Loading...
HomeMy WebLinkAboutDrainage Reports - 06/10/1992-��Py-�-- Oar cw Final A oved Report PORT COMMA arrt Date 6 1a .�- FINAL DRAINAGE & EROSION CONTROL REPORT FOR LOT 9, BLEVINS COURT, P.U.D. FORT COLLINS, COLORADO MAy 11, 1992 PREPARED FOR: KENT GLOVER PREPARED BY: PARSONS & ASSOCIATES CONSULTING ENGINEERS 432 LINK LANE PLAZA FORT COLLINS, COLORADO 80524 (303) 221-2400 PROJECT NUMBER: 91.15 GLV FINAL DRAINAGE & EROSION CONTROL REPORT FOR LOT 9, BLEVINS COURT, P.U.D. INTRODUCTION This drainage investigation has been prepared along with final plans for the development of a duplex on Lot 9 of the Blevins Subdivision. This study was prepared in accordance with the City of Fort Collins "Storm Drainage Design Criteria and Construction Standards." SITE DESCRIPTION This project is to be constructed on Lot 9 of the Blevins Subdivision which is located at the southwest corner of Blevins Court in the Southeast Quarter of the Southwest Quarter of Section 14, Township 7 North, Range 69 West of the 6th Principal Meridian, Larimer County, Colorado (see figure 1). Lot 9 includes 11,846 square feet (0.27 Acres) and was platted as part of the Blevins Subdivision in 1958. Lot 9 remains the only vacant lot in this area. Adjacent structures appear to be single family residences converted to rental usage due to their proximity to the Colorado State University Campus. These units are typically raised one foot above curb level with individual yards draining.into street curbs. -1- - — . 0114 st'< w !�N ' INi '4 WWd u d° a k =r _ EMDu W 51 i M F. $/ Z z U W",a.SI < N v E N1 S A•N i t, @ HbcD S( ; N ¢ Q L old N l �4Yh 'M -' •lain D/ iYSt N. hW P. J�3 O COLORADOy r 1 a 0 �� uM,..,h A. ?,f?sii,?�:t. 'bra 'Sou16W-�,:pt41( • . l:.k.�.'OPd D, s STATE :fdr ,. _.w Pllkln St 4 ,gym Jimd[C[ y" ``wm+' ,IW GbS H.mvtt Rd 81,4n,cr UNIVERSITY Summr 51 W Pn, .m PQ gw111d. N T.m,.,B 4 BMum L Dr 26 C4 .B. Mobblt S1 JYPIPM L. B. Dr P kw S( Ct � wrty PI VICINITY MAP i N C PROJECT SITE FIGURE 1 This site slopes from west to east at about a 2.0% rate and is covered by natural grasses. It appears that no drainage facilities were constructed as part of the Blevins Subdivision and runoff is conveyed via streets in this area towards Spring Creek. All other utilities (including sewer and water) were located along back property lines and extend from South Whitcomb Road. CRITERIA The Rational Formula has been used to develop runoff flows from this site. The Rational Formula is an excellent predictor of flows from drainage basins with areas less than 200 acres. HISTORIC DRAINAGE Runoff in this area drains from northwest to southeast towards South Whitcomb Street and Prospect Road at about a 2% slope. The area is primarily single family residences with grassed yards. Little or no site grading was completed when homes were constructed and runoff sheet flows through this area. No sideyard swales exist and the sheet flows typically run against the house foundations and then are either detained in natural back yard low areas or flow around the house foundation to the street. No improved storm sewers, detention -2- areas, inlets, swales or other drainage conveyances except for the curb and gutter on Blevins Court are apparent. PROPOSED DRAINAGE OFF -SITE FLOWS Runoff patterns, except for a 0.82 acre area immediately west of the proposed site, will remain the same (see figure 2). This 0.82 acre area, designated as Basin A, is intercepted by berms and the proposed parking lot and this drainage will be diverted into Blevins Court. Flows to the north of this site continue to run through lot 8 and into Blevins Court. Flows to the south and east continue to flow away from this site towards Prospect Road as shown by the contour mapping and spot elevations. These site improvements will cause the 0.82 acres represented as Basin A, which would regularly flow uninterrupted through this area towards homes to the southeast, to be diverted to Blevins Court. This substantially reduces the amount of water which flows towards Prospect Road ON -SITE FLOWS The runoff from the site including roof drainage and a small area of offsite flows is collected by grass -lined swales along the north and south side of the proposed structure. These flows are diverted (shown as Basin B,) to the parking lot which also is designed to act -3- LOT .9 BL V1 1 CT.' , .OFFSGE ITE DR x5a1 -�*• ± , , r�. �,' *"" �.; , kI, ems. 'v��%.� • � . JW 5 X 5012.9 JI KV � .yv-�fl.H:C y •'� �� `t X � ti (' T� � .r �� v'' -sue.'. � ..t ! �. ' "`' � � ..�� r'I��•a/ s ��4' y, -�^ r - - `� .w \`_ r••,iM1y��.�r�`.��.. rv`� C.,'�'•+^j.%r!-NM,ior•e.t: - t ' 50J•":.�._ ..�{ b�.x..:l�''z+,vr'.v V.X 50.51{<M✓a• -- .. 61 a � $• sue` f i� :.+ 9 • a �F• �• _ - f ^4A .1.. w. 77i-l ca/ X 5012.4 Y (71 ��py e �'f}+p te�a► v,. FFee y � � ����'�p'' ) C .fit• 9 i •.� v -'^�.� . fib."1�. t i,�r 'K• • _ - - Ji:''-v ;mid FTFyv i;. ,i. y y , y� . \ v. .s? ��r.f-f.�rr+^Y .. •--�—, a+.. r, '�''.-. •r.....!!!!k'�!'IS'_`T'i ....,...p„4'I�q�$k� '- •"...T..•. y ..-� L �, �.. Y �If r. •. .� .tS!, �'f � .ram , FIGURE 2 as a detention and sedimentation pond. An outlet pipe at the northeast corner of the parking lot will restrict outlet flows to the historic two year rate. This pipe will outlet into Blevins Court where flows will be conveyed in the existing curb and gutter easterly to South Whitcomb Street (see figure 3). The calculations for the detention pond are attached. Due to the proposed volume required for the detention pond, a slight berm will need to be built around the parking lot. This will result in a small 0.03 acre area (shown as Basin B2) discharging directly onto adjacent properties. This is primarily a five (5) foot strip of grassed area along the south and east edge of the property. Sheet flows from this basin are minimal and will be more than adequately replaced by runoff from Basin A. Calculations for the runoff are also attached. They are summarized as follows: On -Site (0.24 Acres) Basin B, Historic Qz = Qtoo = Developed Off -Site (0.82 Acres) Basins A Historic .10 cfs QZ = .28 cfs .36 cfs Q,00 = 1.01 cfs QZ = ..20 cfs Qioo = .78 cfs -4- EROSION CONTROL The parking lot and building area will be stripped during construction. The back one- third of the lot will remain in natural grasses. Due to the small size of this project all of the improvements will be built at one time. Water erosion control will be accomplished by silt fences and the placement of a sediment trap at the location of the proposed detention pond. Wind erosion control will be accomplished by existing.trees and grasses at the west edge of the site. The construction will be completed during the summer of 1992 at a time of low wind potential. More detailed erosion control calculations and schedule are attached. CONCLUSION The construction of a duplex and parking lot on Lot 9 will improve the drainage conditions in this area. The berms, swales and parking improvements/detention pond will divert flows from the west onto Blevins Court and reduce the quantity of the water which previously ran through this area. The parking lot provides 1 1-50 cubic feet of detention and will release a historic two year runoff of .10 cfs through a 1 7/8" X 1 7/8" square orifice plate. A 4" PVC outfall pipe and sidewalk culvert convey this water to Blevins Court. It is -5- anticipated that the -.10 cfs historic flow will have minimal impact on Blevins Court street flows. An overflow elevation of 13.14 is established at the entrance driveway for the detention pond and any overflow including the routing of offsite Basin A through the detention pond will discharge through the driveway. All drainage improvements are to be maintained 1 by the property owner. VARIANCE A variance to discharge runoff onto adjacent property from Basin B2 is requested for this project. Runoff from Basin B2 would be sheet flow from 0.03 acres of grassed area. This area is primarily a five (5) foot strip of landscaped area along the east and south edges of this project. These flows would travel in a southeasterly direction towards Prospect Road. It should be noted that almost one acre (Basin B2 and Basin A) historically contributed runoff through this area. These flows are now diverted through the proposed parking lot to Blevins Court which will drastically reduce runoff towards Prospect Road. Q fC- >/'arrahce �nx�� 0 GRAPHIC SCALE T (dnrr) 1 l h - EO K �I 7 I 6 5 \ I \ EXIST HOLLYWOOD CURB. GUTTER k WALK / � I \� T 3927' BLE"S COURT I II I I 2' TAPER CURJ(TO I _ _ �XIISTINC 8! WA1pR LINE k FIREVAYDRANT _ _ _ _ _ _ _ _ —I 1 BACK OF WAUK I I (BY qTY OF FORT COLLINS) / — — — — -t — (BOTH SIDES) I PROPOSED METER PIT SERVICE B TDP OF a RY (SEE DETAIL) ,.� EXIST CURB STOP BASIN A I I I ELEV. u.� / I PROPOSED jSttiEWALK CULVERT_ PROPOSED I+ 0,82 AC. I I WATER SERVICE�` TK! 6'II PROPOSED 2' CURB OPENING �,( ,) • 1 1 \ TRANS1110N FROM YEfiT.TO �.p0' PROPOSED 6 X 5' UEASEME)i1T 111 TFALL CURB AND GUTTER � 1 I I I II \ DRAIN PIPE SEE DETAL 1 OU A�L CURB k GUTTER 14 / 1 I / RDOF FENCE �d141x / BASE/AENT FLOOR + GRAVEL FILTER / x ELEV. 07.00 PFlt CITY ST DA D I , A 1 A 10 J� 1 1 9 III�m OF EERY / 0 FIGURE BASIN BI FINISH FLOOR ELEV. ,t ELEV. 13.5 .24 AC. ❑.DO NINE - BASIN B2 PROPOSED 2' CU oRAlx „ , q�\ �' I 1 SILT o... c' Ir EXIST 6' WOOD i NCE I uFENCE _----------: --- O �— i 4SANITARY SEWER SERVICE MH -0 — — — — — — =--�'-�O= — —, RIM 601250 Sinus m w w I IN V OUT 5004:67 TOP OF BERM EXIST. 8" SAt. SEWER PROP INV IN 5005.00 ELEV, 13.5 L J ` S0N.5 n p 1 I I I III � I 11 I I I I— o L-- I IIII 12 i _ 1 14 f LJ 13 I � I IR I II - -----------� •,�"„M'^'�`*�:�- w.'...'. SILT FENCE , wee.'-.r.'...-.... ...r..` a. urr orrdrt cou.ls -mow �rw�.N. -� i1mMwArtA uru isF •': a-q •_ " i E¢` i Iai s 1j I ,i n,p 1 _ W7 iis'-�lrf 6 ir3 t:t�[ ! IiI�lcA_ `rp _iisF TYPICAL SERVICE DETAIL ==o wi EXIST -� y MH N I: Y•1m MR (i[ RTM) 3- rt.niT f �„bJ,IDI I r y.aw . •nla - DRAIN DETAIL NI1 n lu. Z. STANDARD EXTERIOR SETTING FOR 3/4•'i 1' WATER METERS mcowx,. cb.O.IAi A. PLANW� i N4 f SECTION A -A CONCRETE DRAIN PAN Ln./Ib v�41 ea rv.� 0 IMZ N .dr 6¢NrlAA rrn1O°`I I ° \ NI /,CVI NNi ORIFICE . PLATE DETAIL �rtr- �lr•-x: 1! I H I 1 1 I A I S 1 O IN I u ...__.. _.....n- +m Irsln (wlu ba w.im+`� • I ul x mab mare SIK u4. . hriq. ��i 1-I/.I.wJi II„11a LN 1... Yr, LII Ir.Nr.11w, .wa.r"?«.al. rrly a � ,rYRM,1: I,f14,b .. MI.,I.IYO.r� xYtllln/x,mn[ (b,M(Ib mt LMuno uIWY(aa an b IMtb wA wuv.alm IOU I5.0 Y 1 A SECTION A -A .DRIVEWAY CURB TAPER EXISTING PROPOSES DESCRIP770N o DECIDDu09 TREL 6,HiCREW ]REE w PoIIH! Poll' 4 DDT RRE t ucRr PDu T =N l CIF AS Sow mRl nw! HItAD ° • fODND RSRAR / SEl RAHAR 0 • MANTIOLET pA N V"m (70RTO :4 Al O ATlONS TIT )K l R)SRANT ,_•-1 �=ti WATER I Tom- ,� SANITAJIY 9EIIA'R 91VRA/ 9EIA'R ,— • —� '—�„ FndPROM' Lm A RISER BOA' pmR10 ! 1 VAULT 1 r I L__—J AN 0I111104`WN IRG PARSONS TC&c �h r eW oyl /(�p(�/ JOK/B� NO. 11-IS G ZV ASSOC/A TES PROJECT 7/� 11 BIOII S9 C^' ' ty a' CALCULATIONS FOR CONSULTING ENGINEERS MADE BY- I_/� `� CHECKED BY DATE SHEETOF FL Collins, C 1orado 80521 C C C. C C c PARSONS & C k{n� �I odr� JOB NO. (r I • 1 " I ASSOCIATES PROJECT Lei �' �s (k CALCULATIONS FOR h' O CONSULTING ENGINEERS Ft. Collins, Colorado 8057A MADE BY W ` DATE CHECKED BV DATE SHEET 2 OF /I a 170 a -- -� �,_�.�Te'z � _�- l; �'�Ci.�)� �c•o)(.z)) lao l� � �� _ �> 8Z (U•1)- it-0��1t9)��� J`�=_i_l�•811 t .l_9Y = �8 rf�� _flyI J41'(64) i•zs)(9) ��� ��IS}9ayt�L.9.7_; _17-9.11ih I I I 1j �1 � 3 1 5 I I _ I L I C C C PARSONS & °' / Pill clover JOB NO. / 916 61V FASSOCIATES PROJECT rd� iev145 -d It HVA CALCULATIONS FOR CONSULTING ENGINEERS JW HY- !(. 3 5 Ft Comma, Colorado 80524 MADE BV DATE CHECKED BV DATE SHEET OF . , T �.� �0 P��,��� I!nl_un, e � � red . Br )�. -r�� �q�� � I �a� �� l►rov�a�l�Sr_�)�;--� -- - —+ . - — _y _.rl13�U1 C_/�rQleA.l(_ t�JaJM I:. I CI3 ' ,..._.. ._ 1A;_. ri,zlr j r 11 tl _ I ' V 17) 1 , I....-.i�.,-,---i.. jai i I _�... i" I i 3 �• , - , a ✓, , -- - -- - - - io_727.;4�'�_�_.� o.K9✓' J176� T,211 936`�i i i - -i— r - 1 f to _ r !-102 0 loff..— , 1 -, I t , I /_�. I ,�.__... ' ...._i..__!__. ...._;__... 5.. 1 , 1 , 1-4- I i I I i 1 1 L i i I FPARSONS & r k', T 6 /w/, JOB NO. 7/,/S &LV ASSOCIATES PROJECT lei I 0104,S G(Irlill CALCULATIONS FOR delt,711�11 CONSULTING ENGINEERS i Ft. CoMrks6 Cotora& 80624 MADE BY Twc DATE 1-5-12 CHECKED BY- DATE SHEET am am L-4- It ILS xL, t .Seri[' _Cf C T wl AV 3l PARSONS & 6fawl -JOB NO. 71./5 6t V rASS 0 CLA TES PROJECT 10t CWtIN CALCULATIONS FOR QU tl't t CONSULTING ENGINEERS Twc 15'-1 MADE BY- a r OF Ft. CoMn,6 ColoradoNS24 DATE L CHECKED BY -DATE SHEET i-d A. a ow fs 7 A .... RAINFALL PERFORMANCE STANDARD EVALUATION 1--------------------------------------------------------------------- PROJECT: LOT 9 BIed14S C004 V. STANDARD FORM A (COMPLETED BY. Jeff COUGA DATE: 3-?-12 1----------------=-------=-------------------------------------------- IDEVELOPEDIEROOIBILITYI Asb I Lsb I Ssb 'I Lb I Sb I PS ISUBBASIN I ZONE I (ac) I (ft) I (%) .1(feet) I (') I (A) Lof 9 no, JefaIe o.Z7 170 2,0 i V-0'� I I I IX l I I take � I i I � --------=------------------------------------------------------------I HDI/SF-A:1989 EFFECTIVENESS CALCULATIONS -------------------------------- / =--------------------------------i PROJECT : Le q L oils Cou/� �.Q.Q• STANDARD FORM S I (COMPLETED BY: Jeff, DATE: 3-el I Erosion Control C-Factor P-Factor Method Value Value Comment ------------------- 8q�e Sell -----------=--------------------------- 1.0 11•0 Pair i of mat I/1I<W Cass 0.17 I•d UpkfG/def dock �13 of ID� Stcilm /Al%Ap I.0 0.0 In PakHy A�t� Burldr�g fjica p, � 1. op I i --------SiIf_ fee Rs---------1.0---------°=SD-----�I��� F1jf,E1,, cf O(Ifid��i MAJOR[ PS I SUS I AREA I I SASINI (�) 15P.SiNI (Ac) I CALCULATIONS -----I------I-----i------i--------,--------------------------- Lot 9 79.0 I 0. Z7 I I ESp�I rs�rd (jars (o,b9 ntrrs) d��k 1 of ---- rl- I I sac 6roand 05l R(fes) I Qu'dolil &ta (0.03 4C/rs) I I I I �, G _ alfoj 0,17 AciP3 T®14 I I I I gal( 8.;tjllj G Ors (o.l x .03) . (a.os x. Oil) .27 Werybfr�_'��` jy_cfor ,0- EFf = [I ft sy x o,.uj x laa = gS.3 ---------------------------------------------------------------------- DI/SF-S:I929 CONSTRUCTION SEQUENCE PROJI , 864S cilud ,_f.V.D• STANDARD FORM C r 5LOU"I3VCE. FOR 19 .9Z ONLY COMPLETED BY: Jeff COU(V DATE: Indicate ,by. use o-f a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. YEAR )MONTH I � I IJ IF !Mid I1'11TITIfi IS10IN Ip I -------------------- ---------- 1---------------------------------- =------------------------ OV.ERLOT GRADING ! WIND EROSION CONTROL Soil Roughing 1 I Perimeter Barrier l I Addltlonal:Barriers Vegetative Methods Soil Sealant Other I I RAINF'.LL EROSION CONTROL STRUCTURAL: Sediment-Trap/Ba•sin Inlet Filters .Straw Barriers Silt Fence Barriers Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other I .VEGETATIVE: 1 Permanent Seed Planting) Mulching/Sealant ! Temporary Seed Plantinal. Sod. Installation Nettings/Mats/Blankets ! Other STRUCTURES: INSTALLED BY VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED HDI/SF-C:1989 P(Al-nJ Lot aunau Ca.S{�4C len I S Lae SCa/l� - I i ---------------------------------------- MAINTAINED BY APPROVED BY CITY OF FORT COLLINS ON �J No Text