Loading...
HomeMy WebLinkAboutDrainage Reports - 06/16/2016Final Drainage Report For Houska Automotive Repair Fort Collins, Colorado Prepared for: D and N Houska Family, LLC c/o Dennis Houska 899 Riverside Drive Fort Collins, Colorado Prepared by: PfPEX ENGINEERING 908 Laporte Avenue Fort Collins, CO 80521 (970) 219-2834 f port Collins Appgoyed Plans (f (o - ua, Final Drainage Report For Houska Automotive Rep 91 Fort Collins, Colorado Prepared for: D and N. Houska Family, LLC c/o Dennis Houska 899 Riverside Drive Fort Collins, Colorado Prepared by: OP EX ENGINEERING 908 Laporte Avenue Fort Collins, CO 80521 (970) 219-2834 May 11, 2016 ENGINEER'S CERTIFICATION I hereby state that this Drainage Report for the Houska Automotive Repair project was prepared by me or under my direct supervision for the owners' thereof and meets or exceeds the criteria in the City of Fort Collins Storm Drainage Design Criteria and Construction Standards. Stacy J. Gowing Registered Professional Engineer State of Colorado No: 34290 O�ppO LI�F� Ov, joHN G J' G •V-1 O� FO TABLE OF CONTENTS I. INTRODUCTION..................................................................................................... 1 II. GENERAL LOCATION AND DESCRIPTION......................................................... 1 A. Property Location.................................................................................................... I B. Description of Property ..........................................................................................2 C. Developed Conditions...........................................................................................2 Ill. DRAINAGE BASINS AND SU13-BASINS................................................................ 3 A. Major Basin Description.............................................................................................3 IV. DRAINAGE DESIGN CRITERIA..............................................................................3 A. Four Step Process.........................................................................................................3 B. Development Criteria Reference and Constraints...............................................4 C. Hydrological and Hydraulic Criteria........................................................................5 V. DRAINAGE FACILITY DESIGN............................................................................... 5 A. General Concept..........................................................................................................5 B. Specific Details - Detention.......................................................................................5 C. Speck Details - Inlets and Storm Sewer...............................................................5 D. Specific Details - Stormwater Quality ..................................................................... b VI. SEDIMENT/EROSION CONTROL......................................................•...................8 VII. CONCLUSIONS.......................................................................................................8 A. Compliance with standards......................................................................................8 B. Drainage Concept........................................................................................................8 VIII. REFERENCES........................................................................................................... 9 IX. APENDICES............................................................................................................. 9 I. INTRODUCTION This report presents the pertinent data, methods, assumptions, and references used in analyzing and preparing the final drainage and water quality design for the Houska Automotive Repair project (the "project"). II. GENERAL LOCATION AND DESCRIPTION A. Property Location The project is located on the south side of Riverside Avenue, just southeast of the existing Houska Automotive site at 899 Riverside Avenue, and is intended to function as an extension of the existing Houska Automotive use. The site is an infill site completely surrounded by existing development. � s f b1::CJr'ry ',! is E Muibriry St 14 SITE Vicinity Map, NTS B. Description of Property 1. The project site is an undeveloped parcel located between the existing Houska Automotive site and the private drive aisle into the Albertson's shopping center along the south side of Riverside Avenue. 2. The project site is currently undeveloped; and is 2.28 acres in size. 3. The site is currently covered with weeds, native and volunteer vegetation; with an existing vegetative cover of approximately 60%. 4. There is no significant off -site runoff entering the site, and the site drains overland to the south curb and gutter of Riverside Avenue. S. Existing surface soils, according to the National Resources Conservation Service, consist of Satanta Loam. The soil type is classified as hydrologic soil group B. 6. Existing soils underlying the proposed work are classed as clayey sand (SC), as identified by a soils investigation prepared by Terracon. 7. There are no irrigation ditches or stormwater conveyance systems on the property. 8. Portions of the project site are located within the City regulatory Old Town 100 year floodplain. The property is located outside the City regulatory Old Town 100 year floodway, however floodway is located inside the Riverside right -of --way adjacent to the property, as shown on the City's online floodplain mapping. C. Developed Conditions The proposed project consists of 3 buildings to support additional automotive repair uses, such as tire maintenance and general automotive repair. None of these buildings are located within the FEMA or City of Fort Collins Old Town Masterplan 100-year floodplain or floodway. 2. The project includes the relocation of the existing Houska access to provide a single access for both the existing and proposed uses, which necessitates the relocation of two existing inlets on Riverside. The project also includes private drive aisles, parking, and associated hardscape and landscaping. 3. None of the proposed buildings are located within the City regulatory Old Town 100 year floodplain or floodway. 2 4. The improvements proposed within the floodplain include a driveway, sidewalks, drainage improvements and miscellaneous site improvements. 5. The project is currently envisioned to be built in two phases. Phase one includes building one, all the public infrastructure and a temporary parking area. Phase two includes buildings two and three. The drainage design for phase one encompasses all phases of the project. b. The developed site will drain from south to north via overland flow and swales to a proposed regional water quality pond located at the northwest corner of the site. III. DRAINAGE BASINS AND SUB -BASINS A. Major Basin Description 1. The project site lies within the Old Town drainage basin. 2. The project site currently drains overland from south to north, exiting the site along the western and northern lot lines. Runoff is received by the existing storm drainage system in Riverside Avenue and the Locust Street Outfall. IV. DRAINAGE DESIGN CRITERIA A. Four Step Process The stormwater management strategy for the project is the "Four Step Process", with the goal of minimizing adverse impacts of urbanization on receiving waters. The following is a description of the steps employed to achieve this goal. 1. Employ Runoff Reduction Practices a. Two bioretention ponds are proposed for the project site. These will collect much of the runoff from the developed areas. Infiltration will be encouraged and directly connected impervious areas will be minimized. This design, in combination with the highly permeable underlying soils (clayey sands) results in infiltration opportunities that do not currently exist on site. b. The percentage of proposed impervious cover is 74%. This impervious cover rate is less than allowed, and less than typical for intensive commercial development. 3 c. The vegetated areas will be heavily landscaped, in contrast to the sparse existing vegetation currently existing, allowing for decreased effective runoff coefficients. 2. Implement BMP's That Provide a Water Capture Volume (WOCV) with Slow Release. a. The steps described above will provide attenuation for peak rates of runoff. b. Additionally, runoff attenuation and water quality treatment is provided by a regional extended detention basin to be located on the development site. This basin receives a large majority of runoff from the site prior to exiting the site. 3. Stabilize Drainageways. a. There are no drainageways or conveyances within the project site, and the site drains directly to existing storm sewer systems. However, off -site benefit is achieved through the use of stormwater extended detention for a site that currently has none. By providing these improvements, discharges are attenuated and treated for water quality. b. Stormwater impact fees and month stormwater utility fees will be paid by this development. This additional revenue will contribute to the overall City programs to stabilize drainageways throughout the city. 4. Implement Site Specific and Other Source Control BMP's. a. The combination of intensive vegetative establishment and water quality treatment through Low Impact Development (LID) techniques will allow for a reduction in particulates and adhered pollutants as compared the existing condition. B. Development Criteria Reference and Constraints 1. As previously discussed, historic drainage patterns are maintained with the proposed project. 2. As an infill project, existing topography along the boundary is maintained. l 4 C. Hydrological and Hydraulic Criteria I. Hydrologic and hydraulic criteria is as per the City of Fort Collins Storm Drainage and Design Criteria and Construction Standards. 2. Analyses are performed using City of Fort Collins spreadsheets and the methodologies presented in Urban Storm Drainage Criteria Manual Volumes 1. 2 and 3: Urban Drainage and Flood Control District, Denver, Colorado. V. DRAINAGE FACILITY DESIGN A. General Concept The general direction of proposed storm water flow is from south to north. Storm water runoff from the site is directed towards a proposed regional water quality pond located on the northwest corner of the site. This pond connects to the Locust Street Outfall, which runs south -to -north immediately west of the site. 2. Existing drainage patterns are maintained by the project. Runoff from the site in both conditions is collected by adjacent storm sewer systems. 3. Water quality treatment is provided with extended detention (through a regional water quality pond located on site) and Low Impact Development techniques as discussed below. B. Specific Details - Detention The project is located near at the bottom of the Old Town basin, adjacent to the Locust Street Outfall. This regional outfall consists of a 108-inch pipe directly connected to the Poudre River. Because of the location of the site, detention on site would be counter -productive since it would only serve to delay the site developed peak runoff to more closely coincide with the peak runoff from the overall drainage basin. Stormwater is proposed to runoff un-detained, allowing the runoff peak to flow into and through the outfall pipe before the larger peak from the overall basin arrives. 2. City stormwater staff, as part of the overall cooperative effort on the regional water quality pond, has modified the hydrologic modeling in the Old Town Masterplan and verified that detention is not required, nor advised, for the development. Detention is not included in the project. C. Specific Details - Inlets and Storm Sewer 1. Two existing storm drain inlets are located under the proposed driveway and must be relocated. It is expected that these inlets are adequately E sized, so identical inlets are being proposed for areas just outside of the proposed driveway. Both inlets are relocated in such a way as to ensure they continue to drain to the same receiving drainage system. a. The 5' Type R curb inlet on the eastern side of the proposed driveway is moved approximately 17' towards the east along Riverside. To accomplish this, the existing pipe to the existing inlet is extended to a new manhole behind the curb/gutter. The new single curb inlet is connected to the new manhole. b. The 15' Type R curb inlet on the western side of the driveway is moved approximately 25' towards the west along Riverside Avenue. This inlet drains to a new manhole placed on the existing receiving storm pipe from the existing inlet. The existing and proposed inlets drain to the storm vault along the Locust Street Outfall. 2. Four storm drain pipes are proposed as part of the regional water quality pond. a. Two 24-inch storm drain pipes (storm pipes 6 and 7) are proposed along the north boundary as part of the regional water quality pond. Storm pipe 7 terminates at an area drain at a point near the eastern boundary, and will serve to convey off -site discharges to the proposed regional pond. The size and general locations of these pipes are as per direction from City stormwater staff. b. A 24-inch storm drain pipe (storm pipe 5), storm manhole and a 30- inch storm drain pipe (storm drain 4) are proposed to connect the outfall structure for the regional water quality pond to the existing vault located on the Locust Street Outfall. D. Specific Details — Stormwater Ouality The City of Fort Collins, in cooperation with the developer, intends to construct a regional water quality pond within the development site. This pond will provide extended detention for a large regional drainage area, and will also provide treatment for the project site. The regional water quality pond has a storage volume of approximately 0.66 acre-feet at elevation 4961.0'. a. The City will acquire easements for the regional water quality pond and conveyance elements as needed for the regional project. b. Unfortunately, an area for Low Impact Development (LID) treatment needed for the development project will be lost to accommodate the regional project. In particular, the regional conveyance is located within areas needed for LID treatment for 6 buildings 1 and 2. Because of this, the site's LID requirement of 75% treatment is reduced by 0.64 acres, which is the amount of LID treatment originally proposed by the developer within the lost area. The LID requirement for the development is reduced to 0.62 acres of treated drainage area (which is 1.68 acres x 75%- 0.64 acres). c. The City's regional water quality pond will also provide standard water quality treatment for the development site through extended detention. d. The City will pay for the design, construction and other costs associated with the regional water quality pond. These costs will be offset by benefits to the development project as subsequently negotiated. e. An emergency spillway path is provided for the un-detained 100- year flow through the water quality pond. This path is towards Riverside Avenue, where the proposed elevations at the back of the sidewalk are 4961.42. This area acts as a spillway with a level crest length of 80 feet and a depth of 0.20 feet. The shallow depth combined with the concrete sidewalk, curb/gutter and paving results in a stable overflow path for emergency flows. 2. Low Impact Development (LID) water quality treatment is required for 75% of the proposed impervious area, minus 0.64 acres as previously discussed. The modified LID water quality treatment area is 0.62 acres. Two LID techniques are used to accomplish this, as follows: a. Rain Garden Bioretention Pond 1 is located in the southwestern portion of the site. This pond is located in an area that was previously constructed as a bioswale for the existing development in the Houska South development. This existing bioswale will be redesigned and reconstructed as a rain garden and bioretention pond. The new pond will handle 1.00 acres of Houska South (identified as drainage basin 5 in the drainage report for that project and drainage basin Q 1 B in this report) and 0.41 acres (identified as basin OIA in this report) of new development. The total area treated is 1.41 acres. b. Rain Garden Bioretention Pond 2 is located in the northwestern portion of the site. This pond receives runoff from the central drive aisle and treats 0.29 acres. c. The total LID treated drainage area is 0.70 acres, which is higher than the required 0.62 acres as discussed above. The net LID treatment percentage for the site is 79.7%, once the credit for the lost LID treatment opportunity is accounted for. 7 3. The sizing calculations and an LID .summary are included in the appendix. VI. SEDIMENT/EROSION CONTROL Temporary erosion control measures will be implemented with this project, as detailed under a separate report entitled "Erosion and Sediment Control Report", dated 3/30/2016, prepared by Apex Engineering. Please see that document for more information on the temporary best management practices proposed to control sediment and erosion during construction. VII. CONCLUSIONS A. Compliance with standards 1. All drainage design conforms to the criteria and requirements of City of Fort Collins Storm Drainage Design Criteria and Construction Standards. 2. Proposed drainage improvements conform to the concepts and recommendations of the Old Town Basin master plan. B. Drainage Concept 1. The proposed drainage plan concept for the project will be effective for the control of stormwater runoff and water quality for the proposed site and conforms to City of Fort Collins standards. VIII. REFERENCES City of Fort Collins Storm Drainage and Design Criteria and Construction Standards. 2. Old Town Drainage Master Plan: Anderson Consulting, July 15, 2003. 3. Urban Storm Drainage Criteria Manual Volume 1-3; Urban Drainage and Flood Control District, Denver, Colorado, April 2008. 4. Geotechnical Engineering Report, Houska Large Truck Facility Terracon (project number 20155048), dated 1 1/1 1/2015. 5. Final Drainage and Erosion Control Report, Houska Automotive Auto Parts Warehouse; North Star Design, April 9, 2012. IX. APENDICES Appendix I - Hydrologic Calculations ■ Peak Discharge Calculations Appendix If - Hydraulic and Water Ouality Calculations ■ LID Stormwater Management Summary Worksheet ■ 'Bioretention Sizing Worksheets ■ Outfall Pipe Sizing Worksheet ■ Emergency Spillway Sizing Report Appendix III - Mapping and Plans ■ Annotated Flood Insurance Rate Map ■ Drainage Exhibit (24"x36") Appendix I - Hydrology d a V R N 104 C J N d L LE N cu V y�d a B 0 *: �m �o C d 0 0 0 m N w U 0 0 0 0 0 m o N O t > U o n m N U~� UO`m J 12 Appendix II - Hydraulics and Water Quality Calculations 13 LID S tommater Management Summary Houska Automtive Repar 5/112016 EAwting Site Data Net Site Area = Proposed Site Data: Total Proposed Impervious Area = Total Proposed Imperviousness = 2.28 acre 1.68 acre 73.7% LID Treatment Area Required = 1.26 acre (75% of proposed imp. area) LID credit for Regional WOL Pond = 0.64 acre Resulting LID Required = 0.62 acre LID Treatment Area Provided = 0.70 acre (Q1A+Q2) Percent LID Treatment Provided 79 7::% LID Treatment Basin Summary Drainage Drainage Bottom Top Volume Basin Area Treated LID Area Area Depth Provided ID (acres) Type (SF) (SF) (inch) (CF) O1A . 0.41 Bioretention 1 1388.0 2680.0 8.0 1356.0 02 0.29 Bioretention 2 281.0 600.0 12.0 440.5 0.700 14 �. Design Procedure Form: Extended Detention Basin (EDB) 1 Sheet 1 of 4 Designer. BIG Company: Apex Engineering Date: May it, 2016 Project: Houska- City Regional WQL Pond Location: Fart Collins. CO 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, I4 4 = 80.0 B) Tributary Area's Imperviousness Ratio (i = 1.1100) 1 = 0.800 C) Contributing Watershed Area Area = 20.200 all D) For Watersheds Outside of the Denver Region, Depth of Average tlr = in Runoff Producing Stonn Choose One E) Design Concept (Select EURV when also designing for flood control) Water Quality, capture Vdume (vVQLI� 06¢ess Urban Runoff Volume (Et1BV) F) Design Volume (1.2 WQCV) Based on 40 hour Drain Time Veesm. 0.80 ac-ft (Ve,yre = (1.0' (D.91 -1'- 1.19 - iv + 0.78' t) / 12' Area' 1.2) G) For Watersheds Outside of the Denver Region, VoEslneorRER- ao-ft Water Quality Capture Volume (WQCV) Design Volume (Vwavonen = (do'(Voaaoe/0.43)) H) User Input of Water Quality Capture Volume(WQCV) Design Volume Vuesoeu AE ac-ft (Only a a different WQCV Design Volume is desired) Choose One 1) Predominant Watershed NRCS Sail Group 0A OB OC/D 2. Basin Shape: Length to Width Relic L : W = 2.0 .1 (A basin length to width ratio of at least 2:1 will improve TSS reduction.) 3. Basin Side Slopes A) Basin Maximum Side Slopes Z = 4.0D ft I It (Horizontal distance per unit vertical, 4:1 a flafter preferred) 4 Intel A) Describe means of prodding energy dissipation at concentrated inflow locations. Huuska Rain Garden 1 - UD-BMP V3.03.tdsm, EDB 5118/2016, 5:33 PM i C Design Procedure Form: Extended Detention Basin (EDB) Sheet 2 of 4 Designer: BG Company: Apex Engineenng Date. May 11, 2(16 Project: Housks - City Regional WQL Pond Location. For Collins, CO 5. Forebay A) Minimum Forebay Volume (Vr'.= 3% of the WQCV) B) Actual Forebay Volume C) Forebey, Depth (DF = 18 inch maximum) D) Forebay, Discharge i) Undetained 100-year Peak Discharge a) Forebay Discharge Design Flow (OF = 0.02 • Q,aa) E) Forebay, Discharge Design Vvme = 0.017 ac-fl VF ` 0.020 ac-ft 0,= In Q,00 = CIS Qr = cis Choose One Oeerm With Pipe (flow too small for bens w! pipe) �Wa11 wth ReVL Notch OWall with V-Noti Wert G) Rectangular Notch Width Calculated W e = 4DN/01 in PROVIDE A CONSISTENT LONGITUDINAL 6. Trickle Channel Choose One SLOPE FROM FOREBAY TO MICROPOOL OConcrete WITH NO MEANDERING. RIPRAP AND A) Type of Trickle Channel F) Slope of Trickle Channel Soft Bottom S = 0.0010 fl/ ft SOIL RIPRAP LINED CHANNELS ARE NOT RECOMMENDED. MINIMUM DEPTH OF 1.5 FEET 7. Mirropool and Outlet Structure A) Depth of Mcropool (2.5-fed minimum) B) Surface Area of Miv0000l (10 ft minimum) C) Outlet Type D) Depth of Design Volume (EURV or 1.2 W QCV) Based on the Design Concept Chosen Under 1.E. E) Volume to Drain Our prescribed Time F) Drain Time (Mot To for W QCV= 40 hours; Max To for EURV= 72 hours) G) Recommended Maximum Outlet Area per Row, (k) H) Onflce Dimensions: 1) Clrcudar Orifice Diameter or Du- ft Au= sgIf Choo e O e OOnf¢e Plate Oodw (DP.mbe): H = 4.70 feet WQCV= 0.553 ac-ft To = 40 hours A. = 1.51 square inches D„mv = 1-3/0 inches I) Number of Columns n 1 number J) Actual Design Outlet Area per Row (A„) Aa = 1.48 square inches K) Number of Rows (1 ^� = 14 number L) Total Outlet Area (Ae) A. ` 20.9 square inches _ Houska Rain Garden 1 - UD-BMP_Y3.03.xlsm, EDB 511812016, 5:33 PM Ic Design Procedure Form: Extended Detention Basin (EDB) Sheet 3 of 4 Designer. BG Company: Apex 11ingineering C Date: May 11, 2016 Project: Houska -City Regional WQL Pond Location: Fort Collins, CO 8. Initial Surcharge Volume A) Depth of Initial Surcharge Volume D,s = in (Mmmum recommended depth is 4 inches) B) Minimum Initial Surcharge Volume VIs = cu It (Minimum volume of 0.3% of the WQCV) C) Initial Surcharge Provided Abuve Micropcol V,, cu ft 9. Trash Rack Choose One OOrcular (up to 1-114" diameter) A) Type of Water Quality Orifice Used Circular (greater than 1-1/4" diameter) OR Rectangular (2" high) BI Water Quality Screen Open Area: q = Ant' 38.5"(s-0"s'0) q _ 707 square inches L Dose One SS. Well Screen with 60% Open Area- O(Xher (Describe): D) For Circular Opening (greater than 1-114" diameter) OR 2" High Rectangular Opening (See Fact Sheet T-12): i) Width of Water Quality Screen Opening(W..,n) W„od:ns= 1t II) Height of Water Quality Screen(Hm) Hra= }( lii) Type of Screen, Describe H "Other" Choose one OAluminum Amim-Memo SR Senes (or equal) OOthv (Describe): v) Cross -bar Spacing Inches N) Minimum Bearing Bar Size C_ `- Houska Rain Garden 1 - UD-BMP_v3.03.1dsm, EDB 5/18/2016, 5:33 PM 11 Design Procedure Form: Extended Detention Basin (EDB) 11 Designer: BG Company: Apex Engineering Date: May 11. 2016 Project: Hcuska - City Regional WOL Pond Location: Fort Collins. CO 10. Overflow Embankment A) Descnbe embankment protection for 100-year and greater overtopping. B) Slope of Overflow Embankment (Honzontal distance per unit Vertmal. 4:1 or flatter prefenedl 2s' S0.00 ft i 0 11. Vegetation Choose One Irrigated AVOID PLACING IRRIGATION HEADS CINot Irgated IN THE BOTTOM OF THE BASIN 12. Access A) Descnbe Sediment Removal Procedures- Nolns I� Houska Rain Garden 1 - UD-BMP_V3.03.1dsm, EDB 511 B/2016, 5:33 PM Design Procedure Form: Rain Garden (RG) 1 Sheet 1 of 2 Designer: BG Company: Apex Engineering Date: Project: May 11, 2016 Houska Rain Garden 1 (Basin 01A and Q1 B) Location: Fort Collins, CO 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ir I, = 80.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = 1.1100) 1= 0.800 c) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 026 watershed inches (WQCV=0.8-(0.91-12-1.19'i2-0.78'i) D) Contribuhng Watershed Area (including rain garden area) Area = 61,420 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWom= 1,344 tuft Vol = (WQCV / 12) - Area F) For Watersheds Outside of the Denver Region, Depth of ds = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWonv ova = ou ft Water Quality capture volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWocv reEn= ouft (Only d a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWuw= 8 in B) Rain Garden Side Slopes (Z = 4 min., honz dist par unit vertical) Z = 4.00 ft / ft (Use'9' if rain garden has vertical walls) C) Mlmimum Flat Surface Area Au,,, = 896 sq ft D) Actual Flat Surface Area Ae,,a = 1368 sq ft E) Anse at Design Depth Crop Surface Area) Ara, = 2680 sq ft F) Rain Garden Total Volume Vr= 1,356 cu ft (V = ((A,. - Aanm) / 2)' Depth) 3. Growing Media Choose One 018' Rain Garden Growing Media Other (Explain): 4. Underdran System raeos� YES A) Are underdreins provided? ENO B) Undadrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = NIA ft Volume to the Center of the Onfice ii) Volume to Drain in 12 Hours Vol,, = NIA cu ft iii) Orifice Diameter, 3/e' Minimum Dr, = NIA in Houska Rain Garden 1 - UD-BMP_v3.03.Asm, RG 5/18/2016, 5:14 PM Design Procedure Form: Rain Garden (RG) Sheet 2 of 2 Designer: BG Company: Apex Engineering Date: May 11, 2016 Project Houska Rain Garden 1 (Basin 01A and 01 B) Location: Fort Collins, CO S. Impermeable Geomembrane Liner and Geotextile Separator fabric Choose Dee YES A) Is an impermeable liner provided due to prmamdy ONO of structures or groundwater contamination? 6. Inlet / Outlet Control Chaase One �Shee[ How- No Energy Dissipation Required I A) Inlet Control OConcentreted Flow- Energy Dissipation Provided '. 'Jega4ation Choose One OSeed (Plan for frequent weed control) SPlanfings OSand Grown or Other Hlgh Inflhratbn Sod F. Irrigation rQho.se One OYES A) Will the rain garden be imgaled? ENO Notes: Houska Rain Garden 1 - UD-BMP_v3.03.)dsm, RG 5/18/2016, 5:14 PM 1• Design Procedure Form: Rain Garden (RG) Sheet 1 of 2 11 Designer: BG Company: Apex Engineering Date: May 11, 2016 Project: Houska Rain Garden 2 (Basin Q2) Location: Fort Collins, CO 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, I, I„ = 100.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Aiea's Imperviousness Ratio (i = 1,11 GO) i = 1.000 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.40 watershed inches (WQCV= 0.8' (0.91' 1'- 1.19' ia+ 0.78' i1 D) Contributing Watershed Area (including rain garden area) Area = 12.600 sq ft E) Water Quality Capture Volume (WQCV) Design Volume Vwucv= 420 cu ft Vol = (WQCV / 12) ' Area Fj For Watersheds Outside of the Denver Region, Depth of d,; = in Average Runoff Producing Storm G) For W atersheds Outside of the Delver Region, Vwo :v U, R = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vw0c, DER = cu ft (Only if a drflerent WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12tinch maximum) Dwcw= 12 in B) Rain Garden Side Slopes (Z = 4 min., hodz. dist per unit vertical) Z = 4.00 ft / ft (Use "0' d rain garden has vertical walls) C) Mimimum Flat Surface Area Aug = 280 sq ft D) Actual Flat Surface Area A,,n,,,y = 281 sq ft E) Area at Design Depth (Top Surface Area) AT,,,, = 600 sq ft F) Ran Garden Total Volume VT= 441 cu 1t (Vr ((A,,., - A�,_[) ) 2)' Depth) 3. Growing Media 1r Choose One 1018" Rain Garden Growing Media Other (Explain): 4. Underdrain System Chopsg One A) Are undesdrains provided? *NO f/N0 B) Underdran system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y= N/A ft Volume to the Center of the Orifice if) Volume to Dram in 12 Hours Vol,, = NIA cu ft ili) Orifice Diameter, 319" Minimum Do= N/A in Hlluska Rain Garden 2 - UD-BMP v3.03.xlsm, RG 511 af2016, 5:15 PM Design Procedure Form: Rain Garden (RG) Sheet 2 of 2 Designer: BG Company: Apex Engineering Date: May 11, 2016 Project: Houska Rain Garden 2 (Basin 02) Location: Fort Collins, CO 5. Impemreable Geornem brans Liner and Geotextile Separator Fabric Choose Oqne YES A) Is an impermeable liner provided due to proximity ONO of structures or groundwater contamination? 5. Inlet I Outlet Control Choose One �$heet flow- No Energy Dsvpattan Required A) Inlet Control OConcentrnted Flow- Energy Dissipation Provided 7, Vegelnnnn e One Oe(Plan for Frequent weed control) [,C;h,—ed PWnbngs OSerld Grown or Other High Infiltration Sod 8. Irrigation �S A) Will the rain garden be irrigated? ENO Notes: Htluska Rain Garden 2 - UD-BMP v3.03.xlsm, RG 511812016, 5:15 Phl CIRCULAR CONDUIT FLOW (Normal & Critical Depth Computation) Project: Houska Pipe ID: Calculation for 100-year flow through regional pond outfall pipe f Tc v r 1 � How and >l V Invert Slope Manning's n-value Diameter ign discharge riow area now wetted perimeter Central Angle flow capacity Central Angle (0<Theta<3.14) i area width ted perimeter r depth r velocity Full Flow Depth Froude Number Central Angle (0<Theta-c<3.14) al flow area al top width cal flow depth al flow velocity al Depth Froude Number So = 0.0132 ft/ft n = 0.0130 D = 24.00 inches Q = 16.70 cfs Af= 3.14 sgft Pf = 6.28 ft Theta = 3.14 radians Qf = 26.06 cfs Theta An Tn Pn Yn Vn Qn Flow Fr Theta-c =radians Ac = 2.48 sq ft Tc= 1.76 ft Yc = 1.47 ft Vc = 6.73 fps t•r� = 1. UD-Culvert_v2.00c - HOUSKA pond outfall pipe.xls, Pipe 5/18/2016, 5:42 PM Project Data Project Title: Designer. Project Date: Project Units: Notes: Oydraulic Analysis Report Houska - Weir Calculations Monday, November 23, 2015 U.S. Customary Units Weir Analysis: Emergency Spillway Notes: Input Parameters Weir Type: Rectangular Coefficient: 3.1000 Length. 80.0000 ft Flow: 16.8000 cfs Result Parameters Head: 0.1662 ft Weir Analysis: WQL Outlet Structure Notes: Input Parameters Weir Type: Rectangular Coefficient: 3.1000 Length: 20.0000 ft Flow: 16.8000 cfs Result Parameters Head: 0.4187 ft 22 • Appendix III - Mapping and flans 23 24 \A .(\\\ CITY HIGH \ `RISK 100-YEAR \\ A ROODPLAIN ,\ A\\\� , f ? A \ r / / A I \ �\ \ ` NNI \ Joy I 1 `•F / / \ C r I EAST A AUTO40TVE` a> I \ RAIN GARDEN BIORETENIION POND 2 BOTTOM ELEV - 4060.55 BOTTOM AREA - 281 SF - DEPTH - 12' VOLUME - "I CF ma SEE DETAIL D-53 a __ \ \ \ `A4- LOT 1 HOUSKA SOUTH SURD ASIOH I wu___ _ HOUSKA Or LED 699 RIVERSIDE AVENUE RAISE RIM OF EXIST INLET TO ELEV 4961.67 TO SERVE AS RAIN GARDEN OVERFLOW INTO EXIST HOPE STORM PIPE BASIN 5 AREA - 1.00 AC Ross - 0,54 RCNtpp = 0.68 IMPERNWS COVER = 76% . AS PER UTUTY PLANS FOR 'HOUSKA AUTOMOTIVE AUTO PARTS WAREHOUSE' DAM 04/09/2012 Oes+`ae' s = � 1� \ I 1 I I 1 LID Stormwater Management Summary Houska Automotive Repair SIT 12016 SrMBng site That NO Site Area = 2.28 Me Propoead site Date: TOO Proposed lmperrinua Area = I an yore Total PmpweOlmpbMousnecs• 73.7% LID Ty nt Area RegWre.1= LN xre p5%plproposed imp. area) LID cre]tl Or Re9bnM WCL Posed = 0.e4 Mro RewNrg LID Rpurel= 0.82 arc LID Trealmerd Arse PyWaed= 0.70 sera (OlAthal Pement LIOTreaTenl PmYMed yeT% 6 DD Tnd Sell Summary4� �. Cmlm9e Dori Gomm Too vdumar amM Mee Treated LID Area Ani Deple pmY d ID (ac ai Typo (SF) (SF) wk ) (CF) O1A 0.41 BM w am I 1358.0 ZBB0.0 BA 1358A 02 0.29 BKNeMnllNr2 2a1.0 500.0 12.0 "Ors REGIONAL ONAL VIOL BASIN A VOL = 0.663 Al \\ \ - 4981.00 \ WSE1m — 4961.41 a 46 am x ` ME Tit %\ \ TO SERVE \ AS RAIN CARD \ A OVERFLOW \ ELivAnaM (rn) sD o ao SCAt Maw DSTANCE FROM BLDG TO ROGOPLAIN is s DISTANCE \'/ „� . J hill in /\ \ FROM BLDC TO J \? RIN1DPlAIN - 0.5' BASIN In \\ + DRAINAGE BASIN AREA = 1.03 AC \ ' DISTANCE FROM BLDG TO ... f1.DO3PIAIN - 14' wt RAIN GARDEN F BIORET=NTION POND 1 \\ BOTTOM ELEV - 4961.00 \ BOTTOM AREA - 1388 9E \ DEPTH - Or I - VOLUME - 1356 CF ' -\ SEE DETAIL D-9 rr - \\ /• \ // ' r all Alto E II _ _ _ _ 1 / RIVERSIDE SHOPPINGPIO CENTER 8 g I 725 28002 IT THE NORTHIEMAY PROPFA EXIST PRIVATE DRIVE AISLE NOTES: @ 1. THIS SHEET IS PROVIDED BY INFORMATIONAL PURPOSES ONLY. SEE APPNOPRNTE SHEET FOR CONSTRUCTION INFORMATION. 2, NO PROPOSED BUILDINGS ARE LOCATED WITHIN THE CITY OF FORT COLLINS 100YFAR ROODPLAIN FRINGE. HOWEVER PORTIONS OF THE PROJECT SITE ARE LOCATED WITHIN THE 101YEAR FLOOCVUIN FLOOD FRINGE. WORK WITHIN THE FLOOD FRINGE (CONSISTING OF LyTy CUR UTTER REPLACEMENT, DRIVEWAY. DRIVE AISLE. RELOCATED 100-YEAR STORM INLETS, UNDERGROUND UTILITIES AND SURFACE GRADING MUST R«ay BE PROCEEDED BY AN APPROVED FLOOOPLAIN USE PERMIT. 3. NK) PART OF THE PROJECT PROPERTY IS LOCATED WITHIN THE CRY OF FORT COLLINS 100.YEAA ROODWAY. HOWEVER PORTIONS OF / RIVERSIDE AVENUE ADJACENT TO THE PROJECT WE IS LOCATED WITH THE FLOODVAY. WORK WITHIN THE FLCCOWAY (CONESTNG OF r4 CURbGU1lER REPLACEMENT AND RELOCATED STORM DRAINAGE INLETS AND PIPES MUST BE PROCEEDED BY AN APPROVED NO -RISE \ CERTIFICATE. I I A\ \ it I ! I W 1 Y' I < I I I n 1 I 1 I JMWRSIDE SHOPPING CENTER PD 9T3128003 731 NORTH IEMAY me5e dans have soon riverhad by Me cry of Fort Collins far caxept only The - done notI ply nistrimilbalfity W the reviewing assessment thin City Enfinshar. or the City ofFM Coal for moral andcwred ribs beloostionds Fuldharmsere Me hill dcea hotl dy that the qa ti f tho Items on Me plans are the final quantifies required . Therevolowsmallnotbeconstrunal mawn as wasedence ornnanclel responsibility by Me City Open Claim for aJtlawal limntro s of Items sham that may be rpiiii dump the control pnaH. City of Fort Collins, Colorado OTELITY PLAN Approval APPROVED: �yng near DAT:: CHECKED BY: DATE: WeW/Wmtenoter Utility CHECKED BY:orm ww � DATE: Y CHECKED By: DATE e�R Rweollcn CHECKED BY. �rdg w CHECKED BY: 0 O¢ w¢ Z ' EEO.._.. ti My =O;N1N6 �I< oil 00'— p0 m 4 0 a 9 a XZ WLL�m Uhis ZCd SIGH LU zLU u° Q NLIJ LL w ~ F Ln QQ O K = O O x 0 D Q Z Q J Q Q U (n 0 0 O 2 F— O J SHEET: CS OF CI�