Loading...
HomeMy WebLinkAboutDrainage Reports - 01/31/2017City of Fort Collins Approved Approved by: Date: '41/1017 FINAL DRAINAGE REPORT Lot 13, the Amended Plat of Lots 13 and 14, Interchange Business Park Prepared for: R4 Architects 226 Remington Street, Unit 3 Fort Collins, CO 80524 970-224-0630 Prepared by: Interwest Consulting Group 1218 West Ash, Suite A Windsor, Colorado 80550 (970)460-8488 January 12, 2017 Job Number 1284-069-00 ' INTERWEST CON SULTI N G GROUP January 12, 2017 tMr. Dan Mogen City of Fort Collins Stonmwater 700 Wood Street Fort Collins, CO 80522-0580 ' RE: Final Drainage Report for Lot 13, the Amended Plat of Lots 13 and 14, Interchange Business Park Dear Dan, I am pleased to submit for your review and approval, this Final Drainage Report for the Lot 13, ' the Amended Plat of Lots 13 and 14, Interchange Business Park development. I certify that this report for the drainage design was prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual with variance request as noted. City comments dated October 8, 2016 from the City of Fort Collins Stormwater Engineering Department have been addressed in this report. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, c Erika Schneider, P.E. Colorado Professional Engineer No. 41777 Reviewed By: Michael Oberlanc Colorado Professional Engineer No. 34288 ' 1218 WEST ASH, SUITE C WINDSOR. COLORADO 80550 M. 970.674.3300 • ILK. 970.674.3303 TABLE OF CONTENTS TABLEOF CONTENTS ............................................................................................................ iii 1. GENERAL LOCATION AND DESCRIPTION................................................................ 1 1.1 Location...........................................................................................................................1 ' 1.2 Description of Property................................................................................................. 1 2. DRAINAGE BASINS AND SUB-BASINS.......................................................................... 2 2.1 Major Basin Description................................................................................................ 2 2.2 Sub -Basin Description................................................................................................... 2 3. DRAINAGE DESIGN CRITERIA...................................................................................... 2 3.1 Regulations......................................................................................................................2 3.2 Directly Connected Impervious Area (DCIA) Discussion .......................................... 2 3.3 Development Criteria Reference and Constraints...................................................... 3 3.4 Hydrologic Criteria........................................................................................................ 4 3.5 Hydraulic Criteria.......................................................................................................... 5 ' 3.6 Floodplain Regulations Compliance............................................................................. 5 3.7 Modifications of Criteria............................................................................................... 6 ' 4. DRAINAGE FACILITY DESIGN....................................................................................... 6 4.1 General Concept............................................................................................................. 6 ' 4.2 Specific Flow Routing.................................................................................................... 7 4.3 Drainage Summary........................................................................................................ 7 I 5. CONCLUSIONS....................................................................................................................7 5.1 Compliance with Standards.......................................................................................... 7 5.2 Drainage Concept........................................................................................................... 8 6. REFERENCES...................................................................................................................... 8 IAPPENDIX A APPENDIX B APPENDIX C APPENDIX D APPENDIX E APPENDIX F APPENDIX G VICINITY MAP, DRAINAGE AND EROSION CONTROL PLAN, AND FLOODPLAIN PLAN HYDROLOGIC COMPUTATIONS HYDRAULIC COMPUTATIONS WATER QUALITY AND LID CALCULATIONS, APPROVED VARIANCE REQUEST BOXELDER INFORMATION (SWMM MODEL) FLOODPLAIN INFORMATION AND CITY OF FORT COLLINS FLOODPLAIN REVIEW CHECKLIST FOR 100% SUBMITTALS SOILS INFORMATION, FIGURES AND TABLES iii GENERAL LOCATION AND DESCRIPTION ' 1.1 Location ' The proposed project is located in the southeast corner of the intersection of Interstate 25 and State Highway 14. More specifically it is located in the northwest quarter of Section 15, Township 7 North, Range 68 West of the 61h P.M., City of Fort Collins, County of ' Larimer, State of Colorado. Please refer to the vicinity map in Appendix A. The project is located southeast of the Southeast Frontage Road and northwest of the Boxelder Creek. It is Lot 13 of Interchange Business Park Amended Lots 13 and 14. Lot 14 is located to the west. Lot 12 of Interchange Business Park is located to the east. 1.2 Description of Property ' The property is approximately 1.2 acres in size and will consist of a single building and ' modifications to the existing parking and drives. The site will be served by an existing private drive. ' The north portion of the land currently slopes to the north at about 1 % and contains the existing drive and parking. The remainder of the site slopes towards the Boxelder Creek ' at about 4%. The site is currently vacant except for an existing parking lot located in the northwest portion of the site and the existing drive connecting Lots 12, 13 and 14. The ' majority of the ground cover is asphalt, gravel and exposed dirt. ' The existing soil type on -site consists of Nunn clay loam (60%), classified as Type C, Larimer-Stoneham complex (36%), classified as Type B and Paoli fine sandy loam (4%), classified as Type A by the Natural Resources Conservation Service. The area of ' development is within the Type C soils located in the north half of the site. Soil, information is located in Appendix G. The Boxelder FEMA floodway is located on the south portion of the property and the flood fringe is on the northern portion of the property (FEMA FIRM Panel 08069C0983H, effective on May 2, 2012). The "City of Fort Collins Floodplain Review Checklist for 100% Submittals" and other floodplain information are included in Appendix F. 1 I 2. DRAINAGE BASINS AND SUB -BASINS ' 2.1 Major Basin Description The proposed development lies within the Boxelder Creek/Cooper Slough Master Drainage Basin. 2.2 Sub -basin Description tThe existing site discharges directly into Boxelder Creek. ' 3. DRAINAGE DESIGN CRITERIA ' 3.1 Regulations This report was prepared to meet or exceed the "City of Fort Collins Storm Drainage ' Design Criteria Manual' specifications. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual" (UDFCD), developed by the Denver Regional ' Council of Governments, has been used. ' 3.2 Directly Connected Impervious Area (DCIA) Discussion Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainageways and implementing long-term ' source controls. The Four Step Process applies to the management of smaller, frequently occurring events. ' Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement ' Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). ' Runoff basins B and C will be routed through a rain garden thereby reducing runoff from ' impervious surfaces over a permeable area to slow runoff and increase the time of concentration and promote infiltration. 1 2 I ' Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release The rain garden helps reduce total runoff by allowing the water to infiltrate and allow ' sediments to settle while incorporating a slow release. ' Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate and volume of runoff during and following development. Because the site will drain to a proposed rain garden, bank stabilization is unnecessary with this project. The rain garden will help improve water quality and attenuate flows thereby improving ' stabilization in receiving water ways. No changes to the main Boxelder Creek channel floodway are proposed. ' Step 4. Implement Site Specific and Other Source Control BMPs ' The proposed development will provide the LID rain garden feature which will eliminate pollution that had previously been exposed during weathering and runoff processes. The proposed project will proactively control pollutants at their source by preventing pollution ' rather than removing contaminants once they have entered the stormwater system as compared to historic conditions. ' 3.3 Development Criteria Reference and Constraints ' The runoff from this site has been routed as much as possible to conform to the requirements of the City Stormwater Department. Today, the north portion of the site has been developed with approximately 8,000 sf of existing pavement draining north and directly to the ROW untreated. With the development, the design leaves approximately ' 6,000 sf of pavement draining north (Basin A). It is not feasible to change this drainage pattern and an Alternate ComplianceNariance is requested from the 100% area treatment standard. Water quality will be met through the use of a rain garden that will accept runoff from basins B and C of the developed site. Please refer to Appendix D for the Stormwater Alternative ComplianceNariance Application. 3 Runoff reduction practices (LID techniques) are also required. 75% of all newly developed areas must be treated by LID techniques. The project has a total 22,400 sf of impervious area. Using the rain garden LID technique, 16,737 sf of impervious area (75%) will be treated. This meets the 75% requirement. Please refer to Appendix D for rain garden and LID calculations and LID table. 3.4 Hydrologic Criteria The City of Fort Collins Rainfall Intensity -Duration —Frequency Curves (Figure RA-16 of the City of Fort Collins Storm Drainage Design Criteria Manual) is used for all hydrologic computations associated with this project. Runoff computations were prepared for the 10-year minor and 100-year major storm frequency utilizing the rational method. All hydrologic calculations associated with the basins are included in Appendix B of this report. Please refer to Appendix A for the Drainage and Erosion Control Plan depicting drainage basins and design points. Water quality volume was calculated using the method recommended in the "Urban Storm Drainage Criteria Manual". Water quality capture volume calculations are located in Appendix D. Basins B and C are treated in the rain garden. It was assumed that Lot 13 was 90% impervious in these calculations (to allow for any potential future additions). The site is located in the City of Fort Collins Boxelder/Cooper Slough master basin. It is located in Master Basin 87 (46 acres). This basin was analyzed as 73% impervious for the 100-year developed condition in the master plan. Interwest has studied the impact of the proposed project on the peak flow in Boxelder ' Creek. For this study, it was assumed that Lot 13 was 90% impervious (to allow for any potential future additions). This study has verified that the project area, even with an increased imperviousness, does not impact the overall peak flow in Boxelder Creek, and therefore the site does not need detention (required in the Master Plan to keep the ' Boxelder Creek peak flow at or below existing conditions). Three models were used to show that our site does not increase the peak flow of Boxelder Creek: 4 1. Existing Conditions City Model: File name: Box_Elder_100.INP 2. Current Conditions City Model with SWMM Basin 87 split into two basins (SB87 and SB87(GRIT)) where Basin SB87(GRIT) is the project site with current impervious conditions (15%) modeled: File name: Box_Elder_100 (CE),INP 3. Proposed Conditions City Model with SWMM Basin 87 split into two basins (SB87 and SB87(GRIT)) where Basin SB87(GRIT) is the project site with proposed impervious conditions (90%) modeled: File name: Box_Elder_100 (PROP),INP The results of the SWMM model show that the existing peak flow of Boxelder Creek in this area (SWMM conveyance ID 925L) is 1463.97 cfs at a time of 12 hours and 47 minutes. By splitting Basin 87 and adding the new imperviousness of the site into the model, the 100-year flow of this node remains 1463.97 cfs at 12 hours and 47 minutes. Therefore, the proposed condition does not increase the peak of Boxelder Creek (because of the time of concentration of the site versus that of the sub -basin and channel). Please refer to Appendix E for printouts of the models. Since the proposed release of the site does not increase the peak flow of Boxelder Creek, detention is not required. 3.5 Hydraulic Criteria All hydraulic calculations are prepared in accordance with the City of Fort Collins Drainage Criteria. All calculations are included in Appendix C of this. The roof drain storm systems was analyzed using StormCAD software. The curb cut was analyzed using F1owMaster software. 3.6 Floodplain Regulations Compliance The site is within a FEMA regulated, 100-year Boxelder Creek flood fringe and floodway (Panel 08069C1003G). A completed "City of Fort Collins Floodplain Review Checklist for 100% Submittals" has been included in Appendix F of this report. Chapter 10 "Flood Prevention and Protection' of the City Code has been referred to for this report. 61 4. Construction activities will occur within the flood fringe and include installation of sidewalk, curb and gutter and asphalt parking, utility work and landscaping. A Floodplain Use Permit Application for this work performed in the Boxelder Creek flood fringe will be required. The building is located outside of the floodplain boundary. Survey will be required prior to construction proving that the building is located outside of the floodplain. The lowest floor (including basement or crawl space) and HVAC will not be required to be elevated above the regulatory flood protection elevation. The rain garden and Swale, landscaping and storm pipe system to the rain garden will be constructed within the FEMA regulated, 100-year Boxelder Creek floodway. A City Floodplain Use Permit and "No Rise Certification" will be required for work in the floodway. The current design will leave the floodway area either at existing grade or in a minor "cut" condition. 3.7 Modifications of Criteria A variance is required for the water quality treatment. The approved variance is included in Appendix D. The SWMM model verifies that this lot does not need detention. DRAINAGE FACILITY DESIGN 4.1 General Concept The south portion of the proposed development and building will be collected and conveyed to the proposed rain garden on the southwest portion of the site where it will be treated before being released over a level spreader into the Boxelder Creek. The north portion of the development will continue existing conditions and flow northeast into the existing drive aisle where it will also eventually discharge into Boxelder Creek from a low point in the SE Frontage Road. 2 t4.2 Specific Flow Routing ' A summary of the drainage patterns within each basin is provided in the following paragraphs. Basin A is 0.27 acres and includes the northwest portion of the site. This basin contains the existing parking area (which will be repaved and is smaller than the existing parking area), six proposed parking spaces and proposed sidewalks. Runoff from this basin will ' follow existing conditions and continue to sheet to the drive aisle and then flow to Boxelder Creek from the SE Frontage Road. ' Basin B is 0.43 acres and includes the building, drive and new parking area. The building roof will be collected in roof drains and be conveyed to the rain garden located southwest ' of the building. The remainder of the basin will sheet flow south to the same rain garden. ' Basin C is 0.48 acres and includes remaining southern portion of the site and contains the rain garden. ' Water will be treated for water quality in the rain garden located north of the Boxelder Creek in the floodway. Water will be released to the south to the Boxelder Creek with a ' level spreader. Please refer to Appendix D for the rain garden design. t4.3 Drainage Summary ' Drainage facilities located outside of the right of way (including the proposed roof storm drain system and rain garden) will be maintained by the property owners. ' S. CONCLUSIONS ' 5.1 Compliance with Standards ' All computations that have been completed within this report are in compliance with the City of Fort Collins Storm Drainage Design Criteria Manual. 7 ' 5.2 Drainage Concept ' The proposed drainage concepts presented in this report and on the construction plans adequately provide for stormwater quantity and quality treatment of proposed impervious ' areas. Conveyance elements will be designed during the final report to pass required flows and to minimize future maintenance. tThe design minimizes impacts to other utilities and properties and maintains the existing ' drainage flow paths as much as possible. The design will effectively control damage from The BMPs from storm runoff originating the site. recommended are sufficient to reduce runoff peaks, volumes and pollutant loads from the impervious areas of the site. If, at the time of construction, groundwater is encountered, a Colorado Department of ' Health Construction Dewatering Permit will be required. ' 6. REFERENCES t 1. City of Fort Collins, "Storm Drainage Criteria Manual", (SDCM), dated March, 1986. ' 2. Urban Drainage and Flood Control District, "Urban Storm Drainage Criteria Manual", Volumes 1 and 2, dated January 2016, and Volume 3 dated November ' 2010 (revised November 2015). ' 3. ICON Engineer, Inc., "Hydrologic Analysis of the Boxelder Creek/Cooper Slough Watershed", dated April 2014. 1 8 L APPENDIX A VICINITY MAP DRAINAGE AND EROSION CONTROL PLAN, FLOODPLAIN PLAN A LOT 13, THE AMENDED PLAT OF LOTS 13 AND 14, INTERCHANGE BUSINESS PARK SCALE: 1 '=1000' PROPOSED DRAINAGE SUMMARY TABLE If op IP S V' ' `Zoo J` N / �\ 1 a / / / DD / m / / 1/\ \ s\ / \ � tOD-Yk FF1U Ms a Teem Me c NI I c1lool I w 10 Iv Im 10 a tm oI sMoawan IIMARKS Pqa s ml aM afs ata e a o.n c.ro o:J so e0 ]a 2A 60RTN PORT04 OF LOT a ¢ 00 cm tm 60 50 Is a AIC PAWI PAWING - 0. [ ro p'K AR 91 ] a in Rt71 ITN PCIRTk'aJ 17F I 0T RAeI f:AFYIFNI summi of Amos Toul Area of the Site 51,345 sq. fL Tout Area of Basin A 21553 sq. ft. Toni Area of Basin B & C M792 sq,ft. larp A Ousting lmperlous Area Unteated 7,896 sq. ft. Proposed Area Impervious Untreated 6,20E sq. ft. Variance Requested lisle ll E Impervious Area Treated 16,737 acre/sq. ft. ImpemlousAreaTmatedhy LID 16,737 acre/sq. ft. % Impervious Area Treated SOD % % Impervious Aua Treated by UD 100 % W / DO \ � \ \ (Mint a M�IIDARY Lp1D \ LOT 12 \ \ /NTERCHANGEBUS/NESSPARK 1 \ I \ — — — — — — — — — — — — — — — — — — — — — — — — — . FF=4929.0 \ O 1 30' PROPosED \ `\\ d#inw�yum LOT 14 AMENDED PLATOF LOTS 13& 14, /NTERCHANG£BUS/NESSPARK — J \ / LOT 13 AMENDED PLAT OF / LOTS 13&14, 1� INTERCHANGE BUSINESS PARK 10 �\\ \ toll—wE rew A\ (aim+awe lawntr uD �Q / 1 / C / 0.48 0. / / / �CO `� \ rculA-wta.o OUTLOTA NTERCHANGES S/NESSPARK ((/TIL/T'Y, DRAINAGE. SAN/TARYSEWER, AND FLOOD CONTROL EASEMENT) 20 10 O 20 40 SCALE'. 1"= 20' NOTES: 1 SEE LANDSCAPE PLAN FOR PLANTINGS THROUGHOUT THE SITE 2. THE TOP OF FOUNDAMON ELEVATION SHOWN IS HIGHER THAN THE MINIMUM ELEVATION REQUIRED FOR PROTECTION FROM THE I O&YR STORM. LEGEND . ri+: �!"•irr�tMA1NAGE BASIN DNpE1M[ 1 ORAe-E—NNUMBER MINORS 14N RIINOFFCOEFFKJEN1 rnenmAGE BASIN AREA QDESIGN POMR PROPOSED DIR=ON OF OVERLAND FLOW CALL UTIUTY NOTIFICAnDN CENTER OF COLORADO 811 FALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOJ DIG. GRADE, DR EXCAVATE FOR t E MARKING OF UNDERGRWND MEMBER UTUTIES. JI M D m Z� N 7 m F CD 0 W O W Er DUN t N C = ZZO0 wm < �pw a R Z U Z itW 0 (L ID U- N N 'a J a Z a� M VU� F-W-� Q zLL 1Q W O J a Z L9 IL 'o 13 CL Z IL p W Q Z Q� �U) 93 Q m W = C9 F Z M U f. D_ W O Z PRELIMINARY w NOT FOR CONSTRUCTION C a �{ Z 2 Y U CITY OF FORT COWNS, COLORADO G u N o U UTILITY PLAN APPROVAL ��o r�q�E APPROVED: S'.•plUi' pTY ENGINEER DATE e CHECKED BY: i 3s2ee U WAIER A WASIEWAIER TLItt DATE CHECKED BY: .. ... �JQVAL SMINAWATER UTUtt DALE 'v pto CHECKED BY: PARKS & RECREAMN DATE PROD. NO. I 69 CHECKED BY: 1rrAF:IG FNWEER DAIS CHECKED BY: ENMRONMENTAL PLANNER DATE f P / wow �C �- �o / 10'RE all s LAC CTRP)- LOT 14 AMENDED PLAT OF LOTS 13& 14. INTERCHANGESUSINESSPARK J e co N W Zcv�Z WIN LL mL~L #k N N k � 7 p � II II� ADEM \\\ BETWEEN BUILDING cp, (2?`( FLo LAPIN � 1 �'%/ CO - V V�� OODPLAN/11RNGE (NORTH OF THE RO)NDARY LINE) 1 \ \\ \ I LOT 72 \ \ ` I INTERCHANGE BUSINESS PARK /`f A• U1tTY EASEIENF O\\ \ — — — — — — — — — — — — — — — — — — — — — — — — - :GAIT 1 10 LEGEND �KKKK� 1'Iv,�lt/>I.I. MINuI"�vii'uJk ��,_ PROOOSED MAIOP CONTtlUP EXISTING MINOR CONTOUR -__.-xxxX E YITTMG MIJOP CONTOUR A� 'O IRFEMAFLOODRLARI A� A� I.YRFEMAFLOODFIRWUE 40 NOTES \ I. NO STORAGE OF MATERIALS OR EQUIPMENT IN THE FLOODWAY. 2, PORTIONS OF THIS PROPERTY ARE LOCATED IN THE FEMA REGULATORY I OOYEAR \ O I \\ FLOODPLAIN AND ALL DEVELOPMENT MUST SATISFY REQUIREMENTS OF CHAPTER 10 OF CITY COOL 3 PRIOR FLOODPLAINTOBE (INNINGSE ANY WORK IN PERMIT IS REQUIRED E FLOOD FRINGE (FILL LANDSCAPING. PAVEMENT, ETC) 1 Jr svmrmm F amF/ . �' fits 4. PRIOR TO BEGINNING ANY WORK IN THE FLOODWAY (STORMWATER PIPE SYSTEM. RAIN GARDEN. LANDSCAPING. WATER OUALTFY. ETC.) AN APPROVED NORISE CERTIFICATE IS REQUIRED. 5. THE BUILDING CORNER AND THE FLOODPLAIN BOUNDARY MUST BE STAKED PRIOR TO CONSTRUCTION. THE FLOODPLAIN ADMINISTRATOR MUST VERIFY THE SEPARATION BEFORE AND �\ \ AFTER CONSTRUCTION. �0� V � j WLnU1 / � Z / LOT 13 C D AMENDED PLA TOF Q C LOTS 13& 14, / NTERCHANGEBUS/NESS ARK FEVA 1OO-VR ,FLOGGWAY (SOUTH OF THE A)UNDARY LAC) N —\ 111 �,F 'eco OUTLOTA NTERCHANGEBUSINESSPARK ! / (Lr/Xl Y. DRAI)VAGE. SAN/TARYSEWER, AND l \ i FLOOD CONTROL EASEMENT) %IOIT'A1TF ¢see•me CALL UTILITY NOTIFICATION CENTER OF COLORADO 811 LELL I -BUSINESS DAYS IN ADVANCE BEFORE YOU DIG. GRADE. OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTIUTE$ Za =F N M U) Wm ID lC 1- W O a W �uN a = Zz° IL wV W a RI ZO z BE f F 0 W 0 a.. D: N N V OI Q I I M I N f' Oi J, U. f p a a z J G a. 0 p It p ZI W Q W x, m; 0 f d PRELIMINARY w NOT FOR CONSTRUCTION 4 m m w w J 2 U CITY OF FORT COLLINS. COLORADO o m m o U UTILITY PLAN APPROVAL APPROVED:3';.�Wl. RECT.I�,�t'c CITY ENGINEER An CHECKED BY: ;' 3Axee WATER A WA$MWATER UTUTY CHECKED BY: SMRMWATER UTILITY DATE �I@ TONAL G `titi. �10nu�ti>ti,• CHECKED BY: PARKS • RECREATION DAM PROD. NO. 126406"O CHECKED BY: TRAFFK; ENGWEER DAM 9 CHECKED BY: ENNRWMENTAL BANNER DAM APPENDIX B HYDROLOGIC COMPUTATIONS l:3 0 W J m Q li Q C� G N a ' V /WLU � Q � Z 0 LU 1 cn O a ' a z LU 0 cc a C7 z a cr y a F OZO F W LL Y LL ¢ 0 0 0a0 0 H z F- cc 0 a. z CL �oF- OHO z m U) 0 0 'A O M O C O 0 m ao ao It O Q O C O O E ui 0 of U E ui ui co 0 G n o N U 0 0 _C O t0 In O0 O N 0 0 0 a N It It a 0 0 0 � m a ¢ m U a a F� N C I C q G o a A S] U 00 Interwest Consulting Group RUNOFF COEFFICIENTS & %IMPERVIOUS LOCATION: GRIT PROJECT NO: 12R4-069-00 COMPUTATIONS BY: es DATE: 111152016 Recommended Runoff Coefficients from Table RO-11 of City of Fort Collins Stormwater Code, Volume I Recommended % Impervious from Table RO-3 Urban Storm Drainage Criteria Manual, Volume I coefficient Impervious C 0.95 100 0.95 96 0.95 90 0.50 40 0.20 0 Type C Soils Runoff Streets, parking lots (asphalt) Sidewalks (concrete) Roofs Gravel Heavy Soil (Flat, c29/6) SUBBASW DESIGNATION TOTAL AREA (ac.) TOTAL AREA (salt) ROOF AREA (sq.10 PAVED AREA (sq.0) GRAVEL AREA (so-fl) SIDEWALK AREA (W'I) LANDSCAPE AREA (W.") RUNOFF COEFF. (C) % hpewoous REMARKS Eh" Lot 1.18 51,345 0 7.896 0 0 3,225 0.16 15 Proposed Lot 1.18 5/,345 7.756 12,079 0 2,565 7.975 0,45 42 tEouations - Calculated C coefficients & % Impervious are area weighted C = L (Ci Ai) / At ' Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all APs 11.15.16 FC FLOW-GRR.As Interest Consulting Group RUNOFF COEFFICIENTS & %IMPERVIOUS LOCATION: GRIT PROJECT NO: 1284-069.00 COMPUTATIONS BY: es DATE: 1111512016 Recommended Runoff Coefficients from Table BOA 1 of City of Fort Collins Stormwater Code, Volume I Recommended % Impervious from Table RO-3 Urban Storm Drainage Criteria Manual, Volume I Type C Soils Streets, parking lots (asphalt) Sidewalks (concrete) Roofs Gravel or Pavers Landscape Areas (Flat, heavy) Landscape Areas (Steep, heavy) Runoff % SUBBASW DESIGNATION TOTAL AREA W) TOTAL AREA IN.111 ROOF AREA (N.9) PAVED AREA IN.91 GRAVEL AREA (N.fl) CONCRETE AREA (N.fl) LANDSCAPE AREA IN.91 RUNOFF COEFR (C) % Ynpe s REMARKS A 0.27 11,553 0 5,843 0 565 5,345 0.60 54 NORTH PORTION OF LOT a 0,43 1aa22 7.756 6.436 0 2000, 2,630 Day e1 BUILDING AND PARKING c 0,48 20.970 0 0 0 0 20.970 o.20 0 SOUTH PORTION OF LOT RAIN GARDEN TOTAL 1.18 51.345 7,756 12,079 2,565 7.975 e45 42 B.O 0.91 39792 ]756 6,436 2,000 23.600 0.51 39 Treated In Rain Garden ROOF O.tB ),)56 LJ56 0 0 0 0 0.95 90 In roof drain storm s stem Eouations Total Impervious A 6,208 Total Impervious B & C 16,192 - Calculated C coefficients 8 % Impervious are area weighted Total Impervious Site 22,400 C. L(Ci Ai)I At CI . runoff coefficient for specific area, Ai Al = areas of surface with runoff coefficient of Ci n . number of different surfaces to consider At = total area over which C is applicable; the sum of all Ats 11-15-16 FC FLOW GRR.s6 O �p f-- 4 v C7= v= II U Y i W Q O O W O C N N m N z� Ea IL "' O O = Om C m ti O W = GI ry r N O � N O W W M OG CV 3 C N N W V W V O � E LL W A N N 2 U W 0 b h m ¢ c t o O C c W O m O O O O W � 00o v� N W ov�iw N r t W can Q � O O O O o e N N N N N co O mro J It W O t00 cq N ON1 o 0 0 0 _ t wm z� n N N IT m a m 13, z LL coU Q co¢ co n co 2 yZ ¢ m Z m a m 0 u N ON Z t 7 C O LL Y U L ca U O V C N w m E N 1] m O c m c m � 2 a c E E _m \ U c nm n N O J > 5 E U U n E z E co . ± li c a U u n W O p � O lt7 o � N � W � U � v II U N Y Q W 2 0 qO IN L61 � S y Z — E I'mil LL m O 7 O O O E m v ii O Y N m n o a W x m N r N ci 7 N W N W U V N V O O LL W z j m V N Q x o m m m m U R C m O O c c 7 0 0 O W m o o 0 o N m 0 o C7 o°O� W J L N W n a J v f � m n m o :. E 0 0 0 0 O o 0 0 0 0 L N N N � r a N O N O n O N O O Z U J Q ui > O U of mro coil m Q O O G O ti z_F n N m m O O m d� N 000 O N = LL 00 mQaOU m ¢ N Z yZ Q GO C7 Z ma u cOF NO N C W LL � d Z 7 U Y LL N U O C N m E .0 O O N_ N C D ttl 'D � C E aLO m 11 F U f. C O E E E_ C E U m w N X cc 0 LL U LL c0 r t LL LL Z E O Y � Q } W. N IL y G ¢ = U W 2 O J LL Z O O Q U O �O O O O p v�i O L 4 II U 0 y� N z O N O 0 Z ¢ a ou 0� 7 a OU 0 N Y a E G 'o N f O N O N N O H Q V w O C O M ¢ O = o ¢ a a U O u C G O fV fV fV lV e o o m o E vi vi m vi U o 0 0 0 m Q p N d d O O O O LL o z r C LL ¢ a 6 a m U U N 0 w g 0 q 21 U o n N Y Q 0 o m m a m r O O ~ o_ 0 ¢ W 'o � E �= ¢ o 0 a`�LL U V O O H O O m m m m V C O O m O U o 0 0 0 V I� Cl m m a m N O a a O O O LL LL Q b g LL ¢ a b ¢ m U 0 ¢ U ~ N 0 m c m O LL N LL LL O E Z r � N Y > Q o W O a� p N Os S G Cw U G r J LL Q Z O O Q U N ¢Y Q W R 0 O N O th O O O f O y U Q d W � C E � c S O N O a o° u 0 O N O Cl O m Q 01 Of N W E N N t0 N U N O N o n 0 0 0 0 a LL m Q U R F Q v W loo 0 m o m a u o a APPENDIX C HYDRAULIC CALCULATIONS C N 1 0 U 0 0 0 0 W W W c c c H H H n n n n n n n n n n n n � I 4a o I v.G 0,w i o I I I I 11 'O I O I U N U u u w l o l I I 1 >, I o 1 U I I N G l o l u v I o 1 7 u W U p LL ro w U W I I W I I I I � I •O I o I v I o I rl N ro N 0 N l 0 1 O O. W U I I H >1 Cq I 1 I I I I v I o 1 v I o 1 W I I ro N N 1 1 W U 0 0 I U O fa H U I I W I I G I I H I I oW O O W H 7 E 1 O O U ro I 0 O. 4 I • H N S-i — I to to a 'U W W I N N ro N N W a o u u G 1 s 0 o I U N r 7 'U UI 4J I l0 ro ro u4J I N N tl SI W W 01 01 O 7 m >1 x o 1 I ro U c c 1-I O W I N H W < J v I E 1 0 0 m N 0 1 W W W N I W N H W I H H O >1 W U I E. CO •-' I I I G I o 0 iT W I G w I r r I 11 H G 1 0 ro a a W ro 1 U U U G 1 S4 14 N U) I -H o I U U I G 1 u Uu O I U U m a)N N N I H H — I I I U I O N r 1 .i 4J1 0 . . H a)a a •O O-, ro ro W I N N N 11 1,1 N W I 01 01 m >r I I � I m ro w 1 I N N N I u u c w I10 m rn m l >. a I ccc 1 x 1 I I I I I G 1 O o 0 1 O I O c c I G W- I to N a0 I 0> W N N N I > u v I 1 w I 1 I 1 I I H aEi 1 . . . ro0 0 „ 1 I W N H W H H rl I O W U F N I I I I I I I C I I N I 1a I H I t1 I N ro A I (7 1 ro I I a 1 c N H 1 m 00 I a U U I I I `N 'oo 00 0 rn�v c � N via N > c U E o dCO c 0 0 0 U) U) n M 0 N Q U m 0 co 0 H nU 0 n c N F. ro �3 0,0 N O GI N V 0 O m n M ES E E m N c O O � Uco Q ap E7 O N N O C A F 00 � � m m H x « $L� k} ) k �\ f 6 & $. - + LU o/f £ )[E co ]E¥ Ln \ co U'j cli _ $ co § k CD >> /}\\§m§ 0 'u±6aE¥ a2 () )0 p k L - . .o / U) ED m — Q O U k S 2 k ' )±6%d/ e & /\k 2 0 2f \(E �z CUE¥ � � � t § ^^ \ \ \ / =2-4- - k(E -i -2 r; k4 b} { \ $§ ' Ev; Worksheet for 4 ft Curb Cut (Basin B) Project Description Flow Element: Rectangular Weir Friction Method: Manning Formula Solve For: Discharge Input Data Headwater Elevation: 0.50 ft Crest Elevation: 0.00 ft Tailwater Elevation: 0.00 ft Weir Coefficient 3,33 us Crest Length: 4.00 ft Number of Contractions: 0 Results Discharge: 4.71 ft'/s Headwater Height Above Crest: 0.50 ft Tailwater Height Above Crest: 0.00 ft Flow Area. 2.00 ft' Velocity: 2.35 ft/S Wetted Perimeter. 5.00 ft Top Width: 4.00 ft Cross Section for 4 ft Curb Cut (Basin B) Project Description Flow Element: Rectangular Weir Solve For: Discharge Section Data Discharge. 4.71 ft/s Headwater Elevation: 0.50 ft Crest Elevation. 0.00 ft Tailwater Elevation: 0.00 ft Weir Coefficient: 3.33 us Crest Length. 4.00 ft Number of Contractions: 0 T 0.50 ft 1 CDO It Worksheet for Trapezoidal Channel - 1 Protect Description Flow Element: Trapezoidal Channel Friction Method: Manning Formula t0v Solve For: Discharge Input Data Roughness Coefficient. 0 035 Channel Slope 0,00600 ft/ft Normal Depth: 0.50 It Left Side Slope: 0.25 ft/ft (H:V) Right Side Slope: 0.25 ft/ft (H:V) x 33 Bottom Width: 4-00 ft �G�$ Results Di Dschharay ge: 374 � � � , � �'+ � fN/s Flow Area. 2 06 ft' Wetted Perimeter. 5.03 It Top Width. 4.25 ft Critical Depth: 0.30 ft Critical Slope: 0.03096 fUft Velocity: 1.81 f /s Velocity Head. 0.05 ft Specific Energy: 0.55 ft Froude Number: 0.46 Flow Type: Subcritical GVF Input Data Downstream Depth 0.00 It Length: 0.00 ft Number Of Steps. 0 GVF Output Data Upstream Depth: 0.00 ft Profile Description: N/A Headloss: 0.00 ft Downstream Velocity. 0.00 f /s Upstream Velocity 0.00 f /s Normal Depth. 0.50 It Critical Depth: 0.30 ft Channel Slope: 0.00600 ft/ft ' Worksheet'for Trapezoidal Channel - 1 cMicarsiope: 0:03096 mrt Cross Section for Trapezoidal Channel - 1 Project Description Flow Element: Friction Method Solve For. Section Data Roughness Coefficient: Channel Slope. Normal Depth: Left Side Slope: Right Side Slope: Bottom Width: Discharge: 4.00 It ---I Trapezoidal Channel Manning Formula Discharge 0.035 0.00600 0.50 0.25 0.25 4.00 3.74 05011 ft/ft ft ft/ft (H:V) tt/fl (H:V) ft ft3/s WATER QUALITY AND LID CALCULATIONS, APPROVED VARIANCE REQUEST Design Procedure Form: Rain Garden (RG) II ' Sheet 1 of 2 Designer: ES Company: INTERWEST ' Dale: Project: September 21, 2016 GRIT Location: RAIN GARDEN (BASIN S AND C) 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, la to = 90.0 (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = 1,100) 1 = 0.900 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.32 watershed inches (WQCV= 0.8' (0.91" i'- 1.19" 1'+0.78" i) D) Contributing Watershed Area (including rain garden area) Area = 39.792 sq It E) Water Quality Capture Volume (WQCV) Design Volume Vwa:v = 1.065 cU It Vol = (WQCV / 12)' Area F) For Watersheds Outside of the Denver Region, Depth of or = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, Vwocv orHLH = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vwocvusee = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) Dwmv - 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AM,,, = 710 sq It D) Actual Flat Surface Area Ai,, eN = 749 sq It E) Area at Design Depth (Top Surface Area) Ara, = 1382 sq ft F) Rain Garden Total Volume V,= 1,066 cu it (VY= ((AT, + Aftw) / 2)' Depth) 3. Growing Media Choose One Q 18" Rain Garden Growing Media Other (Explain); 4. Underdrain System A) Are underdrain5 provided? C11aose One O YES Q NO B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = N/A It Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol,, = N/A cu ft iii) Orifice Diameter, 3/8" Minimum Do = N/A in 11 12-21-16 RG-GRIT.xlsm, FIG 12/22/2016, 10:12 AM Design Procedure Form: Rain Garden (RG) Sheet 2 of 2 Designer: ES Company: INTERWEST Date: September 21. 2016 Project: GRIT Location: RAIN GARDEN (BASIN 8 AND C) S. Impermeable Geomembrane Liner and Geotextile Separator Fabric Choose Onn — Q YES A) Is an impermeable liner provided due to proximity NO of structures or groundwater comamination7 6. Inlet / Outlet Control Choose One Sheet Flow No Energy Dissipation Required [--I A) Inlet Control® Concentrated Flo - Energy Dissipation Provided (' CToosp (LIP 7. Vegetation I Q Seed (Ran for frequent weed rontrol) Q Plantings Q Sand Grown or Other High Infiltration Sod 8. Irrigation r Choos<One I Q YES A) Will the rain garden be irrigated' I 0 � Notes: 1 12-21-16 RG-GRIT.xlsm, RG 12/2212016, 10:12 AM Q U) z w 0 Q 0 z Q a O cc c� c� z J Z) z 0 m U co C r O � O 41 O L N N W O co 3 N OD W U r (}TZ W aD n E E m :3 z z c ac rn a�imE.Nai 0 0 o m m a a 0 0 0 5a cn z w a cc a z cc W Y 0 00 0 C'. 00 O m C w Z G Z) 9 LL m oCa000 V 0>a Qz= ccQ �j cm T IL IL 0 C H Q W co OCOLL,m0 N Q T Q a c� z� w z p 0 w rn LL a���>N ma0 a Q ? W V cce p m O T G LU a m LL N _o maw 0¢ a z U Q ca m m s LID Table Summary of Areas Total Area of the Site 51,345 sq. ft. Total Area of Basin A 11553 sq. ft. Total Area of Basin B & C 39792 sq. ft. Basin A Existing Imperious Area Untreated 7,896 sq. ft. Proposed Area Impervious Untreated 6,208 sq. ft. Variance Requested Basin B & C Impervious Area Treated 16,737 acre/sq. ft. Impervious Area Treated by LID 16,737 acre/sq. ft. % Impervious Area Treated 100 % % Impervious Area Treated by LID 100 % I 1 City Engineer Name Interwest Street Address 1218 W. Ash Stormwater ComplianceNariance Application f Fort Collins Water Utilities Engineering Suite A 970-460-8488 City Windsor State CO Zip 80550 Owner Name RSW Holdings ,LLC Phone ryan@sweetwood.com Street Address 2120 Milestone Drive City Fort Collins State CO Zip 80525 Project/Application Number from Development Review (i.e. FDP123456) POP1buU24 Legal description and/or address of property Lot 13, the Amended Plat of Lots 13 and 14, Business Park Description of ProjecYA single building and modifications to the existing parking and drives. Existing Use (check one): ❑ residential ❑ non-residential ❑ mixed -use (9 vacant ground Proposed Use (check one): ❑ 1residential a non-residential ❑ mixed -use ❑ other If non-residential or mixed use, describe in detail Commercial development -single story gym facility State the requirement from which alternative compliance/variance is sought. (Please include applicable Drainage Criteria Manual volume, chapter and section.) 100% of the site to be treated with some form of water quality treatment. What hardship prevents this site from meeting the requirement? Today, the north portion of the site has been developed with approximately 8.000 sf of existing pavement draining directly north to the ROW untreated. With the developmen4 the design leaves approximately 6,000 sf of pavement draining north (Basin A). It Is not feasible to change this drainage pattern. There is no area to provide water quality. The design reduces the amount of pavement that is untreated from 8,000 sf to 6,000 sf. Attach separate sheet it necessary What alternative is proposed for the site? The amount of impervious area untreated is being reduced. The entire remainder of the site is treated by LID. Attach separate sheet if necessary nacre 2 I The owner agrees to comply with the provisions of the zoning ordinance, building code and all other applicable sections of the City Code, Land Use Code, City Plan and all other laws and ordinances affecting the construction and; occupancy of the proposed building that are not directly approved by this variance. The owner understands that if this variance is approved, the structure and its occupants may be more susceptible to flood or runoff damage as well as oth erse drainage issues. Signature of owner- Date: r 5/ 1b The engineer hereby certiCs that the above information, along with the reference plans and project descriptions is correct. Signature of en ineen i G ' • 11 - g g Date: f 5 4 5 34M V F ll•f�rib: F L PE STAMP ete application submitted: II� ?�17 roval/denial: //i//0-O /7 Variance: A approved ❑ denied / ation/notes/conditions: s. r hA riv.n�l/ V/OKS Q/ CQ 1�L6! C4 rye T�V la 6j �/�� . n7i c rn Cif � [;Approvedby: C :tilityFile Database? ryes ❑ no I APPENDIX E BOX ELDER INFORMATION (SWMM MODEL) E r ... r. • 'v� �` '. r � _ �r�'7•.. its' � {{ a�, I••�41yy''.•yy',J 5 t_ ,..A1 Ali. ,�' n -' 4 F . ` • / f 4 a �--� � , ' `)" t _ ❑' 7E, �,�liaiy POW f+. 0�`4 � "JI� •�j ?1C) CN Ol ❑yEl _ 0- o CO Ol Ito L w �• c OD El 44 ❑ - x C C) 3 P ly - a. ! •� r A via° !' CC F >[jj� � CT 11 ' Ll - � t r, _❑ ��� o. ❑ El co3 a i z LU ao M— U Wcc m . min ❑ �` co M O i r - �r-, ' ~ vl rh t� �*v M ��'x W N CV - I , N OW 1 C V Q ❑❑", °v ' jN CNJ co It y! FTFI rCD r� r•�, Op N -$- rr7 �nm". - F' �a .lam rl �.�•• r N cq El OF]OFF I . I N ❑ O ElL❑ C L .rOiL . �n N v' pJ M rq .--V _ p N C i O W E o tA V) LA E7-� — % ♦ r r, r, , tn •u �r W � ~ H N W W a (7 • O ) Lp L Q U V u Y ® m m® D m® LL O cr = U7 °6113, i� W X q O m t • 7---------------------------- g LU LLJ lJ p Y J a V L O Y1 U aQ • + a O o Oga a • � • ' c R O ®', ' ° i1pi V-'s !t t R t y w pig! R • m-m R + 1' n $ � V V U U Y V U G Z BasinlD Width Outlet Area Imper Slope Overland Flow Length (ft) (Ac) (%) (%) (ft) 2 12700 2 160.3 20 0.8 550 3 33020 3 151.6 41 0.5 200 4 8650 704 29.8 40 1.3 150 5 18380 813 147.7 55 0.7 350 6 1 6120 1 814 63.2 1 6 1.8 450 7 6270 707 136.7 10 0.6 950 8 8040 808 36.9 53 9.1 200 9 1930 809 22.1 23 0.7 500 10 4480 10 87.3 5 1.5 850 11 6420 811 147.3 6 1,1 1000 12 23960 12 27.5 90 0.9 50 13 8590 713 197.1 8 0.8 1000 15.1 610 15.2 12.3 1 30 1 1.3 880 15.2 970 15.2 3.7 14.1 0.8 170 15.3 4060 415 27.9 44.5 2.2 300 15.4 7460 415.4 62.4 35.8 1.1 360 16 500 416 11.5 7 1.6 1000 17 4140 417 52.3 5 3.9 550 18 5460 18 125.3 5 1.0 1000 19 3570 419 82 5 2.5 1000 20 14090 20 1 161.6 20 1 2.0 Soo 21 2190 421 22.6 5 2.9 450 22 1150 822 10.6 5 3.2 400 23 1700 723 31.3 5 2.0 800 24 9790 424 33.7 45 3.3 150 25 5630 725 129.1 5 0.7 1000 26 6756 726 155.1 5 2.0 1000 27 4230 727 72.8 5 2.6 75O 28 5480 28 1 125.9 9 1 3.1 1000 29 21290 729 268.8 29 0.6 550 30 4870 430 33.5 49 1.5 300 31 8040 31 184.5 7 2.1 1000 32 9290 32 213.3 6 1.4 1000 33.1 1480 433 33.9 8 2.1 1000 33.2 5520 433 38 58 2.1 300 33.3 12200 433 84 53 2.1 300 33.4 6050 433 1 41.7 53 2.1 300 34 6220 834 128.5 9 1.0 900 35 13390 735 307.3 6 0.7 1000 36 13840 36 317.8 6 1.0 1000 37 3770 37 34.6 23 1.8 400 38 12660 38 290.7 5 2.9 1000 39 2490 839 17.1 5 30.8 300 40 16070 440 110.7 53 2.7 300 41 1 38510 1 441 132.6 29 1.7 150 42 2350 42 54 5 1.3 1000 43 2060 43 37.8 40 1,9 800 44 3370 744 77.4 7 1.4 1000 45 2370 45 54.3 5 1.0 1000 46 5920 46 135.8 18 3.6 1000 47 13280 747 304.9 9 0.5 3000 48 12690 748 2111 6 0.5 1000 49 9600 49 220.3 1 5 1 3.2 1000 Appendix A - 1: Subbasin Parameters BasinlD Width Outlet Area Imper Slope Overland Flow Length (ft) (Ac) (%) (%) (ft) 50 7310 50 167.7 5 IS 1000 51 11670 51 267.8 5 4.6 1000 52 10260 752 235.6 13 3.2 1000 53 7290 753 150.7 5 2.0 900 54 12310 54 282.6 6 2.6 1000 55 30000 755 688.6 5 1.8 1000 56 21980 456 403.7 24 2.8 800 57 95030 457 1745 36 4.5 800 58 8760 458 130.7 33 4.3 650 59 10400 459 238.7 5 1.6 1000 60 20400 260 468.4 5 3.3 1000 61 3840 61 22 30 2.0 250 62 2090 62 12 22 2.5 250 63 2400 471 1 14 24 4.5 250 64 1570 64 6.3 37 2.5 170 65 1570 65 5.1 52 2.0 140 66 1350 66 7.7 43 2.0 250 67 2990 67 17 37 2.0 250 68 1760 68 30 31 2.0 250 69 720 633 3.3 1 43 2.0 200 70 6730 70 50 30 2.0 320 71 1600 71 5.5 10 2.2 150 72 2850 861 16 5 0.7 240 75 61940 476 1422 38 6.4 1000 76 94220 477 2163 24 3.0 1000 77 51400 475 1180 25 6.0 1000 78 64030 768 1470 5 1.9 1000 79 61051 79 1401.5 5 1.3 1000 80 4350 80 34.9 5 0.3 350 81 6060 934 139.2 5 0.5 1000 83 2370 83 32.7 5 0.8 1 600 84 1130 563 26 5 0.5 1000 85 4270 785 98 5 0.3 1000 86.1 3930 564 90.3 8 0.6 1000 86.2 10450 486.2 36 80 0.6 150 86.3 17440 486.3 120.2 45 0.6 300 87 6710 617 46.1828 73 0.5 300 88 29000 930 133.3 90 0.6 200 89 38158 933 171.324 46 1.1 200 90 15180 790 174.621 32 0.7 500 91 1900 943 43.5 5 0.1 1000 92 3300 92 68.5 5 4.0 900 93 5100 565 104.901 5 0.9 900 94 6500 539 149.624 5 0.8 1000 95 16220 795 372.4 5 2.5 1000 96 2750 918 63.0725 5 2.1 1000 97 4780 544 109.786 5 1.4 1000 98 1870 98 25.7 5 1.7 600 99 4700 799 108.1 5 1.1 1000 100 498D1 100 57.2 25 1.8 500 101 6870 7301 157.8 5 0.8 1000 102 13420 7102 308 5 0.6 1000 103 30200 103 693.2 16 1.5 1000 BasinlD Width Outlet Area Imper Slope Overland Flow Length (ft) (Ac) (%) (%) (ft) 104 12fi00 104 290.8 14 3.6 1010 105 24130 105 553.9 5 3.1 1000 106 15000 1 560 344.9 5 0.6 1000 107 20210 1 505 463.9 5 0.9 10DO 108 8340 108 191.5 5 3.9 1000 109 8940 109 205.4 11 5.0 1000 110 54100 568 1241 5 0.7 1000 111 21740 7111 499.1 5 2.8 1000 112 11300 572 207.3 5 5.3 800 113 34600 113 476.6 5 4.1 600 114 6550 114 120.1 5 2.5 800 115 17650 561 405.1 5 3.5 1000 116 15650 116 359.1 5 0.7 1000 119 47660 119 1094 5 2.8 1000 120 12200 575 224.7 7 2.1 800 121.1 8760 7121 201.2 5 0.8 1000 121.21 21500 4121.21 147.3 52 0.8 300 121.22 6451 7121 148.1 5 0.8 1000 121.3 10540 7121 121 19 0.8 500 122.1 14160 7122 97.5 85 0.8 300 122.2 5370 4122.2 37 1 55 0.8 300 1.23.1 20160 7123 462.8 6 0.5 1000 123.21 6100 4123.21 42 41 0.5 300 123.22 15300 4123.22 105.4 41 0.5 300 123.23 4290 7123 49.2 41 0.5 500 123.3 9980 7123 114.5 18 0.5 500 123.4 21770 4123.4 149.9 28 0.5 300 123.5 16670 4123.5 114.8 39 0.5 300 124.1 18690 124 429 1 5 1.5 1000 124.2 7584 7317 174.1 5 1.S 1000 124.3 2380 7317 54.6 5 1.5 1000 125 17500 125 241.7 5 5.6 600 126 29600 7126 579.6 5 2.2 1000 127 18620 7127 427.3 8 2.2 1000 128 19650 128 270.7 5 6.7 600 129 46850 7129 860.4 5 4.2 800 130 21450 578 492.4 5 0.9 1000 131.1 1810 7131 41.5 5 1 0.7 1000 131.2 8740 7131 60.2 44 0.7 300 132 375B0 7132 258.8 45 0.7 300 133 8310 7133 144.547 5 2.4 760 134 42760 7134 833.451 5 3.0 850 135 11700 135 268.7 5 1.4 1000 136 18290 7136 419.8 5 1.5 1000 137 13300 7137 305.5 5 0.9 1000 138 7240 138 166.1 1 5 1 1.4 1000 139 6250 7139 143.4 5 0.5 1000 140 9790 7140 67.4 5 5.0 300 ]41.1 14240 141 326.8 5 0.7 1000 141.2 19760 4141.2 136.1 52 0.7 300 142 46800 142 752 5 7.1 700 143 37700 582 865.6 5 5.0 1000 144 9040 144 207.5 5 2.5 1000 BasinlD Width Outlet Area Imper Slope Overland Flow Length (ft) (Ac) (%j (%) (ft) 145 9000 145 165.4 13 6.7 800 146 20260 586 465.2 5 0.7 1000 147 8310 147 190.8 5 2.7 1000 148 9460 7148 217.2 5 1.5 1000 149 18230 7149 1 418.5 5 0.9 1000 150 42840 150 688.4 5 8.0 700 151 18790 7151 431.4 5 3.5 1000 152 26050 152 597.9 5 1.3 1000 154 4421 588 101.5 5 0.6 1000 155 3990 155 91.5 5 2.5 1000 156 3750 156 60.3 5 4.0 700 157 33650 7157 681.072 5 3.4 880 158 45450 158 1043 5 0.7 1000 159 28300 7159 649 5 0.8 1000 160 6830 160 156.7 5 1.0 1000 162 58216 162 1336.46 5 4.7 1000 163 29972 7163 688.076 5 3.4 1000 164 2070 164 47.5 5 2.7 1000 165 15163 7165 348.101 5 1.1 1000 166 13050 7166 299.6 5 1.8 1000 167 14720 167 338 5 2.6 1000 168 14509 168 333.081 5 3.2 1000 169 17390 7169 399.3 5 2,0 1000 170 6970 170 159.9 5 5.0 1000 171 19670 171 226.1 5 5.0 500 172 17300 592 397.3 5 2.7 1000 173 12550 595 288 5 1.5 1000 174 16782 174 385.269 5 2.6 1000 175 12210 7175 280.3 5 1.5 1000 176 17500 176 401.8 5 1.0 1000 177 24910 177 571.8 5 2.1 1000 178 25540 178 586.4 5 1.4 1000 179 49790 7179 1143 5 2.3 1000 181 32416 599 744.16 5 2.6 1000 182 25300 7182 580.8 5 2.1 1000 183 42305 183 971.188 5 5.3 1000 184 12134 184 278.566 5 2.5 1000 186 3662.57 186 84.15 5 4.0 1000 188 13173 188 302.4 5 0.6 1000 190 43060 190 989 21 2.4 5000 191 53656 191 1231.77 19 0.9 1000 192 61320 192 1407 19 1.1 1000 193 34630 493 398 30 1.2 500 194 18590 194 299 11 1 2.0 700 195 30240 195 694 11 0.9 1000 196 75077 196 1723.52 5 1.0 5000 200 1460 826 33.6 5 1.6 1000 201 3220 437 14.8 5 2.0 200 202 98097 403 2252 36 6.0 1000 301 33670 301 773.643 5 1.0 1000 302 24071 302 552.596 5 1.5 1000 O N O O C O O N z a a �3 c ca E a a LO M ti N CM O N O N N C O .O O co N i V O w a z to [TITLE] INP file created on 12/26/2013 2:17:35 PM by tmartin with inpPINS version 0.0.2.0 Title/Notes: [OPTIONS] FLOW_UNITS CFS INFILTRATION HORTON FLOW_ROUTING KINWAVE START —DATE O1/28/2013 START_TIME 00:00:00 REPORT —START —DATE O1/28/2013 REPORT_START_TIME 00:00:00 END —DATE O1/30/2013 END_TIME 06:00:00 SWEEP —START O1/01 SWEEP —END 12/31 DRY —DAYS 0 REPORT —STEP 00:01:00 WET —STEP 00:01:00 DRY —STEP 01:00:00 ROUTING_STEP 0:00:30 ALLOW_PONDING NO INERTIAL_DAMPING PARTIAL VARIABLE_STEP 0.75 LENGTHENING_STEP 0 MIN_SURFAREA 0 NORMAL_FLOW_LIMITED BOTH SKIP_STEADY_STATE NO FORCE_MAIN_EQUATION D-W LINK_OFFSETS DEPTH MIN_SLOPE 0 [EVAPORATION] ;;Type ..---------- Parameters ---------- CONSTANT 0 DRY —ONLY NO [RAINGAGES] Rain Time Snow Data ;;Name Type Intrvl --------- ------ Catch Source ---------------- -------------- 1' INTENSITY 0:05 1 TIMESERIES 1 2 INTENSITY 0:05 1 TIMESERIES 2 3 INTENSITY 0:05 1 TIMESERIES 3 [SUBCATCHMENTS] Total Pcnt. Pcnt. Curb Snow ;;Name Raingage Outlet Area Impery Width -------------- Slope Length -------------------------------- Pack ---------------- SB8 1 808 36.9 53 8040 9.1 0 SB80 1 80 34.9 5 4350 0.3 0 SB81 1 934 139.2 5 6060 0.5 0 SB83 1 83 32.7 5 2370 0.8 0 SB84 1 563 26 5 1130 0.5 0 SB85 1 785 98 5 4270 0.3 0 SB86.1 1 564 90.3 8 3930 0.6 0 ;Sunflower Development SB86.2 1 486.2 36 80 10450 0.6 0 ;Clydesdale Development SB86.3 1 486.3 120.2 45 17440 0.6 0 SB87 1 617 46.1828 73 6710 0.5 0 29000 0.6 0 SB89 1 933 38158 1.1 0 SB9 1 809 1930 0.7 0 SB90 1 790 15180 0.7 0 SB91 1 943 1900 0.1 0 SB92 1 92 3300 4 0 SB93 1 565 5100 0.9 0 SB94 1 539 6500 0.8 0 SB95 1 795 16220 2.5 0 SB96 1 918 2750 2.1 0 SB97 1 544 4780 1.4 0 SB98 1 98 1870 1.7 0 SB99 1 799 4700 1.1 0 [SUBAREAS] ;;Subcatchment N-Impery N-Pery -------------- RouteTo PctRouted ---------- - 171.324 46 22.1 23 174.621 32 43.5 5 68.5 5 104.901 5 149.624 5 372.4 5 63.0725 5 109.786 5 25.7 5 108.1 5 S-Impery S-Pery PctZero ------------------------------ � Y �wA 3 x = o � LL � � U N •X O w cd m d' m M I'* m N M r r r V N N N N oo kn Q\ O\ kn O� Wn O\ to w � N N N •-- .-- N N N N N N O O O O _ o w 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - = o - X w L1 r r r Wn 00 ON O r to kn �O c+S r N O� O O\ to M �O m �o r Cl O� O �O m r 4 kn 4 v') d' kn o0 W) 3 C/) o w - %D M �t '. V 00 .-• 00 r. N r Orn ON kn dt X V ca — 2�1�12HW a� a A a a a a A a a A . A a A en M V' V'1 N eq 00 00 00 Wa �n COc Ih r O\ m 00 000w0 N O� r4 m O\ O� O\ ON o\ oN C\ 01 O� m O\ ET N N a) CM m d m co a [TITLE] ;;Project Title/Notes Box_Elder_100(CE),INP file created on 9/13/2016 by eschneider with ICG SWMM version 5.1.010 Lot 13 the Amended Plat of Lots 13 and 14, Interchange Business Park (GRIT) [OPTIONS] ;;Option Value FLOW UNITS CFS INFILTRATION HORTON FLOW_ROUTING KINWAVE LINK_OFFSETS DEPTH MIN_SLOPE 0 ALLOW_PONDING NO SKIP_STEADY_STATE NO START —DATE, 01/28/2013 START_TIME 00:00:00 REPORT —START —DATE O1/28/2013 REPORT_START_TIME 00:00:00 END DATE O1/30/2013 END_TIME 06:00:00 SWEEP —START O1/01 SWEEP —END 12/31 DRY —DAYS 0 REPORT —STEP 00:01:00 WET —STEP 00:01:00 DRY —STEP 01:00:00 ROUTING STEP 0:00:30 INERTIAL_DAMPING PARTIAL NORMAL_ FLOW_ LIMITED BOTH FORCE_MAIN_EQUATION D-W VARIABLE STEP 0.75 LENGTHENING_STEP 0 MIN_SURFAREA 0 MAX_TRIALS 0 HEAD —TOLERANCE 0 SYS_FLOW _TOL 5 LAT_FLOW_TOL 5 MINIMUM STEP 0.5 THREADS 1 [EVAPORATION] ;;Data Source Parameters ..-------------- ---------------- CONSTANT 0 DRY —ONLY NO [RAINGAGES] ;;Name Format Interval SCF Source -------------- --------- ------ ---------------- 1� INTENSITY 0:05 1 TIMESERIES 1 SB76 2 477 2163 24 94220 3 0 SB77 2 475 1180 25 51400 6 0 S378 2 768 1470 5 64030 1.9 0 SB79 2 79 1401.5 5 61051 1.3 0 ;non -tributary area SB8 1 808 36.9 53 9.1 0 SB80 1 80 34.9 5 0.3 0 SB81 1 934 139.2 5 0.5 0 SB83 1 83 32.7 5 0.8 0 SB84 1 563 26 5 0.5 0 S385 1 785 98 5 0.3 0 SB86.1 1 564 90.3 8 0.6 0 ;Sunflower Development SB86.2 1 486.2 36 80 10450 0.6 0 ;Clydesdale Development SB86.3 1 486.3 120.2 45 17440 06 0 8040 4350 6060 2370 1130 4270 3930 SB87 1 617 45.0028 73 6710 0.5 0 SB88 1 yjU 13J.J 7U 29000 0.6 0 SB89 1 933 171.324 46 38158 1.1 0 SB9 1 809 22.1 23 1930 0.7 0 SB90 1 790 174.621 32 15180 0.7 0 SB91 1 943 43.5 5 1900 0.1 0 SB92 1 92 68.5 5 3300 4 0 SB93 1 565 104.901 5 5100 0.9 0 SB94 1 539 149.624 5 6500 0.8 0 SB95 1 795 372.4 5 16220 2.5 0 SB96 1 918 63.0725 5 2750 2.1 0 SB97 1 544 109.786 5 4780 1.4 0 SB98 1 98 25.7 5 1870 1.7 0 SB99 1 799 108.1 5 4700 1.1 0 B87(GRIT) 1 617 1.18 15 162.15 1.16 0 [SUBAREAS] ;;Subcatchment N-Impery N-Pery S-Impery S-Pery PctZero RouteTo PctRouted ;;------------------------ ---------- ---------- - -- ---------- - ------------------- SB10 0.016 0.25 0.1 0.3 1 OUTLET SB100 0.016 0.25 0.1 0.3 1 OUTLET SB101 0.016 0.25 0.1 0.3 1 OUTLET SB102 0.016 0.25 0.1 0.3 OUTLET SB103 0.016 0.25 0.1 0.3 OUTLET SB104 0.016 0.25 0.1 0.3 1 OUTLET SB105 0.016 0.25 0.1 0.3 1 OUTLET SB106 0.016 0.25 0.1 0.3 1 OUTLET SB107 0.016 0.25 0.1 0.3 1 OUTLET SB108 0.016 0.25 0.1 0.3 1 OUTLET SB109 0.016 0.25 0.1 0.3 1 OUTLET SBll 0.016 0.25 0.1 0.3 1 OUTLET SB110 0.016 0.25 0.1 0.3 1 OUTLET SB111 0.016 0.25 0.1 0.3 1 OUTLET SB112 0.016 0.25 0.1 0.3 1 OUTLET SB113 0.016 0.25 0.1 0.3 1 OUTLET SB114 0.016 0.25 0.1 0.3 1 OUTLET SB115 0.016 0.25 0.1 0.3 1 OUTLET SB116 0.016 0.25 0.1 0.3 1 OUTLET SB119 0.016 0.25 0.1 0.3 1 OUTLET SB12 0.016 0.25 0.1 0.3 1 OUTLET t .3 m .a c t U U T C) N CM T_ rn c 0 a 0 L U U a z W U 0 0 T L W x I 0 m \ Y OL 0 �w'A °ww 7 .� U X � W (M It Cl) M M M V d' d' N N U1 -- (7� C� C1 c N O O G O 00 c � 3 c x u- x 0 0 0 0 0 0 0 0 o c o 0 0 0 0 0 0 A � � M M 00 M r C� t- C� V1 O� 00 00 ON 00 O V t� ^' M Wn M �C M M N t- O) � I Mp t- .--� ON �--� O M r d' �Y rn V 00 o to V 000 Xwv E 2 � 7 1 Vl V} W) �O 00 W W) \O r to O) O 0000 0000 0000 T E7 C\ N C\ N � m as as m m en a, CU f7 N N N m n0 d N N to y [TITLE] ;;Project Title/Notes Box_Elder_100(PROP),INP file created on 9/13/2016 by eschneider with ICG SWMM version 5.1.010 Lot 13 the Amended Plat of Lots 13 and 14, Interchange Business Park (GRIT) [OPTIONS] ;;Option Value FLOW_UNITS CFS INFILTRATION HORTON FLOW_ROUTING KINWAVE LINK_OFFSETS DEPTH MIN_SLOPE 0 ALLOW_PONDING NO SKIP_STEADY_STATE NO START —DATE O1/28/2013 START_TIME 00:00:00 REPORT —START —DATE O1/28/2013 REPORT_START_TIME 00:00:00 END —DATE O1/30/2013 END_TIME 06:00:00 SWEEP —START O1/01 SWEEP —END 12/31 DRY —DAYS 0 REPORT —STEP 00:01:00 WET —STEP 00:01:00 DRY —STEP 01:00:00 ROUTING STEP 0:00:30 INERTIAL_DAMPING PARTIAL NORMAL_ FLOW_ LIMITED BOTH FORCE_MAIN_EQUATION D-W VARIABLE_STEP 0.75 LENGTHENING_STEP 0 MIN_SURFAREA 0 MAX_TRIALS 0 HEAD —TOLERANCE 0 SYS_FLOW _TOL 5 LAT_FLOW_TOL 5 MINIMUM_STEP 0.5 THREADS 1 [EVAPORATION] ;;Data Source Parameters ..-------------- ---------------- CONSTANT 0 DRY —ONLY NO [RAINGAGES] ;;Name Format Interval SCF Source -------------- --------- ------ ---------------- 1� INTENSITY 0:05 1 TIMESERIES 1 SB76 2 94220 3 0 SB77 2 51400 6 0 SB78 2 64030 1.9 0 SB79 2 61051 1.3 0 ;non -tributary area SB8 1 9.1 0 SB80 1 0.3 0 SB81 1 0.5 0 SB83 1 0.8 0 SB84 1 0.5 0 SB85 1 0.3 0 SB86.1 1 0.6 0 ;Sunflower Development SB86.2 1 10450 0.6 0 ;Clydesdale Development SB86.3 1 17440 0.6 0 477 2163 24 475 1180 25 768 1470 5 79 1401.5 5 808 36.9 53 8040 80 34.9 5 4350 934 139.2 5 6060 83 32.7 5 2370 563 26 5 1130 785 98 5 4270 564 90.3 8 3930 486.2 36 80 486.3 120.2 45 SB88 1 930 133.3 90 29000 0.6 0 SB89 1 933 171.324 46 38158 1.1 0 SB9 1 809 22.1 23 1930 0.7 0 SB90 1 790 174.621 32 15180 0.7 0 SB91 1 943 43.5 5 1900 0.1 0 SB92 1 92 68.5 5 3300 4 0 SB93 1 565 104.901 5 5100 0.9 0 SB94 1 539 149.624 5 6500 0.8 0 SB95 1 795 372.4 5 16220 2.5 0 SB96 1 918 63.0725 5 2750 2.1 0 SB97 1 544 109.786 5 4780 1.4 0 SB98 1 98 25.7 5 1870 1.7 0 SB99 1 799 108.1 5 4700 1.1 0 SB87(GRIT) 1 617 1.18 90 162.15 1.16 0 [SUBAREAS] ;;Subcatchment N-Impery N-Pery S-Impery S-Pery PctZero RouteTo PctRouted ..------------------------ ------- ---- ---------- ---------- --------- ---------- SB10 0.016 0.25 0.1 0.3 1 OUTLET SB100 0.016 0.25 0.1 0.3 1 OUTLET SB101 0.016 0.25 0.1 0.3 1 OUTLET SB102 0.016 0.25 0.1 0.3 1 OUTLET SB103 0.016 0.25 0.1 0.3 1 OUTLET SB104 0.016 0.25 0.1 0.3 1 OUTLET SB105 0.016 0.25 0.1 0.3 1 OUTLET SB106 0.016 0.25 0.1 0.3 1 OUTLET SB107 0.016 0.25 0.1 0.3 1 OUTLET SB108 0.016 0.25 0.1 0.3 1 OUTLET SB109 0.016 0.25 0.1 0.3 1 OUTLET SBll 0.016 0.25 0.1 0.3 1 OUTLET SB110 0.016 0.25 0.1 0.3 1 OUTLET SB111 0.016 0.25 0.1 0.3 1 OUTLET SB112 0.016 0.25 0.1 0.3 1 OUTLET SB113 0.016 0.25 0.1 0.3 1 OUTLET SB114 0.016 0.25 0.1 0.3 1 OUTLET SB115 0.016 0.25 0.1 0.3 1 OUTLET SB116 0.016 0.25 0.1 0.3 1 OUTLET SB119 0.016 0.25 0.1 0.3 1 OUTLET SB12 0.016 0.25 0.1 0.3 1 OUTLET `O L Q) CD N U T N M T 0 CD U L U U a Z a 0 cc a 0 O T L m W x 0 m ° X 4-2 M M M EF m N m r � r V r � N N N N o0 in 0� ^-� as to O\ In ON kn 00 'ct N N N N tV (V tV tV O O O O 00 p o 3 C X 7L. x � O O C O O O O O O O O O O O O O C 6 `'- 3 ° o xw A kn d r M r rM — 00 r cn �o r r ON r ON to O\ oo 00 m 00 p r kn M in M �o m m N r o N r cq r v� O� in M �o M �o r rn rn �--� v M r d in d' W) `� 00 to 3 � u, m .-, �o %o � W) �o m -t V oo 00 .-. o N r rn o\ Wn v� V Ou a A a a a a A a a A a a a A a a A M ON 0\ 000 � cn N " 00 00 Ni v1 m r lh 00 m ON O 0000 0000 0 m O\ O\ O� O� � O 01 (7) ON O, O% CS C\ N N 0) O d APPENDIX F FLOODPLAIN INFORMATION ' AND CITY OF FORT COLLINS FLOODPLAIN REVIEW CHECKLIST FOR 100% ' SUBMITTALS F FEMA Flood Risk Man High Risk _FEMA Floodway - Area of 100-year floodplain with greatest depths and fastest velocities. FEMA Flood Fringe - May Include: - Areas of FEMA 100-year floodplain (FEMA Zones A, AE, AC, and AH) - Areas of City 100-year floodplain including ponding areas and sheet flow areas with average depths of 1-3 feet. There is a 1% annual chance that these areas will be flooded. Moderate Risk May include: - Areas of FEMA 500-year floodplain (FEMA Zone X-shaded). - Areas of FEMA or City 100-year floodplain (sheet flow) with average depths of less than 1 foot. n -Areas protected by levees from the 100-year flood. JJe�� Low Risk W+E Areas outside of FEMA and City mapped 100-year and 500-year F—IFloodplains. Local drainage problems may still exist. S This information is based on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) and the City of Fort Collins Master Drainageway Plans. This letter does not imply that the referenced property will or will not be free from flooding or damage. A property not in the Special Flood Hazard Area or in a City Designated Floodplain may be damaged by a flood greater than that predicted on the map or from a local drainage problem not shown on the map. This map does not create liability on the part of the City. or any officer or employee thereof, for any damage that results from reliance on this information. All floodplain boundaries are approximate. City of Fort Collins GIS 0 so 100 200 300 aoo Feet Printed: 07/13/2016 a .| ui W . �7o 2 E. g [ ] �� )|\ § 'Loan § \_ k22 Lu |!|, ) | § AJ LU $ B § ■§ ` ƒ ),!|§ �)�{! e -- of 0, ;l,t; e )�\k� LOT 13, THE AMENDED PLAT OF LOTS 13 AND 14, ' INTERCHANGE BUSINESS PARK City of Fort Collins Floodplain Review Checklist ' 100 % Development Review Submittals Instructions: Complete this checklist by marking all boxes that have been adequately completed. Put an "NA" next to any items that are not applicable to this particular submittal. Any boxes that are left blank and do not have an "NA" marked next to them are considered incomplete. Date of Review: Reviewer's Name: ' Plat Man ❑ The following required items are on the plat: ❑ 100-year floodplain boundary ❑ City ❑ FEMA ' ❑ Floodway boundary ❑ City ❑ FEMA ❑ The benchmark number and elevation of benchmark ❑ These items match the FIRM. (FEMA Basin) ❑ These items match the Master Plan. (City Basin) ❑ The benchmark number and elevation match with those published in the City of Fort Collins benchmark system. Site Plan The following required items are on the site plan: ' ❑ 100-year floodplain boundary- FEMA and City ❑ 500-year floodplain boundary (if proposed structure is a "critical facility" and a 500-year floodplain is mapped) ' ❑ Floodway boundary ❑ Erosion buffer zones ❑ Restrictions related to use (ie. critical facility or no residential use of lower floor if floodproffed mixed use structure) Drainage and/or Grading Plan (or a separate Floodplain Sheet if it is too cluttered on ' Drainage and Grading Plan) The following required items are on the drainage and/or grading plan: ' IR 100-year floodplain boundary- FEMA and City NA 500-year floodplain boundary (if proposed structure is a "critical facility" and a 500-year floodplain is mapped) ® Floodway boundary IRA Erosion buffer zones ® Cross-section locations ® BFE lines NA Lowest floor elevation of structures (bottom of basement or crawl space is considered the lowest floor) X The floodplain and floodway boundaries are in the correct location and labeled properly. ' 5d The cross-section and BFE lines are in the correct location and labeled properly. ® Elevations are referenced to the appropriate datum: N FEMA basins — list in both NGVD 29 and NAVD 88 RA City basins — list only in NGVD 29 ' W Floodway regulations have been met. X No fill in the floodway unless a hydraulic analysis shows "no -rise". ® No manufactured homes, except in an existing park, can be placed in the floodway. R No changing a nonconforming non-residential or mixed use structure to a residential structure. ' 9 Landscaping meets requirements for no encroachment in the floodway without a hydraulic analysis to show "no -rise". N No storage of materials or equipment. R A note is on the plans about the above floodway restrictions. N Critical facilities regulations have been met: 9 100 year —no life safety, emergency response or hazardous material critical facilities NA 500 year Poudre — no life safety or emergency response critical facilities NA Any pedestrian bridges in the floodway that are not able to pass the 100-year flow are ' designed to be "break -away". NA Fences in the floodway will not block conveyance. Example: split -rail fence cabled together to not float, flap at bottom of privacy fence to allow water through (flap at BFE or above). NA Any items in the floodway that can float (Example: picnic tables, bike racks, etc.) are noted as being anchored. ' NA Erosion Buffer Zone requirements have been met: ❑ Design of any allowed development minimizes disturbance to.channel bed and banks. ❑ No structures allowed. ❑ No additions to existing structures allowed. ' ❑ Any fencing is split -rail design and break -away, but cabled. Must be oriented parallel to general flow direction. ❑ No detention or water quality ponds. ❑ No bike or pedestrian paths or trails except as required to cross streams or waterways. ❑ Road, bicycle and pedestrian bridges must span erosion buffer zone. ' ❑ No fill. ❑ No outdoor storage of non-residential materials or equipment. ❑ No driveways or parking areas. ' ❑ No irrigated vegetation and non-native trees, grasses, or shrubs. ❑ No utilities except as necessary to cross streams or waterways. ❑ No grading or excavation except as required for permitted activities in ' erosion buffer zone. ❑ No construction traffic except as required for permitted activities in erosion buffer zone. ' ❑ Any construction in the erosion buffer zone shows that it will not impact the channel stability. tNA A note is on the plans about the above erosion buffer zone restrictions. WA Any necessary floodplain modeling has been submitted and approved. All modeling ' must follow the City's floodplain modeling guidelines. ' Special Poudre River Regulations RA Poudre River Floodway Regulations have been met. ❑ No construction of new residential, non-residential or mixed -use ' structures. ❑ No redevelopment of residential, non-residential or mixed -use structures. ❑ No additions to residential, non-residential or mixed -use structures. ' ❑ No fill unless hydraulic analysis shows "no -rise". WA Poudre River floodplain regulations have been met ' ❑ No construction of new residential or mixed -use structures ❑ No additions to residential structures ❑ No additions to mixed -use structures if there is an expansion in the ' residential -use area of the structure. ❑ No floatable materials on non-residential sites ' Information Related to Structures in the Floodplain ' WA For structures in the floodplain, a table is shown that lists the following: Floodplain Use Permit only for Landscaping and Pavement ❑ City BFE at upstream end of structure t ❑ FEMA BFE at upstream end of structure (if different than City BFE) ❑ Regulatory flood protection elevation ❑ Lowest floor elevation (bottom of basement or crawl space is considered lowest floor) ❑ Floodproofing elevation for non-residential structures (if applicable) ❑ Garage slab elevation ❑ HVAC elevation WA The BFE at upstream end of structures are correct based on interpolation between the cross -sections. bd The regulatory flood protection elevation is correct. W The lowest floor and HVAC are at or above the regulatory flood protection elevation. ® Elevations are referenced to the appropriate datum: ® FEMA basins — list in both NGVD 29 and NAVD 88 WA City basins — list only in NGVD 29 WA A typical drawing detail is included for each foundation type proposed (slab -on - grade, basement, crawl space) showing the elevation of the HVAC and lowest floor elevation (which includes bottom of the basement or crawl space) relative to the BFE. WA If garage is not elevated to the regulatory flood protection elevation, then a drawing detail is included showing vent placement, size, and number. ❑ There is 1 square inch of venting for every 1 square foot of enclosed area. ' ❑ The bottom of the venting is not higher than 1 foot above grade. ❑ The venting is on at least two sides, preferably on upstream and downstream sides. (Does not have to be divided equally). ' @A If a non-residential structure is to be floodproofed, one of these conditions is met: ❑ All requirements on separate sheet titled "Floodproofing Guidelines" have ' been met. ❑ If floodproofing information is not submitted as part of the plans, then a note is on the plans stating that floodproofing information will be ' submitted at the time of the building permit application. HA For manufactured homes, all submittal requirements on separate sheet titled ' "Installation of a Mobile Home Located in a Floodplain: Submittal Requirements" have been met. ' pA If the floodplain use permit is not going to be submitted until the building permit is applied for, then a note is on the plans stating that the floodplain use permit will be submitted at the time of building permit application. 9A A note is on the plans stating that a FEMA elevation or floodproofing certificate will be completed and approved before the CO is issued. This is required even if property ' is only in a City floodplain. Drainage Report ' X The site is described as being in the floodplain. Floodplain name and if the floodplain is a FEMA or City -designated is described. Any floodway or erosion buffer zones on ' the site are described. ' Jl The FEMA FIRM panel # and date and/or the Master Plan information is cited. ® A copy of the FIRM panel with the site location marked is included in the report. BA If a floodplain modeling report has been submitted, that report is referenced. The reason for the floodplain modeling report is described. NA If a FEMA CLOMR or LOMR has been approved for the site, the case number is referenced. The reason for the CLOMR or LOMR is described. NA If a FEMA LOMR is required after construction, this is stated in the report. N The location of the structures relative to the floodplain is described. If there is both a FEMA and a City floodplain on the site, the location of the structures relative to both is described. ' WA The use of the structures is described. This is to determine if the structure is residential, non-residential, or mixed -use. Also, structures in all 100-year and Poudre ' River 500-year floodplains cannot be used as a critical facility. (See Chapter 10 of City Code for definitions.) ' N The report describes how the development is in compliance with the applicable floodplain regulation (Chapter 10 of City Code). (Examples: elevation of lowest floor above regulatory flood protection elevation, floodproofing, floodway regulation, ' erosion buffer zone regulation, no -rise, etc.) 0A The type of foundation construction for the structures (i.e. slab -on -grade, crawl space, ' basement, etc.) is discussed in the report. QA The type of foundation matches with the lowest floor elevations and grading plan. ' 0A If any of the garages are not going to be elevated above the regulatory flood protection elevation, the hydraulic venting requirements are discussed. 0A For structures in the floodplain, a table is included (same table as on the Drainage/Grading Plan) that lists the following: ❑ City BFE at upstream end of structure ❑ FEMA BFE at upstream end of structure (if different than City BFE) ' ❑ Regulatory flood protection elevation ❑ Lowest floor elevation (bottom of basement or crawl space is considered lowest floor) ' ❑ Floodproofing elevation for non-residential structures (if applicable) ❑ Garage slab elevation ❑ HVAC elevation tX Elevations are referenced to the appropriate datum: ❑ FEMA basins — list in both NGVD 29 and NAVD 88 ❑ City basins — list only in NGVD 29 0A If the floodplain use permit is not going to be submitted until the building permit is applied for, then a note must be included in the report that states the permit will be submitted at the time of building permit application. BA If floodproofing information is not submitted as part of the plans, then a note must be in the report stating that floodproofing information will be submitted at the time of the building permit application. 9A A note is in the report stating that a FEMA elevation or floodproofing certificate will be completed and approved before the CO is issued. W In the compliance section, Chapter 10 of City Code is listed. Floodplain Use Permit 50 Floodplain Use Permit has been submitted for each structure. Floodplain Use Permit only for Landscaping and Pavement N Permit fee has been submitted ® All information on permit matches the plans N All information on permit meets floodplain regulations FEMA CLOMR Approval NA FEMA has approved any necessary CLOMRs. Additional Comments: Terms to Note Lowest Floor Elevation — Elevation of the lowest floor of the lowest enclosed area (including bottom of basement or crawlspace). This is not the same as finished floor. The lowest floor should be distinguished from finished floor on plans and reports. Re ug latory Flood Protection Elevation — For all floodplains except the Poudre River, the ' regulatory flood protection elevation is eighteen (18) inches above the base flood elevation. For the Poudre River floodplain, the regulatory flood protection elevation is twenty-four (24) inches above the base flood elevation. If there is both a FEMA and a City BFE, the higher BFE should be used to determine the regulatory flood protection elevation. Additional floodplain terminology is defined in Chapter 10 of City Code. ' NOTE: Issues specific to individual sites may arise that result in additional requirements. These will be discussed during initial meetings with the applicant. [1 APPENDIX G SOILS INFORMATION, FIGURES, TABLES AND EXCERPTS FROM REPORTS G ' 10.00 9.00 t 1 8.00 t 7.00 m L Lycc 6.00 C Z 5.00 i :; 4.00 J Q LL = 3.00 2.00 1.00 0.00 +_ 0.00 RAINFALL INTENSITY -DURATION -FREQUENCY CURVE 10.00 20.00 30.00 40.00 50.00 STORM DURATION (minutes) 1-2-year stone - - - 10-Year Storrs 100-Year Storm Figure RA-16 - City of Fort Collins Rainfall Intensity -Duration -Frequency Curves 60.00 ' (C) Volume 1, Chapter S — Runoff: (1) Section 1.0 is deleted in its entirety. (2) A new Section 1.1 is added, to read as follows: 1.1 Runoff Methodolo¢ies (a) There are two runoff determination methodologies that are approved by the City, the Rational Method and the Stormwater Management Model (SWMM). The City is the determining authority with respect to the appropriate ' methodology to use under different circumstances. Early contact with the City is encouraged for the timely determi- nation of the appropriate runoff methodology to use. (b) The Rational Method may only be used to determine the runoff from drainage basins that are less than ninety (90) ' acres in size. The Stormwater Management Model (SWMM) must be used to model drainage basin areas of ninety (90) acres or more. (c) All runoff calculations made in the design of both 2-year and 100-year drainage systems must be included with ' the Storm Drainage Report and all storm drainage facilities designed must be shown on Storm Drainage Plans. (3) A new Section 2.8 is added, to read as follows: 2.8 Rational Method Runoff Coefficients (a) The runoff coefficients to be used in the Rational Method can be determined based on either zoning classifica- tions or the types of surfaces on the drainage area. Zoning classifications may be used to estimate flow rates and vol- umes for an Overall Drainage Plan (ODP) submittal, if the types of surfaces are not known. Table RO-10 lists the runoff coefficients for common types of zoning classifications in the city of Fort Collins. 27 (b) For a Project Plan or Final Plan submittal, runoff coefficients based on the proposed land surface types must be used. Since the actual runoff coefficients may be different from those specified in Table RO-10, Table RO-11 lists coefficients for the different types of land surfaces. The runoff coefficient used for design must be based on the actual conditions of the proposed site. Table RO-10 Rational Method Minor Storm Runoff Coefficients for Zoning Classifications Description ojArea or Zoning Coefficient R-F 0.3 U-E 0.3 L-M-In 0.55 R-L, N-C-L 0.6 M-M-N, N-C-M 0.65 N-C-B 0.7 Business: C-C-N, C-C-R, C-N, N-C, C-S 0.95 R-D-R, C-C, C-L 0.95 D, C 0.95 H-C 0.95 C-S 0.95 Industrial: E 0.85 1 0.95 Undeveloped: R-C, T 0.2 P-O-L 015 For guidance regarding zoning districts and classifications of such districts please refer to Article Four of the City Land Use Code, as amended. Table RO-11 Rational Method Runoff Coefficients for Composite Analysis Character of Surface Runoff Coefficient Streets, parking lots, drives: Asphalt 0.95 Concrete 0.95 Gravel 0.5 Roofs 0.95 Recycled asphalt 0.8 Lawns, sandy soil: Flat <2% 0.1 Average 2 to 7% 0.15 Steep >7% 0.2 Lawns, heavy soil: Flat <2% 0.2 Average 2 to 7% 0.25 Steep >7% 0.35 (4) A new Section 2.9 is added, to read as follows: 28 ' 2.9 Composite Runoff Coefficient Drainage sub -basins are frequently composed of land that has multiple surfaces or zoning classifications. In such cas- es a composite runoff coefficient must be calculated for any given drainage sub -basin. The composite runoff coefficient is obtained using the following formula: n C = i=t (RO-8) A, Where: ' C = Composite Runoff Coefficient Ci = Runoff Coefficient for Specific Area (A) Ai = Area of Surface with Runoff Coefficient of Ci, acres or feet2 n = Number of different surfaces to be considered At = Total Area over which C is applicable, acres or feet2 (5) Anew Section 2.10 is added, to read as follows: 2.10 Runoff Coefficient Adjustment for Infreauent Storms The runoff coefficients provided in tables RO-10 and RO-11 are appropriate for use with the 2-year storm event. For storms with higher intensities, an adjustment of the runoff coefficient is required due to the lessening amount of infil- tration, depression retention, evapo-transpiration and other losses that have a proportionally smaller effect on storm runoff. This adjustment is applied to the composite runoff coefficient. These frequency adjustment factors are found in Table RO-12. Table RO-12 Rational Method Runoff Coefficients for Composite Analysis Sloan Return Period (years) Frequency Factor Cf 2 to 10 1.00 11 to 25 1.10 26 to 50 1.20 51 to 100 1.25 Note: The product of C times Cf cannot exceed the value of 1; in the cases where it does, a value of 1 must be used. (6) Section 3.1 is deleted in its entirety. (7) Section 3.2 is deleted in its entirety. (8) Section 3.3 is deleted in its entirety. (9) A new Section 4.3 is added, to read as follows: 4.3 Computer Modeling Practices (a) For circumstances requiring computer modeling, the design storm hydrographs must be determined using the Stormwater Management Model (SWMM). Basin and conveyance element parameters must be computed based on the physical characteristics of the site. (b) Refer to the SWMM Users' Manual for appropriate modeling methodology, practices and development. The Us- ers' Manual can be found on the Environmental Protection Agency (EPA) website ://www.Mmy/ednrmnrl/modelstswmn-/index.W). ' (c) It is the responsibility of the design engineer to verify that all of the models used in the design meet all current City criteria and regulations. 29 ' DRAINAGE CRITERIA MANUAL (V. 1) Table RO-3—Recommended Percentage Imperviousness Values Land Use or Surface Characteristics Percentage Imperviousness Business: Commercial areas 95 Neighborhood areas 85 Residential: Single-family ` Multi -unit (detached) 60 Multi -unit (attached) 75 Half -acre lot or larger ` Apartments 80 Industrial: Light areas 80 Heavy areas 90 Parks, cemeteries 5 Playgrounds 10 Schools 50 Railroad yard areas 15 Undeveloped Areas: Historic flow analysis 2 Greenbelts, agricultural 2 Off -site flow analysis (when land use not defined) 45 Streets: Paved 100 Gravel(packed) 40 Drive and walks 90 Roofs 90 Lawns, sandy soil 0 Lawns, clayey soil 0 See Figures RO-3 through RO-5 for percentage imperviousness. RUNOFF CA = KA + (1.31i'-1.44i' + 1.135i - 0.12) for CA >: 0, otherwise CA = 0 (RO-6) CCD = KCD + (0.858i' - 0.786i2 + 0.774i + 0.04) (RO-7) CB = (CA + CcD )I2 2007-01 RO-9 Urban Drainage and Flood Control District 40° 3443 N 4T 34 37' N Hydrologic Soil Group—Larimer County Area, Colorado Ilk (GRIT) � 8 500030 500050 500070 500090 S00110 5001M i Map Sole: 1:960 if prifed on A poctrait (S.Y x 11') sheet. � Meters F. 0 10 20 40 60 Feet 0 45 90 180 270 ANMap projection: Web Mena6x Comer coordinates: W(S84 Edge bm: UTM Zane 13N WCSM l o.t Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey }Q{ 4W 3443" N A a a 0 a Q m pP P O� S a in a 40° 34'37N S00150 SM170 3 a 7/13/2016 Page 1 of 4 0 Z w w J a m O m 0 N O p ap N m n Q - U N al 0 m m m oc n > o u _m w o' E U) ma N E ° N =y E O O h _ J N m a N m O N E w vi O U a m a O U m m N N L O M J E Q m Z T C D. N (� O CL N O N EV '- W m J0 0' N N 30 3 N m C L N 0 p L C a N V) Q y m 00 m Q m 2 m L O o p m J V U O m N « O J 6 m m () E a) L J N U 'p N C N a N m >� U fO L m U) N ,m O. O Z o _� L -0 N 'O a' L m E N J J — 0 N a �C U m N y J w N a« L N n Z )O n °' Q o C 0 E a s c m N rn m m O _6) N c MID U w .E 0mu v m 00 L C L sh N O O C D O m 0 '0 O N Z Q O_ `- a)t U J m J n c m m n m J> E° r .v v a an d O m 0 m O N 1] L (U O J O `o m p o E m E L p a E (n U 2i d� Q 0 H« U) U) to O N F 0 o d n m m N m c m O U c N m c � T n m O = N a o N d E m _m m N ^ K O m U U U z ? fN 2 K = Z) Q c m Y D O d O O p i i Y u d d O m � m y) O C O C d O C O m O d N Q d y Q O a d p C n m 0 ao 0 C o ¢ d m Q Q m m C U U O z m¢ ¢ m C m U U O Z m Q Q m m C q a❑❑❑❑❑❑❑❑ o I I t t I I: oo ■■■ ❑ q 'o N N N Q N (Da m Z O� Hydrologic Soil Group—Larimer County Area, Colorado GRIT Hydrologic Soil Group Hydrologic Soil Group —Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 34 Fort Collins loam, 0 to 1 B 0.0 0.0% percent slopes Larimer-Stoneham 36.5% 62 B 0.6 complex, 3 to 10 percent slopes 73 Nunn day loam, 0 to 1 C 1.0 59.7% percent slopes 81 Paoli fine sandy loam, 0 A 0.1 3.8% to 1 percent slopes Totals for Area of Interest 1.8 100.0% i ;OA Natural Resources Web Soil Survey 7/13/2016 i Conservation Service National Cooperative Soil Survey Page 3 of 4 IHydrologic Soil Group—Larimer County Area, Colorado GRIT Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie -break Rule: Higher usDA Natural Resources Web Soil Survey 7/13/2016 i Conservation Service National Cooperative Soil Survey Page 4 of 4