Loading...
HomeMy WebLinkAboutDrainage Reports - 07/06/1988Final Drainage Report for the Charter Hospital of Fort Collins Revised July 6, 1988 TDINC Engineering Consultants 2900 South College Avenue Fort Collins, Colorado 80525 303/226.4955 June 20, 1989 Ms. Susan Hayes City of Fort Collins Storm Water Utility P.O. Box 580 Fort Collins, CO 80522 Re: Addendum to "Final Drainage Report For the Charter Hospital of Fort Collins", Revised July 6, 1988 Dear Ms. Hayes: The purpose of this letter is to document some minor grading revisions to the detention pond at the southeast corner of the Charter Hospital site. The purpose for these revisions is to accommodate the existing grading and landscaping while still achieving the required levels of detention. The attached calculations and sketches show the required changes. Basically, the berm at the southeast corner will be raised approximately 0.6'to elevation 47.6 and the water surface elevation will be raised 0.6' to an elevation of 46.6. This new elevation will give a design storage of 0.96 ac-ft versus a required storage of 0.89 ac-fit. The outlet structure will also be slightly modified to still control the 10 and 100 year release rates. The orifice size for the 10 year storm will decrease from 8" to 7.3" and for the 100 year storm will decrease from 11" to 10.8". The temporary street detention pond will be constructed to the original design. If you have any questions please contact us. Ted A. Borstad enc: Calculations and sketch cc: Perl Tinio, Nobles and Associates Other Offices: Vail, Colorado 303/476-6340 • Colorado Springs, Colorado (719) 598-4107 I P I I \ \ y I �� I+ e l c7 Y I I I I Et -eV I � = I Eyisr c% so ter++ Po na a � 1914 T - r _ 5/7 9j6> G SEC, A -A LMssf GeNC'( OVEF-FLQ%n) 9-w.T, co oTo u 125 11.1� 1�1�1 PLAN ria•mt-/ ""' A SECTION fD 11 I ...6 l0o YR L r y I I I 9.61 II 4.6• - Con Propasea 4eur<5 - - - God r3 E Tr -D Z I V 0- rl@r@. I.G[Ate •[. t2i5-c, SNPWd' P�ev@ W Nee NAN IOi1NON tD. O M.O.tp M• t� y11GWN i@ • WCATSP 64 M tw@ WAu a eettom. RA5E To ELEV 516.65 6 d 0>•c. ewe !O POND OUTLET STRUCTURE (Fro"10 0?III 1 / \ 96, 9 — 2900 S. College Avenue Fort Collins, Colorado 80525 INC. Engineering Consultants Charier Ho-.p4ctl J F-4- Colt;ns Grad;n4 /1Zr4,�no4 e - stiff' 3 orr II Ilevi5;On5 to Zc.-i'awl"O„ P0V,15 G-a0-89 3/e1-00/ CLIENT . /A4 A 4f JOB NO. 342 - 0 0/ INC PROJECT -.660r-4r- /_4.5pfA/ CALCULATIONSFOR Engineering Consultants MADEBY7A6 DATE CHECKED BY —DATE SHFET Z OF J c -- - ----- - - - --- 0; A A- --- --- L J_ A_ L- - -- - - - - - ­ .... .. 60 0 1 F ----------- -- - - - - - ------- -- -- - I* ------- --- --------- ­7 6!t, �O 7 4 4 - ----------- T 1-4- f -4-j- -1 L -.I-- J, i... J Ai. -- ------ L It . .4 L t J_ I A 1 -T- .... .. A--- 7- it i -A 1_1 ---- --- --- -- A [-T r _1 L . . . . . . . .. . + - ------- 7 j m CLIENT Na6 le .5 TJOB NO. �14-001 INC PROJECT C)nQkC,- V�0�,FA�� CALCULATIONS FOR Engineering Consultants MADEBY7-416 DATE%b CHECKED By -DATE -SHEET a OF I J­ J---- --- L J 7- -4 t r _4 -A L--------- ------- --- --- - - - - - -- -------- --- ---- - --- J, ..... 77 IL _i 44 L. . . . . . - - - - L -- -4-- -4- A L-4­ 1 L_ -- ----- T-------- ........ L t--I --- ------ -------- -- . ....... t--- iL L �ll 4. ........ . . . . . . . . ... . ......... .. - - - - - - - is- j. _4 Yt L - - - - - - 4 - -j- -4 A. 4 . to J L it . T - -I- Y ..... LfA ---------- - - --------- - - ----- 1137, CLIENT /\/d d /oil JOB NO. 0 a/ TDINC PROJECT CAdC& A/05,,elA CALCULATIONS FOR Engineering Consultants MADEBY7-'*r,8 DATE tD �8 CHECKED BY DATE -SHEET 3 OF ..... ... .. -- -------- - LL J j J­ - A_ I J - p j. ....... i- J. - -t ----- --- 03 0 -T Lill --------- -- ----- -- A + r. _j i .. .... 76 t J_ -------- -- 1 j L­4 + _J L 4-- ...... . ..... 'T ------- L.-t- --- . . . . . . . r 4-9 . J ... . .. ..... . L -4- t Al I— P r CLIENT — I-Z2dlf5 JOB NO.&/-,' - 00/ INC PROJECT CALCULATIONS FOR Engineering Consultants MADE BY�� DATE�� CHECKED BY —DATE IV —SHEET OF --------------- 4 j ---------- - - -j- -4- - ------ --- L 1 L-, L - - - - - - - - - - -4­ -r -T, 4- L - -A 4- . . . . . . . . --4-4 - - . . . . . . J I, iI J- - - i L 4y L - LA - - - - - - - - - , -- ---- --- --- J ­4 f J 4 k�4 is _A_ F L j-4- . --J-. t 0 F. .. ......... 4 1 01-V LV j'. t :A J CLIENT — No d � f JOB NO.dd7-00 INC PROJECT CAOri 1 '7- 1 SA 14 CALCULATIONS FOR Engineering Consultants MADE BY✓4 DATE' �� CHECKED BY —DATE —SHEET OF - - - - - - - - - - - L T-: - -4� L _J_ ! E .... ...... T-1 - - - - - - - - - - - 4- :0 d 011 i _4 LA LtJ d L Loll -1- -------- ---- _4 --- - ------ -1; ------ - 1-f - ------- - -- -- ------- --------- -4 8 9�2 4_ ...... q_j_ 4 ­3 n d .4 1 ; f 6 L J__ - LL- L I L I _j - - -- - - - - - __L d' - - - - - - - - - - - - jIIz7 ------- - - L A-- -- — --------- I j J 7 7, 4 CLIENT - NO Z Ir- 5 �31 DOS RWINC PROJECT C- 6 Or4r' AU, CALCULATIONS FOR JOBNO.- Engineering Consultants MADEBY�46 DATE4fOC`HECKEDBY — DATE SHEET 6 OF (0 T� T -- ------- - - 4 1--i- i_1A i L 0�6 i t-A A.. .. ..... .. .. . .... .... ........ '7. oCi i Id . J -A -T- 41 L L-J­ -4- 1 - j .... .. ........ .... ...... 77 �bo y y: fi -00" L; 1 FINAL DRAINAGE REPORT FOR CHARTER HOSPITAL OF FORT COLLINS ' PREPARED FOR: CHARTER MEDICAL CORPORATION 577 MULBERRY STREET P.O. BOX 209 MACON, GA 31298 PREPARED BY: ' RBD, INC. ENGINEERING CONSULTANTS 2900 SOUTH COLLEGE AVENUE FORT COLLINS, COLORADO 80525 E Ll 1 1 INDEX INTRODUCTION 1 LOCATION DESCRIPTION SITE DESIGN 2 CONCLUSIONS 2 REFERENCES 4 APPENDIX VICINITY MAP Al 10 YEAR STORM DETENTION VOLUMES A2 (PROPOSED SITE) 100 YEAR STORM DETENTION VOLUMES A3 (PROPOSED SITE) 100 YEAR STORM DUEL RELEASE RATE A4 DETENTION VOLUMES (PROPOSED SITE) 100 YEAR STORM (0.2 cfs/acre) A5 DETENTION VOLUMES (TEMPORARY STREET DETENTION POND) POND VOLUME A6 POND OUTLET STRUCTURE A7 100 YEAR DEVELOPED A8 (SUB -BASIN CALCULATIONS) CONCRETE PIPE OUTLET CONTROL A9 (UNDER DRIVE ENTRANCE) NORTH POND VOLUME CHECK A10 GRADING AND DRAINAGE PLAN POCKET ' INTRODUCTION ' LOCATION The proposed Charter Hospital of Fort Collins will be located in ' the Northwest corner of the Northeast corner of Section 5, Township 6 North, Range 69 West of the 6th Principal Meridian in Fort Collins, Colorado. More specifically this site is just South of Harmony Road and about 1/3 mile west of County Road 9. This 11.8+ acre site is within McClelland's Basin and is located as part of sub -basin 216 from the McClellands Basin Master Drainage Plan, by Greenhorn and O'Mara. This sub -basin, accord- ing to the SWMM Model within the above report, is to drain into gutter number 36 which drains into gutter number 32 and finally ' into McClellands Basin drainageway. More detailed drainage pond locations and criteria for this site can be found in the Master Drainage Study for Wild Wood Farm, by RBD, Inc., June 1988. DESCRIPTION The property for this site is currently irrigated farm land. Three concrete irrigation ditches or laterals exist within this site, two in a west -east flow direction and one flowing both north and south from a highpoint about 185' south of the north property line, see plan in pocket. The most northerly ditch, the Spring Canyon Ditch, is by far the largest with its function mainly to transport flows through this site. The other two laterals service this area for irrigation water. This water, ' after spilling from the laterals flows in a southeast direction. Charter Medical Corporation is developing this site into a health care facility consisting of one building, parking lots and large grassed areas (see plan in pocket). One of the irrigation laterals will be relocated, as shown on the above mentioned plan, ' to avoid conflict with a parking area. The flows from this developed site will continue in the same general direction as historic except that they will be intercepted by a detention pond and released at a specified release rate that will be explained in more detail later in this report. The pond will be located at the southeast corner of this property. A second pond will be constructed for a small section of collector street that is on ' the east side of this site. This pond will be temporary until full buildout of the Wild Wood Farm area which would create a permanent street detention facility. This permanent pond is ex- plained in the Master Drainage Study for Wild Wood Farm by RBD, Inc. Engineering Consultants submitted to the City concurrent with this report. Two small areas flow undetained into the Spring Canyon Ditch. These areas are Basins "F" and "G" which ' are included in the Appendix calculations on Page A8. Histori- cally these Basin areas drained into the same ditch. i-7 ' According to criteria set forth in the above mentioned Master Drainage Study for Wild Wood Farm, a dual release rate is required by the City of 0.2 cfs/acre for a 10 year storm and 0.5 ' cfs/acre for a 100 year storm. The calculations for the 10 year, 100 year and 100 year dual release rate are shown in the Appendix. The on -site 10 year storm calculations show that a ' 20,100 cu. ft. pond is required and that a 37,500 cu. ft. pond is required for a 100 year storm. The pond outlet structure, shown on page A7, was designed according to the pond volume graph on page A6. Ultimately this pond will discharge into the curb and ' gutter of Corbett Drive at the south end of the property. The pond north of the driveway is an extension of the pond at the southeast corner and does not have a controlled release. ' The temporary street detention pond was designed for a maximum release rate of 0.2 cfs/acre during a 100 year storm. The lower ' release rate eliminates the need for a dual release rate struc- ture and allow ease of construction. The volume difference is 0.025 acre-feet between the 0.5 cfs/acre and 0.2 cfs/acre, as shown by on the calculations in the Appendix. Both ponds release at existing grade and therefore continue to flow in the same general direction as historic flows. ' Onsite pipes and inlets were designed according to the flows determined in the sub -basins shown on the plan in pocket. The calculations conform to City specification and are located in ' appendix, pages A8-A10. The drainage analysis has been based upon the future building, parking areas and pool being impervious. ' CONCLUSIONS 1. An on -site detention pond is to be constructed with a dual ' release rate of 0.2 cfs/acre for the 10 year storm and 0.5 cfs/acre for the 100 year storm. This dual release rate produces a 10 year pond storage of 20.100 cu. ft. and a 100- ' year pond storage of 37.500 cu. ft. 2. The temporary street detention pond is designed for a release rate of 0.2 cfs/acre during a 100 year storm. The difference in volume, for this small section,of street, be- ' tween the 0.2 cfs/acre and 0.5 cfs/acre release rate is very minor. ' 3. All onsite pipes and inlets are designed according to specification. City 2 I The construction of drainage facilities designed in this report will satisfy City Storm Drainage specification and allow stormwater to pass through this site in a safe and controlled manner_ Sincerely, RBD, Inc. 1 Ted A. Borstad, P.E. ' Project Manager ' Brian Cole, P.E. Project Engineer 3 REFERENCES. 1. City of Fort Collins Storm Drainage Design Criteria and Con- struction Standards by City of Fort Collins, May, 1984. 2. Master Drainage Study for Wild Wood Farm, by RBD Inc. En- gineering Consultants, June 1988, (Not approved at time of this report). 3. McClellands Basin Master Drainage Plan, by Greenhorn and O'Mara Inc., June 20, 1986. 4. Urban Storm Drainage Criteria Manual, Volume 2, Section 5, by Wright -McLaughlin Engineers; Denver, Colorado, March 1969. 4 .:: �: :� i�: . ( i5� ` �Y 15 1 �.' � i Ty ♦. 4f� Z ; '4 i .� ,�? ....» i�'4�' r a5� l � r 2 pp� �M �� "; &iL�'II�SA4un_amT I 1 1 17 1 1 I 1 J i 1 1 1 VICINITY MAP �� ������ ��D� w�m YEAR ��N���mm�u MAqS DIAGRAM METHOD for DETENTION V�LUnES PROJECT: CHARTER HOSPITAL OF FORT COLLINS COMMENTS: 10 YEAR STORM MAXIMUM ALLOWABLE RELEASE (CFS) = RATIONAL EQUATION: Q = CIA C= 0.43 A(area) =- TIME OF CONCENTRATION = ? TIME CA (min) 5 4.7386 10 4.7386 15 4.7386 20 4.7386 25 4.7386 30 4.7386 35 4.7386 40 4.73G6 45 4.73(36 50 4.7386 55 4.7386 60 4.7386 7i) 4.7386 80 4.7386 90 4.7386 100 4.7386 110 4.7386 120 4.7386 2-2 11.02 I INFLOW OUTFLOW STORAGE (in/hr) (cu ft) (cu ft) (cu ft) (ac ft) 5.65 8031.927 660 7371.927 0.169236 4.4 12509-90 132011189.90 0.256884 3.7 15779.53 1980 13799.53 0.316793 3.25 18480.54 2640 15840.54 0.363648 2.85 20257.51 3300 16957.51 0.389290 2.6 22176.64 3960 18216.64 0.418196 2-35 23384.99 4620 18764.99 0,430784 2.2 25019.80 5280 1973q.80 0.453163 2 25588.44 5940 19648.44 O.451066 1.85 26299.23 6600 19699.23 0.452232 1.75 27365.41 7260 20105.41 0.4615564-* 1.63 27806.10 7920 19886.10 0.456522 0"E 1.44 28659.05 9240 19419.05 0.445800 zlc)/oo 1.3 29568.86 10560 19008.86 0-436383 1.2 30706.12 11880 18826.12 0.432188 1.1 31274.76 13200 18074.76 0.414939 1 31274.76 14520 16754.76 0.384636 0.9 30706.12 15840 14866.12 0.341279 � ���"����� ��0� � m�� m��n� ��m��n�m� MASS DIAGRAM METHOD N� for � DETENTION VOLUMES PROJECT: CHARTER HOSPITAL OF FORT COLLINS COMMENTS- 100 YEAR STORM MAXIMUM ALLOWABLE RELEASE (CFS) = RATIONAL EQUATION: Q = CIA C = 0.54�/ A(area) = TIME OF CONCENTRATION = ? TIME CA I INFLOW (min) (in/hr) (cu ft) ~~ 5 5.9508 9 16067.16 N� 10 15 5,9508 5.9508 7.3 6 26064.50 32134.32 � n� 2O 5.9508 5.2 37132.99 25 5.9508 4.6 41060.52 30 5.9508 4.15 44452~47 N� 35 5.9508 8 47487.38 40 5.9508 3.5 49986.72 N� 45 50 5.9508 5.9508 3.25 3 52218.27 53557.2 � 55 5.9508 2.8 54985.39 60 5.9508 2.6 55699.48 N� 7j 5.9538 2.3 57484.72 � m� 80 5.9508 2.05 58555.87 90 5.9508 1.85 59448.49 100 5.9508 1.7 60698.16 5.9508 1.55 60876.68 120 5.9508 1.45 62126.35 /pJc. -7 -7-��� � 5.51� 11,02 OUTFLOW STORAGE (cu ft) (cu ft} (ac ft) 1653 14414.16 0.330903 3306 22758°50 0.522463 4959 27175.32 0.623859 6612 30520.99 0.700665 8265 32795.52 0.752881 991834534.47 0,792802 11571. 35916.38 0.824526 13224 36762.72 0.843955 14877 37341.27 0.857237+-�� 16530 37027.2 0.850027 18183 36802.39 0.844866 '37,500 19836 35863.48 0.823312 23142 34342.72 0.788400 26448 32107.87 0.737095 29754 29694.49 0.681691 33060 27638.16 0-634484 36366 24510.68 0.562687 39672 22454.35-0.515480 A3 ��� `����� STORMDUAL RELEASE ����� m�� m���� �Nv��n�n����� �������� ���0� MASS DIAGRAM METHOD for DETENTION VOLUMES COMMENTS: 100 YEAR STORM MAXIMUM ALLOWABLE RELEASE (CFS) = RATIONAL EQUATION: Q = CIA I C = 0.54 TIME OF CONCENTRATION = 2.2 efs A(area) m TIME CA I INFLOW OUTFLOW STORAGE (min> (in/hr) (cu ft) (cu ft) (cu ft) (ac ft) 5 5.9508' 9 16067.16 660 154�7.16 0,353699 10 5.9508 7.3 26064.50 1320 24744.50 Q.568055 15 5.9508 6 32134.32 4959 27175.32 0.623859 20 5.9508 5,2 37132.99 6612 30520.99 0.700665 25 5.9508 4.6 41060.52 8265 32795.52 0.752881 30 5.9508 4.15 44452.47 9918 34534.47 0.792802 35 5-9508 3,8 47487.38 11571 35916.38 0.824526 40 5.9508 3.5 49986.72 13224 36762.72 0.843955 45 5.9508 3.25 52218.27 14877 .857237 50 5.9508 3 53557.2 16530 37027.2 0.850027 55 5.95{)S 2.8 54985.39 18183 36802.39 0.844866 60 5.9508 2.6 55699.48 19836 35863.48 0.823312 70 5.9508 2.3 57484.72 23142 34342.72 0.788400 80 5,9508 2.O5 58555.87 26448 32107.87 0,737095 90 5.9508 1.85 59448.49 29754 29694.49 0.681691 100 5.9508 1.7 60698.16 33060 27638.16 0.634484 110 5.9508 1.55 60876.68 36366 24510.68 4.562687 120 5.9508 1.45 62126.35 39672 22454.35 0.515480 A4 ��� `����Y� m�p� n��u�om ��N� ������������ "�mn�wmm� x�w��w�x�~_"�v MASS DIAGRAM METHOD for DETENTIONVOLUMES PROJECT: WILD WOOD FARM (TEMPORARY STREET DETENTION POND) COMMENTS: 100 YEAR STORM -� MAXIMUM ALLOWABLE RELEASE (CFS) 0.14 '+ �_c"-zc��/,Ncms RATIONAL EQUATION: Q = CIA C 1 A(area) =0.72 ' TIME OF CONCENTRATION = ? Z c�-�� � �*�Ek Ak�� w�� TIME CA I INFLOW OUTFLOW STORAGE (/nin> (in/hr) (cu ft) (cu ft) (cu ft) (ac ft) 5 0.72 9 1944 42 1902 0.043663 10 0.72 7.3 3153.6 84 3069.6 0.070468 15 0.72 6 3888 126 3762 0,086363 20 0.72 5.2 4492.8 168 4324.8 0.099283 25 0.72 4.6 4968 210 4758 0.109228 30 0.72 4.15 5378.4 252 5126.4 0.117685 35 0.72 3.8 5745.6 294 5451.6 0.125151 40 0.72 3.5 6048 � 336 5712 0.131129 45 0.72 3.25 6318 378 5940 0.136363 50 0.72 3 6480 420 6060 0.139118 55 0.72 2.8 6652.8 462 6190.8 0.142121 60 0.72 2.6 6739.2 504 6235.2 0.143140 70 0,72 2,3 6955.2 588 6367.2 0.146170 80 0.72 2.05 7084.8 672 6412.8 0.147217 90 0.72 1.85 7192.8 756 6436.8 0.147768 100 0.72 1.7 7344 840 6504 0.149311 110 0.72 1.55 7365.6 924 6441.6 0.147878 120 0.72 1.45 7516.8 1008 6508.8 0-149421�=� -::,/2`r/la. f. PS �-. c./c-���'�«� '�*z-7 -7,L:'^='t AS No Text ■rYiNC Engineering Consultants CLIENT JOB NO. 't- '7_7 PROJECT If 4 A ZI I- CL- �*Q_5P1 1w CALCULATIONS FOR '3� MADEBY B 4__ DATE /Z-71-36CHECKED 13Y -DATE -SHEET- OF z o.C, \_pCA�c:_.K> 0r k-k =r%-, ore\ ARQa va 'A r° AIN 1_' >I _ I 1 0 jj nn OA\ 5t:_09E ------- ­- -- )�P; e_\F( - Li _� ,Ai, -: 3Z�t eIT 4 W:' Jt-'V- Lismbo., , PL-AIQ QL ac _Zr _V" rci&'_k4 (t. >L t L POND OUTLET STRUCTURE 0—, C-f— E Q 0 et kv. L. R_ WiT A'-1 i�� A. A7 01 \OU OF c)(�_ -%0(p) ..Of 95—t V "Q.c_T.LJ. i2� �u It k F \0 5 C 4 _. S I/ Z- k ('10) 0 W a O J W J Q W F IL Q N O a: CC W Q W U C) r sUNA II � r , a f r^ 0 -, 1 13 Ay`o1rA ub..0 w — 0 n — — — — Z SIJ ,n V W Alro.de7 _ ur .,rs CE Z MNMS r — — — — — — — — — — J W rKn•n�w - _ CC N d .^c15 W n 1� tl) IIMrn„ — 1 — — — — if' lY (n IIM r� ry Ln \J IlMmll - i _ Q cr Lr 0 n runL uNr IyLd — — — — — — — — — — — um5 IMII wnL lain � Y — — — — — VICN.� n lur,tp ry 4 1 JI (1 V /� lu u- Q O Z Ln W } Q Q Z m J W v cr (L � c W F c NW } c n N_ W o rn Q t Z 9 � Q C L C) m 2� O Lo n CC U- LL 2 IY O rL J Q U a FORM 6 DESIGNGRITERIA A8 1 1 1 1 i 1 1 1. 1 1 1 1 1 1 CONCRETE PIPE OUTLET CONTROL 2000 4 BUREAU OF PUBLIC ROADS JAN. 1963 s/z� /ss *' Z77- ooZ 1.0 t 1, vc_, Max. Ll 4 S 6 6 10 HEAD FOR CONCRETE PIPE CULVERTS FLOWING FULL n = 0.012 FORM 16A A9 NORTH- POND VOLUME CHECK M>-1`c:,S 1).1 AGRFah1 l°IF..::T Fi(:3I) }:.- �I:EI"E.C•.1"1':EC!I�.1 CHARTER MEDICAL SUP --BASIN "A" COMMENTS: 100 YEAR STORM MAXIINIUM AL..L_OWAB'LE RELEASE (CFS) -- RATIONAL EQUATION: Q = C I A TIME OF t: ONCENTRAT I OPI = 4. 4? Z- Ffeoh GJrLf�.T- GoNTRoL. rb/v oca�AP�� 3, o4 '•SAP>-pAS.n+ .^." TIME CA I INFLOW! OUTFLOW! STORAGE tiro/I_,r) !ct_i ft) (cu -Ft) (cu ft) (ac ft) 5 1 . (41.6 9 44 2.32 1..-29 ] ii:'_;. ') 0. 071242 1 C) T - 7190C)C <:'.. a=CAB ii, 104Oil i ' ._.._ 1.:7 1.64:16 6.) G264.64 :';9£37 4 i7'.64 Ct. 111. 97C:; 20 1.. 64:1.6 5.2 1. 024_';. 58 ;":i.'; 16 4. ri :r'.' :° 84 0. 11. 1.21-&-# REQJ.REO Z-5 1.6416 4. 6 1175, ''i'. (".)4 66W5 46(32. 04 0. 107484 C) 1.. 6416 4. 1',5 1.'Y26''. 7t 797'4 4':?8E3. 7`.i '. tj, Ci9£34`S6 ' „=.. L.6q1.� r t :1 ^;(')99. 96 �:-'.) : �96. `r'6C3 t.! . i37166 4r=; 1.6416 ._ . t° a /(;9. 44 1 ()6 =f 2 7;157. 44 i) . C)7^484 45 1 ., 64 ].6 ='.. 1.440'5. 04 1 1.961 444. C>�1 C): Ci"iL 1C)7 50 1.6416 14774.4 13290 1494.4 0.034077 55 1 . 6.416 2. 8 1.5168.:];8 J.,l619 549. 7-rB4 0. ()12612 60 1.6416 2: 6 1 :'-z 65. 1-];7 1.:i':?49 -5f:i2. 624 -0. )1::.37 a . ,_ 416 1._ E?, 1 ,...3 _-, 1'36 >6 . / }.. .1 _6:.1 )0 3 1.. 64 16 1 . (r35 1 (:�.._ , 'a lll_?.:..:_ ._I........ 1 0t) 1.6416 1.7 16744.32 � 26590 i •-98v: 5. 68 -tl , 22'-25i79 1 J.C) 1.6416 a `•'-, 1.6793 56 1.2444.4 -0 2-8568 12C) 1.6416 1.45 J.7138. _ 0 31896 --1.47`.;7.6 -0, 3:3879 1 V� A S A vOi..11% E OC ' E /29 �8$ r'; C: i ' 7'. b02 A10 1 No Text