0 �� Drainage Control Study for
PVHS Doctors Lane Parking
Lot
Rantec
Fort Collins, Colorado
December 28, 2005
December 28, 2005
Mr. Basil Hamden
City of Fort Collins
Water Utilities -Storm Water
700 Wood Street
Fort Collins, Colorado 80521
RE: Drainage Control Study for PVHS Doctors Lane Parking Lot
Dear Basil:
We are pleased to submit to you, for your review and approval, this Drainage Control Study for
PVHS Doctors Lane Parking Lot. All computations within this report have been completed in
compliance with the City of Fort Collins Storm Drainage Design Criteria.
We appreciate your time and consideration in reviewing this submittal. Please call if you have
any questions.
Respectfully,
Stantec Consulting, Ltd.
Prepared by:
Josh Ziliak
Design Engineer
Reviewed by:
Jim Allen -Morley
Project Manager
TABLE OF CONTENTS
DESCRIPTION PAGE
I.
GENERAL LOCATION AND DESCRIPTION
1
A. Location
1
B. Description of Property
1
II.
DRAINAGE DESIGN CRITERIA
1
A. Regulations
1
B. Development Criteria Reference and Constraints
2
C. Hydrologic Criteria
2
D. Hydraulic Criteria
2
E. Variances from Criteria
2
III.
DRAINAGE FACILITY DESIGN.
2
A. General Details
2
IV.
STORMWATER QUALITY
3
A. General Concept
3
V.
CONCLUSIONS
3
A. Compliance with Standards
3
B. Drainage Concept
3
C. Storm Water Quality Concept
4
VI.
REFERENCES
4
APPENDICES
VICINITY MAP
WATER QUALITY CALCULATIONS
DETENTION BASIN SIZING
ORIFICE CALCULATIONS
1
2
3
4
I.
I
u
u
II.
C
Cep-�7� /1�iZ�1:11 Y [i]►i:�►1I � � ►
A. Location
The Poudre Valley Health Systems Doctors Lane Parking Lot is bounded to the
east by Lemay Avenue, to the west by Hospital Lane, to the south by Doctors
Lane and to the north by a developed lot.
The site location can also be described as situated in the southwest quarter of
Section 18, Township 7 North, Range 68 West of the 6`h Principal Meridian, City
of Fort Collins, County of Larimer, State of Colorado (See Vicinity Map in
Appendix 1).
B. Description of Property
The property consists of approximately 0.35 acres of undeveloped land. The
project site is covered in grass in its existing condition and slopes gently towards
the three existing roads that bound the site. All runoff flows uncaptured from the
site and is conveyed via existing curb and gutter along Hospital Lane, Doctors
Lane and Lemay Avenue.
The property site, in its proposed condition, will consist of a 27 space parking lot
consisting of approximately 0.17 acres of the site. Two small detention ponds and
new sidewalk on the south, east and west are also proposed. The rest of the site
will remain in its existing condition.
DRAINAGE AND DESIGN CRITERIA
A. Regulations
The Urban Storm Drainage Manual (published by the Urban Drainage and Flood
control District — Denver, Colorado) and the City of Fort Collins Storm Drainage
Design Criteria have been used to calculate the storm water runoff and design the
storm water facilities for the subject site.
I
1
1
LJ
1
1
I
1
1
l
B. Development Criteria Reference and Constraints
The criteria and constraints from the City of Fort Collins will be met.
C. Hydrology Criteria
The Rational Method was used in determining surface runoff for the project site.
The 2-year and 100-year storm event were used in calculating runoff values. The
City of Fort Collins intensity duration frequency curves were used to obtain
rainfall data for each storm. The FAA method was used for sizing detention
ponds.
The water quality volumes for the detention ponds were computed using the
Water Quality Capture Volume equation from the Urban Storm Drainage Criteria
Manual, Volume 3. These calculations and criteria are included in Appendix 2.
D. Hydraulic Criteria
All hydraulic calculations within this report have been prepared in accordance
with the City of Fort Collins Drainage Criteria.
E. Variance
A variance for the reduction of the freeboard requirement from 1.0' to essentially
0' is requested. This is because there is no convenient adjacent storm sewer that
can be accessed for the PVHS Doctors Lane Parking Lot. We have provided the
required storm water quality volume as well as the required storm water
detention. Because the outlet is to the street and the depth of water is 1.0', one
foot of freeboard is impractical for this site. If the storm event exceeds the
capacity of the pond, the design allows the pond to overflow to Doctors Lane and
does not endanger any structures.
III. DRAINAGE FACILITY DESIGN
A General Details
I
1
L
IV.
r
u
1
u
The subject site can be broken down into three main drainage basins in its
proposed condition. The first basin consists of the proposed 27-space parking lot
that covers approximately 0.17 acres of the site. The parking lot will drain into
the proposed detention ponds and be detained to allow for water quality treatment.
The detention basins have been designed to detain the 100-year developed
conditions (See Appendix 3 for calculations). The runoff will then be released to
the existing curb and gutter along Doctors Lane. A minimum time of
concentration of 5 minutes was used for the developed site because of its small
size (See Appendix 3).
The second basin consist of just under 0.01 acres of the proposed parking lot
located on Hospital Lane that will be allowed to drain uncaptured from the site.
The final drainage basin consist of the remainder of the site that will stay in its
existing condition and be allowed to drain uncaptured to existing curb and gutter
surrounding the subject site.
STORMWATER QUALITY
A. General Concept
The proposed ponds will provide for the required water quality capture volume.
The outlet structure is designed to release the Water Quality Capture Volume over
a 40 hour time period. Calculations can be found in Appendix 4.
CONCLUSIONS
A. Compliance and Standards
All computations that have been completed within this report are in compliance
with the City of Fort Collins Storm Drainage Design Criteria and the Urban Storm
Drainage Manual (published by the Urban Drainage and Flood Control District).
B. Drainage Concept
n
I
'
The drainage in
proposed concepts presented this report and on the construction
plans adequately provide for the conveyance of developed on -site runoff to the
proposed drainage facilities of the subject site. The combination of the proposed
'
curb and gutter, cross -pan, detention basins and outlet pipe will allow for the 2-
year and 100-year developed flows to be safely routed through the property.
' If groundwater is encountered at the time of construction, a Colorado Department
of Health Construction Dewatering Permit will be required.
C. Storm Water Quality Concept
' The proposed design has addressed the water quality aspect of storm runoff. The
' extended detention basin will provide opportunity for storm water pollutants to
filter out of the storm runoff before being discharged from the site.
VI.
' 1. Storm Drainage Design Criteria and Construction Standards by the City of Fort
Collins, Colorado, May 1984, interim revision January 1997.
[J
1
u
1
APPENDIX I
No Text
I
k
APPENDIX 2
1
t
1
1
1
1
1
Desfgn Procedure Form.xExtended Detentlon iasm (EDB) SedlmentaUon Faculty, �r
Sheet 1 of 3
Designer: Josh Ziliak
Company:
Date:
Project:
Location:
Stantec
December 8, 2005
PVHS PARKING LOT
Lemay Ave/Docters Lane
1. Basin Storage Volume
la = 100.00 %
A) Tributary Area's Imperviousness Ratio (i = 1./ 100) i =Eja�1 AO r;'1
B) Contributing Watershed Area (Area) Area = 0.17 acres
C) Water Quality Capture Volume (WQCV) WQCV =FF�-�`-050_'=;?watershed inches
(WQCV =1.0 - (0.91 ' 13 - 1.1912 + 0.78' 1))
D) Design Volume: Vol = (WQCV / 12)' Area' 1.2 Vol =f`,10 0085� acre-feet
2. Outlet Works
A) Outlet Type (Check One) x Orifice Plate
Perforated Riser Pipe
Other.
B) Depth at Outlet Above Lowest Perforation (H)
H = feet
C) Recommended Maximum Outlet Area per Row, (A.)
square inches
D) Perforation Dimensions:
i) Circular Perforation Diameter or
D =fin inches
ii) 2" Height Rectangular Perforation Width
W NMI 1: 9 inches
E) Number of Columns (nc, See Table 6a-1 For Ma)imum)
nc = ,Wi number
F) Actual Design Outlet Area per Row (A.)
Ao = r-; square inches
G) Number of Rows (nr)
nr = number
H) Total Outlet Area (AoJ
A., =€?j2F ;,: _ square inches
3. Trash Rack
A) Needed Open Area: 0.5' (Figure 7 Value
P A� _ ( 9 ) � Eby
A, =� 1=.m~� square inches
-x,�_
B) Type of Outlet Opening (Check One)
< 2" Diameter Round
? : 12" High Rectangular
Other.
C) For 2", or Smaller, Round Opening (Ref.: Figure 6a):
i) Width of Trash Rack and Concrete Opening (W...)
from Table 6a-1
Wwr, inches
ii) Height of Trash Rack Screen (HTR)
HTR = �,--i�;,_;� inches
USDCM Vol 3 BMP-Prelim.xls, EDB 12/8/2005, 2:49 PM
I
1
1
1
11
u
1
APPENDIX 3
1
(For catchments less than 160 acres only. For larger catchments, use hydrograph routing methods)
(Note: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended)
bestan Inf-ormallon linpufF.
Oalcvnent Drainage Imperviousness
1,=i:::i£i
';i:: 1)06, percent
Catchment Drainage Area
A=i'i
2':'0(1A: acres
Predevelopment NRCS Soil Dnoup
Type=A,
B, C, or 0
Reban Period for Detention COMB
T =: i
?i' ii!3'i;11N1i year (2, 5, 10, 25, 50. or 100)
Tim of ConceMation of watershed
To =: 2"i'
%2::2.;; ::: :minutes
Almmable Unit Release Rate (See Table A)
V
'%t:00: chfane
On>har Precipitabon
P7
Design Rainfall IDF Formula I C1•Pt/(C2+Tc)AC3 ...................
Coefficient One
...................
Cl =
28. o:
Coeffldent Two
C2
Coefficient Mee
C3=:::�::';:?:
Determination of AVerade Outflow from the Basin (Calculated):
Ruwg Coefident
C=
Inflow Peak Runoff
Op -in =7ii8i
oft
Allowable Peak Ounow Rate
Op -out =z i :::
I::: D;14: cfs
Ratio of Op-aOOp-m
Ratio=:+ -.;I+
i:-:'6.1A+
Table A Recommended Unt Flow Release Rate in cWam of bibutary catchment wiW n UDFCD boundaries.
dw vo IOF Lis 121, Made :..
.1,0 ^L. wn'..uai bo cm.r m are. -.di :e order.
Oraation Intensity Volme AFactornt Outflow Volume I Volume et
INnutes inchesM cubic fee eft cubic feel cub
Stormwater Detention Volume (Cubic Feet) _:
Stormwater Detention Volume (Acre Feet) =i 3i`:D10653::
UPOelention v1.00.45, Modified FM 12BI2005, 2:44 PM
Inflow and Outflow Volumes vs. Rainfall Duration
Intersection of Modified and FAA Outflow Plots Is at maximum detention volume
3,500
3,000
2,500
0
cu
u. 2,000
E
.2 1,500
0
1,000
500
0
0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 160.00 180.00 200.00
Duration (Minutes) I -g— lnflnw VnIllm.
UUDetentlon 0.00)ft, Mdftcl FM
1218t2005,2:44 PM
I
r
tmp#7.txt
PVHS DOCTORS LANE PARKING
BASIN 1
12-09-05
JOZ
#units=Elevation,ft,Area,mi2,volume,ft3,volume,ft3
# Elev
Area
Cumml Avg
Cumml Conic
# ft
mi2
ft3
ft3
4971.0000
0.0000
221.8751
219.6130
4970.9000
0.0000
.174.2000
171.9400
4970.8000
0.0000
128.1974
125.9403
4970.7000
0.0000
84.0137
81.7599
4970.6000
0.0000
42.2248
39.9796
4970.5000
0.0000
11.5024
9.7700
4970.4000
0.0000
0.0000
0.0000
' BASIN 2
12-09-05
3Oz
1
1
0
H
I
1
1
#units=Elevation,ft,Area,mi2,volume,ft3,volume,ft3
# Elev
Area
Cumml Avg
Cumml Conic
# ft
mi2
ft3
ft3
4971.0000
0.0001
1434.9579
1430.4644
4970.9000
0.0001
1230.9939
1226.5032
4970.8000
0.0001
1031.1918
1026.7055
4970.7000
0.0001
836.0888
831.6075
4970.6000
0.0001
646.3183
641.8445
4970.5000
0.0001
461.7543
457.2852
4970.4000
0.0001
286.9784
282.5631
4970.3000
0.0000
140.0586
136.1152
4970.2000
0.0000
43.2461
40.8651
4970.1000
0.0000
0.0000
0.0000
PARKING STORAGE
12-09-05
]OZ
VOLUME = DEPTH X LENGTH X 0.5 X WIDTH
VOLUME = 0.5 x 22 x 0.5 x 127 = 698.5 ft3
TOTAL PROVIDED STORAGE = 221.87 + 1434.96 + 698.5 = 2355.33 cubic Feet
TOTAL REQUIRED STORAGE = 2343.53 Cubic Feet
Page 1
1
1
1
1
+
LO
�
_
N
V
n
u
U
t`
00
II
J
O Z
i= E
0
N Q
.. W
U Q o
O�J�
`o 00
LL T
W O
H
CL
U)
Y
O
Cl)Q
1
W
Q
,c N
O
Z
E
uj
LL
J •C
" E
o
Oo
J
W
>
W
J
w
O
LO
9U)
J
O
F-
J
W N
z °°
Q
Qa
�
U,
2
Zco
w
C
co
�
w
z
w
w
w
>
a
O o u-
o0
O
J
�
N
J
Q
z
CD
CO
z
w
J
Q
I—
U M
o
Q
o
0
Z
W ciCN
N
Q
@
Q
O
co
—
CDO O
O
Z
APPENDIX 4
I
1
1
.1
1
n
1
WATER QUALITY OPENING
Worksheet for Generic Orifice
1
Project Description
Worksheet Orifice (WQC
Type Generic Orifi(
Solve For Opening Arei
Input Data
Discharge .002571 cfs
Headwater Elevat 4.5 in
Centroid Elevatior 2.5 in
Tailwater Elevatio 0.0 in
Discharge Coeffic 0.60
Results
Opening Area �188436 in'
Headwater Height Above - 2.0 in
Tailwater Height Above G -2.5 in
Velocity 1.96 ft/s
Project Engineer: Alicia Forward
v:\...\design\drawing\work\jziliak\projectl.fm2 Sear -Brown Group FlowMaster v7.0 (7.00051
02/17/06 08:24:19 AM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 1
10 YEAR DISCHARGE OPENING
Worksheet for Generic Orifice
Project Description
Worksheet Orifice (10 YR DISCF
Type Generic Orifice
Solve For Opening Area
Input Data
Discharge
240000 cfs
Headwater Elevat
10.0 in
Centroid Elevatior
7.0 in
Tailwater Elevatio
0.0 in
Discharge Coeffic
0.60
Results
Opening Area .361009 in'
Headwater Height Above - 3.0 in
Tailwater Height Above G -7.0 in
Velocity 2.41 ft/s
Project Engineer: Alicia Forward
v:\...\design\drawing\work\jziliak\projectl.fm2 Sear -Brown Group FlowMaster v7.0 [7.00051
02/17/06 08:24:37 AM © Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA +1-203-755-1666 Page 1 of 1
A-�
PLAN NEW
\ a,
� 1
(49710) \
N.
g• PVCJ O
0.50%
�g"0!3pi
I��. SILTY
aT IIAS YAW ,roG v / O sIHAWUAL! �_ F<•. _
3T auv Maa x/comTmmxa lrb 4 INLET FILTER
wml W/ wW \ . L _ _ 70.
_ E o
63 Y3
V/ g' C
Axon - Irac -.. • .. . • .': `�. Fro . 8' O 0.501E : ]•
DETAIL 'A• _ -- — __
SEE SHEET C-502 -- - --' -' - o _ _ o
FOR RAMP DETAIL \\ 4 ' _ 1 ` f 1 . Gv
—__
1
-- DOCTORSLANE
— .--
Iv ,� S
1 -
..amr u2w[�
SECTOR A —A
NOTE: WHEN THE CURB IS SEPARATED FROM THE SIDEWALK THE
STEEL PLATE SHALL BE PLACED ON THE SIDEWALK AND
THE CONCRETE CHANNEL (WITH 6• THICK WALLS ON EACH
SIDE) CONTINUED INTO THE CURB AND GUTTER.
2' SIDEWALK CHASE W/ 2'
A METAL CULVERT
� G,>a
LEGEND
g
� M W
PROPERTY UNE
e
.-_
PROPOSED MNVM1E
{
PROPOSED W RS AND CUTTER
Try
LL
'
PR0i HNOIW RAND
$
a
/n\
r
PROPOSED A`hRRElY£ AC' STET 9
n3
FT
7SAkk
PROPOSES SPOT EI£VAMYI
GR
—70.6—
PROPOSED (NACXG CONTOURS
NLT FENCE
— 4970 —
MISSING 001ITWRs
- -1Ad- -
Easnio SANITARY ROVER SSANCE
_ _ _ _
DTSMD RATES UK sEAMCE
0
EPSnRG WATER METER
=mmmzPmwzm
EXISTING cMB A CUTTER
COSnxG RAW
OPROTECT
TIES
NOTES:
1. DETENTION POND TO BE BUILT AT START OF GRADING.
2. EXCAVATE 6• DOWN AND 2' NOE ALONG THE LENGTH OF
THE EXISTING CURB ON DOCTORS LANE FOR EROSION
CONROL DURING CONSTRUCTION. (FILL IN DURING FINAL
GRADING)
3. NO STOCK PILING ONSITE.
4. PROTECT TREES PER BHA LANDSCAPE PLAN. REFER TO
PLAN PRIOR TO ANY CONSTRUCTION.
U
CONOETE CDEWAIK
O3
INFLOW PIRG (SEE OCTAL SHIM (5dl)
O3
SUNTORY MM (SEE DETAIL SHEEID CSDI
OINSTALL
WIDCA➢ RAMP (SE£ DMW SHEET (501)
OALLOW
CURB W I SECTOR FOOTING
OB
NRUGN MRS TEnnCN-s1RQ1(ACE PETAL
DIAL C50M)
1) . ALL DIMENSIONS TO FLONUNE OF AS NOTED.
2) . ALL DISTURBED AREAS TO BE RE -SEEDED
3) . EOP=EDGE OF PAVEMENT, PL=ELOWUNE, ME -MATCH EXISTING,
SW -SIDEWALK, W=GRADE BREAK AND TC=TOP OF CURB
® MKIRO ED RETENTION BASIN
PROPOSED CCgER
I Ii
0 10 A 30
SCALE IN FEET
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
1-800-922-1987
City of Fort Collins, Colonado
UTILITY PLAN APPROVAL
THESE PLANS LAVE BEEN REVIEWED BY THE
LOCAL ENTRY FOR CONCEFr ONLY. THE
APPROVED:
RENEW D06 NOT IMPLY RESPONSBIUTY BY
City Engimer
Date
THE RENEWING DEPARTMENT, THE LOCAL
CHECKED
BY:
ENTITY ENGINEER, OR THE LOOSE ENTRY FOR
Walu A Westexaler WI"4y
Oate
ACCURACY AND CORRECTNESS OF THE
CALCULATIONS. TURITERMCRE, THE REVIEW
CHOCKED
dY:
WE NOT IMPLY THAT QUANTITIES OF ITEMS
S(armvafer Wily
Dote
ON THE PLANS APE THE FINAL OMNTMES
CHECKED
BY:
REQUIRED. THE REVIEW SHALL NOT BE
Parks A Recreation
Date
CONSTRUED IN PINY REASON AS ACCEPTANCE
OF n WCML RESPONSIBILITY BY THE LOI>L
CHECKED
BY:
Date
ENTITY FOR "MOW OUNTITIES OF ITEMS
Traffic Engineer
SHOWN THAT MAY BE REWIRED DURING THE
CHECKED
HP:
CONSTRUCTION PHASE.
Date
UU
W
Ao0
z
CD
0
Q Y
h
a
w
W
Z
� DL
J Z
a3
a�
D
O
(90
W Y
Z K
1—
�o
�Z
a00
4.
JU
P(mitSeal
_r 18701UQ
o 4e NMVNC-170
RevMian Shot
0 4Dt6