Loading...
HomeMy WebLinkAboutDrainage Reports - 04/16/2016'City'of`Ft. Coll insA ro Plans Approved By_ Date1�:1.� UNITED CIVIL Design Group ac March 9, 2016 Mr. Wesiamarque Stormwater Department City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80521 Re.: Drainage Summary Letter — Project #U15014 Aronson Family Dental at Promontory Tract 5 Dear Wes, We have prepared this Drainage Summary Letter to address the development of Aronson Family Dental on Tract 5 in Promontory Subdivision. In general, this summary serves to document the stormwater impacts associated with the proposed project. Site Location and Project Description The Aronson Family development site (referred herein as "the site") is located Promontory Subdivision, in a portion of the East half of the west half of Section 36, Township 7 North, Range 69 West of the Sixth P.M., City of Fort Collins, Larimer County, Colorado. The site development consists of approximately 9,960 square -feet (sf) and is bounded by East Boardwalk to the northeast and existing commercial properties to the west and south. See the attached Grading, Drainage and Erosion Control Plan for additional information. The planned development for the site will consist of the following: • The construction of a dental office building with a proposed footprint of approximately 3,330 sf. • The construction of utilities services to support the proposed building including sanitary, water and storm drainage. • The construction of sidewalk adjacent to the south, west and east sides of the building. Hydrology The proposed site was originally included in the Promontory Utility Plans and Drainage Report that was completed by JR Engineering in September 2000. The proposed development of an office building on this site was very similar to what is being proposed with these plans. It is estimated that the original impervious area used to calculate the drainage requirements for this site was 6,100 sf. This project is proposing a smaller building footprint, therefore the planned imperviousness for this site is smaller at 5,450 sf. The runoff from the site will be conveyed via overland flow and storm drains to a water quality and detention pond that was constructed at the southwest corner of the Promontory Subdivision. Floodplain The site is not located within a FEMA or City -regulatory floodway or floodplain. 1501 ACADEMY CT. STE 203 1 FORT COLLINS, CO 80524 1 970-530-4044 I www.unitedcivil.com ---- - ---- -- ------`�j,, UNITED CIVIL Design Group u, Low Impact Development (LID) Requirements In February of 2013, City Council adopted the LID policy and criteria. We understand that this site is not required to provide LID treatment because it is a Minor Amendment of a previously approved plan and is not increasing the density of what was previously approved. Water Quality will be provided via the onsite detention and water quality pond as previously planned for this development. Erosion Control Erosion control, both temporary and permanent, is a vital part of any development project. For this project, the site disturbance will be less than 10,000 sf;'therefore, comprehensive erosion control measures have been included within the Grading and Erosion Control Plan for the project. Refer to the Utility Plans, under separate cover, for additional information. Conclusions In conclusion, the drainage system proposed provides adequate conveyance of the developed stormwater runoff from the proposed development to existing drainage systems and detention pond. It should also be noted that with this summary and the corresponding design, every attempt has been made to minimize any negative impacts on the downstream receiving waters. We understand that review by the City of Fort Collins is to assure general compliance with standardized criteria contained in the Fort Collins Stormwater Criteria Manual (FCSCM). This letter was prepared in compliance with technical criteria set forth in both the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual and the FCSCM. If you should have any questions or comments as you review this drainage summary, please feel free to contact us at your convenience. I appreciate your time and consideration in reviewing this submittal. Please contact me at 970- 530-4044 or Sam.EliasonPunitedcivil.com if you have any questions. Sincerely, Samuel M. Eliason, P.E. United Civil Design Group, LLC Attachment: Grading, Drainage, and Erosion Control Plan 1501 ACADEMY CT. STE 203 1 FORT COLLINS, CO 80524 1 970-530-4044 1 www.unitedcivil.com EXISTING GAS LINE M FLOOR 0.5' � t&' 1 FlNISHEDGRADE \ \\ WIDTH ALONG BUILDING VARIES (4'-4.75) 1' 190 TYPICAL SECTION A -A "a of �\ 1 ------------- E y S, GRAD BRFJJ( r �- . \ ♦v4' �J \ p to PFO \ \♦ m ♦ ALAI Fa SIDEWALIK WT L ESTING TOPOPOFF WALL Hmro / i /� j / % j �/ �✓OJJ ---- Jf F. ♦ cf A]as axwro ' : i / um io \ bsv .♦ \\ Axbw 41m Fu S� ♦ �bD 'B .1sF \ �Fo GRADE BREAK + lb Fa by 9 YFO A � •F— Al Y I� _. gi° �SadH wetN<" i5 °4. " ArIS� .Lt. G-°�43eras R$i''iu�. t&P 1•`$ �d �51 Y'itO Tc [/E U '♦' \ ���o .+B Cf �� rAt —y1F �t l R �a �.ob _ 1 /` TOP TW (T RIES BE 5.5• BOTTOM 1g a°; - ]•� �s STEP VARIES BETWV. EEN P-S. 1M11ft ,i si bm / IpI ',g SF �b q b� b bb b% bgH.p fib s1RAW V OF SILT N.E0 OF 61LT FENCE ji \ LEGEND I \/w\ ES45liN]pPBa GVnEa w— FLSNp1WlFA /II��I��F� \ . EAIanNCCCNCFEn: —yy— plgnNa eV]TAav \ \ _ _ _ _ _ _ _ E%NnNG GR,V ExIS11M $TORN SEMR EAIanNI PAVELExrBTgIRNG —,As ... UNITED CIVIL —r— ExIsnNG FE1`6E EMISrHo"Knoo Design Group ----- EZIsnNlli B.nLnrouNE —4E— EDsnNc ovERIEADELEcINc rxLsnw PRpEgn UNE r— ExunM TELEFI(KE \ --- EDsnND RowuNE —crv— EoSTM rulery Owl Engineering& Consulting -___-- EDsnM NTEpsiucE EASEMExr � EwsnM FlIE ITIMAf1i SaI �,I�II���� uwrsaFlxaMRBANKE p EZlsnwucHr PaLE vaaFosEnaroRNSE.It O EBanw BTORAIaEVFA 1501 Academy Cl. �— PnaPDSEovuTEaaEmDE Wf° Ste. 203 Q ENsnM aANTAAr SEVER Fan Collins, CO 80524 �— PRaloseoo.ASIE cs NAN,-Om (970)530-4044 �— PRorosEoawTury aEgvTCE wwW.unitedcIvil.com moPDSEDcumacLnTFR .____.vci._____ Er]snw CONTpU1 aPsp —q.. — IWOPTSEOFLpMINE —.sv>— PROPOseoeoNraq ! 3a FRn \6 MIXOTELEVAnON PRCPQSFDCQVC M FOiINaIEDOMCE ;Fs9� • MSHENa1Ea PAYEIAN OR SICEw4% 6Y cwN F M-HoH NGN POINT .T0Pwc. T "S`F 'AA % / PaaPwin eulnNo gg ay row-TOPMwAu � ! � e� �av -1-NO GRADE } {p PRavosmaLDPE /9�NGun/dv-�� —tr— SF-TFENCE I II b ( Z g o fl In GRADING NOTES J 0 Q w Q I. "MrNOUWFRGRCUAAND ohAHEADPUBLIC MOfl4VATEU11unESASSH0%M4ARE INpuTEOA WRNNGro n MSTINFdUNnONAVARA4 Mi EWIMM.n EMIMERC WTO1W4x1EEMEACCIIRACYCFSMH 44F0RW7`0A1.E 3VIRT'µ4Nb F,NOSERNCEBNMYN TBE6TP WNN MABIMGMDMn SE L EMW.N6S. TIE CMNMCTaa&WLBE RESWB$E ro W1Au Vllutt CCAVANEs IRIBIIC ANDPRrvA1E) PRIOR ro ANr CCfbTRIICIIM rovEREY EYACT uNNtt LOGTDIb. Z O ]. SMTEIEVAnIX SMM�AREroFLOMINEMEWEOFMA UNIIESSOTER MNOTED. .h ( W v , ]. AIL p$TLOBEOMFAe MTPAVFDa1NLLBE PEVEGETAIFDPERTIE UJO6LVE PVJS. Q 1R. E RMO ARCHIECIUMLFWSFMINTEWMLBULONGGPDW,WME TMEFWSIEO EIEYATM M6]bbCORRE6FONDGMELEVATIONIWO AtI 1 MTIEARcHMMRALMN6. O J O EROSION CONTROL NOTES iY I. REFFA 10 STMMgp EMEMx NDbEpNEMCCMRCl MIE55HTNIMGFIEPAL MTEs 51EETC8.81. LU ]. ME NIEwLL�UNOBLAPEOTO FlNNLBTAPoUZATM 6EE FlNLL I/NWGI£PLVIFM CETAl15. LL W j ]. SgLALE+CAENr8 E1WI.BE IMCCRFOPATEDINALL LAN]SGIE MFAe roALFPMOFe ATA MTEOF]p9CYANA F£fl ipD&11U1tE FEETaFARFA.OR-foFLaoSE TCPspLxRYI]m anOMENTE OVFAfaFLN5pE0 sLecRADE spIs. REFwropTYMFamcaulls ccaE ascnMalztanaaDH una. L H I. SY ANY pgTBTOOt%IEDON nE SITE SMALLBECMixNED NEANEMSLTFENCE STRAW WATIIES. ott.. GtB O Q ILL AgO1Np TIE 9AbE OF siOp(RLE. RCCXaoC4aaH MUSEDKIENBTOfARLESAREMAPAVED]piFA fA z V�J/ O s, TEW'CWMYSEEpNOb,WLBE IREIZEa Ix TIE EVExr TINTAagACED AAFAnEAFOSEOLCWFR THWOMrS.TIE sITESINLLBE SFECEpvnT11a0%sApOM BRgAE ATA NNMIMAPPUGnM L < � I� R11EMbPLSM1BSACIE. 0 8. AWHg T MMcp MPADWLLBEMOUP DINATVASTpE nMFMVEHCIESA EOUPMI TRACWNJ BEINEEN TE BIEILHGAMPNWMLOT pPIM LO$TgIICIMNI Ci MEBpLOIFD. O LL 7, ASpR.ERCIAL FEgn,pEq µIM TE FpLOMNL SPEC861MLL0E U8m. K ••� ``�F^� Q V W Z Q K V 0 W Q a INGtE01ENi x AvuueLE er xEICHT APPUCATM flAIE IN LBS/ACRE NIROGEN 1] 65 POiA54U4 IS 80 POTASLU4 M 1]0 Am O Z a 8 to, 29 SCALE: I-•lv City of Fort Collins, Colorado UTIL11'Y PLAN APPROVAL APPROVED: tit? Bopom Date CHECKED BY: Water t lsslenler Utility Date CHECKED BY: slarmnter UtWry Date CHECKED BY: Perb & Recreation C3.00 _ 5 DF 7 sIFFTe SCALE LEAlIG4: r-wA Mamxc4: r-tv