Loading...
HomeMy WebLinkAboutDrainage Reports - 09/21/2017 (2)NORTHERN ENGINEERING Drainage Memo Date: September 21, 2017 Project: Stadium Apartments Project No. 1232-001 Fort Collins, Colorado Attn: Mrs. Heather McDowell City of Fort Collins Approved Plans Fort Collins Water Utilities Engineering Approved by: P�J��v1GW 700 Wood Street Fort Collins, Colorado 80521 Date:--L-)--/- / 7 Purpose This letter serves to document the design revision made to Stadium Apartments. The revisions included a redesign of detention Pond B and the revised storm outfall and water quality of basin Al. Below is a detailed description of the items revised from the original drainage report. Also, attached to this memo are supporting calculations. Design Modifications Detention Pond B has been reconfigured to avoid being constructed above the revised sanitary sewer main running through the site. The proposed chambers designed above the revised sanitary sewer line have been relocated and dispersed into the chambers located south and west of the building. Calculations showing the storage provided with both sets of chambers has been provided and is attached to this memo. Storm Line A2 was redesigned to daylight directly into the bio-media through a perforated pipe. Flows above the water quality event will surcharge the grated inlet located in the bio-swale and flow as previously designed. Conclusion In concluding, the revision to the design of Stadium Apartments will not deviate from the orginial design. All previous requirements and standards are being upheld and the overall site will function as originally intended. If you should have any questions as you review this report, please feel free to contact us. Northern Engineering Services Inc. Cody Snowdon, PE Project Manager FORT COLLINS: 301 North Howes Street, Suite 100, 80521 J 970.221.4158 GREELEY: 820 8'' Street, 80631 1 970.395.9880 1 WEB: www.northernengineering.com 8/15/2017 ADS Design Tool Site User Inputs Chamber Model SC-740 Outlet Control Structure Yes (Outlet) Project Name Stadium Apartments Engineer C.Snowdon Project Location Pond B Project Date 04/03/2017 Measurement Type Imperial Required Storage Volume 10,787 cubic ft. Stone Porosity 40% Stone Foundation Depth 6 in. Stone Above Chambers 6 in. Average Cover Over Chambers 18 in. Design Constraint Width Design Constraint Dimension 34 ft. stol A I leul t fl. Results System Volume and Bed Size Installed Storage Volume 10788 cubic ft. Storage Volume Per Chamber 74.90 cubic ft. Number Of Chambers Required 133 each Number Of End Caps Required 12 each Rows/Chambers 1 row(s) of 23 chamber(s) Leftover Rows/Chambers 5 row(s) of 22 chamber(s) Maximum Length 171.18 ft. Maximum Width 30.60 ft. Approx. Bed Size Required 5086 square ft. System Components Amount Of Stone Required 433 cubic yards Volume Of Excavation (Not Including 659 cubic yards Fill) Non -woven Filter Fabric Required 1284 square yards Length Of Isolator Row 165.29 ft. Non -Woven Isolator Row Fabric 146 square yards Woven Isolator Row Fabric 182 square yards TPAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) 51"(1295MM, (150mm)MIN 18" I1) (2.4 m) (450 mm)MIN MAX 5D mm) MIN 30- (760 mm) ZDEPTH OF STONE TO BE DETERMINED BY DESIGN ENGINEER 6' (150 mm) MIN �. 12" (300 mm) TYP nl roROnOw CFFLEpBLE RnrE ExT FORu AVED IRBTHunON8w1ERF WTTW MOu VEMQEs cur 00g INGREA9f COVER TO M'W., ® ADS Stormtech 2016 http://sto"tachcaic.azurowebsites.net/ V 1 8/1512017 ADS Design Tool Site Jr%i T " a— nmY4M_kJ User Inputs Results Chamber Model SC-310 Outlet Control Structure Yes (Outlet) System Volume and Bed Size Project Name Stadium Apartments Installed Storage Volume 1162 cubic ft. Engineer C.Snowdon Storage Volume Per Chamber 31.00 cubic ft. Project Location Pond B3-B4 Number IN Chambers Required 30 each Project Date 04/0312017 Number IN End Caps Required 6 each Measurement Type Imperial Rows/Chambers 2 row(s) Of 12 Required Storage Volume 1,159 cubicft. chamber(s) Stone Porosity 40% Leftover Rows/Chambers 1 row(s) of 6 chamber(s) Stone Foundation Depth 6 in. Maximum Length 92.07 ft. Stone Above Chambers 6 in. Maximum Width 12.10 ft. Average Cover Over Chambers 18 in. Approx. Bed Size Required 960 square ft. Design Constraint Length Design Constraint Dimension 95 ft. System Components Amount Of Stone Required 67 cubic yards Volume Of Excavation (Not Including 83 cubic yards Fill) Non -woven Filter Fabric Required 266 square yards Length Of Isolator Row 86.60 ft. Non -Woven Isolator Row Fabric 47 square yards Woven Isolator Row Fabric 38 square yards (150 mm)MIN 34" (865 mm) PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) 6. (150 mm) 8' MIN 1 M (24 (450 mm)MINhI MAX fie^ i (405 mm) DEPTH OF STONE TO BE DETERMINED BY DESIGN ENGINEER 6" (150 mm) MIN 12' (300 mm) TYP I¶Toeori0u Of Ftnaelf PAVEYar Pon uwAV narAwnaxswrma eumrw; ma waars wr OL�IN. NCREVE WVW TO M'IWomml ® ADS Stonntech 2016 http://sto"techcalc.azurewebsites.net/ 1M N 71 N N C O a E z z E d z 6 LL L m a r.E O 1 b E L O iAt 0 0 0 o g o lh NI CI N N N O 0 n m o L N U l9 N (Y g lrt0 L9'9Z09'13'Aul L4M9'13'PWO Z :Ln - L9 CC+0 @1S M � p J N � W U1 Z9'9Z09'13'nul Inn Z9'009 '13 'AUI 1,01Z0913 WIN L :ui - "E,Lo+o Ins p x Ul 09'9Z09 '13 'AUI Ob'9Z09 '13 'PWD IIgAnO - 00'00+0 g3S p ui g g S .... �gp m M tN+f pg� N N N g pN o W It O CL E E co L 3 CO E L O V' c 0 e n o m o r 2 2 0 m m c _N m C $ O W m O J 2 w c o M Of Of CJ C N N Si� u�i u�i C mm O N g O O o S 7 N J (7 air '� N N N m S � 0 0 o m a c N N E m n b m N r C 0 JN^ C 6 N N C W � O N N h C C m � N N > J CW Z� n N L j m � N J b O V O O m 20_ OI t m � N m � y J Q N O O fA n m c N (V m m E J N m LL � N Q W O m a z J Z 0 A a C bp O N J C O r Ol y O N N O 0 L O M N O U Q voi N K h � N o O O N N�f 0 ul m X N N n h M o n N N 0 w N a Q o o E Z L M M g m m a a a_ 0 J > r r xror N VI C �^ O O O m X N M N J r N N N N N e O O f0 M N J > N N Wo Y N voi N M M ` m 1 N W a o n a o J > U'm^ r r S YI $ YI N O N N N N h O O > 0 O _ E n � Z n U J