Mr. Wes Lamarque
City of Fort Collins
Storm Water Utility
700 Wood Street
Fort Collins, CO 80522
Re: Maple Hill Park
ICG Project No. 1165-012-89
Dear Wes,
INTERWEST CONSULTING GROUP
City of Ft,. Collin rov „ Plans
�►Ppmved By
Date
Please accept the following letter report on behalf of The City of Fort Collins Park Planning and
Development to demonstrate the site's compliance with the previously approved Final Drainage
Report for Maple Hill Subdivision, as prepared by TST Consulting Engineers, dated March 26,
2003.
INTRODUCTION
The proposed park is legally known as Tract I of Maple Hill Subdivision and is 7.14 acres. The
park is bounded on the north by Maple Hill Drive, the east by Bar Harbor Drive, and existing
single family homes on the west and south. The majority of the park currently drains to an
existing low point located near the eastern property line. The original runoff coefficient
calculations and stage -storage table are attached for reference and all detention and water quality
requirements for this site have been met by the overall Maple Hill development.
EXISTING CONDITIONS
The site is currently vacant and contains a stand of natural grasses. The Overall Drainage Plan
that was included in the previously approved Final Utility Plans for Maple Hill designates the
park area and the back yards of the surrounding single family homes that are tributary to the park
as Basin B13. This basin drains to a low point on the park property where it is collected by an
area inlet. The area inlet is connected to the storm system that discharges into the existing water
quality and detention pond located just east of Bar Harbor Drive. The northeast and southeast
corners of the park property are designated as portions of Basin B9 and B 14, respectively. These
areas sheet flow directly onto Bar Harbor Drive and are collected by the existing storm system
which discharges into the existing pond. Basin B 13 has a minor storm runoff coefficient of
0.28.
Mr. Wes Lamarque
February 17, 2017
Page 2 of 2
PROPOSED DEVELOPMENT
The proposed park primarily follows the original drainage patterns described in the original
plans. Basin 1, 2 and 3 make up the park property. Basin OS accounts for the off -site tributary
area that was originally included with Basin B 13 from the approved plans. Basin 1 and 3
continue to sheet flow directly on to Bar Harbor Drive as initially intended; however, these basin
areas are slightly increased. Basin 2 and Basin OS drain to a low point in the park which is the
proposed irrigation pond. This pond will be fed by a proposed raw water connection from the
existing irrigation main located off -site. All stormwater runoff from Basin 2 and Basin OS will
sheet flow directly into this pond. A Type C inlet structure will be placed 6 inches below the top
bank of the pond setting the permanent water surface elevation to 5009.50. This inlet will be
connected to the existing area inlet (which will be replaced with a proposed manhole) and be
conveyed to the existing storm system which outfalls to the existing pond constructed with the
subdivision.
Basin 1, 2, 3 and OS have a combined minor storm Runoff Coefficient of 0.23 which is less than
the Runoff Coefficient for Basin B13 (0.28) from the approved plan. Therefore, it is requested
that the site be deemed in substantial conformance with the previously approved Final Drainage
Report. Please see the attached excerpts from the Maple Hill Subdivision Final Drainage Report
detailing the assumptions and original flow calculations for the park area.
LOW IMPACT DEVELOPMENT REQUIREMENTS
Runoff reduction practices (LID techniques) are also required. No less than seventy five percent
of any newly added impervious area must be treated using one or a combination of LID
techniques. The development of the park adds 28,857 sf of new impervious area. Approximately
81% of that area (23,303 sf) will sheet flow over a grass buffer prior to entering the irrigation
pond. City Stormwater has confirmed that the LID requirements are met with the grass buffers
and the wet irrigation pond. The new impervious area and turf areas will be treated with these
two methods.
It is also important to note that there is no pavement or pollution producing impervious area
associated with this project. Additionally, any suspended solids associated with the runoff from
the park will be captured in the irrigation pond prior to exiting the site via the proposed Type C
inlet.
If you have any questions or comments please contact me at (970) 460-1091.
Sincerely,
S ylar Brower, P.E.
Colorado Professional Engineer 44248
� � I
_ --- ---
--- — — —
— _--------_ ----_ ------------------------------------------------ W __W
—w S
W W W W W W W W W W W — W
�y xb,ypw MAPLEFI/LL DRIVE rx er',eow
s —s s s s s • s• —s i S
-
p i —
s - 5
i i i i i p i i ii i i p_i i
----------------G------�—_ I
------—ram—
rnnetnaeMn Summnro rhaw
(Constrouvo PhusO)
Mabiluonan
Onr i TIP
Grade
Subgmtle
Pann9
W.dFape
DenebilN,alioo
Best Management Practices (BMPs(
_
kruttwtl'FMaNtbn'
comes«ee aerm•
___ - ---
Tnntour furrows IRPPng / Dlskinel
SedlmM171.1 / Hlter
Ven.clt TracFnF Pad•
Contrett waseaw•
Row Barriers Iwan"l l•
kre mNnw D,e......
R., RaP
_ —
'All BMPs to Ee Removed once
Consn Rtlon s ComPlele.
Mgetww
Temporary 5eMng Plznnng
Anytime@e site will sildolment lon er Than 30 Days
Multhing/SUI.nI
Any tlmelhesile Wlll sit dprment Doer than M Days
Pnm..enl SeMng Plzntng
Rolled Prodat[S I ngTBOnkas/Mats
Anytme thesile will sit 0rmentl0n erthan30Days
EXISTING
LOCq p =�COND
Tgq
9pBASIN
DESIGN pi
TOTAL
AW
Irl
R Al.
AREA
n)
ROOF
AREA
IW n)
FAV®
AIE
URnI
SCEYfALK
AREA
ISV nI
UkNE
AISy
laR nl
RIFF
ry$E
(C)
%
FPMAR
F RKS
t
103
M.45
0
0
STO
43ws
01,
1
z
Sm
Zaa1M
0
0
27VI
2Xa13
Oro
10
3
ON
10.08
0
0
No
e.32
ota
9
RaATdal
714
3110.97
0
0
29 mT
2m.2W
Ole
9
as
1 A
71.2+9
30,d00
0
0
.34+9
015
37
Ass ml Rod All ON E3 hon e
T Al-
las
igAma
24am
a
2aan
325,641411
"3
10
40 20 0 40 Bo
SCAIf t"- 40'
LEGEND
~
fRiOPO`£O aRERION
ROW
OG OVERtANO
V EHICLE TRACKING CONRVOL
OCCONSTRUCTON
Y1C
EMRMICp
®
coNCRETE wASHarr
0
i
tMLT FENCE
CD
IP-1 �
INIET PROT'CTON4TYFF i�
O®
wATTL£
O®
GRAD -BAG
-
FROPOS'ED DRAINAGE
BASINONIDEUNE
A
0.3 .6
y
nRAINAGE.. NUMBER
MINOR STJRM RDNOFF GOEFFIGIEYI
DRANAGE BA4NAREA
PnGPo�aRECTaN aF
ovDa.ANo Row
N
N
lD
O
1n w m
Z mO'00m
�aMm
N
O U zO O N 4
o C Q O p N
W
4 O f U I p
EL Lie =Nmn
w w I zw(y)
D �OO LL
V t Ua
N
O
tL
� �
Y
NOTES:
Q
w
a
1 CONiAACTOR TO PROVIDE AND MAINTAIN ALL
NECESSARY EROSION CONTROL MEASURES PRIOR I L I
Q
J
ANDTHROUGHOU'CONSTRUCTION. PLACEEROSION
Z
CONTROL PROTECTION Al ALLEASRNGINLETS
F
J
OOWNSTFEAMION FROM THE CONSTRUCTION PREA
EROSCONOTE TROL PRCTION SHALL REMAIN IN
W
PLACE UNRL CONSTRUCTON IS COMPLETE AND ALL
DISTURBED GROUND IS ADEQUATELY VEGETATED WLT 1
O
W
OWNER'S APPROVAL FOR REMOVAL
(r.
2. THE EXTENT OF EROSION CONTROL PROTECTION
(L
^
BHALL BE OBSERVED AND ADJUSTED AS NEEDED
DURING CONSTRUCTION BASED ON STTECONDLUONS
.
I.L
a
AND THE PERFORMANCE OF THE EROSION CONTROL
CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT
EROSION CONTROL AND MINIMRE DOWNSTREAM
WATERWAY POLLUDON
CALL UTILITY NOTIFICATION
CENTER OF COLORADO
811
CALL 2-81)SINESS DAYS IN ADVANCE
BEFDRE YOU M. GRADE. OR EXCAVATE
r
m
(11
FOR THE MARKING OF UNDERGROUND
'
MEMBER UPUTMS.
IN
=
s
m
w
m
w
0
Dl
0
w
U
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
APPROVED:
OIY EIrI HER
DATE
CHECKED BY:
WATER R WASTEWATER UTIUTY
DATE
CHECKED BY:
STOR1.111I UTILITY
DATE
CHECKED BY:
PARKS h RECREADON
DATE
PRI NO.1116150126
CHECKED BY:
TRAFFIC EMDREER
DAZE
C OF 10
V
CHECKED BY:
DATE
Irlterwest Consulting Group
RUNOFF COEFFICIENTS & % IMPERVIOUS
L.00A110N: Maple Hill Park
PROJECT' NO: 1165-012-69
COMPUTATIONS BY: sb
DATE: 1/102017
Recommended Runoff Coefficients from Table RO-11 of City of Fort Collins Stormwater Code, Volume I
Recommended % Impervious from Table RO-3 Urban Storm Drainage Criteria Manual, Volume I
Type B Soils
Streets, parking lots (asphalt):
Sidewalks (concrete):
Roofs:
Gravel or Pavers:
Lawns, sandy soil (Flat <20/6) :
Runoff
%
coefficient
Impervious
C
0.95
100
0.95
96
0.95
90
0.50
40
0.10
0
SUBBASIN
DESIGNATION
TOTAL
AREA
(W)
TOTAL
AREA
(sq.8)
ROOF
AREA
(sq.q)
PAVED
AREA
(sq.8)
SIDEWALK
AREA
(sq.R)
LANDSCAPE
AREA
(sq.0)
RUNOFF
COEFF.
(C)
%
Impervious
REMARKS
1
1.02
44,495
0
0
570
43,925
0.11
1
2
5.88
256,144
0
0
27,271
228,673
0.19
10
3
0.24
10,448
0
0
1,016
9,432
0.18
9
Park Total
7.14
311,087
0
1 0
28,857
262,230
0.18
1 9
Gs
1.70
74,216
1 30,800
1 0
0
1 43,418
0.45
37
Assumed Roof Area for Ex homes
TOTAL
8.85
305,305
1 30,800
1 0
28,857
1 325,618
0-23
10
Equations
- Calculated C coefficients & % Impervious are area weighted
C=E(Ci Ail /At
Ci = runoff coefficient for specific area, Ai
Ai = areas of surface with runoff coefficient of Ci
n = number of different surfaces to consider
At = total area over which C is applicable; the sum of all Ai's
Final FLOW(Ot-10-17).xls
P
ti
M1
V
✓� ppp/---YYY'111 b b ry N N N- G - N r V1 N V N M r� N
U
m
bra �a:�-aaa::sxaa$�saa <��__rn;Nm-rPa arsa�a� -
t-
0
s.� ^^ �.:� m!Ia $ s ri yy 9q �i g s Si �m o`. . a ^ «a�
> M N ^_ O O I•f m _ r N N N 'G P m P N b /'� - m n P P
p
iO „ S r �O S i •O 'OO O r� n v^i O«^ ^ O 8 « 8 m m P« 2 w ryO
i i O O n N N O O n . O Ci n w1 r1 w1 r rn n.
� O
� 3
�� E n�aosa„„asv :g;8=a----ga r; r�asax�ra
0
^ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - h h
yV
pVZt
J
O
8888888888.8885$888.5 88------------- 888888888
p o c coo d c o o d o o d d o 0 o a o 0 0 o d d d o o d o d d d d 0 O C o 0 0 0 0 0 0
a V
�mq�:smoaa.s.�::?m2�" �a�oa�ryry,�s:ss> ndaTa .��
a - ., s a o a a o.- F N O o o G N C
A �
uU--u
N Z
< < m u
LC
Za
UU w
unofficial copy was downloaded on Jul-30-2015 from the City of Fort Collins Puhlic Records Website: htip://citydms.fcgov.com