HomeMy WebLinkAboutDrainage Reports - 12/21/2009August 31, 2009
Wes Lamarque
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins, CO 80521
City of Ft.Collins proved Plans
Approved By.
Date 1�.��—o�_
RE: Sonic Drive In Riverside and Lemay Minor Amendilor ment
ent — Drainage1) �L�ettter
�/^
Dear Wes,
We are pleased to submit for your review, this letter, which outlines the revised drainage I
design for the proposed Sonic Restaurant at Riverside and Lemay that will replace the
existing Wok -and -Roll. This letter references the reports "Final Storm Drainage Report
for J.L. West Minor Subdivision" and "Addendum to Final Storm Drainage Report for i-
J.L. West Minor Subdivision" by Stewart and Associates originally approved in 1995 and
amended in 2000. All computations in this report have been completed in compliance
with the City of Fort Collins Storm Drainage Criteria, dated May 1984, revised April
1997.
The Sonic project proposes to modify the existing parking area and associated building in
order to convert the facilities to suit the needs of a Sonic Restaurant. The storm water
improvements proposed with the current renovations include the addition of two water
quality ponds in each of the new parking islands. These water quality features will
provide a higher level of water treatment than is currently provided. The previously
approved parking lot detention concept will remain in the design because the site does not
support the modification of this feature due to its limited size and shallow storm water
infrastructure. Two variances are respectfully requested to cover two non-standard
conditions that already exist at the current site.
• A variance from the requirement that the water quality capture volume (WQCV)
is added to the 100-year detention volume.
• A variance from requirement to provide one -foot of free board. The site was
originally designed with a drive entrance serving as the emergency spillway. An
additional 1' around the site perimeter would negatively impact the site grading
and would raise the emergency high water elevation to within 0.6' of the existing
buildings finished floor elevation.
Support for the requested variances includes the following:
• The site was originally designed using pre-1999 rainfall data. Usually, this
condition would be grandfathered in and the revised design would use the same
intensities. Under the proposed design, the detention ponds and orifices were
designed with the City's current IDF-curves.
• Neither the site's 100-year flow-restrictor plate, nor the WQCV orifice plate from
the previous design is installed in the current condition, resulting in the site
releasing stormwater undetained. The proposed design would correct this
condition.
• At less than 1-acre in total size, the peak flow rates leaving the site are very small
in comparison with the watershed. Since the WQCV was never provided by
previous designs or constructed infrastructure, the variances would not result in an
increased peak -discharge.
Basin Summary
The previous drainage designs identified two sub -basins, Basin -A and Basin-B, shown on
the JL West Minor Subdivision Grading, Drainage and Erosion Control Plan. The
proposed design of the Sonic project modifies portions of the existing parking
infrastructure within Basin-B and diverts a small area of Basin-B to Basin A.
Basin A
During design, it was found that an additional curb cut located on the north side of the
drive-thru lane would better drain the drive thru lane and north patio area due to the
existing grades. For this reason, the basin boundary between A and B was modified as
shown on the proposed Final Drainage Plan. The small amount of runoff from the drive
thru lane and patio will be detained in a small pond in Basin A and released at a rate
consistent with the previous designs (0.13cfs).
Basin B
Basin-B represents the remainder of the site and generally skirts the property boundary.
No off site runoff appears to enter this basin and the basin drains to the center of the
parking are consistent with the previous design. The report, "Addendum to The Final
Storm Drainage Report for JL West" indicates the C-value for Basin B was 0.79. Under
the proposed design, the landscaped area was slightly increased resulting in a lower C-
value of 0.75. Thus, the peak runoff rates generated by the site are expected to remain
similar, but slightly decreased, when compared to the previous design and the existing
site conditions. The 100-year historic release rate from the pond in Basin B that was
previously established at 0.90 cfs by the approved designs will be maintained. An FAA
analysis was completed that revealed a detention volume of approximately 3000 cubic
feet of storm water is needed to reduce the developed peak flowrate as previously
established. Consistent with the approved design and addendum, parking area storage,
not exceeding 0.5 feet in depth, will be utilized to store excess storm water runoff.
As previously noted, water quality treatment was not included in the originally approved
design and only briefly mentioned in the approved addendum. Under the proposed
design, a water quality capture of approximately 1050 cubic feet is required in
accordance with USDCM Volume 3. Under the proposed design, two small ponds in the
landscape islands will provide 1070 cubic feet of water quality storage space. A water
quality outlet structure is proposed in the western pond that will serve to regulate the
release of the WQCV over 40 hours in both ponds
The outlet structure will connect to the existing storm system via a I RCP pipe tied in
at the existing storm manhole south of the renovated building. ;A restrictor'plate will
regulate the peak discharge to*the rate previously established resulting in an,anticipated
high water elevation of 4957.0. During the. unlikely event of a.pipe clog, excess storm
water will spill from the site via the existing spillway, the drive entrance off Lemay,
consistent with the previously approved design..:
The above -described design maintains the intent of the .previously approved drainage
designs and is expected to improve the current stormwater system with the addition of
both water quality and detention infrastructure that `furictions as designed. Since the
design serves to maintain the'-voluine and-peaLflow=hate of iunoff-leaving the site; no
negative impacts are anticipated downstream. Therefore, the design proposed in this
letter and corresponding construction documents is assumed adequate to serve proposed
renovations. We greatly appreciate your time and consideration in reviewing this project.
If you have any questions or require additional information, please contact us at (970)
491-9888.
Sincerely,
RUNOFF COEFFICIENTS & % IMPERVIOUS
LOCATION: Sonic at Riverside and Lemay
PROJECT NO: 39649.00
COMPUTATIONS BY: JPF
DATE: 811812009
Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria
Recommended % Impervious from Urban Storm Drainage Criteria Manual
Streets, parking lots (asphalt):
Sidewalks (concrete):
Roofs:
Lawns (flat <2%, sandy soil):
Runoff
%
coefficient
Impervious
C
0.95
100
0.95
96
0.95
90
0.10
1 0
JR Engineering
2620 E. Prospect Rd., Ste. 190
Fort Collins, CO 8525
SUBBASIN
DESIGNATION
TOTAL
AREA
(ac.)
TOTAL
AREA
(sq.ft)
ROOF
AREA
(sq.ft)
PAVED
AREA
(sq.ft)
SIDEWALK
AREA
(sq.ft)
LANDSCAPE
AREA
(sq.ft)
RUNOFF
COEFF.
(C)
%
Impervious
Basin A
0.10
4288.87
0
2236.87
503.29
2052
0.65
63
Basin
0.70
30,416
4,625
17,177
1,561
7,053
0.75
75
Equations
- Calculated C coefficients & % Impervious are area weighted
C=E(Ci Ai) /At
Ci = runoff coefficient for specific area, Ai
Ai = areas of surface with runoff coefficient of Ci
In = number of different surfaces to consider
At = total area over which C is applicable; the sum of all Ai's
3964900flow.xls
JR Engineering
DETENTION VOLUME CALCULATIONS
Rational Volumetric (FAA) Method
100-Year Event
LOCATION: SONIC RIVERSIDE AND LEMAY Pgakinll, W
PROJECT NO: 39649.00
COMPUTATIONS BY: JPF
DATE: 8/ 18/2009
Equations: Area trib. to pond = 0.7 acre
Developed flow = Qo = CIA C (100) = 0.75
Vol. In = Vi = T C I A = T Qp Developed C A = 0.5 acre
Vol. Out = Vo =K QPo T Release rate, Qp0 = 0.9 cfs
storage = S = Vi - Vo K = 0.9 (from fig 2.1)
Rainfall intensity from City of Fort Collins IDF Curve with updated (3.67) rainfall
Storm
Duration, T
(min)
Rainfall
Intensity, I
(in/hr)
Qo
(cfs)
Vol. In
Vi
W)
Vol. Out
Vo
(ft3)
Storage
S
(ft3)
Storage
S
(ac-ft)
5
9.95
5.2
1567
243
1324
0.03
10
7.77
4.1
2446
486
1960
0.05
20
1 5.62
3.0
3541
972
2569
0.06
30
4.47
2.3
4223
1458
2765
0.06
40
3.74
2.0
4712
1944
2768
0.06
50
3.23
1.7
5093
2430
2663
0.06
60
2.86
1.5
5405
2916
2489
0.06
70
2.57
1.3
5669
3402
2267
0.05
80
2.34
1.2
5898
3888
2010
0.05
90
2.15
1.1
6100
4374
1726
0.04
100
1.99
1.0
6282
4860
1422
0.03
110
1.86
1.0
6447
5346
1101
0.03
120
1.75
0.9
6598
5832
766
0.02
130
1.65
0.9
6738
6318
420
0.01
140
1.56
0.8
6867
6804
63
0.00
150
1.48
0.8
6989
7290
-301
-0.01
160
1.41
0.7
7103
7776
-673
-0.02
170
1.35
0.7
7211
8262
-1051
-0.02
180
1.29
0.7
7313
8748
-1435
-0.03
Required Storage Volume: 2768 ft3
0.06 acre-ft
detpond.xls,FAA-100yr SOUTH
JR Engineering
DETENTION VOLUME CALCULATIONS
Rational Volumetric (FAA) Method
100-Year Event
LOCATION:
SONIC RIVERSIDE AND LEMAY -
NOArN
RA/v
PROJECT NO:
39649.00
COMPUTATIONS BY: JPF
DATE:
8/ l 8/2009
Equations:
Area trib. to pond =
0.1
acre
Developed flow = Qp = CIA
C (100) =
0.64
Vol. In = Vi = T C I A = T Qo
Developed C A =
0.1
acre
Vol. Out = Vo =K Qpo T
Release rate, Qpo =
0.10
cfs
storage = S = Vi - Vo
K =
0.9
(from fig 2.1)
Rainfall intensity from City of Fort Collins IDF Curve with updated (3.67") rainfall
Storm
Duration, T
(min)
Rainfall
Intensity, I
(in/hr)
Qo
(cfs)
Vol. In
Vi
(ft31
Vol. Out
Vo
(ft')
Storage
S
(ft)
Storage
S
(ac-ft)
5
9.95
0.6
191
27
164
0.00
10
7.77
0.5
298
54
244
0.01
20
5.62
0.4
432
108
324
0.01
30
4.47
0.3
515
162
353
0.01
40
3.74
0.2
574
216
358
0.01
50
3.23
0.2
621
270
351
0.01
60
2.86
0.2
659
324
335
0.01
70
2.57
0.2
691
378
313
0.01
80
2.34
0.1
719
432
287
0.01
90
2.15
0.1
744
436
258
0.01
100
1.99
0.1
766
540
226
0.01
110
1.86
0.1
786
594
192
0.00
120
1.75
0.1
804
648
156
0.00
130
1.65
0.1
821
702
119
0.00
140
1.56
0.1
837
756
81
0.00
150
1.48
0.1
852
810
42
0.00
160
1.41
0.1
866
864
2
0.00
170
1.35
0.1
879
918
-39
0.00
180
1.29
0.1
891
972
-81
0.00
Required Storage Volume: 358 ft3
0.01 acre-ft
detpond.xls.FAA-100yr NORTH
Sonic PARKING and ISLANDS
Proposed Detention Pond - Stage/Storage
LOCATION: SONIC RIVERSIDE AND LEMAY
PROJECT NO: 39649.00
COMPUTATIONS BY: JPF
SUBMITTED BY: JR ENGINEERING
DATE: 8/ l9/2008
WQCV
100 yr WSEL
V = 1 /3 d (A + B + sgrt(A"B))
where V = volume between contours, ft3
d = depth between contours, ft
A = surface area of contour
PARKING and ISLANDS
Stage
(ft)
Surface
Area
(t`)
Incremental
Storage
(ft)
Total
Storage
(ft°)
55.1
0
55.5
231
30.03
30.03
56.0
931
270.96
300.99
56.5
1340
564.66
865.64
56.6
2905
207.25
1072.89
57.0
9163
2334.51
3200.15
detpond.xls
Sonic NORTH DRIVE THRU
Proposed Detention Pond - Stage/Storage
LOCATION: SONIC RIVERSIDE AND LEMAY
PROJECT NO: 39649.00
COMPUTATIONS BY: JPF
SUBMITTED BY: JR ENGINEERING
DATE: 8/ 19/2008
V = 1/3 d (A + B + sgrt(A*B))
where V = volume between contours, ft3
d = depth between contours, ft
A = surface area of contour
NORTH DRIVE THRU
Stage
A
Surface
Area
(ft')
Incremental
Storage
(W)
Total
Storage
(fe)
56.6
0
57.0
78
10.40
10.40
57.9
2156
793.22
803.62
detpond.xls
Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility
Sheet 1 of 3
Designer: JPF
Company: JR Engineering
Date: August 26, 2009
Project: Sonic -Riverside and Lemay
Location:
1. Basin Storage Volume
la = 73 00
%
A) Tributary Area's Imperviousness Ratio (i = I,/ 100 )
i = 0.73
B) Contributing Watershed Area (Area)
Area = 0.800
acres
C) Water Quality Capture Volume (WQCV)
WQCV = 0.29
watershed inches
(WQCV =1.0'(0.91'13-1.19-IZ+0.78-1))
D) Design Volume: Vol = (WQCV / 12)' Area' 1.2
Vol = 0.0231
acre-feet
2. Outlet Works
A) Outlet Type (Check One) X Orifice Plate
Perforated Riser Pipe
Other
B) Depth at Outlet Above Lowest Perforation (H)
H =
1.50
feet
C) Recommended Maximum Outlet Area per Row, (A,)
Ap =
0.1
square inches
D) Perforation Dimensions:
i) Circular Perforation Diameter or
D =
0.375
inches
ii) Width of 2" High Rectangular Perforations
W =
inches
E) Number of Columns (nc, See Table 6a-1 For Maximum)
nc =
1
number
F) Actual Design Outlet Area per Row (A.)
Aa =
0.1
square inches
G) Number ofRows (nr)
nr=
5
number
H) Total Outlet Area (A,r)
Am =
0.5
square inches
3. Trash Rack
A) Needed Open Area. A, = 0.5 ' (Figure 7 Value)' A„ A, = 18 Squareinches
B) Type of Outlet Opening (Check One) X < 2" Diameter Round
2" High Rectangular
Other:
C) For 2", or Smaller, Round Opening (Ref.: Figure 6a):
i) Width of Trash Rack and Concrete Opening (Wwnc)
from Table 6a-1 Wca,c = 3 inches
ii) Height of Trash Rack Screen (HTR) H, = 48 inches
UD-BMP_v2.08.x1s, EDB 8/26/2009, 11:05 AM
go M
1,✓.47-Cle aUr4G1n/ FGocJ e0AIM404- -
j7FGr0 i�-rnP 7/_l1TG
-BPS.
I
MEAT,
67A L VA �1 � �. IFFL pC.ATr::�
TbP = 5&, &O
a
115 u..4c�,e 5/ 19 Lq uoN Gram2
55 jo = sue./ v
ZESrPIGiDi2 pG14t�
loG-A •CZ jT37-.L�cf•9`
wsEc= s•7-o
4 C) i23 F=rTz
55. o
a(t+
A segn)e rr = Asecaoiz - Air, o jle 7� SeGMPnf = O,
A we= Iir2x F} r= 6.5, B = ►J0, t� i�
Zz' cl
XL
'Z r
110
c