1.24 ac-ft. An additional 20% was added to the volume for a total volume of 1.49 ac-ft. Ex. Gravel Pond #1 has an approximate surface area of 41 acres, and a total available depth of 0.59 feet (Groundwater 4838, Spill Elevation 4838.59). This allows for an approximate storage volume of 24.19 ac-ft, which is 16 times more than what is required. Taking the required detention volume of 1.49 ac-ft and dividing by the total surface area of Ex. Gravel Pond #1 (1.49 ac-ft / 41 acres), shows that we would raise the existing water surface in this area 0.036 feet, or roughly 0.5 inches. The H25 ODP shows this pond being filled in the future, and will therefore need to be redesigned with the future H25 development. The undeveloped offsite areas adjacent to the site denoted as 0-1 through 0-8 will release 1S7 I.Y C1,14... I.r.,:, F.,._. Harmony 23 Final Drainage Report undetained through the site. This amount will be treated as a pass -through flow, and is in addition to the 2-yr historic release. The resulting amount of stormwater (100-yr) passing from Pond A will be approximately 1.1 cfs and 8.6 cfs for Pond B. The total 100-yr pass -through runoff from these undeveloped offsite areas amounts to approximately 9.7 cfs. There will be 2 separate outlet structures utilized in Pond A, a water quality outlet structure (40- hr drain time) to treat the water prior to entering the mitigated wetlands and a 2-stage outlet structure that will include the 100-yr detention volume and emergency overflow. The outlet structure for Pond B will consist of 3 stages. A WQCV stage (40-hr drain time), detention volume (2-yr historic release), and emergency overflow. An emergency overflow stage was added to both outlet structures due to site constraints discussed below. All ponds will have a minimum 1' of freeboard above the detention surface elevation to the spill point out to Strauss Cabin Road. In addition, due to high groundwater elevations, Pond A will be lined with either bentonite or some type of geotextile to prevent exposure of groundwater. The ponds for this site were located in areas to maximize developable area. Emergency spillways for each pond have not been provided due to site constraints. Therefore, these ponds don't have a defined spillway. Instead Pond A is designed to pass a portion of the emergency flow through the 100-yr overflow stage on the outlet structure. Any runoff which exceeds the overflow capacity will pond up to the Boxelder Ditch (Elevation=4849.20) located along the east side of this pond, where it will ultimately either spill into and or across this ditch to the low point in Strauss Cabin Road. The difference between the detention surface elevation (4848.00) of Pond A and the Boxelder Ditch is approximately 1.20'. All building foundations within this area will be designed at an elevation higher than the spill point elevation to prevent flooding. The difference between the spill point elevation and the lowest foundation elevation is 4.30' (Building J Top of Foundation = 4853.50). Similar to Pond A, Pond B will also have an emergency overflow stage on the outlet structure. However, this outlet structure and outlet pipe will be sized to convey the 100-yr storm event. In the event that the outlet pipe becomes clogged, runoff would back up into the parking lot and around Bldg. G (lowest T.O.F.= 4851.65), until it can spill across the Box Elder Ditch and into Strauss Cabin Road. This elevation is approximately 4849.50, which is 3.50' above the 100-yr WSEL. All building foundations, and or garage units within this area will be designed at an elevation higher than the spill point elevation to prevent flooding. The difference between the spill point elevation and the lowest foundation elevation (Building G) is 2.15'. 3.3 Low Impact Development Per agreements with the City and adjacent property owner, all LID requirements for this project will be handled offsite on the property to the east with future development and will not be required at this time. At least 75% of the H23 developments impervious area will need to be TST. INC. CONSULTING ENGINEERS Page 13 Harmony 23 Final Drainage Report . treated using one or a combination of LID techniques on the H25 development. The total impervious area for the H23 project was calculated to be 14.67 acres. Therefore, 11 acres of additional impervious area will need to be treated on the H25 development. Refer to Appendix H for this calculation. 3.4 Floodplain Management This site is situated outside of any City of Fort Collins regulatory floodways and floodplains. This project site sits within the FEMA FIRM Map 08069CO994F dated December 19, 2006. The new LOMR (Case # 14-08-0580P, effective date 12-15-2014) that just received FEMA approval corrected the floodway and floodplain lines to align with the original floodplain workmap. Information provided in this LOMR was taken into consideration for this project. More specifically, flood zone designations within this project site per the LOMR are as follows: • Flood Zone X, Shaded 500-YEAR FLOODPLAIN: Areas of 0.2% annual chance flood hazard. Areas of 1 % annual chance flood with average depth less than one foot or with drainage areas of less than one square mile. • Flood Zone X, Unshaded: Areas determined to be outside the 0.2% annual chance floodplain. Chapter 10, Flood Prevention and Protection, of the Fort Collins Municipal Code provided guidance and limitations for building and development within the floodway and floodplain. Division 4 — Poudre River Flood Hazard Areas of this chapter provide specific standards for development within the Poudre River floodway and flood fringe. The "Limits of Development' as shown on the Grading and Drainage Plan are outside of the half -foot floodway. However, we recognize that a majority of this area still resides within the 500-year floodplain. Land uses proposed within the "Limits of Development' do not include any critical facilities, essential service critical facilities, hazardous materials facilities, government services, or at -risk population facilities. All structures planned to be built within the "Limits of Development' will be elevated and flood -proofed 2 feet above the 100-year flood elevations (shown as Base Flood elevations on the FIRM maps.) TST, INC. CONSULTING ENGINEERS Page 14 Harmony 23 • 4.0 Conclusion • Final Drainage Report The City of Fort Collins Stormwater Criteria Manual has been used to establish the criteria for a developed condition runoff plan within the H23 project. This FDP drainage design report has highlighted the following items: • Project site development is outside of the effective floodway boundary, but within the 500-yr floodplain. IS LID techniques are planned to be implemented offsite with future development, but are not required at this time. • Water quality and stormwater detention for the project will be provided in two separate ponds located onsite. These ponds have been sized to release the 100-yr storm at the 2-yr historic release. • A small portion of this project will be detained offsite in Ex. Gravel Pond #1 located east of the project. • All storm infrastructure has been sized to collect and convey at a minimum the 10-yr storm event. TST, INC. CONSULTING ENGINEERS Page 15 Harmony 23 5.0 References Final Drainage Report 1. City of Fort Collins Stormwater Criteria Manual, Amendments to the Urban Drainage and Flood Control District Criteria Manual, Adopted December 2011, Last Revision April 2012. 2. Urban Drainage and Flood Control District Criteria Manual, Volume 3, August 2011 3. Federal Emergency Management Agency, 2006, Flood Insurance Rate Map, Larimer County, Colorado, Map Number 08069CO994F 4. Federal Emergency Management Agency, 2006, Flood Insurance Rate Map, Larimer County, Colorado, Map Number 08069C1013F 5. Natural Resources Conservation Services, 2013, Web Soil Survey: Soil Survey Area Larimer County Area, Version 8, Dec 23, 2013 6. Colorado Division of Reclamation, Mining & Safety website, http:Hmining.state.co.us/Pages/Home.aspx 7. Chapter 10 of the Fort Collins Municipal Code, http://colocode.com/fcmunihtml.html 8. LOMR, Case #14-08-0580P, Letter of Map Revision (LOMR-BD) Based on Better Data on the Cache la Poudre River 1-25 Divided Flow Path Southwest of Harmony Road and Interstate 25, Anderson Consulting Engineers, Effective Date December 15, 2014. TST. INC. CONSULTING ENGINEERS Page 16 APPENDIX A Rational Method Hydrologic Analysis H H V Soil Information for All Uses Soil Properties and Qualities The Soil Properties and Qualities section includes various soil properties and qualities displayed as thematic maps with a summary table for the soil map units in the selected area of interest. A single value or rating for each map unit is generated by aggregating the interpretive ratings of individual map unit components. This aggregation process is defined for each property or quality. Soil Qualities and Features Soil qualities are behavior and performance attributes that are not directly measured, but are inferred from observations of dynamic conditions and from soil properties. Example soil qualities include natural drainage, and frost action. Soil features are attributes that are not directly part of the soil. Example soil features include slope and depth to restrictive layer. These features can greatly impact the use and management of the soil. • Hydrologic Soil Group Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not • protected by vegetation, are thoroughly wet, and receive precipitation from long - duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. 10411 0 Custom Soil Resource Report Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. 21 K 31M' N M^ 30'WN Custom Soil Resource Report ; Map —Hydrologic Soil Group a a s `s 4993DO 49M 49MO 499600 499700 499800 3 a Map Smle:1:5,38DKyx10etl an Ap0r0ak(8.Sx11')sha- N Mea+s 0 50 100 7ll0 300 DO 0 2Y1 SOD 3000 1500 Mopper:We6Merminr ComercoordhWm WGSB4 Edge OM:U1MZaneMWGSB4 22 11HHE11111111 | 7 ate& !"�°m°&>\«0G°a`«®0 !| - ■ a � ® m ■\ �!} }mno� § !3 o u ` 22 ®#»#f olM !2 !3M w � i{o `� /� > } \\0oo M,- E§ )0M } | E! , !� ;* ;a|! - 7|7[!\2 I)J ! EL 2 | i(; } E■ { k■4/» /cam (§±E 4 ! ■ \\§\ ;rE ( J. ¥ w0 i! |; �; , • _ ,,,} £ §)] 0 {7 )kz@) 0 *!£! £ % ;3E; §!R j §/}7 \ , o &/\ 0 §�}!! �-0 ; ! } 3_#! & §EK k 0 ��� *!- 7 ]- FL33k ! ) 6 §!/ ! }§f� a4; \ ! : 4;0 ] (!]/ £ \ ` -! Custom Soil Resource Report Table —Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit— Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 5 Aquepts, loamy AID 6.5 18.5% 22 D 11.0 31.3% Caruso day loam, 0 to 1 percent slope Larim gravelly sandy B 2.0 60 5.7% loam, 5 to 40 percent slopes 62 Larimer-Stoneham 8 7.4 21.1% complex, 3 to 10 percent slopes 81 Paoli fine sandy loam, 0 to A 0.5 1.4% 1 percent slopes 103 Stoneham loam, 5 to 9 B 7.7 22.0% percent slopes Totals for Area of Inbrest 36.1 100.0% Rating Options —Hydrologic Soil Group Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie -break Rule: Higher 24 H23 City of Fort Collins IDF Curves Duration 2-yr 10-yr 100-yr 5 2 W 4.87 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.80 8 2.40 4.10 8.38 9 2.30 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 245 3.50 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.B7 3.19 6.52 16 1.81 3.08 6.30 17 1.75 2.99 6.10 18 1.70 2.90 5.92 19 1.65 2.82 5.75 20 1.61 274 5.60 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.20 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 140 2.39 4.87 27 1.37 234 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.60 30 1,30 2.21 4.52 31 1.27 2.16 4.42 32 1.24 2.12 4.33 33 1.22 2.08 4.24 34 1.19 Z04 4.16 35 1.17 2.00 4.08 36 1.15 1.96 4.01 37 1.13 1.93 3.93 38 1.11 1.89 3.87 39 1.09 1.86 3.80 40 1.07 1.83 3.74 41 1.05 1.80 3.68 42 1.04 1.77 3.62 43 1.02 1.74 3.56 44 1 V 1.72 3.51 45 0.99 1.69 3.46 46 0.98 1.67 3.41 47 0.96 1.64 3.36 48 0.95 1.62 3.31 49 0.94 1.60 3.27 50 0.92 1.58 3.23 51 0.91 1.56 3.18 52 0.90 1,54 3.14 53 0.89 1.52 3.10 54 0.88 1.50 3.07 55 0.87 1.48 3.03 56 0.86 1.47 2.99 57 0.85 1.45 Z96 58 0.84 1.43 2.92 59 0.83 1.42 2.89 60 0.82 1.40 2.86 From the City of Fort Collins Sic" Drainage Design Criteria and Construction Standards Final Drainage Report Appendix A H23 12.00 10.00 8.00 c 6.00 d `c 4.00 r E 0.00 0 Final Drainage Report City of Fort Collins OF Curves +an +goo. —cmm faro R2=0. y = 2.566 10 20 30 40 50 60 Storm Duration (min) ro.ea 379 5 -0 021. 9 33 70 III_._,..... Appendix A H23 Final Drainage Report City of Fort Collins Rational Method Runoff Coefficients Runoff Coefficient Lawn, Heavy, <2% Slope 0.20 Lawn, Heavy, >7% Slope 0.35 Lawn, Heavy, 2-7% Slope 0,25 Lawn, Sandy, <2% Slope 0,10 Lawn, Sandy, >7% Slope 0.20 Lawn, Sandy, 2-7% Slope 0.15 Roofs 0.95 Streets: Permeable Pavers 0.30 Streets: Gravel 0.50 Streets ave 0,95 From Table 3-3 of the City of Fort Collins, Stormwater Criteria ST J Appendix A v�f l Un E t U $L5 U O � 0 rc u o 0 0 0 $ o 0 0 $ c o $ e 0 a c u o c e o 0 0 0 0 0 o c o u S 0 0 o e o 0 0 0 0 0 E o 0 0 0 uE r m N a m e $ 9 9 U m. m m ry m m o o m$ 00o ry$ yt, ry m m ry m m ry tR m a o dc0000 d�co oco doo 00o n rcE $ r U f Q rvo v`riry$m c'- .:oo cco �ooco oory doo do a pV¢ S 0 41 N N ve e N e N N e p! V! bF N N W ry fa a e eJ E n N ry C 2 K G K 4 y K E K@ C q K C m¢ q q p mq (/ N N N N h N ✓� (Il Vl 4l N � � � � � p � � � � I m a W N Z Z z Z Z Z 2 V) N (O N V! J J J J F tl m m o 0 0 M N_ O 0 0 $ N < x 2 222«92v 2 ) |} I EIIIIIf f f � !|!!!!!!! !| !! ■ $z!z\«za\ :l;;;; -! ! � � ; ;;;;;§; k M N T LP (O O W O r O _ O o 0 c 0 p c f0 E U ~ CO + T Cn N W O 00 r 00 O V H o u a E H 7, rn Lb m 00 r m r of M �. N IT N M R) t0 to N W N a a N ^ N v C ,() Q n O m 00 r O LO t0 00 O M V m c E o o r m r o o v o o 0 0 0 0 0 o N L H U � T C U h C 0) O Q M O O cD M Cn m 00 Q Q O O O O (0 O O N N N Co M m m m L j U a, y C CL a O N Q O Ln O w CO in N LO m (o Q c- O O O O O O c0 O N L (A r- N O 0 N O O O m O O U -O L_ N m' 0 O 00 O (O Q O O O O N O C) (D C J N m m m O O C 3 v LO r 10 m V N L O L) 1 O T N r N N r r- m m 0 H O O d B o a m co a Co � m Q Ln � a (o Q co Q N a m m m m m v v -.- v � o c `w O o a c0 m Q m o m Q Ln v m a> Q Q Q m m m m m Q Q N d D O O) N O m M m M M m m ' O Q � 7 0 0 0 0 LL O (0 O O L0 O O O O O O O O _ C y j J O Lr U m N O LO (D f� O n 00 V L• O L0 00 O m LO 0 (0 LD Ln ,n N U m V O h O 0)L` 00 N h LO O) r 00 N 0) 00 N N N N N N N r` U O O O O O O O O O O O O O O O O O o O O O o O O N C at U_ 0) O V m V 7 O Cl) CO L` O) m N (DLO N It CO O) O O O O C)O C)C O 0 U t` O m O 00 O (0 O LO O r- O L0 O (D O N O (D O V O n O (O O (D O N O r O (DN O N O O N O N o N O N O N o O O -O Q T c N m V V O m m r- m Cl) N (D L0 N V O 00 O O O O O O O O O U m 00 (O L0 n LO (D N Co V n (D (D N r (D . N . N N N O CrN C 0 o O o 6 o O C)0 0 0 0 0 0 0 0 0 6 0 0 0 0 0 0 0 LL U) m U) N U) (0 U) U) c O O O O O _O _O _O D _ N p W O W p W p W p W p W p W p W Z Z Z L Z F Z r Z t Z� Z 'N •- N m Q Ln I? I?N > m O U LL d O LL O u O u O U O N O n O n O w Z Z Z Z Z (n N rn (n rn Ln > > p p LL "LL-U LLUO LL m U .o O LLLL UU . . LL . LL . wOLXOLxOLxOLXO WO WOLxO N S N m Q Ln (O n m O O O O O O O O a X C� m > ry ry m m 0 a` ry m, ry m f'1 8 W T G W Oi S m P 0 N Oi E L c n n E F b u o n n n m 8 U ' E _ q m `o x a m 0 e n o m m N O N N O N O N Z 12n Z 0 r N n N 11 9 f lV y�u1 Zt�mO 'ZQ Z20 yC1 Z0 ZO µC1 yyyCyyyC111111 �LL ULL m�NO✓10NOYl�LL Un uLL uLLuu. voV owor�'ooVoVovo � d d b � � � d H J i I U n A z y W1�1 N Q11 bR1 m C A N O J N < K m y H m j D (yn D q2 Y m D D F D O O O N Ji 'O m 9 m o 0 a 0 a a p N N H ` N m D D D m D m Om c s CL On]] uc]� N�A NH�NmW ti. O NQ O ' P D ma N 1 P m N A P O O m n P W A A m Y i O oe � N w A w q wV O J N �U T 0 P N m mss 'e A p0� m N 0 A N N 1J IJ N N N m �p w Y1 N W W W yN O U y� O N N A m y W u p a > W W a p o] • 3 m (wJ W N P w P o m gV w my� N yy w t1� Y P (p �1 J N V N W mO O N 'p N V A w y O Y m D c m APPENDIX B Street Capacity and Inlet Analysis q m m E m E mv m r d c c 0 N 'O E -EE EE > > > > > > > > > EE > 0 U L w- o�noo3i33 +Hd+ C '� N N J d 0 m m C C C �Cp N m N N a`aaa m m m m u G m m C C C C r r r rrrr r r r=='== m r r r r r r r r r r m u m m 0000000000Zo c O U p UUUUUUnnnn 0 U0 0 0 O p p O m m m m o ar 'm io US N N N O O O O 2 zzz T y... O .0. N m Z. OONOb �ONNNNd N (Om N L U �D N NO�pN {7 Nt7L bNntO NNQ 00f � N� N Nf R q i O �? a N U � OI OfQ W (7M C)I�(7QNNNN R 'U Q Q t7 O b 6l Yl O) Gl M tOO fV lV N 3a O m Q U 0 L B m 3 G p N N N N N N N N Q c c of of of of j m c 0 0 O n m L Q Q Q Q O .... Q O O O O 4Op �� v v vee�d .dro<b Gov �6 cc �c rri D T 4,0 a. c m p t p Of N N N N r_- h (O �p N N O T 3p fNV m N m M d N� m C� O ro N 0 O G 0 w » m Mc {p m m O O Q^ O] N N N p TLL 0 0 0 ry C y m O.MOI OJ ooh N W p NO O .m.. r 00)OQ LLJ O CAN OQON C m U a a m Q m m a a M U a< 01 N 'Q u p 6 c c c c c c c c c c c c c c m O' m a 0 m C > Q o FL n o m c m y O z O O C m t T 0 0 F C � N m o m - C L 'p N m h N O C � C m Y m m m N O G a N T ry C Zm �y O m Q Q O m N _c 5 o n m o m O p 0 a C_ G C x_ Lp L S O 6 m C m t C G y E 6 y n m E m 5 m n E v o a E 9 c N x D om E c m 3 `m to $ T� m ti o s -i,2'6 N 7 p O E c 5 n$ 2 m a d a m m fi m E m o m o o= a o 1O Z Y 2 o m c m m p N C T O m y o U O C LOPL- m miN c - 5 y c c_oio O L p f 3 x rya m m N C m C y C y m N m m �cn=co5 m m n N mm U V m L y C - pU,-Cm`D0C p C C O C u noa O om @ n m x a vi m� m N O L O o Z Z . p . % f Pr0(act Inlet to I ALLOWABLE CAPACITY FOR ONE•HALF OF STREET (Minor S Major Storm) b heave blank W m mnveMw m Abehiw cuNl BWIN Can lrypually b vwn a Ott mtl 0.0201 or Cwb el colter Fk Una e ft. Coro Face 10 Street Crown Tremyelae Sly, Ceyo Sbpe (l plcelly 2lmhee ove124 Incbn a10.083 Ml) L.w4.1n0Sbpe Enle,Oforlamp.WJJlan q'e Ro,h,. lm St,. Sedlon (lyplcelly bWween 0.012 aM 002p1 Nbwabb SpW010F M1W S MW Slone AnawMle Denb M Olney Fk wllm br M1m16 Mope Sum Fbw OWlh n S.. C— playa el.. lol m) STORM Allowable Cepeclry ie b—d an DepN C.-ion STORM Alowablo Capacity Ic nanotl on Oepth CrllOnon +t.Ln <+o+w T....` %.,n.= - Rape= w -1 S, Sw = Sc- ncrxe loo n WM1 ncnea IS R NM1 IUM1 owo aw 000 2.DO 0.020 0.003 0.000 0.013 Mlmr Slate Myw S e Ttw= 120 320 00 120 IfttW r I' m =ye0 MWF Slom M Sbtm oy_ .1 SUMP I SUMP 01e U6Inlet v4.01. Inlet -IA 61812017, 11:18 PM F INLET IN A SUMP OR SAG LOCATION �Lo(C)+ N•Cure N-Ved Wo W Via Lo(G) In Mlarmalbn flneNt of lnll CDOT TypORCUID Opening TYM= Depmeebn(national b wMlnumx goner dernaNOn'a1ban O-Allon) a— ner of Und Ii (Green or Can Opening) III r own of Fbwllne bureau. of bul.preealon) Porli Deeper I Inbrmllan In of a Jan Grele IG) I of a Unit 01.1. W. 01.1, Rahn our a Gale 0roica Ileea D.tSO W) Am = III Fadal for a Cirinln Grain flnlcel vaaa 0,50- O70) C, io). Weir Caeffldenl(fearer Inner 2 15.3.00) C• (G)' Orlore LoolOalnnl pyplwlrehm Ol0 0,80) 0°(G). Opening lnformllon hole will Coro Canal, (C)' it of Vembal taro Opening in lndrea N_' Il of Curb Onilro rnmel In bailee N,r,— of TiOol fees UGDCM Figure GT-6) Them. final for Depraineon Pan (Irowaii be inner web of 2 bell W, = III Freim for a single Curb Oyenbre (VW Ia l vrd. 0. 10) C. (C) _ Opening WmI Coegaiem (lyplraI .In. 2.. 3 21 C• (C) ° opening Orli coemnarre (broad Ielae 0 00- 0 70) C, (C) = I for Gale Mb1wMn dr,- I For Curb Doming Wait Equation dn.n abortion INl Perfgmai Reluelbn Fatlor ler Well bell RFra„— Ormarea PerlormYae Redudbn Factor for Long III RFC.. of Inll Proka ca Redudnn Finn ar IOI La, Inds RF..,.• CDOT Type R Cab Coal 3.00 I 4.a B.2 WA WA N/A N/A NIA NIA N/A goo D m 010 N/A 0 m M 082 O.Ba N/A no. lme O.emOe Depine aol ou ani nallnn nrnne leenene oal roral Intel interception Capacity (assumes clogged Condition) GL �� a.B ) 3e.a �TIc'7�a mal Caparnyl3 c000 br Minor and Yam, smrrunI PI -ol-Rw a.e 22.2 p• UPlnlet W,01, 111111 5/8Q017.11:18 PM Plefp[t Into, lD V ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) Plbwebin WIOM lot Spread BehIM Curb Bouncl Curb I love b%nk for notmll,mun n, bossiness: md) R 4priess Fowled Cum (MPlcelly between o 012 eM 0020) of Curb as Guitar Flow Lim n from Curb Food to Sleart Crown Width rranevarse Slope Cores Slope (p plcallp 2lrehas over 24 lmhw or 0080 M) Lmyllurllnel Slope Enter 0 for sump mMWon Iu o Rouphers. far Strout Semml P,HMlly betwusn 0012 end 0.020) file Spread for Mhou 8 Mopl Storm able Depth at Grntw Flowkrw for Minor 8 Mapr Storm Gaplb at Strout Crown l leave blank Mr rot STORM ♦llowabls Capacity la based on Depth Criterion STORM Mlowabb Capacity Is based on Depth Cmerlon Minor Storm Melar Skrm T,v„ = 12.0 M.0 dt•n.= 00 12.0 Ilusbaked f cMwk=ys M... Storm Me I or Storm Our• SUMP SUMP h UDAnkt_v4.01. Iek41B 99=17, 11:18 pM INLET IN A SUMP OR SAG LOCATION {—Lo tc1 H-CuT H-Vern' W0 Wp IN Lo (GI In lnlofmMlon Intent) CDOT TypeRCUT Opening .rl lmnl Type: DuVrnasmgnlJXlantlbmnlrrluaw glMer tleprwbn'e'Irom'O-AIW) a-, m nt Unit Inlets One. or CUT Omar") No = r Dolph at Fbwlim (oulede of poet rearne.ron) Funding paper = r lofamlMlon y. of jr," Grate 1.,(G)• t of a urn Grate W, Overturf, Ratio for a creep (typkal vetoes 0.160.W) Awn = pop Factof for a SIM Grale Dypicel value 0,50-0 70) Cr(G)= WWI Coeeldenl (typical Wake 215 - 0.90) C. (G) Orlllce CoaMlclml (Iyplcel value 0m - DAD) ce (G) = Opening lnlormMlon h of . Unh cunt Otani, Lr (c) ° It of Vol CUT Open, In Inchn H„t a It of cuT 0,It . Tlroel In Inch.. Htv°° ° of Throe pea USOCM Figure ST 5) Tager a NIMh Id Dapfuabn Pan (p,II.oy 1M gWler wMb.121") W, ° ,in Facbt for a Single Cud, open," (Iyvkei valw 0.10) Cr (0)= ORWI, WN, 0o011dw1(111.1 veto. 2,}0]) C. (C)= Openitg Ortnw coNudnn (lwlwl velw 0.ef1- 0,70) C,dc) _ r I., G.W. Mrtlwglh Ee,.e t br Curb OV.mng W nr EVuntwu u- 1mNnn 1.1.1 p.d.nnanro Re a 11— F.dot Inr L., I.I. RFo_ Open., PaCormam. Retludlon Fedor for Lmq Intel, RFcw r J lnlel Wrlotmnrwa Ralurlan Fact., to, Lon, N. RF.,er Inlet Interception Capacity (assumes clogged condition) MINOR MAJOR COOT Type R Curb Opurr. 300 4.4 u2 MINOR MAJOR WA NIA NIA NIA WA NIA NIA nnr.e owmne Delrme 00 m a InMAJOR p NIA NIA 01 a nn II 0.41 08% 0.. 00a NIA NIA MINOR MAJOR U6lnlet v,1.01, Inlet-18 W2012, 11:18 PM Int c! ALLOWABLE CAPAC TY FOR ONE-HALF OF STREET (Minor & Major Storm) Sbpe SebrrFl Curb (Meve bank iw m canvnyence uWn bebrM wM) I"a RoWlrnue IMaM Cab(Irac lly beawear 0.012 eM 0(I20) of Cab el Gurley Flow We s I.ra Crab Faro In Ill" Crown a slopenyprcelly 2 Inches over 24 lrrcee or 0.003 Nfll IMWInelSkrpa EMar Olm Gump wrWAlan Rnikinmee far Sboe1 Sedlon (lyplu lly between 0.012 mx10020) Nle Spread for Mt., S MSlor SlIar Ile Depth at GtAer Flowline for Mlmr S Major Slorm Gepin el Street Crown fleeve blank Im ml STORM Allowable Cepwiry M beeetl an Depth CM.d. STORM Naweba Gepa411y Is beN4 on Depth Criterion mm cage Te.r�= 18 0 1 0.020 IM Mmne=M03 arhaa Trv.we�n nIpuwn Sr, =MS erere = Mirror Slorm Malor Storm Tr.o..= 120 020 0 00 120 Inebee rr- cback -yea Manor Storm ME Orm O+r' SYMR p PM IPA i 1 UO ale1 v4.01. InM14C &912017, 11:19 PM �\1 J _J INLET IN A SUMP OR SAG LOCATION .�—Lo (c) M-Cuea M-Van Wo WP IN Lo (G ) an lnfarmetbn llneWl o101M COOT TWO R CUM Opening T ypa. IOmreeeron laWnbnalb mWlnlum 9Wler Eepreubn'e'fmm'OAIION') Arc.' bet of Unll Wele (Graor or Curb Openlrg) No n Dxplb el Fbwllm (.Nelda of burl tlepreeelon) P.ml, OaMII a lnl.rmMlon 1h of a UNI Gram L, (G) r or a Unn G1Me W1. Oprning Ron. I., It Gw. ("I.rl velum 0.'"w) b. pill, Factor far a 51,10 GfMe("1au vale 0.90- 0.70) C, (G) r Welr Coen,denl ("lull value Y. 15- 9 W) 0.. (G) a Onnm Cue0lded (Iw,w, vdus 0eo. o. W) C. (G) Opening lnfornmium M.F. JIM Cur. olrxnlnp L IC)' k W VMlul Cwb On.nmg,n Irrtlree M.., 1 of Coro Orlllw Throd m IrlCres M,xs r o Thr.d (na. USOCM Fgur ST-5) iM1ae Wider Io, Den,azc,tnt pan uwlully Im gult. w !r of z feel) W. Inq F.., I., a Sug4 C.rb Oven., nwltal relue 0 10) C. (c) opal„re W a,t :wlbao o (1w,ad rel.e 2131) c- (c) Gnnm,w onbca coa@o.nl Irwxal vale. o W .0.]D) Cu ID) >r Gmlx M..011, 4„r m Curn Op—, W xr, E... I— Ecr .I.. I.I. Pmlmman- Rmucnxn Factor br Lang Id. RFre.,.r x,n,ryl Pxnmmxncx Rooudron Fodor I., L., miss Inlxl P.,rmmennx Rdwd,un Podu, for Lora WMA RFs Capacity (assumes clogged condition) Q. Ilnnrmn M.I., Sftr—,W PEAKI Gau nF.,,n,n MINOR MAJOR CDOTTypeRCL Openln 0.W Imbm 1 4.4 1v3 Irebm MINOR MAJOR FOwoido DepN. N/A (eel NIA led Nla NIA N/A N/a Nla MINOR low MAJOR led ow a 1e a res WAO .y,om 2.00 0,10 0 10 0.00 0.m MINOR MNOR NIA WA 040 OBO oat o &W 1m NIA WA IJD-InieLv4.01, Inlet -IC 502017, 11:19 PM War ID: ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) um Albwebb W 41 Im Spra. BeMM Curb Stop. Beblml Colt IMevn part lot . convay»nce rutpit beMM cupl algb ROupbmeo 3e111N Curb fr arally between 0012 all 0.020) at Curb at Goller Flaw Llne x Imm Curb Feu 10 S1raa1 Crown Width Tmmvamo Slope CLOY Sppe (IypluOy 2 armai over 241MM1ee w 0083 MI) .arRdmnMl Slope Enter 0 for Bump wrWhIca g's Roupllresa for Slre& Stmon (IWmHy belw6en 0012 and 0020) Ala wnbb Spam br Minor S Mma Spam Nlowa le Cream M Catlx FbwbrarM arm Q Map, Storm I Fbw Dam Y Sbetl Crown (4avo bWM KK no) STORM MIcavabla Ca,amy Is baaetl On Oaplb CrIpaim STORM NlawabM Capat M hoed On Depth CrllarlOn Tow. • Sow'.• OFF Ncuxn • Tce w Sr Sy u5W.. ,== 10.o b NO LMnea n m IMN II 0.02C 0,020 0 no 40.0 2oWIIb a 00 Mlmr Slwm Map, Storm Tv..= 120 320 J...,,=1 90 1 120 Inches r- r cMk=Yes MI., Storm Me Storm 0,.�• SVYP BUMP M1 UD-Inlet 04.01, IFI0Lt 0 51912017. 11:19 PM INLET IN A SUMP OR SAG LOCATION DLO (GI! H-Cut H Ven W. Wp IN Lo(G) caliph leforediflo, bripartl MINOR MAJOR ye of lnlel CDOTTMpe R Cut Opening HI eWe= a Dan—,.. (.dH.nal a confir.. eguae, depmerlo.'aimm'0.AIIm) Inches: umber of Unit trials (Grate or Cut Opening) No = star Del el Fbwllne(aWltle of d.capita gn) Plead, Depth- an rate Informal.. MINOR MAJOR rdata. Catch. anger of a Unit Glen -(G)= feel Mln of a Onll Gra. ar, lee, use Opening Ra40 for a Grefe (lyplcel valuer 0.16090) A,.. = egging Fedor fora Single Code(iyplral value 050- 0.e0) Cr(G)= late Weir Coefficient (typical value 2.15 -3.00) C. (G) _ ,Me ONnce co.mnem (typical vtue 0.00- 000) L, (G) - urbOpening lnfmrnall.. MINOR MAJOR engtb of a Unt Cut Opening 4(C)= feet Height of Vetch Curb Opening In I.- i- Inches Rican of Cut Orifice Thera In fund. Heim` Inches Angle of Throat heed USDCM Figure SLS) ThM= ,. Side Width for Deprusron Pan Oypi®Ily the gutter wain of 2 Map Wc= %el egging Fehr for a slrgl. cut Opening (hi v01m 0.10) C. (c)= Cut Opera, War Contained(f I.I nitx}3.T) CNOf- ut Opening Orifice coemciem pypical value DJW- 0,70) or (0) _ Lear Head P rmence Reduction Cac atl MINOR MAJOR Depth for Grate Midi aq.m` f epm for Cut Opening Weir Equation d,,- 1 omYMelbn Inlet Performmrce Reaii FetOr for Wofret, RFea„y,ao,= urb Opening Performance Reduction Factor for Long Inleta RF,..- sled Inl.l Pelfmmence Financier, Fedor far Long Inlela RFv.=,= MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Qa • 4.9 me lots total Clinch, 15 GOOD Ion Mlno, and Mgar S,hchd OPEAR QKMaeouneo` 3.9 18Y fa COOT Type R Curt OVnnmO 000 1 4q 92 NIA NIA N/A NT NIA N/A WA Ia ;, NIA FJ &I.W B.W 0.00 mTg9 za0 9.fo DID 3.00 O.0> NIA NIA az0 o.w 1101 O:BT D Bz 0.89 NIA NIA U0.lnlei va.Gt, inlebip 51912017. 11:19 PM INLET-2A INLET IN A SUMP OR SAG LOCATION L.(C) 4 H-Curb H-Ved We_- W Win L.(G) barren Infoaeon MINOR MAJOR, yp. of mlol CDOTTyp.RCulb Op.ning Type - caMlmpenig) tlapreeelon'e INm'G-Alluw') aad=�IOdlas krone, of Jeion(aOtllbone., umhe� of Unu kkts IGreta ar CUN Openly) No = Water Depth at Flow I- beside of kcal depression) PoMIy Dapm= inches rate Intern allon MINOR MAJOR W Coamee Driji ear of a Jon Gum L.(G)' to. pth of Uhll Oral. W, = teal ee Opening Ratk tar a Grate (lypicel values 0. 15-0.90) A.. = bg0iy Fedor for a tal G.I.N twl value of-0.70) CF(0)= tale Weir Caretaker! finalvalue Cl5-3.e0) C„ (G- rate OalCaeRnent(tallwalue Valf -fuji Ce(G) urb Opanmp Informal.. MINOR MAJOR elgib W a Unit Curb Opening L.(C)- (ea Ralph of Vern.1 Curb Openly in ladles H.a= lochs ei of Curb Oaf. These In hrcM1ee Hn„m = i1 yle.I Throat flee USDCM Figure CT-5) Them = agrees He WMNfor Depression Pan brplially lhageter wklh of 2 feel) Wr= fed Crafty, Fedor far a Sil Curb Openhg(Iypical value 0. 10) Ci(0)= ulb Opening Wa r Coeffidare (rypNal ualue2b311 C, (C)= mh Openly Coke Coeffidam (Feel value 0.50-0.70) C.(C) _ Lm Head a ce Reduction C Iculm d MINOR MAJOR Depth for Glade Wall tlma. _ Doll for Curb Cenral Weir Equation el Comninmian lnfaf Performance Paelbn Fedor br Log lean. AF..ys,o.= Curb Opening Pmformar. RelugWn Fagar for Long Inl.m RF,,-= raleh Intel Performance Rehlx1ka Fader for Loy let. RFe,.r= MINOR MAJOR Total Inlet Interception Capacity(essumes Clogged Canadian) Q. ea 25.a lie IAI - 1n a Peak for Major Slorm OwM.r.—F. s.. ZaLe COOT Typa Opmlrq )Curb 3 00 i g.a tz.g NIA N/A NIA NIA rvrA NIA N/A t0.00 BW B.00 e0A0 2W o.tg n lg 9.80 gsr NIA NIA 039 003 0:5] 1 00 O.B3 1.00 N/A N/A J U0.able W.01, InIeN2A 619/201Y.11:19 PM INLET-M INLET IN A SUMP OR SAG LOCATION ,1=Lo (C){ H-Cum H-Van WO WP W L.(G) 3,,I,alnicarear n In ul �I ype of lnlol COOT TpaPGuIO CPrmnO J TW.- MINOR MAJOR ralD(aIEJIOnal to wmenee.sur aBplWbn . som'ONbw') ri. rrclmn owner.1 Can at (Drale or CUM OpMYaq) N0 - sterDepth at FbMnie(ouml0e of bul0•gruon) Penal, DepN. ncaes Drive Inbrmtllon MINOR MAJOR W OwmOe D,,s, Ia of a Una G.m uet MM1 of a Car Gala W., • Joel reater Operate Rude be aGlale llyplralvrlin. 0.'59W) hr- k IM Fat for a SiMb, Grain (yphul value 0.W-070) G(G)- men Won CanOir a rt Uyp¢. venue 2 le. 3 W) C. (0) - rateOnbceCanpinnalgb,balvalue0Wb O.W) C.(G)= orb Oga®rs Mlwmtlbn MINOR MAJOR aFglb of a Unit Curb Onto, L. (C) - ant sent of VONrul Curb Opentig In III Haa. want or Curb Onbm Tread. lncn- H_• rgk al Tnroal loran USDCM Fgue ST-5) TM1M• • pe Walrb toi Deprrauvwn Ponflyprelly lMOMfor wn0121.1 Wv' awFehr N for a Snyle Curb Opervrg IIII for. 010) Or (C)urn Op ra, wwr Coalition. fiyploal value 2.13.7) C.(CI'umopmttgonbceeoemerenit'hoovelueo 00 - 070) C„(C)'aw Hetel PrHormarrw Radactlon Cticulalee MINOR MAJOR I for a'.. M.wtlrn do —:Win for Curb Opamrg Won Equation Ec„amnlnallon Intl Paaboban ce Re]ugpn Fatlm fur L., lnle. RFr,�,�„,- uM Openirq Porlurrwrre Rodur ion F.. ba L., Iol&s RFr,,,>- releJlnblPwlornenva Reduction FrMm br Lnrg III RF,._.MINOR MAJORo[al lnletlnterceptlon Capec"(assumes cloggeD canDitlon) a • s.! SaInapwlySGOGG IinMlnor nnJ Meur SlurniN'O PEAKI Gwa.awwu' It1 113 N/AN/ANIA NIANIA N/A tOW000sODNb3.000.10 aao p.m WA WA 0.!! O.aJ 0.!) i W 021 1.00 WA WA UPINII_W.01, INet-JA 519I201 ], 1120 PM ,r—La IC) •I, H-Curb H-Verl Wo Wto — IN La(G) mmon Orman I COOTTp RC.MOP.nlnO anmman Type: Correlation laddilonM but coMlnwlro 9ubar drefterno a front G-AIIUW) 4w` nor of Unit Irwin 1Grele or Caro OW.,) Nor- n OePIM1 el Fbwlbn(.tod. of brat Jeer o) PortlYq 0,10 In of a Una Gmm b IO) 1 or a UnA Grain Wn • Conform Rabb for a Grate III vNes U 15-0 Pat Aa JIM Fatlar lot a SirgM Grate (lyrical iff 0 50 � 0701 G la) Wen coenloor" b " vela. 215.3 N) i (a) tonfeacoef5wemtanoelvalenorio owl C„181 OPanlnb lnformrtlw In of a Unn Curb Orenlrp L. (c) • u o1 vemtel C.. connate, In Inches H- A .1Curb orir TMan In 1. H..e- r of TNoal (caa USCCM Figure SL5) TMM • W nlb for Carferell Pen RyPlcaEy, a1a eubrerwOn.121") W. • IN F., to a SNW Curb OPuntq fleebal vffiw 0. to) C. (C). oconut, Web Cwlnnnfm (tminl valor 213 71 C. (c) opernrg orair. Confncmnt(bo lvexn 0w-0lot C. (C) for Grate MdwMa do— lor Curb Coemtg Wan Etlualrn 6:.. nation lneaf Patlmmmca ReducLon Factor for tarp Inaft RFr,..y..e, )pennon Ple ormanoa RW udern Fadm for WIN WIN, Hil— I Inlet Performance Reeudbo Former lot Lore Inlet Rh,... tl0rception Capacity (assumes clogged condition) Q. ISGOO, .vO PEANI Orvunemnrr coor rpRa R club oP«xre ]W 1 Bp r MINOP MNOR ncMe rcM1ro W ovamae Corona. WA feat N/A feet NM N/A N/A Well WA tom I., noner. 6.00 e.w f. Wmee bere MA0 2.00 0.10 0.10 3N o.m MINOR MI NM N/A 0.]3 F. 0.57 1m Ir 0. tm WA N. UG-Intet_14.01, Ilmlel-SA 5191201T, 11:20 PM IN A SUMP OR SAG LOCATION ,�—Lo (C). H-Cure H.Van WO Wto W La(G) an of later„Ion flacon CDOTTypaRCurprDMp O rate I Dupreeebn(abAbrellp wMNww Orrller tleprmbn'e'Irom'O-Albw') er' aer at UM IMMe (Onfor or Curp Operate) No or Depth at FWeOrle (ouMMe of WCN deformation) PoMLe DwIF e lnlpnnFllpn m of a onA Gale 4101' a of a Dahl copper W o' creep, Ratio fora 0m1e(Iyplael veluw0 1".00) h..' pare Fed., far n What. Good. ("I" value 0.50- 0.10) Cr (0) 1 war coell¢Iwr(NoNral value 215. 300) C. (G)• s Oaflm Cooflbleat (tvioel value 0 an- OHO) C. (G) I Opnln0lnlofinetlon m of a Unll Cup Op rnla0 4 (C) • at of van"I Orat®r OpennO hawses H•„I It of cwa onfke Threat In )..a Hiq . of Throtl lees DSDCM Feun ST 51 IDda WWIa tar De ,.. Pan (t,koflly the BWar wMltl of 21") W,.' jlre F WWr Far a Glreb OUN Openae (tylrcel ash. 0.10) C, (C)' OWN wolf coemdeM ( w—t aerate 2.33,1) C, (C) ` open, DNIw Caelndml l+ypacal-tee 0 W - 0 70) c.. (c) • for On . MW.411, br Cup Open, Wen Eeuellon 4.n' Ilratern IN. Per.... ReOucllon F'.., br Lore ankle ptfr , : Open, Perlormanw Reoudbn Fedor for Lore arras RFIu- J Inkl P.Rarre lw Renudwn Fedor to L., Inbk RFo...' Inlet Interception Capacity(assumes clogged condition) Q. rnnrlrr 1.1 000O 1nr M,n or nna M.nnr Slnrnrnl aO PEArtI a--- n MIA NIA NIA mNIA NIA NIA NIA MAJOR CDOT Type R Cur! Opemrlp J.00 Irbum t 8.0 n.0 Indoor, MAJOR W OvemEe Depth. tent Nor MINOR 15.00 MAJOR lad am Incnne e.00 mcnee 040 Porw. 300 a n 0.10 0 la 0w om 1 JJ WNIANIA 100 1 w NIA MAJOR 110.1n1et vA.01. Irea-OR WQ011.1120 PM T'—LO (C)T H-Cub H-V.M WO wp so LO (G ) ),,I,R pf,MR0-p1 - MINOR MAJOR ypepl,nlet COOT T)peft Cub Opening Typo= COOT 1 Depreeegn(eEOtl4nnl b Rods.. We, repression 'e' 1mm G-All—) ""' Incnnx umbel of Unit Inlets (Grele Or Cub Openhq) No star Derl M FIDWInt(oWMo of N,,W depression) petMtrg ONoth= Ird'., Me Myennelon MINOR MAJOR I�Ouemae Deptbe wglh of M Unit 0.1. L�(G)= 1-1 Allen of a Unit Grote W„- .tot tee Opening Fall. for a class (Intent veW.0.160.00) A,.o' I ,I, Fedor lot a91,1. Graf. logical.MtM 080-0,70) 4.IG) role Wen Coebdnnt (RPlpel value 2,16- 3e0) C. (G) rob Ortl COeffldesl (typical vela. 0, W - 0.e0) C. (G)- meOpening lnlermallon MINOR MAJOR south of a Unit Curb Consist, L.(C)` Fort ett,hl of VaN,cal Curb Opening In trees H..n= InpM1m eght of curb OOOca Thmat in Most H.— IMOM. ryM of Threat (see UBDCM Flyurr BLB) TMIe' IW taee IW WMb for Deensewn Pon(tW"ly tin gullerwq .12 feet) We` lee, Mg01F0 Fedor for a Gogle Ours Opens, (ypNet vMbre 0.101 Q tc)= cab Op." Won Coeelneb (Nelson.1w 2"7) C. (C) ` uro Opening Onflce Caemcrore (ryplW VIAM o.eo-0 70) C. (C) - PM Redudbn CalcultleJ MINOR MAJOR f0r Grlb MI.Not Bus` 8 spin br Curb Conn.o Wen Enueu.n Cr— ` b Ombenson Intel PMwmanon ReelucbOn FMot lot Lmq Inters RFu,.., - ub Openng PerlOrmence RWudbn F., Im U., Inlets RFpy = rase Inbl Pisormwoo Redr dan Factor lot lmg Inlets if MINOR MAJOR Ocal InIW InNIO: IIOO GepeCHy (868UTe8 CIOgQBG CORGRIOn� Qea 8.3 10.] CIS Inlet CannmvrS GOOD I.1 Yinm sett Mom SmnnMaO PEARI Q. I,t—o 1.8 B] ds Tyco R Cum Onomrq 3W 1 e.0 110 N/A N/A NIA N/A N/A N/A NIA tong e.ao e.W ea ao 2:ao 0.10 aW o,m WA N/A o.eg oso Od] Di5 0B3 100 WA N/A U0.1n1e1 v4.01, InIe46C SIB12(11I, 11:21 PM ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor d Major Storm) ) lnm wn RNoweflk WMN to, SoreW 6WM C. Slane eemmt Curb (I.eve conk for no mnvayarm min celem Cum) rmp a nonplusses annual Cams (Wvally Important 0.012 and o.M) of Curb at GUMr Flow Lma a Imm Coro Firm to somal Cm ra Sbne (1,rualy x Induce ovm 2,l acnn or 0.o0S nm) tMJlnel Slope- Eller olor sump cmNnMn RoWI nese for Street Carbon (tm✓-ally prosper o 012 and o.oxot rob SPnW br Mlrwr 6 in.)., Storm role pegM1 at GMer Fbwllue for Mirror 6 Major Storm Depth at Strait Crawrr (I"ve bin" rot mr) ♦lloweble Capacity is eeesa on N rth Cmerlon •llowebb Capacity I. b.wa on 0.pth Crlmnon T_=-.= too p s1C.= U. nm rvw.= Omm Won = B00 Y¢M1m Too-- b0 11 W = 00 fl S,= 000 s:.= ooas nm S, o.000 n..... = 0.013 Minor Stom Mepr Sbrm To,. -F 120 aaa fl d s, a.o txa Inclw r r ch..l • yea Minor Slarm Ma ai Sloim q,rw.• SUMP SUMP of. UO-Inlel v4.01. Inlet-6A 519120V, it 21 PM INLET IN A SUMP OR SAG LOCATION ,--Lo (C)K N-Curb N.V." We Wp W Lo(G) In Il upon noul) COOT Tpe If Curb Corning � ul nnl T pe: Connors— latintA In, oombe a Bute, re uenalon'I from 0 Allons) so - ., of Un,I plate (GrNe or Curb OWI,) No r Debi, M FlowlFv Intends of bW tleprtYbn) PgtlXq Coco, InNemallor n of o Unit Go.. le (0)" I u n Unn Grnle W. Onemmp Ralp for a Code Gynrol velwe o t1 Og0) Av' nqf Fnam for a Slrgb Grate (byglul Value 050.0 70) G (G) War Contribute (fY "V91u 210.5.00) C. (CS): Orton Cootr¢Imnl(typical Velu (I'M-0,W) O,(G): Opening information If or a Unn Curb Cirrus l t„(C)I it of Vertical Curb opening In Inatures N,.,,: II oI Curb griper Three, In nrclln N,.m' of Tbmef (son USOCM Figure ST 5) There Width for Oopremlon Pen (ly0laally Ion guller each of 2 Nei) W. II, Fadm lm .Slagle Curb Openllg(typkelvalue0f0) C,(C)' Opening Wait Coefetlent(IypIW value 230.21 C,,(C): Openblp Conn. CoetrlaNnt(1,lom) velw b.eo. 0 0) C,(C). I for Gale M10wNln Ely,,,: I for Curb Corona Web ENualbn 0c.a' tlnelron Intel Perlormenu Rechristen Factorfor Long lnlau Opens, Pelbrmenoa ReEuclNn Factor for Lang fears RFo.:.' It lnNr PMmmmu Redugbn Factor for Long Inlet. RFc,-: Inlet Inrorceptlon Capacity (assume clogged condition) ll -lnleLv4.01, Inlet -SA 00 DD m 0. 0.67 N/A NIA 010 aeo 0.91 0&1 car! I 100 N/A I WA 0„ar00e Dep01e art none. norm IPoree. J &9/2017,11:21 PM ■"■■■■■ N! ■■'■■■■ ■■1,■■■■ ■■"■■■■i ■■■■■■■ ■■■ .■■■■■■� ■■■„■■■■■■I ■■■„■■■■■■' ■■■■.■■■■■I ■mmmmm■m■■I.1 ■■■■„■■■■■� ■■■■M MEME■� ■■■■.I„■■■■m ■m Imlhqhm■■� • � m■■■I_. MEmm m■■■I II■■E\■1 IImmmu\I I I ■mm■I ■■■■MIMMM W�►" ■■■■■Im■■sMMMMMIMMMM ME 0 0 0 0 - o O O O o O o 0o O o 0 0o O O o 0 0 o O o 0 0 0 O 01 W r 10 h O 17 N � O (s)o) Alioedeo I N W W a I . 10110111 Ell Ell I: ■���1 IJ \ Ir M--_1 ■-- �1111IMEM1 ■EME �___,_■__ ■____,__ MNM ill • ■_____ ,_ ■ s -- -- --,-- --'■ E --■'- ---'- 1_ __ . =Kim= maim� mmmm mmmm mMMLUMMM --\----� ==a\===i ---,---m --_---m , m 0 d = � � d N oN� II 0 0 a t7 Ol fV tV r' s G LL (sp) 43edeo U � o N O R O N I e N � yob O N I O O O Capacityjcfa) O O O {NCI {J {4�11 O O O � O � O � l J O l v m 0 1 / APPENDIX C Storm Sewer Design U. M N x A LLaaada LL as a LL a aaaa a a cncn(n m UUUUUU U UU U U u UUUU U U 000 0 �m���� m �� m �m�� ¢¢¢ ¢ v a a c a E Doi m vv D D v cowo0m D v tmm o m (D CD n In to V M S N N M M M N N� W o. a N U 0 N N N 1- Ln co co O CO i� N O CD coO N I- r r O� O Ln U[ M N N (D co co S LL co (N N O) O N N W CDN V <" ) V It (D co N pp N O C co (D CO N N N = M in V V co m y N 0 C) a a L ¢m C)OWLL (D 2— ¢ ¢ ¢mUQ W ¢ ¢mU ¢ N M Ln (n LO (D m 3 v 0 w w _ E J J m O F U ¢ m F ¢ ¢ ¢ m U ¢ ¢ m U ¢ 4) ¢ m U 2 N C> Ln ¢ mLI? to O r r r OJ 0 H HF- Np_ = 2 2 S W¢ W W W m W W W 2 2 W W W W W W W J J J J J J J J J J J J J J Z Z Z Z Z Z Z Z Z — O 0 a a E ¢am ¢ �22SSW S 22 2 co (nWSS 2 � (nW W cn O W J W W W J cG W W J J W 0 LL Z — LL LL LL Z LL LL Z Z LL O U. U. N M tP. ¢ (D r r r o] O O O 0 0 O I? O O CD O O I? O O ~ (n co (n cn (n (n (n (n (n (n 0 a S 1 -0 1, ST-0 1 A, ST-0 1 B, ST-01 C 100-yr Design Storm Tailwater Elevation = 4838.59 DUMMY NODE INLET ID t IE 10 lY NODE OUTLET A DUMMY NODE IN1li1'-1C G DUMMV NOW.[NLRT-IH �O O� Y IJ IA FES-lA DUMMY NODE OUTLET STRUCTURE POND B Manhole Input Summary: Given Flow Sub Basin Information Ground Knw Local Drainag Overlan Gutterrelo lement Ekvation Cootributio rver'an Runoff Syr a Coeff-icien Coefficien d d Lengt Name nn w Area Lengthlopeh(It)(olsS (cfsAc.tt(ft)%) (ft) FES-IA 4850.00 70.00 0.00 FO.00 7 0.00 0.00 F 0.00 F 0.00 0.00 70.00 1 A 4850.87 F66.22 F 0.00 0.00 0.00 F0.00 F0.00 0.00 0.00 0.00 1 B 4849.32 62.72 0.00 F 0.00 F 0.00 0.00 F 0.00 0.00 0:00 FO.00 IC 4846.35 62.- 0.00 o.00 0.00 0:00 0.00 0.00 0.00 0.00 II 4845.89 18.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DUMMY NODE 4845.89 I8.90 ���������� 0.00 0.00 0 00 0.00 0.00 0.00 0.00 0.00 INLET-1 B 1 D 4849.17 29.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1 E 4848.26 20.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 C� IF _4843.00 2.70 . _ 0.00 0.000 OAO� 0.00 _ - 0_00 I _ O.00 : 0.00 D OUTLET A F 43.00 ( 2-70 - 0.00 0.00 0.00 F7oo- Foo-oJl-o-oo lo-oo- 0 00 UMM UMM NODEY 4848.26 18.22 0.00 r 0.00 0.00 ; 0.00 0.00 "[ 0.00 Fo .00 0.00 INLET -ID I - 1G - .I 4848I1 _0_00 _-._-_. -0.00 _ L_ _0.00 -1- -0_00 11_ 0.00 _'1 0.00 10.00 DUMMY 1 " � NODE 4848.11 9.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 INLET- IH 1 4845.89 1 22.16 1- - 0.00 _ I 0_O0 I_. 0.011 ..I _ O.UU it O.UUq 0.0U ,1_ U.W DUMMY INTT ODEA 4845 89 22.16 o oo 0.00 J 0.00 0.00 0.00 0+00 0.00 0 00 lJ 4839.25 10.51 0.00 jQ7W71 0.00 0.00 0.00 ! 0.00 F 0.0o 0.00 DUMMY ' Foo DE OUTLET 4839.2510.51 ,[ 0.00 0.000.000.00 0.00 0.00 ! 0.00 STRUCTUR; E POND B . Manhole Output Summary: Local Contribution Total Design Flow Overland Gutter Basin Local Manhole:PeaF Element 1 Time Time Tc lntensIt Contrib' Coeff. Intensity. Tc FloComment Name (min) (min) (min) , (in/hr) (cfs) Area (in/hr) (min) ( cfs - - 1 FES-IA 1 0.00 1 0.00 1 0.00 1 0.00 :1 0.00 '10.00 1 0.00 1 0.00 110.00:1 IA 0.00 0.00 0.00 O.Oo i 0.00 0.00 0.0o 0.00 66.22:F _ IB 0.00 0.00 0_00 0.00 0-00 ^0_00 0.00 0.00 62.72,� 1C 0.00 0.00 0.00 0.00 j 0.00 0.00 F 0.00 F 0-00 62.72 11 0.00 0.00 0.00 F 0.00 iF o.00 10.00 F o.00 F 0.00 + 18.90 F-DUMMY NODE 0.00 0.00 0.00 { 0.00 ! 0.00 0.00 0.00 0.o0 18.90•F INLET-1 B 1 D 0.00 0.00 0.00 0.00 To To 0.00 T 0.00 29.77 F I 0.00 0.00 0.00 0.00 1 0.00 0.00 0.00 0.00 20.85F 1 F _ OAO J 0.00 0.00 0_00 0.00 10.00 OAO ; O to 2.70 DUMMY OUTLETODE A IF 0.00 0.00 0.00 0.00 0.00 + 0.00 o.00 o.00 2.70 D INL T-IDDE 0.00 0.00 0.00 0.0o 0.00 0.00 ' 0.00 ! 0.o0 18.22� 1G 0.00 0.00 0.00 0.00 I -o-o 0.00 0.00 i 0.o0 19.53'F- DUMMY NODE 0.00 0i00 0.00 0.00 ( 0.00 . 0.00 0-00 0.00 9_53 INLET_1C I H F0.00 10.00 0.00 0.00 I 0.00 0.00 o.00 OAO 22.16 DUMMY NODE 0.00 0.00 0.00 0.00 f 0.00 0.00 0.00 0.0o 22.16 F INLET IA L Ii F o.00 Fo.00 o.00 F o.00 F o.00 o.00 F o.00 F o.o0 10 51 DUMMY NODE Surface Water OUTLET o-oo 0.00 0.00 0.00 0.00 0.00 .00Fo oo F STRUCTURE POND B IFo(Up cream) Sewer Input Summary: Elevation Loss Coefficients Given Dimensions Sewer Upstream p Cross Rise San pName Element Lengthvert Nstream fSope Invert Fnings Bend Lateral (ftor(ftor/o) (ft)ft) u (ft) Loss Loss Section in) in) lA 144.20 4834.82 0.2 4835.11 0.013 0.00 I 1.00 CIRCULAR 160.00 60.00 � in in 54.00 54.00 1B 538.76 4835.21 0.2 4836.29 0.013 1.32 0.00 CIRCULAR in in in in 1C 595.72 4836.39 0 2 4837.58 0.013 0.05 0.25 CIRCULAR" 54.00 54 00 11 65.46 4840.09 in in I I.0 4840.74 . 0.013 1.32 0.00 CIRCULAR 24.00 24 00 DUMMY IOBDE INLET- 1.00 4840.73 1.0 4840.74 0.013 0.25 0.00 CIRCULAR 36.00 36.00 in in in in 1D 543.71 4837.68 0.5 4840.40 0.013 0.05 0.25 CIRCULAR F00 00lE 18.53 4840.50 0.5 in in 4840.59 0.013 1.32 0.00 CIRCULAR.00 36.00 I in in IF 51.30 4840.69 0.6 4841.00 0.013 0.05 0.00 CIRCULAR 18 00 18.00 DUMMY OUTLETODE 1.00 4840.99 0.6 4841.00 0.013 0.25 0-00 CIRCULAR 18 00 18 00 in I in DUMMY NODDE INLET- 1.00 4840.59 0.5 4840.59 0.013 0.25 0.00 CIRCULAR 36.00 36.00 in I in I G 78.58 4840.50 OS 4840.89 0.013 1.32 0.00 CIRCULAR 18 00 18 00 DUMMY NODE INLET- 1.00 4840.89 0.5 4840.89 0.013 0.25 0.00 CIRCULAR 18 00 18 00 1H 14.00 4840.08 1.0 4840.22 0.013 1.32 0.00 CIRCULAR 24.00 24.00 DUMMY NODE INLET 1 00 4840.21 1.0 4840.22 0.013 0.25 Fo .00 CIRCULAR 30.00 30.00 1J 52.00 4836.99 0.5 4837.25 0.013 0.05 0.00 CIRCULAR 36.00 36.00 DUMMY NODE OUTLET STRUCTURE [100.4837.21 4.1 4837.25 0.013 0.25 0.00 CIRCULARFn 36.00 POND B Sewer Flow Summary: I Full Flow Critical Flow Normal Flow Capacity j Surcharged` Element Flow Velocity Depth, Velocity Depth, Velocity, Froude Flow Flow Length Comment; - Name I (cfs) (fps) (in) (fps) (in) - (fps) Numbed Condition (cfs) (ft) IA 116.79 5.95 27.531 7.54 ! 32.35 i 6.13 0.73 Subcritical . 66.22 0.00 IB f 88.18 5.54 27.64 7.66 ' 33.65 6.02 0.69 Subcritical 62.72, 0.00 IC-1 88.18 5.54 27.64 7.66 ! 33.65' 6.02 0.69 Fsubcritical 62.72 0.00 I I-i 22,68 7.22 18.77 - 7.17 16.74, 8.08 _ L26 _ Supercritical' 18.90 DUMMY NODE',' 66.88 9.46 16.72 5.88 13.09 8.14 1.60 Supercritical 18.90 0.00 IF INLET-1 B 1 D ; 101.84 8.10 19.41 6.25 17.78 ; 7.03 1.18 ,Supercritical' 29.77' 0_00 IE ! 47_29 6.69 '17.60 6.07 l, F,6.73 6.48 1.10 Supercritical 20.85r 00 IF 1F 8:16 4.62 7.48 3.89 j 7.13 4.14 1.10 r Pressurized' 2.70 51.30 i� DUMMY OUTLETODE' 8.16 -4.62 - 7.48 3.89 7 13j 4 l4 1 10 Pressurized 2_70 1.00 DUMMY NODE 47 29 6.69 16.40 5.81 15.51 , 6.26 1.1 I Supercritical 18.27 0.00 INLET-1D :F������ � I - I I 7.45 4.21 18.00; 5.39 j 18.00; 5.39 0.00 Pressurized 9.53, 78.58Jl DUMMY NODE; 7.45 4.21 18.00; 5.39 i 18.00" 5.39 0.00 Pressurized 9.53i 1.00F. INLET -IC 1H 22.68 F722 120.16 1 7.87 1119.19' 8_23 1.12 'Supercritical F22.16F 0.00 DUMMY NODE 41.13 8.38 19.21 6.67 � 15.68 { 8.53 1.48 Supercritical FIT 0.00 ;I INLET IA 1J 47.29 6.69 12.32' 4--9 11.53' 3.38 1.14 Supercritical.10.51 0.00 DUMMY NODE F678 OUTLET STRUCTURE [135.42 19.16 12.32 4.92 11.37 3.19 F rcritical 10.51, 000 POND B I! 1 � • A Froude number of 0 indicates that pressured flow occurs (adverse slope or undersized pipe). • If the sewer is not pressurized, full flow represents the maximum gravity flow in the sewer. • If the sewer is pressurized, full flow represents the pressurized flow conditions. Sewer Sizing Summary: Existing Calculated Used I 'I Element rF ak Cross Area Comment wRise Span Rise Span Rise SpanName s)' Section (ft 2) IA 66.22 CIRCULAR 60 00 60.00 54.00 54.00 60.00 ; 60.00 19.63 m m m m m m - - - 54.00 54.00 488 00 FI 48.00 54.00 j 54.00 1B 62.72 CIRCULAR 15.90; ' S4 00 S4.00 48.00 48.00 54.00 54.00 1C 62.72 CIRCULAR 15.90 in in in in in in 24 00 24.00 24.00 . 24n 24.00 24.00 11 18.90 CIRCULAR`������ 3.14 m m m m m m DUMMY NODE INLET-1B 18.90 CIRCULAR, 36.00 3 1.00 . 24.00 24.00 36.00 36.00' 7.07 in n in I in in in 48 00 48.00 33.00 33.00 48.00 48.00 - 1D 29.77 CIRCULAR,���FF� 12.57 F m� m m m m m 36.00 36.00 27.00 2Z00 36.00 36.00 lE 20.85 CIRCULAR 7.07 F-� m m m m m m, -- - - - _ - - - - j� 18 00 18.00 12.00 12.00 I8.00 18.00 1F 2.70 CIRCULARI .' �,FF�� 1.77 F m m m m m m 18 00 1 in 12.00 12.00 18. 00 18.00 DUMMY NODE OUTLET A 2.70 CIRCULAR ������ 1.77 m m m m m m 36 00 36.00 27.00 27.00 36.00 36.00 DUMMY NODE INLET -I D 18.22 CIRCULAR ���i��� 7.07 m m m m m m Existing height is smaller than the suggested height. 1G 9.53 CIRCULAR 18.00 in 18.00 in 21.00 in 21.00 in 18.00 in 18.00 in . 77 1 Existing width is smaller than the suggested width. Exceeds max. Depth/Rise Existing height is smaller than the DUMMY NODE INLET -IC 9.53 CIRCULAR 18.00 in 18.00' in 21.00 ' in 2I.00 in 18.00 in 18.00 in 1.77 suggested height. Existing width is smaller than the suggested width. Exceeds max. i Depth/Rise 1H 22.16 �1-. CIRCULAR 24.00 �n ' 24.00 m 24.00 m 24.00 m 24.00 m 24.00 �n 3.14 . - - - DUMMY NODE INLET IA 22.16 CIRCULAR�� 30 00 m 30.00 m 24.00 m ���� 24.00 m 30.00 m 30.00 m 4.91 lJ ]0.51 CIRCULAR 36 00 in 36.00 in 21.00 . m 21.00 m 36.00 in 36.00 in 7.07 DUMMY NODE OUTLET STRUCTURE POND B 10.51 CIRCULAR 36 00 in I 36.00 in I I5.00 in I 15.00 in I 36.00 in I 36.00 in I 7 07 • Calculated diameter was determined by sewer hydraulic capacity rounded up to the nearest commercially available size. • Sewer sizes should not decrease downstream. • All hydraulics where calculated using the'Used' parameters. Grade Line Summary: Tailwater Elevation (ft): 4838.59 ;[__1 Invert Elev. Downstream f Manhole HGL ; EGL Losses Element Downstream Upstream! Bend rLateral Downstream Upstream, Downstream Friction, Upstreaml Name (ft) (ft) (ft)sLos(ft) (ft) (ft) (ft)Loss (ft) IA 4834.82 4835.11 0.00 0.00 4838.59 4838.67 ' 4838.86 0.12 4838.98 1 B 4835.21 4836.29 0.32 OAO 4839A0 48395I 74839.30 0.63 4839.92 1C 4836.39 4837.58 0.01 F0.18 4839.74 4840.50` 4840.12 0.90 4841.01 11 4840.09 4840.74 0.74 0.00 4841.48 4842.30 4842.49 0.61 4843.10 ; DUMMY NOBDE 4840.73 4840.74 0.00 4842.95 4842.95 4843.13 0.00 , 4843.13 10.03 INLI D 4837.68 4840.40 0.00 0.22 4841.13 4842.02 4841.24 1.39 ! 4842.62 lE 4840.50 4840.59 IF0718 0.00 F 4842.55 484255 4842.80 0.03 4842.83 1F 4840.69 4841.00 7o --0.00 4842.80 4842 83 4842.83 0.03 F 4842.87_' DUMMY OUTLETODE 4840.99 4841.0 1 0.01 0.00 4842.84 4842.84 4842.88 t 0.00 f 4842.88 DUMMY NODE 4840.59 7 4840.59 0.03 `OAO 4842.67 4842.67 ` 4842.86 0.00 , 4842.86 I INLET-1 D I 4840.50 4840.89 0.60 0.00 4842.77 4843.41 4843.22 0.64 j 4843.86 DUMMY NODE 4840.89`! 4840.89 0.11484352 484353 i 4843.98-; 4843.98 -0.00-i J001 INLET -IC IH 4840.08 4840.22 1.02 0.00 484L68 4841.90 4842.73 0.13 4842.86 DUMMYNODE 4840.21 4840.22 0.08 0.00 ' 4842.62 4842.62 4842.94 0.00 ! 4842.94 INLE 1J 4836.99 4837.25 0.00 0.00 4838.90 4838_90 4838_98 0:03 4839_Ol I DUMMY NODE i f OUTLET STRUCTURE 4837.21 4837_25 FF4839.780.000.00 4838.91 4839.7414839.78 ; POND B • Bend and Lateral losses only apply when there is an outgoing sewer. The system outfall, sewer #0, is not considered a sewer. • Bend loss = Bend K * V_fi ^ 2/(2*g) • Lateral loss = V_fo ^ 2/(2*g)- Junction Loss K * V_fi ^ 2/(2*g). • Friction loss is always Upstream EGL - Downstream EGL. ST-02 100-yr Design Storm Tailwater Elevation = 4848.00 Manhole Input Summary: Given Flow Sub Basin Information Total Ground Local Drainage Fve Overland Gutter[Gu tteElementKnownRunoff 5yrElevationContribution Area Slope Leng[h elocity Name Flow Coefficient. Coefficient (ft) (cts) (cfs) (Ac.) (%) (ft) (fps) FES-2A 4842.00 0.00 0.00 0.00 0.00 0.00 o.o0 0.00 0.00 0.00 2A 4849.79 32.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DUMMY NODE 4849.79 ������i���� 32.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 INLET-2A Manhole Output Summary: Local Contribution Total Design Flow Gutter Basm Local Manhole Peak FOverland Element Time Time Tc Intensit Contrib F0eff-� Intensi Te �� FlowCommentName (min (min) (min) (in/hr)ya (cfs) (=Isi) (mm) (cfs) FES-2A 0.00 0.00 0.00 0.00 0.00 0.00 I 0.00 0.00 0.00 I Surface Water Present - -- -- -- - -- _ (Upstream) 2A 0.00 0.00 1 0.00 FO .00 0.00 0.00 0.00 0.00 32.58 Surface Water Present (Downstream) 11 DUMAMY FFF��FF[NODE INLET- .00 0.00 0.00 0.00.58 L] Sewer Input Summary: Elevation Loss Coefficients Given Dimensions jl Element Sewer Downstream Slope'iInvert Upstreami Mannings' Bend Lateral Cross Span Len tr Invert I [Rise orft orName (in) (f j (ft) (%) (It) n Loss Loss Section in) 2A 56.93 �- 4844.00 '1 0.5 4844.28 ',1 0.013 1 0.03 1 0.00 CIRCULAR 136_00 in 136.UU in DUM L T NODE 1 00 4844.28 0.5 f 4844.28 , 0.013 6 0.25 0.00 CIRCULAR 36.00 in 36.00 in Sewer Flow Summary: Capac ty CFull Flow ritical Flow Normal Flow SurchargedLengthCommentName Element Flaw Velocity .Depth. Velocity' Depth Velocity Froude Flow Fw (cfs) (fps) (in) (fps) (in) (fps) Number• Condition (ft) 2A 147.29 1 6.69 �22.23'� 7.11 121.96 1 7.21 1 _1.U2 jPressunzed,j3Z.M,j j6.93 ,1- D INLET 2UMMY 0DE 4Z29 6.69 22.23 7.11 21.96, 7.2] i 1.02 Pressurized 32 58; 1 00 • A Froude number of 0 indicates that pressured flow occurs (adverse slope or undersized pipe). • If the sewer is not pressurized, full flow represents the maximum gravity flow in the sewer. • If the sewer is pressurized, full flow represents the pressurized flow conditions. Sewer Sizing Summary: Existing F Calculated Used PeakFIross Element Fcf)ection Rise fSpan Rise Span [[['Area Rise Span ! CommenC Name (fN Z) - - - - - _2A_ 32.58 Rini' 36.0U m 33_AU -m- 33.0U m 36.UU in 36.UU m! L(rl -0 DUMMY NODE INLET-2A32.58CIRCULAR3600in36.00n33.00 in33.00 m36.00 in 3600injl 7 _ • Calculated diameter was determined by sewer hydraulic capacity rounded up to the nearest commercially available size. • Sewer sizes should not decrease downstream. • All hydraulics where calculated using the'Used' parameters. L-1 Grade Line Summary: Tailwater Elevation (ft): 4848.00 Downstream Invert Elev. Manhole HGL EGL Losses BendF Friction Element Downstream UpstreamDownstream Upstream Downstream Upstream Name (ft) (ft) Loss (ft) (ft) (ft) Loss (ft) (ft) (ft) 2A 4844.00 4844.28 1 0.00 1 0.00 4848.00 4848.14 4848.33 0.14 1 4848.46 DUMMY NODE 4844.28 4844.28 0.08 0.00 4848.22 4848.22 4848.55 0.00 4848.55 INLET-2A • Bend and Lateral losses only apply when there is an outgoing sewer. The system outfall, sewer #0, is not considered a sewer. • Bend loss = Bend K * V_fi ^ 2/(2*g) • Lateral loss = V_fo ^ 2/(2*g)- ]unction Loss K * V_fi ^ 2/(2*g). • Friction loss is always Upstream EGL - Downstream EGL. rI ST-03 100-yr Design Storm Tailwater Elevation = 4848.00 w A zz a Manhole Input Summary: FES-3A Given Flow T Sub Basin Information Element GroundF l n Lacal Drainage' AreaLengthlope unoff Fc SyrElevationContribution Overland rverland', FG GutterF VelocityName (ft) ow (cfs) (Ac.) fficient CoefficienN (ft) %) (fps) FES-3A 4848.00 0.00 0.00 0 00 0 00 0.00 0.00 0.00 0.00 0.00 1 _ B1 _ 4852.68 14.17 0.00 0.00 0.00 0.00 Oy00 _0.00 0.00 _0.00- D O 4852.68 14.17 0.00 0.00 0.00 0.00 0.00 1. 0.00 0.00 0.00 NO Manhole Output Summary: Local Contribution Total Design Flowil Overland! GutterPeak I F_ment Time Time Basm Tc Intensity Con�trib' Coeff. Area Intensity Manhole Tc Flow [Comment�a.c mm ( ) mm ( ) (min) (in/hr) (cfs I ) (in/hr) (min) cfs) , FES-3A t 0.00 10.00 I 0.00 I 0.00 'I 0.00 11 0.00 I 0.00 'I - 0.00 11 0.00 !1 B I 7 0.00 0.00 0.00 0.00 0.00 0.00 OAO 0.00 14.17 DUMMY NODE' OAO _OAO 0.00 OAO OAO 0_00 0_00_' 0.00- i 14.17 L-j Sewer Input Summary: Elevation Loss Coefficients Given Dimensions Sewer Downstream' rl7nvertm a' Element Length Invert FSI.ofpe Mannings Bend Lateral Cross RiseP pan Name ) _ - Loss Section (ft or in)or in) (It) (It) B1 60.69 1 4846.00 0.5 1 4846.30 1 0.013 10.03 1 0.00 (CIRCULAR 124.00 in 124.00 in DUMMY NODE' 1.00 4846.30 0.5 4846.30 0.013 0.25 0.00 CIRCULAR 24.00 in 24.00 in Sewer Flow Summary: Full Flow Capacity Critical Flow Normal Flow Surchar ed Element [Flow Velocity Depth Velocity FDepth Veloci Froude Flow Flow Length Comment Name (cfs) (fps)ty Qn) (fps)ty (fps)ty Number Condition (cfs) Bl 16.04 5.11 16.27 6.25 17.53 5.76 0Subcritical .86 14.17 3.14 --- - - - - --- - - - - - -. --_ _--- - Surcharged - - - - --- --------- DUMMY 16.04 5.1 I 16.27 6.25 17.53 5.76 0.86 Pressurized; 14.17 1.00 NODE • A Froude number of 0 indicates that pressured flow occurs (adverse slope or undersized pipe). • If the sewer is not pressurized, full flow represents the maximum gravity flow in the sewer. • If the sewer is pressurized, full flow represents the pressurized flow conditions. Sewer Sizing Summary: Existing Calculated Used �I eak Element FI0%[Sect Cross RiseSpanRise Span Rise Span Area Name ion (ft^2)Comment cfs) ' B1 114.17 I CIRCULAR 124.00 in 124.00 in 124.00 in 124.00 in 124.00 in 124.00 in 1 3.14 DUMMY NODE 14.17 CIRCULAR 124.00 in 24.00 in 24.00 in 24.00 in 24.0o in 24.00 in F3.14 • Calculated diameter was determined by sewer hydraulic capacity rounded up to the nearest commercially available size. • Sewer sizes should not decrease downstream. • All hydraulics where calculated using the 'Used' parameters. Grade Line Summary: Tailwater Elevation (ft): 4848.00 Downstream Invert Elev. Manhole HGL EGL Losses Lateral Friction] Element Downstream! Upstream[Biend Downstream' UpstreamFstream�, Upstream Name (ft) (ft) Lss Loss (ft) (ft)t) Loss (ft) ( ft) (ft) (ft) ' Bl II 4846.01) ,I 4846.3U 'I U.UU I U.UU I 4848.UU 14848.11 4848SL _I . U.1L 'I 484z5.�4 DUMMY 4846.30 j 4846.30 ' 0.08 0.00 4848.30 4848 30 4848.62 0.00 ' 4848.62 NODE • Bend and Lateral losses only apply when there is an outgoing sewer. The system outfall, sewer #0, is not considered a sewer. • Bend loss = Bend K * V_fi ^ 2/(2*g) • Lateral loss = V_fo ^ 2/(2*g)- Junction Loss K * V_fi ^ 2/(2*g). • Friction loss is always Upstream EGL - Downstream EGL. r) ST-05 and ST-05A 100-yr Design Storm Tailwater Elevation = 4846.00 DUMMY NODE INLET -5B Q FES-SA Manhole Input Summary: Given Flow Sub Basin Information Total Ground Local Drainage Overland Overland Gutter Gutter Element Known Runoff 5yr Elevation Contribution Area Length Slope Length Velocity Name (ft) (cf� (cfs) (pc,) Coefficient Coefficient (ft) (%) (ft) (fps) �_ �� �_� FES-5A 4846.00 0.00 0.00 0.00 0.00 0.00 0.00 F70.09 0.00 0.00 SA 4847.90 F53.98 F 0.00 F 0.00 F 0.00 F 0.00 F 0.00 FO.00 F 0.00 0.00 DUMMY NODE 4847.90[12-11 0.00 0.00 0.00 0.00 0.00 FO00 0.00 0.00 INLET-5A 5B 4849.21 1 44.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SC 4849.61 44.21 0.00 0.00 0.00 0.00 0.00 6.00 0.00 0.00 5E 4849.19 F8.32 F 0.00 0.00 0.00 F0.00 F0.00 F0.00 F0.00 0.00 DUMMY NODE 4849.19 8.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 INLET-5C [ f :1 5D 14848.59 1 36.01 1 U.U0 I U.UU I 0.UU I U,UU 'I U.00 I U,U0 1 0.00 1 0.00 0 • DUM IN NODE B F 8.59 ; 36.61 i 0.00 0.00 0.00 0.00 0.00 1 0.00 0.00 LET -- - - - - - - - ---- -- -Loc- -- - - - - - - -To -- -- - --�I al Contribution Total Design Flow OT d' BTaass lI Manhole Element me Timteer cn Intensi C000 ntrib Coeff. Intensi FI0 w1FCom Name (mm) (mm) - (mm) (m/hr (cfs) Area (in/hr ty (mm) (cfs) FES-5A I 0.00 1 0.00 1 OOU j 0.00 UOU 1 UOU it U.UU I U:UU I U.uu 1- 5A 000 000 F 0.00 7-00 0.00 0.00 000 0.00 53.98iF DUMMY NODE INLET 0.00 0.00 0.00 0.00 0.00 0.00 i 0.00 0.00 12.111E 5A SB 0.00 0.00 0.00 ', 0.00 0.00 0.00 j 0.00 0.00 44.21 �- 5C 6.00 0.00 0.00 _ -Too 0.00 0.00 I 0 00 j 0.00 44.21 � SE 0.00 0.00 0.00 0_00 0.00 0.00 0.00 0.00 8.32 iF - ---- - DUMMY NODE INLET- 0.00 ! 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.32;Fj SC - - _ SD _ i 0_00- - 0.00 OAO-I _ 0_00 0.00 0.00 0.00 0.00 _ 36.61I, DUMMY NODE INLET - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.61!�`, Sewer Input Summary: Elevation Loss Coefficients Given Dimensions Sewer .Downstream Upstream -Pin) Rise Span Element Length Invert Sloe p Invert Mannm s g Bend, Lateral; , Cross or (It or (in) Name (ft) (ft) o (/o) (ft) n Loss Loss Section in) i SA ;I 148.25:� 4840.60 0.5 4841 34 0.013 0.00 0.00 0.00 I CIRCULAR 14i "' 14S UU I DUMMY NODE 1.00 4841.34 0.5 4841.34 0.013 0.25 0.00 I IF 48.00 j 48.00 j INLET-5A in in i SB in 75.65 4841.44 0.5 J 4841.82 0.013 0.05 0.00 CIRCULAR 48 75 65 F4841 o5800 j 48 00 5C 270.03 - 4841.92 0.4 4843.00 0.013 0.05 0.25 CIRCULARli 4 in 48.00 i 5E j 12.50 4843.10 0.5- 484336 0.013 1.32 0.00 CIRCULAR; 36n S6.00 in DUMMY in 1 INLET SODE i 1.00 4843.16 0.5 4843.16 0.013 0.25 0.00 CIRCULAR{ 36.n 0 ! 36.00 5D 135.64 4843.10 0.4 48433664 0.013 005 -0.00 CIRCULAR' 36 in ` 36.00 DUMMY NODE I.00 4843.64 0.5 4843.64 0.013 0.25 0.00 CIRCULAR 36.00 ± 36.00 Sewer Flow Summary: ��-Full Flow Critical Flow Normal Flow Capacity ed Element Flow Velocity FDepth Veloci De th Veloci Froude [Number FlowFlowSurchar Length Comment Name (cfs) (fps)ty (fps) (n) (fps) Condition (cfs) (ft) 1 5A 1101.84 1 8.10 126.50 1 7.59 124.85 1 8.22 1 1.13 1 Pressurized 153.98 1 148.25 1 I DUMAMY 11o,F810 F54 ��NODE INLET-.84 12.19 4.82 ] 1.18 FF rized 12.11 1.00 1 511 11UL84 1 8AU 123.87 1 7.U9 122.11 1 7.82 1 1.16 1 Pressurized 144.21 1 75.65 1 .02SuPical 44.21 201.897223.87723.58 7.19SC 9L09 Jump 5E 47.29 6.69 Flog,4.60 10.22 5.04 1.14 Pressurized 8.32 12.50 F- DUMCMY F 9 F [10 �FPressur ��F NODE INLET-; 47.29 6.69 10.91 4.60 .22 5.04 1.14 ized' 8.32 1.00 d5D42.3U I 5.98 123.61 7.45 125.86I 136.611 135.64 1 Pressurized DU BMY �F669 ��[23 ���F366P[ � NODE INLET 47.29 23.61 7.45 .79 7.39 0.99 Pressurized 1.00 • A Froude number of 0 indicates that pressured flow occurs (adverse slope or undersized pipe). • If the sewer is not pressurized, full flow represents the maximum gravity flow in the sewer. • If the sewer is pressurized, full flow represents the pressurized flow conditions. Sewer Sizing Summary: -IF Existing FCalculated F Used peak Element Flow Cross Rise San p Rise San p� Rise San Area Comment Name (cfs) Section ft 2 ( ) 1 5A 153.98 1CIRCULAR, 148.00 in 148.00 in 142.00 in 142.00 in 148.00 in 148.00 in 112.57 1 -SA 8.00 in24.00 in22.57DUMMY NODE INLET 44 5B 44.21 CIRCULAR 48 00 in 48.00 in 36.00 in 36.00 in 48.00 in 48_00 in' I2.57 F- 5C 44.21 CIRCULAR! 48.00 in 48.00 in 42.00 in 42.00 in 48.00 in 48.00 in; 12.57 5E 8.32 CIRCULAR 36.00 in 36.00 in 2L00 in 21.00 in 36.00 in 36.00 in F7.07 F DUMMY NODE INLET-5C 8.32 CIRCULAR: 36.00 in 36A0 in 2I.00 in 21.00 in 36.00 in 36.00 in 7.07 5D 36.61 CIRCULAR' 36.00 in 36.00 in 36.00 in 36.00 in 36.00 in 36.00 in 7.07 �- DUMMY NODE INLET -5B 36.61 CIRCULAR 36.00 in 36.00 in 33.00 in 33.00 in 36.00 in 36.00 in 7.07 • Calculated diameter was determined by sewer hydraulic capacity rounded up to the nearest commercially available size. • Sewer sizes should not decrease downstream. • All hydraulics where calculated using the'Used' parameters. is Grade Line Summary: Tailwater Elevation (ft): 4846.00 Downstream Invert Elev. Manhole HGL EGL Losses Bend Lateral Downstream. Upstream. LossLoss Downstream Upstream Downstreamtream rFrictiisonjl�,Element Name (ft) (ft) (ft) (ft)(ft)(ft)(ft)(ft) --. 5A-_ -_ _.1 4840.60_ 1_4841.34_1 0.UO_..�,- 0.00-__-_.4846.UU �� 4846.21_ 1 4840.29 _I-U.21_ 1_4840.49 DUMMY INLET SODE 4841.34 4841_34 0.00 0.00 4846.48 4846_48 4846.50 0.00 i 4846.50 5B 4841.44 4841.82 0.01 0.00 4846.31 4846.38 4846.50 0.07 4846.58 5C _ _484L92 4843_00 OAI 0.14 4846.54 ' 484671 - 4846.73_ 0.19 484692 4846.94846.95 4846.95E 4843.10 443.16 003 0.00 4846.93 DUMMY NODE 4843 16 4843 164' 0.01 0.00 4846.93 4846.93 m 4846.96 - 0.00 4846.96 INLET -SC SD 4843.10 4843.64 ' 0.02 0.00 - 4846.74 4847_l4 4847_15 0.41 484Z56 DUMMY NODE 4843.64 4843--( 0.10 0.00 4847.25 4847.25 , 4847.66 0.00 4847.67 INLET -5B • Bend and Lateral losses only apply when there is an outgoing sewer. The system outfall,.sewer #0, is not considered a sewer. • Bend loss = Bend K * V_fi ^ 2/(2*g) • Lateral loss = V_fo A 2/(2*g)- Junction Loss K * V_fi ^ 2/(2*g). • Friction loss is always Upstream EGL - Downstream EGL. • • ST-06 100-yr Design Storm Tailwater Elevation = 4846.00 DUMMY NODE INLET-6A FES-6A 6A Manhole Input Summary: Given Flow I Sub Basin Information Element Ground Elevation TOta1 Known Local Contribution Drainage Area Runoff Syr [oeI Overland Length utter Overland Gutter[eloc Slope Length ity Name Flow Coefficient ficient) - - (ft) - (cfs) (cfs) (Ac) (ft) - (%) (ft) fps) - - FES-6A 4842.00 F0.00 6.00 0.00 0.00 F0.00 0.o0 F0.00 0.00 0.o0 6A 4850.31 12.30 F 0.00 0.00 0.00 0.0o 0.00 0.00 0.00 0.00 DUMMY NODE 4850.31 ���������� 12.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 INLET-6A Manhole Output Summary: Local Contribution Total Design Flow Overland Gutter Basin Local Manhole Peak Element Time Time Tc Intensity Contrib Coeff. Intensity Tc Flow Comment Name (min) (min) (min) (in/hr) (cfs) Area (in/hr) (min) (cfs) FES-6A 0.00 0.00 0.00 0.00 I 0.00 0.00 0.00 I 0.00 0.00.1 Surface Water Present (Upstream) 6A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.30 Surface Water Present ���������� (Downstream) DUMAMY F_F_[o ������NODE INLET-0.00 00 .00 0.00 0.00 0.00 0.00 0.00 12.30, Sewer Input Summary: Elevation Loss Coefficients FGiven Dimensions i Sewer Downstream Upstream' Rise Span i Element g th Invert Slopel Invert Mamm�gs I BendaFLateral, CrossLen ftor ftorName (ft) (It) (%)n (ft) LossssSection in) in) 6A 60.66_1 4840.00 1 0.5 11 4840.30 11 U.013 I 0.1)3 am CIKCULAK lz4.uu In' L4.UU to DUMMY NODE 1.00 4840 30 0.5 4840.30 0.013 0.25 .00 CIRCULAR 24.00 in 24.00 in 6 Sewer Flow Summary: -Full Flow Cava citv - Critical Flow `Normal Flow -- — _ — -- -- Surcharged Element Flow �� Velocity Depth` Velocity Depth Velocity c Fronde Flow F(cfs)'!� Comment Name (cfs) (fps) (in) f (f s P) m C) f (P) :�� Number' ConditionLength (ft) 6A 1.16.U4,I 5.11 115.12:1. �1.91,) ,I IZIJZ, I :1.03 I.-u.yz Irressurizea,IiL�3u,l ou.00 _,I D INLIET 6ODE 16.04 -5.11 15-12 j 5-90 15.75 5.63 0 92 Pressurized! 12 30., -1 00 11 • A Fronde number of 0 indicates that pressured flow occurs (adverse slope or undersized pipe). • If the sewer is not pressurized, full flow represents the maximum gravity flow in the sewer. • If the sewer is pressurized, full flow represents the pressurized flow conditions. Sewer Sizing Summary: Existing Calculated Used r !I Element Fcfswwk) Cross Rise Span Rise Span Rise Span 1 Area Comments Name Section - (ft^2)' 1 6A _112.3U ICIKCULAK 124M in 124.1-11) in_124_UU in IZ4.1iU in IL4.UU in IL4_UU DUMMY NODE INLET-6A 12.30 CIRCULAR, 24.00 in 24.00 in 24.00 in 24:00 in 24.00 in 24_00 in; 3.14 r j • Calculated diameter was determined by sewer hydraulic capacity rounded up to the nearest commercially available size. • Sewer sizes should not decrease downstream. • All hydraulics where calculated using the'Used' parameters. C] Grade Line Summary: Tailwater Elevation (ft): 4846.00 Downstream F-1 Invert Elev. Manhole HGL EGL Losses Downstream Bend Lateral Upstream Downstream Upstream Downstream Upstream (ft) (ft) LossLosssName (ft) (ft) (ft)t) r1rictisonElement (ft) (ft)(ft) 6A 4840.00 4840.30 1 0.00 OAO 4846A0 4846.18 1 4846.24 0.18 1 4846.42 DUMMY NODE 4840.30 4840.30 0.06 0.00 4846.24 4846.24 4846.48 0.00 4846.48 INLET-6A • Bend and Lateral losses only apply when there is an outgoing sewer. The system outfall, sewer #0, is not considered a sewer. • Bend loss = Bend K * V_fi ^ 2/(2*g) • Lateral loss = V_fo ^ 2/(2*g)- Junction Loss K * V_fi ^ 2/(2*g). • Friction loss is always Upstream EGL - Downstream EGL. 0 L 11 ST-07 100-yr Design Storm Tailwater Elevation = 4848.00 a r F W a w A LFES7A 70 5, x O M Z tV Manhole Input Summary: _G_iven Flow Sub Basin Information -�FJ.Total� - Ground Local Drainage Overland FvGutter Gutter t Knawn� Runoff Syrlevation Contribution Area LengthLeng[h Velocity (ft) Flow (cfs) (pc,) 'Coefficient Coefficient (ft) (ft) (fps) (cfs) FES-7A 4848.00 F 0.00 j 0.00 0.00 F 0.00 0.00 F 0.00 F 0.00 F000 0.00 7A 4851.50 8.57 j 0.00 0.00 0:00 0.00 0.00 0.00 0.00 _ OAO 76 4851.75 2.50 ? 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 DUMMY NODE 4851.75 2.23 0.00 Foo F .00 0.00 0.00 0.00 Foo 0.00 , INLET-7B 7C 14852.00 1 0.28 '!1 0.00 1 0.00 .1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 j 0.00 ,� DUMMY INLE EC 4852.00' 0.28-- 0.00-_e_- 0.00 _ - 0.00 0.00 - 0.00 - 0.00 0.00 S 0.00 IN NODE A 14851.50 6.06 I 0.00 0.00 0.00 0.00 I 0.00 0.00 10.00 1 0.00 i Manhole Output Summary: Local Contribution Total Design Flow Overland Gutter Basin Local Manhole Element Time Time Tc Intensi Contrib Coeff. Intensi Tc [loweak Comment Name (min) (min) (min) (in/hr) (cfs) Area (in/hr) (min) cfs) FES-7A 0.00 0.00 10.00 I 0.00 I 0.00 10.00 I 0.00 I 0.00 10.00 I 7A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,57 Surface Water Present (Downstream) 7B 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.50 DUMMY NODE 0 00 - 0 00 0 00 0.00 0.00 0.00 0.00 0.00 2.23 INLET-7B 7C 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 028 -1 DUMMY NODE 0 00 0 00 0 00 0.00 0.00 0.00 0.00 0.00 0.28 INLET-7C INLINL E. T--7A 7 I 0.00 10.00 10.00 I 0.00 I 0.00 10.00 I 0.00 ;I 0.00 16.06 Sewer Input Summary: Elevation Loss Coefficients Given Dimensions Sewer Downstream U stream CrossPP Rise Element Length Invert Sloe P Invert Mannin s g Bend Lateral (ft or ISan (ft or Name (It) (It ) o ( ) (ft) n Loss Loss Section in) in) 7A 1246.12 I 4847.00 10.5 14848.23 I 0.013 .I 0.03 10.00 ICIRCULAR 124.00 in'I24.00 in 7B 73.87 : 4848.33 0.5 4848.70 0.013 0.05 0.00 CIRCULAR 18.00 in, 18.00 in DUMMY NODE 1 00 4848.70 0.5 4848.70 0.013 0.25 0.00 CIRCULAR 18.00 in 18.00 in INLET-7B 7C 67.36 4848.80 0.5 4849.14 0.013 1.32 0.00 CIRCULAR 18.00 in 18.00 in DUMMY NODE 1.00 4849.14 0.5 4849.14 0.013 0.25 0.00 CIRCULAR, 18.00 in 18.00 in INLET-7C 4848.27 CRCULAR!4.00 n'4.00 nDUMMY NODE 1544823 013 25 INLET-7A 0000.00 Sewer Flow Summary: Capacity Critical Flow -- -- ---- --- - - -- - -- ------ - - Full Flow Normal Flow ed gY Element Flow *,S; De th, P Veloci �i De th; P Veloci ty' FroudeFFlowFlowSurchar Length Comment Name (cfs) (in) (fps) (in) (fps) Numberndition (cfs) (ft) I 7A 116.04 I 5.11 112.52 iI 5.17 112.48 ,I 5.19 I. 1.01 ISupercritical 18.57 I 0.00 I - 7B 7.45 4.21 7.18 3.80 7.18 3_80 ; L00 Supercritical 2.50 0:00 DUR M T 7BDE 7 45 4.21 6.77 3.67 6.75 3.68 I.00 Supercritical, 2.23 0.00 0 • A Froude number of 0 indicates that pressured flow occurs (adverse slope or undersized pipe). • If the sewer is not pressurized, full flow represents the maximum gravity flow in the sewer. • If the sewer is pressurized, full flow represents the pressurized flow conditions. Sewer Sizing Summary: Existing Calculated I Used Peak{ Element Cross Rise Span Rise Span Rise Span Comment Namet) j Section (tom 2e; 7A LL--.18.57 ICIKUULAK'1Z4.UU m 1Z4.UU m lZl OU m lZLUU m_IL4.VU m lL4.UU m 3_14^� --. -- - R -- -- - 7B _� 2.50 � CIRCULAR; 18 00 m' 18.00 in 12.00 in 12.00 m 18.00 in 18.00 in' 1.77 �� j DUMMY NODE_ INLET-7B 2.23 i CIRCULAR 18.00 in' I8.00 in 12.00 ini 12.00 in 18.00 inj 18. 0 in 1.77 7C 0.28 CIRCULAR 18.00 in 18.00 in, 12.00 in 12.00 in 18.00 in' 18.00 in 1.77 'F DUMMY NODE I_NLE_T-7C 0.28 _ CIRCULAR; 18.00 in 18 00 in' 12.00 in' 12_00 in 18.00 in 18A0 in 1.77 j DUMMY NODE INLET-7A 6.06 CIRCULAR 24.00 in 24.00 in 18.00 in 118.00 in' 24.00 in; 24.00 in' 3.14 • Calculated diameter was determined by sewer hydraulic capacity rounded up to the nearest commercially available size. • Sewer sizes should not decrease downstream. • All hydraulics where calculated using the'Used' parameters. Grade Line Summary: Tailwater Elevation (ft): 4848.00 Downstream Invert Elev. Manhole HGL EGL Losses BendFLale.ral U Downstream Friction Element Downstream Upstream Loss p stream LossUpstreamp , Name (ft) (ft) (ft)Downstream (ft) (ft) ft ( ) (tt) 7A f 4847.00 'I 4848.23 1 0.00 1 0.00 - 4848.U4 4849.27 4848.46 1.23 I4849.69 7B 4848.33 ' 4848.76 0.00 0.00 4849.65 4849.65 4849.69 F553 `, 4849.72 DUMMY NODE 4848.70 4848.70 0.01 0.00 4849.68 4849 68 4849.73 0.00 j 4849.73 INLET-7B 7C 4848.80 4849.14 0.00 0.00 4849.72 4849.72 4849.72 0.00 4849.73 j DUMMY NODE 4849.14 4849.14 0.00 0.00 4849 .72 4849.72 4849.73 30.00 ( 4849.73 D INLET 7ODE 4848.23 4848.23 0.01 0.00 4849.59 4849.59 4849.70 0.00 4849.70 • Bend and Lateral losses only apply when there is an outgoing sewer. The system outfall, sewer #0, is not considered a sewer. • Bend loss = Bend K * V_fi ^ 2/(2*g) • Lateral loss = V_fo ^ 2/(2*g)- Junction Loss K * V_fi ^ 2/(2*g). • Friction loss is always Upstream EGL - Downstream EGL. 0 ST-08 100-yr Design Storm Tailwater Elevation = 4846.00 FES-8A Manhole Input Summary: Given Flow Sub Basin Information Element Ground Elevation Total Known Local Contribution Drainage Area Runoff Syr Overland' Length Overland Gutter Gutter Slope 'Length. Velocity Name (ft) Flow (cfs) (Ac.) Coefficient Coefficient (ft) (%) (ft) (fps) i -- -(cts) J -_ _ ------ - - _J FES-2A 4842.00 0.00 0.00 0 00 0.00 0.00 OAO , 0.00 0.00 0.00 j 8A 4849.00 1.08 0.00 0.00 ' 0.00 0.00 0.00 0.00 0.00 0.00 DUMMY [4849-00 f 1.08 4 0.00 0.00 , 0.00 0.00 0.00 0.00 0.00 0.00 f mNODEBA . Manhole Output Summary: �- Local Contribution i Total Design Flow Gutter Basin Local Local Manhole Peak F16Vcrland Element � T�me Tc Intense) Coeff. Intensity Tc Fl�w Comment- Name ,Time mm ( J) mm ( ),r (min (m/hr (cfs) Area (in/hr) (mm) (cfs) i FES-2A 0.00 10.00 10.00 'I 0.00 0.00 0.00 0.00 0.00 0.00 Surtace water rresent (Upstream) 8A 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Lpg Surface Water Present ��I�I �i (Downstream) DUMMY NODE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.08 INLET-INLET Sewer Input Summary: Elevation 'Loss Coefficients Given Dimensions i Element Sewer Downstream ,Upstream Span Length Invert Sloe j Invert Mannin s g Bend LateraP CrossName 7Risv (ftor( (ft) • /o (tt) n Loss Loss Section(ft) - in) 8A 1151.70 1 4842.00 1 2.0 1 4845.03 1 0.013 10.03 1 0.00 (CIRCULAR 118.00 in 118.00 in DUMMY INLET-8A 1.00 4845.01 f 2.0 4845.03 0.013 0.25 0.00 CIRCULAR, 18.00 in 18.00 in Sewer Flow Summary: Full Flow Critical Flow Normal Flow �_- Capacity I --- -- --.__- ___-- ---- --- --- --- --7 8A I14.89 I 8.42 14.66 2.98 3.28 4.90 1I 1.98 ISupJumpicalll1.08 125.83 --- DUMMY IF INLENODE.1490 8.43�48.662.98 I 4.90 f 1.98 �Su (1.08 0.002�I F • A Froude number of 0 indicates that pressured flow occurs (adverse slope or undersized pipe). • If the sewer is not pressurized, full flow represents the maximum gravity flow in the sewer. • If the sewer is pressurized, full flow represents the pressurized flow conditions. Sewer Sizing Summary: Existing Calculated Used F1 Peak Element Flow Cross [Rise [SpanRise Span Rise Span Area Comment Name (cfs Section(ft^2) 8A 11.08 (CIRCULAR 118.00 in 118.00 in 112.00 in 112.00 in 118.00 in j 18.00 in,l 1.77 1 DUMMY NODE INLET-8A 1.08 CIRCULAR 18.00 in I8:00 in 12.00 in 12.00 in 18.00 in 18.00 in F,.77 �- • Calculated diameter was determined by sewer hydraulic capacity rounded up to the nearest commercially available size. • Sewer sizes should not decrease downstream. • All hydraulics where calculated using the'Used' parameters. r, u Grade Line Summary: Tailwater Elevation (ft): 4846.00 Downstream Invert Elev. Manhole Losses HGL EGL Bend Frictlonj Element Downstream. Upstream P Loss `. F Downstream Upstream, p Downstream; Loss U stream P Name (ft) ({t) (ft) (ft) (ft) ({t) (ft) (ft) 8A I 4842.UU 14845.03 I U.UU I U.UU 'I 4846.UU 14646.U1 4640M U.UI 14846.UG '. DUMMY INLET BODE 4845.01 4845.03 0.00 0.00 4846.O1 4846.01 4846.02 0.00 4846.02 • Bend and Lateral losses only apply when there is an outgoing sewer. The system outfall, sewer 40, is not considered a sewer. • Bend loss = Bend K * V_fi ^ 2/(2*g) • Lateral loss = V_fo ^ 2/(2*g)- Junction Loss K * V_fi ^ 2/(2*g). • Friction loss is always Upstream EGL - Downstream EGL. APPENDIX D Channel Design r N � m o v V m W o Z Z Z E T C C Y C Y O Y C Y p C N C N C O C Y O i0 E E E E m YLL Y aaaa Y Y N T U O 6) 7 N �p V � O. w V 7 M % N L 4 � 3 � 000.o 0 LL O j U U U P Y= Y Y Y V i J 7 N L 3_ O O m e o e e e p O O O O p O O O O N N N N N y y d V '- p LL O � y ow U ow! w t0 M M fD T O p LL u Y ow G U U U af?fm w u U U iq 0 x Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Aulodesk, Inc. H23 - Swale A s Tuesday, May 9 2017 -\ Triangular Highlighted Side Slopes (z:1) = 4.00, 4.00 Depth (ft) = 0.94 Total Depth (ft) = 3.00 Q (Cfs) = 12.33 Area (sqft) = 3.53 Invert Elev (ft) = 100.00 Velocity (ft/s) = 3.49 Slope (%) = 2.00 Wetted Perim (ft) = 7.75 N-Value = 0.035 Crit Depth, Yc (ft) = 0.91 Top Width (ft) = 7.52 Calculations EGL (ft) = 1.13 Compute by: Known Q Known Q (cfs) = 12.33 Elev (ft) Section 104.00 103.00 102.00 101.00 100.00 99.00 0 5 10 15 20 25 30 35 Reach (ft) J J Depth (ft) 4.00 11 1 3.00 2.00 l 1.00 0.00 j -1.00 J l • C Channel Report CHydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Curb Cut #1 Rectangular Bottom Width (ft) = 2.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 100.00 Slope (%) = 2.00 -, N-Value = 0.013 Calculations C Compute by: Known Q i Known Q (cfs) = 4.03 Elev (ft) Section Highlighted Depth (ft) Q (cfs) Area(sgft) Velocity (fUs) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday. May 9 2017 = 0.33 = 4.030 = 0.66 = 6.11 = 2.66 = 0.50 = 2.00 = 0.91 101.00 i `- 100.75 C 100.50 C C100.25 C_ C C 100.00 C C C 9975 .5 1 1.5 2 Reach (ft) 2.5 3 Depth (ft) 1.00 0.75 0.50 0.25 = $I Iffelp4l Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Curb Cut #2 • Monday, Feb 27 2017 Rectangular Highlighted Bottom Width (ft) = 1.00 Depth (ft) = 0.22 Total Depth (ft) = 0.50 Q (Cfs) = 0.950 Area (sgft) = 0.22 Invert Elev (ft) = 100.00 Velocity (fUs) = 4.32 Slope (%) = 2.00 Wetted Perim (ft) = 1.44 N-Value = 0.013 Crit Depth, Yc (ft) = 0.31 Top Width (ft) = 1.00 Calculations EGL (ft) = 0.51 Compute by: Known Q Known Q (cfs) = 0.95 Elev (ft) Section 101.00 100.75 100.50 100.25 100.00 99.75 0 .25 .5 .75 1 1.25 1.5 Depth (ft) 1.00 0.75 J 0.50 0.25 J 0.00 �l -0.25 Reach (ft) i0 C Channel Report C Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. C Sidewalk Chase #1 r Rectangular Bottom Width (ft) = 2.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 100.00 Slope (%) = 2.00 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 4.65 Elev (ft) Section Highlighted Depth (ft) Q (cfs) Area(sgft) Velocity (fds) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Tuesday, May 9 2017 = 0.36 = 4.650 = 0.72 = 6.46 = 2.72 = 0.50 = 2.00 = 1.01 1U1.UU C C 100.75 100.50 l 100.25 C C C 100.00 C 99.75 0 .5 1 1.5 2 2.5 3 C. Reach (ft) Depth (ft) 1.00 0.75 0.50 E111xA -0.25 • APPENDIX E Riprap Design a n x y 7j C 5 SS 5 8LLy" E ` a€90 oSS �a x xg b ee OO Eo 86i Q i •- r $N R a„ C � R 0 a wE o` �o_ n sso5 a �o= Q rR o N F 4 N N 4 4 N N N m M, ELI V 01 NJ Ll INo I,k mi'm \1 11 MEN I No ONE mmgNljl� mommook y � a tr 010 ■IElll ONE LIE ,Xm . ON . Ol� mbow 8 oli k0l)"! 10SNUG I F i • APPENDIX F Detention Pond Design H23 Table F-1 Detention Pond Summary Table Final Gr.finage keVuil Water Quell, Capture Volume 100-yr Oetentlon Total Volume (100-yr+WGCV) 2.yr Total (WOCV)(ac-ft) Volume tK-R) (ac-ftl Hlstorlc Groundwater Who, Quality 100-yr Pond 10 Contributing ng Release W SEL (it) WSEL(it) WSEL(it) Area Reaubed Provided Re0ulred Regulred Provided Rate (cfs) Pond 976 0.18 021 2.27 245 2.53 1.61 N/A 484433 4048.00 Pond B 11,40 020 1.07 2.49 2.69 4.06 1.88 NIA 4862.25 4640.00 'U' Batts Added to Ex. 581 Waived NIA 1.49 NIA N/A 0.9B 4930.00 NIA 4698.04 Greeel Pond #1 NoteThe release rate for "U' Basins was determined based on the area multipaed the allowable release rate per acre. This release rate was used in a spreadsheet to determine the 100-yr storage whims for those basins. H23 Detention Requirements Pond A - Major Storm (100-yr) Mass Balance Method Runoff Coefficient, C = 0.76 2-yr Release. Q,,, = 1.61 cfs Area = 9.76 1 acres Final Drainage Report Detention Requirements City of Fort Collins criteria (120%) 189 acre-feet 2.27 acre-feet Time (min) Intensity (Inlhr) Q. (ds) Volume, (ft) Q.. (sfa) Volume,,,, (ft) Volume detained acre -fifer 5 9.95 73.805 22.141.54 1.61 483 0.497 10 7.72 57.264 34.358.32 1.61 966 0.767 15 6.52 48.363 43,526.48 1.61 1,449 0.966 20 5.60 41.539 49,80.27 1.61 1.932 1.100 25 4.98 36.940 55,409.47 1.61 2,416 1.217 30 4.52 33.528 60.349.59 1.61 2,899 1.319 35 4.08 30.264 63,554.00 L81 3382 1.381 40 3.74 27.742 66.580.38 1.61 3.865 1.440 45 1 3.46 25.665 1 69,295.22 1.61 4,348 1.491 50 3.23 23.959 71.876.54 1.61 4,831 1.539 55 3.03 22.475 74.168.58 1.61 5 314 1.581 60 2.86 21.214 76 371.61 1.61 5,797 1.620 65 2.70 20.028 78 107.33 1.61 6.281 1.649 70 2.60 19.286 81000.19 1.61 6 764 1.704 75 2.50 18.544 83.448.00 1.61 7.247 1.749 80 2,40 17.802 85,450.76 1.61 7.730 1.784 85 2.30 17,060 87.008.45 1.61 8,213 1.809 90 220 16.319 88.121.09 1.61 8,696 1.823 100 2.05 15.206 91.236.48 1.61 9,662 1.873 110 1.90 14.093 93,016.70 1Al 10,629 1.891 120 1.75 93 481.76 1.61 11,595 1.879 130 1.60 92.571.65 1.61 12,561 1.837 140 1.40 87,230.98 1.61 13.527 1.692 150 1.20 M7.788 80,110.08 1.61 14.494 1,506 160 1.15 81.890.30 1.61 15 460 1.525 170 1.10 83 225.47 1.61 16,426 1.534 180 1.05 84,115.58 1.6t 17392 1.532 _.... l4gpelldix F H23 Table F-2 Water Quality Capture Volume (WQCV) Pond A % Imperviousness 53.56 % WQCV (inches)'=a(0.910-1.1 gi'+0.781) 0.22 inches Volume =(WQCVII2)xA 0.18 ac-ft 'WQCV in 40-hr drain time a=1.0 from Figure 3-2. Water Quality Capture Volume (WQCV) Based on BMP Drain Time UDFCD Storm Drainage Criteria Manual Volume 3 Final Drainage Report ® ._.,........ Appendix F Project: M23 Baton ID: Pond A a. eP[ ! ® M1 Y; e#p[ L STAGE -STORAGE SIZING FOR DETENTION BASINS I M6 I 1e. Y� Dealan Information tlneuth Width of Basin Bottom, W = H Length of Basin Bottom. L = H Dam Side-M.p.(HN),2;, = H/ft r wl �y r4. L Right an is OR Isosceles Triangle OR. Rectangle OR Circle I Ellipse OR Irregular X (Use Overdo values in cells G32:G52) MINOR MAJOR Storage Requirement from Sheet'ModlBed FAA': acre-ft. Storage Requirement from Sheet'Hydrograph': aCm . Storage Requlmmern from Sheet Tull-Spaclmm". acre-ft. Label. for WOCV, Minor. & Major Storage Stages (In utl Water Surface Elevation H Side Slope (H:V) 9/ti Below El. Baeln Width at Stage ft ¢rtn ul Been Length at Stage H Wut ul Surface Area at Stage fP loulnuh Surface Am at Stage fft User O.adde Volume Below Stage K (cutnul) Surface Area at Stage acres w ut Volume Below Stage act" output) Target Volumes for WOCV. Minor. & Major Storage Volumes In, Oal reek) 4843 �00 0.00 _ _ 1,419 0 0.033 0.000 4844,00 400 0.00 10.055 1)32_ 9, 114 20,196 0231 0.132 WOCV Q44.33 4.00 51) 0.00 10.412 0.239 0.209 4845.00 4.00 0.00 22.668 0.520 0.464 4846900 4.00 _ _0.DO 0.DO 51) 0 DD 29.867 45,463 0.840 1.044 4147 00 4 00 0.00 32.126 75.480 109968 0.738 1.732 100 •WOCV 4848.00 4.00 _ 0.00 0.00 36691 0.847 2.525 4849 00 4.00 0.00 0.00 43.335 150,081 158819 0.995 3.445 Boa Elder Ditch 4849,20 4.00 _ _ 000 0.00 440411 1woll 3.646 #WA #WA #WA #WA %WA #WA #WA li #WA #WA !!WA #WA #WA #WA #WA #WA #WA #_WA #WA #WA #NIA #WA #NIA #WA #WA #WA MA #WA WA WA _ #WA #WA #NIA WWA ll MA #NIA MA #WA #N/A #WA #WA #WA #N/A NWA #WA #WA #WA fill #WA MA #WA #WA #WA dWA #WA #WA #WA WA #WA #WA #WA WA WA _ #WA MIA 1 MA #NA IIWA #WA UD Detention Pond A VclCalc. Basin 5I9I2017.10:46 PM STAGE -STORAGE SIZING FOR DETENTION BASINS Project. Basin ID: STAGE -STORAGE CURVE FOR THE POND I I I 4849.00 — 4848,00 - 4847.00 oz d N w d ✓T A � 4846.00 4845.00 4844.00 -- / 4843.00 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 Storage (acre-feet) UD Delendon Pond A VolCalc. Basin 5r9/2017. 10:48 PM I Ei �. :....: ....- :::-- ----- ------ Is ` �ll|mill i|lillili|lilli mili l | IIIIIIIIIIIIIIIIIIIIIIIIII| I��| 2: a| •| } | | Il|s| -- .-- w r U J C r N r w J r O 3 w u t rc O u 10 LL W O C U w U' rc a x u N O W (7 H N 8 R R 8 R 8 S 86 1'eap ysea ofins t •1 RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES Project: H23 Basin ID: Pond A —D n To 0 0 — o x o 0 0 Y0 Sizing the Restr ctor Plate for Circular Vertical Orifices or Pipes (Input) Water Surface Elevation at Design Depth PlpeNenlcal Orifice Entrance Invert Elevation Required Peak Flow through Orifice at Design Depth PipeNentcal Onfice Diameter (inches) Orifice coefficient Full -flow Caoaclty fCalculatedl Full -flow area Half Central Angle in Radrens Full -low capacity Calculation of Orifice Flow Condition Half Central Angle (0<Thetac3.1416) Flow area Top width of Odfice finches) Height from invert of Orifice to Bottom of Plate (feat) Elevation of Bottom of Rate Resultant Peak Fiow Through Chigoe at Design Depth Width of Equivalent Rectangular Vertical Orifice Centroid Elevation of Equivalent Rectangular Vertical Orifice Elev: W S - Elev: Invert = 0= Die Co = W feel feel efs inches 1. sgfl ThifAf : 3.14 rad77 Of=1 19.0 1 cis Percent of Design FIM =1 118D% Theta: 0.75 red A,= 0.14 sgIt T.= 1223 Inches Ye= 020 feet Elev Rare Bottom Edge - 4,843.20 feel O,= 1.6 c15 Equivalent Widths 0.70 feet Equiv. Cancroid EI.= 4�843.10 hat ED Detention Pond A VolCelc, Restndor Plate 51912017, 10r46 PM LLL L L( �_' L I- Stormwater Detention and Infiltration Design Data Sheet Stormwater Facility Name: Harmony 23 Pond A Facility Location &Jurisdiction: Harmony and Strauss Cabin Road, Fort Collins, CO I User (Input) Watershed Characteristics Watershed Slope = Watershed Length -to -Width Ratio = Watershed Area = Watershed Imperviousness = Percentage Hydrologic Soil Group A = Percentage Hydrologic Soil Group B = Percentage Hydrologic Soil Groups C/D = 0.020 ft/ft L:W acres percent percent percent percent 5.00 9.76 53.6% 20.0% 49.0% 31.0% User Input: Detention Basin Characteristics WQCV Design Drain Time = 40.00 hours After completing and printing this worksheet to a pdf, go to: https:llmaperture.digitaidataservices.com/gvh/?viewer=cswoit create a new stormwater facility, and attach the pdf of this worksheet to that record. Design Storm Return Period = Two -Hour Rainfall Depth = Calculated Runoff Volume = OPTIONAL Override Runoff Volume = Inflow Hydrograph Volume = Time to Drain 97% of Inflow Volume = Time to Drain 99% of Inflow Volume = Maximum Ponding Depth - Maximum Ponded Area = Maximum Volume Stored = Routed Hvdroeraoh Results ,rr � err WQCV 2 Year 5 Year 10 Year 25 Year 50 Year 100 Year 0.53 0.98 1.36 1.71 2.31 2.91 3.67 0.174 0.381 0.622 0.859 1.330 1.769 2.363 2.53 0.174 0.380 0.622 0.858 1.329 1.769 2.530 2 1 3 5 6 10 13 1 19 2 3 5 7 10 13 19 0.55 1.26 1.80 2.21 2.95 3.57 4.56 0.127 0.305 0.461 0.545 0.633 0.695 0.799 0.035 0.185 0.391 0.603 1.037 1.451 2.186 in acre-ft acre-ft acre-ft hours hours ft acres acre-ft Compliance Spreadsheet Pond A.xls, Design Data 6/29/2017, 10:1( 1 s0 45 40 35 30 3 25 0 u. 20 1s 10 5 Stormwater Detention and Infiltration Design Data Sheet III// CIFWr /II/ III1I' WA \ IIIIIIIIIIIIIII■IIIIII IIIIIIII,lllllllll♦IIIIIIIII,__IIII■ a 0.1 5 4.5 4 3.5 r = 3 r a W Z 2.5 C Z 0 a 2 1.5 1 0.5 0 0.1 a Compliance Spreadsheet Pond A.xls, Design Data 1 1 TIME [hr] DRAIN TIME [hr] 10 10 6/29/2017, 10:11 H23 Detention Requirements Pond S - Major Storm (100-yr) Mass Balance Method Runoff Coeffic lent, C = 0.72 2-yr Release, Q.., = 1.88 tl> Area = 11.40 Final Drainage Report Detention Requirements 2.08 acre-feet City of Fort Collins criteria (120 % ) 2.49 acre-feet Time (min) Intensity (iNhr) Q,,, (Ms) Volume,,, (ff) Q., (cfs) Volumed,,, (ft') Volume detained acre-feet 5 9.95 81,670 24.500.88 1.88 564 0.550 10 7.72 63.366 38,019A6 1,88 1,129 0.847 15 6.52 53.516 48.164.54 1.88 1,693 1.067 20 5.60 45.965 55,157.76 1.88 2.257 1.214 25 4.98 40.876 61.313.76 1.88 2.822 1.343 30 4.52 37,100 66,780.29 1.88 3.386 1.455 35 4.08 33,489 70,326.14 1.88 3,950 1.524 40 3,74 30.698 73675.01 1,88 4,514 1.588 45 3,46 28,400 1 76.679.14 1.88 5,079 1.644 50 3.23 26.512 79,535.52 1.88 5,643 1.696 55 3.03 24.870 82,071.79 1All 6.207 1,742 60 2.86 23.475 84,509.57 1.88 6,772 1,785 65 2.70 22.162 86,430.24 1,88 7.336 1A16 70 2.60 21.341 89.631.36 1.88 7.900 1.876 75 2.50 20.520 92.340.00 1.88 8.465 1,926 80 2.40 19.699 94.556,16 1.88 9,029 1.963 85 2.30 18.878 96.279.84 1.88 9.593 1.990 90 2.20 18.058 97.511.04 1.88 10,157 2.005 100 2.05 16.826 100.958.40 1.88 11.286 2.059 110 1.90 15,595 102,928.32 1.88 12,415 2.078 120 1.75 14.364 103.420.80 1.88 13,543 2D63 130 1.60 13.133 102435,84 1 1.88 14,672 2,015 140 1.40 11 491 95.526,08 1.88 15.800 1, 853 150 1.20 9.850 88.646.40 1.88 16.929 1.646 160 1.15 9439 90,616.32 1.88 18.058 1.666 t70 1.10 9.029 92,093.76 1M 19.186 1,674 780 1.05 8.618 93,078.72 1.88 20.315 1670 Appendix F H23 Table F-3 Water Quality Capture Volume (WQCV) Pond B Imperviousness 49.98% WQCV (inches)'=3(0.9113-1.19i2+0.781) 0.21 Inches Volume =(WQCVl12)xA 0.20 ac•ft 'WQCV in 40-hr drain time a=1.0 from Figure 3-2. Water Quality Capture Volume (WQCV) Based on BMP Drain Time UDFCD Stem Drainage Criteria Manual Volume 3 TST Final Drainage Report Appendix F Project H23 Basin ID: Pond B eu ii6'! M STAGE -STORAGE SIZING FOR DETENTION BASINS IP� 6iLaLr.2 Wa �..... ....... ... • iMMrr2 Deakin Information (hipt R), Width of Basin BWtom, W = it Length of Basin Bottom. L = It Dam Side-slope(H:V). Z,,= 810 �4W aa'r Ilr� s M1'i e Right Triangle OR Iseadcelea Triangle OR Rectangle OR Circle/Ellipse OR Irregular X iUsa Omddetelues In calls G32:G52) MINOR MAJOR Storage Requirement from Sheet 'Modified FAA': acre-8. Storage Requlrament from Sheat'Hycirogreph': acre4t, Storage Requirement bornSheet'FUIISpectrum': acted. Leads for W O(-Y, Minor, 8 Major Storage Stages nnmdi Water Surface Elinabon 6 Imnol Side Slope (HN) 11M Below El- Basin Width at Stage 8 lout N) Basin Length at Stage 8 QriAlimh Surface Area at SM9e to ou id Surface Ala at Stage fe User Overldo Volume BeICw Stage fi acres out ut) Surface Am at Stage foulatiO Volume BMow Seaga acra-R fouthdd)HOi Target Volumes for W OCV. Miner, 8 Major Storage Volumes d..lseu0.' 483925 0 Daniel 0.000 0.000 484000 4.00 0.00 0 O6 000 0.00 000 1 0.00 0.00 6,907 2,590 16.561 0.150 0.059 4841 00 4.00 0.00 21 .034 0.483 0.380 484200 4,00 0.00 25,924 40,040 0.695 0.919 WOCV 4842.25 4,00 0.00 26.862 46,638 0,617 1.071 4843.00 4.00 0.00 29938 67935 0.887 1.560 484400 4.00 0.00 1 34.123 1_ 99.968 0.783 2.295 4845.00 4.00 0.0D 000 0 00 0.00 0.00 0.00 38480 138270 0.883 3.128 100-r*WOCV 484600 4.00 0.00 42968 176,994 0.986 4.063 484700 a.00 0.00 48,628 222,792 1.116 5.115 4848,00 4,00 0.00 _ 54506 274.359 1.251 6,298 4849.00 4.00 0.00 61,088 332y58 MWA MWA 1.402 7.625 MWA _ MIA MIA MIA #NIA MIA MIA MIA MIA #WA MWA MIA MIA MA MIA WA MIA MIA MIA MA MIA MIA MWA CN'A NA #NA MWA MIA #WA MIA MWA MA MWA MIA MIA MIA MWA MIA MWA MA A #WA MWA _ _ MWA MA MA WA WA TWA #WA #WA #WA MWA MN/A MIA _#WA MWA MWA MWA MWA MWA MWA UD Deleneon Pond B VolC lc. Basin 59i2017. 1047 PM STAGE -STORAGE SIZING FOR DETENTION BASINS Prefect Basin 10 STAGE -STORAGE CURVE FOR THE POND 4851.25 — 4849,25 48.17.25 - (D 4) 4845.25 N r y 4843,25 4841.25 4839.25 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 Storage (acre-feet) I 000elemion Pond 8 VolCalc. Basin 6r9l801Z 10:47 PM s vp FC4�d� rr";sss �GaY �4 srs fip F'Cp �Re�tl�� ae5 6 a e.00$e,oga.>..e.,eee::::3::'S':3 II.,!:::::33;t61,Ft1�''. 1 3` Eo E o FaR 0 a I 4e 4aQ I 4d ig s 0p C [ OQ3 Wu O� �« gs� fill IiiIIIII 3u::u:a gggggQgggggggggg 8888888$8188j888SSe gggggggg�sai e A �U.N...,3 i11�i"aa'3S.z 81 lit If I v SS gd gdggegd go ge gge ggd �[[� gggggggggggggg �o. el i I87 tg�y b',ryA 66_88gg.__ __ _ B88I�3V�ii ���.z ... _zez z<ap d$ g8 g8 68 g88p8 pp8 g8 388RE:R gg6 8yyg$e8,S gg�yB 88 ggO - - zs.���z. lz opa o �a� .Ili �IIIIi z,<p g8 gc " 88 d I�Iggg�g�8sc ddd 'd do o .c,.al 0 �Q j13�iIzz zaz3331�.zzo-a 6 8gg&gSR888 $$ 8d 8aae-as"�Se88 gg¢g p ERB.�.EER9mSER, Y.�8ERti3m 0 No Text RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES Project: H23 Bain ID: Pond B Oro T 0 0 0 0 0 Y. Sizints the Restricto, Plate for Circula,Ver-fical Orricalso, Pi ut Water Surface Elevation at Design Depth Plpe(Vertlwl Orifice Entrance liven Elevation Required Peak Flow through Onfice at Design Depth RpeNertical Orifice Diameter (inches) Orifice Coefficient Fulbflow Capacity (Calculated) Fulkilow area Half Central Angle In Radians Furl -flow capacity Calculation of Orifice Flow Condition Halt Central Mgle (0<Theta<3, 1416) Flow area Top width of Orifice (inches) Height from Invert of Orifice to Bottom of Plate (feet) Elevation of Bottom of Rate Resultant Peak Flow Through Orifice at Design Depth Width of Equivalent Rectangular Vertical Orifice Centroitl Elevation of Equivalent Rectangular Vertical Orifice Elev: W S = Elinvert = 0= Dia = C. = At Theta = Of = Percent of Design Flow = kt Verlical Orifice k2 Vertical Orifice 4848.W 4,339.25 1.90 16.0 0. 15 1.77 314 88 22.6 1108% feet feet ds ncnes sq 8 red ch Theta= A,= T. Ye= Elev Rafe Bottom Edge %=I Equivalent Width -1 Epuiv. Centroitl EI. • 0.75 ratl edit Incites feet feet Ids fret feet 0.14 1227 020 403g.45 ji 1.9 1 0.70 4,839A0 UD Detention Pond B VoiCalc, Restddor Plate 519/2017. 10:48 PM Stormwater Detention and Infiltration Design Data Sheet Harmony 23 Pond 8 5tormwater Facility Name: Facility Location &Jurisdiction: Harmony and Strauss Cabin Road, Fort Collins, CO _ User (Input) Watershed Characterls Watershed Slope = Watershed Length -to -Width Ratio = Watershed Area = Watershed Imperviousness= Percentage Hydrologic Soil Group A= Percentage Hydrologic Soil Group B = Percentage Hydrologic Soil Groups C/D= 0.020 5.00 11.40 50.0% 20.0% 49.0% 31A% User Input: Detention Basin Characteristics WQCV Design Drain Time = 40.00 hours After completing and printing this worksheet to a pdf, go to: h"ps:// pert ,e.digitaidatase"itescom/gvh/?viewer=cswdil create a new stormwater facility, and attach the pdf of this worksheet to that record. Design Storm Return Period Two -Hour Rainfall Depth: Calculated Runoff Volume OPTIONAL Override Runoff Volume Inflow Hydrograph Volume Time to Drain 97% of Inflow Volume Timeto Drain 99%of Inflow Volume Maximum Ponding Depth Maximum Forded Area Maximum Volume Stored User Defined Stage K User Defined Area [W2] User Defined Stage [ft] User Defined Discharge Ids] 0.D0 0 0.00 1.88 0.75 6,907 0.75 1.88 1.75 21,034 1.75 1.88 2.75 25,924 2.75 1.88 3.75 29.938 3.75 1.88 4.75 34,123 4.75 1.88 5.75 38,480 5.75 1.88 6.75 42,968 6.75 1.88 A WQCV 2Year 5Year 10 Year 25 Year 50 Year 100 Year 0.53 0.98 1.36 1.71 2.31 2.91 3.57 0.194 0.409 0.683 0954 1.498 2.003 2.689 4.06 0.194 0.409 0.682 0.953 1.498 2.002 4.063 1 3 4 S 8 11 23 1 3 4 6 9 12 23 0.56 1.18 1.11 2.08 2,11 3,33 5.36 0.128 0.282 0.430 0.530 0.611 0.672 0.847 0.036 0.161 0.343 0.531 0.921 1 1.288 2.551 Compliance Spreadsheet Pond B.xls, Design Data J J J\ J �l J �l J J J J • in acre-ft n acre-ft acre-ft hours hours WARNING] acres acre-ft �\ 1 6/29/2017, 30:19 AM , C C C C C Stormwater Detention and Infiltration Design Data Sheet C80 - —100YR IN 100YR OUT C70 —SDYRIN C- - SOYR OUT C6D —25YR IN ----- - --- 25YR OUT C 50 IN --10YR -- - 10YR OUT —SYR IN 40 - ... •• •�• SYR OUT _ —2YR IN 30 -- --- 2YR OUT —WQN IN .. 20 ..... WQCV OUT -- 10 - 0 0.t —100YR C_ 5 —50YR —25YR C —SOYR C 4 —SYR —2YR C. C. at 3 8 —WQCV 8 C C 2 - C C' 1 C C.. 0 D.1 C C C Compliance Spreadsheet Pond Bxls, Design Data 1 1 TIME [hrj DRAIN TIME (hr) 10 10 100 6/29/2017, 10:19 AM H23 Detention Requirements Offsite Pond . Major Storm (100-yr) Mass Balance Method Runoff Coefficient. C = 0.83 2-yr Release, Q , ^ 0.98 cis Area • 5.81 1 acres Final Drainage Report Detention Requirements 1.24 acre-feet City of Fort Collins criteria (120 %) 1.49 acre -teat Time (min) Intensity (inlhr) din (cis) Volume,(ff) Q..,(cis) Volume„e (tt°) Volume detainedwr4-feel 5 9.95 47.982 14.394.57 0.96 266 0.324 10 7.72 37228 22,336.89 0.96 575 0.500 15 6.52 31.441 28,297.26 0.96 863 0.630 20 5.60 27.005 32 405.86 0.96 1.150 0.718 25 4.98 24.015 36022.58 0.96 1,438 0.794 30 4.52 21.797 39.234.23 0.96 1,726 0.861 35 4.08 19.675 41.317.47 0.96 2,013 0.902 40 3.74 18,035 43,284.96 0.96 2,301 0.941 45 1 3.46 16.685 45,049.93 0.96 2,588 0.975 50 3.23 15.576 46,728.09 0.96 2876 1.007 55 3.03 14.612 48,218.18 0.96 3,164 1.034 60 2.86 13.792 49.650.40 0.96 3,451 1.061 65 2.70 13.020 50,778.82 0.96 3.739 1.080 70 2.60 12.538 52,659.52 0.96 4,026 1.116 75 2.50 12.056 54.250.88 0.96 4 314 1.146 80 2.40 11.574 55.562.90 0.96 4 602 1.170 85 2.30 11.091 56.565.58 0.96 4,889 1.186 90 2.20 10.609 57288.92 0.96 5177 1.196 100 2.05 9.886 1 59 314.29 0.96 1 5.752 1.230 110 1.90 9,162 60471.64 0.96 6,327 1.243 120 1.75 8.439 60.760.98 0.96 6,902 1.236 130 1.60 7.716 60.182.30 0.96 7 477 1.210 140 1.40 6.751 56,710.25 0.96 8,053 1 1.117 150 1.20 5.787 52,080.84 0.96 B 828 0.998 160 1.15 5.546 53,238.19 0.96 9 2D3 1.011 170 1.10 5,305 54106.21 0.96 9778 1.018 180 1.05 5.063 54,684.88 0.96 10353 1.018 �......... Appendix F APPENDIX G FIRM Maps and Original Floodplain Workmap T. 6 N. >� 4850 4850 Xlv� ZONE X L z J J_ O LL W (1 U z PROJECT SITE I o ZONE X o (n W J z LL Y O UJ W O = m PRECISION DR zz City of Fort Collins I 080102 STEELHEAD ST 4 ROCK CREEK DR C z _ sill J (n If U , ZONE X z W F- F- z 1 } County GALILEO DR Q Z U •ated Areas 101 OBSERVATORY DR 00 1 IY LL W LL O Q �- �_J U BIG DIPPER DR LITTLE DIPPER DR I ECLIPSE LN 7 MAP SCALE 1" = 500" 500 1000 FEET METERS A ISO 300 PANEL 0994F FIRM FLOOD INSURANCE RATE MAP LARIMER COUNTY, COLORADO /.—ZONE AE AND INCORPORATED AREAS FLOODING EFFECTS FROM IgO CACHE LA POUDRE RIVER PANEL 994 OF 1420 0 (SEE MAP INDEX FOR FIRM PANEL LAYOUT) W z Q Q. CONTAINS COMMUNITY NUMBER PANEL SUFFIX Z 0 FORT COLUNS, CITY OF OB0102 0994 F LARRAER COUNTY 080101 0994 F 4485(100m N 3 Votice to User: The Map Number shown below >hould be used when placing map orders; the community Number shown above should be ised on insurance applications for the subject ;ommunity. Jh T QE•% MAP NUMBER a M 08069CO994F EFFECTIVE DATE �No SEA DECEMBER 19, 2006 Federal Emergency Management Agency This is an official copy of a portron of the above referenced flood map. It was extracted using F-MIT On-Lme This map does not reflect changes or amendments which may have been made subsequent to the date on the title block. For the latest product Information about National Flood Insurance Program flood maps check the FEMA Flood Map Store at www. msc Tema. gov _ 1 , LEGEND I v'ecTrve Monaure ersa.,nc onnl. _ ---' _ , � e ol.• mu B1P1RM emu 2006 DIFRM 100—YEAR - YD YEM iILODVWN / ..A. FLOODPLAIN AND FLOODWAY wR EABnaoPwN % LOCATED WITHIN ACTIVE CHANNEL, �' ,1•� ` v .. .- BU6IECT PWP[RR BOIMOMT - . � i � ' \ '• i • Ilk- • ru.r ro ncmwn. urtu.. acw o rlsam _ / _'_ a msuc auow re.m. vrt o.,em mue o�awr. mal _ __ -- �y. y., • o.van aa.w +a n ma u.ro.rme.o .00rnn n ''. _ _ - -� 11 /R � -j'i \ � / - ♦ { sir yy1 _ ItpL f .• , , tl } Oa > - Q ata 2006 DFIRM 100-YEAR_ s/ t LL Y �rF' FLOODPLAIN ON ELEVATEDI �L rLL INTERSTATE RAMP O W d - _ y_.. / Li I - ✓ INTER51' `- y,. _ O C J r `` LL i r—_G-\ • \ 1 I rr a =K Q❑ LLJ N Q r ui cc a �n1'+F4 c'� \� `-liy cr W 0 cc .I F » •cam."— - ... .1 'j ',1.•, ->__L_ I • '1 - - '.__-- .. cQ W U >_ Q LL W Ii; �. LLZOt❑ rti ',.R /y 1-r' i I/ ' ' •,`1 I J `ate Q ❑ Q / LLI W 0 >_ j + W m Vi �.l•...... .. - _ •'°`' , ::: y. � _ •r Imo'. E'i��i',�i ' � � J j ;� . `'s I fit;, . • X. l �� i � , , , •`.� _ •^ . } �. / / . - � , t li 2006 DIFRM 500—YEAR FLOODPLAIN SHIFTED WEST Y � �' �' % OFF TOP OF ROAD -,j - '+f T•' ' - -� ,-:C 200 400 Boo ,I PROJECT SITE 1 "r >�.: ra •�, . � - IF 1 • , a _ I'�__ \ �';• __ "_ f/► ; low � {�. > - J.a - - /'fHr' lq -�. ' 1 DRAWN BT: JMA OCSIGNED BY: JMA CHECKED BY: CJP PROJECT NUMBER: ' DATE: 7-23-2013 SHEET: SHT21 INDEX: IND1 9 Page 1 of 5 Issue Date: August 1, 2014 Effective Date: December 15, 2014 Case No.: 14-08-0580P LOMR-APP �SVPhR F °^ Federal Emergency Management Agency Washington, D.C. 20472 ND SECJ LETTER OF MAP REVISION DETERMINATION DOCUMENT COMMUNITY AND REVISION INFORMATION PROJECT DESCRIPTION BASIS OF REQUEST City of Fort Collins NO PROJECT UPDATE Larimer County Colorado COMMUNITY COMMUNITY NO.: 080102 IDENTIFIER Cache La Poudre River 1-25 Divided Flow Path APPROXIMATE LATITUDE & LONGITUDE: 40.518,-104.995 SOURCE: USGS QUADRANGLE DATUM: NAD 83 ANNOTATED MAPPING ENCLOSURES ANNOTATED STUDY ENCLOSURES TYPE: FIRM' NO.: 08069CO994F DATE: December 19, 2006 DATE OF EFFECTIVE FLOOD INSURANCE STUDY: February06, 2013 TYPE: FIRM' NO.: 08069C1013F DATE: December 19, 2006 FLOODWAY DATA TABLE: 4 Enclosures reflect changes to flooding sources affected by this revision. ' FIRM - Flood Insurance Rate Map; " FBFM - Flood Boundary and Floodway Map; "' FHBM - Flood Hazard Boundary Map FLOODING SOURCE(S) & REVISED REACH(ES) Cache La Poudre River 1-25 Divided Flow Path - from approximately 110 feet downstream of County Road 36 to approximately 140 feet upstream of County Road 38 SUMMARY OF REVISIONS Flooding Source Effective Flooding Revised Flooding Increases Decreases Cache La Poudre River 1-25 Divided Flow Path Zone AE Zone AE YES YES Zone X (shaded) Zone X (shaded) YES YES Floodway Floodway YES YES ' BFEs - Base Flood Elevations DETERMINATION This document provides the determination from the Department of Homeland Security's Federal Emergency Management Agency (FEMA) regarding a request for a Letter of Map Revision (LOMR) for the area described above. Using the information submitted, we have determined that a revision to the flood hazards depicted in the Flood Insurance Study (FIS) report and/or National Flood Insurance Program (NFIP) map is warranted. This document revises the effective NFIP map, as indicated in the attached documentation. Please use the enclosed annotated map panels revised by this LOMR for floodplain management purposes and for all flood insurance policies and renewals in your community. This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document, please contact the FEMA Map Information eXchange toll free at 1-877-336-2627 (1-877-FEMA MAP) or by letter addressed to the LOMC Clearinghouse, 847 South Pickett Street, Alexandria, VA 223044605. Additional Inform�ationn about the NFIP is available on our website at http://www.fema.gov/nfip. Luis Rodriguez�P.-E.,, Chief7 Engineering Management Branch Federal Insurance and Mitigation Administration 132942 PT202.BKR.14080580P.H2O 102-1-C Page 2 of 5 Issue Date: August 1, 2014 Effective Date: December 15, 2014 Case No.: 14-08-0580P LOMR-APP Federal Emergency Management Agency 04 ,� Washington, D.C. 20472 ND SE�J LETTER OF MAP REVISION DETERMINATION DOCUMENT (CONTINUED) OTHER COMMUNITIES AFFECTED BY THIS REVISION CID Number: 080101 Name: Larimer County, Colorado AFFECTED MAP PANELS AFFECTED PORTIONS OF THE FLOOD INSURANCE STUDY REPORT TYPE: FIRM' NO.: 08069CO994F DATE: December 19, 2006 DATE OF EFFECTIVE FLOOD INSURANCE STUDY: February6, 2013 TYPE: FIRM' NO.: 08069C1013F DATE: December 19, 2006 FLOODWAY DATA TABLE: 4 This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document, please contact the FEMA Map Information eXchange toll free at 1-877-336-2627 (1-877-FEMA MAP) or by letter addressed to the LOMC Clearinghouse, 847 South Pickett Street, Alexandria, VA 22304-4605. Additional Information about the NFIP is available on our website at http:/Avww.fema.gov/nfip. Luis Rodriguez, P.E., Chief Engineering Management Branch Federal Insurance and Mitigation Administration 132942 PT202.BKR.14080580P.H2O 102-1-C Page 3 of 5 Issue Date: August 1, 2014 Effective Date: December 15, 2014 Case No.: 14-08-0580P LOMR-APP OF'eAl1F4. Z Federal Emergency Management Agency z � 0 �� Washington, D.C. 20472 No S�GJ LETTER OF MAP REVISION DETERMINATION DOCUMENT (CONTINUED) COMMUNITY INFORMATION APPLICABLE NFIP REGULATIONS/COMMUNITY OBLIGATION We have made this determination pursuant to Section 206 of the Flood Disaster Protection Act of 1973 (P.L. 93-234) and in accordance with the National Flood Insurance Act of 1968, as amended (Title XIII of the Housing and Urban Development Act of 1968, P.L. 90-448), 42 U.S.C. 4001-4128, and 44 CFR Part 65. Pursuant to Section 1361 of the National Flood Insurance Act of 1968, as amended, communities participating in the NFIP are required to adopt and enforce floodplain management regulations that meet or exceed NFIP criteria. These criteria, including adoption of the FIS report and FIRM, and the modifications made by this LOMR, are the minimum requirements for continued NFIP participation and do not supersede more stringent State/Commonwealth or local requirements to which the regulations apply. We provide the floodway designation to your community as a tool to regulate floodplain development. Therefore, the floodway revision we have described in this letter, while acceptable to us, must also be acceptable to your community and adopted by appropriate community action, as specified in Paragraph 60.3(d) of the NFIP regulations. COMMUNITY REMINDERS We based this determination on the base (1-percent-annual-chance) flood discharges computed in the FIS for your community without considering subsequent changes in watershed characteristics that could increase flood discharges. Future development of projects upstream could cause increased flood discharges, which could cause increased flood hazards. A comprehensive restudy of your community's flood hazards would consider the cumulative effects of development on flood discharges subsequent to the publication of the FIS report for your community and could, therefore, establish greater flood hazards in this area. Your community must regulate all proposed floodplain development and ensure that permits required by Federal and/or State/Commonwealth law have been obtained. State/Commonwealth or community officials, based on knowledge of local conditions and in the interest of safety, may set higher standards for construction or may limit development in floodplain areas. If your State/Commonwealth or community has adopted more restrictive or comprehensive floodplain management criteria, those criteria take precedence over the minimum NFIP requirements. We will not print and distribute this LOMR to primary users, such as local insurance agents or mortgage lenders; instead, the community will serve as a repository for the new data. We encourage you to disseminate the information in this LOMR by preparing a news release for publication in your community's newspaper that describes the revision and explains how your community will provide the data and help interpret the NFIP maps. In that way, interested persons, such as property owners, insurance agents, and mortgage lenders, can benefit from the information. This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document, please contact the FEMA Map Information eXchange toll free at 1-877-336-2627 (1-877-FEMA MAP) or by letter addressed to the LOMC Clearinghouse, 847 South Pickett Street, Alexandria, VA 22304-4605. Additional Information about the NFIP is available on our websile at http:/twww.fema.gov/nfip. Luis Rodriguez, P.E., Chief Engineering Management Branch Federal Insurance and Mitigation Administration 132942 PT202.BKR.14080580P.H2O 102-1-C Page 4 of 5 Issue Date: August 1, 2014 Effective Date: December 15, 20114 Case No.: 14-08-0580P LOMR-APP Federal Emergency Management Agency 0 Washington, D.C. 20472 ND SE�J LETTER OF MAP REVISION DETERMINATION DOCUMENT (CONTINUED) COMMUNITY INFORMATION (CONTINUED) We have designated a Consultation Coordination Officer (CCO) to assist your community. The CCO will be the primary liaison between your community and FEMA. For information regarding your CCO, please contact: Ms. Jeanine D. Petterson Director, Mitigation Division Federal Emergency Management Agency, Region VIII Denver Federal Center, Building 710 P.O. Box 25267 Denver, CO 80225-0267 (303)235-4830 STATUS OF THE COMMUNITY NFIP MAPS We will not physically revise and republish the FIRM and FIS report for your community to reflect the modifications made by this LOMR at this time. When changes to the previously cited FIRM panel(s) and FIS report warrant physical revision and republication in the future, we will incorporate the modifications made by this LOMR at that time. This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document, please contact the FEMA Map Information eXchange toll free at 1-877-336-2627 (1-877-FEMA MAP) or by letter addressed to the LOMC Clearinghouse, 847 South Pickett Street, Alexandria, VA 223044605. Additional Information about the NFIP is available on our website at http:/Mww.fema.gov/nfip. �l3 Luis Rodriguez, P.E., Chief Engineering Management Branch Federal Insurance and Mitigation Administration 132942 PT202.BKR.14080580P.H2O 102-1-C Page 5 of 5 Issue Date: August 1, 2014 Effective Date: December 15, 2014 Case No.: 14-08-0580P LOMR-APP Federal Emergency Management Agency =�z °g �� Washington, D.C. 20472 ND SE� LETTER OF MAP REVISION DETERMINATION DOCUMENT (CONTINUED) COMMUNITY INFORMATION (CONTINUED) A notice of changes will be published in the Federal Register. This information also will be published in your local newspaper on or about the dates listed below and through FEMA's Flood Hazard Mapping website at https://www.floodmaps.fema.gov/fhm/Scripts/bfe_main.asp. LOCAL NEWSPAPER Name: The Fort Collins Coloradoan Dates: August 8, 2014 and August 15, 2014 Within 90 days of the second publication in the local newspaper, a citizen may request that we reconsider this determination. Any request for reconsideration must be based on scientific or technical data. Therefore, this letter will be effective only after the 90-day appeal period has elapsed and we have resolved any appeals that we receive during this appeal period. Until this LOMR is effective, the revised flood hazard determination information presented in this LOMR may be changed. This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document, please contact the FEMA Map Information eXchange toll free at 1-877-336-2627 (1-877-FEMA MAP) or by letter addressed to the LOMC Clearinghouse, 847 South Pickett Street, Alexandria, VA 223044605. Additional Information about the NFIP is available on our website at http://www.fema.gov/nfip. Luis Rodriguez, P.E., Chief Engineering Management Branch Federal Insurance and Mitigation Administration 132942 PT202.BKR.14080580P.H2O 102-1-C v 0 N L 3 O m W .A � � A 0.0 LU A LU �LLJA W m W> a N Ix 03 ax O x W Q U F U w V O zUQw ..en Q�Q b CQ. a z a x w W O c C7 U U � rZ. � sae E a A m v `L TABLE 4 w O z U � z N 1� M r 00 00E- V': Vl V1 U W = "a U j Z pC r tn r— en rn M rnm o� M o M d (/ F N N M M M M V V h Vl O F 00 00 00 00 00 00 Ob W o0 W W W y a � 'cY d �n V1 N N M M M M� � w x �W Z r v z w m oro � N � oho � N � � 00 w A � M N N Q F" Obi c O� � 0�0 � C U � W vi oo — -- rl N ri N d' N N vi N r` N N of N M a a xo U 'I A �w z � A C u aa3 W rA a� O ¢ = U 0 w w C7 7C w U ¢ � A a CC(L CCC ZONE AE 33 J77 34 T 6 N 3 City of Fort Collins \\ 080102 \\� REVISED'" AREA W 4 o = o J W --I Z W > y = O O r � � PRECISION DRIVE m O z ZONE A STEELHEAD STREET w rn Z U3 g o WO Z W C W Cy H= Z 7 U O m OBS DRIVE DRIVE ECLIPSE LANE STAR GAZER DRIVE Larimer Countv Unincorporated Areas 080101 9 Aty of Fort Collins 080102 FLOODING EFFECTS --I-25 DIVIDED FLOW CHACHE LA POUDRE RIVER PROJECT SITE NOTE MAP AREA SHOWN ON THIS PANEL IS LOCATED WITHIN TOWNSHIP 6 NORTH, RANGE 68 WEST AND TOWNSHIP 7 NORTH. RANGE 68 WEST SPECIAL FLOOD HAZARD AREA OTHER AREAS OF FLOOD HAZARD Without Base Flood Elevation (SEE) With BEE or Depth Regulatory Floodway 0.2%Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth lessthan one foot or with drainage areas of lessthan one square mile Future Conditions 1°'o Annual Chance Flood Hazard Area with Reduced Flood Risk due to Levee See Notes. -- SCALE Mao radio ' NAD83 STATE PLANE Col000 o North FIPS 0501 (Feet) Weelem HeMephe,e. VN,ACI Dolum NAVDea N1 inch = 500 feet 1:6,000 1,000 Feet Melers 50 Jo0 NATIONAL FLOOD INSURANCE PROGRAM E oonINSURANC: nnrF NIA;' ULRIMER COUNTY, COLORADO O 4ntl lncorpOraletl Areas W PANEL 994 OF 1420 -�. w N C COMMUNITY NUMBER PANEL SUFFIX O r0a"CIXLINs. OeltP.+ OBde ! C"r of O LARIMER COUAFTY 000101 MOA F IL C C ?EVISED TO to REFLECT LOMR EFFECTIVE: December 15, 2014 VERSION NUMBER 1.1.1.0 MAP NUMBER 08069C0994F MAP REVISED DECEMBER 19. 2006 4853` T 7 N T6N. HARMONYROAD ZONE AE Larimer County Unincorporated Areas 080101 I AREA REVISED BY LOMR DATED JUNE 18, 2012 4853 Citv of Fort Collins 080102 4847 48 4850 Pro' le Baseline 7 t 4842 4841.1 od- 4841 4839 10 1 REVISED NOTE: MAP AREA SHOWN ON THIS PANEL Fossil Creek AREA IS LOCATED WITHIN TOWNSHIP 6 NORTH Reservoir Inlet RANGE 68 WEST AND TOWNSHIP 7 NORTH RANGE 68 WEST. AH AG ZONE AE Town of Timnath 080005 34 4844 ON Town of Timnath 080005 —� PF 0 N Q Np w � ¢w �O �a Uj wZ rp Z� _ w 3 asa01 AREA REVISED AD 483! AC 483 �4837 l 4837 5 tkoo BY LOMR DATED NOVEMBER 14, 2008 4841 WRhout Base Flood Elevation (BEE) WRh BEE or Depth SPECIAL FLOOD WARD AREAS RegulatoryFloDdway 0.2%Annual Chance Flood Hazard, Areas of 1% annual chance Hood with average depth lessthan one foot orwith drainage areas of less than one square mile -� Future Conditions 1% Annual Chance Flood Hazard . OTHER AREAS OF Area with Reduced Flood Risk due to Levee FLOOD HAZARD See Notes.:: SCALE Map Pmpr ' NADRA STATE PLANE Colorado North RIPS 0501 IFeen We stern Hemrephere verb al Datum NAVD88 N l inch -500 feet 1:6,000 50C 000 FeH Metes 150 300 NATIONAL FLOOD INSURANCE PROGRAM ^fin IV51 1'pheF 4,"dF CSA.' IARIMER COUNTY, COLORADO � And lncwporatetl Aren 1013 1420 W a` PAMa OF U i a M i N C COMMUNITY NUMBER PANEL SUFFIX ,oxrco Ins, miw_ 1o13 mor G IFIMEH couxry peolot tM3 LL- TMNATH. TOWN IXIWS 1M3 OF t4 C O REVISED TO REFLECT LOMR EFFECTIVE: December 1, iU i4 5 VERSION NUMBER Cn MAPNUMBER cc V 08D69C1013F MAP REVISED DECEMBER 19, 2006 APPENDIX H Low Impact Development Table H-1 Low Imnact Develooment (LID) Basin/ Sub -Basin Total Area (acres) Impervious Area (acres) % Impervious N-1 3.27 2.57 76.51% N-2 2.93 0.53 18.67% N-3 1.50 1.28 82.63% N4 0.52 0.28 53.62% N-5 1.54 0.68 42.87% S-1 4.88 3.45 69.17% S-2 1.19 0.59 49.08% S-3 1.29 0.85 65.18% S-4 2.64 0.10 5.71 % S-5 1.20 0.67 56.72% S-6 0.20 0.07 32.80% U-1 2.09 1.53 73.50% U-2 3.60 2.00 54.94% U-3 0.12 0.07 59.17% i orar Zo.y i 14.0i os.auin Total Impervious Area to be Treated Offsite Using LID Techniques (acres) = 11.00 'Percent impervious values based on UDFCD Vol 1., Chapter 6, Table 6-3 Per agreements with the City and adjacent property owner, all LID for the H23 project will be handeled offsite on the adjacent H25 developement. APPENDIX I Proposed Drainage Maps / I SEE POND EXHIBIT BELOW FOR EX. Y GRAVEL POND #1 SPILLWAY LOCATION \ \ p / = HARMONY & 1-25 ODP AREA/' / I $ EX. GRAVEL POND /IMiami i w \ aaM CRAEL POND)n zaol l ) 1 $aaa GROUNDWATER ELEVATION le 41!0&00 IS, t^ f I 'd= SPILL AY ELEVb•00 -' I al^\`pair— % -mEcnc wo-v ME Mae am as m INIF Me Im AIM e"', little IIIIII 1L THIS CT srE IS cnrWTIIN TIE 5 Wklt FEMA NEwIAIgAF ED FLOmN. PEAR A FIRM AM a ORMOOl iY DATED DECEUBFF 15, SMa, 2Lam . AU. AREAS IN ME FLCOfiINN AND ROCOWAY ME SUBJECT TO ME STANDARDS a CHAPTER 40 a THE FORT CawxS MUNII CCIX, 3 H0 li MAY 0.YIMJICE IN ME FLOWMAY all A FLYMPwx USE PONT AND x0-RI; caram Td HATE BEEN MI NK)WD BY ME CITY OF ArMS lx�iH6BµPo�YPE.xm PJST FROEcr. A. AD- F wME FRINGE SE ICAPPVRN UPERMIT. S. OPTICAL FACIUTES ARE PREHI EED N ME POUNE MWA RO]CPwx. S. WERE STEP raxOAMMS OWIR, ONLY UNEST TOP CE FCUNDATEN BUBMNC EIEVAMENS ARE S OSIN. STRUCTURE B 0-7 •WMA CRM SECTM TABLE I D 3 B tO P, I � m 4 1 I i0Q I I I nb� ' Ym 11 4art �pLL I m I I Maeal aftaftea I Mail I p J Ba>.B>�B>�B�aBT®000m Bl•Bl• Bl•Bl•Bl•BIBI BIB.BI• T DAP LES W02 DRAINAGE �j / � LBBBID Al = BASIN NUMBER % AREA IN ACRES Y - UOO-YR RUNCEE COEFFICIENT FC" DESIGN PONT ® Z gPROPOSED CONTOURS �� M(V o EXISTING CONTOURS Y Z W APPROVED CLOIR (UMITS) ....... cO Q L Z APPROVED LOMR-E (UNITS) SWALE CROSS-SECTION ALJ APPROVED CLOIAR APPROVED LOMR-F BASIN BOUNDRY •���• PROPOSED STORM SEWER �-- EXISTING STORM SEVER �- im City of Ft. Collins, Colorado UTILITY PLAN APPROVAL CONSULTINGTOT, Il' mF 7" Maier, Way APPROVED: CHECKED BY: City righter Wear Sk Weslewe"r USULLT Dap Date Fort Cil �mlar, eae: z Pe055 al co 1219.0002.00 CHECKED BY: Sbrmweler Utr DateSwur1•=10D' CHECKED BY: Par" A RecreaUon Data JULY 2017 CHECKED BY: Traffic EnRmeer Dal. CHECKED BY: 58 69 EnWerarta lal Planner Date of