Loading...
HomeMy WebLinkAboutDrainage Reports - 02/12/2014 (3)Cite of Ft. CollinyprovqjPlans A PIuved fay_ January 16, 2014 Mr. Wes Lamarque City of Fort Collins Stormwater Department 700 Wood Street Fort Collins, CO 80521 RE: Drainage Memorandum — Harmony Technology Park Third Filing, Second Replat Dear Wes: The purpose of this drainage memorandum is to summarize the proposed drainage design and provide calculations for the additional impervious area runoff being added by the 23 parking stalls, which will be located along the south side of the existing Custom Blending Building. The stalls will add approximately 3,870 square feet of additional impervious area to the site and will replace a portion of the existing grass median island, located along the south side of building. Aspen is providing the following analysis and supporting calculations to demonstrate the added parking stall area (additional impervious area) has very little effect on the overall site runoff and masterplan drainage area (HTP Masterplan Area). Please refer to the attached Drainage Exhibit and accompanying rational method calculations for details. The proposed 3,870 square foot parking stall area will tie directly to the southern drive aisle (at the south end of the stalls), with the north side of the stalls fronting the existing green space, located south of the existing building. The additional 3,870 square foot impervious area will increase the `c' value for Basin 2 from 0.53 to 0.67, which also provides for a slight increase in the overall �site .`c' value from 0.68 to 0.69 (overall site impervious ratio increases from 65% to 67%). It's important to note that the existing site, including the added impervious area, continues to fall below the allowable `c' value of 0.80, thereby, continuing to meet the intent of the HTP Drainage Masterplan. The calculated 2-year time -of -concentration. for Basin 2 is 7.3 minutes, versus the previous 8.8 minutes. The 2-year rational method flow for Basin 2 will increase from 0.52 cfs to 0.70 cfs. The calculated 100-year time -of -concentration for Basin 2 is 5.4 minutes, versus the previous 7.3 minutes, while the 100-year rational method flow for Basin will increase from 2.43 cfs to 3.40 cfs. The decrease in time of concentrations (faster travel times) and slight increase in the 2-year and 100- year runoff rates appear to be negligible and have very little effect on the drainage patterns or runoff for the Custom Blending site, and in relation to the HTP Masterplan basin. Stormwater runoff from Basin 2 will continue to follow the historic drainage path to the south and will be routed through the LID basin(s), prior to flows spilling south and into the existing water quality and detention pond. It's important to note that Aspen met with the City of Fort Collins Stormwater and Stormwater Quality Departments, in which it was determined that additional LID measures are not required for the increase in impervious area, as the LID measures proposed in the HTP Third Filing, Second Replat Utility plans provide the necessary LID measures, all of which are in addition to the existing water quality/detention pond, which provides all of the required water quality and detention for the entire Custom Blending site. In summary, the proposed 3,870 square feet of additional parking stall area on the south side of the existing Custom Blending Building meets the intent of the "Final Drainage and Erosion Control Report for Harmony Technology Park Third Filing, Second Replat", dated August 16, 2013, by Aspen Engineering, and also the "Final Drainage and Erosion Control Report, Harmony Technology Site Master Plan, by Stantec Consulting, dated May 19, 2008. The proposed improvements appear to have little effect on the existing drainage system and existing facilities and meet the intent of approved plans and drainage reports for the HTP Third Filing, Second Replat, and the HTP Masterplan plans. Should you have any questions or concerns, please contact me. Sincerely, ORA�O C�CF Ov: '•FtYAN ' •. ti� G'�P: 3251 NAL ECG\ John Gooch, P.E. Aspen Engineering Developed Weighted Runoff Coefficients Custom Bfendmg 101-001 Basin RootAma(sqft) •r Asphalt Area (sqft) r Concrete Area (sqtf) r•r GmvelArea(sqft) r, LawnArea(sqh) r TatalArita Composite 2 0 7,315 3.870 0 7.141 18,326 0.67 3 0 33.788 0 0 2,540 36,328 0.90 4 0 21.240 0 0 938 22,178 0.92 5 0 19.161 0 0 769 19,930 092 6 0 0 12.265 0 739 13,004 0.86 7 0 862 690 0 4,125 5,677 044 8 0 0 0 0 45.120 45,120 0.25 131 0 9,200 0 0 1,255 10,454 0.87 132 r29,255 0 0 10.820 40.075 076 Total SITE 122.840 16.825 0 78,218 217.883 Total Acreage 0.00 2.92 0.39 0.00 1.80 Si a r = a, 53 ( P964IH.5 ) Impervious Katto No. 1 0 2,019 0 0 4,771 (Sqft) 6.790 Ratio 33"6 2 0 7.315 3.870 0 7,141 18.326 6316, 3 0 33,788 0 0 2,540 38.328 93 A, 4 0 21.240 0 0 938 22.178 96 % 8 0 19,161 0 0 769 19,930 96% 6 0 0 12,265 0 739 13,004 95 2 7 0 962 690 0 4,125 5.677 314 8 0 0 0 0 45.120 45.120 5, Total SITE 0 Re 3A5 16,825 0 68,143 167,353 677 Total Acreage 0.00 1.94 0.39 0.00 1.52 &61 tarsi use or Surface GMracterMics Parawiw keyar-vioe+Nss 9usbless; Commercial ere. 95 Nwalibimood areas 85 Residential: sftlo-family AWRIUMI 4aacheit 80 MuMunit e0achetl 75 Mlf-acre Im ce laig., enenls SD bUuseial: M ar.s 8o P-Iesy,i is. 90 P.rks, cenwWrlss: 5 Plan.".: 10 Schools: 50 Raiaea4 yard areas: 15 undo aroma: Fletmical How AnalAnalves, 2 Givaebale, prkulWrel OIf-sae flow analyse Wind uN not 4efr 45 asses: Pere4 100 Grow 40 a14 aMaweOu: 90 Roofs: 99 lawns N edl 0 arse d ace 0 -Kwer to rlgures KUN mmugn mI Irl mis tun ,riwws C r G. LS (m6i 16A3 ) k.,s ji� ( tUVJQA5 ) 9:09 AM 11152014 t 00 U n u � U L0 W ~II ii z 0a Z W ? p Z � m 0 VO o U. N Z3 O aU W N Y 'A < OM V(f w r If ti -�l LY J Z,C (V W M co if) 0 0 f'- O (n LL C r LO M (fl V M r LO r LO " E O N O O O O O r O N O� O M CO. M I- r- V OM 11 r J r N N N N M N r r W W 2 w J O O�(D O O CD O I, Ln (O W ' J a.. - O- N N N Lo r 0 0 Q U) LY J W m a°°a-aaaaa(D(D�aa Q C7 CD CD U fir` oornao(ovo�or- `- V I- (O M M r Z (V r N W J C f- CO to r M O N Q] O Sri W 1- Z LY W OM o LO O) CO 0 0 0 0 0 '-T «7 CD J N V r M r M r (V Z 2 (� M N� V 00 M Z M N (O CD N Cl) r r r w J Q w Il- O N N w V Ln r w () (h V (O O W W W V N M r ¢ o 0 0 0 0 0 0 0 0 0 0 Q Z_ W U (O N CO r (p O CO d' d' N u N r cf OD U') V M r O N M in Q 0000000 r o o m Z lb r r N r N Cl) V (n (O n m Cl) M a Z CO r r FA ¢o CO N O LC) r ? + +_ � N u u CUJ � U r 00 I I Z O � E � O � Z c w N O Z 70 m o O EO Ci (U O LL >. N O O U w F U M cY w J Q ,C N IT O O O O F� 0 0 Z E — LO tri tsi LO tri 1- vi LO ,C t0 CO t0 V Cl) t0 ,- u E N00000'-0N U / O 0) M N N M V V O a ch M J N N N N M N w w w J a o - V (00000000 w U Vc 0 t0 o O O o r t0 c0 J O N N N t0 0 0 Q H J w to a°0„ IT M aaa���aa Q } 2 F- U 2 F- O 0) co (0 V' O 1� Z to-O w N J Ccn O r N _ E (Dm N w H Z Q Q� w w R 000000000 > U o (O M O (Doom V too O J IT r N r M N J M Q Z 2 f- U V Z M O N(0 0 0 w N M J Q (0 f- O N N M V' (O f- (0 U M V (0 M M M M q N M t- a Z wN (O N t7 M M O M q V N M t0 V- M I O N M QQ o o o 0 0 0 O, O O CD Z m U) U M (M M Q Z m E rc m U q O 1 L_ m d m E ❑ � 0 c 0 a LL C O m IL .J U ^w O O. m a U L n m m a c m 3 0 LL N C Ul m C _ ` m c A 0 O JS m _ 0 y 1 P U v n O N N n i0 N n N Y n m O N__ 0 0 0 0- N 00 m 0 c 0100000000 0 00 O „ .r 8 0 0 0 0 0 0 0 0 0 00 .0 a C m, O V N O [' I N N P O O 00 n C N N n 7 m n N Q n m o Om 3 O m V N O [7 m O t� V N m �[] Y m O N P m n do O n [7 Y O O m 4 m n m m O m d W, m N 0 N ry N N N N N N N N N N N N n O N N m Q Y1 n m N N m n m () m P P P m O N m n P P m n m 0 000.0000 00 00 0 m C m- 'E m > C ZOD0000000 OP O th 0 o00000000 06 ON o v E N N LL y Q o n m O C o N O N K f L O O J N _ O O 00 m C N - m m n< m m n m M! m p m m m i a o mn m J 0 O 13 E o £. x2 V > s a� LL C _ LL `� m� G V v U iS8 L N O C �1 F `r _ y m " c a 2 4 N m m = rz U ti `�� assesses sa as aooa -oo 00 00 O[ n 0 0 0 0 O 0 0 0 0 0 V 01 0 m 0 n U -oo 0 U mmm�:rvmn �m m � �. ssssemas ss s� eE q2 mE om00000 00000a oa o0 0« m o C u o u � c o nc ry _r c .on�.oin�on oo voi voi m m c o O �