Loading...
HomeMy WebLinkAboutDrainage Reports - 05/08/2017 (2)TA I T tta.e re t.t c..ttt.et D:970161311447 rrr,t9i4tpnt September 14, 2016 City of Fort Collins Engineering Division 281 N College Fort Collins, CO 80524 Drainage Letter for the Proposed Site Development located at 2860 E Harmony Road, Fort Collins, CO 80528 Lot 6, Front Range Village Dear Rick Richter . s 6163 E. County Rood 16, lo.elond, CO 80537 i ter Utilities Redlln Review Date: Sao Return with Res �. City offt,, COOT pro ,Plans Approved Sy Date This drainage letter is to convey the proposed site development conforms to the overall report, which is titled Final Drainage and Erosion Control Study for Front Range Village, Fort Collins, Colorado prepared by Stantec Consulting Inc. 209 South Meldrum, Fort Collins, Colorado 80521 (February, 2007), and will hereafter be referred to as the Master Report. The subject property is currently an undeveloped lot. The lot is a 55,922 square foot (1.28 acre) site located in the southeast quarter of Section 32, Township 7 North, Range 68 West of the 60' Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado, on the northwest corner of Harmony Rd and Zeigler Rd. The subject property lies on Lot 6 of the Front Range Village Subdivision. It is bound to the South by Harmony Road, to the west by an existing Chase Bank, to the north by a private access drive, and to the east by a Famous Dave's BBQ Restaurant. Proposed improvements for this lot include a building constructed on the south side of the site with a total footprint of about 8,540 square feet, consisting of a strip mall of two restaurants with a combined square footage of 6,720 SF and a retail store that uses 1,820 SF. This site will have 51 parking spaces, paved driveways, parking stalls, a trash enclosure, and landscape islands. The site consists of Type C Soils Nunn clay loam, and existing backfill. This site is located in flood Zone X, "Areas determined to be outside the 0.2% annual chance floodplain." Existing drainage patterns convey flows to the northeast side of the property where there is an existing area inlet. The Master Report was calculated using an overall imperviousness of 95-percent for this basin. The proposed lot is accounted for in the Final Drainage Report as a portion of basin 200, which has a total area of 2.74 acres. Basin 200 has a C10 of 0.85, C100 of 0.85, Tc10 of 6.4 minutes, Tcloo of 5.0 minutes, and flows of Q1o=10.41 cfs and Q1oo= 27.24 cfs. Lot 6 has an area of 1.28 acres, so the weighted flows for pre -developed Lot 6 are Q1o= 4.86 cfs and Q1oo=12.72 cfs. The post developed site will discharge at rates less than or equal to these flows in the 10 and 100 year storm events. Post -development drainage will be conveyed via a private, on -site storm drainage network which will be composed of four 6" trench drain systems, each connecting to a 12" PVC storm drain pipe which will convey runoff to the existing area inlet in the northeast corner of the site. At the same time, the parking lot and sidewalk along the north face of the building will be conveyed via sheet flow and curb and gutter to a curb cut in the northeast corner of the parking lot. This curb cut will allow flow to travel to the proposed grass swale along the north landscaping area of the lot where it will discharge into the existing area inlet. From this existing inlet, runoff from the site will be conveyed to an existing detention pond within the Front Range Village system prior to the ultimate discharge of the runoff into the Cache la Poudre. Pipe sizing calculations are attached to this letter for reference. The post development property consists of six on -site sub -basins and two off -site basins. See drainage sheets for additional information. Post -development Sub -basin B1 consists of 0.20 acres of the proposed building. This basin is 90% impervious. Runoff from this basin drains via roof and storm drains to the existing type B inlet where it is piped into existing storm sewer infrastructure. Sub -basin 61 discharges at a rate of 0.85 cfs in the 10- year storm event and 1.82 cfs in the 100-year storm event. Post -development Sub -basin B2 consists of 0.64 acres of parking lot and landscaped area on the north side of the property. This basin is 82% impervious. Runoff from this basin generally sheet flows to the north where it is routed through a 3' curb cut and into the existing inlet. Sub -basin B2 has a discharge rate of 2.52 cfs in the 10-year event and 5.56 cfs in the 100-year storm event. Post -development Sub -basin 63 consists of 0.18 acres of paved walkway, paved road, and landscaped area along the east side of the property. This basin drains offsite, where it sheet flows towards the existing inlet on Lot 7 in accordance with existing conditions. This basin is 77% impervious. Sub -basin B3 discharges at 0.68 cfs in the 10-year event and 1.52 cfs in the 100-year storm event. Post -development Sub -basin 64 consists of 0.08 acres of paved walkway and landscaped area on the southeast corner of the property. This basin drains into a proposed trench drain inlet along the south side of the proposed building. This basin is 53% impervious. Sub -basin B4 discharges at 0.23 cfs in the 10- year event and 0.59 cfs in the 100-year storm event. Post -development Sub -basin B5 consists of 0.08 acres of paved walkway and landscaped area on the southwest corner of the property. This basin drains into a proposed trench drain inlet along.the south side of the proposed building. This basin is 53% impervious. Sub -basin B5 discharges at 0.23 cfs in the 10- year event and 0.59 cfs in the 100-year storm event. Post -development Sub -basin B6 consists of 0.07 acres of paved walkway and landscaped area on the west side of the property. This basin drains into a proposed trench drain inlets along the west side of the proposed building. This basin is 63% impervious. Sub -basin B6 discharges at 0.22 cfs in the 10-year event and 0.52 cfs in the 100-year storm event. Post -development Sub -basin OFF1 consists of 0.04 acres of paved walkway and landscaping south of the property. The sub -basin is 48% impervious. Discharge from this area runs onto B5 and then follows the same drainage patterns. Sub -basin OFF1 discharges at 0.11 cfs in the 10-year event and 0.30 cfs in the 100-year storm event. Post -development Sub -basin OFF2 consists of 0.08 acres of paved walkway and landscaping south of the property. The sub -basin is 35% impervious. Discharge from this area runs onto B4 and then follows the same drainage patterns. Sub -basin OFF2 discharges at 0.18 cfs in the 10-year event and 0.53 cfs in the 100-year storm event. The overall post -development site imperviousness is 67%, compared to the 95% pre -development conditions. This imperviousness was calculated using 0.24 acres of landscape as pervious service. After improvements, the site will discharge at a total rate of 11.44 cfs in the 100-year storm event, generating 1.28 cfs less than existing conditions. In the 100 year event, the total site discharge rate will be 11.44 cfs, compared to 12.72 cfs in the originally proposed condition. The site will discharge at 1.28 cfs less than the originally proposed condition as determined in the master drainage report. The overall drainage concept for this site is to convey flows via underground storm drain and sheet flows to an existing inlet on the northeast corner of the property. The proposed condition reduction of runoff in the in the Master Report. Sincerely, Alex Hoime, PE Director has 1.08 acres of impervious surface, 18% less than originally proposed, and a 100 year storm event of 1.28 cfs from the originally proposed design as shown RUNOFF COEFFICIENT CALCULATIONS Project Name: C01303B - Front Range Village - Lot 6 Calculated By: KV Check By: AH Date: 8/17/2016 RECOMMENDED RUNOFF COEFFICIENT AND PERCENT IMPERVIOUS' Runoff Coefficients C-value LAND USE %IMPERVIOUS 10 YEAR 100 YEAR LANDSCAPE 2 1 0.22 0.52 DRIVES AND WALKS 90 0.87 0.91 ROOFS 90 0.87 0.91 POST -DEVELOPMENT CONDITIONS: AREA DESIGN A(LAND.) AC A(D&W) AC A(ROOFS) AC A(TOTAL) AC C110 C100 % IMPERVIOUS B7 0.00 0.00 0.20 0.20 0.87 0.91 90 B2 0.06 0.58 0.00 0.64 0.81 0.87 82 B3 0.03 0.15 0.00 - 0.18 0.77 0.85 77 B4 0.03 0.05 0.00 0.08 0.59 0.74 53 B5 0.03 0.05 0.00 0.08 0.59 0.74 53 B6 0.02 0.05 0.00 0.07 0.67 0.79 63 OFF1A 0.02 0.02 0.00 0.04 0.56 0.72 48 OFF2A 0.05 0.03 0.00 0.08 0.46 0.67 35 TOTAL: 1.37 WEIGHTED: 0.74 67 1 Runoff coefficients and percent impervious per Grand Junction Stormwater Management Manua 'CONTRIBUTING OFFSITE AREAS DRAINING INTO DETENTION BASIN BUT OUTSIDE OF PROPOSED PROPERTY. 10-YEAR INDIVIDUAL BASIN FLOWS Project Name: C01303B - Front Range Village - Lot 6 Calculated By: NE Check By: AH Date: 8/22/2016 POST -DEVELOPMENT CONDITIONS: SUB -BASIN DATA DIRECT RUNOFF CONTRIBUTING BASINS BASIN AREA acre C10 EFFECTIVE AREA acre I in/hr SUB BASIN' Q cfs Bi 0.20 0.87 0.17 4.87 0.85 B2 0.64 0.81 0.52 4.87 2.52 B3 0.18 0.77 0.14 4.87 0.68 B4 0.08 0.59 0.05 4.87 0.23 B5 0.08 0.59 0.05 4.87 0.23 B6 0.07 0.67 0.04 4.87 0.22 OFF1A 0.04 1 0.56 1 0.02 4.87 0.11 OFF2A 0.08 1 0.46 1 0.04 4.87 0.18 TOTAL: 5.02 I per City of Fort Coillins stormwater design standards. 010= C*I*A 100-YEAR INDIVIDUAL BASIN FLOWS Project Name: C01303B - Front Range Village - Lot 6 Calculated By: NE Check By: AH Date: 8/19/2016 POST -DEVELOPMENT CONDITIONS: SUB -BASIN DATA DIRECT RUNOFF CONTRIBUTING BASINS BASIN AREA acre C100 EFFECTIVE AREA acre I in/hr SUB BASIN Q cfs B1 0.20 0.91 0.18 9.95 1.82 B2 0.64 0.87 0.56 9.95 5.56 B3 0.18 0.85 0.15 9.95 1.52 B4 0.08 0.74 0.06 9.95 0.59 B5 0.08 0.74 0.06 9.95 0.59 B6 0.07 0.79 0.05 9.95 0.52 OFFM 0.04 0.72 0.03 9.95 0.30 OFF2A 0.08 0.67 0.05 9.95 0.53 TOTAL: 11.44 I per City, of Fort Coillins stormwater design standards. Q100= C*I*A Culvert Report Hydraflow Express Extension for Autodesk@ AutoCAD® Civil 3D® by Autodesk, Inc. 12-inch PVC Storm Drain Analysis Invert Elev Dn (ft) Pipe Length (ft) Slope (%) Invert Elev Up (ft) Rise (in) Shape Span (in) No. Barrels n-Value Culvert Type Culvert Entrance Coeff. K,M,c,Y,k Embankment Top Elevation (ft) Top Width (ft) Crest Width (ft) S. ml id 00 107 M TM00 106W 10. o0 IM M 10$.00 'Q DD 100.00 W00 = 100.00 = 400.00 = 1.00 = 104.00 = 12.0 = Circular = 12.0 = 1 = 0.012 = Circular Concrete = Square edge w/headwall (C) = 0.0098, 2, 0.0398, 0.67, 0.5 = 107.00 = 395.00 = 395.00 �Neme> GrMVGd M L Em k Calculations Qmin (cfs) Qmax (cfs) Tailwater Elev (ft) Highlighted Qtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (ft/s) Veloc Up (ft/s) HGL Dn (ft) HGL Up (ft) Hw Elev (ft) Hw/D (ft) Flow Regime Wednesday, Sep 14 2016 = 4.35 = 4.35 _ (dc+D)/2 = 4.35 = 4.35 = 0.00 = 5.69 = 5.54 = 100.94 = 105.70 = 106.42 = 2.42 = Outlet Control H D.M m 4.00 3A0 I.00 1.00 0.00 4.00 -z.00 -900 4.00 .500 Ra 00 Channel Report Hydraflow Express Extension for Autodesk@ AutoCAD® Civil 3D8 by Autodesk, Inc. 3-foot Curb Cut Analysis Rectangular Bottom Width (ft) = 3.00 Total Depth (ft) = 0.50 Invert Elev (ft) = 100.00 Slope (%) = 1.00 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 5.56 Elev (ft) 101.00 - 100.75 100.50 100.25 100.00 99.75 Section Wednesday, Sep 14 2016 Highlighted Depth (ft) = 0.37 Q (cfs) = 5.560 Area (sgft) = 1.11 Velocity (ft/s) = 5.01 Wetted Perim (ft) = 3.74 Crit Depth, Yc (ft) = 0.48 Top Width (ft) = 3.00 EGL (ft) = 0.76 0 .5 1 1.5 2 2.5 3 3.5 4 Reach (ft) Depth (ft) 1.00 0.75 0.50 0.25 -0.25 1 u anmm• P !♦ K 11 PROPOSED 6' e TRENCH DRAIN � • ' PROPOSED IYN • D �• '. OPOSED �! ♦•• / i oe . N • AI STORM DRM I� / � STORM DRAIN 5i f S /B �•D may. • > \� D 1 '�'} ,. a B5 ppOFpyD g• 1 CH �qce -'� • BSI' iRET 1 I - r .D sa �. , .0 53202, 1 N 89'26'30" W OFF1 i � OFF2 � i 0.1 --- 1 1 .J----------------------- --- 1 UNAUTHORIZED CHANGES & USES THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR OR UABLE FOP. UNAUTHORIZED CHANGES TO ON USES OF THESE RANI ALL CHANGES OF THESE BANS MUST BE N WITHIG AND MUST BE APPROVED BY THE PREPARER OF THESE BANS PRIOR TO CONSTRUCTION CONSTRUCTION CONTRACTOR AGREES THAT N ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME SCE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THAT THIS FEOIREYENT SHALL BE MADE TO APPLY CONTIWOUSLY AND NOT BE WTED TO NORMAL WORKING HOURS AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL UABUTY, REAL OR ALLEGED, N CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROECT. EXCEPTING UABUTY ARI9NG FROM THE SCE NEGLIGENCE OF DESIGN PROFESSIONAL ENGINEERS NOTE TO CONTRACTOR THE DOSITNCE AND LOCATION OF ANY UNDERGROUND UTUTIES, PIPES, AND/OR STRUCTURES mom ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVALABLE RECORDS THERE MAYBE EXISTING UTILITIES NOT SHOWN ON TIES RANB THE CONTRACTOR SHALL ASCERTAIN THE TRUE VERTICAL AND HORIZONTAL LOCATION OF THOSE UNDERGROUND UTILITIES TO BE USED PRIOR TO CUISRUCTHN AND SHALL BE RESPONSIBLE FOR ANY DAMAGE TD ANY PUBLIC OR PRIVATE UMUES. SHOWN OR NOT SHOWN HEREON. GENERAL NOTE: ANY FUTURE LAND DISTURBANCE, INCREASE IN IMPERVIOUS AREA, AND/OR CHANGE IN RUNOFF CONDITIONS ON THIS SITE MAY REQUIRE ADDITIONAL STORM WATER MANAGEMENT PER MSD REGULATIONS IN PLACE AT THAT TIME (INCLUDING TOTAL LAND DISTURBANCE AND/OR IMPERVIOUSNESS ADDED ON THIS PLAN). STORMWATER RUNOFF NOTES: TOTAL LOT AREA: 1.28 ACRE TOTAL DISTURBED AREA: 1.30 ACRE PRE -DEVELOPMENT % IMPERVIOUS: 2% POST -DEVELOPMENT % IMPERVIOUS: 67% POST -DEVELOPMENT 10-YR STORM RUNOFF: 6.77 CFS POST -DEVELOPMENT 1DO-YR STORM RUNOFF: 11.44 CFS i1 A = BASIN DESIGNATION Ei B = AREA IN ACRES C = % IMPERVIOUSNESS SUMMARY RUNOFF TABLE BASIN ID AREA TONG ACRES C VALUE t00YR PEAK YR (CFS) 100YR (CFS) B1 0.20 0.91 0.85 1.82 82 0.64 0.87 3.04 5.56 83 0.18 0.85 0.96 1.52 B4 0.08 0.74 0.37 0.59 B5 0.08 0.74 0.42 0.59 86 0.07 0.79 0.44 0.52 OFFi 0.04 0.72 0.26 0.30 OFF2 0.08 0.67 0.44 0.53 < rs BEARNGL ALIwNT711 CAP 30 NEST OF CORBETT DRIVE ON TOP OF BEARNIGS ARE BASIS ON THE NORTH LOT LINE OF LOT 1, FRONT CONCElE WAll OF RHGATION STRUCRM CITY OF FORT GE VW,GE AS SOUTH 90' DO 00' EAST ACCORDING TO THE COLLINS BENCHMARK 12-94. TIDE➢ RAT. NAGW 29 ELEVATION 4950.1 FEET. Z 3 Lc, d f- Z O J Za o W O Z g=Z C) > W Q 0 zo 0 _ Q *QUJ �o Z N 0 LL J_ LL I - PREPARED UNDER THE SUPERVISION OF TUT E ASSOCIATE$ INC -PRELIMINARY- E 0 E m m o Z Q Z U c NOT FOR iw wow= r CONSTRUCTION s DR1 1 �.. LO