Loading...
HomeMy WebLinkAboutDrainage Reports - 08/17/2000PARK ENGINEERING CONSULTANTS PROPERTY OF FORT COJIMS UTUrr= • ,lrril/�j � . � jj1.II JUN t 3 aw ADDENDUM FINAL DRAINAGE REPORT AND EROSION CONTROL PLAN ADVANCED ENERGY BUILDING 7 FORT COLLINS, COLORADO 420 21st Ave. Suite 101 • Longmont, CO 80501 • (303) 651-6626 • FAX (303) 651-0331 E-mail dpark98Qaol.com ADDENDUM FINAL DRAINAGE REPORT AND EROSION CONTROL PLAN ADVANCED ENERGY BUILDING 7 FORT COLLINS, COLORADO Prepared for: The Neenan Company 2290 E. Prospect Fort Collins, Colorado 80522 (970) 439-8747 Prepared by: Park Engineering Consultants 420 21" Avenue Suite 101 Longmont, Colorado 80501 (303) 651-6626 April 24, 2000 Revised: June 08, 2000 PEC Job # 10751 afdr2.wpd TABLE OF CONTENTS Certification I. General Location and Description II. Historic Drainage III. Drainage Design Criteria IV. Drainage Facility Design V. Referenced Drainage Reports VI. Conclusion Appendix A - Drainage Calculations for Advanced Energy, Building 7 Map Pocket Appendix B - Erosion Control Map Pocket "I hereby certify that this report (plan) for the drainage design of Advanced Energy, Building 7, was prepared by me (or under my direct supervision) in accordance with the provisions of The City of Fort Collins Storm Drainage Design Criteria and Construction Standards for the owners thereof' Registered Professional Engineer State of Colorado No. 16726 (Seal) I. GENERAL LOCATION AND DESCRIPTION This Drainage Report and Plan serves as an Addendum to the approved `Final Drainage Report and Erosion Control Plan' for `Advanced Energy Buildings 7 and 8' approved on January 27, 2000 by Park Engineering Consultants. This report addresses small site revisions for the site without modifying the Tract A - Pond Analysis, found in Appendix B of the approved final drainage report. LOCATION The proposed Advanced Energy, Building 7 is located within the Lots 9 and 10 of Prospect Park East P.U.D. and Lot 23 of Prospect Industrial Park, both subdivisions located in Section 20, Township 7 North, Range 68 West of the 6' P.M., County of Larimer, City of Fort Collins, State of Colorado. More specifically, located on the east side of Midpoint Drive and west of Sharp Point Drive. The site occupies 4.85 acres of said Lots 9, 10, and 23. The site's general location is shown on the enclosed Grading and Drainage Plan located at the end of this section in the map pocket. TOPOGRAPHY The site is unimproved and void of trees, and has ground cover of a variety of grasses and weeds. The site slopes north on an approximate slope of 1.0%. There are existing improvements that surround the site. Water and sanitary sewer lines are present within Midpoint Drive right-of-way. Other utilities such as telephone, gas and electric are in the area. See enclosed map for existing contours and topographical features. H. HISTORIC DRAINAGE BASIN DESCRIPTION The site lies within the Cache la Poudre River Basin. The site drains northerly to an existing pond in Tract A, previously dedicated as a Drainage Easement. The site has been included in previous master planning for the Prospect Park East, P.U.D. Subdivision, and is consistent with the planning. Since the original master drainage report and plan is unavailable, this report will state assumptions used in the master plan. The pond discharges through three 24 inch pipes under Sharp Point Drive. The 3 pipes drain into an old gravel pit. The old gravel pit is on the Anderson property, and there is an agreement with the Andersons to take the drainage. The historic Advanced Energy site consists of two basins, each basin described by the following paragraphs. The historic drainage basin boundary is the common lot line between Lots 9 and 23. Basins (1) and (2) is referenced as the AE site. Basin I : Basin 1 includes Lots 9 and 10 of the Prospect Park East, P.U.D. subdivision as shown on the enclosed Historic Conditions map. Historic drainage overland flows northeasterly to an existing pond in Tract A. Historic drainage calculations for Lots 9 and 10 are located in Appendix A. The historic flow rates for the 10 and 100-year storm events are as follows: Q10 1.79 cfs, Q100 3.68 cfs. Basin 2 Basin 2 includes Lot 23 of the Prospect Industrial Park subdivision, as modified by Vipont at Prospect Park East subdivision, as shown on the enclosed Historic Conditions map. Historic drainage overland flows northeasterly to Lot 8 in Prospect Park East, as developed by the Vipont Manufacturing Facility. The drainage report for Lot 8 is enclosed in Appendix E. Within said report, an off -site undeveloped basin of 1.65 acres is considered_ and accounted for in the design of Vipont's improvements. The undeveloped flows from Lot 23 is included within the off -site basin for the Vipont Manufacturing Facility. The off -site, undeveloped flow rates for the 10 and 100-year storm events are as follows: Q10 0.39 cfs, and Q,.= 0.82 cfs. For more information, see the report and plan in Appendix E. Historic calculations for this Basin are included in Appendix A. Original Master Drainage Planning for the AE Site: The original master drainage concept/plan for the original Prospect Park East, P.U.D. subdivision was to provide drainage facilities which convey the storm drainage to the improved drainage facilities, and has been accepted and approved by the City for all previous developments in/for the Prospect Park East, P.U.D. subdivision; including all relative properties replated with original Prospect Park East, P.U.D. lots. Historic storm drainage from the AE site overland flows to the pond area in Tract A. Since the AE site is part of the Prospect Park East P.U.D., all developed storm water flows for Commercial/Light Industrial uses were considered in the Master Plan. "Limited" off -site drainage from Midpoint Drive currently flows through a drainage swale across the south and southeasterly property lines and conveyed to Tract A. "Limited" is described and defined as follows: given the existing section and profile of Midpoint Drive, the existing profile from Timberline Road is near -0.5% sloping easterly to an existing cross pan. The cross pan is adjacent to the common lot line for Lots 9 and 23 and is shown on all plans for the proposed development. The next `high point' in Midpoint Drive is located approximately 140 feet south of the cross pan and is shown on the enclosed plans; this high point is located near the northern edge of the Temporary Access Drive in Lot 23. Existing spot elevations are shown and basin he has been delineated, to show and visualize the existing high point. The 100-year flow rate for Midpoint Drive is 10.20 cfs. Since the City has not required on -site detentioning for the Larimer County Detention Center in the past and most recent expansion, 100-year flows from the County's facility is 60.4 cfs. See the Drainage Report and Plan for the County Detention Center prepared by The Engineering Company, dated February 1998 in Appendix E. The County's property was not included within the Prospect Park East, P.U.D. master drainage plan, and the AE site is required to convey undetained storm water flows through the site to the existing pond in Tract A. The existing pond volume is 7.69 acre-feet and is shown on the Off -site Drainage Plan, located in the map pocket at the end of this report. As stated in the Storm Drainage Report for One Prospect P.U.D., prepared by Stewart & Associates, Inc. dated August 16, 1990, and enclosed in this report in Appendix E, under the second paragraph of the `Offsite Drainage Onto The Site' section, `the 100 year existing condition storm will cause a 75 c.f.s. overflow of Timberline Road', per the Engineering Professionals' March 1988, Spring Creek drainage study. In the fourth paragraph of said report and said section (for off -site drainage), `the overflow of Timberline Road will occur more than 2 hours after the beginning of the storm', per the Northern Engineering Services, Inc. analysis of the Spring Creek flood flows. M. DRAINAGE DESIGN CRITERIA The City of Fort Collins "Storm Drainage Criteria Manual" was used as a standard. This report was developed using the above referenced manual. The hydrological criteria used for this report was based on the "Intensity - Duration - Frequency" curves for the City of Fort Collins. Using the rational formula method for runoff calculations, flow rates for each sub - basin was determined for the 10 and 100 year occurring storms. Hydrologic calculations are included in Appendix A along with the related tables and figures. The original master drainage planning for the subdivision (and AE site), and previous drainage reports found in the approved original `Final Drainage Report and Erosion Control Plan' by Park Engineering, which this report serves as an Addendum. IV. DRAINAGE FACILITY DESIGN The drainage concepts for the developed conditions will be discussed in the following paragraphs. The developed conditions are shown on the Drainage Plan located in the map pocket at the end of this report. History: The AE site will be developed in a manner consistent with storm water management practices, and the approved master plans for the subdivision. The development is typical with buildings, parking, and landscaping for uses in IL Zoning. The runoff will be directed through inlets and piping, curb and gutters to the existing pond in Tract A. The site is broken into nine (9) sub -basins by the development. All sub -basins are shown on the Drainage Plan in the map pocket at the end of this section. Sub -basin Al is located at the south end of the property includes the proposed temporary access drive to Liberty School, and the drainage from the access drive will be free released to the existing storm water collection system for the Liberty School. The approved "`Drainage Report Lots 5, 6, & 7, Prospect Park East P.U.D., Vipont Laboratories"' dated April :7, 1987 for Stewart & Associates accounted for off -site flows (Q10=1.3 cfs and Q100=3.1 cfs) from Sub -basin Al to the property. The actual `developed' flows (Q10=0.86 cfs and Q100=1.46 cfs) will be free released to the school property which is less than the considered flows, and should not have any detrimental affects to the existing storm sewer facilities located on the Liberty School property. Therefore no Drainage Easements are required for Sub -basin Al to drain to the existing Liberty School property. Sub -basin 1 for the Liberty School (same Sub -basin 1 for the Vipont Manufacturing Facility previously mentioned and referenced) currently, and will continue to drain storm water flows through the AE site and will be protected through the dedication of a Drainage Easement on the AE site. All sub -basins for the AE site, collects storm drainage for overland flows and infrastructure through local grated inlets and will be conveyed to the pond in Tract A. Sub -basins F6 and F 18 represents the service area between the two buildings and collects runoff from the service yard and a small portion of the building and piped through a storm line to the existing pond in Tract A. Sub - basin E5 represents the building which connects buildings 7 and 8 and a small court area at the northeasterly portion of the site, and will flow. directly to the pond. Off -site runoff from Midpoint Drive for the 10-year storm will be piped and the majority of the 100-year storm will be allowed to overflow the curb/street section and will overland flow through the AE site to the existing pond in Tract A; which will not change the conveyance route for the storm water from existing conditions. This analysis can be found in Appendix A and B of this report. Original: Developed runoff rates for the sub -basins are calculated in Appendix A as follows: Sub -basin Al: Q10 = 0.86 cfs; Q100 = 1.46 cfs; Sub -basin 132: Q10 = 3.05 cfs; Q100 = 5.18 cfs; Sub -basin C3: Q10 = 2.76 cfs; Q100 = 4.70 cfs; Sub -basin C 17: Q 10 = 0.71 cfs; Q 100 = 1.22 cfs; Sub -basin D4: Q10 = 4.47 cfs; Q100 = 7.61 cfs; Sub -basin E5: Q10 = 1.73 cfs; Q100 = 3.32 cfs; Sub -basin 176: Q10 = 2.14 cfs; Q100 = 3.89 cfs; Sub -basin F18: Q10 = 1.43 cfs; Q100 = 2.43 cfs; Sub -basin GT Q10 = 6.69 cfs; Q100 = 12.15 cfs; Addendum: Developed runoff rates for the on -site sub -basins are calculated in Appendix A as follows: Sub -basin Al: Q10 = 0.86 cfs; Q100 = 1.46 cfs; Sub -basin B2: Q10 = 3.05 cfs; Q100 = 5.18 cfs; Sub -basin C3: Q 10 = 2.76 cfs; Q 100 = 4.70 cfs; Sub -basin C 17: Q 10 = 0.71 cfs; Q 100 = 1.22 cfs; Sub -basin D4: Q 10 = 4.47 cfs; Q 100 = 7.61 cfs; Sub -basin E5: Q 10 = 1.73 cfs; Q 100 = 3.32 cfs; Sub -basin F6: Q 10 = 2.14 cfs; Q 100 = 3.89 cfs; Sub -basin F 18: Q 10 = 1.43 cfs; Q 100 = 2.43 cfs; Sub -basin GT Q10 = 6.69 cfs; Q100 = 12.15 cfs; The developed runoff rates for the on -site basins were (in the original drainage report) and continue to be small sub -basins in which the time of concentrations for each sub -basin did not exceed the 5 minute, minimum, time of concentration. Since the underground storm drainage facilities were designed using the minimum acceptable standards, which, through analyzing the revised site (with this addendum to the original drainage report), the storm water flow quantities for the 10 and 100-year storm did not change, as can be seen above. Detention Pond, Release Structure and Other Improvements - No other improvements are required for this site since this area is allowed to free release to the existing pond in Tract A. V. REFERENCEWDRAINAGE REPORTS This Drainage Report serves as an Addendum to the following drainage report, which is not included due to size, which contains all previous drainage reports for the Subdivision. Final Drainage Report and Erosion Control Plan Prepared By: Park Engineering Consultants Dated: April 7, 1999 Approved: January 27, 2000 VI. CONCLUSIONS The drainage concepts for this project are consistent with current policies and practices for storm drainage management. The site will maintain the flow patterns and be consistent with the development practices in the area based on the master planning. APPENDIX A Drainage Calculations for Advanced Energy - Building 7 3.1.6 Runoff Coefficients The runoff coefficients to be dsed with the Rational Method referred to in Section 3.2 "Analysis Methodology" can be determined based on zoning classifications if the character of the surface is unknown. However, the final drainage study must calculate a composite coefficient using Table 3-3. Table 3-2 lists the runoff coefficients for the various types of zoning along with the zoning definitions. Table 3-3 lists coefficients for the different kinds of surfaces. Since the Land Development Guidance System for Fort Collins allows land development to occur which may vary the zoning requirements and produce runoff coefficients different from those specified in Table 3-2, the runoff coefficients should not be based solely on the zoning classifications. The runoff coefficient used for design should be based on the actual conditions of the proposed development. The Composite Runoff Coefficient shall be calculated using the following formula: n C (CiAi) / At i=1 Where C = Composite Runoff Coefficient Ci= Runoff Coefficient for specific area Ai Ai= Areas of surface with runoff coefficient of Ci n = Number of different surfaces to be considered A,= Total area over which C is applicable; the sum of all Ai's is equal to A, - Table 3-2 RATIONAL METHOD MINOR STORM RUNOFF COEFFICIENTS FOR ZONING CLASSIFICATIONS Descriotion'of Area or Zonina Coefficient Business: BP,BL..................................... 0.85 Business: BG,HB,C................................... 0.95 Industrial: IL,IP................................... 0.85 Industrial: IG...................................... 0.95 Residential: RE,RLP.................................. 0.45 Residential: RL,ML,RP ............................... 0.50 Residential: RLM,RMP................................ 0.60 Residential: RM,MM.................................. 0.65 Residential: RH..................................... 0.70 Parks, Cemeteries .................................. 0.25 Playgrounds ........................................ 0.35 Railroad Yard Areas ................................ 0.40 Unimproved Areas....................................0.20 Zoning Definitions R-E Estate Residential District - a low density residential area primarily in outlying areas with a minimum lot area of 9,000 square feet. R-L Low Density Residential District - low density residential areas located throughout the City with a minimum lot area of 6,000 square feet. R-M Medium Density Residential District - both low and medium density residential areas with a minimum lot area of 6,000 square feet for one - family or two-family dwellings and 9,000 square feet for a multiple family dwelling. R-H High Density Residential District - high density residential areas with a minimum lot area of 6,000 square feet for one -family or two-family dwellings, 9,000 square feet for a multiple family dwelling, and 12,000 square feet for other specified uses. R-P Planned Residential District - .designation of areas planned as a unit (PUD) to provide a variation in use and building placements with a minimum lot area of 6,000 square feet. May 1984 Revised January 1997 Design Criteria 3-3 No Text 0 CW4 o O N N N s U O W W ¢' Uo 2Ci QM UU II II N N II O G b V1 H O� n 00 b 7 0 U O .-. O �1 N M H H A A II r7 cn C� a ° � F v� ¢ w � Q ti 11 II S C6 n a a aw. o C aa, a O H O F, a c' z � � d o as r w x d a C n n O O w Q f� W xV W O z II II II ww jj......)) O O � Ii 22 UO O V u a 00o �n _Ohovi OR 0 OR II 'o 20 II II II O �, U G .. C r-i o o ..i F:. o h a0 1pj� C .• u F F F F n II O L" F Q v w �q d I V�pck ± u o r U U F �V °a O � Iv 0 z a a w w a w w a m a 4 N w C's z n u u cn > ww w� 6Ko �0000ryo S o N oo`b N O �Q^ "' O o�o� N^ �yj��jj C�q UU a ��TT CD 00 II I^ oo II p II' II II p^p II �O S (? �oo o .. U C .• o .a � � .a F: :� o � oo A. m vi F F F F II F � Q W � ti II F II co p CD CD o_ z 0 li s N w � o z a ova w F W.a W A n o e W 8 0 � N Q WW xU W O z II if II cr a 0 ov oo no O Q, O oCD n �o non o U O N O r O Q F7 U U a N O O v1 O Ox v1 II li�. �� II O 11 II II 00 II �� U O .a V N vi F F F F II O L" F U Q � Q ^ A � II U GO �xo Oo UU �� as 0 00 o-r v II O F M � U o z a � a ' � o w w > A W� w N 'c n 0 0� W {xW xUx W [yew z u II n (1! a O 00 N O U N b n Q N N+ W W Ifif a 000 0 ov�ov� 00 0 0o n oo u II I%�^ o 0 0 0o v, o. U o= o a >> .a t: o n oo o 0 3 F H F F A 0 � F w L1 t n x�" W4 x S F OU Oa W �F x Q 0 ' � 8 O o U U V '• a O' z o n 0 � F proU ti ;To z a � t e a a --TFFm w o z II n u cn > acn me� ^ V ON ¢ U O .-+ .+ N O M f`I F1 aLl x OOC OONO. II It p II a, en �n06 c� F F F F A F Q F n A II U U z 0 0 GL 7 � o z a o�a a � a O w a H w a n 0. t, e 0 f. O y y y N O O O v1 N 0� 0 N O 00 y W y W Q U o- r N r- ri U U 7 �n 00 S o0 II It ^ II pp II o II 00� CDC\ U o0 � �D C o0 O ' VV F ems. F F F n CA O L' F y Q w r, AgQ a l FOOD ^ E~ II II U A - w C,V O U � o0 u > rx 0 F GT* o z a m a ' � o ^� F A e o W XW F] 0 z u n u rlr a coo GLL V o o O_ w O N O S (� O O� �D M II A �{ .M+ O i� Cam+ �I C 77 U Cn U a 7 0 O 0 j oq II 0 II 0 II II O O C O r C.• Uc.--�O 4n o0 1. Nm V F F F F A y _ 0 � F Q � w A F A II a Q rn rn w4;jF� >itII � � F• 00 UV C.� II UWU Ca W F. u F 00 _ p �U �a z 00 0 c n 0 F b w a � a ' � o ^� F A e a� s o o6 ci a z° v O O e O O h�O oo N O can CAA II oo CN .--+m N vArn C .-� W V IX. V a n 00 ov,ov� o0 Cl 00 (' Mr O .-. U O .-. O r..i > > 11 F Q cn isA,,^ II II L:7 t �OOcK II .7 rn 00o p U F U as z 0 v r.r II O F w ELI' o z � Q a oa a � o w a F W �W W A N w �sQ7 k] xV W O z n n u zz p z v>> cn L'-1 C: o O O v1 00 V1 N O C N M N M vl II M 00 q 'O VW1 Vi VVV N A F7 U W U a II r. II O II II Cj S O lei O O V F F F F n CA O ~ Li H n u c U, o U V UW�¢ U II O p,a O n 0 ice. F r o z � x A o W ..a F W W A d c IF 4 DRAINAGE CRITERIA MANUAL RUNOFF 5C 30 f- 20 z w U cc a 10 z w a 5 w cc 3 O U 2 w F- Q C- 1 5 .1 oil FA 0 �11, IN �. ■�� YAM 0i w FA we 2 .3 .5 1 2 3 5 10 20 VELOCITY IN FEET PER SECOND FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE WITH THE RATIONAL FORMULA. * MOST FREOUENTLY OCCURRING"UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. 5 -1-84 URBAN DRAINAGE 6 FLOOD CONTROL DISTRICT APPENDIX B Temporary Erosion Control EROSION CONTROL Temporary erosion control for this site consists of silt fence, hay bales and vehicular tracking precautions. Silt fence is to be placed on the down sloping side of all areas where earthwork will de done and where the soil has/will been disturbed prior to the initiation of construction and removed once the `exterior' site construction is completed. Hay bales will be placed around the private storm inlets once installed, until all paving is completed on the site. Vehicular tracking will be placed at the two access points to the property as shown on the plan. Permanent erosion control will consist of concrete pans in the storm water flow channels where required. Please refer to the Erosion Control Plan for specific location of erosion control devices and notes, located in the map pocket at the end of this report. CONSTRUCTION SEQUENCE PROJECT: llpll/9NCED &U&V &c C7 7 STANDARD FORM C SEQUENCE. FOR DO ONLY COMPLETED BY:2K��afFk /1 _ Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR MONTH ---------------------------- OVERLOT GRADING WIND EROSION CONTROL Soil Roughing Perimeter Barrier Additional Barriers Vegetative Methods Soil Sealant Other RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin Inlet Filters Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary Seed Planting Sod Installation �"! -----------------------------------------------------------I I ! I Nettings/Mats/Blankets Other I I I ---------------------------------- -------------------------------------=- STRUCTURES: INSTALLED BY VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED HDI/SF-C:1989 MAINTAINED BY APPROVED BY CITY OF FORT COLLINS ON A = 13M9'30r R - 757.27' T = 87.34' _ L� 19591� i CN T - 88.85' I N VA � x v I \ I LOT 22 \ a III LARIMER COUNTY DETENTION CENTER I I I I I I i F j I A-o7 )•W I R - 55 L- 70. a -• A all i ADDENDUM NCA \\ ADDENDUM NO, 1 INCLUDES THE FOLLOWING REMSIWS TO THE APPROVED PLANS DAM 01/27/00: \ (1) NORTHWEST ACCESS DRIVE TO SITE FROM MIDFMIT DRIVE AND AFFECTED PARKING AND LANDSCAPE AREAS; DRIVE MOVED CLOSER TO NORTHWEST PROPERTY LINE; (2) NORTHWOST ON -SITE WATER LINE FOR FIRE HYDRANT, FIRE LINE AND DOMESTIC SERVICE \ WATERLINE MOM WITH DRIVE (TO BE CENTERED IN DRIVE); I ((d)) FINISHED FLOOR ELEVATOI; INCREASED BY ONE (1) FOOT; (4) MODIFIED LOCATON(S) AND NUMSER(S) OF DOCK HIM DOORS ALONG SOUTHWEST SEE OF BUILDING; I (5) ABANDONMENT"SMULTPLE (TWO - 2) WATER AND SANITARY SEWER SERVICES TO THE BUILDING; NOW A SINGLE DOMESTIC WATER AND SANITARY SEWER SERVICE. THE CHANGES TO THE APPROVED PLANS ARE 'CLOUDED' AND REFERENCED BY ADDENDUM'. NO. 1 0+00 0+50 MIDPOINT SWALE SECTION SEE SECTION M-M H.T.S. 0 R=1 MIS T = 100._4 / \ A L: 193.60' CH SIM43PE Y IVI — IPLN -- — r�ITTT-PIT LOT 8 N VIPONT AT PROSPECT PARK EAST F.F. = 4898.90 l SNAiwI` -- VARIES 4 / \ — 11'47'IN SECTION A -A DRAINAGE SWALE NTA ,,-'' % B '00 \1 IBLDGI T/ F.F. = 4901 / / I� 1 64P I A 1.07 \�CLJAOO �FVIWIT a\OI\T N lln� III I) 1� la LOT 11 aIII III I �IaII a MOM Part — — -- — %/ li a-aLM as i `/ err DRAINAGE LEGEND EASONG CONMR 0-Vo / PROPOSED CIXGpA (1_f.) vRavox) CCNteIF (5'2) // / / / I ❑ PWOSID CAMI DAMN / �• PROPOSE) INLET I ' ORANAGE FLOW MMOR I/ h of Fat Collins, Colorado I \ I I tn7T PLAN PROVADIOED I Put �7 m gL�Gx6p m� .1„ L F.F. = 4896.90 I / I ONEC"'EO BY: I III/ I SNARi PONT dilvE NFI \ \ � L � TWNMARr Reuse f127 m F!k_________ _ _ ____ 1 a/UDAW aTr Caaanrs Wnw m/J1A7O aN I T _ .._ wAam AttQ1gM No. 1 GWn 1 �� //_` � � a- / ORIgNAL SCAlE 1'-40' LOIGMONT CO. BO501- (30J)651-61 ADVANCED ENERGY, BUILDING 7 GRADING PLAN J� .,sm 1/4'R Y 11 11 R CRIWEIE e. CRnICATCHP�� N.T.S. 4,/T ,. 1/4'R 2 CONOEIE R' B• WmncAL (]1RB [SILL PAN) N.M �' -- MIDPOINT _1 mum- u+uu ,+uu 100 YEAR SWALE SECTION SECTION D—D DRAINAGE I FGMD O\ m 1p� A lo-1cM RRm ammr 9.a1 IIWA (4NKq EM"NG X Nl NTWR mlr Eg511050n pR[PoSEp Cp1rINR ❑ Mm D CArw RnsN �. NfWD5ED ICU .. — rRw0 SMIM 40013t ® I RwOY➢ STCRN w EM51N0 PM W RM LARIMER COUNTY DETENTION CENTER / °0' rr. Wn J op [ /\ TV1�41 / / ( IXV: N IXV. W DRAINAGE SUMMARY TABLE \ BASIN Awl 91R 919D •1 ne9 w p apWe 3 al Cl a an FA 4ll 0.1 all I.Sf 1 0 0. I." &47 Al M41ne a:xI I." a- m tw 7.14 IL15 m 1.422 ap 9.94 J10 ])J A 63.•6 X11 4Ap 1a4p n" 1 L12 ai =17 wee M13 0. 31M 00.11 M4 Wo }w ms a „�.,220. 424 me =A mb Iwo 339.7 i J LOT 8 VIPONT AT PROSPECT PARK EAST F.F. = 4898.90 ADDENDUM NO.1 ADDENWM N0. 1 INCLUDES THE FOLLOWING REMSIWS TO TIE APPROVED PLANS DATED 01/27/OG (1) NORTHWEST ACCESS DRIVE TO SITE FROM MIDPOINT DRIVE AND AFFECTED PARKING AND UNDSCAPE ASS; DRIVE MOVED CLOSER TO NORTHWEST PROPERTY UNE; (2) WAAIERUNEE NOVED WT-I DRIVE (TO BE CENTERED INTLINE AND DOMESTIC SERMCE; DRIW) ((J)) FINISHED FLOOR ELEVATION; INCREASED BY ONE (1) FOOT; (4) MODIFIED -O `R N(S) AND NUMBERS) OF DOCK HIGH DOORS ALONG SWTIWEST SIDE OF BUILDING; (5) ABANDONMENT OF MULTPIE (TWO - 2) WATER AND SANITARY SEWER SERMCES TO TiE WILDING NOW A SINGLE DOMESTIC WATER AND SANITARY SEWER SERVICE THE CHANGES TO THE APPROVED PLANS ARE 'CLWDED' AND. R0TRE4CED BY ADO❑1WM NO. Wn.07 1 --_91 �r `f�- �y II I II \ III v I ill Icn LOT 1 1 I\ I 1 111 d 1,]4 r ri (FT111 rR AW7lTFTTTTlTML.0 iji1LL n LZUJ -A- l 1j(-)l 4o / I mOPnWMw Lae i / rl l I I 1 1 I I n / . fur 1i1�4emd / B// I CtmrzFrw R" j ,LTpp-lRf M w d / / e / ilo I °- MY of EDR CDWN. Colomdo \U71L n PROV NINgv[D: 1 E9 BD p.N dEGNEDSV: •)N).N 1 CNFGNED RN wYv U MY � CIIEGfED BY.. DHECKEo m: �i BN --var- F.F. = 4896.90 SCAB` 1'.4O' . I CONSULTA P rwnn SULTA TS — NTS 420 AVENUE, SUITE 101 � LWGO. CMWT CO. NMI (J03)851- 1-GI ADVANCED ENERGY. BUILDING 7 DRAINAGE PLAN