Loading...
HomeMy WebLinkAboutDrainage Reports - 11/29/2017City of Fort Collins Approved Plans Approved by: PfP--E Engineering [Nate: "!, -t Zoe 908 Laporte Avenue • Fort Collins. Colorado 80521 • 970.219.2834 • bob@apex-engineer.com August 23, 2017 Mr. Shane Boyle, P.E. Stormwater Department City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80521 RE: Drainage Memo Red Truck Brewery - Minor Amendment Dear Shane, This purpose of this letter is to examine the potential impacts of the proposed site improvements associated with the above referenced Minor Amendment (MA) project on the existing drainage facilities located on the project site. As we discussed in our meeting on 5/31/2017, the project consists of exterior and interior remodeling of the existing Fort Collins Brewery located at 1020 East Lincoln Avenue. There is also an elevated deck proposed over the existing detention pond. The deck is supported by 38 12"xl2" concrete piers and four 24"x24" concrete piers. The total plan area of the 42 proposed piers is 54 square feet. The changes in impervious cover created by the revisions to the site design are as follows: Removal of concrete from parking area and sidewalk (190) Expansion of existing patios and sidewalk (906 SF) A gravel trail along the west side of the building (1283 SF) In preparing this drainage memo, the following approved documents prepared by Apex Engineering for the Fort Collins Brewery (FCB) project are referenced: • Utility Plans (and subsequent drawings of record), dated 4/20/2009 • Final Drainage, Erosion Control and Water Quality Report, dated 4/20/2009 • Drainage Certification, dated 9/24/2010 Runoff Parameters The net effect of the removal and additions listed above, the weighted composite runoff Coefficient (C) and percentage of impervious area changes very slightly. The following is a comparison of the existing and proposed values (calculations attached): -C % Imo. Existing 0.852 82.1% Proposed 0.857 83.0% Detention Storaoe The original FTB detention analysis was based on a proposed C of 0.852 for full build out of both phases of the project. The original analysis was modified to reflect the higher proposed C of 0.857. The results indicate that these revisions do not increase required detention volume. Please note that this result is to be expected since the City's detention volume calculation spreadsheet adds a 25% factor of safety to all runoff coefficients. Therefore, the resultant detention volume calculation is based on an identical C of 1.00 for both conditions. Water Quarrhr As noted above, the percentage of impervious increases slightly due to the proposed improvements. The slightly higher figure was used to recalculate the Water Quality Capture Volume (WOCV) using the same methodology as the FCB project. The revised design spreadsheet is attached, and the results are summarized below: % Imp. WOCV Existing 82.1% 0.092ac-ft Proposed 83.0% 0.094 ac-ft Pond Volume Rating Curve The revised WQCV and detention volumes were then used to modify the original as -built pond stage -storage calculations, which was attached to the original drainage certification for the FTB project. This spreadsheet was also modified to reflect the proposed piers by subtracting 54 square feet from the area of each elevation in the analysis. The revised spreadsheet is attached, and the results are summarized below: WQCV WSE 100-Year WSE Existing 4936.60 4940.59 Proposed 4936.63 4940.60 As noted in the Drainage Certification for the FfB project, the design emergency spillway elevation was 4940.60. The proposed very slight increase in 100-year WSE of 0.01' is insignificant since it is at the design spillway elevation. This analysis reveals that the increased elevations in the pond are insignificant, and contained within the existing detention pond system. The increases are not significant to water quality treatment or detention functionality of the existing pond. Therefore, it is concluded that no modifications to the existing pond are needed to accommodate the Red Truck improvements as included in the Minor Amendment for the property. I appreciate your time and consideration in reviewing this submittal. Please contact me at (970) 219-2834 should you have any questions or concerns. Best Regards, Bob Gowing, P.E. APEX Engineering Attachments: • Proposed Runoff Coefficients and Percent Impervious Calculations • Proposed Water Quality Capture Volume Calculations • Proposed Pond Volume Rating Curve Calculations • Original Drainage Certification for the Fort Collins Brewery Developed Weighted Runoff Coefficients Red Truck Beer Composite Calculations Basins Total Area Sum CaA Composite C P-1, EA 3,64 3.12 0.857 Li Use or Suri Characteristics Percent lmpe-vbusness Business: Commercial areas 95 Neighborhood areas 85 Reetalimdal: Om le-famA ' Multiunit detache0 60 Multiunit(altacheE) 75 Half -acre lot or larger ' Apartments so Industrial: L ht areas 80 Heavy areas 90 Parks, cemeteries: 5 Playgrounds; 10 Schools: 50 Railroad yard areas: 15 Undeveloped areas: Historical Flow Analysis 2 Greenness, agnalltwal Off -site flow analysis (when land use not defined) 45 severe: P9ved 100 Gravel(packed) 40 Drivesra sand sidewalks: 90 Reots: 90 Lawns. sandy soil a Lawns, clayey soil 0 'Refer to Figures RO-3 through RO-5 in Runoff Chapter Notes. 1. Net increase in concrete area = 535 SF 2. Net increase in gravel area = 1340 SF 1 32 AM APEXENG(NEERING 8232017 100 Year This is to convert % imp. to a C value 100-year (must insert % imp. and C pervious). Required detention 'C'value 'C" 1.25 Area 0.86 1 3.64 acres ft3 acre-ft. Modified Modified Release Rate 0.73 M. FATER D. JUDISH C. I -I Nov-98 5/95 Nov-97 POND SIZING TIME INTENSITY Q 100 Runoff Release Required cum 100 year Volume Cum total Detention (secs) (in/hr) (cfs) (ft^3) (ft^3) (ft^3) 0 0 0.00 01 0.0 0.0 300 9.950 36.22 10865.4' 218.4_1 10647.0 600 7.720 28.10 16860.481 436.8 16423.7 900 6.520 23.73 21359.52 655.2 20704.3 1200 5.600 20.38 24460.81 873.6 23587.2 1500 4.980 18.13 27190.8 1092.0 26098.8 1800 4.520 16.45 29615,04 1310.4 28304.6 2100 4.080 14.85 31187.52 1528.8 29658.7 2400 3.740 13.61 32672.64 1747.2 30925.4 2700 3.460 1259 34004.88 1965.6 32039.3 3000 3.230 1176 35271.6 2184.0 33087.6 3300 3.030 11.03 36396.36 2402.4 33994.0 3600 2.860 1041 37477.44 2620.8 34856.E 3900 2.720 9.90 38613.12 2839.21 35773.6 4200 2.590 943 39596.923057.6 36538.3 4500 2.480 9.031 40622.4 3276.0 37346A 4600 2.380 8.66 41583.36' 3494.4 38089.0 5100 2.290 8.34 42511.56 3712 8 38798.8 5400 2.210 8.04 43439.76 3931.2 39508.6 DETENTION TIME Required (mins) Detention (ac-ft) 0 0.0000 5 10 15 0.2444 0.3770 0.4753 20 0.5415 25 0.5991 30 35 0.6498 0.6809 40 0.7100 45 0.7355 50 0.7596 55 0.7804 60 0.8002 65 0.8213 70 75 80 85 0 go! 0.8388 0.8574 0.8744 0.8907 0.9070 95 5700 2.130 7.75 44193.24 4149.6 40043.61 0.9193 100 6000 2.060 7.50 44990.4 4368.0 40622.4 0.9326 105 6300 2.000 7.28 45864 4586.4 41277.6 0.9476 110 6600 1.940 7.06 46606.56 4804.8 41801.8 115 6900 1.890 6.88 47469.24 5023.2 42446.01 120 7200 1.840 6.70 48 222.72 5241.6 42981.1 0.9596 0.9744 0.9867 Page 1 g BBegeeeeeeeHeRHeHegeee I ;RSGgBgRRaoRRaaRURRRewu :eeS32RaRRRRRRRhSRBReRR ;RSB\EgQRaaaaaRawRuaRUR @@RRg9Ra§he�§BawhaahaR !� Red Truck Detention Pond As Built Detention Pond Volume Rating Curve Based on As -Built Topography of Existing Detention Pond 35.50 332 0.008 0.001 0.001 36.00 3,495 0.080 0.019 0.020 36.50 7,007 0.161 0.059 0.079 36.627 37.00 7,059 0.162 0.081 0.160 37.50 7,097 0.163 0.081 0.241 38.00 7,136 0.164 0.082 0.322 38.50 7,518 0.173 0.084 0.406 39.00 9,004 0.207 0.095 0.501 39.50 9,653 0.222 0,107 0.608 40.00 16,220 0.372 0.147 0.755 40.50 28,703 0.659 0.254 1.009 40.60 31,206 0,716 0.069 1.078 40 604 (100 year Volume) Required = 0.99 acre-ft WQCV Required = 0.094 acre-ft (100 year Volume+ WQCV) Required = 1.08 acre-ft 100-year WSEL = WQ WSEL = V = ld�A+B+ AB) where: V = volume between contour interval d = elevation - elevation., A = area of elevation_, contour B = area of elevation„ contour 1:33 AM APEX ENGINEERING 8/23/2017 ENGINEERING 238 Walnut Street ■ Suite 200 ■ Fort Collins, Colorado 80524 a 970.797.2906 September 24, 2010 Mr. Jay Barber City of Fort Collins, Stormwater Department 700 Wood Street Fort Collins, CO 80521 RE: Fort Collins Brewery - Drainage Certification Dear Jay The purpose of this letter is to provide as -built information for the drainage facilities constructed as part of the Fort Collins Brewery project. Detention Pond: The detention pond area was surveyed by Edmonds Land Surveying on September 3, 2010. The results of that survey were used to recalculate the pond volumes using the same methodology as that used for the design. A copy of the revised detention pond volume rating curve is attached. The results of the volume calculation indicate that there is adequate volume within the pond for the required detention volume of 1.08 acre-feet. This volume corresponds to a water surface elevation of 4940.59 within the pond. Although slightly higher than the design elevation, this is still lower than the emergency spillway elevation of 4940.60. In addition, the final finished floor elevation for the adjacent building was surveyed, and that elevation was found to be 4942.08. This elevation provides 1.49 feet of freeboard from the 100-year water surface elevation to the finished floor. It should be noted that several elements of the building structure are immediately adjacent to and subject to inundation from the detention pond. This situation was known to the owner, architect and structural engineer during the design process, and we have no reason to believe that this was not accounted for adequately. We simply mention this because Apex Engineering does not provide architectural, structural or geotechnical services and has no way to check or verify this. We make no statements concerning, and are not responsible for, any impacts that this situation may cause to the building, sidewalks, paving, or other structural elements of the project. There are several aspects of the construction of the pond which may present future maintenance issues to the owner. Those include less than ideal slopes in the bottom of the pond and the riprap at the pipe outfalls in the pond. The pond bottom shows several areas which may not drain completely, and the riprap installation is not as large as designed. Neither of these issues should affect the detention or water quality performance of the pond, and the owner has been advised (via this letter) that these areas may need occasional maintenance in the future. Culverts. Inlets and Pipes: The drainage infrastructure such as culverts, inlets and pipes show many minor deviations from design. The as -built elevations, inverts and slopes are shown on the enclosed Record Drawings and are based on survey information provided by Edmonds Land Surveying. Street Drainage There are two areas where drainage along the sides of the adjacent streets is less than optimal. Both of these areas were addressed by minor field adjustments as coordinated with the Engineering Inspector and other City Engineering Staff. In particular, the throats of the two type R inlets accepting drainage from Lemay and Lincoln Avenues were constructed and the storm manhole along storm line B was constructed higher than design with a solid cover, which was not in accordance with design. This resulted in minor pending at the handicap ramp near the intersection and along the western edge of paving for Lemay Avenue. Drainage near the ramp was provided by a small channel which was ground into the existing asphalt, and a small gravel drain to the Type R inlet along Lincoln Avenue. It was determined at a field meeting with Wayne Lenard, Tracy Dyer and Marc Virata that the proposed solution was adequate and the small area of minor ponding adjacent to Lemay was not an issue since the adjacent street improvements are interim. Site Drainage: Many of the privately owned and maintained areas within the site were not graded as per design. These include the drive aisles, parking areas, sidewalks and the open areas throughout the site. Most of the variances from design are minor, but several field changes related to paving slopes were undertaken by the Owner and Contractor for reasons related to the decision to use concrete paving instead of asphalt paving as shown in the design documents. These as -built areas were not analyzed in detail since they are private and the Owner is responsible for maintenance implications of the changes. Based on our visual observation these changes do not appear to affect the overall drainage concepts or drainage infrastructure design for the site as a whole. Enclosed please find the following supporting information: Drawings of Records for drainage improvements (PDF format). Detention pond volume calculations Drainage Site Certification Checklist The above stated opinions and calculations are based on the survey information provided by Edmonds Land Surveying and information provided by the owner and contractor. Please contact me should you need additional information. Sincerely, Bob Gowing, P.E. CC: Tom Peters, Fort Collins Brewery