Loading...
HomeMy WebLinkAboutDrainage Reports - 03/28/2016City of F Collins Approv Plans Approved by Date: 3 ze 201(o FINAL DRAINAGE AND EROSION CONTROL REPORT FOR RAW URTH DESIGNS (LOT 20, BLOCK 3, EVERGREEN REPLAT 1) FINAL DRAINAGE AND EROSION CONTROL REPORT RAW URTH DESIGNS (LOT 20, BLOCK 3, EVERGREEN REPLAT 1) Prepared for: Raw Urth Designs P.O. Box 369 Bellvue, CO 80537 Prepared by: North Star Design 700 Automation Drive, Unit I j Windsor, Colorado 80550 (970)686-6939 February 22, 2016 Job Nwnber 264-10 North Star Aftw design 700 Automation Drive, Unit I Windsor, CO 80550 Phone:970-686-6939 Fax:970-686-1188 February 22, 2016 Dan Mogen City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522-0580 RE' Final Drainage and Erosion Control Report for Raw Urth.Designs Dear Dan, I am pleased to submit for your review and approval, this Final Drainage and Erosion Control .Report for Raw Urth Designs (Lot 20, Block 3, Evergreen Replat 1). I certify that this report for the drainage design was prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, ... 0,.... :r o? �a 31306 Patricia Kroetch, P.E. ii TABLE OF CONTENTS TABLE OF CONTENTS ..................................... 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location...................................................................................................................1 1.2 Description of Property ............................................................................................I 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description..........................................................................................1 2.2 Sub -Basin Description.............................................................................................I 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations ..... ............. :........................................................................................... 2 3.2 Development Criteria Reference and Constraints...................................................2 3.3 Hydrologic Criteria..................................................................................................2 3.4 Hydraulic Criteria................................................................:...................................3 4. DRAINAGE FACILITY DESIGN 4.1 General Concept......................................................................................................3 4.2 Specific Flow Routing.............................................................................................3 4.3 Drainage Summary ..................................................................................................5 5. STORMWATER MANAGEMENT CONTROLS 5.1 Written Analysis.....................................................................................................6 5.2 SWMP Contact Information...................................................................................7 5.3 Identification and location of all potential pollution sources..................................8 5.4 Best Management Practices (BMP's) for Stormwater Pollution Prevention ........... 8 5.5 BMP Implementation.............................................................................................10 6. CONCLUSIONS 6.1 Compliance with Standards..................................................................................13 6.2 Drainage Concept..................................................................................................13 7. REFERENCES..................................................................................................................14 APPENDICES A Vicinity Map B Hydrologic Computations C Detention Pond Sizing Calculations D BMP Schedule and Cost Estimate E Figures and Tables nl 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location This site is located on the north side of Conifer Street, west of Red Cedar Circle and east of the existing alley in the Northwest Quarter of Section 1, Township 7 North, Range 69 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. See the Vicinity Map in Appendix A of this report. This project is bounded on the north by an existing building, on the east by existing Red Cedar Circle, on the west by a paved alley, and on the south by existing Conifer Street. 1.2 Description of Property The entire project consists of approximately 0.9 acres. The site is currently undeveloped, with areas of existing volunteer weeds and grasses. The existing site is flat with existing slope to the southeast at approximately 0.5% to 1%. The site currently drains into the adjacent streets and alley. Proposed development on -site will include one building, a private drive along the north side of the building, a parking lot and sidewalks. Existing drainage patterns will be altered to direct flow to a proposed detention pond in the southeast comer of the site which will release into the existing storm system in this location. 2. DRAINAGE BASINS AND SUB -BASINS 2.1 Major Basin Description The proposed development lies within the Dry Creek Drainage Basin. Stormwater detention is required for this basin but water quality extended detention is not required because it is provided in the North East College Corridor Outfall (NECCO) detention pond. The City requirement for stormwater detention in the Dry Creek basin is a single - stage detention with a 100-year release rate of 0.2 cfs per acre. 1 2.2 Sub -basin Description Runoff from this site currently flows to the existing streets and alley. From there, the runoff enters an existing inlet near the intersection of Red Cedar and Conifer. With the proposed drainage concept for this site, the runoff from the site will flow to a proposed detention pond and be released at the rate of 0.2 cfs per acre into the storm system near the intersection of Red Cedar and Conifer. 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations This report was prepared to meet or exceed the "City of Fort Collins Storm Drainage Design Criteria Manual' specifications except where variances are requested as noted in Section 4.2 of this report. Where applicable, the criteria established in the "Urban Storm Drainage Criteria Manual' (UDFCD), 2001, developed by the Denver Regional Council of Governments, has been used. 3.2 Development Criteria Reference and Constraints The runoff from this site has been routed to conform to the requirements of the Dry Creek Drainage Basin and the City of Fort Collins Stormwater Department. Both stormwater runoff detention and water quality extended detention are required for this site with on -site detention and offsite water quality. The release rate from the site will be 0.2 cfs per acre. 3.3 Hydrologic Criteria Runoff computations were prepared for the 10-year minor and 100-year major storm frequencies utilizing the rational method. All hydrologic calculations associated with the basins are included in Appendix B of this report. Standard Form 8 (SF-8) provides time of concentration calculations for all sub -basins. Detention volume was calculated using the predetermined release rate of 0.2 cfs per acre. The FAA method for detention pond sizing was utilized to determine the required volume. Refer to the detention calculations included in Appendix C of this report., 2 3.4 Hydraulic Criteria Hydraulic elements have been designed per City of Fort Collins standards to adequately convey the 100-year storm; runoff from this site to the proposed detention pond. A proposed 12" storm pipe will convey the detained runoff from the site to the existing manhole at the southeast comer of the site. 4. DRAINAGE FACILITY DESIGN 4.1 General Concept The runoff from this site will flow into the drive aisle and parking lot which will be constructed using conventional materials (asphalt or concrete) and permeable interlocking pavers. The runoff from the site will either flow on the surface or enter a storm pipe via the permeable interlocking pavers or inlet. In a situation where the permeable interlocking pavements are clogged, the runoff will flow on the surface and enter the detention pond through a metal sidewalk culvert. On -site runoff will also be conveyed to the detention pond via flows in LID swales along the north property boundary to an area inlet and storm pipe. The detained runoff will discharge into the existing storm pipe located at the southeast corner of the site. 4.2 Specific Flow Routing With this design, the site has been broken into 3 basins which correspond with the LID feature that the basin flows to. The basin are described in the following paragraphs. Basin 1 is located in the northmost portion of the site and contains a majority of the private drive and LID feature #1 which is an LID swale with an underdrain. The runoff from the paved area will flow to the swale and will be collected in an area inlet. The storm pipe then conveys the flows to the south into the detention pond. Basin 2 is located in the eastmost portion of the site and contains a portion of the paved private drive and the parking lot which is surfaced with porous pavers.. The runoff from this basin flows to a low point in the private drive then south into the parking lot porous pavers. The flow, if it exceeds the capacity of the pavers, will flow into the detention pond via a metal sidewalk culvert. 0 Basin 3 is located in the southwest portion of the site and contains the building and the detention pond (landscape area). The roof of the storage building is sloped to drain to the south and the bottom of the detention area is sloped to drain east. This basin accepts runoff from Basins 1_ and 2. The detained runoff will enter the existing storm system via a new storm pipe with an orifice to restrict flows to 0.2cfs per acre. Basin OS is the site area that drains to the street undetained. A majority of the area that is draining to the street is a narrow landscape strip located between the detention pond wall and the sidewalk. The impervious area is a portion of the drive entry (approximately 300 square feet) that drains to Red Cedar. The amount of runoff is quantified as 0.0 cfs in the minor storm and 0.1 cfs in the 100 year storm event. Drainage design for this site has been designed to convey on -site runoff to the proposed detention pond and incorporate the required LID enhancement features. On -site runoff will be conveyed to the detention pond via surface flow in the drive aisles, in the LID swale and subsurface in the perforated pipes. The detention pond will release the detained runoff from the site at the rate of 0.2 cfs per acre. The developed 2-year runoff rate for this site is 1.3 cfs and the developed 100-year runoff rate is 6.2 cfs. 4.3 Drainage Summary This site has been designed to meet or exceed the "City of Fort Collins Stone Drainage Design Criteria Manual' specifications. The proposed drainage design for this site has been designed to convey on -site runoff to the detention pond while minimizing future maintenance. The site incorporates a LID (Low Impact Development) treatment areas including an LID swale without underdrain along the north property line, and permeable interlocking pavers in the parking lot. Refer to the end of Appendix D for a table indicating the size of the LID treatment area and the area of the site that drains to that LID treatment area. All drainage facilities proposed with this project, including the detention pond, LID features, porous pavers and outlet structure are private and will be owned and maintained by the property owner. 4 5. STORMWATER MANAGEMENT CONTROLS 5.1 Written Analysis The soils on this site are classified by the USGS Soil Survey as Nunn Clay Loam and are classified in the hydrologic group C. The soils are described as having a slow runoff rate and the hazard of water erosion is moderate and the.hazard of wind erosion is moderate. The site is surrounded by developed sites including streets and paved areas. The construction shall utilize silt fence around the perimeter to control sediment transport from rainfall and from wind. The silt fence that is located in the proposed pavement areas will be removed prior to placing new pavement. Rock socks will be utilized in the existing curb and the newly constructed swales to capture sediments that are not fully contained by the silt fence placement. The locations of the rock socks will be in the areas of concentrated flow such as in the existing curb, at the new swales and as needed. The site will also utilize a vehicle tracking control pad to minimize sediment from being tracked onto adjacent pavements. Sediment that is tracked will be removed and placed within the site or permanently disposed of offsite. A concrete washout will be used on site during the concrete placement. All hardened concrete will be disposed of offsite. These BMP's have not been located on the site map due to the fact that the site is very small and these BMP's will need to be placed by the contractor in locations that are most beneficial and will minimize disruption of adjacent traffic. Permanent erosion control consists of covering the soils with a building, concrete walks, concrete drives and sod. No soil will be left exposed to erosion after the construction is complete. Refer to the landscape plan for areas of and instructions for placement of sod and soil amendments required prior to placement of sod. 5 Refer to Appendix D for the timing of the construction phases and the sequential installation of all BMP phasing for this site. Refer to the Appendix D for the Erosion Control Surety calculations. 5.2 SWMP contact information Permit holder: Name: Address: Phone Number: Email Address: Appointed agent: Name: Address: Phone Number: Email Address: 6 5.3 Identification and location of all notential nolh,tion sn,rrces Potenha Pollutant Source Activr fi�[z, sPotential Pollutant Generated �v t 5`tr .B..'ER- A hcable to, ,�thispib�ect Disturbed Areas Sediment X Soil stockpiles Sediment X Travel to adjacent public streets Tracked sediment X Contaminated soils Sediment, chemicals Loading and unloading chemicals Chemicals Unloading of building materials Trash, debris X Outdoor storage of chemicals Chemicals On site equipment maintenance Oil, grease On site equipment fueling Diesel, gasoline X Dust generating activities Particulates, sediment X Use of fertilizer, pesticides, herbicides Fertilizer, pesticides Use of detergents, solvents, oils Detergents, solvents, oil X Waste dumpsters, waste piles Chemicals, trash, debris X Concrete washout Concrete, sediment, wash water X On site equipment washing Detergents, oil On site asphalt batch plant Asphaltic cement, sediment On site concrete batch plant Cement, sediment Portable toilets Domestic sewage X 5.4 Best Management Practices (BMP's) for Stormwater Pollution Prevention Structural Practices for Erosion and Sediment Control Structural practices for the site will consist mainly of silt fence and rock sock filters and are described in detail in the following paragraphs. These BMP's are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMP's are in place and/or removed at the appropriate time in the construction sequence. All temporary and permanent erosion and sediment control practices must be maintained and repaired as needed to assure continued performance of their intended function. Silt fence and rock sock filters shall be in place prior to commencement of construction activities. During clearing and grubbing necessary for silt fence installation, all cleared material shall be placed on the uphill side so that if erosion occurs from the cleared material, the sediment will be trapped and not transported downstream. Rock socks shall be implemented in the existing curb line as shown on the Drainage & Erosion Control Plan. 7 All BMP's shall be installed per the details shown on the construction plan set. Temporary & Permanent Structural BMP's: 7 S It 4 Sttvctural BM A w _ "• � � (ay.S � ag.�=��':;�T,,Approximate fan 1 location • x� on' A Itcable to thts'S" Silt Fence Site perimeter, refer to site map X Straw bale dams Rock Socks At sidewalk culverts, in swales, at new inlet, in existing gutters, refer to site map X Earthen diversion dams Vegetated swales Sediment trap/pond Pipe slope drains Geogrid Inlet/outlet protection In the detention Pond X Culverts Riprap Erosion control mats Inlet protection Vehicle Tracking Control Pad At site entrance, refer to site map X Concrete Washout To be located by Contractor, near site entry X Non -Structural Practices for Erosion and Sediment Control: Soils exposed during the earthwork phase and landscape prep phase shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control is installed. No large amount of soils (in excess of 15 yards) will be allowed to be stock piled on site. Overburden from the utility pipe trenching will be piled adjacent to trenches upstream of sediment controls and will be replaced in the trenches within 72 hours. Excess excavated materials from the demolition and grading phases of the project that cannot be reused on site will be exported as it is excavated. This includes any asphalt pavement from the existing site that is to be removed. A vehicle tracking pad will be installed at a location most beneficial to the site construction as determined by the contractor. Vehicles will not be permitted in the excavated area if soil is muddy. Gravel sub base will be placed and compacted in the areas indicated for pavement following excavation. In the current pre construction state the site enables tracking of silt onto the adjacent streets during wet conditions. During construction activities the street will be monitored for foreign debris tracked out of the site and mechanical sweeping and clean up will be performed as needed. 8 No area shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed. Temporary & Permanent non-structural BMW's: Structural BMP .s1 u Approximate location ''»E A ltcabl' to`tht$ `. a PP 1Non ,_ e< on site _ eci_ e fgp: Surface roughening Entire site X Soil stockpile height limit (less than 10') Perimeter vegetative buffer North boundary of site X Minimization of site disturbance Mulch Seed & mulch stockpiles after 30 days Stockpile toe protection (silt fence, wattles or ditch) Preservation & protection of existing vegetation & trees North boundary of site X Good site housekeeping (routine cleanup of trash & constr debris) Entire Site X Sweeping & scraping of hardscape areas On and off site pavements X Heavy equip staged on site, properly maintained & inspected daily (no Staging area X onsite maintenance) 5.5 BMP Implementation 1) Phased BMP Implementation BMP's are expected to change as the construction progresses and it is the responsibility of the contractor to ensure appropriate BMP's are in place and/or removed at the appropriate time in the construction sequence. A construction sequence schedule has been included on the Drainage & Erosion Control Plan and included in the construction plans for this site. All BMP's shall be inspected and repaired or replaced as required to satisfy the conditions of the Stormwater Discharge Permit. All BMP's must be maintained and repaired as needed to assure continued performance of their intended function. Refer to Appendix D for the BMP schedule and estimated costs. 9 Niaterrals handlin and S ill Prevention: Mafenals Handlmg &Spill Preventton BMPt*t°� tr# �� , x„ APProxunate location on situ A hcable to this _,* YYrM rr; < ` �,y Portable toilets, anchored & d3}W located away from drainages Contractor to determine x Fuel storage located in bulk tanks with secondary containment & spill kit Mobile fueling performed at least 200 feet away from drainages & Contractor to determine x fully attended Fertilizers, form oil, solvents, cleaners, detergent stored in 55 gal or smaller containers, kept in Contractor to determine x storage units Dumpsters containing used chemicals containers & liquid Contractor to determine x wastes kept covered Equipment cleaning (on site) uses no detergents & flows to onsite retention basin In case of a release of fuel or other chemicals, absorbent booms or earthen berms will be immediately constructed to contain the spill & Location of spill x prevent runoff to adjacent surface waters MSDS sheets for onsite chemicals will be kept at the construction trailer to facilitate spill response & Contractor to determine x cleanup 3) Dedicated Asphalt or Concrete Batch Plant: Not proposed with this development 4) Vehicle Tracking Pad: Vehicle tracking control pad shall be installed wherever construction vehicle access routes intersect paved public roads. Vehicle tracking control pads shall be installed to minimize the transport of sediment (mud) by runoff or vehicles tracking onto the paved surface. Any mud tracked to public roads shall be removed on a daily basis and after any significant storm that causes sediment to be transported. It is unlawful to track sediment/mud onto public streets and may be enforced by the City of Fort Collins, by the State of Colorado or by the EPA. 10 5) Waste Management and Disposal: Portable toilets will be anchored & periodically maintained by waste management company. Dumpsters on site will be covered & periodically emptied by waste management company. Concrete waste will be allowed to harden and then will be removed from site. No washing activities will occur on site. Location of the concrete washout is shown on the site map. The washout will be suitably deep to accommodate all anticipated concrete truck wash water. Waste concrete will be allowed to harden & be removed from site periodically as the washout reaches 50% of capacity. Truck wash water will not be allowed to reach the curb & gutter or any other water course. 6) Groundwater and Stormwater Dewatering: No groundwater was encountered during soils exploration therefore ground water is not anticipated to be an issue. If groundwater is encountered a groundwater discharge permit shall be obtained and a detailed report shall be completed describing the location and the route of where pumped groundwater will be conveyed and the measures taken to prevent the transport of any pollutants to downstream waters. 7) Inspection & Maintenance: _It is required that routine site inspections are performed to effectively address maintenance and repair of Best Management Practices (BMP's). The site inspections are to be performed by the contractor or an inspector designated by the administrator at a minimum of once every fourteen (14) calendar days on active construction sites and after any significant storm event (an event causing runoff). As part of the site inspections the inspector is required to keep documentation of all inspections and BMP maintenance, including an updated Site Map indicating new BMP's or the removal of BMP's since the previous inspection. Any maintenance, repair, or necessary installation of BMP's that are noted during the inspection must be completed within seven (7) calendar days from the date of the inspection 11 6. CONCLUSIONS . 6.1 Compliance with Standards All computations that have been completed within this report are in compliance with the "City of Fort Collins Erosion Control Reference Manual for Construction Sites", the "City of Fort Collins Storm Drainage Design Criteria Manual", and the "Urban Storm Drainage Criteria Manual". 6.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans adequately provide for the collection and conveyance of on -site runoff to the detention area. Conveyance elements exist to adequately convey detained runoff downstream. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit would be required. 12 7. REFERENCES 1. Urban Drainage and Flood Control District, "Urban Storm. Drainage Criteria Manual", 2001 Edition Volume 1 updated June 2001, January 2004 and April 2008; Volume 2 updated June 2001 and April 2008; and Volume 3 updated November and December 2010. 2. The Fort Collins Amendments to the Urban Drainage and Flood Control District Criteria Manual, adopted by the City Council of the City of Fort Collins, as referenced in Section 26-500 (c) of the Code of the City of Fort Collins. 3. ORDINANCE NO. 152, 2012 of the Council of the City of Fort Collins amending Chapter 26 of the Code of the City of Fort Collins and the Fort Collins Stormwater Criterial Manual to incorporate provisions implementing Low Impact Development (LID) Principles. 13 APPENDIX A VICINITY MAP A PROJECT LOCATION VICINITY MAP -low ED SWALE WITHOUT UNDERDRAJN LOT 19 PER DETAIL ---------------- -------------------------------- ___ AREA, INLET FIEFER TO imw PLAIN - - ------------- ...... . ... ............ --------------- ----------- POROUS PAVERS I'M DETUM ,,E, A A,vN SO w w Lu Irl INSTALL CONCRETE IMADIVALL. WIN Nina PLATE PM DETAIL - -------------------------------- ------------- - -------------- ------- ------- --------- ------------------- ----- . . .. .............. -------- ---- -- - - ---- ------ -- ------------- - ----- -------------- - -- ----------------- -12--_���ONIFEIR �STREET� 21l! SPILLWAY RIEFER M GRADNG PLAN FOR DETAILS - - - - - — - - - - - - - - - - - - - - —_ 01 20 la 0 20 40 SCALE� 1' 20' LEGEW EXISTNG PIPES - - - - - - 4905 - - - - - - EXISTNG 5' CONTOUR ------------- ___ -------- EXISING V CONTOUR —.905— PROPOSED 5 CONTOUR PROPOSED 1' CONTOUR Ai DESIGN POINT BASIN CRITERIA 10 " RUNOFF COEFFICIENT AREA IN ACRES FLOW aRECTION "W0.0 0 UNW9.01111 BASIN BOUNDARY —sF—SF— SILT FEN CE VEHICLE TRACKING PAD BECONCRETE WASa,OUT AREA 4-:b ROCX SOCK �w 16 "5 CS C� E 0 , (? 0 5 0 U5 a 0 5� _Zt TO CLILL. A z 0 INLET PROTECTION CA OL. Go IN it =RB IN RXK SM. 0 it; c CONSTRUCTION SEQUENCE PROJECT: RAW URN DESIGNS DAM: 2/22/16 . . . . . . . . . . SULT FENCE BARRIERS CONTOUR FURROWS (RIPPAGAISKING) METTR ====MMMMM =1111 MMM=MMMMMM== MPGRARY SEED PLANTING MULCHING / SEALANT PERMANENT SEED PLAN /.All 31306 _j a- z __j Z Ct) LU C) Lu (Y- 0z 0 c) _j Lu > z 0 M Lu V) c; Aieee C) 0 a� 04 D � LLJ 0 z LLj _j c) < z _j a. City of Fort Collins, Colorado ul UTILITY PLAN APPROVAL cc APPROVED: SHEET — City Eng�aer Date CHECKED BY.— CALL UnUTY NOTIFICATION WatW A wasawatw Utility CHECKED BY: Date 5 CENTER OF COLORADO — st--ter Utility Date 1-800-922-1987 (811) CHECKED BY:— � 2-BUSNESS DAYi IN ADVANCE Pa.. & R..'eati- Data 5 OF 8 SEIME YOU DIG. MADE. OR EXCAVAM FOR THE MARKING OF UNDERCFEENO CHECKED BY, 'WBER UnUIES, I Traffic Engineer Data No. 177-09 CHECKED BY.. Haii'� Date APPENDIX B HYDROLOGIC COMPUTATIONS 0 tbth Star Design, Inc 700 Auton bon Dme, Unit I Waksor, 00 80550 LOCATION: Raw Urth Designs PROJECT NO: 177-06 COMPUTATIONS BY: ppk DATE: 8/122015 Recommended Runoff Coefficients from Table 3-3 of City of Fort Collins Design Criteria Recommended % Impervious from Urban Storm Drainage Criteria Manual % Runoff Impervious coefficient C Streets, parking Ids (asphalt): 100% 0.95 Sidewalks: 96% 0.95 Gravel: 40% 0.50 Roofs: 90 % 0.95 Lawns (Flat <2%, heavy soil): 0 % 0.20 SUBBASIN DESIGNATION TOTAL AREA ac.) TOTAL AREA sq.ft) ROOF AREA sq,ft PAVED AREA sq.ft SIDEWALK AREA sq,ft GRAVEL AREA (s .ft LANDS AREA s .ft % Impervious RUNOFF COEFF. C) 1 2 3 0.19 0.15 0.51 8474 6427 22236 0 0 12415 6368 5,354 0 0 360 004 0 0 0 :506 113 8.917 75Y. 89% -A% B76 0.87 0.65 ALL 0.89 38,584 12,415 12,010 1,264 0 12,895 bite 0.70 OS I 0.03 1,178 0 i 300 1 0 1 0 1 878 25X 0.39 Equations - Calculated C coefficients & % Impervious are area weighted C=E(Ci Ai)/At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all Al's North Ster Design, hi0 70DN omation Drive, Urm1 wmCeor, rO 80550 LOCATION: Raw Urth Desiprs PROJECT NO: 177-06 COMPUTATIONS BY: ppk DATE: 9112f'015 2-yr storm C1= 1.00 STANDARD FORM SF-3 TIME OF CONCENTRATION - 2 YEAR SUB -BASIN DATA DESIGN SUBBASIN(s) Area FAINT (ac)_ (1) (2) INITIAL (OVERLAND TIME (a) C Length Slope 6 (ft) (%) .(min) (3) (4) (5) IS TRAVEL TIME I GUTTER OR CHANNEL FLOW 00 Length Slope n Vel. a tc (ft) (%) Manning (fl/o (min) 6+a (7) (6) rough. (9) (10) (11) It: CHE CK (URBANIZED BASIN) Total tc�V180)+10 (ft) (min) (12) (13) FINAL tc (min) (14) REMARKS 1 1 1 1 2 3 0.19 0.15 0.51 0.76 0.87 0.65 35 24 67 1.5 1.5 1.0 3.1 1.8 6.5 204 146 283 0.5 0.6 0.6 0.030 0.016 0.030 0.8 1.6 0.8 4.49 1.56 5.68 7.6 3.4 12.3 239 170 350 11.3 00.9 11.9 7.6 5.0 11.9 i ALL 0.89 0.70 67 1.0 5.9 283 0.6 0.030 0.8 5.f1B 11.6 350 11.9 11.6 1 OS (53 0.39 13 3.5 3.0 0 0.6 0.030 0.8 0.00 3.0 13 10.1 5.0 tUUAI IUNS: It: =lf+a ti=[1.87(1.1-Cq)L05]IS'& It = L /Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + It and urbanized basin check . min. tc = 5 minutes Nosh sm nedpllrc _ WinAo,. 00 81550 lkd I WilCsor, CO 96550 LOCATION: Raw Urth Designs PROJECT Na. 177-06 COMPUI'ATJONS BY: ppk DATE: 8/12/2015 100-yistorm C/= 1.25 STANOARD FORM Sli TIME OF CONCENTRATION • 100 YR SUB -BASIN DATA DESIGN SUBBASIN(s) Ares POINT (ac) (1) (2) INITIAL /OVERLAND TIME (D) C C'Cf Long m Sbpe I - (0) (%) (min) (3) (4) (5) (6) TRAVEL TIME I GUTTER OR CHANNEL FLOW (It) Length Slope n Val. It tc= (n) (%) Mannhg (fUs) (min 0 8+R (7) (8) naWh. 1 (9) (10) (11) lc CHECK (URBANIZED BASIN) TotalL tt--(U180)t10 (n) (min) (12) (13) FINAL to (mil) (14) REMARKS 1 1 1 1 2 3 0.19 0.15 0.51 O.7fi 0.8] 0.65 0.95 1.00 0.87 35 24 67 1.5 1.5 1.0 1.4 0.8 4.2 204 146 283 0.5 0.6 0.6 0.030 0.016 0.030 0.8 1.6 0.8 4.49 1.56 5.68 5.8 2.3 9.9 239 770 3W 11.3 00.9 11.9 5.8 5.0 9.9 1 ALL 0.89 0.70 0.87 67 1.0 3.3 283 0.6 0.030 0.8 'S.68 9.0 350 11.9 9.0 1 OS 0.03 0.39 0.49 13 3.5 2.6 0 0.6 0.030 0.8 0.00 2.6 13 10.1 5.0 IIVIVJ: Ic=ti+n 6=(1.87(1.1-CCI)Oil] /S 1n It = INel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collin Design Manual) final tc = minimum of ti + It and urbanized basin check min. tc = 5 minutes Wh Star D.*m h 700 Aubmffiion Drive, Unit 1 Winc r, CO 80550 RATIONAL METHOD PEAK RUNOFF' (2-YEAR) LOCATION: Raw Urth Designs PROJECT NO: 177-06 COMPUTATIONS BY: ppk DATE: 8/12r015 2-r slam, Cf 1.00 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Point Tributary Sub -basin A (ac) CCf tc (min) i (new) (iNhr) Q (2) (cfs) from Design Point Q (2) (cfs) Q(2pot (cfs) 1 1 0.19 0.76 7.6 2.45 0.4 0.4 To area inlet 1 2 0.15 0.87 5.0 2.85 0.4 0.4 to sidewalk culvert 1 - 3 0.51 0.65 11.9 2.05 0.7 0.7 To Det Pond 1 ALL 0.89 0.70 11.6 2.08 1.3 1.3 To Det Pond 1 - OS 0.03 0.39 5.0 2.85 0.0 0.0 To Streets N Star Deaipn, Inc. 700 M mation Dwe, UN I Windwr, CO e05W RATIONAL METHOD PEAK RUNOFF (100-YEAR) LOCATION: Raw Urth Designs PROJECT NO: 177-06 COMPUTATIONS BY: ppk DATE: 8111'015 100-yr storm, Cf = 1.25 DIRECT RUNOFF CARRYOVER I TOTAL REMARKS Des. Point Area Design. A (ac) C'Cf tc (min) i (new) (in/hr) 0(100) WS) from Design Point O(100) (cfs) O(100)lot (cfs) 1 1 0.19 0.95 5.8 9.41 1.7 1.7 To area inlet 1 2 0.15 1.00 5.0 9.95 1.5 1.5 to sidewalk culvert 1 3 0.51 0.81 9.9 7.74 3.2 3.2 To Det Pond 1 ALL 0.89 0.87 9.0 7.96 6.2 6.2 To Det Pond 1 OS 0.03 0.49 5.0 9.95 1 0.1 1 0.1 To Streets EEI O=CiA O = peak discharge (cfs) C = runoff coefficient I = rainfall intensity (in/hr) from OF curve A = drainage area (acres) FIM.d 0100 AREA INLET IN A TRAPEZOIDAL GRASS -LINED CHANNEL Inlet 1 TMw, Grass 7 e Llmltirka Mannin 's n' T A 0.06 - - _ 0.04 \ d c o.033 fj ,is 'n"" D 0.03 / E 0.024 1 of Trapezoidal Grass -Lined Channel Using S S M sgelel Rated. (A, B, C. D. or E) 'a n (Leave cell D16 blank kl manually sow an n value) unwed Slope Sandy 6.0 fps 0.50 N�7.O fps 060fps O60 Allowable Top YYmh of Chenal for Mmr a Major Storm Allowable Water Depth in Chanel for Minor E Major Shorn eble Channel C=adNBreed On Channel GeomatrvBawtl On Chmnal Gsomatry R STORM Allowable Capacity Is baud on Top Width Criterion )R STORM Allowable Capsciry Is based on Top Width Criterion Pask Flow Storm max. allowable capacity GOOD - greater than flow given on shael'O-Peak' storm max. allowable caoaclty GOOD - mortar than Dow given on sheet'O-Peak' A. B, C, DorE no 0.000 So = 0.0055 MR B = 0.00 R 21= 8.00 Pofl Z2= 400 fvt Q Sandy 71 ® Nan -Sally Minor Sfarm Major Slum T. 10.00 10.00 feet d.e1= 6.00 1 6.00 feet ro.=I1.00 1 1.00!R Q..1 cfs OAO I 1.70 d-I o.za 1 0.43 feat INlet 1.Asm, Area Inlet _ 8l12/2015, 1:17 PM AREA INLET IN A TRAPEZOIDAL GRASS -LINED CHANNEL Raw Unh Inlet 1 Design Information (Noot1 of Imet Inlet Type =1 User-DeOned of Inclined Grete(must be <= 30 degrees) 0= OA0 degrees of Grate W = 1.05 feel not Grate ��„ �f`"-•..._,,,.....1 _ L= 2.00 feel Area Rate / / • *-••...._.......' A.T. = 0.42 1 of Inclined Grate IV I Jr' He ° 0.00 feet Ing Factor ._,....,,._ .`..�.. "^.+,.,........._......-,�. Discharge Coeffion,,, _....__. _. ,. _.,„ I Ce= WA Aeffic9at `L. MINOR MAJOR Depth at Inlet (far depressed! inab, l fool is added for depression) d = Inlet Interception Capacity (assumes clogged condition) Q, _ apaclty IS GOOD for Minor and Major Storms (> 0 PEAK). Bypasead Flow, Q = Capture Parentage = OJQ = C% Warning 02: Depth (d) exceeds USDCM Volume 1 recommendation. 028 0.sB 1.18 z01 0.00 0.00 100 IN INIet 1.Idsm, Area Inlet S/1212015, 1:17 PM Normal Flow Analysis - Trapezoidal Channel U Raw' rthc.; `,7 Project: Channel ID:."-.`7. wit i Sidewalk,Ctjlv'e 11 Basin 2" A F < -------------T ------------ > YO W Z2 ZI < ----- b ------ > �Channel Invert Slope so= Manning's n n = 0.013 Bottom Width B = 2.00 ft Left Side Slope ZI = 0.00 ft/ft Right Side Slope Z2 = 0.00 ft/ft Height F = 0.32 fit ,Freeboard Design Water Depth Y= Normal Flow Condtion (Calculated) Discharge Q = ,.,,-�'T.52 cis Froude Number Fr = 1.91 Flow Velocity V = -4.,48 fps Flow Area A = .0.34 sq ft Top Width T = 11 ;.2.00 ft Wetted Perimeter P = `-,2.34 ft Hydraulic Radius 0.15ft Hydraulic Depth D =' - 'OA T ft Specific Energy Es = 0.48 ft Centroid of Flow Area , .",-0.09. fit Yo = "I" Specific Force Fs =:.' i:..!:`'0.021 kip UD-Channels—v1.04.xis, Basics 12/29/2015, 4:05 PM LOCATION: PROJECT NO: COMPUTATIONS BY: SUBMITTED BY: DATE: Weir Check of Channel Sizing Raw Urth 177-09 PPk North Star Design 2/22/2016 Solve for h using Weir Equation Q = CLH32 where C = weir coefficient H = overflow height L = length of the weir Sidewalk Culvert in Basin 2 Q = 1.50 cfs C = 2.62 L = 2.00 ft Solve for H= 0.43 ft APPENDIX C DETENTION POND SIZING CALCULATIONS C MINIMUM DETENTION VOLUME REQUIRED FAA METHOD (100-YEAR) LOCATION: Raw Urth Designs PROJECT NO: 177-09 COMPUTATIONS BY: PPK SUBMITTED BY: North Star Design, Inc. DATE: 8/12/2015 Equations: A trib. To pond = 0.89 acre Qo=CiA C100= 0.87 Vi = T*CiA = T*Qu Developed C*A = 0.8 acre V. =K*QPo*T QPo = 0.18 cfs S=V1-Va K= 1 (from fig 2.1) Rainfall intensity from City of Fort Collins IDF Curve Storm Duration, T (min) Rainfall Intensity, i (in/hr) Qo (cfs) Vol. In V1 (ft3) Vol. Out Vo (ft) Storage S (ft) Storage S (ac-ft) 5 9.95 7.7 2311 55 2256 0.052 10 7.72 6.0 3587 110 3476 0.080 20 5.60 4.3 5203 221 4982 0.114 30 4.52 3.5 6300 331 5969 0.137 40 3.74 2.9 6950 442 6509 0.149 50 3.23 2.5 7503 552 6951 0.160 60 2.86 2.2 7972 662 7310 0.168 70 2.62 2.0 8520 773 7748 0.178 80 2.38 1 1.8 8846 883 7962 0.183 90 2.22 1.7 9282 994 8289 0.190 100 2.05 1.6 9524 1104 8420 0.193 110 1.93 1.5 9863 1214 8649 0.199 120 1.80 1.4 10035 1325 8710 0.200 130 1.60 1.2 9663 1435 8228 0.189 140 1.40 1.1 9106 1 1546 7560 1 0.174 150 1.20 0.9 8362 1656 6706 1 0.154 160 1.15 0.9 8548 1766 6782--1 0.156 170 1.10 0.9 8688 1877 6811 1 0.156 180 1.05 0.8 8781 1987 6793 1 0.156 Required Storage Volume: 8710 It 0.200 acre-ft STAGE - STORAGE TABLE LOCATION: Raw Urth Designs PROJECT NO: 177-09 COMPUTATIONS BY: PPK SUBMITTED BY: North Star Design, Inc. DATE: 8/1/2008 . 100 yr WSEL 100 yr Detention Volume Required = 0.200 Water Quality Volume Required = 0.000 Total Volume Required= 0.200 Stage (ft) Surface Area (f) Incremental Storage (ac-ft) Total Storage (ac-ft) 4768.80 0 4769.0 761 0.001 0.001 4770.0 1,695 0.027 0.029 4771.0 4,321 0.067 0.095 4771.80 7,253 0.104 0.200 4772.0 8,009 0.139 0.235 4 772.3 9337 10.060 0.294 SPILLWAYELEV Detention Pond Outlet Sizing --- - - - LOCATION: Raw Urth Designs PROJECT NO: 177-09 COMPUTATIONS BY: PPK SUBMITTED BY: North Star Design, Inc. DATE: 8/12/2015 Submerged Orifice Outlet: release rate is described by the orifice equation, Qo = C,A. sqrt( 2g(h-E,)) where Q. = orifice outflow (cfs) Ca = orifice discharge coefficient g = gravitational acceleration = 32.2 ft/s A. = effective area of the orifice (ft) E. = greater of geometric center elevation of the orifice or d/s HGL (ft) h = water surface elevation (ft) Qo = 0.18 cfs outlet pipe dia = D = 12.0 in Invert elev. = 4768.80 ft Eo = 4768.88 ft h = 4771.8 ft - 100 yr WSEL Co = 0.62 solve for effective area of orifice using the orifice equation Ao = 0.021 ft' = 3.1 in' orifice dia. = d = 1.97 in Check orifice discharge coefficient using Figure 5-21 (Hydraulic Engineering) d/D= 0.16 kinematic viscosity, u = 1.22E-05 fels Reynolds no. = Rea = 4Q/(pdu) = 1.14E+05 Co = (K in figure) = 0.62 check Use d = 1.95 1n A o = 0.021 ft z. 2.99 in a Q, = 0.18 cfs Emergency Overflow Spillway Sizing LOCATION: Raw Urth Designs PROJECT NO: 177-09 COMPUTATIONS BY: PPK SUBMITTED BY: North Star Design, Inc. DATE: 5/24/2005 Equation for flow over a broad crested weir 7 top of berm Q = CLH spill elev�4i®n where C = weir coefficient = 2.8 H = overflow height L = length of the weir 0 900 n WSEL The pond has a spill elevation 0 It above the maximum water surface elevation in the pond Spillways will be designed with 0.25 ft flow depth, thus H = 0.25 ft Size the spillway assuming that the pond outlet is completely clogged. Q (100) = 6.2 cfs Spill elev = 4971.80 ft .100 yr WSEL = 4971.8 ft Top of berm elev.= 4972.30 Weir length required: L= 18 ft Use L = 20 ft v = 0.89 ft/s Stormwater Detention and Infiltration Design Data Sheet Stormwater Facility Name: Raw Urth Designs Facility Location & Jurisdiction: Raw Urth Designs, Fort Collins, CO User (Input) Watershed Characteristic Watershed Slope = d.008-.=' ft/ft Watershed Length -to -Width Ratio = -2.27 =:. -7 L:W Watershed Area =`- 0.89` -+ acre Watershed Imperviousness= - 63.0%:'. pert Percentage Hydrologic Soil Group A = 0.0%-'- pert Percentage Hydrologic Soil Group B = --0:0%^°:• - pert Percentage Hydrologic Soil Groups C/D = :: 100.0%,'�. pert Location for 1-hr Rainfall Depths (use dropdown): j Urer Input zf, User Input: Detention Basin Characteristics WQCV Design Drain Time = • ' 40.00 -' hours After completing and printing this worksheet to a pdf, go to: https://maperture.digritaidatasemices.com/avh/?viewer--cswdif, create a new stormwater facility, and attach the pdf of this worksheet to that record. Design Storm Return Period , One -Hour Rainfall Depth Calculated Runoff Volume OPTIONAL Override Runoff Volume Inflow Hydrograph Volume Time to Drain 97%of Inflow Volume; Time to Drain 99%of Inflow Volume: Maximum Porting Depth Maximum Ponded Area Maximum Volume Stored 0n,duA N.,A.,.o.e..6 De J+. User Defined Stage [ftl User Defined Area [ftA21 -'`0.20 671 .0.70 '.:1,183 1.20 '1,695 ". 1.70 ., 3,008 2.20 : 4,321 3.00 7,253. )-.3.50:.9,337 User Defined Sage [ft) User Defined Discharge [cfs) .0.20 - .0.04-. - 0.70 - ' - "'^ 0.08 ". 1.70 0.13 2.20 - :- 0.15 ' 2.70 . :,' 0.17 . 3.00'.: _ 0.18 .3.50 '7.20 WQCV 2Year 5Year 10 Year 25 Year 50 Year 100 Year .�:0.53. 0.98'": -.- 1.36'1.71 •:-2.31-: 2.91 ." C'3.67 ,. 0.018 0.044 0.070 0.095 0.140 0.183 0.242 0.017 0.044 0.070 0.095 0.139 0.183 0.241 4 6..9. 11 14 16 19 4 7 9 1 11 14 17 -.:2T,-., 0.63 1.26 1.68 1.97 2.38 2.69 3.02 0.025 0.043 0.068 0.085 0.114 0.140 0.168 0.010 0.031 0.054 0.076 0.117 0.156 0.207 n acre-ft acre-ft acre-ft (ours lours t acres acre-ft SOI_Drain time check_FC_Rainfall.xlsm, Design Data 2/23/2016, 3:52 PM r II' Stormwater Detention and Infiltration Design Data Sheet SDI —Drain time check_FC_Rainfali.xlsm, Design Data - 2/23/2016, 3:52 PM APPENDIX D BMP SCHEDULE & COST ESTIMATE ------------------ ______Raw-Urth -LLD-Table----._----..____ _-----------------_. New Impervious Area 25689 sq. ft. Required Minimum Impervious Area to be Treated (50%) 12845 sq. ft. Impervious Area Treated by LID Treatment Method #1 (LID swale with underdrain) 6368 sq. ft. Impervious Area Treated by Porous Pavement 5714 sq. ft. Total Impervious Area Treated (47`Yo) 12082 sq. ft. New Pavement Area 12010 sq. ft. Required Minimum Area of Porous Pavement (25%) 3003 sq. ft. Area of Paver Section A 3047 sq. ft. Run-on area for Paver Section A 2667 sq. ft. Total Porous Pavement Area (25°o) 3047 sq. ft. CONSTRUCTION SEQUENCE PROJECT: RAW URTH DESIGNS DATE: 8/10/15 CONSTRUCTION PHASE (MONTH) 1 2 3 4 5 6 7 8 9 10 11 12 GRADING (INCLUDES OVERLOT) OVERLOT DETENTION / WQ PONDS SWALES, DRAINAGEWAYS, STREAMS PIPELINE INSTALLATION (INCLUDES OFFSITE) WATER SAINITARY SEWER STORM SEWER CONCRETE INSTALLATION (INCLUDES OFFSITE SIDEWALK CULVERTS & CHASES INLETS POND OUTLET STRUCTURES CURB AND GUTTER PAVEMENT INSTALLTATION FINE GRADING / BASE COURSE INSTALL PAVEMENT BEST MANAGEMENT PRACTICES STRUCTURAL SILT FENCE BARRIERS CONTOUR FURROWS (RIPPING/DISKING) SEDIMENT TRAP / FILTER VEHICLE TRACKING PADS FLOW BARRIERS (WATTLES, ETC) CONCRETE WASHOUT ROCK SOCKS BARE SOIL PREPARATION TERRACING RIPRAP VEGETATIVE TEMPORARY SEED PLANTING MULCHING / SEALANT PERMANENT SEED PLANTING SOD INSTALLATION NETTING/BLANKETS/MATS Erosion and Sediment Control Escrow/Security Calculation for The City of Fort Collins Project: Raw Urth Designs Disturbed Acres: 0.90 V w , Estimated Unit Total EROSION CONTROL BMPs Units Quantity Price Price Silt Fence L.F. 730 $3.00 $2,190.00 Rock Sock each 15 $85.00 $1,275.00 Vehicle Tracking Control Pad each 1 $1,500.00 $1,500.00 Concrete Washout each 1 $1,200.00 $1,200.00 (add all other BMPs for the site in this list) Sub -Total: $6,165.00 1.5 x Sub -Total: $9,247.50 Amount of security: $9,247.50 ...�` ,v,.,..}i b,al.a �l^_u i�c.-a,:..,r, +.a:%�:u n.t...v1E.__: ._, .-,go.J., ,.- .. . ., Z �T� u x •a - Total Acres x Price/acre: $1,080.00 Unit Price of Seeding per acre: $1,200.00 Sub -Total: $1,080.00 1.5 x Sub -Total: $1,620.00 Amount to Re -seed: $1,620.00 _; « m. r TMr e. 14 Mirnumum Escrow Amount Minimum escrow amount: $3,000.00 •:' -f Final=Escrdw,Amoi'i'nt - Erosion Control Escrow: $9,247.50 -The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-haljtimes the cost to re -vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid, whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three thousand dollars ($3,000) jar commercial development" 5/12/2015 3:13 PM N:1MT Raw UMWminagalFsampb Exm APPENDIX E FIGURES AND TABLES E -(11)-Section 4.O is amended to read as follows: 4.0 Intensity -Duration -Frequency Curves for Rational Method: The one -hour rainfall Intensity -Duration -Frequency tables for use the Rational Method of runoff analysis are provided in Table RA-7 and in Table RA-8. Table RA-7 -- City of Fort Collins Rainfall Intensity -Duration -Frequency Table for Use with the Rational Method' (5 minutes to 30 minutes) Duration (min) 5 2-Year Intensity (ice) 2.85 10-Year Intensity (tom) 4.87 100-Year Intensity (in/hr) 9.95 6 2.67 4.56 9.31 7 2.52 4.31 8.8 8 2.4 4.1 8.38 9 2.3 3.93 8.03 10 2.21 3.78 7.72 11 2.13 3.63 7.42 12 2.05 3.5 7.16 13 1.98 3.39 6.92 14 1.92 3.29 6.71 15 1.87 3.19 6.52 16 1.81 3.08 6.3 17 1.75 2.99 6.1 18 1.7 2.9 5.92 19 1.65 2.82 5.75 20 1.61 2.74 5.6 21 1.56 2.67 5.46 22 1.53 2.61 5.32 23 1.49 2.55 5.2 24 1.46 2.49 5.09 25 1.43 2.44 4.98 26 1.4 2.39 4.87 27 1.37 2.34 4.78 28 1.34 2.29 4.69 29 1.32 2.25 4.6 30 1.3 2.21 4.52 33 r "gr Table RA-8 - City of Fort Collins Rainfall Intensity -Duration -Frequency Table for Use with the Rational Method (31 minutes to 60 minutes) Duration (min) 31 2-Year Intensity (in/hr) 1.27 10-Year Intensity (in/hr) . 2.16 100-Year Intensity (in/hr) 4.42 32 1.24 2.12 4.33 33 1.22 2.08 4.24 34 1.19 2.04 4.16 35 1.17 2.0 4.08 36 1.15 1.96 4.01 37 1.16 1.93 3.93 38 1.11 1.89 3.87 39 1.09 1.86 3.8 40 1.07 1.83 3.74 41 1.05 1.8 3.68 42 1.04 1.77 3.62 43 1.02 1.74 3.56 44 1.01 1.72 3.51 45 0.99 1.69 3.46 46 0.98 1.67 3.41 47 0.96 1.64 3.36 48 0.95 1.62 3.31 4.9 0.94 1.6 3.27 50 0.92 1.58 3.23 51 0.91 1.56 3.18 52 0.9 1.54 3.14 53 0.89 1.52 3.1 54 0.88 1.5 3.07 55 0.87 . 1.48 3.03 56 0.86 1.47 2.99 57 0.85 1.45 2.96 58 0.84 1.43 2.92 59 0.83 1.42 2.89 60 0.82 - 1.4 2.86 34 RAINFALL INTENSITY -DURATION -FREQUENCY CURVE 10.0 9.0( 6.0c t 7.00 a m L e 6.00 m 5.00 Z W F J 4.00 J Q LL z 3.00 2.00 1.00 0.00 0.00 10.00 20.00 30.00 40.00 50.00 60.00 STORM DURATION (minutes) 2-Year Storm - - - 10-Year Storm -100-Year Stonn Figure RA-16 City of Fort Collins Rainfall Intensity -Duration -Frequency Curves (13) Section 5.0 is deleted in its entirety. (14) Section 6.0 is deleted in its entirety. (15) Section 70 is deleted in its entirety. (16) Section 7.1 is deleted in its entirety. (17) Section 7.2 is deleted in its entirety. (18) Section 73 is deleted in its entirety. (19) Section 8.0 is deleted in its entirety. (20) Table RA-1 is deleted in its entirety. 36 Table RO-10 Rational Method Minor Storm Runoff Coefficients for Zoning Classifications Description of Area or Zoning Coefficient R-F 0.3 U-E 0.3 L-M-In 0.55 R-L, N-C-L 0.6 M-M-N, N-C-M 0.65 N-C-B 0.7 Business: C-C-N, C-C-R, C-N, N-C, C-S 0.95 R-D-R, C-C, C-L 0.95 D, C 0.95 H-C 0.95 C-S 0.95 Industrial: E 0.85 1 0.95 Undeveloped: R-C, T 0.2 P-O-L 0.25 For guidance regarding zoning districts and classifications of such districts please refer to Article Four of the City Land Use Code, as amended. 40 Table RO-11 Rational Method Runoff Coefficients for Composite Analysis Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: Asphalt 0.95 Concrete 0.95 Gravel 0.5 Roofs 0.95 Recycled Asphalt 0.8 Lawns, Sandy Soil: Flat <2% 0.1 Average 2 to 7% 0.15 Steep >7% 0.2 Lawns, Heavy Soil: Flat <2% 0.2 Average 2 to 7% 0.25 Steep >7% 0.35 (4) A new Section 2.9 is added, to read as follows: 2.9 Composite Runoff Coefficient Drainage sub -basins are frequently composed of land that has multiple surfaces or zoning classifications. In such cases a composite runoff coefficient must be calculated for any given drainage sub -basin. The composite runoff coefficient is obtained using the following formula: �Ki *A;) C = '_i A (RO-8) Where: C = Composite Runoff Coefficient C; = Runoff Coefficient for. Specific Area (A) A; = Area of Surface with Runoff Coefficient of C;, acres or feet2 n = Number of different surfaces to be considered A,= Total Area over which C is applicable, acres or feet2 (5) Anew Section 2.10 is added, to read as follows: 41 2.10 Runoff Coefficient Adjustment for Infrequent Storms - The runoff coefficients` provided in tables RO-10 and RO-1 fare appropriate for use with the 2-year storm event. For storms with higher intensities, an adjustment of the runoff coefficient is required due to the lessening amount of infiltration, depression retention, evapo-transpiration and other losses that have a proportionally smaller effect on storm runoff. This adjustment is applied to the composite runoff coefficient. These frequency adjustment factors are found in Table RO-11 Table RO-12 Rational Method Runoff Coefficients for Composite Analysis Storm Return Period Frequency Factor ears Cf 2 to 10 1.00 11 to 25 1.10 26 to 50 1.20 51 to 100 1.25 Note: The product of C times Cfcannot exceed the value of 1, in the cases where it does a value of 1 must be used (6) Section 3.1 is deleted in its entirety. (7) Section 3.2 is deleted in its entirety. (8) Section 3.3 is deleted in its entirety. (9) A new Section 4.3 is added, to read as follows: 4.3 Computer Modeling Practices (a) For circumstances requiring computer modeling, the design storm hydrographs must be determined using the Stormwater Management Model (SWMM). Basin and conveyance element parameters must be computed based on the physical characteristics of the site. (b) Refer to the SWMM Users' Manual for appropriate modeling methodology, practices and development. The Users' Manual can be found on the Environmental Protection Agency (EPA) website (htti)://www.epa.gov/ednnrmrl/models/swmm/index.htm). (c) It is the responsibility of the. design engineer to verify that all of the models used in the design meet all current City criteria and regulations. 4.3.1 Surface Storage Resistance Factors and Infiltration Table RO-13 provides values for surface storage for pervious and impervious surfaces and the infiltration rates to be used with SWMM. Table RO-13 also lists the appropriate infiltration decay rate, zero detention depth and resistance factors, or Maiming's 'In" values, for pervious and impervious surfaces to be used for SWMM modeling in the city of Fort Collins. 42