Loading...
HomeMy WebLinkAboutDrainage Reports - 07/21/2017Drainage Report for BeBee Christian School/Church 2103 Nancy Gray Avenue Fort Collins, CO 80525 City of Fort Coll' s Approved PINS Approved by, Date: 7 2 Prepared by. Mike Beach, P.E. Project #.16-026-001 Dated: May 4, 2017 RIDGETOP ENGINEERING & CONSULTING. 5255 Ronald Reagan Blvd, Suite 210 Johnstown, CO 80534 (303) 322-6480 EMAIL: mbeach@ridgetopeng.com Section 1. Project Engineer's Certification........................................................................................ 3 2. Project Location & Overview............................................................................................ 4 3. Drainage Design Criteria................................................................................................... 5 4. Hydraulic Calculations....................................................................................................... 6 5. Facility Design.................................................................................................................... 7 6. Conclusion.........................................................................................................................8 7. References.........................................................................................................................8 Appendix A -,,Site, Vicinity Map Appendix B — Flood Insurance Rate Map - Appendix-C.— NRCS Soils Map: -�A Appendix D — Hydrologic Criteria Fort Collins Rainfall Intensity Curve Fort Collins Rainfall Intensity Table Table RO-3 — Recommended Percentage Imperviousness Values Appendix E — Hydraulic Calculations Runoff Coefficients & Imperviousness Time of Concentration - SF-2 Rational Method Runoff Flows — SF-3 (2-Year Event) Rational Method Runoff Flows — SF-3 (10-Year Event) Rational Method Runoff Flows — SF-3 (100-Year Event) Detention Volume by Modified FAA Method Rain Garden Calculations (both Subbasins) LID Summary Drain Times Appendix F — Maps Drainage Plan/Subbasin Map Appendix G — References 2 1 P a g e Section 1: PROJECT ENGINEER'S CERTIFICATION I hereby attest that this Final Drainage Report for the design of stormwater management facilities for BeBee Christian School on 2103 Nancy Gray Ave. was prepared by me, or under my direct supervision, in accordance with the provisions of the City of Fort Collins Storm Drainage Design Criteria and Construction Standards for the responsible parties thereof. . R 45088 =E '•• .....: 0NA.l Mike Beach, P.E. Registered Professional Engineer State of Colorado No. 45088 3 1 P a g e Section 2: Project Location & Overview Location The sites address is 2103 Nancy Gray Avenue, Fort Collins, CO; which is described as a portion of Outlot A, Spring Creek Farms North, City.of Fort Collins, County of Larimer, State of Colorado. For Recording purposes: Part of the Southeast Quarter of Section 19, TP 7 N, R 68 W of the 6th PM. Located along the north side of Nancy Gray Ave. and east of South Timbe'rline,Road ih %ite is described as above and contains 3.326 acres of undeveloped vacant land `(See Appendix A — Site Vicinity Map) �� er 1 a: Existing Condition .. The existing site is covered by native vegetation and slopes predomiriate,l:towards-South Timberline Road at approximately 0.5% slope. Stormwater runoff collected into.,aAxisting stormwater detention pond along the eastern side of the site. Currently the detained water is released at 2.0 cfs via an existing outlet structure and conveyed via piping to "Storm 2" as delineated in previous storm reports. Storm 2 connects to Sidehill Filing 2 Storm system. The Sidehill report requires the outlet be contained to a 1.1 cfs release rate and it appears existing pond has not been updated since its original construction, therefore, as part of this project the pond is being redesigned to accommodate the slower release rate. Proposed Condition The intent of the development is to construct a new building of approximately 26,200 SF, asphalt concrete parking, curb and gutter, playground area containing grass and gravel material, and landscaping. It has been determined by the survey that the existing pond does not have sufficient detention capacity for this project. Existing pond size of 0.866 ac-ft is will be slightly regraded along the west side to increase overall pond volume to meet the minimum required. Floodplain FEMA Floodplain mapping in this neighborhood is located on map -panel 08069C1000F, Effective December 18, 2006, (Not Printed), however it appears the subject property is located in Zone X, which is outside the 100-year floodplain. Flood Insurance Rate Map not available for printing. Existing Soils The Natural Resource Conservation Service mapped the historic soils on the site as part of the Nunn clay loam. The Hydrologic Class is Type 'C' Soils. (Appendix C — NRCS Soils Map) 4 1 P a g e Section 3: Drainage Design Criteria Reference Manuals Storm drainage design criteria is defined in the City of Fort Collins "Storm Drainage Design Criteria and Construction Standards Manual (FCSDCM) and Amendments, which references to the "Urban Drainage and Flood Control District" (UDFCD) and the "Urban Storm Drainage Criteria Manual" (USDCM), Volumes 1, 2, and 3, dated 2008 with revisions (the Manual), are used and referenced in this report. Low Impact Development (LID) Requirements The proposed development is required to meet the City's current Land Use Code, which includes: - 50% of the newly added or modified impervious area must be treated by LID techniques and 25% of new paved areas must be pervious. - 75% of all newly added or modified impervious area must be treated by LID techniques. Four Step Process The City of Fort Collins has adopted the "Four Step Process" that is recommended in Volume 3 of the USDCM for selecting BMP's in urban redevelopment areas. The goal of this process is to minimize adverse impacts on receiving waters. The following describe how each step of the process are incorporated in the proposed development: Step 1 - Employ Runoff Reduction Practices By selecting a site that is undeveloped that currently does not have water quality treatment, the impacts of the proposed development will be less due to the addition of the water quality capture volume included. The project proposes to install a rain garden with underdrains to aid in conveyance and infiltration opportunities which will reduce the effects of the added impervious area from the development of the site. Step 2 - Water Quality Capture Volume (WQCV) In order to reduce the sediment load and other pollutants leaving the site, it is important to provide WQCV to minimize the downstream impacts. This project proposes to provide rain garden prior to the stormwater entering the detention pond, both located on the site. These facilities are sized to release at or below the historic runoff rates. Step 3 - Stabilize Drainageways Since this site is in close proximity to Poudre River it is important to take this Step into consideration. By providing stormwater detention and water quality and lowering the historic runoff and providing a metered outflow the project impacts to the drainageway are essentially reduced. The majority of the drainageway leaving the site is already stabilized. 5 1 P a g e Step 4 — Implement Site Specific and Other Source Control EIMP's The proposed project will contain the following BMP's: Rain Garden: All runoff from the project site will be directed into and through the proposed BMP facilities prior to leaving the site. Rain gardens utilize native plants that act as sponges to reduce the amount of stormwater runoff and absorb contaminants. Maintenance: In order for BMP's to remain effective proper maintenance needs are required. Scheduled visual inspections and routine repair after larger storm events are critical in the maintenance and effectiveness of the installed BMP's. The sites owner will be advised of these practices during installation in order to maximize the efficiency of the installed BMP's. Section 4: Hydraulic Calculations Criteria Runoff criteria for the proposed sites was analyzed for the 2-YR, 10-YR, and 100-YR storm events. The Rational Method is being used for the design of the proposed improvements. Rainfall Intensities used in the proposed design were determined as a function of the Time of Concertation for each subbasin. The values used were determined by the City of Fort Collins Rainfall Intensity/Duration/Frequency curve (Figure RA-16 and Table RA-7 (see Appendix D). Imperviousness Values from Table RO-11 (Fort Collins Amendment to the USDCM) were used in determining the sites imperviousness. The overall proposed site improvements and landscaping equate to a total onsite proposed Imperviousness of 46%, while the total basin reaching the pond is 53%. Time of Concentration & Runoff Coefficient The onsite area was separated into three (3) subbasins with slopes varying between 0.5% to 1.5%. The calculated Time of Concentration (Tc) for each subbasin are listed in Appendix E. See Basin Map in Appendix F for more information. WQCV The UD-BMP—v3.03 (UDFCD) spreadsheet was used to calculated the required Rain Garden water quality capture volume. See Appendix E for design information. Open Grated Nyloplast structures (or equivalent) tied to the detention pond will be installed one foot above the bottom of the Rain Gardens that will accept flows above the required WQCV. The existing detention pond design also included a volume allotted for the WQCV. Per the previous report by Stantec, a volume of 0.033 ac-ft is required for WQCV. This report calculates a required WQCV for a 40 hour release to be 0.046 ac-ft. This volume is accounted for within the regraded pond and the volume calculations. The previous pond design did not allow for an extended WQ drain time, so therefore a new orifice plate is being designed and included with 6 1 P a g e this project. The revised pond will outlet the WQCV over a 40-hour period as allowed by the Manual. Detention The existing detention pond is already constructed and was designed by Stantec with an allowable release rate of 1.1 cfs. The design was also discussed in the 'Interim Timberline Road Widening — Drake to Prospect" and "Spring Creek Farms North Filing No. 2". See existing report information in Appendix G. The detention facility Drain Time Spreadsheet and Stage Storage relationship spreadsheet have been calculated and is included within Appendix E of this report. The calculated drain time for 99% of the inflow volume of the pond with the proposed project and off -site area included is approximately 40 hours for the 100-year event. Section 5: Facility Design The proposed improvements will increase the amount of impervious area; however, measures have been included in the design to minimize the amount of stormwater released from the site. Per previous design reports, specifically the Spring Creek Farms North, the outlet structure is designed to release at 1.1 cfs. The existing water quality plate in the existing pond will need to be replaced to meet current requirements and drain times. The new plate is designed with multiple 3/8" diameter orifices to release the WQCV over 40 hours, and a single 4-1/4" diameter orifice above the WQCV to release the 100-year event at 1.1 cfs. WQCV Orifice design per Figure EDB-3, Figure 5, and Figure 4 (all from the UDFCD); see Appendix E for Figures. Per our report, the predeveloped 2-year event release rate is 2.44 cfs per for the entire 3.32-acre site (see Appendix E for historic calcs). The runoff will sheet flow until a concentrated point and then be conveyed via trickle channel or gutters and then deposited into the water quality device and/or detention pond. The regraded detention pond will have 1.0-ft of freeboard. The site was broken into three developed subbasins for water quality purposes; Subbasin 1.0 (0.856 acres), Subbasin 2.0 (1.859 acres), and Subbasin Pond (0.608 acres). OS-7 and PS-1 (as described below) was also modeled and included in the detention calculations. See Appendix E for breakdown of the different area types for each subbasin and Appendix F for the Subbasin Map. Subbasin 1.0 - contains half of the proposed building and the parking and paved areas south of the building. The runoff will be conveyed to the east side of the building and outlet into a proposed rain garden. The rain garden will outlet to the modified detention pond. Subbasin 2.0 - contains half of the building, the parking and paved areas to the west of the building, and the playground area. All areas drain to the north and east. Water Quality for this subbasin will be provided via a rain garden. The rain garden will outlet to the modified detention pond. 7 1 P a g e Pond Basin - is that area within the existing Drainage Easement on the east side of the site. The existing detention pond was already sized for a release of 1.1 cfs, however current regulations require slight modifications to the steel orifice plate to meet drain times. Currently it has one 3.5" diameter orifice plate that will be replaced with a new plate containing a single 4-1/4" diameter orifice above the WQCV to release the 100-year event at 1.1 cfs. The existing pond was modeled with the proposed project and the 100-year WSEL's is indicated on the Drainage Plan in Appendix F and minor grading efforts will be required to obtain the required volume. OS-7-This off -site basin is the area of Nancy Gray and a portion of Timberline that drain to the existing detention pond. Full design calculations are included in order to determine the required detention volume is being provided within the existing pond. PS-1 -This off -site basin is the northeast portion of the Police Services site that drains to the existing type R in Nancy Gray that is conveyed to the existing detention pond on -site. Since there is only one detention pond modeled with this report we have provided a summary of the proposed design below. See supporting calculations within the Appendix of this report. Area 2-year Flow (cfs) 10-Year Flow (cfs) 100-Year Flow (cfs) WQCV (ac-ft) WQCV Req'd 100-Year Vol. (ac-ft) Detention Re 'd (ac-ft) Tot. Volume Provided (ac-ft) Release Rate (cfs) (ac) Sub 1.0 0.86 1.33 2.32 6.21 0.013 - - - - - Sub 2.0 1.86 2.19 3.73 10.20 0.028 - Pond 0.61 0.17 0.29 0.74 - - OS-7 1.24 1.81 3.85 11.07 PS-1 0.88 1.19 2.05 5.79 Total Site 3.32 3.28 5.63 14.48 Total Untreated 2.73 3.15 5.37 14.58 0.046 0.046 Total Basin 1 5.44 5.77 1 10.02 25.62 1.166 1 1.031 1 1.212 1.1 Section 6: Conclusions All computations that have been reviewed or completed within this report are in compliance with the City of Fort Collins Storm Drainage Design Criteria and Construction Standards manual and the Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volumes 1 &2. The proposed drainage concepts presented in this report and on the construction plans adequately provide for stormwater detention and water quality treatment of impervious areas by releasing the 100-Year storm event at the required allowable release rate of 1.1 cfs, which is less than the Predeveloped 2-Year runoff rates. The Water Quality design will benefit the site by reducing the initial discharge from the site and removal of any sediments or other pollutants generated by the developed site. As well, with the modified steel outlet plate, water quality is now being provided for the offsite basins that drain to the existing pond. 8 1 P a g e Section 7: References • The Natural Resource Conservation Service Soil Survey for Larimer County and the WSS website. • FEMA FIRM map -panel 08069C1000F Effective 12/18/2006. — Not Printed. • "City of Fort Collins Stormwater Criteria Manual" dated December 2011 • Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual (UDFCD), Volumes 1, 2, and 3, dated 2008 with revisions (the Manual). • Drainage Report: Police Services Building • Drainage Report —Spring Creek Farms North • Drainage Report —Timberline Road Widening • Drainage Report—Sidehill Filing 2—Stormwater Pipe Reduction 9 1 P a g e Appendix A Site Vicinity Map m SITE LOCATION NANCY GRAY AVE. CHARLES BROCKMAN 0 Z w J Z J Q J � _ W m a w O � E. DRAKE RD. 0 VICINITY MAP Appendix B Flood Insurance Rate Map (Not available to Print) Appendix C NRCS Soils Map go 00 N N „' O a0 m O O N 00 C M N N C ` N O — C O L j m O� ci L U U p i QI 3 U cu yNN > UN m mO NC Cm w O C C1 O1 a y y 7 m >. O m n 2 fp U do N N O y E (�'i y w E cmi N S �, E O. 7 0 ` 7 m .= L p y N — U G1 Z n cmU 0 y o c �n 7 dv a n o m E M n m N w O` N y .O m m fa m N y L N 00 w y (n N O E cd cO D y > T c C C y 7 U E Q L L ..: a`r V E m m a1 y N° ((� H 2 a a Z U N o U 73 E y rn E 0 n c a m o o t/ 0 m y v L o C y E m O y ui y C m 7 7 O N N �' N " m Qm m n L m E N 'O D m n L N N Q n n C y N N L y C m O N Q O0 o m a� E o c ami o `O £ c m w m o Cl y a>i cu v D o y 0 o y 3 a °1 `1 o c ami E o U o n L E c E Z a o L 0 a� 2 v o v _ c y a m C C O y N 2 r L 7 o U p cd G1 41 O m O' y L N T a O >,� C C l0 L N (n y N L y O y m d E c a o�r U —2on o aD Ea1 a OL Q U m L �y 7 J (n y n C U m y J N 3 L D m m v p C ._ a y y c t0 E CL m O N> L Z . Q U m N— m N O N O cp dc n o, E m v E 41 n M m V) aci m v m ".0 v o-oty �w C, 5, w mmo rnM �m m E oam0 01 - c�7 0cc m2(n � a o -a Q� m rca� 7 (n N y U >' E (n 61 E - m 7 C 7 C 6T1 7 Q) O- m N -C b Oi E d N R G1 0— @ _O O N a -0 2 Q n m L 'D 7 Yl C m'OC N` VOi N U y U C N J n 41 7 0 E p' y n 0 o' d `°7�-" `°m ono nm=°'� ti> �2 -m ° a ESE FL- wEnvo, dE (n U a-yoQcm) �Z U)(n ino Omni tr-UE`o T d 2 7 O 61 � 2 a1 7 > m � o a N a E ^ n >y O A C 10 t O U L C c p a H o O a 4 m v O o t Z o E o a A N y Ir O 9 N O N C ep O N � V C) C) InZ : UO w S Q 3 R C cm LLJ m 7 AG 1 U A 3 r m W J v d d n m s 0 C o 0 mv a° o 0 0 ° Q Of 2 a m co U U U Z pc Q a m m U O U Z pc Q a m m m I C C d - Il II�111 nI - 1( 1( 1( `(] V Q n O y O v � m — 2 M V) j y C m O Z U i Hydrologic Soil Group—Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit— Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 73 Nunn clay loam, 0 to 1 percent slopes C 4.3 97.1 % 74 Nunn day loam, 1 to 3 percent slopes C 0.1 2.9% Totals for Area of Interest 4.4 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition USDA Natural Resources Web Soil Survey 7/7/2016 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Larimer County Area, Colorado Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 7/7/2016 a" Conservation Service National Cooperative Soil Survey Page 4 of 4 Appendix D Hydrologic Criteria 10.00 9.00 8.00 ° 7.00 E m m L S 6.00 C a 5.00 z w z z 4.00 J J Q LL z 3.00 2.00 1.00 0.00 4- 0.00 RAINFALL INTENSITY -DURATION -FREQUENCY CURVE 10.00 20.00 30.00 40.00 50.00 STORM DURATION (minutes) —2-Year Storm - - - 10-Year Storm —100-Near Stonn Figure RA-16 City of Fort Collins Rainfall Intensity -Duration -Frequency Curves s 60.00 4.0 Intensity -Duration -Frequency Curves for Rational Method: The one -hour rainfall Intensity -Duration -Frequency tables for use the Rational Method of runoff analysis are provided in Table RA-7 and in Table RA-8. Table RA-7 -- City of Fort Collins Rainfall Intensity -Duration -Frequency Table for Use with the Rational Method (5 minutes to 30 minutes) Duration (min) 5 2-Year Intensity (in/hr) 2.85 10-Year Intensity (in/hr) 4.87 100-Year Intensity (in/hr) 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.8 8 2.4 4.1 8.38 9 2.3 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.5 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.3 17 1.75 2.99 6.1 18 1.7 2.9 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.6 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.2 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.4 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.6 30 1.3 2.21 4.52 Table RO-11 Rational Method Runoff Coefficients for Composite Analysis Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: Asphalt 0.95 Concrete 0.95 Gravel 0.5 Roofs 0.95 Recycled Asphalt 0.8 Lawns, Sandy Soil: Flat <2% 0.1 Average 2 to 7% 0.15 Steep >7% 0.2 Lawns, Heavy Soil: Flat <2% 0.2 Average 2 to 7% 0.25 Steep >7% 0.35 Appendix E Hydraulic Calculations � a§m,�■em� (A CL _�........ ®2C/ (Pm § _ IL ad £ 1au--Mu@2 a$ �)£�adk(ƒ �lQo, p 0 0 w /U) _ §�§ }} -�E 66 0! ) CL k )-) .2 u t;R7S 20MM ..a CL U. )ke$° « a. § 0M )`M-M . ui !/22X. \ M! LU 0 D 7 �`; ® ou0 \ �\) m��§? }\/)k E Bc C|\$). .6 z 7Go;: ! k k78 ) WL) W K O O N 00 N O W Z H NO LL LL' Cn Z O w y LL U 0 �Oo Q U m ZLL QO W U2 H ry I I LU C7 M m LL U LL a O t Cl) C) 7 O Q W N C U) C '� p W U m U � H � E d u O y w � o ^ w m N + °� N V O II N W F- II II . «. *: > Location: BeBee Calculated By: RSB Date: 10128/2016 Cf = 1.00 RATIONAL METHOD PEAK RUNOOF Event: 2-Year Historic Flow Rate SUB -BASIN DATA Direct Runoff Q = Cf*C•i•A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor I = Rainfall Intensity (in/hr) from COFC IDF Curve (I = 24.221 / (10+tc)A0.7968 A = Drainage Area (ac) e J C ao a oa0 D c 0O� c W « r O O a N �� a y � W 0 a d E m o n Nc O r D d UIL o U D a b N A y m W C d J 10 U � m C a E J o �U 0 0 0 0 a 0 0 0 W3i a U. �M 0 0 M M M N d'W D L M Q M Q N M 00 N m O r N 0 cO a WxQ Jf O M O NYml M N N y:Q g fr d` n o 0 0 0 0 0 0 0 U' � Q Q V N A A O q N A M O. OAi Q Q Y' • m r N O) m Q Q N O O O N � Q N � tO N � 0 0 W M W N uQi 101 N F �. W, N O OOmD M? r W .R cG OD O— fd O N O M ui N o m `•� N O NN Om W mQ� a oa t90 c F a N LL m O LL ❑ Q Z Q r m M W _O F ❑ F- z Z w U Z m O m LL O w H z O N m m } � m (n ❑ W g U J U ca 0 ro N � N 11 LU U) Y K LU W J Z C N � C u) m0 0f n .3 � � eD M u) h LL 0 (n + z a c fh O O O (O o (D (() (O Fn M O N Q Y m li U ❑ 8 W W = N H U z O Q z N (O (O (O (D 0 0 0 O "'y m !L' W LL J co N m (O u'! (D I GO (O O no n r V 7 F v O a N � ITu) r) � ( n 0 `Y " PD � u) f� V1 O r- O) U c p rn v ci rn v, m l v (v (n (D(o n of iCL c7 N O eo C O W 0)(O LL N N N C LO u) (O (D (D (D (O (D w g c o 0 0 0 0 0 0 0 m 0 0 0 0 0 0 0 0 J w "' W a Qv o (n (n (n N u� �n K � O O O O O F � O O O O O O o 0 z LL n N? u) (D C W V J ❑ _ c N (7 N (D N m z u) (+) er u) c;O (O g O w j w D o C. 0 0 0 0 0 0 0 O 2 J N N N IT N N M QF (n z Z LL R M v) � C^ CD co Ln J O N (D -W 0o a' Q M Q co O— co (D O N co O M c') V u7 1- N Z Q O, � m Q U N (ND u) (n u) (O IN m❑ 0 0 0 0 0 0 0 0 U : c Ci o o c 0 y p m W N Q LL m ❑ a H a 0 O N c J O mL U c0 U U q C14 d u0 z� d + Ud « d N II II N LL N O LL O Q p Q F- tn Z O 9 ♦- Z w U Z O U LL O w H d n w U Y W w J Q c (0 M O O M M Z (D N 10 (0 (0 M aD LL 0 Z m C CV) CD0 0) (D CD (D M (D C M O N M 4 N Q Y m 17 U p W w 2 N F U Z Q 'y m Z W LL N (0 10 (0 O O O 10 O O c- a0 M (0 (0 (D C a0 � (D co - r� � 7 H H a lD M M R O N O M �� O to N LO (n (n m U C p W a T7 M (- V M `T N O N M O (D I� M -J V% M (0 N O GO V V O W a Q � LL N N N O � to to co (D to to w (D W C c Oo 0 0 0 o O O O H m 0 (D (D 0 00 0 0 w ' v W a 0 N L Oc 0 0 0 O O F � 2 CD CD O CD O O O O Z LL^ N R R (O co C W J C U0 C� N r- M T7 (D O O M c, M N 00 h W a o o 0 0 0 0 0 0 0 p N N N� N N Cl) Z N W v~ w z LL C A M (0 Or O O O Or O <OD Q J F Z_ U ao v w N co IT O IT r 01 co (O I� O U o 0 0 6 0 6 0 0 Q W O cD V O N C M M Q Q W O O � O O N aO O M N N Z Q Q F N QI O v Cl) (D N ao Q U C].44 (D (n n (D (n (D (D op p O o 0 0 0 0 0 0 m a? c Ci r o o c ch o CO w (i a° o a m m w p - O a (? N rn LL U LL d 17 L 3 c 0 P') M O IM cr W C J m C m (Ui U c �O W U V m N N ' E 06 o dw +co II O 0 N � II II Location: BeBee RATIONAL METHOD PEAK RUNOOF Calculated By: MRB Event: 2-Year Date: 3/14/2017 Cf = 1.00 SUB -BASIN DATA Direct Runoff Comments DESIG: C AREA Ac C*Cf tc min i (in/hr) Q (cfs) 1.0 0.62 0.86 0.62 8.2 2.50 1.33 2.0 0.59 1.86 0.59 13.0 2.00 2.19 Pond 0.10 0.61 0.10 5.4 2.80 0.17 OS-7 0.74 1.24 0.74 7.5 1.98 1.81 PS-1 0.53 0.88 0.53 6.3 2.55 1.19 Total OnSite 0.51 3.32 0.51 13.6 1.94 3.28 Total Basin 0.56 5.44 0.56 14.3 1.90 5.77 and Ext. WQ 0.52 2.73 0.52 9.7 2.24 3.15 Q = Cf C*i*A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor I = Rainfall Intensity (in/hr) from COFC IDF Curve (I = 24.221 / (10+tc)^0.7968 A = Drainage Area (ac) Location: BeBee RATIONAL METHOD PEAK RUNOOF Calculated By: MRB Event: 10-Year Date: 3/1412017 Cf = 1.00 SUB -BASIN DATA Direct Runoff Comments DESIG: C AREA Ac C'Cf tc min i (in/hr) Q (cfs) 1.0 0.62 0.86 0.62 8.2 4.35 2.32 2.0 0.59 1.86 0.59 13.0 3.40 3.73 Pond 0.10 0.61 0.10 5.4 4.75 0.29 OS-7 0.74 1.24 0.74 7.5 4.21 3.85 PS-1 0.53 0.88 0.53 6.3 4.40 2.05 Total OnSite 0.51 3.32 0.51 13.6 3.33 5.63 Total Basin 0.56 5.44 0.56 14.3 3.30 10.02 and Ext. WQ 0.52 2.73 0.52 9.7 3.82 5.37 Q=CfC'i'A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor i = Rainfall Intensity (in/hr) from COFC IDF Curve (i = 84.682 / (10+tc)^0.7976 A = Drainage Area (ac) Location: BeBee RATIONAL METHOD PEAK RUNOOF Calculated By: MRB Event: 100-Year Date: 3/14/2017 Cf = 1.25 SUB -BASIN DATA Direct Runoff Comments DESIG: C AREA Ac C*Cf tc min i (in/hr) Q (cfs) 1.0 0.62 0.86 0.78 6.5 9.30 6.21 2.0 0.59 1.86 0.74 12.3 7.44 10.20 Pond 0.10 0.61 0.12 5.3 9.75 0.74 OS-7 0.74 1.24 0.92 5.4 9.69 11.07 PS-1 0.53 0.88 0.66 5.0 9.95 5.79 Total OnSite 0.51 3.32 0.64 13.6 6.85 14.48 Total Basin 0.56 5.44 0.70 14.3 6.75 25.62 and Ext. WQ 0.52 2.73 0.64 8.3 8.30 14.58 Q = Cf C*i*A Q = Peak Discharge (cfs) C = Runoff Coefficient Cf = Frequency Adjustment Factor i = Rainfall Intensity (in/hr) from COFC IDF Curve (i = 84.682 / (10+tc)^0.7975 A = Drainage Area (ac) Equations: LOCATION: CALCULATED BY: PROJECT NUMBER: DATE: BASIN: QD = CiA V; = T*CiA = T*QD Vo =m*QPo*(60*T) S=V; -Va Rainfall intensity from COFC RA-16 IDF Curve DETENTION VOLUME CALCULATIONS RATIONAL VOLUMETRIC (FAA) METHOD BeBee Christian School MRB 16-026-001 5/1/2017 Total Basin (Basins 1, 2, Pond, OS-7, and PS-1) A trib. To pond = 5.440 Cioo = 0.70 Developed C*A = 3.81 QPo = 1.100 tc = 14.3 acre (C*Cf) acre cfs min Storm Duration, T (min) Rainfall Intensity, i (in/hr) QD (cfs) Vol. In V; (ft3) Outflow Adjustment Factor, m Vol. Out V. W) Storage S (ft3) Storage S (ac-ft) 5 9.95 37.9 11367 1.00 330 11037 0.253 10 7.72 29.4 17639 1.00 660 16979 0.390 20 5.60 21.3 25590 0.86 1135 1 24455 0.561 30 4.52 17.2 30982 0.74 1465 29517 0.678 40 3.74 14.2 34181 0.68 1795 32385 0.743 50 3.23 12.3 36900 0.64 2112 34788 0.799 60 2.86 10.9 39207 0.62 2455 36752 0.844 70 2.62 10.0 41903 0.60 2772 39131 0.898 80 2.38 9.1 43503 0.59 3115 40387 0.927 90 2.22 8.5 45650 0.58 3445 42205 0.969 100 2.05 7.8 46838 0.57 3762 43076 0.989 110 1.93 7.3 48506 0.57 4138 44368 1.019 120 1.80 6.9 49352 0.56 4435 44916 1.031 130 1.60 6.1 47524 0.56 4805 42719 0.981 140 1.40 5.3 44782 0.55 5082 39700 0.911 150 1.20 4.6 41126 0.55 5445 35681 0.819 160 1.15 4.4 42040 0.54 5702 36338 0.834 170 1.10 4.2 42726 0.54 6059 36667 0.842 180 1.05 4.0 43183 1 0.54 6415 36768 0.844 Required Storage Volume: 44916 ft3 1.031 acre-ft Design Procedure Form: Rain Garden (RG) Sheet 1 of 2 Designer: Company: Date: Project: MRB Location: Basin 1 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area,1, 1.= 58.0 % (100% if all paved and roofed areas upstream of rain garden) B)Tributary Area's. Imperviousness Ratio (1=Id100) i= 0.580 C) Water Quality Capture Volume(WQCV)fora 12-1hour Drain Time WQCV= 0.18 watershed inches (WQCV- 0.8 •10.91- It_ 1.19 • la+ 0.78' II D) Contributing Watershed Area (including rein garden arse) Area = 37,297 sq h E) Water Quality Capture Volume (WQCV) Design Volume Vwacv= cu it Vol = (WQCV / 12) `Area F) For Watersheds Outside of the Denver Region, Depth of it, = 0.43 in Average Runoff Producing Storm GI For Watersheds Outside of the Denver Region, Vwocvowee = 57048 on it Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vwocvusee= suit (Only If a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch mapmum) Dwacv= 12 In B) Rain Garden Side Slopes (Z = 4 min., honz. dist per unit vertical) Z = 4.00 8 / 8 (Use "0' 8 rain garden has vertical wails) C) Mlmimum Flat Surface Area Are., - 311 so it D) Actual Flat Surface Area A,. Y = 38D soft E) Area at Design Depth (Top Surface Area) ATw = 764 so 8 F) Rain Garden Total Volume Vr= 572 cu it (VT= ((AT, +A,) / 2) - Depth) 3. Growing Media Choose One a 18" Rain Ganlen Growing Media O Other (Explain): 4. Undemrain System A) Are underdrains provided? Choose One 0 TF5 ONO B) Underdren system office diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y= 0.0 it Volume to the Center of me Orifice il) Volume to Drain in 12 Hours Vohs= 406 cu it ) Orifice Diameter. 3/8' Minimum Dn = 1.38 in UO-BMP v3.03 Basin 1, RG 10/2812016, 9:25 AM Design Procedure Form: Rain Garden (RG) Sheet2 oft Designer: MRS Company: Rldgetop Engineering Date: October 28, 2016 Project: Beads Christian School Location: Basin 1 5, Impermeable Geomembrane Liner and Geotextile Separator Fabric Choose One Q YES A) Is an Impermeable liner provided due to proximity ® NO of structures or groundwater contamination? 6. Inlet / Outlet Control Choose one ® Sheet Flow No Energy Dissipation Rer{ulrN A) Inlet Control O Concentrated Flow -Energy Disslpntlon provitletl One ?. Vegetation O Seed (Plan for frequent weed control) [Choose Q Plantings Q Sand Grown or Other High Infiltration Sod 8. Irrigation Choose One Oy5 A) Will the rain garden be irrigated? Q No Notes: U0.BMP_v3.03 Basin 1, RG 10128/2016, 9:25 AM i Design Procedure Form: Rain Garden )RG) II Designer: Company: Oat.: Project: Location: MRS R1dg.top Engineering October 28. 2016 BaBee Christian School 1. Basin Storage Volume A) EffeclNre Imperviousness of Tributary Area, I, 1„ = 56.0 v (100% 0 all paved and roofed areas upstream of rain garden) B) TdbNary Area's Imperviousness Ralio(I=1./100) - 0.560 C) Water Duality Capture Volume (WQCV) for a 12-how Drain Time WQCV = 0.18 wafcrshed inrhes (WQCV= 0.8' (0.91' 1'-1.19 - Is � 0.78' 1) D) Contributing Watershed Area (including rein garden area) Area = 80,978 sq h E) Water Duality Capture Volume (WQCV) Design Volume Vwocv= on 0 Vol = WQCV 112) - Area F) For Watersheds ONSItle of the Denver Region. Depth of do = DA3 In Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VwacvoTaea = 1.,208.2eu ft Water Quality Capture Volume WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vwacvusea = cu it (Only ge different WQCV Design Volume Is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) Dwacv = 12 In B) Rain Garden Side Slopes (Z = 4 min., horiz. that per unit vertical Z = 4.00 ff / ff (Use "0' 8 rain garden has vertical wags) C) Mlmenun Flat Surface Area A. = 804 >w ff D) Actual Flat Surface Area A� = 915 sq ff E) Area at Design Depth (Top Surface Area) A, = 1510 so, ff F) Rain Garden Total Volume VT= 1.213 ou ff (VT= ((AT, - A.m.d 12) ' Depth) 3. Graving Media rnOOH0"! 0 16' pain Garden G oving. Media Q Otte (Explain): 4. Underdrein System A) Are underdralns provided? Ir Cheese One L C) R0 8) Undardraln system orifice diameter for 12 hour drain time 1) Distance From Lo sest Elevation of the Storage y= 0.o it Volume to the Center of the Orifice Ill Volume to Drain In 12 Hours Volga= 1,206 on it ill) Orifice Diameter. 3/8" Minimum Co = 2.37 in UD-BMP y3.03 Basin 2, RG 10/28/2016. 11 35 AM Design Procedure Form: Rain Garden (RG) Sued 2 of 2 Designer: MRB Company: Rldgetop Engineering Date: October 26, 2016 Project: B.S.. Christian School Location: Basin 2 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric Choose One Q YE A) Is an impermeable liner prodded due to proximity Q ND of structures or grounAnter Contamination 6. In at I Outlet Control r Choose One I (5 Sheet Flow- No Energy Dissipation acquired A) Inlet Control I Q Concentrated Flow -Energy Dlsslpatlon enraged Choose Once 7. Vegetation Q sees! (Plan for frequent weed mntml) Q plantings Q Santl Grown or Other High Infiltration Sod B. Irtigation Choose One Q YE Al Will the rain garden be Imlg3ted9 Q NO Notes: UD-BMIsv3.03 Basin 2. RG 10/28/2016, 11:35 AM STRUCTURAL BEST MANAGEMENT PRACTICES DRAINAGE CRITERIA MANUAL (V. 3) i 0.60 m , 0.40 E 0 0.2C r 0 0 O 0.10 I 0.06 0.046 ac-ft 0.04 0.02 0.01 0.02 EXAMPLE: DWO=4.5 it WOCV = 2.1 acre-feet SOLUTION: Required Area per Row = 1.75 in? EOUATION. wocv a K 40 in which, K40=0.013Dwo +0.22DwO -010 01 s � tirl OeQr JF I I I 0.04 0.06 0.10 0.20 0.40 0.60 1.0 2.0 4.0 6.0 0.13in^2 Required Area per Row,a (in.2 ) Figure EDB-3-Water Quality Outlet Sizing: Extended Detention Basin (Dry) With 40-hour Drain Time for Capture Volume S-62 Rev.612002 Urban Drainage and Flood Control District DRAINAGE CRITERIA MANUAL (V. 3) STRUCTURAL BMP DETAILS I 3/8" dia. holes at 4" separation i b.•� lbt I lt; I e[I _ l r, ra 1/'i :0 ^ VW., f/H < Lqp F. <' _ S 1 • 59 II/ c 'I 4 ) f 4 4 Figure 5—WOCV Outlets Orifice Perforation Sizing. Rev. 12/2812004 SD-7 Urban Drainage and Flood Control Distnct PPOICU: /�PLaGC .j/ckGo//L/i urc� OESCPIPTION: Pe. L,46>rc1> ia, 5 -/y. a 5 = /. 33 c rS (�$ is - ao (� ,.s- = x < 65 3.o )- a' x (-).f ,.s _ .2./oZ% cPs 30 = U.�ygcFS 1 oia I "F I a c,) oo-t.r l,J eTr I a I T (a) D. P4(8 = 3. 317 > l 3 3 UFS c cre r i 5 S u��ie�t � GATE. �a - �(-�6 PROJECT: ZjPGCK ti BY: V DESCRIPTION: wee (.-4(3 67 a C), = a . I a C-�-S 6t /a— a4D ,.s CPS E8 0-a f� = 43 J�acw x Z }}�.s x 4s' O.�yB cps rtp4al F/oW over a S cle= i9n,ea D LID Table 100% On -Site Treatment by LID Requried New Impervious Area 69,460 sq. ft. Required Minimum Impervious Area to be Treated 69,460 sq, ft. Area Treated by Rain Garden (Basin 1) 22,793 sq. ft. Area Treated by Rain Garden (Basin 2) 46,667 sq. ft. Run-on Area 0 sq. ft. Impervious Area by LID Treatment 69,460 sq. ft. Actual % On -Site Treated by LID 100% 0% Porus Pavement Requried New Pavement Area 0 sq. ft. Required Minimum Area of Porus Pavement 0 sq. ft. Porus Pavement Area 0 sq. ft. Run-on Area (up to 3:1 allowed) 0 sq. ft. Total Porus Pavement Area 0 sq. ft. Actual % of Porus Pavement Provided #DIV10! Stormwater Detention and Infiltration Design Data Sheet Lot 18 - Pond 1 Stormwater Facility Name: Facility location &Jurisdiction: 2590 Midpoint Dr, Fort Collins User (Input) Watershed Characteristics Watershed Slope = 0.020 ft/ft Watershed Length -to -Width Ratio= 2.00 LW Watershed Area= 5.44 acres Watershed Imperviousness = 52.0% percent Percentage Hydrologic Soil Group A = 0.0% percent Percentage Hydrologic Soil Group B = 0.0% percent Percentage Hydrologic Soil Groups C/D = 100.0% percent User Input: Detention Basin Characteristics WQCV Design Drain Time = 40.00 hours After completing and printing this worksheet to a pdf, go to: hnps;/Zmapenure.digitaidatasemices.com/vh/?viewer=cswdif. create a new stormwater facility, and attach the pdf of this worksheet to that record. Design Storm Return Period - Two -Hour Rainfall Depth - Calculated Runoff Volume OPTIONAL Override Runoff Volume Inflow Hydrograph Volume Time to Drain 97% of Inflow Volume: Time to Drain 99%of Inflow Volume Maximum Podding Depth Maximum Podded Area Maximum Volume Stored: User Defined Stage lei User Defined Area(ft-21 User Defined Stage lftl User Defined Discharge Icfsl 0.00 1 0.00 0.01 0.60 40 0.60 0.01 1.60 2,990 1.60 0.01 2.60 6,291 2.60 1.10 3.60 8,052 3.60 1.10 4.60 9,922 4.60 1.10 5.60 11,913 5.60 1.10 6.60 14,033 6.60 1.10 7.10 15,142 7.10 1.10 7.60 16,283 7.60 1.10 Routed Hvdrneranh Results WQCV 2Year 5Year 30 Year 25 Year 50 Year 100 Year 0.53 0,98 1.36 1.71 2.31 2.91 3.67 OD95 0.219 0.373 0.518 0.791 1.043 1.393 0.094 0.218 0.372 0.528 0.791 1.043 1.392 38 35 32 29 23 18 17 40 40 40 40 40 40 40 1,99 2.62 3.41 4.09 5.19 6.05 7.11 0.098 0.145 0.177 0.206 0.254 0.295 0.348 0.067 0. 144 1 0.271 0,402 0.654 0,890 1.230 in acre-ft acre-ft acre-ft hours hours ft acres acre-ft Drain times Pond 1, Design Data 5/1/2017, 9:55 AM LStormwater Detention and Infiltration Design Data Sheet 35 100YR IN — 100YR OUT 30 25 10 5 0 0.1 8 —100YR 6 �5 z a c zq C z 0 a 3 2 1 0 0.1 0 1 TIME [hr) 10 1 30 100 DRAIN TIME [hr] Drain times Pond 1, Design Data 5/1/2017, 9:55 AM Location: Calculated By: Date: CLG`8 100-Year WSEL = PROPOSED DETENTION POND - STAGEISTORAGE Pond: 1.0 Babes - Proposed WQ 8 Detention Pond MRB 5/1/2017 V = 1/3 d (A+ B+sgrt(A•B)) V = Volume between Contours, ftA2 d = Depth between Contours, ft A = Surface Area of Contour, ftA2 Stage (ft) Surface Area (ftA2) Incremental Storage ac-ft Total Storage ac-ft Detention Storage (ac- ft 4936.4 0 4937 40 0.000 0.000 4938 2990 0.026 0.026 4938.27 3521 0.020 0.046 0.000 4939 6291 0.081 0.127 1 0.081 4940 8052 0.164 0.291 0.245 4941 9922 0.206 0.497 0.451 4942 11913 0.250 0.748 0.702 4943 14033 0.297 1.045 0.999 4943.5 15142 0.267 1.213 1.166 4944 16283 0,180 1.393 1.347 4944.5 17448 0.194 1.586 1.540 Required Detention Volume = 1.031 See "Detention Volume Calculations" this report Provided Detention = 1.166 Required WQCV = 0.046Per "StantecReport" WQ=0.033,Per calcsthis Provided WQCV = 0.046 report WQCV = 0.046 Total Required Volume = 1.077 Total Volume Provided = 1.212 Orifice Calculations (Detention) BeBee School/Church 5/1/2017 A = Area of Orifice (ftA2) Q = orifice flow rate (cfs) H = effective head on each orifice opening (ft) C = Discharge Coefficient (0.60 for square edges) g = Gravitational acceleration constant (32.2 ft/secA2) Q = CA(2gH)A0.5 A = Q/(C(2gH)A0.5 100 - Year Detention Orifice Q (cfs) = 1.100 H (ft) = 5.24 Eq 12-19 UDFCD (Total Pond height minus WQ depth) Total Area (sq-in) Diameter (in) Standard Size Dia. (in) A = 1.1/(0.6((2*32.2*5.24)A0.5)) 14.37 4.28 4-1/4" Orifice Diam. = 2*(A/3.14)A0.5 Match existing IE ,. Appendix F Maps 151Page T ---- "- I _J J DURET 12 X12' OPEN GRATED ' NYLOPLASi AREA DRNN'DR EQUIVALENT) OUffALL - OS' DEEP. ELEVATED 1 FT ABOVE ROAD BOTTOM ! 5' WIDE 0 1% ' PIPE 07.2R ' /{ �1,dCA,� I PERFORATED PIPE I� L{jL�Ni �ILi ]II 'I ih II -I li ILL i( 10` II ADS 261 LF 6• ill xll 111 II��I JJII :I. PIPE 00.5R - III Ill III I l Il.:f lr W. lt. �, III I II •.l '•SCHOOUCHURCH ±26.200 SF RAIN GARDEN 2 NOL. REWIRED: 1,206.2 CP • I'I' J FFE: 49450 VOL. PROVIDED: 1.213.0 OF BOTTOM I EL 4944.0 TOP El: 4945.0 ) I SEE DEEM MS SHEET 1 PI ROOF GRAIN SEE BASIN 1 OUTFALL - 0.5• DEEP III ARCH PLANS s 2' WIDE 0 IR (..- FOR DETAILS 0.856 AC '', RAIN GARDEN 1 ' III 1 VOL REWIRED: 570.8 OF _ I 267 LF fi• ADS `NL. M04ED: 572.0 OF PIPE 0 0.5R BOTTOM EL: 4944,0 111/ I TOP EL: 49450 III - SEE GETAI MIS SHEET 1 P - )•II I .. I_... CLEANO7 .. lI I I N n I I I 4»2- I __ _ jJI _ ___ __ .. ......... ..... ...., F Y I OUTLET - 12'X12- f PERFORATED OPEN GRATED PIPE NY.OPLAST AREA DRINK (OR IP EQUIVALENT) ELEVATED'I-FT j ABOVE POND BOT10M POLICE STATION BASIN 0.88 AC PER REPORT RILED 'FINAL DRAINAGE AND EROSION CONTROL REPORT FOR THE CITY O FORT COLONS NEW POLICE SERVICES BUILDING DATED FEBRUARY 23, 2006. BIORETENTION SAND MEDIA SPECIFICATIONOTY OF FORT MONS PART I - GENERAL A SIORETENTION SAND MEDIA (BSM) SHALL BE UNIFORMLY MIXED, UNCOMPACTED. FREE ET STONES, 5. TOPSOIL SHALL HAVE A PH RANGE OF 5S TO 7.5 AND MOISTURE CONTENT BETWEEN 25-55R STUMPS. ROOTS, OR OTHER SIMILAR OBJECTS LARGER MAN TWO INCHES, NO OTHER MATERIALS 6. CONTRACTOR SHALL CERTIFY THAT TOPSOIL MEETS THESE SPECIFICATIONS. SUBSTANCES SHALL BE MIXED OR DUMPED YARN ME BIMETENTION AREA THAT MAY BE 0. LEAF COMPOST HARMFUL TO PLANT GROWTH OR PROVE A HINDRANCE 7O THE FACILITYS FUNCTION AND 1. BSM SHALL CONSIST OF 10-20R LEAF COMPOST BY VOLUME. MAINTENANCE. 2, LEW COMPOST SHALL CONSIST O CLASS 1 ORGANIC LEAF COMPOST COI OF AGED B. BSM SHALL BE FREE OF PLANT OR SEED MATERIAL O NON-NATIVE, INVASIVE SPECIES, OR LEAF MULCH RESULTING FROM BIOLOGICAL DEGRADATION AND TRANSFORMATION OF WEEDS. PLANT -DERIVED MATERIALS UNDER CONTROLLED CONDIRONS DESIGNED TO PROMOTE AEROBIC C. FULLY MIXED BSM SHALL BE TESTED PRIOR TO INSTALLATION AND MEET ME FOLLOWING CRITERIA DECOMPOSRON. 1. P-INDEX OF LESS THAN 70 J. ME MATERIAL SH&L BE WELL CCMPOStED, FREE Of VIABLE WEED SEEDS AND CONTMN 2. PH OF 5.5-6.5. SHOULD PH FALL OUTSIDE OF THE ACCEPTABLE RANGE, IT MAY BE M001RED MATERIAL OF A GENERALLY HUMUS NATURE CAPABLE OF SUSTAINING GROWTH O VEGETATION, WITH LIME (TO RAISE) OR IRON SULFATE PLUS SULFUR (TO LOWER) THE LIME OR IRON WITH NO MATERIALS TOXIC TO PLANT GROWTH. j SULFATE MUST BE MIXED UNIFORMLY INTO THE BSM PRIOR TO USE IN ME BIORETENTION 4. COMPOST SHALL BE PROVIDED BY A LOCAL US COMPOSTING COUNCIL SEAL OF TESTING FAOUTY. ASSURANCE (STA) MEMBER. A COPY OF THE PROVIDER'S MOST RECENT INDEPENDENT SIX TEST 3, CATION EXCHANGE CAPACITY (CEC) GREATER MAN 10 REPORT SHALL BE SUBMITTED 10 AND APPROVED BY RE OMER PRIOR TO DELIVERY O BSM 4. PHOSPHOROUS (PHOSPHATE, P205) NOT TO EXCEED 59 PPM TO ME PROJECT SITE. 5, BSA THAT FAILS 10 MEET ME MINIMUM REQUIREMENTS SHALL BE REPLACED AT THE 5. COMPOST MATERIAL SHALL ALSO MEET THE FDLOYANG CRITERIA: a 100 PERCENT O ME MATERIAL SHALL PASS THROUGH A 1/2 INCH SCREEN CONTRACTOR'S EXPENSE. bBETWEEN 6.0 A . PH O THE MATERIAL SHALL BE AND B/ 4, BSM SHALL BE DELIVERED FULLY MIXED IN A DRUM MIXER. ONSITE MIXING OF PIES WILL NOT GE ALLOWED. MIXING OF ME BSM TO A HOMOGENEOUS CONSISTENCY SHALL BE DONE TO THE I c POSTURE CONTENT SHALL BE EEBETWETWEEN 35 AND 50 PERCENT SATISFACTION O ME OWNER. d. MATURITY GREATER MAN 80 PERCENT (MATURITY INDICATOR EXPRESSED AS PERCENTAGE Of GERMINAFON/VIGOI BM/BOA) PART 2 - SOIL MATERIALS e. MATURITY INDICATOR EXPRESSED AS CARBON TO NITROGEN RATION < 12 A. SAND I. MATURITY INDICATOR EXPRESSED AS AMMONIAN/NIMATEN RATIO <4 I. BSM SHALL CONSIST O 60-70% SAND BY VOLUME MEEIING ASTM C-33, g. MNII ORGANIC MATTER SHALL BE 40 PERCENT DRY WEIGHT BASIS B. WEDDED PAPER R. SOLUBLE SALT CONTENT SHALL BE NO GREATER THAN 55M PARTS PER MIWON OR 0-5 1. 8SM SHALL CONSIST O 5-10% SHREDDED PAPER BY VOLUME. MMHOS/CM 2. SHREDDED PAPER SHALL BE LOOSELY PACKED, APPROXIMATE BULK DENSITY OF 50-100 I. PHOSPHORUS CONTENT SHALL BE NO GREATER MAN 325 PARTS PER MILLION LBS/CY. 1 HEAVY METALS (TRACE) SHALL NOT EXCEED 0.5 PARTS PER MILLION 3. SHREDDED PAPER SHALL GANSS7 OF LOOSE LEAF PAPER, NOT SHREDDED PHONE BOOKS, k. CHEMICAL CONTAMINANTS. MEET OR EXCEED US EPA CLASS A STANDARD, 40 OR 50113, AND SHALL BE THOROUGHLY AND MECHANICALLY MIXED TO PREVENT CUUMPNG. TABLES I do 3 LEVELS C. TOPSOIL L PATHOGNI MEET OR EXCEED US EPA CLASS A STANDARD, 40 OR 501 LEVELS 1. BSM SHALL CONSIST O 5-10% TOPSOIL BY VLUME, 2. TOPSOIL SHALL BE CLASSIFIED AS SANDY LOAM, LOAMY SAND, OR LOAM PER USDA TEXTURAL PART 3 - EXECUTION TRIANGLE RIM LESS THAN SR CLAY MATERIAL. A. GENERAL 1 ONSTE, NATIVE MATERIAL SHALL NOT BE USED AS TOPSOIL 1. REFER TO PROJECT SPECIFICATIONS FOR EXCAVATION REQUIREMENTS. 4. TEXTURAL ANALYSIS SHALL BE PERFORMED ON TOPSOIL PREFERABLY Al ITS SOURCE, PRIOR B. PLACEMENT ME MOD TO INCLUDING TOPMIL IN ME MIX, TOPSOIL SHALL BE FREE O SUBSIL, DEBRIS. WEEDS, 1. BSM MATERIAL SHALL BE SPREAD EVENLY IN HWZO1l LAYERS. ' FOREIGN MATTER, AND ANY OTHER MATERIAL DELETERIOUS TO PLANT HEALTH. 2, THICKNESS OF LOOSE MATERIAL IN EACH LAYER SHALL NOT EXCEED 9-INCHES ' C. COMPACTOR OF BSM MATERIAI IS NOT REWIRED. � I t `I 1 11 . EXISTING OUTLET TO BE MgXHED SEE DETAES ON SHEET C-4.2 IE = 4936.40 WO ORIFICE = SEE DETAIL SHEET C-4.2 100-YR ORIFICE = (1) 4-1/4•• (1.1 CFS) jPOND BASIN 0.608 AC Ben BOTTOM ELEVATION0/0 WO VOL,REQUIRED: .04 0046AC-Fi WC VOL,PROVIDED. 0.046 AC -FT 10 OUSEL . REQUI 100 YR OROWED L031 AC -FT IOU YR OCT.NDVOLRED 1166 AC-F1 TOTAL POND OL. FROUIM 1212 AC -FT Q TOTAL PONARD L; 4 44.50 O: 1.212 AC -FT FREEBOARD E4 4944.50 LU in Z ILL ILL M m WATER -QUALITY TREATMENT LEGEND BASIN BOLNOARY 100-YR WSEL, I �. fSl�m1I13FCD]i��� Surface 2 12" bonding Depth F_ N Inlmum 12" Thick Layer of Bloretentlon Sand Media CONNECT UNDERIERAIN (see Sioretentlon Sand TO OUTLET STRUCTURE Media Specification below) 1 Inlmum 6" Thick Layer of Pea Gravel Diaphragm Minimum COOT No. 4 Aggregate!/ Above and BelDw \. inimum 8" Thick Layer of PVC Pipe \ h COOT No. 4 Aggregate T UnOistu betl Soil Inlmum 4" Perforated PVC Pipe (Optional Depending on Underlying ' - Soil Conditions) BIORETENTION CROSS SECTION MODIFIED FROM FORT COWNS STANDARD DETAIL D-53 100160n511e Treatment by LID Rbu mend NOW Impervbus Area 69A60 sq. R. Required Minimum Impetuous Area W be Treated 69,460 sq. ft. Ma Treated by Ran Garden (Basin 1) 22,793 so. ft. Area Treated by Ran Garden (Bash 2) . 46,667 MI. h. Run-on Area 0e4.A Impervious Ares by LID Treatment 69.460 sq. ft: Actual%On-bite Treated by LID 100% 01 Parus Pavement Rs uded 'Nov P. on, Ate. 0sq. ft. Required Minimum Area of Pone Pavement 0 sq. ft. Pow Pavement Arse 0 sq. ft. Run-on Area (up to 3:1 allowed) . 0 u, ft. Total Paw Pavement Area 0 sq. f. Actual % of Porus Pavement P.Wim, eDIVAR 2 man . so IL CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL APPROVED:__________ CITY ENGINEER DATE CHECKED BY: ---- _--- _- -------- ----- -- WATER & WASTEWATER UTILITY DATE CHECKED BY: STORMWATER UTILITY DATE CHECKED BY:______ PARKS AND RECREATION DATE CHECKED TRAFFIC ENGINEER DATE Rives G o ENGINEERING & CONSULTING 62ss Ama2 eeae.,, WAN. 1 I.1.1 .m W. 210 w ,Eylgae- 2a.me.RLnMsa. BEEBE CHRISTIAN SCHOOLAND SEVENTH.DAY ADVENTIST CHURCH 2103 NANCY GRAY AVE. FORT COLLINS, CO , ROCHE CONSTRUCTORS 361 71ST AVE. GREELEY. CO DEVELOPMENT PLAN DRAM BY B6P/R6B CNECNEO BY: MRB PROJECT NO.: 160264101 CITY COMMENTS 11128/21,I8 LIFT COMMENTS 01 N31M1] CITY COMMENTS 0YI84017 01 /11 /2017 DRAINAGE PLAN 5 C-2.1 9 Of 13 I.SwNT W.wele4ou0nlwn,dauw,�l.,•M11Hf�.iolawlwY vul lTW).Pwnllk.. •tsdaWmlMrN if MwP a.A..lAtslw MWrr W1MNN(.MemAd sl4r.«.wmMaraw. A fAw aurMnwn. a o.•MT i W 4Mtlm G W Aen r.nwt PTw Imd.ka 41AVA4wvWPmA•• nu.MpT ),I' h6,.6ov W.M.Wrtn w<al.m.ywm.l)4.rnl+0lgkum+hiwrwpmra) 5. Po.bn.uedT•*Inl nu<uwen Mi4do.wr.mrrdaYw. IERGTHOP PTRO1EC110N I- �,•�,r,o,[1 wmnlaarorEcrK)N- I + A Tr7r1 r�,f+ 7T. T ve,ls•. e.wrs [M.A., rcN.w.mc AMAr...fw,.MwM. WMAWAY P-au+Ne w•WmI . r r '^TIFF -�- d 1N= .�.•wn n, a..w�n��. CULVERT OUTLET PROTECTION -PLAN VIEW MAIL. I-.Y DROP rRurF O,R np�i1K WRIfT AGCIWM.Il1YMIRPROrECImN fir^ RRAI[yM1CN M[91 ^w� �- Iu.N•r.noM•r,•,�r •^-_ SECTION VIEW AA wR PROFILE VIEW I. ._ .T. _. .I --� g rt ll� ANCHOR PATTERN .m V.n>..me.MMw.n.aA.-Iw ANCHOR ILLUSTRATION AQAWNAAWWAAPW" WWA,WMWNN f aRnPwW IwuNw.•.R•M.n...am.arrW.. VM.. 4.>A-nl. IMw. RY fw.Y[W.n=WWA_AWYW. MY.naON YYnbL MA-s.LLo[. [,aseM•avM fw,n rl Ardu. W.nNrn!w WA.WWWn MYphr WA_ n, .AECuEO ru .MXL.a4%IIr6z.mD2ieOW9Cxa AA.-scoutop° T ,W� 1,xm.1M..B.mrlwwcllNem+1» SCOURSTOP DETAIL N.T.S. FORT COLLINS ONLY L � SAPP ec�cccre�"• 42- BICYCLE RACK IN EXISTING BRICK PAVERS SET IN SAND ON CONCRETE 6+ Ilrogr+ _ '�EG{II I Ir I 42' BICYCLE RACK IN EXISTING BRICK PAVERS SEf IIV SAND ON GRADE BICYCLE RACK DETAILS LAN34P.R CoIINIY CONSIRIiCTIOv RRT'ov NO: BRAWLNC Avo4Ros oRAmvo9 OATS: oe/or/oo 1706E BIKE RACK N.T.S. ETcI 4 aiwi'i enu� E 9 !4 SINGLE POST NOTES: I. ALL VMS SNALL COMPLY WITH U.S. DEPARTMENT OF TRANSPORTAnW, FEDERAL HIGHWAY ADMINOTRATONS 'MANUAL OF UNIFORM TRAFFIC CONTR0. DEMCES". LOCAL CODES AND AS SPECIFIED. - uOUNT SIGNS TO POST IN ACCORDANCE MTH MANUFACTURER'S INSTRUCTIONS 2 GALVANIZED SWARE NEE riuraa EMT En [a POST TUBES - 2".MEET 6' t2A O - POST TUBE OHAL1 ZED AS1M A1011 A653 50 POST TUBE GALv4xIZE0 AS PER AS1M A65] GRADE 90. fA0.M RM•Q WJT r.lx f]A ANCHOR NBE - 2-1/4',2-1/4'l,3/I6" 12go HEAVY DUTY ANCHOR NBE SHILL MEET ASTM A500 GRADE B. [u�g•^' °O STRUCTURAL NBE WHO STEEL SHALL BE HOT DIP GALVANISED PER ASTM A123. n'•"'"[• • •• �• SQUARE TUBE BREAK AWAY POST SIGN LOCATIONS - 90' PARKING THE UPPER SICK POST SHAH TELESCOPE INSIDE THE ANCHOR TUBE 4 MINIMUM OF tr. THE ANCHOR .n NBE SHALL BE A MINIMUM 27" OUR WITH 3 AN. MAX. EXPOSED ABOVE RNISI MADE. SIGN MOUNTING AND BASE WITHOUT BOLLARD - (USE WHERE SIGN IS WITHIN CURBED ISLAND) 3D' O STANDARD LSD AND WHITE SGN R5-1 '00 NOT INTER' SON N, T.S w �'iii'' •i'i . '• v 4i•'•if••"O 111111111 .�i•Jiiii•' mmogill '�ii�%•%�ii'%%tOiO��i•�i'JJi%�•J��'��•'•'••%i3i� 10 • •�JA•ii•�F�•�•i i� ♦..��`�•J •• 6,,��••J•.A•ii' Ody •O )•J •i• •Jd•��•�Q.•iO�a�i�J••i�%i•'Jai J•�• • A�•�•�ii� di�ilidM����i������O�i�•�•••••� • p•�•'�'yi�• �• •�• Tip i�i IIIII�I CHAIN LINK �7 I� CHAIN LINK FENCE DETAIL N.T.S. SIGN MOUNTING AND DETAILS N.T.S. BwNig- I RROIGNAY 74" Ill SKN IERFRS m COMPLY NM srNOND .Au N AM "GOAT 90"S (SEWS C =1 YA PMI6110 - ITS EMERGENCY VEHICLES ONLY IYRc•111�ILY wa6 OlY � IEE)0 Ox Wh BAOIQYIM N.i.S •AGM ro G1E 84A IMT M:CFSYAY �6• 4-1/4' PERFORATION E 493&27 S6, REMOVE EXISTING STEEL PLATE INSTALL NEW 1/4' STEEL PLATE ENSURE FIELD V4mFY FIELD TOP OF STRUCTURE REMOVE EXISTING STEEL PLATE INSTAL I' MS SECURE TO OUTLET STRUCTURE r—� �t4g3&g NEW 1/4' STEEL PLATE INSURE - PLATE PER COFC D-46 _ PB STRUCTURE TO OUTLET STNUCNRE BOTTOM I N WOUQV: DO6.40 WC VOL PROADED 0.046 AC -FT I I I Z- WC VA PROVIDED: 0.046 AC -FT I " WE WSEL I C' $ IDO-YR DET.REQUIRED 1.031 AC-Fl IW-YR DEi. PROMTIED: 1.166 AC-n TOTAL POND VOL REWIRED: 1.077 AC -FT I TOTAL POND VIA. PROMDEO 1.212 AC -FT n I 3 3/8' DIA PERFORATOR `POND BOTTOM: 4936.40 4-1/4' DNA. PERFORATION IL 4936.40 IF 4938.26 REPLACEMENT WQCV FLOW CONTROL PLATE REPLACEME� NIS SEE LaC DETAIL D-46 FOR WELL SCREEN AND ORIFICE PUT: REWIREMENTS THE EXISTING STRUCTURE MUST BE RET2OTT/LPGRADfD. A NEW SMUCNRE IS NOT REWIRED a Gum MET TOP 6 DRYING SUMA)M: W)AW RDA fO1T0.1 aArt MP' H D)SD4 N' WTIET M VEIL ARFN rys RIFA srMxIESS I[O-IN MOfT UIRCE SIFT Q EWA) o-M ATE(11fD1116 4F IWTA 9W[D PB• WTIOL MILO ON Y b' WREN L 4M2W RETROFIT POND OUTLET STRUCTURE TOP OF STRUCTURE l493&B Mum: 4936.40 Pff. RWm RNA, r f3]T RtHBO SM.,L) w ,axlN>ma.can .,WYA W WSH , BEEBE CHRISTIAN SCHOOLAND SEVENTH DAY ADVENTIST CHURCH 2103 NANCY GRAY AVE. FORT COLLINS, CO ROCHE 361 71 STAVE. GREELEY, CO DEVELOPMENT PLAN DRAM BY: SSAMSB CHECKEDBY: MRB PROJECTNO.: 16036001 CITY COMMENTS imsCu16 CITY COMMENTS OIMM17 CITY COMMENTS 0411 17 CITY OF FORT COLLINS. COLORADO nATF UTILITY PLAN APPROVAL 01111 /2017 APPROVED: CITY ENGINEER DATE _5HEELTITLE CHECKED BY:_ WATER k WASTEWATER UPUTY ____ DATE DRAINAGE DETAIL SHEET CHECKED BY: STORMWATER UTILITY DATE ARMw CHECKED BY: C-4,2 PARKS AND RECREATION DATE CHECKED BY:_—______-- TRAFFIC ENGINEER DATE Appendix G References 161 Page ' ISPRING CREEK FARMS NORTH J 11 LJ� L P B. Specific Details Ponds 5 and 8 will provide a water quality capture volume as follows: Pond WQCV (ac-ft) Water surface elevation 5 .067 4939.70 8 .033 4940.84 Please refer to Appendices calculations. VI. EROSION CONTROL A. General Concept This development lies within the Moderate Rainfall Erodibility Zone and the Moderate Wind Erodibility Zone per the City of Fort Collins zone maps. There should be minimal to no erosion problems after completion of the Spring Creek Farms development. Silt fence will be installed along the north, east and south sides of the site to prevent sediment from leaving the site. Tracking pads will also be placed at entrances/exits to the site: The Erosion Control Plan may be found in Appendix 8. B. Specific Details A silt fence shown on the erosion control exhibit will be installed prior to grading. All disturbed areas -not in a roadway or greenbelt area shall have temporary vegetation seed applied within 30 days of initial disturbance. After seeding, a hay or straw mulch shall be applied over the seed at a rate of 1.5 tons/acre minimum, and the mulch shall be adequately anchored, tacked, or crimped into the soil. Those roads that are to be paved as part of the Spring Creek Farms project must have a 1-inch layer of gravel mulch applied at a rate of at least 135 tons/acre immediately after overlot grading is completed. The pavement structure shall be applied within 30 days after the utilities have been installed. If the disturbed areas will not be built on within one growing season, a permanent seed shall be applied. After seeding, a hay or straw mulch shall be applied over the seed at a minimum rate of 1.5 tons/acre, and the mulch shall be adequately anchored, tacked or crimped into the soil. In the event a portion of the roadway pavement surface and utilities will not be constructed for an extended period of time after 11 unofficial copy was downloaded on Dec-07.2016 from the City of fort Collins Public Records Website: http://citydocs.fcgov.com ' .dditional information or an official copy, please contact City of Fort Collins.Utilities 700 Wood Street Fort Collins, CO 80524 USA - Spring Creek Farm: Pond 8 Detention Pond Volume Rating Curve 4934 39 0.00 0.000 0.000 _ - 4935 1,708 0.04 0.015 0.015 4936 3,006 0.07 0.053 0.069 4937 4,741 0.11 0.088 0.157 4938 6,617 0.15 0.130 0.286 4939 8,517 0.20 0.000 0.286 4940 10,546 0.24 0.218 0.505 4941 12,722 0.29 0.266'. 0.771 4942 15,005 0.34 0.318 1.089 100.year WQCEL+ WSEL = ; i • Volume Required = 0.505 acre-R. 1110-year WQCEL = Water Surface Area = ' 0.242 acre ( Volume Required = 0.032 acre ft V = 3 d(A+B+� water Surface Area = 0.051 acre where: V = volume between contour interval Volume Required tao-r ws¢ = 0.47 acre-ft. d = elevation - elevation, , TOTAL VOLUME (WSEL+WQCEL) 0.60 acre-iL A = area of elevation t contour Volume Provided= 1.089 acre-ft. B = area of elevation,, contour The Sear -Brown Group his unofficial copy was downloaded on.Dec-07-2016 or additional information or an,official copy, please a 12:33 PM 6182005 Collins Public Records Wcbsite: kUp:/)city'docs:fcgov.com Ilins:Utilities 700: WoodStreeffort Collins, CO 80524 USA - 1 1 1 1 1 1 1 1 1 i 1 1 i 1 1 1 1 �1 1 mo m M N ON t7 h (1J (� OOD Q7 tpO u1n O.-t7 (O n0'-C7 pp co nu��nn in rn O r•NM P P P emu) V7�N 0000(010 rD�� P d d d Wtt�LL U IYUQ - Otp O Ntl PI P 00 (Dnmc0—�-e---- —Nn [OON N - P-N- O�- O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U O U. F J LL Q T U U O Q D7 O v7 C) O O O N n r• M O] .-DO > O O�.O O) f0 a0 O r o V1 O N tp Q7 v P O O m m N O r NC9 P P LQUt N tD (O �tc r r r n W mr r<o<or n o c o 0 0 o c r o r c O F o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J J LL ?0 f- u�u1 O) W O hN COOtD N(") P O)t7 LnONt�N {p u1 m r• 07 O off LL')�r PN0O7 fD l7NMO�P P���O W O Q N F . . . .tDO OD1r W U LL O W ULL 0 to ul O O M t5 W Q W m m Z LL C.) Q.W LL 0 J CO Q lLLL Z c 3 i 2 Q 90 OQ LL LU U tD a d' = Q: Q lY C Z O OOOONNC7. f") P d1�0(O�aO OIOONMPMtO�� } Z } Q F p _ to F to 0 Z H H Z C (n ? O ? E unofficial copy was downloaded on Dec-07-2016 from the -City of Fort Collins Public Records Website: dditional information or an official coos. olease contact City of Fort Collins Utilities 700 Wood Street F, 11 P Design Procedure Form: Designer: Company: Date: Project: Location: Detention Basin (EDB) - Sedimentation Facility Sheet 1 of 3 Andrea McDaniel Stantec December 15, 2004 Spring Creek Farms Fort Collins, Pond #8 _ 1. Basin Storage Volume I, = 6.30 % ' A) Tributary Area's Imperviousness Ratio (i = I, / 100) i = _ •_Oi06; - { B) Contributing Watershed Area (Area) Area = 7.29 acres ' C) Water Quality Capture Volume (WQCV) WQCV 0 04 ';watershed inches (WQCV =1.0 ' (0.91 ' 13 - 1.1912 + 0.78.1)) D) Design Volume: Vol = (WQCV / 12) • Area ' 1.2 Vol = _ fi. "0.033 r' acre-feet 2. Outlet Works ' A) Outlet Type (Check One) X Orifice Plate Perforated Riser Pipe Other. B) Depth at Outlet Above Lowest Perforation (H) H = 1.50 feet ' C) Required Maximum Outlet Area per Row, (A,) A. = ; 010-, y square inches D) Perforation Dimensions (enter one only): Circular Perforation Diameter OR D = 0.3700 inches, OR ii) 2" Height Rectangular Perforation Width W = inches E) Number of Columns (nc, See Table 6a-1 For Maximum) nc = 1'a':'_ j number ' F) Actual Design Outlet Area per Row (A,) A. = square inches G) Number of Rows (nr) nr = t', ,_7—'6: " 4 number . ':, H) Total OuUetArea (A,J Aa= ���;A_48_�7._,)square inches ' 3. Trash Rack A) Needed Open Area: At = 0.5' (Figure 7 Value)' A,, A, _ '4`18- - square inches ' B) Type of Outlet Opening (Check One) X : < 2" Diameter Round r_ _2" High Rectangular Other. ' C) For 2", or Smaller, Round Opening (Ref.: Figure 6a): i) Width of Trash Rack and Concrete Opening (W.) from Table 6a-1 W _ ,; 3 : ' _,inches ' is unofficial copy was downloaded on Dec-07-2016 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com - or additional information oran official, copy, please contact:City of Fort Collins Utilities 700 Wood' Street Fort Collins;: CO 80524,USA _. ii) Height of Trash Rack Screen (HTR) HTR = y .,,'A2; „inches Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet 2 of Designer. Andrea McDaniel Company: Stantec Date: December 15, 2004 Project Spring Creek Farms Location: Fort Collins, Pond #8 iii) Type of Screen (Based on Depth H), Describe if "Other" iv) Screen Opening Slot Dimension, Describe if "Other" v) Spacing of Support Rod (O.C.) Type and Size of Support Rod (Ref.: Table 6a-2) vi) Type and Size of Holding Frame (Ref.: Table 6a-2) D) For 2" High Rectangular Opening (Refer to Figure 6b): 1) Width of Rectangular Opening (W) ii) Width of Perforated Plate Opening (W. = W + 12") iii) Width of Trashradc Opening (W,p,-;n8) from Table 6b-1 iv) Height of Trash Rack Screen (HTR) v) Type of Screen (based on depth H) (Describe if "Other") vi) Cross -bar Spacing (Based on Table 6b-1, ldemp' KPP Grating). Describe it "Other" vii) Minimum Bearing Bar Size (laempTm Series, Table 6b-2) 4. Detention Basin length to width ratio 5 Pre -sedimentation Forebay Basin - Enter design values A) Volume (5 to 10% of the Design Volume in 1 D) B) Surface Area C) Connector Pipe Diameter (Size to drain this volume in 5-minutes under inlet control) S.S. #93 VEE Wire (US Filter) Other: "10.139" (US Filter) Other: finches W = f - , { inches - �,—; t. W,,,,,= t=:^..,.�� .,inches W, !inches Hrn ._"inches 10empTA° KPP Series Aluminum Other. 3inches Other. acre-feet acres inches unofficial copy was downloaded on Dec-07-2016 from. the City of Fort Collins Public Records. Website: hup://citydocs.fcgov.com dditional information or an official copy, please contact City. of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 US. C H l 1 11 P ' D) Paved/Hard Bottom and Sides I yes/no I Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility Sheet_ 3 of 3 Designer. Andrea McDaniel Company. Stantec Date: December 15, 200.4 Project: Spring Creek Faints Location: Fort Collins, Pond #8 6. Two -Stage Design A) Top Stage (Dv4o =-2' Minimum) D,,vo = feet Storage= acre-feet B) Bottom Stage (Des = Dk,,,o+ 1.5' Minimum, Dwo + 3.9 Ma)imum, Des = feet Storage = 5% to 15% of Total WQCV) Storage= acre-feet Surf. Area LQ 1,, acres C) Micro Pool (Minimum Depth = the Larger of Depth= feet 0.5 ' Top Stage Depth or 2.5 Feet) Storage= acre-feet Surf. Area=))E- ° ° !Xacres D) Total Volume: Volt = Storage from 5A + 6A + 66 Must be> Design Volume in I Vol, acre-feet 7. Basin Side Slopes (Z, horizontal distance per unit vertical) , Z = _ _ - _ (horiiontaltvertical) Minimum Z = 4, Flatter Preferred 8. Dam Embankment Side Slopes (Z, horizontal distance) Z = (horizontaVvertical) per unit vertical) Minimum Z = 3, Platter Preferred 9. Vegetation (Check the method or describe "Other") Native Grass Irrigated. Turf Grass Other: Notes: LLLJ unofficial copy was downloaded on Dec-07-2016 from the City of Fort Collins Public Records additional information or an official coos, please contact City of Fort Collins. Utilities 700 Wooc 5Pht'kict C2F, I - �'-- Staactec L v 1u=1! m?is _ l�n;-.•t...•r.l<_ N(st�:�1c. Q-rLE-�E La') = la l cfs q = 3Z2 n=TY2 D=zr l" I cts * = 13.L,4 � Ws _ ff^,� 2 _ ))P 1D= Designed by 4 F r i s Checked by on official copy was downloaded on Dec-07-2016 from the City of Fort Collins Public RecordsWetisite: http://citydocs.fcgov.com additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA Project: Spring Creek Farms Location: Pond 8 Spillway Broad Crested Weir - Basic Equation: Q = C*LeHi.s Calculate Q from Dimensions: C= 3.00 L= 10 ft H= 1.00 ft Q= 30 cfs Calculate L from Q and H C= 3.00 Q= 26.34 cfs H= 1.00 ft L= 9 ft Calculate H from Q and L C= 3.00 Q= 26.34 cfs L= 10 ft H= 0.92 ft STANTEC Proj. Number: 187000140 By: A.McDaniel Q= Qloo x 2....... Q= 13.17x.2 = 26.34 cfs. H= Freeboard - 100-Yr WSEL = 4941.00 4940.00 = 1.06' Therefore ... L=10' unofficial copy was downloaded or .dditional information or an official of Fort Collins'Poblic Records Website: ht Fort Collins Utilities 700 Wood Streei Fort 4 r { m { �-Cory +FY _ _mm•wl- �M W - r �- ._- -Z-- e-°T^--Tewa•°--.-+Y.-w,..=�..v._=-•� �r--- ,e-^'�"± +t � �s.�y,- ._ P_.ew -- --- -�' � f _a r � A�i9s~rNaaaAr wd �"� � _ - _._ _- _- _ } 4\ -\. .,w w•1-� � _ �y � .1 . P 1 r _ s 11Y""•• (` ` � 1 I � � i .� f 6pja y • E�". -' - •_ _.-">.--. - -!cam-:--r•"_-:w .__. _ .-. -' _. ..�. _ _ \- _F ." '! ... .._ ......-a_tr9f �4a-. $tl➢i:.....� 2 °� - 1rash i 11 { \ • _,,..•\c, 4 FUtURE 96q� r � p 1 I -=-------------------\ - 1 .! -1r, ' 1 ; -1- - - - -- ----- -- - - - 4 � -. msEVNuler+oa yp1 r 8 C. . L 1 e p 1 � �[I r I rig . 1 /•/ --- - e __ __ 12 _ _ qp y5 I. Y aw a82 ZL J N,f A L alp _ S � - � f t �• � `.Tw1BERl11YER0A0 _ -�-�-� 3 N IIOPJW VVVIII rw9mp m e6rrm - - - - - - 'SC E W PEEL -LEGEND" Hy0N0.0(7Y 7A�E I W.•� ORAWA0EBASWWJNCM LWE - ' CALL TY NOLORAD ON CENTER RJ lO2 - MA 10 CENTTER OF COLORADO 0.ffi - ArliE9 4 ® ORAWAOE OESM POINT i ® ,Aay 9A1FA 1u11fACE (� 107 M CAIDI RAM 9 ACE ® 'RIPRAP ( PM S11rMYryShCwmt - PC d jWOCV (906) WC(N 1gNI slratCO abv. /00 yr Dwafton vCwmi mpl, peal 100 yr Detention and WCG1/ Vo" M*imd(a06) t00 yr dwbkM H volume P-JdAd 100 yr "w swbco dvwOM 100 yK 'max chsomai p (c!) QO85 aW7.7 0.54 QSCS 1 0.673 1 4939.7 - 37 0.032 ap35.a 0.7 0.76 1.OpD a9W 1.11 °" .C.. °"" oh'. 1-800-922.1987 z 0) t Point BAitnfsl' .Nelson) C.. Ky(af) (aft) y 1 1 33.90 025 , 7,98 36.90 uute1N611pA1'axNNNb odm,wao.uumM[#wM 2 2 3.10 0.30 l23 8141 IMM h „ 0 3 0.65 0.59 OAS 3.88 iy : CO a 3 a 5 120 SAO 0S9 025 1.37 1.05 S." p.97 City Fort Collins. Colorado W DO -' 6 7 0 7 o43 0E7 o.pt 0.63 0.76 1.07 a.57 4.50 of UTDM PLAN APPROVAL. Z � � 88a 4w. - p e S.a9 025 1.45 p.6A APPROYM K:J 0 S 9 10 9 t0 0.81 - C.76 0.7'7 0.71 1.56 1." 7.28 a.6p �/ �� C d' � ? h- 0 ffiZ ,-40- PRcrosln oOEn c6Ni6uR (Wtw Otv ecea 7rJ 123 0..71 1.12 00 921 2.O1 7D6 CHECKEDB Wdff a UOAUUM7 8 0t3 ` 39-IDw7umauxw A l'mia CHECKED B7: Dnt1Aw Cry e000 FD t mwm aw t601t7 OatA PAfAIEtT N0. O mHo WGO[ co~ - 5 " WlE x - ' CrtaEuer 187010140 ---(5039)---°m9w"Wom0N lwcv-inWu -PArb p BAvulloo ' mta - . - I CHECKED By: ate CS230 1mft EM&M . i CHECKED Br. SHEET 6 OF 25 0.4 TIMBERLINE ROAD WIDENING provide its own detention (0.36 efs l acre).`•'Storm A begins at the southeast corner of the.' police station property (at the location ,where -the detention pond will• most• likely be). Storm A then flows south to an existing area inlet at the northwest corner of Drake and Timberline.. Spring Creek Farms will be designed to release detained flows into Storm A..' ; Storm A has been designed to incrementally accept additional- flows with the makimum flow being 20 cfs. 'The design flow additions are shown in Appendix C. • T'his'storm . • .. sewer design has'been reviewed bythe Spring Creek Farms Engineer (Staritec). • , Basin 5 — includes Timberline Road adjacent to.the future Police Station and the roads on • the west and south sides of the Police Station. This area will flow into the street on the 'south side of the Station and be detained on the Police Station site. Basin 6 — includes the Police Station site (less the perimeter streets). This -area will be' required to detain to 0.36 cfs /. acre and will release into Storm A. The drainage systems and roads will be constructed at the same time as this project. Basins 7 throueh 12 (areas west of Timberline drainine throueh SideHill 2): Basin 7 — includes what is expected to, be the street on the north side of the future Police Station and a portion of Timberline Road. - Again, Basins .7, 8, and 9. weie originally designed to flow south to.the North Tributary Storm Sewer.., Because there .will be a ' drainage outfali (sized for existing) 00-yea'r'flowsy, this land now can drain to the north which will -eliminate the need for a considerable amount of -storm sewer, and should reduce the detention constraints on the.iest of Spring Creek Farms. This basin will flow io a sump in the street north of the Police Station and to a pond on the north side of Spring Creek Farms. Basin 8 _ includes the north portion of Spring Creek Farms, which can now drain to the ' north. This area will drain, to a pond proposed with Spring Creek Farms: This pond is presently being designed;by S'tantec and'per a conversation with Jim Allen -Morley, the ' release rate is designed as the 2-year historic rate. This pond will drain to Storm 2. It is ' assumed that the detained release rate -will be approximately 2 cfs. - The existing Cargill Irrigation Ditch will be rerouted to tun along the south side of Basin ' 9. The rerouting of the ditch will be shown on the plans for Spring Creek Farms, the pipe crossing under Timberline Road •will be designed and shown on the SideHill Filing 2 ' 6 plans.,:... Basin 9 -includes the portion of Timberline that is adjacent to Basin'8: This area will' flow north to a roadside ditch and into Storm 2. Because Basins 7, and 8 are being detained to the 2-year historic, and the receiving pipe on SideHill has been designed for the 100-year existing flow,'it•has been decided to allow Basin 9 to discharge to the area ' inlet (Design Point 10) undetained. .. Basin 10 — includes the area north of Spring Creek Farms that will drain to the southerly of the two storm pipes that will take flows east through SideHill Filing 2 (Storm' 2). ' Timberline will have a rural section in this area and will drain to a 4' diameter area inlet , on'Storm 2..Storm 2 is allowed 21.92 cfs (based on the SideHill design). ; Basin 11•.7 includes the area: that will drain to the northerlypipe that will 'take flows through SideHill (Storrri3). A 5"diameter area inlet is proposed to accept flows from a proposed roadside ditch. Storm 3.is allowed 47.36 cis (based on the SideHill design).. It should be rioted that the receiving pipe on the SideHill Subdivision is a 30",RCP. Storm 3' has been' designed as a 36" RCP because of the 'Very -high HGL at the connecting manhole.. Basins 22 througb 26 (east half of Timberline south of ride draining into SideHill): Timberline Road Street Cap acity•Calculations are provided in .the Drainage Report for SideHill Subdivision. Basin 22 —'includes the area south of Iowa Drive that will drain into Krisron Road. Basin 23 — drains from the proposed highpbint into Iowa Drive. ; Basin 24 — drains from the proposed highpoint north to Nancy'Gray Avenue. Basin 25 — drains "to Sandbur Drive. ' ,Design point 25 is a sump that aligns with the • . proposed street." Basin 26 — includes the area sbuth of the ridge that drains south and into Blackbird Drive., Basins 12 13 14 and 27 (area north of ridge and south of railroad): Basins 12, 13) and 14 — includes the west,half of'Timberline between the ridge and the , 7 IL •'' S y ' ' • m s• cc E y "moo •'TS 'C o� G g M�o go ' _ •:gym �$ 00co0 0 LO LL cq LO •'.Ifl c y U i Vl mF�E� �y . — F — • 01 n y N cr co cc EE aM 0, we for 71 q N N n Y o W - o$ Z m o � cc LLJ u 6W cc tOQ~q •. O yyJ�, a Oto yu �p�>y` µpZ>� _ y6� �u in CC _ cc Q In O � O y • R Ix IL yIL N J -8NI J y?OO O IL 1 C Lai 9 m W yQj ��1i11 N m 0: y N �•• � A N p A p A � m �^^ N A N f N 01 m m� A 0 • • ' W v In t w R m A O A ll'•l1 N 0 mm o y O Ci N N f 0 0p m w A m rc e o c d c o c o o o c e o 0 0 0 o d c e e o O •�• w m yNaOk N qq fq qq N mm m �]j N N C1 VI g'2af e F R o al, 0 0 0 o g Q$$ • Y • N Idd IY N N O y n m aa E $NIe�oaoA a. n QQ w w n n P� a Af� w om�mvrpvw'�m� C. coca Coco 0 *I I 0 0 0 0 0 0 0 0 0 d 0 0 C ... a g Q o pt �wmm °'•� ti e .$ f a i "p•' 0 .7p3 m PP; mRm' x a E N M N O O m- mg N h m S A e% w f O m O WO !�`! O vR Y� m O O N N m i 11 ly 01 O A a N I: UI O w N 0 0 0 0 0 0 0 .• O O yQ m 2 m O N Pl v m 10 w Mae N ^ O m m w a •C' R N (y N N m W O u� _ 2 •U m .I• � m MCI U m � W y c :m V c n E rn m c G ZO Z Q . E C 1 .fp 8 ..twUC �K md m �m oc000 I W Z• W fY O C j� Q Y y C ' � O o Q p � � q' Ij C • � Or u ui U al at � w a n a A, a ra is m V1 � E1 01 N K � C� ' •q1. O � O � g o 0 0 0 0 0 0 o a o 0 0 g Rai 39a fgr�.o��bC� N n O b$ O a 0 vi a a � e 0 0 •• '9 og..0.=e�doaoadely W 0cj J • o • . �y n >t m q O q - �. �2tV • m � . m - m .•. Q p p Y II ` , tea: W ell . SU . I W Z• W fY O C j� Q Y y C ' � O o Q p � � q' Ij C • � Or u ui U al at � w a n a A, a ra is m V1 � E1 01 N K � C� ' •q1. O � O � g o 0 0 0 0 0 0 o a o 0 0 g Rai 39a fgr�.o��bC� N n O b$ O a 0 vi a a � e 0 0 •• '9 og..0.=e�doaoadely W 0cj J • o • . �y n >t m q O q - �. �2tV • m � . m - m .•. Q p p Y II ` , tea: W ell . SU . J • o • . �y n >t m q O q - �. �2tV • m � . m - m .•. Q p p Y II ` , tea: W ell . SU . • N - m . O O o� Z. LL F 1 0 C N II p to S u< U3{� U O < r `m YS �aUO ' w • _ N N n Y g o N � y y� N y W U 7 f m w Q la, m^ cc O YW 7d W yy �O M000�0 yurioyi"nN� I- Qm a zaUUza V G to QQQq ,�rj SOON O? 3yy0 7d Z�ZO;�IN r O Sa L7 S N N 1 N p y D V! o y O V �3 U N N G O G = o Ym Or V f71gN . Fl O m m � m m %d ,-g A Y! Oi YI m W Oi d :: N O LL t l; ^ b P{ b f b b' A b♦^ O b^ m m n b O b !! b 0 w' O^ b N t=t■ K B,=L ^��75 �^{^�� n i`f�u58$ 88f �fi �iS MemonFi-""C r ^ 5 ^ OO OOINm^ ^ rl cdO Ah O NN N ��1�Om AO V ClA�e'mi of a 0 f N ads dinwA 'i re�taWor������8�Ra33 m'd � LL 0 0 mA 0 � i N O[ V N i e l J 2 Og O m m^ O^ O m b m^^• n O b b h m m O m m f N f O N N w 0 .- A S ammmRmgm cil m g'gmgggmmmmmmmm^m�R�g�� O odomod OOm^, .00av000eeeee aaodood to 8s$8888 S Ilt A,CG d ^ .-^riOOOOOO N^ ^ NOO E� .n� foi ela f n ui iew rtif ie� ei^mfnNn N nN ueio�N m A 1R = 0 0 0 0 0 0 0 O OpNO 0 0 0 NNNNNNNN 0 0I+I 00 NNNNN O OO 3� �_s SS:R�SiB � R��SR:�l�QR��R�::6RgSSm 000O0000000dododdoe 0ocd6cdddd6ddd q _ry my� m m O pNOOAN m tNO1:;Ixl. ^n N ppy gnA mrl mwNm oI. i9��b Prvl ry PI^ ^GO �:O Od d d 6 d • e �rvwia mmnmmpp �.� �NNMNNNNNN•V 11��epqmmAmm Ref N n'ei <F N G �� ^Nnvmb AmO��.N-.n-� �m � ��R NNNNm NNtVNRn•`�n 133 Fl N N - O Q z �UJ 2 O p ' 'LL W ' U U i<y3• �` • z Q zzF . O C O < 0 8 < o v N ' 00 N _ n • o u u . O O y S O ! N W ° m 4 m c O � o0 g n2 N V! a Ra 11 �W U"• M Hal O N _ N A O i•1 <g AIR mom U. • :, •'13 ... rL m „m EL n i47 m co „ + ,CC' .. Oci .. E Z F+ o m' ifa+ �. a„ d 3: am.... _.� . � N _ � N M yY W .. R � W • • W `i f,QN AO W Q W . • ' 2 W Oy� HWHO O V '9 LU ¢yN�J¢= 2 N� ��tt y ``��I ��xyy 2 �a{p2 W ! 1IQU 7 O 9' O Q C. x��Rct 4W S K> �A mar 00. ,NOn> Y W M LL OF1./ g K 7 dui 7 t n w 6 w O ;� m �^ Q m y OMu m O J� O ZQ J n • < W Qz pO= re =tea QUzy m C4=pI-y�Q4 oq• ah0 A5 =c7 5 O wr Z Q O p 2 Q 3 N O 1-N O (NUQFrNu Q O V f gZ uy�ONNN tf//J� ^< ry �6�'N�N� Q� 110� Q . • LL oaf 0 g f C V `� E '"• Ci O m � � � Mj f YID o � 1� 1� � �Y .If A Y{ Yf YI r eb � Y{ f� Yl m YI 0 N � Yl m O, O C` N- ----- -- - -N_ �mpy + a^ y �., h aidde�Nui n m f f m �ryryi e r: m M 1:rdvh.=���M, o 0 m e m M n 0 vi 0 N n'A vt m qg m 0 o�Nrid OR N A =• a egi n;00MR +� tgmai.�R n" mmm�0$�3�mN J m "d N d c AtaV M N m G IV O N d m< N N N N CI C N N a - J _ . a �2... O N.•.=.•NNN cq m O O'• m � OR �N����NNri�����.=ri�No�� N •� ^ O m N N m m m m m f N N f m � ry A A V C R o Q 0 0 RR0 0 0 w w a 0 0 S Q Q. O d O O d d C O d d O 0 0 O O O d O d 0 d d 0 G 0 0 d d 0 0 d d 0 d 0 0 d d 0 0 d d 0 d 0 O d Fl cc d d d W EKm SSR$gg$ �od� R 2�88g8n8+'%� N pp Hm p gN p t4{wn d N.- ��. .-'i0 Pe000n ��NNee W" H 8 HRgarRRm�R���'�c�rw`l�Jup3 • m•5 E V n o m NNd�dN m v m C4 n Dui N m o v ry m nrid m w m �dri.- m ry Rio m m m dvi�w m N a o ry o 4X v VYJ O N 0000 N N {M tV 00 lV N aC N Q N N OOOOQ M Y{ N" iV N Q 000000 N N N M N N N Q ty N N Q N O Q N {V C! O,ON N N J gR0.RwRR n cc w w v e�g$R� < p mm P Yq} �y ry p pG pp 0 0 A h g p O S S m$ S S S ry S 0 S M H p f S p S 0G � d 0 o 0 6 o d o' d O o1f3 d d d d o . a do d .- . d -: d -; d W e $ asoddddddddddododddoodaoddddddddooP V A e N A {oV A n� ny :9 Y P C! f m N f t: Neai, � '54 'c:o.a n ad n�nr'�Si�ryn� .•�O MClw �•m a 0 OIANO r. � �OOdGG O � �00�O�00dOCC �Nn C N 0h002= V UM ^ m 0RN{V NIfV iNV {mV nhNt'!n nA �F z� WGQg y� �N19f NmAm00 � � � � �0w m 0' RNtV tV �cfvNNnNtV �in�� Z O 1 - G W z V LL O LU tu J it U m cn z Z F zz< €� � �u �g3 ' 3CVQ >2 >2 0 a• o • mm ' Qp� Y W J N m mmm u � yn� ein r. J S � m m � C G G ado ul � id€'eSO 6 lV m _ _ �xLm Ntp.3 7s F aJ . cq CD It CD .CC LL • O O c $ ,�• • W Cl a .Fl 11 e E z A B� . i 7 v LL �- W Z, LL Z Oi D Q w Ill - CL ' a r J ' • Q Z ' Lgcn 6 UE ' c Z l z°z0 oSP . • N f .. r W •' • W ���OQ��� wrN, W vsa � FO, ga x3<O a• ', W � W OOP` Cm�y; {1?1O� Nyy>11 O� K W i NRw � mm�Zi �. m�prh r Xg OryW.F'i=3Zz3NN¢Nv1Nyu) = F < y0O U F N^ 'no 0 F0 FO OOOmy�2x< 2 !- O a' U mm2�g O= Y Z N 8 CL U Y O y'YO ]YC O a4ri1�2 J c ''�mFocx�iuoi ~1 y3v••oig"�"�" W��]]� • N • NN � � yyo~~ Q a• W y40 �=t�Id 'm O fin' XvX 4 N N W R + • f O .- •• in{ K^ m IA i m O 1'I fl P f 0 H m^--dOO J# n m tp P m n dIV m m d'a O N i of n w YI 0 ^ai f'1 n d n n d a oa f C O o m L d i lJ '1 IA i VI q o• -ew•i �w�io � CR �ri �ri s n ei 4 v 46vi v i i i$inv rmi i 3 ^PP�^w one Plm jmm�wdad mr/m OPIOmm vjaf rti �!dwnPmm�Pn O{On On ONO �O �n G_S. St; 0mM 2.22 31;;,2xia u ddmd o��yO��NNodmo d o ddd�opdo d6pd ' me oo pdod♦d ((dyyd po��dd w A !1 1d�md Py A !d � diS�dw � uio�Nd� C dddo: ^dd �o-� ddGOd o a- L/ N Y a •� ^ N 1.1 f mOw mm� �� � � �m �mONNN�N �Nw NlV t+)n Pl o • � .'�. gu 1'•1 m Q b oQ O .1' • n U N O ..7n.UG n y� w Y 9 K p A D O O 0 s � tu %1. u 10H ti ,5 � E Aida m - u U' d d d Q ddol N ' a Vl ' LL - - E C m W r Yy�y p c C 6 5 '� 7 n a alu • As •'jo U "-- . - N � a Hal 1 _ V• LL C • LL ce } o O W • C J , 2 ' OC LU Sg N d 10 N ' 0 U . '. Z . s ZZ0 Q(. < IL gii 801F ZZ N F 1pQ b O F= b O Yw us . j d U d2 s 0 LL 7 uYt ZO 7d b O 0 0 0 0 4 0 0 0 H 3 C>� z O]j � O g K ~O �11�72yI�m U OTj. 77 02 yNt~/! wN �jO N GY N LgIA5 Q=O o 2 `2O J; '. � a �FOO~OF�FO�� O w O O O • ~�N N r N N m ir Nd�W W = O N y O xx •�• mb m mwn Qi m wn m tal n m b f m m d�vi� N b m ri eri � O . , u O ' �-a S mayy. mgmmwn�mm^. aa.m-�.^-wvtm�perioid�� r!�mQmm co wi � wen!m°!.-ryu�aq^ W N N-airi-�I2 ri.•non —g m ry �emi,mpmYi Oiq I-INISIAlsIN WON��'1namm 90idmoi ai m 2oi ai �emmmmoi is o� •$ E wllm� QGi ad iM��1 O v Q^ "�pQ ntiQm NO O h,:a0pi m 00.0 vpipppm Yppi �Om apw rtpi C! vCi mta��f �0 �upoi U U 8 0 c Cpd O N coo mm„vi OI tbV, a g S QQww�� 1d of a m w n 1n O O O R P 4 R 9 l¢Vyi O a1 S o G� C o g O O� 0 0 C O e c O C •� e uu • q Nm j �m N n Q pppp b G$NV o nn 0 n ' w �mm O W �nMRR1!��mme�qe�v1�f''��tIn O- 0 0 0 1• O n CJ rm• N O 0 Z d - O O- 0 0 u a• G�i � ^ � N N C! 1V a itl N {V m C1 � Ol N fV OA Cl n, V W R . a � � N n Q m m n m m� � � � � � m^ O m R N N N lQ•1 N N N N e 0 Pf N ca Co N Vl U 1 U fA Z a C UOE� ' "m mcm oil NOF N N off• u' ^^8 o aci m w ci m y ^o-4 o n r ass u' � �oaC4 N O G a ' I -----------------i-----------------------------�____—_ u t I d II ;1 LEGEND i ocamwnt 1: I'--------------`7 ...I —' e�snwwn�ee I I �, (eeo�aa�}-mmvr cwncr (na) - win \ AM$ - wM nNK nL9Ca II t �\ - cu"Ac �m PPnPosm sly---------- .L m° , ----------------------- - ifi----I CMEK FAMa I rnsmc r COn pdP 1 l I i� Tr eCIT Yiv F 1[i iq DffKM0PA0vr 1 wiaasm r conrow I n I ktliii°i�l ! . —.b PPWa V c WUR mcfAwsay ® FunOW SPPM CREW FARMS jr'I��y ® �I� � -�.- 4 � ® Im m°Prwo °EVEz°P "R j t ti k u I\ I GENERA \ i -- I k n w wn •ro ,•• PIR I ' � W — �1 � � I; , � pt1 1 , SrELZ \ I I AVUSMS — , I ' I. , ip I P�eo . I. _ i, _ \ •i iVT MATED EOUwS Ir I /ntii1ju�J1 �Y t �� I •, i P J. ., u � � � ss 7 �,- 1 i:� } \ . 1� ; �•t, i.' t If i i n11A. iT OK�t �IOYIn ,, ,i Soost i+ �' i FI/TG4E MENU AENVG = I V sasqu FXAw F3NG ow rp g i I•,' L / '.III 4 ^' k uc 90% SUBMITTAL IP•.... ' NOT FOR CONSTRUCTION uruo•r ee.• a.eu. CITY OF FORT ' COLLINS, COLORADO Maor Mao I TIMBERLINE RO�LD WIDENING -INTERIM I 1 I l ENGINEERING DMSION _ , -,nn { k.,a.ns ` i DRAINAGE EXHIBIT 2 POLICE STATION 3. PROPOSED (POST -DEVELOPMENT) HYDROLOGY & HYDRAULICS 3.1 General Flow Routing The site hydrology was analyzed in order to size the proposed detention and water quality ponds and to complete the hydraulic design of the proposed inlets and pipes. The proposed site generally follows the existing drainage pattern with a portion of the site draining to the north and the majority of the site draining to the south into the proposed detention and water quality enhancement pond. The portion of the site draining to the north will be detained and treated in the proposed pond located just north of Nancy Gray Drive per an agreement between the City of Fort Collins and the owner of that property. The on -site drainage basins are described as follows: Basin 101 includes the northeast comer of the north parking lot and will drain via overland flow and gutter flow to a 5' type R inlet located at design point 1. This inlet connects to a proposed storm sewer pipe system that connects to the existing system in Nancy Gray Drive and discharges to the detention and water quality pond for Spring Creek Farms North. Runoff from Basin 102 is conveyed via overland and gutter flow to the proposed 18" wide concrete curb opening and channel located at.design point 2. This.channel discharges into the back of the modified Type R inlet located in the middle of the north parking lot. Runoff from Basin 103 is conveyed via overland and gutter flow to the proposed modified 5' Type R inlet located at design point 3. This inlet is part of the proposed storm sewer system, labeled Storm 2 in the plans, which discharges into Pond 2 located just north of Charles Brockman Drive. Runoff from Basin 104 is conveyed via overland and gutter flow to the proposed 5' Type R inlet located at design point 4. This inlet is part of the proposed storm sewer system, labeled Storm 2 in the plans, which discharges into Pond 2 located just north of Charles Brockman Drive. Basin 105 includes the roof area on the north portion of the building that is captured in a series of roof drains which tie underground into the storm pipe adjacent to the north side of the building, Storm 2. Although stormwater runoff from the roof drains enters the storm pipe in several locations, for simplicity in the modeling the pipe was analyzed as if they all entered at design point 5, located on the upper end of the pipe run. Drainage and Erosion Control Report Page 5 The New Fort Collins Police Services Building February 23, 2006 Basin 106 includes the west parking lot and the portion of the roof that drains to the west. This portion of the roof will not be intercepted by underground roof drains that connect to the storm sewer system. The roof area that is part of Basin 106 is discharged to the surface via a series of downspouts and overflow scuppers. Runoff from Basin 106 is conveyed via overland and gutter flow to the proposed 5' Type R inlet located at design point 6. This inlet is part of the proposed storm sewer system, labeled Storm 2 in the plans, which discharges into Pond 2 located just north of Charles Brockman Drive. There is a 6" storm line from the Sally Port area of the building which discharges into Storm 2 at the proposed manhole labeled STMH 5 in the plans. This pipe connects to an internal floor drain within the Sally Port. Runoff from Basin 107 is conveyed via overland and gutter flow to the proposed 2' concrete curb opening and channel located at design point 7. This channel flows to the parking lot to the south and in Basin 108. Runoff from Basin 108 is conveyed via overland and gutter flow to the proposed 5' Type R inlet located at design point 8 and then is discharged directly into Pond 2 located just north of Charles Brockman Drive. This inlet and pipe is part of the proposed storm sewer labeled Storm 2 in the plans. Basin 109 includes the south, middle portion of the site and a part of the roof. Runoff from Basin 109 is conveyed via overland and gutter flow to the proposed 5' Type R inlet located at design point 9 on the south side of the parking lot. This inlet is part of the proposed storm sewer system labeled Storm 6 in the plans, which discharges into Pond 2. The roof area that is part of Basin 109 is discharged to the surface via scuppers and downspouts. Basin 110 includes the southeast portion of the building and parking area. Runoff is conveyed via overland and gutter flow to the proposed 5' Type R inlet located at design point 10 on the south driveway entrance. The pipe that this inlet discharges into connects ponds 1 and 2. Basin 111 includes the west pond (Pond 2) which drains via the proposed vegetated low - flow channel to the pipe located at design point 11. This pipe connects Pond 2 with Pond 1. Drainage and Erosion Control Report Page 6 The New Fort Collins Police Services Building February 23, 2006 Basin 112 includes the small roof on the northeast comer of the building which discharges into two 4" roof drams that will daylight under the sidewalk adjacent to Timberline Road, pass through a metal sidewalk culvert and through a 2' concrete channel to the curb and gutter on the west side of Timberline Road. Runoff will then travel south along Timberline and to the proposed storm inlet and pipe located on Charles Brockman Drive and into the proposed detention pond (Pond 1) on the Police Facility site. Basin 113 is located in the northeast corner of the site. Runoff is conveyed via overland flow to the gutter of Nancy Gray Avenue and Timberline Road, to the stormwater system in Nancy Gray Avenue. This system discharges into the water quality and detention pond located just north of Nancy Gray Avenue. The stormwater system and the pond is being built with plans for Spring Creek Farms North. Basin 114 includes Pond 1 and the portions of Joseph Allen Drive, Charles Brockman Drive and Timberline Road that drain to the storm sewer system on Charles Brockman Drive which discharges into the proposed detention and water quality pond for the Police Facility site 3.2 Hydrologic Computations The Rational Method was used to determine the l0-year and 100=year peak runoff values for each Basin per guidelines in the SDDCCS Manual. Runoff coefficients were assigned using Table 3-2 "Rational Method Minor Storm Runoff Coefficients for Zoning Classifications" of the SDDCCS Manual. All hydrologic calculations for the Basins shown on the attached drainage plan are included in Appendix B of this report. • 3.3 Hydraulic Computations • Hydraulic calculations for sizing of the proposed stormwater inlets and pipes were completed using StormCAD hydraulic modeling software. The pipes were designed to convey the 10- year peak storm flows. The 100-year storm was analyzed to insure that the hydraulic grade line did not exceed the elevation of the storm manhole rims. At design point 4, there will be ponding during the 100-year storm event within the parking lot at a depth less than 1'. The OF curves for the City of Fort Collins were entered into the database as well as the physical parameters for standard Type R inlets used in the City of Fort Collins. Standard roughness coefficients for the pipes and headloss coefficients through the structures were used. The storm system profiles, inlet report, node report and pipe'reports are included in Appendix C. Drainage and Erosion Control Report Page 7 The New Fort Collins Police Services Building February 23, 2006 4. STORMWATER DETENTION & WATER QUALITY TREATMENT 4.1 Overview Basins 101 and 113 will drain to the north and into the stormwater detention and water quality facility being proposed for Spring Creek Farms North located in the comer of Nancy Gray Avenue and Timberline Road. The remaining portion of the site and the equivalent of one-half of the adjacent streets (Basins 102-112 & 114) will drain to the proposed stormwater detention and water quality ponds located on the south side of the site just north of Charles Brockman Drive. . 4.2 Detention Pond Design The stormwater detention system is divided into two ponds, Pond I on the east side of the entrance drive and Pond 2 located on the west side of the entrance drive. These ponds are designed to detain the post -development 100-year storm and release at a peak flow rate less than or equal to the allowable release rate according to the Foothills Master Drainage Plan and the capacity of downstream conveyance facilities. The allowable release rate in accordance to the Foothills Master Drainage Plan is limited to 0.36 cfs/acre as stated in the "Drainage Design Report for Interim Timberline Road Widening — Drake to Prospect" (2005). The total tributary area to the Police Services Building Pond is 8.60 acres which results in an allowable release rate of 3.10 cfs. For reference, the historic peak 100-year flow to the south is 18.6 cfs and the 10-year peak flow is 7.3 cfs (Basin H2). Thus the proposed release rate of 3.10 cfs is less than both the 100-year and the 10-year historic (undeveloped) peak flow at this same point. The Rational Volumetric FAA Method was used to calculate the required detention volume at the given release rate. The pipe connecting the ponds has • been sized to convey the 100-year peak flow unrestricted. Detention volume calculations are included in Appendix D. n U 4.3 Extended Detention Basin Design The recommended water quality enhancement measure is the use of an extended detention basin (EDB) designed using guidelines set forth in the Urban Storm Drainage Criteria Manual, Volume 3 (2004). The proposed EDB is a sedimentation facility which will capture stormwater runoff from frequently occurring rainfall events and extend the emptying time over 40-hours to allow for pollutant removal through gravity settling. The removal of soluble pollutants will be enhanced by providing a small wetland marsh area in a lower stage basin and permanent micro -pool below the active water quality capture volume. This Drainage and Erosion Control Report Page 8 The New Fort Collins Police Services Building February 23, 2006 am I-- -IIS I' _UII I I i Il i I � 111 I 1 I I I I 1 I I II I II I 11 I II I I I ! I I It IIII I I II I I I I I I I I I I I II I 11 I p III it I Itl I I I I II i i I I �ipl I II I II I I I I II I II I T It • I I I p II = p I Q� i iW B It y i�i ui I IW H t III II I I I ' I ! 1 t3 2 I I I I I y I I i i I jl I I l II41 I I 1 I I j I �II I jl I I I li II i I jl I II1 � I I I I II I 1 _J r 1� II lu ✓ram I / 1 L__--J OUTLOTA caaaur_•ro�cra Aau¢AJ^4 sooca•ea. .u.- -_ SPK/NGCREEXFA?MSNORm mRSTFIL/NG a 40 20 0 40 BU SCALE: 1 40• I ( DRAINAGE SUMMARY TABLE DWP NICKAaY.lUO naamry aaa4r4. Ar. o(10 711a% e0R *M Map. 11 7 OMIRAoe atlaxtw ; IN aae on ow it0 to I,; xT •mtl Rant ] In 021 on- .-O.W •ns-. 7a0-• at -_Y.0 Lsld4.OWlEL Tm all ea aes an ao as 1.0 a 1@ 103 a.10 on LLN U so Lf 10 xreRNtlf 4 Ta an am an Iae as Ls a0 TVP6Reuer 5 IDS all ap Im b.0 ao Lo 4I rCLa1�- tm as ate 0.0 III -to 13 T.1 IYPE.Num 1 - In am o6 Lm so ea 0.3 01 aoNa rlaNEl 1M am 0.61 I.CO so a0 l3 33 . wan 40 ae3 l.m 3o so a 40 PER.AAT 0 In Im an 1.0 If. so a2 lax TrIfI RMET 10 - 110 - I.0 .a I.m 1y1 5.0 SI IIA Dl ae1 0.13 0.19 IS, I" a4 1.0 it 1a2am•Ia.+e»Taw+n.Ia.1m ae] an on Ile ee re 323 IS, ROP III 1n aW a05 Lm so 5.0 a,a 03 a.N IeMMIa 113 A43 as ow _ IS sa 0.7 to n4 za on aq uA' LI as a.I H +o»im•la•+o3naan•+a•+w•ualnnl»n1 am on o.n lea ee its w.t wo wnet emlon Cap mlem Pool wom IOV WSEL IMF StrSEL top of". Proposed Detention and Water Duality Pond Summary stop Sulhc. Am (3z) YrtnrllenYl .Stomp. Patlat Sant, a" 6 e. Ana Ia.fmmAW wita9e Panan SKap. Toll SW" DatarlllEll Stoop! 4w Ts 0 4032 155 3 9 493175 No 4W .00 0.00 0 0. 35 2/Oa 0. 3 0.03 I935 0 01 0.01 O.M 4936 3164 am .09 /a36 a463 006 QOa 0.1 4=426 3099 0.02 0.11 / .31 axe 0.oa 513 0.20 4W7 4IN O.m .13 1931 0669 0.5 0.26 0.46 T21 IOII)3 49N 0.08 028 IW1.81 I 0.3 0.61 0.8 Q62 4= 5223 003 a." 4936 4064 0. 0.32 0. 0.60 409 6561 0,14 42 4939 iliff .36 0.92 1.34 I.H) 4940 0.17 0.59 4940 22141 .1a 1. 1.12 /90. exo- o.a oe] 4ao. 2469E o]e 1. 236 z.n {9/0] 9110 0. 0 0.73 911. 1ns2 0.]2 a 2,5] 4941.00 0380 o.OB o.T9 4041.a 267(11 Taht Witter Owdiy 4PMn Vauer Wallind- On ..A Taft l Doalreon VUI W4Wr.d- 1.22 .eA W.br Swirly GPem Valuing PreNCed- 0.20 .aA Deb116aR Vol PNAN1Sd- 2.11 ..A CONSRUCTION SEQUENCE NOTES, rtAvann rawc rlevrtc .ua'.anr'zl.3.N.rrrawm' 1. CONTECH"PRAM.AT'(ORAPPROVEDEOI3AUl'OBE cnwalmn: a.zstlmSTuy Ere uo-m INSTALLED PER MANUFACTURER'S SPECIFICATIONSS, Wrrrrvaal-e-var4oe H.n-wm4vaa sr.a.rrrt.rl. W.a-�v.ffn 2. SEE SHEET 2 OF 13 FOR STANDARD EROSION AND swoesra�im-a-uf-auoai.w.�-uawww Mwoa oM+- _ SEDIMENT CONTROL CONSTRUCTION PLAN NOTES. a I to 1 Iz 1 3. ALLDISTURBEDABEASTOBESEEOEOAND _ MULCHED. aa.ro I 4, ROOF DRAINS ONTHE SOUTH. EASTAND WEST SIDE .Rrfawe�m�at OFTHE allLDING TO DISCHARGE ON GRACE. SEE eP3a-W�v eanl-a ARC1111ECTURAL PLANS FOR EXACT LOCATIONS. I .r-r Me-rMNY-1 .MYr. a- I ' earwra .MnP.,I.N..RI ® �r .4ao OTY OF FORT COLUNS• COLORADO U11UN PLAN APPROVAL I I wtli-a earwNra AFPRO%ED:. a4.rowrn I Otte-ea3m awsew-1 CHECKED BY: rsv-.+'u�rr I a•*w A'asrtw+Tw unulr w ' CHECKED BY: uawruaTR3:tm•I I I CHECKED BY: 0MVIARR UWW e11wTRac verAumer 1a� Imyya3rl9.1; dye PrnG�01i vRtrAna4.LIXwcwacIIX roeeofl22a.IEOn PO CHECKED BY: WIEaIB.ROx MTGWOf IAIrO1.aMIIX ' CHECKED BY: City of Fort Collins :Police Services Focilit b� Architcctl:IPC a'. Mao, iWa44r. m1aMr tar. RN iglu. rolr au aN- Ifam-14 -e Hawaar4 d rMr Md1 rauiln au am/b Y W ANarL M Mdelt M Id II an afoot MaaReyu o CS M euf/ r--wa � lf4lMf T�-R �=C-•• nvm • - I-f-¢O•.IRI DRAINAGE & EROSION CONTROL PLAN 1es16T lowm Rm®I ono �ro e3 .r Tm3-Elam n a 3/nN acTw 7 OF 13 0 SIDEHILL FILING 2 - PIPE REDUCTION City of Ft CollinsApp ved Plans Approved By -� Date Li - q - o March 30, 2007 i Mr. Wes Lamarque City of Fort Collins Stormwater.Utility 700 Wood Street Fort Collins, CO 80521 RE: Stormwater Pipe Reduction Due to Decrease in Offsite Flow Release Rate Dear Wes: We are pleased to submit for your review and approval this addendum to the Sidehill Filing 2 Final Drainage and Erosion Control Report (May 27, 2005). This addendum addresses the drainage impacts from the revised release rates from the offsite properties to the west of Timberline Road and Sidehill Filing 2. Two drainage reports; Final Drainage and Erosion Control Report for Timberline Center Subdivision, and Final Drainage and Erosion Control Study for Spring Creek Farms, were reviewed to determine the revised 2-year historic release rates into the Sidehill Filing 2 storm system that initially was sized to receive the 100-year release rates from the offsite properties. Because the offsite release rates have been significantly reduced from the previously approved design rates, it is feasible and practical to redesign the effected Sidehill Filing 2 storm system. The Timberline Center Report .states a release rate of 2.1 cfs and 13.3 cfs to Storm 2 and Storm 3, respectively. The Spring Creek Farms Report states a 2-year release rate of 1.1 cfs from Detention Pond 8 into the Sidehill Filing 2 storm system. Therefore, the total release rate into the Sidehill Filing 2 storm system is 16.5 cfs. This reduction in offsite flow enabled 10 pipes on storm profile Line H (sheets 90 & 91) to be reduced in size. The storm pipe from storm manhole 16 to storm manhole 9 are existing pipes and oversized due to the decrease in offsite flow into this storm system. The reduction in pipe size occurs downstream from storm manhole 9 to the flared end section outlet. Also 2 pipes were able to be converted from HERCP to RCP and still maintain adequate cover. The storm profile Line El (sheet 88) was revised and the 2 pipes were upsized 0.5 feet but still maintained the approved inverts. The supporting calculations and drainage reports are included with this addendum. JR Engineering has reviewed and concluded that the above -mentioned revisions have been designed with provisions for safe and efficient control of stormwater runoff in a manner that will not adversely affect the stormwater system. s unofficial copy was downloaded on Nov-30-2016 from the City of Fort Collins Public Records Website:,http:pcitydocs additional information or an official copy, please contact City of Fort Collins: Utilities 700Wood street Fort Collins,. CO 9 L We appreciate your time and consideration in reviewing this submittal. If you have any questions or need additional information please call (970) 491-9888. Prepared by: Mike Malvey Design Engineer Reviewed bv: /ph arone P.E. ager X:\3930000.all\3935006\Word\Re orts\Drainage Addendum Storm R, is unofficial copy was downloaded on Nov-30-2016 from the City of Fort or additional information or an official coov. please contact Citv of Fort Co Public Records' Website: http://citydms.fcgov.com Iities700 Wood Street Fort Collins, CO 80524 USA