Loading...
HomeMy WebLinkAboutDrainage Reports - 09/02/20161 { City-offt.'Collb : Plena ;Approved By `Date —1 FINAL DRAINAGE REPORT FOR LEMAY AVENUE CRAFT BREWERY & SELF -STORAGE FACILITY Prepared For: FORT COLLINS SELF -STORAGE, LLC 5013 Bluestem Court Fort Collins, CO 80525 August 1,2016 Project No. 39708.02 Prepared By: JR Engineering, LLC 2900 South College Avenue, Suite 3D Fort Collins, CO 80525 ' TABLE OF CONTENTS Table of Contents .................................. :............................................................................................................ i ' VicinityMap......................................................................................................................................................... I General Description and Location..................................................................................................................2 Location And Existing Site Characteristics.................................................................................................2 SiteSoils...........................................................................................................................................................2 Floodplai n........................................................................................................................................................2 ' Drainage Basins and Sub-Basins.......................................................................................................................3 MajorBasin......................................................................................................................................................3 Historic Sub-Basins........................................................................................................................................3 ' DevelopedSub-Basins....................................................................................................................................4 DrainageDesign Criteria..................................................................................................................................6 Regulations......................................................................................................................................................6 Low -Impact Development............................................................................................................................6 Development Criteria Reference and Constraints...................................................................................7 ' HydrologicCriteria........................................................................................................................................7 HydraulicCriteria..........................................................................................................................................7 Floodplain Regulation Compliance..............................................................................................................8 Modificationsof Criteria...............................................................................................................................8 DrainageFacility Design....................................................................................................................................9 GeneralConcept............................................................................................................................................9 Water Quality/ Detention Facilities............................................................................................................9 Stormwater Pollution Prevention..................................................................................................................10 ' Temporary Erosion Control......................................................................................................................10 Permanent Erosion Control.......................................................................................................................10 Summary& Conclusions.................................................................................................................................I References.........................................................................................................................................................12 1 J-R ENGINEERING Page i APPENDIX ' Appendix A — Site & Soil Descriptions and Characteristics Appendix B — Hydrologic Calculations Appendix C — Hydraulic Calculations Appendix D — Existing & Proposed Drainage Plans Appendix E — LID Exhibit J-R ENGINEERING Page ii Engineer's Certification Block I hereby certify that this Final Drainage Report for Lemay Avenue Craft Brewery & Self -Storage Facility was prepared by me (or under my direct supervision) for jR Engineering, LLC and the owners thereof and meets or exceeds the criteria of the City of Fort Collins Stormwater Design Standards. Registered Professional Engineer State of Colorado No. 37953 ) .J-R ENGINEERING Page iii VICINITY MAP t VINE OR IVINE i IT LF--. 11 i� WF� SIT AVE VicligiTY MAP SCALE 1!'rro—or— Page I GENERAL DESCRIPTION AND LOCATION LOCATION AND EXISTING SITE CHARACTERISTICS Lemay Avenue Craft Brewery & Self- Storage is located in the northeast quarter of Section 12, Township 7 North, Range 69 West of the 61h Principal Meridian in the City of Fort Collins, Larimer County, Colorado. More specifically, the Lemay Avenue Craft Brewery & Self- Storage site is a 6.35 acre property that is currently undeveloped. The site is zoned I (Industrial) and will support the proposed craft brewery and self -storage facilities. The site is surrounded by Buckingham Street to the north, Lemay Avenue to the east, and developed land to the south and west. ' The currently proposed uses of the site, require the parcel to be subdivided into three lots. The first lot contains the craft brewery building with 7,912 total square feet. The second lot, totaling 104,000 square feet, contains the self -storage facilities with 8 buildings. The third lot is for a future ' development and will be a lawn area until the lot is developed. The proposed detention pond was designed for the future development of lot 3, modeled at 60% impervious. The existing site generally slopes from the north to south with slopes ranging between 0.60% and 2.5%. The property is generally covered with sparse native grasses. The site currently drains to the southeast corner of the site where runoff is collected in an existing 307 CMP culvert and piped south in the City's Lemay Avenue Right -Of -Way. SITE SOILS The Lemay Avenue Craft Brewery & Self- Storage site soils consist of loamy soil, predominately Nunn clay loam. Nunn clay loam belongs to hydrologic soils Group C. Group C soils have a slow infiltration rate when thoroughly wetted. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Nunn clay loam with 0-3 percent slopes generally has a combined surface layer thickness of approx. 30 inches. Runoff is moderately high, and the hazards of wind erosion are moderately low. Supporting figures can be found in the Appendix, page A- I. FLOODPLAIN The site is shown on FEMA FIRM panel 08069C0983H, dated May 2, 2012. The site lies within an area determined to be outside the I00yr floodplain, but within the 500yr floodplain. The "City of Fort Collins Floodplain Review Checklist for 50% Submittals" checklist is not applicable for this Drainage Report Page 2 DRAINAGE BASINS AND SUB -BASINS MAJOR BASIN The proposed Lemay Avenue Craft Brewery & Self -Storage site is located in the Dry Creek major drainage basin. The Dry Creek drainage basin is tributary to the Cache la Poudre River and extends from the Wyoming border to where it joins the river near Mulberry and Timberline. The Dry Creek basin is approximately 23 miles long and six miles wide and encompasses approximately 62 square miles. The land used in the upper and middle portion of the basin is primarily rangeland and irrigated hay meadows and pastures. The majority of the lower portion of the basin is developed and includes commercial, industrial and residential uses. The project site is a part of the lower Dry Creek basin. HISTORIC SUB -BASINS ' Lemay Avenue Craft Brewery & Self -Storage is an infill development piece of property. It is governed by the City's Reasonable Use policy, in which the proposed drainage basins will need to follow the generally accepted principle of releasing the 100-year developed condition flow rate at the same location and at a magnitude of 0.2cfs/acre as the pre -development condition. There are no offsite areas that flow across the proposed development site. Referring to the "Existing ' Drainage Plan", included in the Appendix, the following describes the existing condition drainage basins. ' Existing Onsite Sub -Basins: The site has two existing onsite drainage basins. ' Sub -basin EX consists of a 1.51 acre area of undeveloped open space with native grasses and weeds covering the majority of the ground and is assumed to be 2% impervious. Runoff ' in sub -basin EX -I collects in a roadside Swale and flows south to the southeast corner, of the site where it is piped south, off -site through an existing 30" CMP culvert. ' Sub -basin EX2 consists of a 6.20 acre area of undeveloped open space with the same ground cover and percentage imperviousness as sub -basin EX -I. Runoff generally flows to ' the southeast across basin EX-2, at slopes ranging from 0.50% to 2.0%, generally leaving the site at the southeast corner, where it is piped south off -site through an existing 30" CMP ' culvert. Page 3 DEVELOPED SUB -BASINS The proposed developed condition sub -basins, including detention and LID facilities, have been designed to mimic the historic basins' runoff patterns. The following describes the proposed conditions on -site drainage basins. Refer to the "Proposed Drainage Plan" in the appendix for review. Proposed Onsite Sub -Basins: Sub -basin A consists of 0.98 acres on the northern portion of the subject property. Runoff from the proposed building and parking lot travels west to an LID basin in the northwest corner of the property. From the LID basin, runoff flows south in a swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub -basin B consists of 0.85 acres on the northwest corner of the subject property. Runoff from sub -basin b is collected in an LID basin on the northwest corner of the property. From the LID basin, runoff flows south in a Swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub -basin C consists of 0.41 acres near the northwest corner of the subject property. Runoff from the proposed building and driveways travels west to an LID basin on the western edge of the property. From the LID basin, runoff flows south in a swale through another LID basin and into the proposed detention pond on the southern edge of the property. Sub -basin D consists of 0.16 acres on the western edge of the subject property. Runoff is captured in a proposed soft Swale and then flows south through and LID basin and into the proposed detention pond on the southern edge of the property. Sub -basin E consists of 0.39 acres in the western portion of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the southwest corner of the site and then flows south into the proposed detention pond on the southern edge of the property. Sub -basin F consists of 0.16 acres on the east side of the subject on the western edge of the subject property. Runoff is captured in a proposed soft Swale and then flows south through and LID basin and into the proposed detention pond on the southern edge of the property. Page 4 I Sub -basin G consists of 0.77 acres in the center of the subject property. Runoff from the ' proposed building and driveways is conveyed to a proposed LID basin and then flows south into the proposed detention pond on the southern edge of the property. Sub -basin H consists of 0.68 acres in the center of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the eastern edge ' of the property, and then flows south via a swale, through another LID basin and into the proposed detention pond on the southern edge of the property. Sub -basin I is comprised of 0.82 acres in the center of the subject property. Runoff from the proposed lawn area is conveyed to a proposed LID basin near the eastern edge of the property, and then flows south via a Swale, through another LID basin and into the proposed detention pond on the southern edge of the property. ' Sub -basin J is comprised of 0.19 acres at the eastern edge of the subject property. Runoff from this basin is captured in a swale and flows south through an LID basin and into the proposed detention pond on the southern edge of the property. Sub -basin K is comprised of 0.32 acres near the southeast corner of the subject property. Runoff from the proposed building and driveways is conveyed to a proposed LID basin near the southeast corner of the site and then flows south into the proposed detention pond on the southern edge of the property. Sub -basin L is comprised of 0.76 acres and contains the proposed detention pond area. Runoff from this basin is collected in the proposed detention pond on the southern edge of ' the property. ' Sub -basin M is comprised of 0.53 acres on the northern edge of the subject property. Runoff from this basin is collected in a proposed sump inlet along Buckingham Street. Captured flows are piped east to the corner of Buckingham Street and Lemay Avenue ' where they are release into a swale that flows south along Lemay Avenue to the southeast corner of the site. Runoff is then piped south, off -site through and existing 30" CMP culvert. ' Sub -basin N is comprised of 1.48 acres on the eastern edge of the subject property. Runoff from this basin is collected in a swale that flows south along Lemay Avenue to the southeast corner of the site. Runoff is then piped south, off -site through and existing 30" CMP culvert ' Sub -basin O is comprised of 0.10 acres on the southern edge of the subject property. Runoff from this basin sheet flow south off -site. Page 5 DRAINAGE DESIGN CRITERIA REGULATIONS ' This report was prepared to meet or exceed the City of Fort Collins stormwater criteria. The City of Fort Collins Storm Drainage Design. Criteria and Construction Manual (with all current 2011 ' Revisions) (FCSDDCCM) and the Urban Drainage Flood Control District's (UDFCD) Drainage Criteria Manual (USDCM) Volumes I, 2 and 3 were referenced as guidelines for this design. Low -IMPACT DEVELOPMENT Volume reduction is an important part of the Four Step Process and is fundamental to effective stormwater management. Per City criteria, a minimum of 50 percent of new impervious surface area must be treated by a Low -Impact Development (LID) best management practice (BMP) ) as well as 25% of the new drive area must be treated by porous pavement. The proposed LID BMPs will have the effect of slowing runoff through the site lot and increasing infiltration and rainfall interception by encouraging infiltration and careful selection of vegetative cover. The improvements will decrease the runoff coefficient from the site and are expected to have no adverse impact on the timing, quantity, or quality of stormwater runoff. The proposed site uses porous pavers, bio- swales and LID basins for the LID/BMP design elements. In total 100% of the new impervious area is treated by an LID before reaching the proposed detention pond and 25.1% of the new pavement area is porous pavement, see the tables below for more details on each. Since 100% of the new impervious area is being treated by an LID, water quality is not needed in the detention pond. An illustrative LID/Surface Maps as well as sizing of the LID/BMPs is provided in Appendix E. Tabeel: LID Requirements 50% On -Site Treatment by LID Requirement New Impervious Area 144,522 sq. ft. Required Minimum Impervious Area to be Treated 72,261 sq. ft. (=50% of new impervious area) Area of Paver Section #1 16,748 sq. ft. Impervious Run-on area for Paver Section #1 (1.5:1) 25,090 sq. ft. Impervious Area Directly Treated by LID Treatment Method #2 - LID Basin #2 17,770 sq. ft. Impervious Area Directly Treated by LID Treatment Method #3 - LID Swale #1 7,377 sq. ft. Impervious Area Directly Treated by LID Treatment Method #4 - LID Basin #3 64,572 sq. ft. Impervious Area Directly Treated by LID Treatment Method #5 - LID Basin #4 29,713 sq. ft. Total impervious Area Treated 144,522 sq. ft Actual % of Impervious Area Treated 100.0 % Tablet: Porous Pavement Requirement 25% Porous Pavement Requirement New Driveable Area Required Minimum Area of Porous Pavement (=25% of new pavement area) Area of Paver Section #1 68,778 17,195 17,280 sq, ft. sq. ft. sq. ft. Total Porous Pavement Area 17,280 sq. ft. Actual % of Porous Pavement Provided 26.1 % Page 6 TWO: LID Sizing LID Measure LID Sizing Impervious Area Treated Sq. ft. Area of LID sq.ft. Ratio Paver Section #1 25090 16748 1.5 LID Swale #1 22222 5599 4.0 LID Swale #2 18261 2516 7.3 LID Basin #1 4097 4097 1.0 LID Basin #2 2925 585 5.0 LID Basin #3 64572 6520 9.9 LID Basin #4 11452 1636 7.0 DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS There were no previous drainage reports or master plan used in the development of this final drainage report The developed site runoff is constrained to release 0.2 cfs per acre from the proposed detention pond. There are 6.49 acres contributing to the pond and therefore the maximum pond release is set to 1.3 cfs. HYDROLOGIC CRITERIA ' The rational method was performed to calculate the peak runoff rates for each basin. Weighted percent imperviousness and weighted runoff coefficients were calculated for each basin using USDCM Tables RO-3 and RO-5 based on Natural Resources Conservation Service (NRCS) Type C hydrologic soil classification and surface characteristics of each basin. The time of concentration was calculated using USDCM Equation RO-3 and the intensity was calculated using the corresponding storm rainfall depth and USDCM Equation RA-3. To more closely match the City of Fort Collins IDF Curve, Coefficient 3 of the UDFCD's intensity formula was adjusted to 0.7867. The City of Fort Collins area has 2-year, I -hour rainfall depth of 0.82 inches and a 100-year, I- hour rainfall depth of 2.86 inches. These depths do account for the 1997 adjusted rainfall depths. The 2- hour 100-year rainfall total is 3.67 inches, based on the rainfall frequencies adopted by the City of Fort Collins. HYDRAULIC CRITERIA This report demonstrates that the proposed stormwater detention concept is able to reduce the 100-year developed condition flows to a flow rate of 0.2 cfs/ acre; thereby satisfying the City's Reasonable Use requirements. The Rational Formula -based Federal Aviation Administration (FAA) method is used to preliminarily size the detention pond in accordance with City criteria, as the tributary area is less than 20 acres in size. The ultimate Lemay Avenue Craft Brewery & Self -Storage storm drainage system will be designed to convey the minor and major storm events through the property with the proposed inlets, storm Page 7 sewer pipes, soft swales, and LID measures for the flows being calculated by this report. Per the ' requirements provided by the City of Fort Collins Storm Drainage Design Criteria and Construction Manual, all inlets and storm pipes will be designed to convey the 100-year storm flows. During the major developed condition 100-year storm, the accumulated water depth in the ' ponds will be held to a maximum level of one -foot below all building finished floor elevations. Additionally, this report summarizes if any, the expected changes to offsite conditions or flows. This ' project will eventually show that the flow rate released downstream is less than would historically be experienced, and that the sedimentation is lessened through increase infiltration. ' All swale and pipe outlets will be protected with turf mat or riprap; whichever is most appropriate. Storm sewer pipe outlets will be protected using the requirements set by the USDCM for the ' protection of downstream conveyance channels and culverts. Lid measures have been integrated into this design on higher levels than most City of Fort Collin's projects to date. In all, 100% of this project's impervious areas pass through and are treated in LID's prior to reaching the detention ' pond. FLOODPLAIN REGULATION COMPLIANCE ' The site is shown on FEMA FIRM panel 08069C0983H, dated May 2, 2012. The site lies within an area determined to be outside the I00yr floodplain, but within the 500yr floodplain. The "City of Fort Collins Floodplain Review Checklist for 50% Submittals" checklist is not applicable for this ' Drainage Report ' MODIFICATIONS OF CRITERIA There are no modifications to the Storm Drainage Criteria Manual and Construction Standards being requested. Page 8 DRAINAGE FACILITY DESIGN GENERAL CONCEPT ' The proposed improvements to the Lemay Avenue Craft Brewery & Self -Storage site will result in developed condition runoff being conveyed around the proposed buildings and to the south via ' concrete pans and swales. Low -impact development best management practices are proposed to improve the quality of runoff and aid in reducing peak flows. Specifically, permeable pavement systems are proposed for portions of the parking lot, Lid infiltration forebay basins to treat roof and driveway drainage, and grass lined bio-swales (soft-swales) are proposed on the west and east sides of the site to improve water quality. Runoff from the site is captured in LID basins and swales located around the self -storage site and in open areas adjacent to the building. Runoff is conveyed via sheet flow, concrete pans and bio- swales in a southerly direction to the proposed detention pond at the southern end of the site. The existing drainage outfall from the site is in the southeast corner of the property. The proposed detention pond is sized to detain the 100 year flows from the site and release at a rate of 0.2cfs/acre to the southeast corner of the property. Runoff collected from Buckingham Street and Lemay Avenue will combine with flows released from the proposed detention pond and will continue to flow south off -site through an existing 30" CMP culvert, similar to historic conditions. WATER QUALITY/ DETENTION FACILITIES Water quality will be provided for the site through the use of LID basins and swales. Detention will be provided for the site through the proposed detention pond on the southern edge of the site. The voids provided by the gravel in the permeable pavers will also be included in the provided detention volume. The proposed detention pond will detain the 100 year flows from the site and release at a rate of 0.2cfs/acre to the southeast corner of the property. The 100 yr water surface elevation and the overflow weir elevation for the pond is at 4944.90. The proposed pond also has I foot of freeboard above this elevation. See Table 3, below, for detention pond sizing and release rates. Table4: Detention Pond Values Storage WQCV Volume Storage Volume Provided 100-yr Max I00-yr Volume Required (acre-ft) Including volume provided by Inflow Rate Max Required (*provided in LID basins void space in Pervious Pavers (cfs) Release (acre-ft) and swales) (acre-ft) Rate (cfs) 1.36 0.16 1.36 28.9 1.3 Page 9 u STORMWATER POLLUTION PREVENTION TEMPORARY EROSION CONTROL A temporary erosion control plan is to be implemented for the site during construction. Temporary erosion control measures include, but are not limited to, slope and swale protection, ' silt fence placed around downstream areas of disturbance, construction vehicle tracking pad at entrances, a designated concrete truck washout basin, designated vehicle fueling areas, inlet protection, and others. All temporary erosion control measures are to be removed after they are deemed unnecessary. PERMANENT EROSION CONTROL Permanent erosion control measures include, but are not limited to, the constructed detention/water quality ponds, riprap pads placed for culvert outlet protection, seeding and mulch placed to enable and established vegetative growth, etc. Long-term maintenance of these erosion control measures shall be the responsibility of the owner of the property. JR will provide a detailed Storm Water Management and Erosion Control Plan at the time of the FDP submittal that will meet ' all requirements of the City of Fort Collins. Page 10 SUMMARY & CONCLUSIONS The existing conditions drainage patterns have two onsite sub -basins with the same ultimate outfall ' point in the southeast corner of the subject property, within Lemay Avenue right-of-way. The proposed drainage condition was designed to mimic the historic basins' runoff patterns. The existing ' conditions drainage patterns are maintained with the design of the project. The proposed improvements will have positive impacts on the timing, flow rate, and quality of runoff leaving the site; and will reduce potential impacts for flooding downstream of this site. ' The hydrologic and detention calculations were performed using the required methods as outlined in the City of Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria ' Manual. The proposed drainage improvements meet or exceed the City's requirements. ' The proposed concept for the development of the Lemay Avenue Craft Brewery & Self -Storage site involves routing developed condition flows to a proposed onsite detention pond. LID site enhancements will treat the site runoff at the source before allowing the runoff to be conveyed to the proposed detention pond. The site's stormwater facilities are sized to meet the City of Fort Collins "Storm Drainage Criteria Manual and Construction Standards" for both detention and water quality. Page I I REFERENCES I. Urban Storm Drainage Criteria Manual (Volumes I, 2, and 3), Urban Drainage and Flood ' Control District, June 2001. ' 2. Storm Drainage Criteria Manual and Construction Standards, City of Fort Collins Storm Water Utility. City of Fort Collins. Colorado, Updated January, 1997. ' 3. "Hydrologic Group Rating for Larimer County Area, Colorado", USDA -Natural Resources Conservation Service, National Cooperative Soil Survey. Web Soil Survey URL: http://websoilsurvey.nres.usda.gov. [July 21, 2010] Page 12 APPENDIX A SITE & SOIL DESCRIPTIONS AND CHARACTERISTICS ' J-R ENGINEERING LEMAY AVE. CRAFT BREWERY & SELF -STORAGE DRAINAGE REPORT -- — —--E VINE i T� E LINCOLN AVE VICINITY MAP SCALE : 1 "=500' SIT E VINE DR Project No. 39708.02 FIGURE 1- VICINITY MAP 1 1 1 1 1 1 1 1 1 1 1 1 1 t 1 LEMAY AVE. CRAFT BREWERY & SELF -STORAGE .1 Hydrologic Soil Group—Larimer County Area, Colorado h 4P 35'37N i0" l5'i4'N 494950 494900 495010 495M 495070 3 G �, Map Sole:1:1,360 ifprvNaO onA porb�at (9.5"x 11")shell. Meters 0 20 . __.. 40 8o 120 Feet A 0 50 100 200 300 Map proleal0n: Web MerWW Comer o=dir0b+s: wGSe4 Edge tim: UrM Zone 13N V KIM Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 495100 R a g� d 40° 3524*N 495130 3 4/8/2015 Page 1 of 3 DRAINAGE REPOF Hydrologic Soil Group—Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 22 Caruso clay loam, 0 to 1 D 0.0 0.5% percent slope 64 Loveland clay loam, 0 to ' C 0.7 10.0% 1 percent slopes 76 Nunn clay loam, wet, t to C 6.5 89.5% 3 percent slopes Totals for Area of Interest 7.2� 100.0% Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff None Specified Tie -break Rule: Higher [Sun Natural Resources "� Conservation Service Web Soil Survey National Cooperative Soil Survey Page 3 of 3 qV�t INU. Oufuo.ul FIGURE 2 - SOILS Mi 1 1 1 1 1 LEMAY AVE. CRAFT BREWERY 8t SELF -STORAGE 1p ;'111'IG 0. a) w cD w o= o SITE N4�]�. N Ii �A�n '" HCET 40 F CITY OF FORT COLLINS 080102 E NOTE: THIS AREA IS SHOWN S E CTED FROM THE I-PERCENTGREATER FLOOD HAZARD BY A LEVEE SYSTEM, OVERTOPPING OR FAILURE OF ANY LEVEE SYSTEM IS POSE�IBLE. / FOR ADDITIONAL INFORMATION, SEE THE "ACCREDITED LEVEE NOTE" (/ IN NOTES TO USERS. LL1020X 12 O h, Ic - � L uti �I 1 I I. ZONE AE MAcr 1455000 1 I 3125000 FT JOINS PANEL0981 4937 ZONE AE Dry Creek (South of Canal) PROFILE BASE LINE. v 'OUCRE PARKWAY ?� Old Dry Creek (Historic Channel) 2r NrFe,STeRCT w O DRAINAGE REPORT MAP SCALE 1 r' = 500' 250 0 500 101 E`T —: ME 0 — 150 300 ll�lil'�l'1`I PANEL 0983H i FIRM FLOOD INSURANCE RATE MAP LARIMER COUNTY, COLORADO m� AND INCORPORATED AREAS PANEL 993 OF 1420 (SEE MAP INOE.X FOR FIRM PANEL LAYOUT) i P.nNTAIN3 COMMUNITY N PARF9 -ANEL SUFFIX LAPWEPCOMIY C90m WS'1 P I � I I waf cuu.Ias cm pF amw oem " wa�W b J. rM rYp NYnIMI lhcWn Otlmv n" p . ead ene, Pao, "wa d^a: m��cmnv"ar rams. agym, te,eee m apcw amble ... erollm o r r.m�.: aahhh`np w"a* MAP NUMBER py� MAP MAP REVISED 2+wp ae MAY 2, 2012 FadaralEwrgmey Mswga 111 Aµcm, LARIMER COUNTY Q� UN INCORPORATED AREAS P,P 080101 COVR7SrRfEi 1%ANNUALCHANCE FLOOD DISCHARGE CONTAINED IN CULVERT This to an chicle, cow ma Dorton of the above referenced hood map R nevtmctw using FAIT On -Line TNs map does not reflect changes mwdmarrts which may haw been made subsequent to the date on the MIa dock. For the latest product Information about National Flood Insurance 4w MULBER Prpgmm flood maps check the FEMA Flood Map Store at w msc fame gov'. Project No. 39708.02 FIGURE 3 - FIRM MAP APPENDIX B HYDROLOGIC CALCULATIONS COMPOSITE % IMPERVIOUS CALCULATIONS ubdiviclon: Project Name: Lemay Ave. Craft Brewery & Self -Storage Location: Fort Collins Project No.: 39708.02 Calculated By: BAB Checked By: Date: 3/9/16 Basin ID Total Area (ac) Paved Roads/ Drives Lawns Roof Basins Total Weighted % imp. % Imp. Area (ac) Weighted %Imp. %Imp. Area (ac) Weighted %Imp. %Imp. Area (ac) Weighted %Imp. A 0.98 100 0.73 74.69 5 0.15 0.80 90 0.10 9.20 94.69 B 0.85 100 0.00 0.00 5 0.85 5.00 90 0.00 0.00 5.00 C 0.41 100 0.23 56.10 5 0.00 0.00 90 0.18 39.50 95.60 D 0.16 100 0.00 0.00 5 0.08 2.50 90 0.08 45.00 47.50 E 0.39 100 D21 53.85 5 0.00 0.00 90 0.18 41.50 95.35 F 0.16 100 0.00 0.00 5 0.06 1.90 90 0.10 56.30 58.20 G 0.77 100 0.36 46.75 5 0.00 0.00 90 0.41 47.90 94.65 H 0.68 100 0.33 48.53 5 0.00 0.00 90 0.35 46.30 94.83 1 0.82 100 0.48 58.54 5 0.34 2.10 90 0.00 0.00 60.64 J 0.19 100 0.00 0.00 5 0.19 5.00 90 0.00 0.00 5.00 K 0.32 100 0.16 50.00 5 0.00 0.00 90 0.16 45.00 95.00 L 0.76 100 0.00 0.00 5 0.76 5.00 90 0.00 0.00 5.00 M 0.53 100 0.39 72.88 5 0.14 1.40 90 0.00 0.00 74.28 N 1 1.48 100 0.45 30.41 5 0.96 320 90 0.07 4.30 1 37.91 O 1 0.10 100 0.00 0.00 1 5 0.10 5.00 90 0.00 0.00 1 5.00 X:V910000aIT39?080'F,c,ttDmi.g,,JrOW2Dr i.0 Cdcs.xls Pepe 1 dI 3.A: 016 no L .c. f 4. v. U U z d 0 T T elmC� `a N 0 w z ��oaC d d Y i m U Chi z d V OW U qq CC O dA U zw �o F^ �VJ F zQc GG oorgoov.M.co T_ F � - a � ,n •C P'.J,P corQaP,gY v^m C �• A ... T � tf. "• 07 .� o. F h •D N V) N Q Q v: MM M a m r M V L Z U F � o- z- %M r N -- -�• rl - - �• N I u� s W > i. S c o 0 0 0 0 o G o 0 0 0 0 0 0 f a M,c o Vr c-- v� �% a O N O p C C O p O C O O O G O N a. Y. h Vl h Vi C Q v1 N_ C N MQ. M U S N aQ-q x�ommNmM fl hry Z F E CQ O G G G ^J G m b G m G G G G Q Q G O ti vl v v. u, p O C G O O C 0 — Z � S O O O G O G O G O p O C O C O m fl C G M P P Q� P N C z CI � h N P •L a �C % x �D m vl r V: Y. e ey hp�Dhv,Nrm.�pocnap y r x e vo,n vi ec� < < E s w � UU:J000 UU:J U:JUCUvU 9 9 S � m q V Y v! N r O N C x � E 3 0 E � o o m E f Y o 'o E F u � 2 q i c 3 c N� Q pp l P> u C p W o •o Xs� c F�i3=U G u g ( i �■�■■�■■������������■■■ �■�■■&■■��■�■�■&■■&■■■■ ������■■��������������� ������■■��������������■ ��1111111111111111111111 ��1111111111111111111111 �1111111111111111111111 �E�Ii1�11�11111111�111=1 �111i11�11111111111111i �111�1��1�1111�1�1111�1 \ § 3 /7 — 2 §!m m! $ 2E %§ * }\ �& A � w \ �) ( \\ 43 e !`!k— �{} um ` }7) r r 1 1 1 5 v r E e 1 2 o �a n 2 121 ' z 9pp Z • e 7 °aJ L F 4 1 Y w v k � Z z W C Q C j Z .. r� r -IA �1��1111 APPENDIX C HYDRAULIC CALCULATIONS INLET IN A SUMP OR SAG LOCATION Project = Lerner Avenue craft Brewery & Self -Storage Facility Inlet ID = OP 9 ./--Lo (C){ HLub H-Vera Wo Wp w roslmi ndometkn firm) ype of Iran Iran Type: oa Depiession(a0®1brW to continuous 1peer repression V from'O-AOOW) ao : !urnber of Und Inkfs (Grab or Curb Opering) No Dater Depth M Fbvdro (oWide of local depression) Porting Deptl1: rate Ydombtlon englh of a Unit Grate 4 (G): flath of a Unit Grate W. sea OpeneV Ratio for a Grate (typical vanes 0.15-0.90) A:eo: 'bgpry Factor for a Slrgk Grab (typical vane 0.50 - 0.70) Ct (G): rate Weir Coefficient (typical vane 2.15 - 3.e0) C. (G): rate Onto, Coefficient (typical value 0.60 -0.90) Ce (G)' tub Oper lna hlfOlrrlatlwn ergth of a Urit Curb Opemg to (C)' leigN of Vertical Curb Opering In k1ohes H. : leighr of Curb Orifice Throat In Inches Heooa: roe of Throat (see USDCM Fgure ST-5) Than, ide Wdrh for Depression Pan (typically the altar vldth of 2 feet) W. :logging Factor for a Shpk Cub Opebg (typical value 0.10) Cr (C): :urb OpeNng Weir Coefficiert "cal vane 2.3-3-7) C. (C): :tab Opering Orifice Coeffi«n (hpia vane 0.90 - 0.70) Ce (C) 'otal Inlet Interception Capacity (assumes clogged condition) Q. a ikt Capacity LS GOOD for Ifnor vncl Major Storms(>O PEAK) Oreraasauafp: MINOR MAJOR CDOTIDemer 13 Gcrbhetion 200 2.Oc i cl t 6.0 9.0 irsdca MINOR MAJOR I]OwaeUe� 3.00 3 %. ass 1.73 i.?3 eel OA3 043 0.50 0.50 3.30 3.30 0.e0 c.e(! 3.00 3.00 e.50 n_3L 5.25 52 O.DO .00 2.DO 2.00 D.10 0.10 3.70 3](! D.06 0.ea set whits lchea kprees w UD-Inlet_Y3.14-DP 9.)dsm, Inlet In Sump 12182015. 9:55 AM Project: Inlet to: 11 ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Stormy ' mum Allowable Width for Spread Behind Curb Tsa = 11.0 ft Slope Behind Curb (leave blank for no conveyance credit behind curb) ssn = 0.002 it ring's Roughness Behind Curb (typically between 0.012 and O.D20) n� = 0.013 it of Curb at Gutter Flow Line Hmm = 6.00 inches nc , from Curb Face to Street Crown Tcaonw = 24.0 it �r Width W = 2.00 ft tt Transverse Slope S. = 0.020 ft/R n Cross Slope (typically 2 inches over 24 inches or 0.083 fVft) Sw = 0.083 ft/ft d Longitudinal Slope - Enter 0 for sump condition So = 0.005 Nit iing's Roughness for Street Section (typically between 0.012 and 0.020) ns, F T = 0.012 Minor Storm Major Stonn Allowable Spread for Minor & Major Stone TMM = 24.0 24.0 ft Allowable Depth at Gutter Flow ire for Mirror & Major Storm cl u = 6.0 6.0 inches r Flow Depth at Street Crown (leave blank for no) j __-j ;? check = yes )R STORM Allowable Capacity is based on Depth Criterion Minor Storm Ma or Storm OR STORM Allowable Capacity Is based on Depth Criterion Q,ua., 13.0 13.0 lots ,r storm max. allowable capacity GOOD - greater than flow given on sheet'Q-Peak' r storm max. allowable capacity GOOD - greater than flow given on sheet 'Cl-Peak' UD-Inlet_v3.14-DP 9.xlsm, Q-Allow 1218/2015, 8:53 AM Detention Pond Sizing Subdivision: Project Name: Lemay Ave. Craft BIenery&Self-Storage Location: Fort Collins Project No.: 39708.02 Calculated By: BAB Checked By: Date: 3/9116 This is to convert % imp. to a C value 100-year (must insert % imp. and C pervious). Required detention 113 acre-ft. 'C'value F,_ 0641 594236' 1:3643dA 'C'1.25 0.8 Area 6.49 acres Modified Modified Release Ratel 1-.3 cis M. FATER D. JUDISF C. LI 5/95 Nov-97 Nov-98 DETENTION POND SIZING TIME (mins) 0 5 r 10 15 20 25 30 35 40 45 50 55 60 65 70 75 r 80 85 90 95 100 r 105 110 115 120 125 103 135 140 145 ' 15 155 160 165 170 ' 175 180 185 190 195 200 200 205 210 215 ' 22 225 230 235 240 1 r TIME INTENSITY 0100 Runoff Release Required Required cum 100 year Volume Cum total Detention Detention (secs) (in/hr) (cfs) (ft^3) (ft"3) (ft^3) (ac-ft) 0 0 0.00 0 0.0 0.0 0.0000 300 9.950 51.66 15498.12 390.0 15108.1 0.3468 600 7.720 40.08 24049.34 780.0 23269.3 0.5342 900 6.520 33.85 30466.66 1170.0 29296.7 0.6726 1200 5.600 29.08 34890.24 1560.0 33330.2 0.7652 1500 4.980 25.86 38784.24 1950.0 36834.2 0.8456 1800 4.520 23.47 42242.11 2340.0 39902.1 0.9160 2100 4.060 21.18 44485.06 2730.0 41755.1 0.9586 2400 3.740 19.42 46603.39 3120.0 43483.4 0.9982 2700 3.460 17.96 48503.66 3510.0 44993.7 1.0329 3000 3.230 16.77 50310.48 3900.0 46410.5 1.0654 3300 3.030 15.73 51914.81 4290.0 47624.8 1.0933 3600 2.860 14.85 53456.83 4680.0 48776.8 1.1198 3900 2.720 14.12 55076.74 5070.0 50006.7 1.1480 4200 2.590 13.45 56478.58 5460.0 51018.6 1.1712 4500 2.480 12.88 57942.72 5850.0 52092.7 1.1959 4800 2.380 12.36 59313.41 6240.0 53073.4 1.2184 5100 2.290 11.89 60637,37 6630.0 54007.4 1.2398 5400 2.210 11.47 61961.33 7020.0 54941.3 1.2613 5700 2.130 11.06 63036.07 7410.0 55626.1 1.2770 6000 2.060 10.70 64173.12 7800.0 56373.1 1.2941 6300 2.000 10.38 65419.2 8190.0 57229.2 1.3138 6600 1.940 10.07 6647&37 8580.0 57898.4 1.3292 6900 1.890 9.81 67708.87 8970.0 58738.9 1.3485 7200 1.840 9.55 68783.62 9360.0 59423.6 1.3642 7500 1.790 9.29 69702.6 9750.0 59952.6 1.3763 7800 1.750 9.09 70870.8 10140.0 60730.8 1.3942 8100 1.710 8.88 71914.39 10530.0 61384.4 1.4092 8400 1.670 8.67 72833.38 10920.0 61913.4 1.4213 8700 1.630 8.46 73627.75 11310.0 62317.8 1.4306 9000 1.600 8.31 74764.8 11700.0 63064.8 1.4478 9300 1.570 8.15 75808.39 12090.0 63718.4 1.4628 9600 1.540 8.00 76758.53 12480.0 6427&5 1.4756 9900 1.510 7.84 77615.21 12870.0 64745.2 1.4863 10200 1.480 7.68 78378.43 13260.0 65118.4 1.4949 10500 - 1.450 7.53 79048.2 13650.0 65398.2 1.5013 10800 1.420 7.37 79624.51 14040.0 65584.5 1.5056 11100 1.400 7.27 80683.68 14430.0 66253.7 1.5210 11400 1.380 7.16 81680.54 14820.0 66860.5 1.5349 11700 1.360 7.06 82615.1 15210.0 67405.1 1.5474 12000 1.340 6.96 83487.36 15600.0 67887.4 1.5585 12300 1.320 &85 84297.31 15990.0 68307.3 1.5681 12600 1.300 6.75 85044.96 16380.0 68665.0 1.5763 12900 1.280 6.65 85730.3 16770.0 68960.3 1.5831 13200 1.260 6.54 86353.34 17160.0 69193.3 1.5885 13500 1.240 6.44 86914.08 17550.0 69364.1 1.5924 13800 1.220 6.33 87412.51 17940.0 69472.5 1.5949 14100 1.210 6.28 88580.71 18330.0 70250.7 1.6127 14400 1.200 6.23 89717.76 18720.0 70997.8 1.6299 Page 1 10-year Composite 'C' 0.52 Area 6.49 acres Release Rate 1.3 DETENTION POND SIZING TIME TIME INTENSITY Q 10 cum 10 year (mins) (secs) (in/hr) (cfs) 0 0 0 0.00 5 300 4.870 16.44 10 600 3.780 12.76 15 900 3.190 10.77 20 1200 2.740 9.25 25 1500 2.440 8.23 30 1800 2.210 7.46 35 2100 2.000 6.75 40 2400 1.830 6.18 45 2700 1.690 5.70 50 3000 1.580 5.33 55 3300 1.480 4.99 60 3600 1.400 4.72 65 3900 1.320 4.45 70 4200 1.250 4.22 75 4500 II A 90 4.02 80 4800 1.140 3.85 85 5100 1.090 3.68 90 5400 1.050 3.54 95 5700 1.010 3.41 100 6000 0.970 3.27 105 6300 0.940 3.17 110 6600 0.910 3.07 115 6900 0.880 2.97 120 7200 0.860 2.90 Modified Modified M. FATER D. JUDISF C. LI 5/95 Apr-98 Nov-98 Runoff Release Required Required Volume Cum total Detention Detention (f A3) (ft^3) (ft^3) (ac-ft) 0 0.0 0.0 0.0000 4931 390.0 4540.6 0.1042 7654 780.0 6874.0 0.1578 9689 1170.0 8519.1 0.1956 11096 1560.0 9536.3 0.2189 12352 1950.0 10401.8 0.2388 13425 2340.0 11085.0 0.2545 14174 2730.0 11444.2 0.2627 14822 3120.0 11702.1 0.2686 15399 3510.0 11889.2 0.2729 15997 3900.0 12096.6 0.2777 16483 4290.0 12192.5 0.2799 17009 4680.0 12329.0 0.2830 17373 5070.0 12303.5 0.2824 17718 5460.0 12257.7 0.2814 18072 5850.0 12222.1 0.2806 18467 6240.0 12226.9 0.2807 18761 6630.0 12130.5 0.2785 19135 7020.0 12115.1 0.2781 19429 7410.0 12018.7 0.2759 19641 7800.0 11841.3 0.2718 19986 8190.0 11795.6 0.2708 20269 8580.0 11689.0 0.2683 20492 8970.0 11521.8 0.2645 20897 9360.0 11536.8 0.2648 Page 1 2-year Composite 'C' ` 0'.42 Area 6.49 Release Rate 1.3 DETENTION POND SIZING TIME TIME INTENSITY Q 2 cum 2 year (mins) (secs) (in/hr) (cfs) 0 0 0 0.00 5 300 2.850 7.77 10 600 2.210 6.02 15 900 1.870 5.10 20 1200 1.610 4.39 25 1500 1.430 3.90 30 1800 1,300 3.54 35 2100 1.170 3.19 40 2400 1.070 2.92 45 2700 0.990 2.70 50 3000 0.920 2.51 55 3300 0.870 2.37 60 3600 0.820 2.24 65 3900 0.770 2.10 70 4200 0.730 1.99 75 4500 0.690 1.88 80 4800 0.660 1.80 85 5100 0.630 1.72 90 5400 0.610 1.66 95 5700 0.580 1.58 100 6000 0.560 1.53 105 6300 0.540 1.47 110 6600 0.520 1.42 115 6900 0.510 1.39 120 7200 0.490 1,34 Modified Modified M. FATER D. JUDISF C. Li 5/95 Apr-98 Nov-98 Runoff Release Required Required Volume Cum total Detention Detention (ft^3) (ft^3) (ft^3) (ac-ft) 0 0.0 0.0 0.0000 2330.559 390.0 1940.6 0.0445 3614.411 780.0 2834.4 0.0651 4587.521 1170.0 3417.5 0.0785 5266.246 1560.0 3706.2 0.0851 5846.841 1950.0 3896.8 0.0895 6378.372 2340.0 4038.4 0.0927 6697.291 2730.0 3967.3 0.0911 6999.854 3120.0 3879.9 0.0891 7286.063 3510.0 3776.1 0.0867 7523.208 3900.0 3623.2 0.0832 7825.772 4290.0 3535.8 0,0812 8046.562 4680.0 3366.6 0.0773 8185.577 5070.0 3115.6 0.0715 8357.303 5460.0 2897.3 0.0665 8463.609 5850.0 2613.6 0.0600 8635.334 ,6240.0 2395.3 0.0550 8757.995 6630.0 2128.0 0.0489 8978.785 7020.0 1958.8 0.0450 9011.495 7410.0 1601.5 0.0368 9158.688 7800.0 1358.7 0.0312 9273.172 8190.0 1083.2 0.0249 9354.946 8580.0 774.9 0.0178 9592.09 8970.0 622.1 0.0143 9616.622 9360.0 256.6 0.0059 Pond WCQV Sizing Subdivision: Project Name: I zma Ave. Craft Bmvery & Self -Storage Location: ort Colluis Project No.: Calculated Bv: BAB Checked By, Date WQCV = (0.911' - 1.19I2 + 0.781)' A/12 Site Basin Area % Impervious A 0.98 84.7 B 0.85 5.0 C 0.41 95.6 D 0.16 47.5 E 0.39 95.4 F 0.16 58.2 G 0.77 94.7 H 0.68 94.8 1 0.82 60.6 d 0.19 5.0 K 0.32 95.0 L 0.76 5.0 TOTAL 6A9 62.1 WQCV = 6,877 cf WQCV = 0.16 acre-ft WQCV provided in LID Basins and Sw•ales :%3970000An970802',FuePDnhnpeli970W.Dramaw_Caks xb Pep i of) 3M2016 POND VOLUME CALCULATIONS Subdivision Location Fort Collins Volume=1/3 x Depth x (A+B+(A*B)"0.5) A - Upper Surface B - Lower Surface pnnfl Project Name: Lemav Ave. Craft Brewery & Self-Stmal Project No. 39708.02 By: BAB Checked By: Date: 3/9/I6 Stage Stage Elevation Stage Surface Area (square feet) Stage Volume (cubic feet) Cumulative Volume (cubic feet) Cumulative Volume (acre fect) 0.00 4941.35 4,095 0 0 0.00 1.00 4942.00 5,866 3,220 3,220 0.07 2.00 4943.00 14,371 9,806 13,026 0.30 3.00 4944.00 21,341 17,742 30,768 0.71 3.90 4944.90 30.928 23,38G 54,154 1.24 Pavers 30-1. of Volume of ff2 rock in avers = 0.12 acre feet (see below) 1.36 ' Volume Rater Surface Elevation Volume (acre feet) I 100.Vear Detentioni 1.36 4944.90 Paver Volume Calculations Paver Surface area= 16,748 sq. ft. Depth of #2 rock = 1 ft Volume of #2 rock = 16748 cubic ft. 30% of Volume = 5,024 cubic ft or 0.12 acre ft x^397,0W N3Y0S0+_1Fscel�Dnm+gi39i0602Dcaimpe_Calccali Pepe loft 3:"1:_016 POND VOLUME CALCULATIONS Subdivision Location Fort Collins Volume= 13 x Depth x (A+B+(A*B)A0.5) A - Upper Surface B - Lower Surface VVVI V.I.... i. I'M. Project Name: Lernay Ave. Craft Brewery & Self -Storage Project No. 39708.02 By: BAB Checked By: Date: 3.;9/16 Stage Stage Elevation Stage Surface Area (square feet) Stage Volume (cubic feet) Cumulative Volume (cubic feet) Cumulative Volume (acre feet) 0.00 4943.00, 0 0 0.00 1.00 �','4944.00 1,373 1,373 0.03 2-00 494 00 5 2,000", 2,245 3,618 0.08 300 1,744 5,362 0.12 4.00 •4947.00 1,30U' 1,399 6,761 0.16 0 � ',,4�,tj ] Volume needed Cumulative Volume Provided Water Quality l 0.16 0.16 XV9770000.M--US��Dnivagr 970602U.mW Cd i,� Pax I.fl IM1016 00 00 c \ § 0 oo � 08 ED ]! CN ))$foR& �°ƒf2a\ kmb) «¥py°a auj r r E 2 2 / U} f L k � _ \ / $ ) \ 2 \ j cm or - ! ` ID k §! ' ) r ,> e @ 7 })�7 fr UIT 0C= ] ( f\I& 2� CD '� kl m -P m )k ,|g%g� , \, �< o,:% }3 a! tK«0- |)kkk%))2}{k) d75 kk ;)7/7\ ))) }))/f!} a 2 - | J d ri '- - STAGE -DISCHARGE SIZMG,OF THE WEIRS AND ORIFICES (INLET CONTROL), Project: Lenny Ave. Craft Brewery d Self Storage Basin ID: awes o,a.. sc is�.eua) aedi�ae..sz EV .P 4T_ McmrONn.3 rsy S'.") Ay w Current Routing Order is 93 U notion Information flnnutl: #1 Hor¢. #2 Honz, #1 Vert. #2 Vert. Circular Opening: Diameter in inches Dia =1 inches OR Rectangular Opening: Width in Feet W= -. 3.00 1 058 1, It. Length(Heigsfor Vertical) Lor H= 1 3,00 1a:024 1 ft Percentage of Open Area After Trash Rack Reduction %open = % Orifice Coefficient C.= ' Weir Coefficient C..= Office Eevation (Bottom for Vertical) E. = ft. Calculation of of Collection Net Opening Area (after Trash Rack Reduction) N = 4.50 0.14 sq. ft OPTIONAL: User-O"ride Net Operang Area A. - -: sq. it. Perimeter as Weir Length L..= 9.00 it OPTIONAL: User-Overide Weir Length L. it Tap Elevation of Vertical Orifice Opening, Top 4941.58 R Center Elevation of Vertical Orifice Opening, Can = 4941 A6 2 Routing 3: Single Stage - Water flows through WOCV plate and #1 horizontal opening into #1 vertical opening. This flow will be applied to culvert sheet (#2. vertical & horizontal openings is not used). - - Hmisnnsah onMns Vertical Orifices ".50 li 0.62 062, - t:3.00 '. 4944.00e 4941 34, Labels roc wOty, Mior, a Major Stare#e W.S. Ek,vdive (input) Water Surface Elevation ft 6tned WOCV Plate/Riser Fbw Cis fUserfinkedi #1 Honz. #1 Hortz Weir Orifice Flow Flow cis Cis ' (Ou #2 Honz. #2 Horm Weir Office Flow Flow cis CIS (m :) 'c 1 #1 Vert. Collection Capacity CIS ( ut 02 Vert Collection Capacity cis c Total Collection Capacity Cfs ou ut Trgat Vo for wOCv,W , aMepr Steers Vm nil for mh seek 4941.00 0.00 :: 0.00 0.00 ODO 0 )D 0.00 0.00 0.00 494100 '' -0.51 0.00 0.00 0.00 0.00 0.51 0.00 0.51 4943.00 086 "- 0.00 0.00 O.00 0.00 0.86 0.00 0.86 4944.00 -':1it'k 0.00 O.OD 0.00 0.00 1.11 0,00 1.11 4944.90 ':'-23.05' -' 23.05 21.24 0.00 0.00 1.29 0.00 1.29 ' '#NIA :• #MIA #NIA MIA #NIA #N/A 0.00 #N/A #NIA:. - #NIA #N/A #NIA #N/A 0.00 #NIA #MIA MIA #N/A #_NIA MAIA 0.00 I #NIA #NIA:.. #N/A #NIA _ #N/A _ #NIA 0.00 #NIA #WA.` -' #MA #WA #NIA #NIA j#N/A 0.00#NIA #NIA'.. #NIA #NIA #N/A #N/A 0.00 #NIA #NIA #MIA #NIA #N/A #MIA 0.00 #MIA #NIA: #NIA #NIA MIA #NIA #Di/A 0.00 #NIA #NIA". #NIA #NIA #MIA .: #NIA #N/A 0.00 #NIA *MIA #NIA #MIA #N/A #NIA #WA 0.00 #NIA __. #NIA =": #WA #NIA #N/A #NIA #NIA 000 #NIA ?#NIA :: MIA #N/A #NIA #NIA #MIA 0.00 #NIA '..'.#NIA- #NfA ##N/A MIA #NIA #N/A 0.00 #NIA --#NlA.::' #NIA #l1/A #NfA #N!A #N/A 0.00 #N/A #N/A: +t #NIA #NIA h #IV/A *MIA #N!A 0.00 #NIA '#M/A ': #N/A _ *MIA #NfA #N/A #N/A '.:#N/A ' #N!A #NIA #N/A #N!A #N!A 0.00 #NIA '#NIA'... #NfA #NIA #N/A #MIA #NfA 0.00 #N/A "#N/A"- #MIA #NfA MIA MIA #N/A 0.00 I #NfA a #NIA #NIA #N/A #N/A MIA #NIA 0.00 #N/A '= #NIA'= #MIA #N/A #N/A #MIA #N/A 0.00 1 #NIA :'- #I1/A #N/A MIA #N/A MIA #N/A 0.00 #NIA #NIA #N/A *MIA #NIA #NIA #NIA 0.00 #NIA #NIA.. f. #N/A #NIA -.w._ #N/A _ #N/A #N/A 0.00_- ##/A - #NIA ".. #MIA MIA #N/A #NIA #N/A ODD #NIA #NIA _ : #N/A #NfA #N/A #NIA SN/A 0.00 MIA #N/A" "_ #NIA .A itN/A .�..e. #N/A �.sa._ JIN/A ._. Tr#NIA _ 0.00 #N7A _ #NIA-"' _ _ #M/A #MIA^- _ _ #N!A #NIA #NIA 0.00 #NIA #N/A'::.: #N/A #N/A #N/A #NIA #NIA 0.00 #NIA r_-#NIA ` #NIA #NIA #N/A #NIA #NIA 0.D0 #NIA #N/A #NIA #N/A #N/A #NIA #N!A 0.D0 #WA ti #WA #H/A #WA #NIA #MIA #N!A 0.00 #N!A -` -#WA #WA #N/A #N!A_ #N/A #_N!A 0.000 NfA _ #WA ##NIAO _ #NIA #N)A _ #N!A � #NIA #NIA M#N/A #11: /AA 0.00 MIA MIA #N/A-: #NIA #WA #N!A #N!A D.00 #N/A #WA #MIA #N/A #NIA �_ #N/A MIA O.DO #NIA #J/A".: 't #NIA MIA #NIA #N/A #NIA 0.00 #NIA #Id/A[- #NIA #NIA MIA #N/A MIA 0.00 #NIA •-#NfA J #NIA #N!A #MIA #NIA #INlA 0.00 #N/A 3970802 LID -Detention J2.35.375, Outlet 3/7/2016, 4:43 PM STAGE -DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL) Project: Lemay Ave. Craft Brewery 8 Sel/ Storage Basin 10: STAGE -DISCHARGE CURVE FOR THE OUTLET STRUCTURE 4945.5 4945 4944.5 0) 4944 C) w d 4943.5 m l0 r y 4943 4942.5 4942 4941.5 4941 0 0.2 0.4 0.6 0.8 1 1.2 1A Discharge (cfs) 3970802 UD-Detention_v2.35.)ds, Outlet 3172016, 4:43 PM 1 Cross Section for Pond Emerqency Overflow ' Project Description Solve For Headwater Elevation Input Data Discharge 28.90 ft3/s Headwater Elevation 4945.41 ft ' Crest Elevation 4944.90 ft Weir Coefficient 2.61 US Crest Length 30.00 ft Cross Section Image 0.51. ff 30A0 tt Fk'1 ' Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.071.00] 3/8/2016 11:56:52 AM 27 Siemons Company Drive Suite 200 W Watertown, C7 06795 USA +1.203-765.1666 Page 1 of 1 1 R d N _d .+ O I I Ol O Ol . O O O Vf O O Ill O u1 O O .+ Vl .+ .r .r O .+ .; G .+ M M M M m M m m CD (D CD 0 0 0 00 .M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ? m 1O Ol m N CDN .! �-+ 00 O V1 1A C O CD CD N M m N 0 lO M" N N N N N N N .4 kO M 00 N O V M m O Op 1� 00 N ll1 Ol .+ M N N N + M N M CY, m m 47% a% al co O N lO Vl N i� m O O 00 Ol lO ON v .ti cli M N N H Q lM Pi V? V, 7 V,7 V C O, Ol O? Ol Ol Ol Ol O+ -gr v- V- V- Ir Q V, O N 7 N 0 0 0 N O OR to W N V1 Ol li M N N N M N M 7 ? V- IT V rnrnolO+olrnrnrn v v c v c v IT v ON ON ON O Ol M O O� l0 O to 00 Ir M N N N .4 V M M v'vvvvvvv N Ol 00 al N V. m V1 Ill .+ O .ti Ol .+ Ill vl N N N N O M N N Ol � Ol Ol Ol O1 Ol � V v v v v v v v IA N Ol M {f T R CO (n 7 7 7 01 Ol ON mOt C% Ol T M M CY 7 O 0 O CD CD a 0 O O .� 0 0 0 0 0 0 0 0 O O O O O O O O ooOMrnMrno O N N l0 ti .� Ill N O Ill Ill 0 0 o O 0 0 0 .rcv,oMoon M to Il bdabe888 Li c � N m Eo rn c T a c E mQ m c 0 d m N O� Ol 2 O�'i N � G 'a z Q � �i y O>1 U N Q G w a D � W H � c = 30 0 Q � � > 3k na., 0 Q. N � C C J Ln W L Z J as y J C N C J> Ln L C CX L 0 O 4 a: M tD ? N M lD N 1ll O O N M V' lD IA O O O C 0 0 0 0 0 O 0 O loll O O 1�11 0 Ill O O .+ Ill 1A .ti IA MMMMMMMM OCDOOOOOO O C O O O O O O lD N OC � n tD lD Ol M N Ill M M N N %D O. v M N l0 O M N O M In Ol (� N cOD OOi m n lD M M V' N N 6 N .+ M lD tD v t " O 1� vl co �O lD v O ID N I!1 M M O O O Ill I N VM' VM' v v 7 MMMchcMMMM rri (+i ni ri �+ d• V' V' V-V-vvvvvv rn rn m rn rn D+ D+ al vV-vv- V- vvv O O N . co V. lD O OR n M O c0 N Vl N M M M v " 111 V' d- o CT, S;XX VM 9, Q V• V• Ill N O H O? rl 1tl 1n N N N N O M N N OOl l Ol Ol7l Ol 01 01 Of v v v v v v v v lfl N M M v ON v O In M IA M .-, lD O Ol Ol Ol ON d• V' V' V' V' V' V' V' MO 0 0 0 0" 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O M M M M O O N r1 M l0 Ol Ol 00 to 'r N M N .y lD .i .-I IA N O 1I1 Ill N N Ui M (O+l (O+l M l0 %D .-i In ri vi vi f+i O + N lD 66666 oo 1 Re-- _ as"a wa"e Paaaaa u3Nwaa swVYYYww1��+T++t+++wwwlw+Yw w O4vn1Vw+O ww�wwwVwwYw�O�a+♦ (y) uo�pengg R aaaaaaaaTaaax:_..,, a vxx. .x ,.xxxx..a x xxxx^ xaa� (y3 I P a P u ..:........:. .............. uoReiup .... .................... . RSA eqe ----- a aPNPu tlS: r .. r ..: r ... r .......... r . v : iL)uoPoti�3 r v . • .......... r .. r .... ... . a t a c No Text i .I d Fu - 1� I In — r f l I� a q o 0 Eu i' e. .»»xaa"x"aa�aaaaaaa"aax..aaxa�aa��ai��aaaa"xxaaa"a_. ma"a"aa HY-8 Culvert Analysis Report Table 1 - Culvert Summary Table: Culvert 1 Discharge Total Culvert Headwater Inlet Control Outlet Flow Normal Critical Outlet Depth TaiMatar Outlet Names Discharge Discharge Elevation (ft) Depth (ft) Control Type Depth (ft) Depth (ft) (it) Depth (ft) Velocity lots) (cfs) Depth (ft) (ftfs) 2 r 1.73 1.73 4947.33 0.806 0.590 1S2n 0.544 0.557 0.544 0.547 3.435 t00yr 10.20 6.13 4949.27 2.630 2.750 4-FFf 1.000 0.931 1.000 1.064 7.806 Straight Culvert ' Inlet Elevation (invert): 4946.52 It, Outlet Elevation (invert): 4946.41 ft Culvert length: 22.45 It, Culvert Slope: 0.0049 Culvert Data Summary - Culvert 1 Barrel Shape: Circular ' Barrel Diameter: 1.00 ft Barrel Material: Concrete Embedment: 0.00 in Barrel Manning's n: 0.0130 t Culvert Type: Straight Inlet Configuration: Grooved End Projecting Inlet Depression: NONE Water Surface Profile Plot for Culvert: Culvert 1 Crossing - DP1. Design Discharge - 10.2 cfs Culvert - Culvert 1, Culvert Discharge - 6.1 cfs 4949.0 4948.5 Y A • .T; 11 w 4947.5 4947.0 4946.5 10 15 20 25 Station (ft) ' Table 2 - Culvert Summary Table: Culvert 1 Discharge Total Culvert Headwater Inlet Control Outlet Flow Normal Critical Outlet Depth TaiMater Outlet Names Discharge Discharge Elevation (ft) Depth (ft) Control Type Depth (ft) Depth (ft) (f Depth (ft) Velocity (cfs) (cis) Depth (ft) (ftfs) 2yr 1.00 1.80 4944.25 0.687 0.415 1S2n 0.458 0.501 0.458 0.555 3.335 100yr 8.70 8.70 4945.42 1.802 1.855 7-. 1.500 1.138 1.138 1.D02 6.051 ........................................ ....... Straight Culvert ' Inlet Elevation (invert): 4943.56 ft, Outlet Elevation (invert): 4943.42 ft Culvert Length: 31.94 ft, Culvert Slope: 0.0044 ' Culvert Data Summary - Culvert 1 Barrel Shape: Circular ' Barrel Diameter: 1.50 ft Barrel Material: Concrete ' Embedment: 0.00 in Barrel Manning's n: 0.0130 Culvert Type: Straight Inlet Configuration: Grooved End Projecting Inlet Depression: NONE Water Surface Profile Plot for Culvert: Culvert 1 Crossing - DP6, Design Discharge - 8.7 cfs Culvert - Culvert 1, Culvert Discharge - 8.7 cfs 4946.5 _. 4946-0 4945.5 + - V c 4945.0 m - 7 a) - ----------- ------------------- w 4944.5 4944-0 4943.5 - -10 0 10 2 Station (ft) PIPE OUTFALL RIPRAP SIZING CALCULATIONS Subdivision: Project Name: Le ma Ave. Craft Brew & Self -Storage Location: ort o 1ns Project No.: Calculated By: Checked By: Date3/9/16 - STORM DRAIN SYSTEM 24' RCP FES I Pond Outfall Qtoo (cfs) 11 5 _� ' �' 1.3 ;� `' Flows are the greater of proposed vs. future D or H in 24 24 Wft Slope % 1.30 1.30 Yn in Yt (R) Unknown'`"'Unknown If "unknown" Yt/D=0.4 Yt/D, YUH 0.40 0.40 Per section MD 7.2 Supercritical No No O/DA2.5, QANHAl.5 2.03 0.23 Q/DAt.5, Q/WHA0.5 4.07 0.46 Da, Ha in ' Da=0.5 D+Yn , Ha=0.5 H+Yn Q/DaA1.5, Q/WHaA0.5' d5o (in), Re uired 3.37 0.38 Required Riprap Size L L Fig. MD-21 OR MD-22 Use Riprap Size L - L ;. d5o in 9 9 Table MD-7 1/ 2 tan 0 4.00" , 4.00 _..' Fig. MD-23 OR MD-24 Erosive Soils Yes Yes . At 2.09 0.24 At=Q/5.5 L 2.5 -6.8 L= 1! 2 tan 8 At/Yt - D Min L 6.0 6.0 Min L=3D or 3H Max L 20.0 20.0 Max L=1 DO or 1 OH Len ft 6.0 6.0 Bottom Width ft 6.0 6.0 Width=3D Minimum Riprap Depth in 18 18 De th=2 d5o Type II Base Depth in 6 6 Table MD-12 fine grained soils Cutoff Wall Cutoff Wall Depth ft Depth of Riprap and Base Cutoff Wall Width (ft) Note: No Type II Base to be used if Soil Riprap is specified within the plans ' For use when the flow in the culvert is supercritical (and less than full). x:13970000.ai1h970802\ExttNhamageU970803Aaimge_Cala.xls Page 1 of 1 3gR016 APPENDIX D EXISTING & PROPOSED DRAINAGE PLANS APPENDIX E LID EXHIBITS a. e S3.T v.. ... £ d/c 2r.§-".. ^+}. .rb 1 d !/`'xVW S isel$. .O.°. . - Design Procedure Form: Permeable. Pavement Systems (PPS) Shsat 1 of 2 Designer: BAB Company. JR Engineering - Date: April21, 2016 Project: Lemay Avenue Craft Brewery 8 SGNStorege Location: Paver Section #1 L Type of Permeable Pavenerd Section O M Infiltration �,- a A) What type of SeCdefl of Permeable pavement is used? (ID Partial Innhatlon Sedian (Based on the land use and actMbm. prolumity, to ad)acent ' structures an0 sod characteristics.) O FUN IMCation sedbn --owsdone.... ..-_-._._-____... ...-.< B) What type of wearing course? p Pla, O Canrete Grid Pavanmt`"�.. O vmba Concrete O Porous Crave;', 2. Required Storage Volume s; A) Effective Imperviousness of Nee Tributary to Permeable Pavement, I, I, = 84.7 % B) Tributary Area's I per iousness Ratio (1= 1,1100) i =i C) Tributary Watershed Nee Arm = 25,090 sq ft (trldudblg area of permeable Pavement system) - 4. D) Area of Pemmble Pavement System Arvs = 16,748 sq ft (Minimum recommended Permeable pavement area = 7464 sit ft) - E) Impervious Tributary Redo RI (Contributing brpervhlos Area / Pea eabie Pavement Ratio) F) Water Quality Capture Volume(WGCV) Based on 124our Drain Time WCICV=i` '802' Even - (WoCV=(0.8-(0.91'ie- 1.19' P+0.780/ 12)' Area) Dwane One G) is food contra volume being added? O 1'g I No ti) Tciwv .mr, 3. Depth of Reserver _. A) Mmhtum Depth of Reservoc D, = 6.0 inches (Mminum recommended depth S 6 inches) C/oow One 8) Is the slope of the reservoc/subgrade interface equal to 0%? �O YES- Flat or shred lnctabdan d .. p No- stoned Installation C) Porosity (Porous Gravel Pavement 10.3, Omens 10.40) P = 0.20 D) Slope of the Base CourselSubgrede Interface S = 0.005 ft/ft E) Length Between Lateral Flow Barriers (max = 71.89 ft.) L= 50.0 ft ro' - F) Volume Provided Based on Depth of Base Course V ='-- 977 "€ cu n Flat a Stepped: V = P' ((D_,Y12) *Arm Sloped: V = P' [(D,v,_ (D-- 6'SL-1)) / 121' Area Volume assumes uniform slope 8 lateral flow bamer spacing. _ Calculate the volume of each call individualiv when this varies. 4. Lateral Flaw Barters Chum Ow - A) Type of Lateral Flow Barriers O [onoete wags ® PVC geanaroare installed namal to lim O WM Rat wtabox, O Oran (oescroe): B) Number of Permeable Pavement Cells Cells = CM 5. Perimeter Barrier owae Ore = A) Is a perimeter barter provided on c0 sides of the Ir0 YES �- Pavement system? I O No -s' (Recomneded for PICP, concrete grid Pavementfor any a 3970802 UD-BMP_v3.03- Pavers#lxlsm, PPS 4/21/2016, 11:44 AM 1 3970802 UD-BMP_v3.03- Pavers #1 Alm, PPS 42112010, 11.44 AM N - Design Procedure Form: Permeable Pavement Systems (PPS) ,.` Shaet2 of K„ Designer. BAB Company: JR Engineering Data: ApriI21, 2018c,'. Project: Lemay, Avenue Craft Brewery 6 SeMStorage " Location: Paver Section fl e, 6. Fitter Material and Underdram system 1 Choose One r A) Is the underdrain placed below a 64nch tNck layer of Q yB CDOT Class C filter material? k O No 0 NIA Choose One B) Diameter of Slotted Pipe (slot dimensions par Table PPs-2) r I O anh 0a r kxh C) Distance from the Lowest Elevation of the Storage Volume y = It Q.e. the bottom of the base cause fo the writer of the orifice) ri Li si an:. f; Pp; xtllo "wtparat , i ac::c fi- Crowe One r i �x rrrc vx a-=:-?r: er'- -gwma J P'4 �erx rd nv YES No um f (home Q1e v Y9 9 • O Placed eba the kW ' G Q PWmd ebwe and belnv the 1W = 8. Outlet (Assumes each cell has simtar area. Wbipade slope. and length _ between lateral barriers (unless subgrede is flat). Celmlate cells - �: indiviWeOy where this varies-) A) Depth of WOCV in the RMIVO r D,spv =iv 71 inches a _ (Elevation of the Flood Control Outlet) • B) Diameter of Orifice for 12-hour Drain Time D� _ w= Ines (Use a minimum orifice diameter of 318-Inches) :. Notes: _ t' 1 3970802 UD-BMP_v3.03- Pavers flAsm, PPS 4212016, 11:44 AM n nb1..sKF 1" s ..S rs t:: ,f 4• L:_ COMM W s �r Design Procedure Form: Grass Swale (GS) .;` Sheet 1 of z' Designer: BAB Company: JR Engineering- Date: April 21, 2016 Project: Lemay Avenue Craft Brewery & Self -Storage Location: BioSwale #1 1. Design Discharge for 2-Year Return Period Q2= 0.34 cis 2. Hydraulic Residence Time A) : Length of Grass Swale Ls = 210.0 ft B) Calculated Residence Time (based on design velocity below) THa= i ! minutes 3. Longitudinal Slope (vertical distance per unit horizontal) A) Available Slope (based on site constraints) S.r = 0.010 ft 1 ft B) Design Slope So = 0.008 ft 1 ft 4. Swale Geometry - A) Channel Side Slopes (Z = 4 min., horiz. distance per unit vertical) Z = 4.00 ft 1 tf B) Bottom Width of Swale (enter 0 for triangular section) Wa=ODD ft lit, oose ChOne5. VegetationGrass From Seed 0 Grass From Sod A) Type of Planting (seed vs. sod, affects vegetal retardance factor) Design Velocity (0.7 ft / s maximum for desirable 5-minute residence time) V2 —I 0 56 ?';'ft / s a6. 7. Design Flow Depth (1 fool maximum) D2—_.039�"ft A) Flow Area A2 `' 0 fi ^ ; sq it x='. B) Top Width of Swale Wr r 3.1 _' lift a C) Froude Number (0.50 maximum) F = U 22`'t D) Hydraulic Radius RH ' I- E) Velocity -Hydraulic Radius Product for Vegetal Retardance VR= A F) Manning's n (based on SCS vegetal retardance curve E for seeded grass) n = -0'078'�`:a F ,r� t. G) Cumulative Height of Grade Control Structures Required Ho 0 40-' . �ft Choose One AN UNDERDRAIN IS r� 8_Underdrain QYES REQUIRED IF THE x" (Is an underdrein necessary?) DESIGN SLOPE <2.0% -'�- s; 9. Sal Preparation ` (Describe soil amendment) elm. One 10. Irrigation I 0 Temporary Permanent L r Notes: 0 r a re= MA 1 3970802 UD-BMP_v3.03- Bio-Swale #1.x1sm, GS 4/21/2016, 11:46 AM .ee"+-..,. -5 �^R°k^ �5e �,Yf•—t �. ..i ffn "e'a._=` __" �®" "Ema.v, �` �'.i'., ..5: _ . s' _ .. sr,�"'.8*. _ Design Procedure Form: Grass Swale (GS) �' r Sheet 1 of 1 Designer: BAB Company: JR Engineering kr"w April 21, 2016 Date: -'�- Project: Lemay Avenue Craft Brewery & Self -Storage Location: BioSwale92 1. Design Discharge for 2-Year Return Period Q2= 1.70 cfs 2. Hydraulic Residence Time A) _ Length of Grass Swale Ls = 105.0 It k> B) Calculated Residence Time (based on design velocity below) THR= r 2 4`'� minutes U 3. Longitudinal Slope (vertical distance per unit horizontal) r A) Available Slope (based on site oonstraints) S„a = 0.004 ft / ft B) Design Slope So = 0.003 ft / ft 4. Swale Geometry A) Channel Side Slopes (Z = 4 min., horiz. distance per unit vertical) Z = 4.00 ft / ft B) Bottom Width of Swale (enter 0 for triangular section) We = 0.00 it Ik �� Choose One �. 5. Vegetation' z; Grass From Seed Graz From Sod - c,> A) Type of Planting (seed vs_ sod, affects vegetal retardance factor) 6. Design Velocity (0.35 it / s maximum for desirable 5-minute residence time) V2 -I �0.74�-v7it / s m un� 7. Design Flow Depth (1 foot maximum) D2 =D it A) A) Flow Area A2 2 3 sq it B) Top Width of Swale F _.z Wr 6.1 it C) Froude Number (0.50 maximum) F = i 021 - ? D) Hydraulic Radius R. E) Velocity -Hydraulic Radius Product for Vegetal Retardance -., VR = N y F) Manning's n (based on SCS vegetal retardance curve E for seeded grass) n= G) Cumulative Height of Grade Control Structures Required Ho 0.10 ,"� it s Choose One AN UNDERDRAIN IS 8. Underdrein REQUIRED IF THE YES NO DESIGN SLOPE < 2.0% RE (Is an underdrain necessary?) 9. Soil Preparation (Describe soil amendment) 10. Irrigation Temporary Q Permanent `. �F yNotes: e. ' 3970802 UD-BMP v3.03- Bio-Swale #2.xlsm, GS 4/21/2016, 11:46 AM Design Procedure Form: Rain Garden (RG) 1 Designer: BAB Sheet 1 of 2 Company: JR Engineering Date: May 20, 2016 Project: Affinity Fort Collins Location: LID Basin 01 1. Basin Storage Volume A) Effective imperviousness of Tributary Area, I, i, = 5.0 % (100% it a8 paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = 1.1100) i =r ' 0.050 C) Water Quality Capture Volume(WQCV)fora 12-hour Drain Time WQCV= watershed inches (WQCV= 0.8' (0.91• P- 1.19 - P+0.78- i) D) Contributing Watershed Area (including rain garden area) Area = 4,097 sq it E) Water Quality Capture Volume (WQCV) Design Volume Vw., =i�` -�' w fl Vol = (WQCV 112)' Area F) For Watersheds Outside of the Denver Region, Depth of it, = 1.40 in Average Runoff Producing Stomn G) For Watersheds Outside of the Denver Region, Vwowornrn = 32.1— 7 cu it Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vwocvwea = cu it (Only it a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch mammum) Dwv = 12 in B) Rain Garden Side Slopes (Z = 4 min., hor¢. dirt per unit vertical) Z = 4.00 ft 1 ft (Use'0' drain garden has vertical walls) C) Mimimum Flat Surface Area Ar =i7 2/ �. sq 1t D) Actual Fiat Surface Area A� = 333 sq it E) Area at Design Depth (Top Surface Area) AT, = 1513 sq it F) Rain Garden Total Volume VT=77923 ,ALL: cu ft (Vr= ((Arm ` A, )12) * Depth) Choose One 3. Growing Media Q 18' Rain Garden Growing Media Q Other (Bplan): 4. Underdrein System Choose Orhe @) YES A) Are underdrains provided? Q NO B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y= 2.2 it Volume to the Center of the Orifice - ii) Volume to Drain in 12 Hours Volu=.' 32 : w lit iii) Orifice Diameter, 318' Minimum Do =4 - 0.13 in MINIMUM DIAMETER 318" ,.! a iPY' ..•� Fi �.. -?...". i ., �: 3Fs '3Yr' i..ry i ffi-.�. 6..3�... ... __c.( 1 3970802 UD-BMP_v3.03- Basin #1.Idsm, RG 5/20/2016, 12:03 PM Design Procedure Form: Rain Garden (RG) Sheet 2 of 2 Designer: BAB Company: JR Engineering - Date: May 20, 2016 Project: Affinity Fort Collins Location: LID Basin 91 Ch� One 5. impermeable Geomembrane Liner and Geotextile Separator Fabric O YES A) is an impermeable liner provided due to proximity of structures or groundwater contamination? ................._........_....... Oxxm One 6. Inlet / Outlet Control Sheet Flow- No Energy Dissipation Required A) Inlet Control Concerbated Row- Energy Dissipa0ion Provided loo. 7. Vegetation O Seed (Plan for frequent weed control plantings 0 Sand Grown or Other Nigh Infiltration Sod Choose One 8. Inigation YES 100 A) Will the rain garden be irrigated? l'�_____ Notes: 1 3970802 UD-BMP_v3.03- Basin #1.xtsm, RG 5/2012016, 12:03 PM Design Procedure Form: Rain Garden (RG) Designer: BAB Company: JR Engineering Date: April 21, 2016 Project: Affinity Fort Collins Location: LID Basin #2 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, 1, 1, = 95.6 % (100% 8 all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = I./100) i C) Water Quality Capture Volume (WQCV) for a 124=r Drain Time WQCV=1 .�.0.38. '�'t watershed inches (W OCV= 0.8 • (0.91' P- 1.19 - P+ 0.78 - i) D) Contributing Watershed Area (including rain garden area) Area = 2,925 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VW,,, = .- -`� i ou It Vol = (WQCV / 12)' Area F) For Watersheds Outside of the Denver Region, Depth of da = 1.40 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, Vw� o,m =: . W.7 cu It Water Quality Capture Volume (WQCV) Design Volume H) User input of Water Quality Capture Volume(WQCV) Design Volume VWQTUSEa= tuft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch madmum) Dw� = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dirt per unit vertical) Z = 4.00 ft/ ft (Use'0" if min garden has vertical walls) C) Mimimum Flat Surface Area Anx,'+:,. 192" ' sq It D) Actual Flat Surface Area A, = 275 sq ft E) Area at Design Depth (Top Surface Area) AT,o = 322 sq ft F) Rain Garden Total Volume VT E- 299 ,° ? ou ft (VT= ((Arm+ A, ) / 2)' Depth) Oboe One 3. Growing Media 18" Rain Garden Growing Media LOO Otlrer(&�afn)` 4. Underdrain System Choose One YES A) Are urderdrains provided? O NO B) Underdrain system orifice diameter for 12 hour drain time --- _--..-.... i) Distance From Lowest Elevation of the Storage y= 2.2 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Volri= '28a `.`;? cu ft m) Orifice Diameter, 318" Minimum Do =' 9.39 + in 3970802 UD-BMP_v3- Basin #2.xlsm, RG 412112016, 11:51 AM s.M77.5. 77�7 .aMw'7..v*8 .-Design Procedure Form: RainGarden (RG) Sheet 2 of 2 Designer: BAB Company: JR Engineering Date: April 21, 2016 Project: Affinity Fort Collins Location: LID Basin 92 Choose One 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric 0 YES A) Is an impermeable liner provided due to proximity 0 NO of structures or groundwater contamination? . Choose One 6. Inlet I Outlet Control 0 Sheet Flow- No Energy Dissipation Required A) Inlet Control Concentrated Row- Energy Dissipation Provided 7. Vegetation 0 Seed (Plan for frequent weed comro0 OQ plant6gs 0 Sand Grown or Oder High Infiltration Sod J Choose One 8. Irrigation YES NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? 0 NO — Notes: 1 3970802 UD-BMP_v3- Basin #2.xlsm, RG 4/2112016, 11:51 AM Design Procedure Form: Rain Garden (RGi ... Sheet 1 of 2 Designer: BAB Company: JR Engineering ' Date: April 21, 2016 Project: Affinity Fort Collins Location:. LID Basin Y3 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, I, I, = 94.7 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = I J100) C) Water Quality Capture Volume (WQCV) for a 12-tour Drain Time WQCV ° S 0 38 �:` watershed inches (WQCV= 0.8. (0.91• i'- 1.19' e+ 0.78' i) D) Contributing Watershed Area (including rain garden area) Area = 64,572 sq It E) Water Quality Capture Volume (WQCV) Design Volume Vwocr"' ss . �. n.... .. ee tuft Vol = (WQCV / 12)' Area F) For Watersheds Outside of the Denver Region, Depth of de = 1.40 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VwOCV omea ? e8 227 1'x' cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VwQ� usea = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-ixh matdmum) Dwacv = 12 in B) Rain Garden Side Slopes (Z = 4 min., honz. disl per unit vertical) Z = 4.00 ft / ft (Use'9" drain garden has vertical walls) C) Mimimum Flat Surface Area An '; 415L`. sq ft D) Actual Flat Surface Area A� = 4160 sq ft E) Area at Design Depth (Top Surface Area) Any = 8356 sq It F) Rain Garden Total Volume VT=`` B 258'„Y cu ft , (VT= ((Aran + Ate) / 2) " Depth) Chow One 3. Growing Media QQ IB" Rain Garden Growing Medal Q Other (Ecpleln): . 4. Underdrain System Ooose One YES A) Are underdrains provided? . Q NO B) Underdrain system orifice diameter for 12 hour drain time ........... i) Distance From Lowest Elevation of the Storage y= 2.2 ft Volume to the Center of the Onfice fi) Volume to Drain in 12 Hours Vold =`r" 6 227 `A"r, cu ft ni) Onfice Diameter, 318" Minimum Do : �'' 1 79''�'v in %aasm w*`a. qma M�«.a,p`�, 1 3970802 UD-BMP_v3- Basin #3.xlsm, RG 4/21/2016, 12:02 PM —Design Procedure Form: Rain,Garden (RG) E Sheet 2 of 2 Designer: BAB Company: JR Engineering Date: April 21, 2016 Project: Affinity Fort Collins Location: LID Basin #3 Choose One 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric Q YES A) Is an impermeable liner provided due to proximity Q NO of structures or groundwater contamination?_-- -_- Choose One 6. inlet I Outlet Control Q Sheet Flow- No Energy assipa6wr Required A) Intel Control Q Concentrated Row- Energy DLssipatlon Prrnnded 7. Vegetation Seed (Plan fa frequent weed control)control)Plantings QQ �Q Q Sand Grown or Other High Infiltration Sod ......... _..... Choose One 8. Irrigation YES NO SPRINKLER HEADS ON FLAT SURFACE A) Will the min garden be irrigated? Q NO Notes: 1 3970802 UD-BMP_v3- Basin #3.xlsm, RG 412112016, 12:02 PM Design Procedure Form: Rain Garden (RG)' Sheet 1 of 2 Designer: BAB Company: JR Engineering Date: May 20, 2016 Project: Affinity Fort Collins Location: LID Basin 04 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, I, I, = 77.4 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = 1,/100) i =, 0.774- C) Water Quality Capture Volume(WQCV)fora 12-hour Drain Time WQCV =i. 0:25"; watershed inches (WQCV= 0.8' (0.91- i3- 1.19 - P+0.78- i) D) Contributing Watershed Area (including rain garden area) Area = 11,452 sq If E) Water Quality Capture Volume (WQCV) Design Volume Vw. _ - `:h-; cu it Vol = (WQCV / 12)' Area F) For Watersheds Outside of the Denver Region, Depth of da = 1.40 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, Vwo v 0 = r r _ 777.5 . ;� cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume Vwocv uses = cu it (Only 8 a different WQCV Design Volume is desired) 2. Basin Geometry A) WOCV Depth (12-inch ma)dmum) D,,,, = 12 in B) Rain Garden Side Slopes (Z = 4 min., honz. dist per unit vertical) Z = 4.00 ft / ft (Use "0' if rain garden has vertical walls) C) Mmimum Flat Surface Area AM„ x, tar 516 �e's sq ft D) Actual Flat Surface Area A, = 223 sq It ACTUAL FLAT AREA MINIMUM FLAT AREA E) Area at Design Depth (Top Surface Area) AT,o = 562 sq ft . F) Rain Garden Total Volume VT '� 3'- 393 . ".`. cu It (VT=((ATE+Ax )/2)'Depth) Qoose one 3. Growing Media QQ 18' Rain Garden Growing Media Q Dow (Explain): 4. Underdrain System Choose One ' YES A) Are underdrainns provided? O NO B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y= 2.2 It Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours V0112=i.:. 777'7. " cu ft iii) Orifice Diameter, 318"Minunum 0.83'''in zrff,�m _WD,wo=` 3970802 UD-BMP_v3.03- Basin 94.xtsm, RG 5/20/2016, 12:03 PM - - Design Procedure Form: Rain Garden (RG) Sheet 2 of 2 Designer: BAB Company: JR Engineering Date: May 20, 2016 Project: Affinity Fort Collins Location: LID Basin 94 Choose One 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric —� O� A) Is an impermeable later provided due to proximity O tff) of structures or groundwater contamination? ------- .......................... Choose One 6. Inlet 1 Outlet Control O Sheet Row- No Energy Dissipation Required A) Inlet Control entraow- Energy Dissipation Provided Cortctad R 7. Vegetation I �O O Seed (Plan for frequent weed w..b 1) 0 Plantings O Sand Grown a Other High [nflltratlon Sad ct w One S. Irrigation 0 YES NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? O ND Notes: 1 3970802 UD-BMP_v3.03- Basin #4.xlsm, RG 5120/2016, 12:03 PM 0 Y 8 �39 m / I I I / I / I I I I LEMAY AVENUE CRAFT BREWERY & SELF -STORAGE FACILITY EXISTING CONDITIONS DRAINAGE MAP X1 __ �—d—� s1 12— .sa �_____ s�Wl� —ewv �\�___�_ —�_ �� _� avuR __ _ _ _ - ____ z ____ _-�i_plu____�y____��_ ��____ _____—_____ ___ �.___x,.,ll�_� Y_T= r__� w___ _r 07 If \ \ I I \ 1 / Jr it •\ dddb � \ I / J \ A — __---__ .'� 1 1� _ - _WAIF ,�-------_-----------------r1 1lTfi-T�' 11-IT T1T1-�1�� Existing Runoff Summary Table BaloO M r el3lePe 4.. G l Iml Q10 4N1 IXI OSI QO6 143 11] AB EV I 6A 1 LL% 1 0.13 1 I11 1 Ot 1 E18 LEOEWD — — 100— — EMS NC MAJOR CONTOUR EWnNG INi RMMAIE CMR EMSPNG STORM YNER/RCP A BASIN 10 C A BASIN X!PGNATICN B B: AREA (AC) 0 C: MINOR STpm CGFSROENT 0: M&K)R STROM CC MaENT Q ORAINAC£ MSCHMC£ OMGN PONT b ""MG ROW OIRECRON •�������� CO$TNC BARN ORMNAM AREA 1 , I I Know. whara below. \1 C811 before you dig. Y c \ LEMAY AVENUE CRAFT BREWERY & SELF STORAGE FACILITY 3970802 08/01/16 SHEET 1 OF 2 J•R ENGINEERING 30 15 0 30 60 AW anC y ORIGINAE SCAI£: 1" — 30' CBEmrM 3A-74o-9i13. CocrA *l �M FatC 970-49F999J• wxNmOmaYgum LEMAY AVENUE CRAFT BREWERY & SELF -STORAGE FACILITY PROPOSED CONDITIONS DRAINAGE MAP sir`ioloOJaIlT�7T/Ii161�TI/1IIIQo11�s_r w - — 1�« 1�»i%1 ✓ li;l �llr rcrr�lor�oloroz� olrrr�lolorl�� iTr �a�a - 1 cuev evculm 'PN pry___- OW - f "I'm A¢gwml Qw Q nVe D, K41 D,. Ohl A aw a] RAI 73 Ib fi< 0 affi an OD1 60 01 An c AN a1O An 50 a9 16 o a16 am nR 10 a m E OA am "I 5D a9 16 F 4116 a0 (ON SO a2 ID G a9 am Am SO ID 6T x 0m aw p81 5] IA 17 I an 161 An 11.4 aT 5 019 an 0% 50 al 's 0 On as am SD 0.T 17 L an an a® 9J al ]2 IN am an an U aT SI Y aY 021 1 Tb 1 10 1 7A a as U52 a6 1 10 1 007 1 05 Detention Pond Smnnnary Table wvge vtlme Wm"~ ReN.ea 7pb a uwmvw TW gPotl vavire MIS Nkne ws Mtlewe Me ft NpiM(rn#7 (Wr�N n (ChoNo I.S R16' Lw•• 1Y11.!a 15 omEw Za9 NYm wwvpw uueu ana• we agen an pcne "IsyrJumuvnO4,rt pmrMW 46genlon rynJ es xcllva iEervMrlxe Mlliepm'uuapraa LEGEND —'6/Pr- — EXISTING MAJOR CONTOUR - - - - - - - - - EXISTING INTERMEDIATE CONTOUR • �Gs— PROPOSED MAJOR CONTOUR • LEMAY AVENUE CRAFT BREWERY PROPOSED INTERMEDIATE CONTocR & SELF STORAGE FACILITY PROPOSED STORM SEWER/RCP 3970802 08/01/16 PROPSED SWµE KnowwhaCsbelOw. SHEET 2 OF 2 BASIN ID CBII beleEa QIe. BASIN DESIGNATION you R G B: 0: AREA (AC) D c: MINOR s1oRu cOEmclExr 0: MAJOR STORM cOES91CIENT J•R ENGINEERING Q DRAINAGE DISCHARGE DESM POINT Awnmen Cvmwvy 30 15 0 30 sO y PROPOSED Elow OIRECTION ORIGINAL SCALE: 1 - 306 Caia7W 303-740. • GbaaC Spnp 7M 59Yr3i BASIN MANAGE AREA fDt CDiu S�VYF99BA' wxxpeglm7yarn