Loading...
HomeMy WebLinkAboutDrainage Reports - 04/27/2016City of Ft. Collins , proves , lans' Appmed Date, Final Drainage and Erosion Control Report for Harmony Technology Park Infrastructure Improvements Fort Collins, Colorado November 4, 2015 November 4, 2015 Mr. Shane Boyle City of Fort Collins Water Utilities --Storm water 700 Wood Street Fort Collins, Colorado 80521 RE: Final Drainage and Erosion Control Report for the Harmony Technology Park Infrastructure Improvements Dear Shane: We are pleased to submit to you, for your review and approval, this Final Drainage and Erosion Control Report for the Harmony Technology Park Infrastructure Improvements. All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria. We appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Respectfully, Aspen Engineering John Gooch, P.E. Principal x• 43251 °�' �W ��S�DNAL E�G\� TABLE OF CONTENTS DESCRIPTION PAGE I. GENERAL LOCATION AND DESCRIPTION 5 A. LOCATION 5 B. DESCRIPTION OF PROPERTY 5 H. DRAINAGE BASINS 5 A. MAJOR BASIN DESCRIPTION 5 B. EXISTING SUB -BASIN DESCRIPTION 6 III. DRAINAGE DESIGN CRITERIA 7 A. REGULATIONS 7 B. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS 7 C. HYDROLOGIC CRITERIA 7 D. HYDRAULIC CRITERIA g E. VARIANCE g IV. DRAINAGE FACILITY DESIGN g A. GENERAL CONCEPT g B. SPECIFIC DETAILS 9 C. DETENTION POND 11 D. STREET CAPACITIES I 1 V. STORM WATER QUALITY I I A. GENERAL CONCEPT I I B. SPECIFIC DETAILS 11 VI. EROSION CONTROL 12 A. GENERAL CONCEPT 12 VII. CONCLUSIONS 12 A. COMPLIANCE WITH STANDARDS 12 B. DRAINAGE CONCEPT 13 C. STORM WATER QUALITY 13 D. EROSION CONTROL CONCEPT 13 E. EROSION CONTROL ESCROW ESTIMATE 14 REFERENCES 14 APPENDIX PAGE VICINITY MAP A RATIONAL METHOD HYDROLOGY B STORM SEWER PIPE SIZING, INLETS, & STREET C CAPACITY CALCULATIONS SIDEWALK CULVERTS & RIPRAP CALCULATIONS D EROSION ESCROW E PROPOSED DRAINAGE BASIN EXHIBIT, EXHIBITS & EXCERPTS, F EROSION CONTROL PLAN, & EROSION CONTROL NOTES AND DETAILS SHEET FINAL DRAINAGE AND EROSION CONTROL REPORT FOR THE HARMONY TECHNOLOGY PARK INFRASTRUCTURE IMPROVEMENTS FORT COLLINS, COLORADO I. GENERAL LOCATION AND DESCRIPTION A. Location The Harmony Technology Park Infrastructure Improvements (referred to as "HTP Infrastructure" here -forward) is bounded to the north by Harmony Road, to the east by Lady Moon Drive, to the south by undeveloped land, and to the west by Intel. The project site can also be described as situated in the northwest quarter of Section 4, Township 6 North, Range 68 West of the 6m P.M., of the City of Fort Collins, Larimer County, Colorado. Please refer to the vicinity map in Appendix A for the site location. B. Description of Property The HTP Infrastructure project is comprised of an approximate 6.05 acre footprint area (Basins 2-7, 9-10), in which only roadway and utility infrastructure for portions of Technology Parkway and Timberwood Drive will be completed, within existing, platted, City right-of-way. Approximately 8.61 acres of area will undergo grading to provide for the roadway and utility infrastructure improvements and to tie-in to existing ground, adjacent to the roadway and utility improvements. It's important to note that no development will be provided with this infrastructure project. Currently, the HTP Infrastructure project area is irrigated agricultural land, with roadway access stubs into the existing site area at Precision Drive/Technology Parkway, Technology Parkway/Harmony Road, and Timberwood Drive/Lady Moon Drive. The majority of existing topography of the HTP Infrastructure site (and surrounding, internal future development area) generally slopes from the northwest to southeast at approximately 0.55%. H. DRAINAGE BASINS A. Major Basin Description The site lies within the McClellands Basin. The site drainage has been previously accounted for in the Harmony Technology Park Site Master Plan (HTPSMP). The project drainage will be in conformance to this study, which can be found in the East Harmony Portion of the McClellands Creek Master Drainage Plan (August 1999). B. Existing Sub -Basin Description The existing HTP Infrastructure project site is contained within existing sub -basins EX1, EX4, and EX7 of the HTP Masterplan, and SWMM basins 401, 501, 600, and 601 of the HTP Masterplan report. Existing basins EXl, EX4, and EX7 contain approximately 57.08, 10.99 acres, and 47.63 respectively, and were modeled with the entire 57.08, 10.99, and 47.63 acres having a'c' value of 0.32, with a 100-year runoff rate of approximately 72.86, 16.41, and 59.53 cfs respectively, for the historic condition of the basins. However, the HTP Masterplan Report specifies the HTP Infrastructure site being contained within SWMM Basins 401, 501, 600, and 601(71.3 acres total) and being allowed a developed impervious value up to 80%, with all flow from the HTP Infrastructure and associated future, adjacent development within the said basins allowed to release at a combined release rate of 27 cfs (or approximately 0.38 cfs/acre for the 71.3 acres, per the SWMM Model, for attributing basins). Because the HTP Infrastructure site will not entail any development and only roadway infrastructure, the site is in conformance with the HTP Masterplan SWMM Model. Upon future development of adjacent land/parcels to the HTP Infrastructure roadway infrastructure project (approximately 6.05 acres), a regional water quality and detention pond will be required to be constructed south of Timberwood Drive, east of Technology Parkway, and north of Precision Drive to provide the water quality and detention needs for not only the HTP Infrastructure roadway infrastructure areas, but also the future, developed, adjacent parcels, as shown in the approved HTP SWMM model. The runoff from the existing site basin areas of the roadway infrastructure project flow primarily from northwest to southeast across the existing agricultural fields, with the majority of runoff infiltrating into the existing fields. During irrigation of the existing fields, additional runoff flows to the southeast and in to existing tailwater pits, located along the west side of Lady Moon Drive. The runoff is conveyed east in existing irrigation/storm sewer pipe and into the storm line in Lady Moon Drive. Please refer to the HTPMSP report for masterplan details (excerpts can be found in Appendix F of this report). Please also see the rational calculations (Appendix B) and the drainage exhibit (Appendix F) of this report for the existing and proposed drainage basins for the subject site. 161 III. DRAINAGE DESIGN CRITERIA A. Regulations Because no development is being proposed with this infrastructure project, water quality and detention is not required at this time. However, future development of adjacent parcels will be required to provide water quality and detention for their parcels. It is anticipated that a future, regional water quality and detention pond will be constructed south of Timberwood Drive (centrally located between Precision Drive and Timberwood Drive, and Technology Parkway and Lady Moon Drive. Future development will be required to adhere to the McClellands Creek Master Drainage Plan and the Harmony Technology Park Site Master Plan (HTPSMP), as well as HTP Masterplan SWMM Model, which allows for a combined impervious ratio of 80% for the developed and associated, adjacent roadway portions for the attributing parcels. LID improvements are not required, as no development is occurring or being proposed with this infrastructure only project B. Development Criteria Reference and Constraints The criteria and constraints from the City of Fort Collins will be met. Water quality, detention, and BMP's and LID measures will be required with future development of adjacent parcels. C. Hydrologic Criteria The Rational Method for determining surface runoff was used for the infrastructure project to provide for anticipated pipe flow only, for the storm sewer infrastructure in Timberwood Drive. The 2-year and 100-year storm event intensities were used in calculating runoff values. The City of Fort Collins intensity duration frequency curves were used to obtain rainfall data for each storm specified. 7 It's important to note that future development of parcels will be required to meet the • 80% impervious ratio for the developed condition of the parcels and associated, adjacent roadways, rather than match the rational `c' values shown in the rational calculations in Appendix B of this report. Rational calculations (and corresponding `c' values) shown in Appendix B of this report were used solely to size (possibly oversize) the storm sewer infrastructure in Timberwood Drive and Technology Parkway to provide for future development of the adjacent parcels to the north and south of Timberwood Drive, and east and west of Technology Parkway to allow for future conveyance of those parcels to a future, regional pond, located south of Timberwood Drive, and for a future regional pond (or onsite pond) for the area west of Technology Parkway. D. Hydraulic Criteria All hydraulic calculations within this report have been prepared in accordance with the City of Fort Collins Drainage Criteria and are also included in the Appendix. Final storm sewer pipe, chases/sidewalk culverts, storm inlet and street capacity calculations, and riprap calculations have been completed using UDSewer and UDInlet from UDFCD, as well as other spreadsheets and hydraulic software. E. Variance No variances are being requested for the project. IV. DRAINAGE FACILITY DESIGN A. General Concept For the purposes of sizing the storm sewer pipe infrastructure in Timberwood Drive only, ten drainage basins will provide conveyance of drainage for approximately the 25.50 acres of onsite roadway infrastructure and future anticipated, adjacent parcel areas to each basins respective design points. In the interim condition, basins 1 and 8 (future developed parcel areas) will remain in their historic agricultural condition, with runoff continuing to infiltrate into the existing crop/field. Basins 2-5 and 9-10, which comprise portions of Technology Parkway and Timberwood Drive, will be routed to proposed inlets in Technology Parkway and Timberwood Drive, which will convey runoffto interim cobble pits on the south side of Timberwood Drive and east and west sides of Technology Parkway. Runoff will infiltrate into the soil, as historically occurs. Future development will provide for the extensions of the storm pipe systems to regional ponds (or onsite ponds), which will be constructed with future development. 8 Basins 6 and 7 will flow east on Timberwood Drive, then north (for basin 6) and • south (for basin 7) down Lady Moon Drive to the existing inlets and storm sewer systems in Lady Moon Drive. Upon future development of the adjacent parcels (basins 1 and 8) and areas south of Timberwood Drive, it is anticipated that the storm sewer infrastructure, shown to be stubbed south of Timberwood Drive and east of Technology Parkway with this project, will be extended south and east, respectively, to a future, regional water quality and detention pond. The future water quality and detention pond will provide detention and water quality for the attributing basins, up to a maximum of 80% imperviousness for the adjacent future developed parcels and associated, adjacent roadways. It's important to note that additional storm sewer has been added and stubbed to the north and south of Timberwood Drive to provide outfall and connection points for future development of adjacent parcels, and has been approved by MAVDevelopment for outflow and basin sizing. Likewise, a storm sewer stub has been stubbed to the west side of Technology Parkway (south of Intel's site) to provide for an outfall from a future regional pond in this location (per the SWMM model), or for an onsite pond, as may be applicable in the future. As noted above, proposed storm sewer stubs will convey runoff from Timberwood Drive and Technology Parkway to interim cobble pits until future development provides for onsite water quality and detention ponds for these areas. The proposed improvements along Timberwood Drive and Technology Parkway are in accordance with the HTP Site Masterplan Report and SWMM Model, and shall be tracked with future development. It is important to note that with the extension of Technology Parkway south to Precision Drive, proposed grading and drainage design provides for the east and west sides of Technology Parkway (from Harmony Road south to Precision Drive) being directed to their corresponding sides. This minor change to the basins has negligible effect on the approved SWMM model, as the basin areas between 501 and 401 remain nearly the same. Please refer to the HTP SWMM model exhibit in this report, which shows the basin layout for basins 401 and 501. Future sizing of the regional pond, south of Timberwood Drive, will provide additional details on this small basin exchange for pond volume sizing purposes. LID and BMP measures are not included with this project, as no development is being proposed. However, LID and BMP measures will be required for future parcels and will be required to be completed onsite. W7 B. Specific Details 0 Basin 1 A CDOT Type C Inlet with close mesh grate will be installed at design point 1 to provide an outfall for the future development of the parcel in this area. The CDOT Type C Inlet will also serve as the outfall point for the median underdrain that will be installed under the median in Technology Parkway with this project. Future development of Basin 1 shall provide for runoff being conveyed to the CDOT Type C Inlet. It's important to note that storm sewer pipes with flared -end -sections are shown to be stubbed underneath the berming, located on the south side of Harmony Road and within the 80' setback buffer, to convey runoff from the attributable Harmony Road right-of-way south and under the proposed bernung. Future development of the retail parcels will connect and install the storm sewer pipes and flared -end -sections, as • construction of the retail parcel(s) are currently planned to occur simultaneously with the infrastructure improvements. Please refer to the overall utility plan sheet in the HTP Infrastructure plans for additional information. Basins 2 & 3• Proposed 5' Type R Inlets will be placed at design points 2 and 3 to capture runoff from basins 2 and 3. Runoff will combine with that from Basin 1 (as may be applicable) and will be conveyed east in the proposed storm sewer system towards design point 3A. Basins 4 & 5: Proposed 5' Type R Inlets will be placed at design points 4 and 5 to capture runoff from basins 4 and 5. Runoff from basins 4 and 5 is conveyed south in the proposed storm sewer system and into an interim cobble pit on the south side of Timberwood Drive. Future development in this area (south of Timberwood Drive) will extend the pipe (or provide a Swale system) to the future regional detention pond area, as approved by MAVDevelopment. Basins 6 & 7• Basins 6 and 7 will convey their runoff east along a short segment of Timberwood Drive, then north and south, respectively, down Lady Moon Drive and into the existing inlets and storm system in Lady Moon Drive, as historically occurs. Basin 8• Two, 2' x 5' RCB's will be installed at design point 8 to serve as a future outfall for the future development of basins 1 and 8, and the associated Harmony Road and Lady Moon Drive frontage to basin 8, as historically flows to and through parcel 8. The two, 2' x 5' RCB's will also serve the developed condition of the roadway infrastructure for basins 2-3. 10 • Runoff from basins 1-3, and 8 will be conveyed to and through the two, 2' x 5' RCB's when future development occurs. The two, 2' x 5' RCB's have been modeled to carry '/z of the attributing 100-year flow (for the future developed condition) from basin 8 (Qloo = 85.26 cfs), as well as the 100-year, routed flow from basins 2-3, and basin l(for the future developed condition of basin 1: Qioo = 33.23 cfs). This provides for approximately 70.14 cfs being utilized to size the western 2' x 5' RCB. It's important to note that the runoff from basins 1-3 will only discharge to the westerly 2' x 5' RCB. The easterly 2' x 5' RCB will convey the remaining 42.63 cfs (other % of the 100-year from basin 8) south under Timberwood Drive, when future development occurs. Aspen anticipates a large structure will be built, with future development, at the north end of the 2' x 5' RCB's, with future development of basin 8 being required to tie-in to the structure at design point. 8. This measure will provide for the 100-year flow from basin 8 being conveyed under Timberwood Drive and to a future regional detention and water quality pond, but only to the extent that the combined imperviousness ratio for basin 8, as shown in the drainage exhibit for the HTP Infrastructure, does not exceed 80%. It's important to note that the north ends of the two, 2' x 5' RCB's will be plugged in the interim condition, and only runoff from the developed roadway infrastructure for basins 2-3 will be conveyed to the westerly 2' x 5' RCB, which will discharge runoff to the interim cobble pit. Runoff will infiltrate into the soil and existing field, as historically occurs. Likewise, basin 8 will continue to remain in its historic condition (until future development), with runoff infiltrating into the existing crop/field. Please refer to the proposed drainage basin exhibit in Appendix F, and the rational and stone sewer pipe sizing calculations in Appendices B and C for the proposed roadway infrastructure areas, and also for the future development areas. Basins 9 & 10• Runoff from basins 9 and 10 will be conveyed south down Timberwood Drive to proposed 10' Type R Inlets at design points 9 and 10. Runoff will be conveyed, via storm sewer pipes, east and west of Technology Parkway, to interim cobble pits (for the interim condition only). Runoff will infiltrate into the existing fields, as historically occurs. Future development of east and west of basins 9 and 10 will be required to connect to the existing storm sewer stubs and extend the storm sewer systems to the future regional ponds or onsite ponds, as may be applicable for these specific areas. 11 Overflow Conditions: Should any of the storm sewer infrastructure inlets, pipe, or riprap pads become clogged, runoff will spill south and east and over the existing fields, as historically occurs. C. Detention Pond Detention and Water Quality pond sizing is not required for this infrastructure project. Future development will provide for detention and water quality needs through the utilization of a future, regional water quality and detention pond. D. Street Capacities Street capacity calculations for public roads have been analyzed and are included in Appendix C. V. STORM WATER OUALITY A. General Concept Because the project does not entail development, water quality (within a detention pond area) will not be provided with this project, and runoff will infiltrate into the existing fields and soil, as historically occurs. However, water quality of stormwater runoff must be addressed on all final design utility plans. Therefore, Best Management Practices (BMP's) for the treatment of stormwater runoff will be provided with future development for the future parcels and may include grass/ sod -lined swales with soft pans, riprap pads at culvert discharge points, permanent erosion control fabric or riprap at curb cuts and swale entrances into the future, regional pond, grass scrubbing across the bottom of the future, regional water quality and detention pond during first flush conditions, and a 40-hour extended detention structure with orifice control incorporated into the future detention pond design. These future, anticipated water quality features will provide a mechanism for pollutants to settle out of the stormwater runoff before flows are directed downstream to the McClellands Drainage Basin. The future water quality/ detention facility will have adequate capacity, in accordance with the HT? S WMM Model, and will provide all of the required water quality and detention up to the 100-year event for the developed condition of the subject site and offsite adjacent areas (up to an impervious ratio of 80% for offite parcel areas and associated, adjacent roadways), prior to releasing flows downstream. 12 B. Specific Details LID's and BMP's will be provided with future development, with specific details provided at that time. VI. EROSION CONTROL A. General Concept The subject site lies within the Moderate Rainfall Erodibility Zone and the Moderate Wind Erodibility Zone per the City of Fort Collins zone maps. The potential exists for erosion problems during construction, but should be minimal after completion of proposed roadway infrastructure. Silt fence will be installed along the boundaries of the grading areas, as shown in the erosion control plan, to prevent sediment from leaving the project area. A gravel tracking pad(s) will also be placed at entrances/exits to the infrastructure areas. Gravel inlet filters will be placed at existing and proposed inlets, with straw wattles installed in green areas and swales to mitigate the build-up of sediment and transport of debris. Riprap and erosion control fabric will also be utilized at concentration points (riprap pads and pipe outlets) to minimize erosion and increase soil stabilization. VII. CONCLUSIONS A. Compliance with Standards All computations within this report have been completed in compliance with the City of Fort Collins Storm Drainage Design Criteria. The City of Fort Collins Storm water Utility will not maintain the private storm drainage facilities within offsite parcels. The owners of the offsite parcels will maintain their on -site storm drainage facilities on a regular basis. The following shall be implemented for the private stormwater improvements' operations/ maintenance procedures for the project on an annual or bi-annual basis: 1) Storm Sewer Inlets, pipes and flared -end -sections, curb cuts and concrete sidewalk culverts/chases, structures, manholes, and the water quality/ outlet control structures, as may be applicable, shall be cleaned through the removal of debris and sediment from the associated items to allow for adequate drainage through the site to the interim facilities. 2) Sedimentation/ silting shall be removed to allow for adequate drainage along the bottom of the swales. 13 2) Sedimentation/ silting shall be removed to allow for adequate drainage along the bottom of the swales. 3) Re -vegetation through the use of Natural Seeding/ Sod shall be provided for disturbed areas and other permanent erosion controls shall be provided for areas where erosion has taken place and requires remediation back to the proposed condition shown in the plans The Stormwater Operating/ Maintenance Procedures listed above are guidelines to the minimum procedures that shall be implemented for the infrastructure project, with these and additional measures being utilized on an as -needed basis. B. Drainage Concept The proposed drainage concepts presented in this study and shown on the utility plans adequately provide for the transmission of developed runoff from the proposed roadway infrastructure to the interim cobble pits south of Timberwood Drive and east and west of Technology Parkway. Future development will provide for the removal of the cobble pits and the storm sewer infrastructure being extended south to a future regional detention and water quality pond (for Timberwood Drive), and removal of the cobble pits and extension of the stone sewer systems east and west of Technology Parkway to the regional pond(s), or onsite pond for the areas east and west of Technology Parkway, as may be applicable. Runoff for all other areas will provide for the 100-year developed (and historic) flows and drainage patterns from adjacent offsite basins to continue to be conveyed to discharge points, per the HTP drainage Masterplan or as historically occurs along Lady Moon Drive. If groundwater is encountered at the time of construction, a Colorado Department of Health Construction Dewatering Permit will be required. C. Storm Water Oualitv Future development will provide for final design which addresses the water quality aspect of stormwater runoff. The future, regional detention pond (south of Timberwood Drive) and future regional pond (or onsite pond) west of Technology Parkway, south of Intel) will be grass -lined and provide extended detention. This will provide an opportunity for stormwater pollutants to filter out of the stormwater runoff before flows are directed downstream. 14 D. Erosion Control Concept Proposed erosion control concepts have been provided for and adequately provide for the control of wind and rainfall erosion from the proposed development. Through the construction of the proposed erosion control concepts, the City of Fort Collins performance standards will be met. The proposed erosion control concepts presented in this report and shown on the erosion control plan are in compliance with the City of Fort Collins Erosion Control Criteria. Erosion Control Escrow Estimate The Erosion Control Escrow Estimate for the HTP Infrastructure is approximately $45,962. Please refer to Appendix E for this calculation. Storm Drainage Design Criteria and Construction Standards by the City of Fort Collins, Colorado, May 1984, Revised January 1997. 2. Erosion Control Reference Manual for Construction Sites by the City of Fort Collins, Colorado, January 1991, Revised January 1997. 3. East Harmony Portion of McClellands Basin 100-Year Master Plan, by Icon Inc., Fort Collins, Colorado, August 1999. 4. Final Drainage and Erosion Control Report, Harmony Technology Park 2nd Filing, by JR Engineering, June 20, 2001. 5. 2004 High School Drainage and Erosion Control Study, Poudre School District R-1, by Nolte Associates, Inc., June 24, 2002. 6. Final Drainage and Erosion Control Report, Harmony Technology Site Master Plan, by Stantec Consulting, May 19, 2008. 7. Final Drainage and Erosion Control Study for Harmony Technology Park Third Filing, by Stantec Consulting, May 19, 2008. 15 APPENDIX 16 APPENDIX A 17 VICINITY MAP 18 11MMI1 Mp tS � APPENDIX B 19 RATIONAL METHOD HYDROLOGY P 0 Developed Weighted Runoff Coefficients Hammy Tech Park Ffah Wing 100-M it (Sqlq Concrete Area Gravel A,P 1 0 0 168,000 0 29,025 197.025 0.80 2 0 10,793 . 4,495 0 3,288 18,576 0.81 3 0 10,700 4,457 0 3,260 18,417 0.81 4 0 7,540 3,141 0 2,296 12,9T7 0.81 5 0 7,647 3,185 0 2,330 13,162 0.81 6 0 2,252 SIM 0 685 3,875 0.81 7 0 2,252 938 0 685 3,875 0.81 a 0 0 550,000 0 100,412 650,412 0.80 9 0 73,542 13.808 0 14,933 102,284 0.84 10 0 64,034 13,006 0 13,276 90,316 0.84 T. itat Tote) Acreage 0.00 4.10 17.49 0.00 3.91 26.60 2 0 10,793 4,495 0 3,288 18,576 83% 5 0 10,700 4,457 0 3.260 18,417 83% 4 0 7,540 3,141 0 2.296 12,977 83% 6 0 7.647 3,185 0 2,330 13,162 83% 6 0 2,252 938 0 655 3,875 83% 7 0 2,252 938 0 685 3.875 83% a 0 0 550.000 0 100,412 650,412 85% 9 0 73,542 13,808 0 14,933 102,284 86% 10 0 644034 13,006_.._ 0 13,276 90,316 86% Land the or 6udeca CheracLtlstks Pasant knimmaurass Business: Comnwdw areas 95 Neighborhood anew 85 Residanlhh MuM4 d 90 waian R LOUNnom 75 Helte la orls sr Apartinaft W trd s 1:.. We e'ess Bo Heavy. ec Parksi 5 PWgnnnxIs: 10 schools: W RaOwd areas: 1s Undeveloped areas: Historical Floor Analysis 2 Graenealls, agrkuleual Osefta now analysis lsrouesaaa 45 stew: Paved 100 Grant 40 and sldaue0u: 90 Roofs: B0 Lana sardy was 0 Lawn,%daywyew 0 ne�m w rigam rtw uwougn rt in miovatr unap[er AsrEN aNOeQQaNp 1:16 PM 11r2m15 z O ag t` z W U z O U W O W g r- IE co t Cl � r U~ m n u U m V "� I U CIOoo oo ~II +.i cn Y < Q M r W J C CV N r r 0 0 0 0 CO C'l I� Zr z NCO COOOCo tO LL NNN .0 0 N N r rq ;r r `- 0 E v CA V V NNrr 00(0 � O Or CD OO Co O�nMO CO r CO C` N N V' V- 0 M M J ... r r r N N r r r r r W i W W W O c V'w CIOv V'0 CO 1--00 OCOOrr > J Cj 0 CjOO Q F- J W N Z W °Dn.n.an.aa Q Q Q Q Q Q Q Q Q Q CLMa.m U ~ .-. z fit` O 1� C` r r V' M n CO ONN C-4 QONN00 CO WV' V' N N r rco U') co J .a =0 V'O)m0000iONM .. M M M W F- 0 z � w O p o LO o 0 0 0 0 0 0 0 0 0 N N N N N N N N N N U) Q Z N Z V' 000000OOOON r N N N N N N C0 CI W J Q O r r r r r r 0 -V Vt Q o000000000 Z ^ UN NMN0006)M 0t` CO V V'Co co oO�MO O o o 0 0 c i mz m M V' CO W Cl- Om Zr'rN a (0 a� aa) v; m o0 N �I 7 _U CO U N w C U O Cc > 47 O � CL U f a a) if C J �a m U N C "a v n p a oV z m Ci o `° a z O F- z W c.> z O U a O W t N .� r U~ u u U r-I 00 00 r--i O) .0 t w LL N - -a CZ � � O T O C Oca p rz Y cM r W J Q C N O O O O O O M M M z r to N to to t(y tf) O O O LL E m V' V NNrr MMM O w Or m m 0 to to r I` M O M r (0 I N N t o M M .J v r r r N N r r r r r w w 2 JW W a c O v O 0) O aD 00 CD Un 'tT M. CR M MM Mto LO h 'ORt0 .J O00rr-00000 Q> H J W N W Q Q Q Q Q Q Q Q Q Q Qz CLaaaaan.mmm U ~ I- O 1" h r r t{ I. co I, N O N N w w N N M O M lZ I1 'Kr 7 N N r r(D LO � J C M MI-Il- Il-Ih n I-NN LO v r 0 0 0 0 0 0 r r r w 0 z w w W > 0- O o 0 0 0 0 0 0 0 0 0 Co OaOoOoOOOO 0_5 N N N N N N N N N N Q z S H Z�� O N N N N N w N N COD i- J Q 00 M CO CO 00 Co ao M CO M Q o000000000 Z "' O N Un 'V'NV fM(OO�MO QQ '- CD0 Cl 0 0 0 N N mz Mm Zr rNM�Un(0r,wm� >1 cc a u; m 00 N II U U u C O m N J > mCL N m a N 11 C J �a m L U L N �a v u m�a °m z 2Ln ao (p N W 2 Z W - 4 H Q E rc m y, 0 `m G m d > W � @o C O LL C � � m w � m y. r w a � 5 m �N c LL m � C N m b C C � C W m Q N r 0 ° m a m c a m O a 4�1 u W w W � m Om W mnNNeO r �� °t m� � �coodood�Mni W 1p ron rN (qp {Y1j o� `m�wo8$SSo8888 88 S8 88 $ C O O O O G G G 0 0 C O 0 0 O p m C m f7 N OI O �- e- m g q m n N N f O h t0 (7 m 0 0 0 0 0 0 m N N m n n N O m 10 C. 6 V OCOOGO•�NmmN V i[l CO w" m � m m m m m 0 m N Ym] N N N N N � � �- y m " � 1V�iN � � mm n N N n U O y m m 0 m m m m m m m m m m m m m oododdodod od dd dd 6 c; tN` l V i h N > c p m _ E O 6 6 O O 6 0 0 6 0 0 0 O O O O O n O V N O V O m O m f t � O G O E ry LL oI a v e e p A N •..• O O O O N m I a ILa a a � n ..P c E N�-'-000Om l7 n �T tp (O HHN i[>N tV N N N .e-Q W m 0 N 00 tot m N m W �Nt'J emmnmT .-N n Oct NM ep g; m 3 � �NCle u�mnmmo �N 8 � oP @0 z €o a LL 02 }m OLL L r a$ V a a 6m0 _ m LL O N C O O O ¢ C O ` C m d N r �2 O Sa m 0 p p H\.pOOpON\,N Npp� AM1 $0 m �� LMOIK\NOaOG��� lNl e� �� NY! G O O e p Q p p p p p p O O O O O O O S O O S S S S p p O O p O p O O O O o 0 0 o O C G O O o OO 66 G sp mm !2 .9. ii °o���o vim C �m\CO OOO GO�NtV fN NH 2 OOO N R3 ���NNNYI � ��pM1 H�(l�� 0 0 0 0 0 0i M1 M1 0 Op�p0 hN n M1 M10 0H N N mpl Nei 0 0 b U U pd p0 p0 p0 pN ph ph O O O O O O O O O O O O pN O O pq pq' O O, O U + m m m b m m o m m m c c000000co com cd o0 0 E �YINYINNV1000 �q ON YI MI N O � g@ E €E0000000aoo oM1 om o C O O O OO C C O O G 0' ryo € EEr m �g I a an a a �E�NNNNuiNw� R00000 iT V C CI q 0 S --w\vi m n m m� a� E APPENDIX C 21 11 STORM SEWER PIPE SIZING, INLETS, & STREET CAPACITY CALCULATIONS 22 171 5� 1 Z9 N %� 0 w w a o a I ,E LOOO N L f N IL— N N N O0 0 i N IL_ L— l0F o 0 0 l0 �0 0 0 0 a,^ o LC5 0 0 o to o o 0 0 0 0 0 0 00 0o0 0o =a0000!oloio!oCD o o 000000i000 y a O N aL7 O O O v,5 I in v,O � I I O v� i O O O (, 0 � ; O � I eD I I I t I i oa�:00�00v1�r'OM� R O ^y D W O 05 O enO 0 +O O V I N IN •--� O IN Oiz M f7r I�g � L(,; L47�t OlNCL(;oN -•vaa �v��r aaa v(�r v� 00 ta ri � � F' . u I � H 6rz A A .9 1) I � � •�1 GLI v � � � M M � � M t._ �"? I � y p v p 0 O O O I O O O 00 o A 1I IvNi LL •p In L0L00 0oho � f M ! � M I � ` OHO �L��I� 0000 I h 0M N I O ( O (� i M M �w 110 N�( O OoO C�Oi LWI OHO I � vi ikn I j to •� V� 0 0 0 vi O vi Lti Ll vi u — 0 c 0( o c c I g�o 0 0 0 o Io 0 0 0 c 0 c �- l- _- i V� V] GO on `_. C • 0 N Pt LIO0 0 �o 0 0 0 00 00 0 0 cn •r O L(C- O 00 i L i a �� a to. O O U uU U �U U ~ m O LE� L(=� LC) I OOo I o o. ILo— I— •,Vr I C N L:w==, N�ONl�lo :cq2 �' I q V C O O O O O O �O O _0S O O O O IO O O I N IO N i " I \O O CD cc t W I kn w v �o O t` O t` O t� L r-. � ri CD 00 0 00 O a ucl- 0OI� o 0 0 0 to 0 0 0 �, ... � L_ � I L ii ^+ OHO O�0 en WO kq I W I O I Ri v � CD a,% CD aN � ' � (is� +I OOi I ' .-. N N to �tnC#n Con Intn� G � I L V y. 'a O oo O kn M I� I lz I o M°I 0 r m 2 lz tm- o I o Io . 'Q � o � ' o Io o z I I i V ow� OM M i I L 0 I N N M � i O CL O O I tn O M, w 2 6 N U o N OMO of L_ A oL.ttn- u q G U vi w i vi 4 a o N kn N (t N ; i I N '� ^ �N _o w G4vOi wz� — �rn CO) � .r I� M 0 0 0 ...cEai i a �Ob to to to to to to 41 k k � .X cd � •k cd i< � L W•.rW W'� WSW WSW I I es 1 Q s Vl V1 M c; i -E � N N 7 I N I I O I M I i yaw ii co �'i O fir' O, •� O •� I O co 'a ! U i a o o C) O C O I _I I'o M � I L M _ ppj q a r O v� O �n oo O i Lj � pAq pAq � U I rA W I U •: I X C an on co oq yrn .fir H I _ O O I O O 00 00 I p I p �00 c0 OO O Ei M { M 0 00 106 en �p fo L CDCD M I M I' O 00 O4 00 I O p I O M i U U U U M I M I M M II{L— M Q 4 en Q Un Ltj) L 0 Q I i { a o w N L L��L ojol� tn w I4 4 00 00 N O 1 w 06 0\ O r+ N N N' 4 ON w O O O O M O a a" o 0 6 6 6 6 6 6 Li Q m�L Ll •--�V�vo Eo` — ^ 00 O O O N I rr R7 .-� W W M h kn� O q .w�,. o 0 0 0 0 0 o( O i CT D\ O\ O\ as ON O\ O� C It V V It 'qr � 7 IIt I y Q B 5Tatw A an-ka& Z' x s' 9c8) (FAs r6M Z' x s `P-c8) EruD 2 ` x S ` /-CA I N 1 1 � 1 Q 1 � OUTFALL z ` Xs I AC B i l�Lo„•� ;�Oir, !N � gw{olo i 0 e'o io two o.\ Io 0 to ca es G � �pq d I I (o to O I!C!I O .. 10 I C I QQiolo a I s ; ! I O c u10LV �� cl o `� I ° alo'� tIC;! cl 41 06 cc � x p � � q d• � b °o !o (o i o� OQ ky r.d .� ..fir G � ^^� � - � .■ "I � ! � s., U It rA z ag ca F f ! ! i I � I , I� � ! I i cn i a I(V cV i ja Gir v I d. d. m; l� j O E y N ( N E" I p `. 00 ono ""' }oho o o Flo 6 mi •q- L I O � � r JQ: cl v hH i 0 tei 0 0 Q 0 N V I ipi m q C �I 10, .•. co WIC I ! w d � pv" O i. .ED a _ten. a. N N .b 0 N U 0 rn on w a U 70 0 0 Q 'L7 0 w 21 0 0 0 0 �o 44 W I O I L__ Ikn i a as 0 tV 93 C-4 I • • • �a O it O e� 00 L, o rn Ml �w � O C'? H s �. la, t v o IOw Iq I o�100 a u o w Z7 c C ' C° i a i 3 �ON � A 61 � x' � M L� loi 0 p^ �.ccy •F: O W C i 0 A I�av��i I a i14D i �c f i 'N I q k s- W 1 N r,,#► - B7, (S' TVIF P-)PJr er) F-+ 6Nb 18 "Rcp 0 A Gn 10 L a l 0> •� L��4CD LO4 L(Q=� oioE I� I i L O� OIO O � I C O C o0 0 0 U ��I w aQi 'u a c o I 0 ao 000 L0 0^ o 0 0 �d�, o 0 0; A b � � o 0 0 rn 1 3 o C ej C ri N wovo r, � w I a ° O n n i w a wz o��l is a tLotr-'� Lac� u c o 0 0 .° •g Q•� i�r O O O C 00 00 N Ud o 0 0 LL u � C F .•. q o •� Lc; L�! 0 " q a o Io 0 0 N W o cn CC y d O i 0 O � q; y saO v �, w0606 O o O 0 U U wl d p a� N o Lc; Y q q to 0 a y q v!v v ,-. o I o v 0 't ; W a i i a e t - w q O " o� i� rn C) i �o a 06 o l Wz P P� I �- 0 s s , U I ^O a� VDA .. 4X �'n y o 06 0 .- rna _ C u 00 F- I C 1 O .d w O N N (iy L O O n C z oww N ryl � M M ,$ q � ry O o w U A v 0 CD tn 00 Ru u N N t V w wv kfi WI p, N u, � a 3 as ty y N O y �+ O t3 N U) a w ¢�4, • • • w � y coin Q bA Op TS bU to . w�w�w ol N tC2 "O O O O 00 00 00 00 'b v fir. c L(O-Do N I � Ci a p, rA o 00 0 00 q a o L o U Cl y o n a awv N �+ � N w CO) rA C • • 06 O Lam o 0 i w W 8 I R M �O ♦+ Cl) h v C� C> O � � A N vy wl C> C> D v v a c. i+ i ! L— A an a m o y a an v Apq a o O i � OOi W cc IL_ A Wz 14 O F— Q F- D 0 Z O vi 06 CU O F— M� E-' z `iJ r K 1-3 HW A ww As o wp, o 00 0 0 0 a Lr 010 0�0 0 C 00 °' 'n 4m (o o 0 0 c I a Qw oiolo 0 0 `"" � U o 0 0 tn 0 kn I � ` ��v o,0 0IO 0 K a y o to 0 0 0 C a y O O 1 ' C w I C O O o o (OMi IN o O I •c q�^ n 0 0 00 IC7 W I� O1v ;v v v r. I M cc (tea wz 5 T3 . 'b . U 'C7 W vUi •Lf y � 3 �y = p G O O O O I O A cc Fy o o •� s J* ,a 0 0 0 o 0O0 0 Q 0 O o o of o1c; cow a 0 oo Io o 0 of 0 o 0 Q cq U Ling 0 0 I 0 I 00 kn o E4 0 o Ioo 0 0 0 0 L,6s � 8•� 'E..i o O o�o OHO 0 O 0! O( IVVV• � L_ —__ f Mci � � 00 00 en I � O N N N N .fir b .G O O Vl N e L � wz O O O �O �O i �p O I c N CIR wa M M M I wO O �O N Iw 0 O � Ii i00 M 0 0 0 �� cn I- cd w b b a 00 I 7a R �0 r "., : Z X El LJ 0 0 j N N N '~ I.. A aqy I O O O O N N N ow O O O O O —I v a I O I o 0 0 _ I I ri N pD G O O O O ++ N N N N I 0 0 I U U o 0 0 C-i cli 1 a; N Cd W 5•] O\ N � y v�Oi �D I� rn l� rn ON 01% o ry cis p," rn rn rn rn � a � � 1 x kn vi � rn rn A p � 0 a a CDan o 0 0 l a q o <n A aaavL(=> 0 0 0 i W C4v M � 0% rY ON Vl C� H L N N O O a C) C� � U Cl) � U U H, E cu a0i V on Q N pQ N +r wI Q w o Q 3 bD *= �7 ��°w N ca N O SIN a N > � * N y >Cd In II 'v C+I) o o c�raaw STORM E STint —EZ <<o' TYPE R �N6t-Y 29" Skn4 hv0 ..� JTFALL O a, 00 0 a, a 0 W i.l e� �W F _a a w O o A •� •o ? v �oaool00 I L_ �a w. 0 '1 0 0 i �a� o i o o� L o 0 0 in r e o �� w CD aQi �a c CQ L �.^ 00 On 0 � y U O O q 0 x o 0 of U � �cl R f IA •� RS c o D a 49 W � 41 04 b F ' 1 0 so. o o _a � _I •� i. IN N 00 N N H L I o to Ud o[o o Iw��+� ao`��I� U I i C CD 00 y � N i a � � O L4 a.9 0l0 �E:Biolo I ao 0 a, ..., �w o IAI N a ;i O N �� �I as aaa Ui I o ►r O� v ► IW�tn C9CD R7 v O\ �a � 8 w Wz I b �a� o 0 — u ri O p v � R wz ► If, A � � $ o a v ^ A.5 oNo. Cam" U O O O� N 7 U >wo 0 Pro o ej w� 6 0 0 0 a s U f � I Ii Qv M� i 0 c, o ►`7 t� N m O N I O O N v U � o N Q a c N N C I �U O O w a w % `^ r, w Wz con ca r E rA o � of i Ia I Gn +r W) �r w �wav ikn rn Oo" ' j I x r O �v, rr y oo i q ... O 0 I I^ O � Vi � rm CA iEa o io cc 000 W4 oI N y ^ � � a � M i IIII G L N 95 C V � vt A Wz STORM F STrN -rS ►AILET ) -z_ 24p 5� . ' OUTFALL 1 A c 12 Ow I� 00 ta 5 0 I� L w LLI a a p,^ O e o o o 0 0 ca �Ioa ,-. O w 0 a:: o o Lo Ca eC C 'v c. o � U o C O 'V O w e O O (t) a C O Ly cc, ^o _o Ad� o d i a 0 O N v O O F q o o c�i W _ C 140 W a Wz E5 L I a w F i GTr 614 II� � �i IDR7 �" O O o o CAi cl 0 a °oo' I 10 a ., oloi E., a O o w wz q O O Q v�i O � u � p N a 0 o U a C C O ci i knt W .� 6� � w a^ o0 LQ W� L i ^ +r A p C> A L� C � M a � w Wz i I � 0 U 't3 3 � vN o d � O N U p; � wz o 00 0? wa � M as A" N o p 4=1 00 W L U A" o N a cs a^i. C � enO �. U v M o ;To w wV �. � � w Wz 0 0 • ; a by b o two Ubo rn N y 7 d v M � � o N a o N � N � a o N N N GM U aw N Wz 0 t a �.I °o a c Lc�) LI �^ °" rn GM ♦+ kn A � o PC 14 tea' w q PC c pq a v o A a vn W L wl A � � w Wz No Text • Project: Inlet ID: DESIGN PEAK FLOW FOR ONE-HALF OF STREET BY THE RATIONAL METHOD Hannorw Tech Park FMh Filing IMOM at Design Pdnfa 114 3 S 1 Design Flow = Gutter Flow. Carry� Flow —i OVERLAND V LOVND� I STREET I IOV`R❑LWND GUTTER PLOW PLUS CARRY-OVER PLOW '% GUTTER PLOW. III INLET INLET �• —1/2 Or STREET .ocal ..... 0.8 4.2 cfe Show Detaft Subcatchment Area- gees Percent lmpervioua= 9(, NRCS Sea Type = a. C, or Site Type: Slope ) lan Ih ff Is this, Overland Flow • aae a Non-liam Gutter Flow _ 1 s = ' ' ♦Minor Storm 11Qor tone Design Storm Realm Period. T, _ !ears Realm Period Ono -Hour Preapitagon, Pr • I;,,,s,•, User -Defined Sturm Runoff Coeffident (leave eas blank to aeeept a celaWteO vaWe), C User -Defined Syr. Runoff Coefficient pease Otis dank to amept a ealodeletl V ), Cs Bypass (Cary4W Flow from upstream SabortehmeMq 0. cfs TOW Design Peak Flow. Q • 0.9 /,2 cry 1bd; f - F-twtl Ta SI zF /dLt>�3 -TYPE /N1-67:5 Work..sheet Protected IN THIS SECTION IN THE SECTIONS InIetDP2, Q-Peak 7/142015, &.21 PM 11 I ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor a Major Storm) (tsasea on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Project: Harmony Tech Park Fifth Filing Inlet ID: Inlets at Design Points 2,3, 4 8 5 Tcnowx K T. TMex w T, �, 'I Street �a �. Crown r i4.���� MLURB d \.�\✓� i 5 Y� Warning Allowable Width for Spread Behind Curb Slope Behind Curb (leave blank for no conveyance credit behind curb) hV's Roughness Behind Curb of curb at Gutter Flow tine ce from Curb Face to Street Crown Depression Width Transverse Slope Longitudinal Slope - Enter 0 for sump condition g's Roughness for Street Section Allowable Water Spread for Minor & Major Storm Allowable Depth at Gutter Flow Line for Minor & Major Storm Flow Depth at Street Crown (leave blank for no) TWK = 10.0 ft SsMx = 0.020 ft. van. / ft. horiz niv= = 0.029 Hems = 5.00 inches Tcs = 20.0 ft a = 2.0D inches W = 2.00 ft Sx = 0.020 ft. vert. / ft. hortz So = 0.010 ft. vert. / ft. hortz n, =1 0.018 Mirror Storm Major Storm TMex = 10.0 15.0 ft dw,= 6.0 7a.0 inches check = Yes 1110wable Gutter CapacityBased on Minimum of Q, or Minor Storm Major Storrs Ctmw = 3.4 8.9 cfs storm max. allowable capacity GOOD - greater than flow given on sheet'Q-Peak' drama canoe InIetDP2, 0-Allow, 11/=15, 1:14 PM INLET IN A SUMP OR SAG LOCATION Project' Harmony Tech Park FFRh Filing Inlat ID - IrtlMa at Design Paints 2,3, 4 a 5 r t4Glab ' � /IVart wP L. (G) r of Ireat d Depesaion (additional to cerdhnuwra gutter oepaoslon'ahom'O-Ntorn doer of Una Intete (Grate or Curb Opening) r Depth auWde of Local Depreaatm at treat a Womutlon IN of a Unit Grate h of a Unit Grate Opening Ratio for a Grate (tAkal values 0.1".00) ping Factor for a Single Grata (typical value 0.50 - 0.70) e Weir Ooelfoard (typical value 2.15- 3.80) e Orifice CmrtkieM (typical value 0.60 - 0.80) n Opening htiamotlon th of a Unit Curb Opening M of VwbcW Gab Opening o1 Inches M of Curb Orifim Threat in Inches s of Throat (sea USDCM Figure ST-S) Width for Depasalea Pan (typically the gutter WON of 2 feet) ping Factor Ma SOgle Curb Opening (typical value 0.10) Opening Weir Coefficient (typical value 2.33.6) Opening Odom Coel0dent (rypkal value 0.80 - 0.70) Inlet Interception Capaelty (assumes clogged condition) MINOR MAJOR Inlet Type= COOT TypeR Gob Openong ocr 3.00 3.00 No 1 i Flow Depth = 6.0 12.0 MINOR MAJOR N..n' H.' That, W,' rr(C)• C.(C)= C,(C)= n N/AMWA WA WA WAWAWA MAJOR 5.00 t/ 500 6.00 6 00 6.00 500 63.40 9360 2.00 2,00 0.10 0.10 3.60 3,60 0.67 0,57 Itches Inches /eat feat feet itches Inches degnew fast INe1DP2, Inlet In Stomp 7/142015, 8:22 PM INLET IN A SUMP OR SAG LOCATION Project HTP 6TH FILING Inlet ID = STIN-El (D" L.(CL= M-ven \W�\ WP _,----------- Io(G) of Inlet I Depression (additional to continuous gumer dePressim'a hom'Q-AIIMI W of Unit Inlets (Grate or Curb Opening) Depth outside of Loral Depression at Inlet r Interreation tlh of a Unit Grate I of a Unit Grate Opening Ratio for a Grate (typical values 0.15.0.90) ling Factor for a Single Grate (typical value 0.50 - 0.70) Weir Coefficenl (typial value 2.15- 3.60) Orifice Coefficient (typical value 0.60 - 0.60) Opening W—tion h of a Unit Curb Opening d of Vertical Curb Opening in Inches d of curb OdPae Throat in Inches of Throat (see USDCM Figure STS) Mdmh for Depression Pan (typically Oro gamer width of 2 feet) Ong Factor for a Single Curb Opening (typical value 0.10) Opening Wait Coefficient (typical value 2.3-3.6) Opening Orifice Coaffhcent (Weal value 0.60- 0.70) Inlet Interceptlon CapacRy (assumes clogged condldon) MINOR MAJOR Inlet Type' CDOT Type R Curb Opening an,r= 3.00 3.60 No= 1 Flow Depth = 6.0 16.0 MINOR MAJOR L,(C) H.•h' Theta = W. Cr (C) _ C (C)' Ca (C) _ Lo WA N/A WA NA WA NIA WA WA WA NCA WA RA 10.00 10.00 e.OD Gm 6.00 6.00 63A0 c"3:0 2.00 200 0.10 0.10 3.60 3.60 0.67 0.67 inches feet feet feat inches Inches degrees feet STIN-El, Inlet In Sump 11=015, 1:11 PM ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) lclased on Regulated criteria for Maximum Allowable Flow Depth and Spread) Project: HTP 5TH FILING Inlet ID: STIN-E1 , (DP-9) Warning T•Aca Tcaowx S•��. T. TMAX w T. ^ Street Crown Hcuae • LTA � $. Tim Allowable Width for Spread Behind Curb Slope Behind Curb 0eave Wank for no conveyance Credit behind curb) irVs Roughness Behind Curb of curb at Gutter Flow Line m from Curb Face to Street Crown Transverse Slope Longitudinal Slope - Enter 0 for sump Condition ig's Roughness for Street Section T. ` 13.0 ft SMA = 0.020 fl. ven. / R horiz n•nca = 0.029 Hume =MO.O05 I ncnes Tcaowu =ft a =inches W =ft Sx =ft. van. / ft. hor¢ So =ft. van. / ft. hor¢ nmm =1 0.01E Minor Storm Major Storm Allowable Water Spread for Minor & Major Storm Tmx =1 18.5 1 24.0 ft Allowable Depth at Gutter Flow Line for Minor & Major Storm rl v = 6.0 18.0 inches Flow Depth at Street Crown (leave blank for no) Li Li cheek = Yes Minor Storm Major Storm Allowable Gutter Capacity Based on Minimum of Q. or Q. Q .. .1 7.6. 19.1 cfs r storm max. allowable capacity GOOD - greater than flow given on shoot'Q-Peak Warning not Aaainw harm. STIN-El, Q-Allow 11/2/2015, 1:11 PM INLET IN A SUMP OR SAG LOCATION Project' HTP FIFTH RUNG Inlet ID = STIN-F1(DP-10) r-- I.o(C "= r N-Vert 1NP _ o Lo (G) of Inlet Depression (adm0aial to continuous gutter depression'a' hem •O-mbw) w of Unit INets (Grate W Curb Opening) Depth aulsWe of Local Depression at Inlet M of a Unit Grate It of a Unit Grate Opening Ratio for a Grab (IypiW vakm 0.15.0.90) RN Factor for a Single Grate (lypiral value 0.60 - 0.70) r Weir Coeffdent (Iypial value 2.15 - 3.60) t Orifice Coeffdent (typtat value 0.60 - 0.80) Opening bdomlation Ih of a Unit Curb Opening It of Vertical Caro Opening in Inches it of Curb Orifim Throat in Indies I of Throat (see USDCM Figure ST.5) Width for DaWasaion Pan (lypiafiy the Quitter WWta of 2 feet) ling Factor for a Single Clue Opmeg (typical vahm 0.10) Opening Web Coelfiaenl ("iced vehro 2.3-3.6) Openbg Orifice Coefficient (lypial value 0.60-0.70) Inlet Interception Capacity (assumes clogged condition) ipaeny 13 GOOD for Minor and Maler Brnnns no PFenI MINOR MAJOR Inlet Type COO T OT Type R Curb Opening Z= 3.00 300 No 1 Flew Depth = 6.0 18.0 MINOR MAJOR naea 1.(G)= WA WA feet W. WA WA. feel Are= WA N/A G (G) - WA WA C. (G)= WA N/A C=(G)= WA NiA MINOR MAJOR I. (C) _ Hasa = Theta = Wr= Cr (C) _ C.(C)= Ce (C) _ a 10.00 10.0C 6.00 6.00 6.00 6,00 63.40 e3+0 2.00 2.% 0.10 0.10 3.60 0.67 -357 feet inches motes degrees feat STINfI, inlet In Sump 1122015, 1:12 PM ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storfn) - Protect: _____'_ HTP FIFTH FILING Inlet ID: STIN-F1 (DP-10) TBACK TCRO�WH Sa1C_— k T. TMA. IN T. Sheet rown NCUMB a \yi Warning MUM Allowable Width for Spread Behind Curb Slope Behind Curb (leave blank for no Conveyance Credit behind curb) mtg's Roughness Behind Curb of Curb at Gutter Flown Une m from Curb Face to Street Crown Depression Transverse Slope Longitudinal Slope - Enter 0 for sump condition tg's Roughness for Street Section Allowable Water Spread for Minor & Major Storm Allowable Depth at Gutter Flow Lime for Minor & Major Storm Flow Depth at Street Crown (leave blank for no) ToK = 13.0 R awc Sx = 0.020 ft. varl. / ft. horiz na.cx = 0.029 Hcune = 8.00 Inches TcRowM = 28.0 R a = 2.00 inches V = 2.00 R Sx = 0.020 ft. verl. / ft, horiz So = 0.005 ft. Vert. / IL horiz tt mm =j 0.018 Minor Storm Major Storm T, x = 18.5 24.0 Ift tf r 8.0 18A linches check = Yes Minor Storm Major Storm rle Gutter Capacity Based on Minimum of (], or cl, = 7.6 191�dfa max allowable capacity GOOD - greater than flow given on sheet V-Peak' max. allowable capacity GOOD - areater than flow aiven on aheat'O_P.k, not meet the d.f..n .a.... STIN-F1, "low 11/2/2015, 1:12 PM APPENDIX D 23 SIDEWALK CULVERTS & RIPRAP CALCULATIONS 24 HTP FIFTH FILING Culvert cl 7-15-15.txt • CULVERT C1 Q100 = 3.16 CFs (C = 0.95, 1 = 9 IN/HR, A = 0.37 AC) 7RG 7-15-15 channel calculator Given Input Data: shape Rectangular solving for Depth of Flow Flowrate 3.1600 cfs ✓ slope 0.0100 ft/ft manning's n ..................... 0.0290 Height.......................... Bottom width .................... 48.0000 in,/ Computed Results: Depth 4.1667 in — � velocity ........................ 2.2752 fps ✓ Full Flowrate ................... 15.6418 cfs Flow area 1.3889 ft2 Flow perimeter 56.3335 in Hydraulic radius 3 5503 in Top width ....................... 48.0000 in area ............................ 4.0000 ft2 Perimeter .................... 72.0000 in Percent full 34.7227 % critical Information Critical depth 3.2243 in critical slope 0.0225 ft/ft Critical velocity ............... 2.9402 fps.,' Critical area ................... 1.0748 ft2 Critical perimeter .. 54.4485 in critical hydraulic radius ....... 2.8424 in Critical top width .............. 48.0000 in specific energy 0.4277 ft Minimum energy ................. 0.4030 ft Froude number ................... 0.6807./ Flow condition .................. subcritical ✓ Page 1 "fps ' f' o ,I Culvert C2 7-15-15.txt HTP FIFTH FILING CULVERT C2 Q100 = 6.6 CFS (C = 0.50, I = 6 IN/HR, A = 2.20 AC) 7RG 7-15-15 Channel Calculator Given Input Data: Shape Rectangular solving for Depth of Flow Flowrate ........................ 6.6000 cfs slope 0.0100 ft/ft manning's n 0.0290 Height ..................... 12.0000 in Bottom width .................... 48.0000 in ✓ computed Results: Depth ........................... 6.7101 in velocity .................... 2.9508 fps ✓ Full Flowrate ................... 15.6418 cfs Flow area ..................... 2.2367 ft2 Flow perimeter .................. 61.4201 in Hydraulic radius ................ 5.2439 in Top width ....................... 48.0000 in ✓ Area ............................ 4.0000 ft2 Perimeter .................... 72.0000 in Percent full .................... 55.9172 % critical Information critical depth .................. 5.2683 in critical slope .................. 0.0210 ft/ft Critical velocity ............... 3.7583 fps critical area ................. 1.7561 ft2 critical perimeter .............. 58.5366 in critical hydraulic radius ....... 4.3200 in Critical top width .............. 48.0000 in specific energy ................. 0.6945 ft Minimum energy .................. 0.6585 ft Froude number ................... 0.6957✓ Flow condition .................. Subcritical ✓ Page 1 • • APPENDIX E 25 EROSION CONTROL ESCROW ESTIMATE 26 L EROSION CONTROL COST ESTIMATE Project: PRECIS ON R 100-002 Prepared BY JRG Date: 0 10 0 0 0 11/4/201 CITY RESEEDING COST Unit Total Method Quantity Unk Cost Cost Notes Reseed/mulch 8.61 ac $723 $6,225.03 Subtotal $6,225 Contingency 50% $3,113 Total $9,338 otes: 1. A<=5 ac=$655/ac; A>5 ac=$615/ac. EROSION CONTROL MEASURES Unit Total Number Method Quantity Unit Cost Cost Notes Vehicle Tracking Mat 41 CY $30 $1,230 6 Gravel Filter 6 ea $300 $1,800 5 Straw Wattle Barrier 6 ea $150 $900 8 Sift Fence Barrier 8362 LF $3 $25,086 38 Gravel Mulch 0 ac $1,350 $0 39 Hay or Straw Dry Mulch (1-5% slope) 3.25 ac $500 $1,625 Subtotal $30,641 Contingency 50% $15,321 Total $45,962 Total Security $45,962 APPENDIX F MA PROPOSED DRAINAGE BASIN EXHIBIT, EXHIBITS & EXCERPTS, EROSION CONTROL PLAN, & EROSION CONTROL NOTES AND DETAILS SHEET 28 'ti � i - J: �MRMIXa BY WI1�lApEAACl1fECT 1 `EF r 1 I, I I I u`N`iE n��oEra me 11 __ I EASTamEOITECHOLOOYP xce� I I I g I I I I / I I • I^ I � I I i//J 11 •III I.I/ I I I I I I I I I 1; i III ewme Mmoocumear I p II IIII PRreMNLEr I Ilrve �,AUDI O (IIII I nWJeveeouunoaLMpr I tea..Fil iil>;cis:PRIa z IIIII I, °"aa� "WITH.pin¢A`i Ia: IREMT x1Er IF�I .� Cr , -- n�' l I r�F MATCwIEEEcauO I I I _ _ /I I =SM= E10 Nuux \ xvwlER Ww 1 / WsruLrMSLEOEBXIEwcEALONP I 1 \ w�In WoeaFaceraEKNloawww —A \ w _______________ _______- I I \ \\ \ I I I \ I I I \ \ \ I I I \ \ I I I / lip IN Hid 00FIenraNw we.E VOTn DEcx ORAua /FILITER ALLIN _ I s' L_ EWV I i ___ FNnTfxn 'CONCRETE SIDEWALK WLVERTS O.W MIN. (FOR CONC ONLY) I 8' 6• 4000 Psi cencrele /4 Ban 0 12'o.c., e.e. 04 Ron Continuous 2-/4 Ban 0 120Ac., 3' AD C. /4 Son Continuous 'D' OPENING 0 12'o.c. SECTION CC xrs aFluL Yl'YIIXAa VR plYA19U®rowLYW ICE a1S wRcl eplaT.t WxwxaxvpT �rMLIMIaTc®1. CULVERTO 'A' B. 4917.57 'C 'D' 4918.0) KM`WAm+uA)N f jl�llll I I \ . 1 ;/il llllI 1l it IIIII 1l II11 IIII tl 19111 I I I I lillll 1 \\ pllll//11 III 1 IIII IIIIII s 1// Illllll 111 ) II Illfill !!IIII p 1 I IIIIII / 1 / I 1 \\ I 1 I I I n / I IIII I i / \ 2 =. 6 ijL IMETRLi�H� la Jli I I RKPRPw � I � l repNMnooMApr I WwPv I I MpEWI I graEPuun6mREM I I I CALL UTILITY NOTIFICATION CENTER OF COLORAOp 1-800-922-1987 — 20 PPLVp"YO INcfM CONTOUR - 5 IT INTERVAL — 21 PRW4YU WlER1ED1An CWICVR - 1 it IF vplcL6 nACKlxc PAD — $F 5Li FENCE ® MP RAP }1,,,,,:% le' wnrnF WOK DAM HAY LA STRAW MY WLCN (1-sx) WAYII INLET FILTER L.nis of xOTLovuExi CONSTRUCTIW ACTMTES. TOTAL LENGTH OF SILT FENCE 8.784 LF (FOR SILT FENCE ALONG THE NORTH 860UTH SIDES OF TIMBERVAOU OR. EMT AND MST SIDES OF iECXNOLCOY PPANWAY, AND NORTH AND SOUTH SIOE OF PROPOSED SIDEWALK AND BERMS ALONG HARMONY flOM. WHERESILT FENCE 188HCNN OVER NARDSLAPE (SIDEWALK ASPHALT. ETC3 A GRAVEL SOLWFILTER SHALL BE UTILIZED IN THESE AREAS DURING CONSTRUCTION. AS APPLICABLE. 2) ALL p6NRBEDAREA3 A0.F TO BE SEEDED AND MULCHED, J) STOCK PILES SHALL NOT TO EXCEED ttl IN HEIGHT. q) ALL OFFSITE AREAS DISTURBED WRING CONSTRUCTION ME TO BE RE-VEGETATFDAND RETURNED TO HISTORIC CONDITION. $)GRAVEL INLET FILTERS SHALL BE INSTALLED WTHE PROPOSED TYPE R INLETS. AS WELL AS OTHER NEARBY EXISTING INLETS, AS ANY BE DETERMINED BY THE CITY OF EMT COLLINS EROSION CIXITROLINSPECTOR. 0) VEHICLE TRACKING PAOI6) LOCATIONS SHALL BE DETERMINED BY THE CONTRACTOR AND PRIOR TO CONSTRUCTION. AND SHALL BE IN6TALLED ACCORDINGLY. T) SEE SHEET C{q] FOR EROSNMI CONTROL NOTES AND DETAILS. B) MINOR GRADING VALL OCCUR SOUTH OF TIMBERV000 DRIVE 0.pW MD EAST AND WEST OF TECHNOLOGY PARKWAY, AS SHOWN IN THIS OMNINO FOR CONTINUITY BETWEEN W61TE ANOOFFSITE GRADING. 0)TNE COBBLE PITS ON THE SOUTH 610E OF iIMBERNGOD DRIVE ANO EAST AND NEST SIDES OF TECHNOLOGY PARKWAY WILL BE REMOVED 1MTH FUTURE DEVELOPMENT AND THE PIPES EXTENDED TO FUTURE, REGIONAL DETENTION AND WATER QUALITY PONDS (OR ONSITE PONDS, AS MAY BE APPLICABLE). MET AND 6EDIME ITT SMALL BE MONITORED IN THE PIPES DISCHARGING i0 THE COBBLE Pli6, AND CLEANED AS APPLICABLE. PRIOR TO FUTURE PIPE E%iENSION(S). tp PROP BERMING SHOWN HAS BEEN PROW DEO BY THE LANDSCAPE ARCHITECT. EXIST UTILITIES MO OTHER SITE FACILITIES MAY REQUIRE ELEVATION ADJUSTMENT. PND/pi flELOLATION. CONTflFLTOH TO COOROIIUTE NITX APPLICABLE ENTITY FOR flELOLATN)N ORADJUSTMENT TO GRADE OF EXISTING UTILITY VAULTS, VALVE eOXE8. HIRE. VAULTS, ECi. FOR THE PROJECT AREA City of Fort Collins, Colorado UTILITY PLAN APPROVAL mvRwFD: City Fn9lmer Dote CHECKED M: Water k WaelawaM way Dole CHECKED BY: StormvMer WstY Dote CHECKED BY: Parks k Recrealbn Date CHECKED BY: Traffic Engineer Site CHECKED BY_ Fnvnanmentol Planner Dula THESE PUNS HAVE BEEN REVIEWED M THE LOCO FMNY FOR CONCEPT ONLY. THE REVIEW DOES HOT IMPLY RESPONSIBIUIY BY TIIE RNICWINC DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS Of THE CALCULATIONS. FURTHERMORE, THE RE`/IEW GOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PUNS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN MY REASON AS ACCEPTANCE OF FINANCIAL RESPo1uslRVTY BY THE LOCAL EMItt FOR ADDITIONAL OUAMITIES OF ITEMS SHOWN THAT MAY DE REQUIRED DUPING THE CONSTRUCTION PHASE. aleekeD BT 11111 J.Cw[M1 UPSIONEU UY: AVAIMmm UMWN tlY: ANiFmim PiF� ? jo moo" Q ?p /ONPLE G�3' W. IOOOOi DATE. 12/18/I5 SHEET N0: COOS 5 OF 38 �"1M"wmtr.- It CALL UTILT' NOTFICATION CFIRENOFCOLORADO 1-800-922-1987 III YOU DIG GRADE OR EXCAVATE FOR THE PARKING OF UNDERGROUND PALMER JDAUTIES 0xH P EO 12P — 20 — PROPOSED WDEM CWTCUS - 5 PT INTERVAL — 21 — PRUP D NIEMIEMAIE CONCUR - 1 ET II umVEHICLE TRAINING PAD SILT FENCE — OF RIP RAP GOCISS UCEED VW WATTLE CHECK DAM MAY MI STRAW CRY MULCH U-5K) — OMAEL INLET FILTER WITS Of DEVELOPMENT 1) CONTRACTOR TO INSTALL SILT FENCE, PRIOR TO BEGINNING CONSTRUC ION ACTMTIES. TOTAL LENGTH OF SILT FENCE 8.7" LF (FOR SILT FENCE ALONG THE NORTH & SOUTH SIDES OF TIMBER M DR, EAST AND MST SIDES OF TECHNOLOGY PARKWAY, AND NORTH AND SOUTH SIDE OF PROPOSED SIDEWALK AND BERMS ALONG HARMONY ROAD. VMERESILT FENCE IS SHADOW OVER HAROSOME BICEWALK ASPHALT, ETC,) A GRAVEL SOCKffILTER SHALL BE UTILIZED IN THESE ARMS WRING CONSTRUCTION, AS APPLICABLE. 2) ALL DISTURBED AREAS ARE TO BE SEEDED AND MULCHED, S) STOCK PILES SHALL NOT TO EXCEED I Or IN HEIGHT. e) ALL OFFSITE AREAS DISTURBED WRING CONSTRUCTION ME TO BE RE -VEGETATED AND RETURNED TO HISTORIC CONDITION 5) GRAVEL INLET FILTERS SHALL BE INSTALLED ON THE PROPOSED TYPE R INLETS, AS HELL AS OTHER NEARBY EXISTING INLETS, AS MAY BE DETERMINED BY THE CITY OF FORT COLLINS EROSION CONTROL INSPECTOR. 6) VEHICLE TRACKING PALS) LOCATIONS SHAL BE DETERMINED BY THE CONTRACTOR AND PRIOR TO CONSTRUCTION, AMID SHALL BE INSTALLED ACCORDINGLY. T) SEE SHEET CART FOR EROSION CONTROL NOTES ME DETAILS. S) MINOR GRADING WILL OCCUR SOUTH OF TIMBERVA00 DRIVE ROW AND EAST AND WEST OF TECHNOLOGY PARKWAY. AS SHOWN IN THIS DR WNG FOR CONTINUITY BETWEEN ONSITE AND OFSITE GRADING. 9) THE COBBLE PITS ON THE SOUTH S1DE OF TIMBERW DRIVE AND EAST AND WEST SIDES OF TECHNOLOGY PARKWAY WILL BE REMOVED W111BI FUTURE DEVELOPMENT AND THE PIPES EXTENDEDTO FUTURE, REGIONAL DETENTION AND WATER QUALITY PONDS OR ONSITE PONDS, AS MAY BE APPLICABLE), SILT AND SEDIMENT SHALL BE MONITORED IN THE PIPES DISCHARGING TO THE COBBLE PITS. AND CLEANED AS APPMCABLE, PRIOR TO FUTURE PIPE EXTENSIONSO 10) PROP BERMING $MOM HAS BEEN PROVIDED BY THE LANDSCAPE ARCHITECT. EXISTING UTILITIES AND OTHER SITE FACILITIES MAY REWIRE ELEVATION ADJUSTMENT,ANWR RELOCATION. CONTRACTOR TO COORDINATE WTH APPLICABLE ENTITY FOR RELOCATION OR A➢JUSTMENTTO GRADE OF EXISTING UTILITY VAULTS, VALVE BOXES, Was VAULTS. ECT FOR THEPROJECTAREA City of Fort Collins, Colorado UTILITY PLAN APPROVAL City Engineer B: Water & Wastewater Utility BY: Stormwoler Utility PI @ Recreation BY Traffic Engineer Environmenkl Plonner THESE PLANS HAVE BEEN RENEWED BY THE LOCAL ENTRY FOR CONCEPT ONLY. THE RENEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE LOCAL ENTM FOR ACCURACY AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE. THE REVIEW WES MART IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ME THE FINAL QUANTITIES REQUIRED. THE RENEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL ENTITY FOR ADOITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. E a M CIIEC'KED BY'. 1. GM]I DESIGNED BY'. AVAMWun DRAWN DY: Am VI L i Z W IL 0 W o O\ Q r � 0a(I Z � J u 0 U. r NZ f fN N 24. Z ODW3 uwT[. IZIB/IB SHEET NO: C-006 6 OF 38 18-e STRAW 'NATII£S, EMBEDDED AND STAKED, As e w STMIOArm[ OOMA BIOwIRT Op WM CORSTRUCIMMPW ems WO M W -WATTLE FILTER- DETAIL, THIS SHEET, TO eMlalE ENSURE STABILICAROIN DE WATTLES 3ACHG SHALL BE O peamw, ID BASED M YCRTICA, ME-10-HEAD HEcHT(Ai ; ypxKy (IJ The- anted mslrwlurmuthe -t•d defeat WV bur(L) hung war to my cmlb= an WIERVa S YMME HE HEIGHT IS EXCEEDED BY SLOPE FpXi A MIST 0 ME Am OF CHANNEL) BE MOIER IryPI ($,] TIIwe shad6e en dsd g advifty wWftMe li ,d g dad An NO e==eped plans en ywmLE NCCO MIN MXT B (].I M wy Im dp ielt tl com tl Rating Jl Ili b' ael= my land dnlurdw•Nvity (t Xpl9 Ffl'^B gwbIBM ). Nl dM1tt rtqu+ed m1d +het he-n4JIMtlMe InPl nNeml m+•W rem es nd[akdn Me eTgrwMp I 1 neWk carrsW[kn ,\ and remory FORM HJ a all'times gig ther DwOWw unit W wingoemble for R -g Wit CMUdkNawb eeR=W M 1wa1 nM i d. The pa ,h ntlm be re be sP IN M unm r N n FIg n Oman )k aA ham alle hw - (sJ Piediyam wpNNia I ula Ra Id drN 'noewn mTTnl R I a,lnrbnaor OWNED (t(eWwredTba-gmeddE•le m lw 41mdL PAVIEW SECTION mes MNtdPd IX abl Hainfilling M k�dcMmla "M B ng 'ahelihM m) NI ein paDupmd donbylk*ngdA gal 91a d l , M1XeMNos Rq 4M aSM 1 9By FOOT -COMPACTED 1. INSPECT, MID ISP tNECESSMY)ME land rpltwotwryahM remeb pond b/I nddmrbnp Maly M1x In MM(ml der b1w vlXe g BACKFILL FLOW WATTI£ FLIERS AFTER EACH EHNL twmmarywly ome a 4(09. AewMr+rkh,l A pg,H.. Iles dheM=e 2. ALL WAT S MUST DEC RE CED AVER 12 •Rnandb)NacryR:anty. NJ InatlwrorMnikesm4n luWnWl.rlllpnXv<aruduraU Nnlbn [one4lm[amne any t. t - l Ir MDXMs UNLESS APPROVAL IS CAnxIED BY ME dONEERING gNSIDN FAIR LvNGER USE, Be"n edA,nribum dame wary AM, US weeks and af®=va, sOlifmnl Blom wait - ndreywimd orcM mdW05 rw'wrxy m CHART to eMers Me=urenued 0.+fummw of 3 HHASE REFER 10 F0.LOMNG NRCS NE04E FOR Mdrir enCM4ncdm. )v ADUllp L WATTLE INFORMATION AND INSrAW BE) Remainln phmmil won smasalMa rurmundingdNWMeanasaracurM'i"LaWvd PROFILE VIEW NOTES AND OETMLS wa,. .. .arre.sa_Wrwl andwVMmd by Ma w i Ecmtd lnsMda. let B•Mnw afar the vL has MAT vMamMN Sca°0xd as d OMInM by the vosm cmhd rwas 18" DIAMETER STRAW WATTLE CHECK DAM NTO nm 04 Man my ame[mare m•ssurm are removed Me OwNopa Than b4 responsible hit Me cleani ItOF up ,it nmrval III sMimem and Anne nail At dmmW Innis°utlure and Wlw pr m=iliW$ (9) Themm...for shell immedNdy ckm up any= Ilwclim mAMWB CAwn MlYdepnNdmed+Bel CURB INLET AwN, sdew,lk,, moMa pubic ABMs V OR end make Tort mmhnndwadwan•te [kmM+1M•-_ am of each wi dry. (1SJ Neuromood"anO,PoE=uMdY MnempwdrwMaY surta=es. dill b•remwed antl dspoa•tlN and stamen so ns nM mc.aa.MNrrman mo.mwAwi MMoumw sb. LEJ Nasal sm[Fpile shalxned lea 110)M1YbMpM.MMR ebdpin ehnlbpUeel•dfmr••SINM aensp MN surface Moorland welMrg. Mdwmlmrdtbrcg. Aa alOrlpilerenl•WMMe GRAVEL FILTER �' thin TSB) dry, JON be seeded and nulcned. (APPROX. 3 4. CIA) ( / ) (13J The SCROCR MV84me caNway ofdwmbon Honda we N rnax•d and dean same ln+ wit M cleaned ucaneeuon aHdeter,O end befue wrong Me maidnmp mnmtlX CryFNrAya CONCRETE Homemakerse Of WIRE SCREEN (ISJ disc And Ee DIS PardhilA tem (CIDI Ru CwaadamOf A APPR0X. 1 2- MESH) ESH ( / ) CWamm4Mr ffm•mme or[sand son. discharge nmrp My SdI mNeryoldlw polmanl w=mlammWNal5 A cFvmm�tmdash W We Ited t concrete track wash" ch�oMmllswS pia,,dw iw bAYenMImde°towaaW 2'X4" WOGD SND ThadldrgmahbN. W •^dew+ R4d4cls Bner. ens sann.ry wade. The devNapw MraM al ell4n�es iax.wnaleva meesan O OVERFLOW FILTERED WATER rt .auyl4a[seuml. mW [dN&Mmgdabms Nof ponmm� on Me ap ln.a=rea.awan •n/ me ell epgiaEle bml, yap and hbrtl rtgdanms. RUNOFF (14J Adtignaedarw indl me poAMdmsMe M[arrcntt nr<h[Nlewa:MrA. iberte LrYlbe am4uaed n esro mrwin walloutmtlMd mild b[md a Intl Bly IS01 mtaxry M1wn+q ewumry .. Mani m_o_o_m_n_ __n_m_o_o Q*W�PSC....M...... +r�t�Im. T.11rw1 �mi-_mmmmmm MOM MOM IKMMMMNM ermw.w smmmoommmmmmo mm-mmmmmmmmm wommommmmom mmmmmmmmmmm Q� mmmmmmmmmmm Q�mmmmmmmmmmmm mmmmommmmoom =MMMM �... ....I _._._m..mmmm SEEDING CHART Table 11.2. Recommended Species and ApDlkallon Raley of Seeds for Temporary Vegetation antl/or C'owr Crops Species Season(1I Drilled Pounds/Acre Lr (J Annual Ryegrass Cod 20 Oats Cod 70 l Cereal Rye Cod 40 Meet Winter Cod 40 U Wheal - Spring Cod 60 a Z Barley Cod 60 MMlat Wmm 30 ,{yf Hybrid Sudan Worm 15 Sorghum Warm 10 Cod xosmmgaaaes make their moor growth In the Wing. Warm season grasses make their major growth n late spring and summer Table 114 Identifies planting p dates far perennial and temporary/cover crop grasses b5 Table 11.4. Planting Dotes tea Permnml and Temporary/Cow Crop Crosses. DATE PERENNIAL TEMPORARY/COVER So GRASSES CROP GRASSES Warm Coal Warm Carol Jon 01 - FeD 28 Yes Yee No No Mar 01 - May 15 Yes Yes No Year May 16 - Moy 31 Yea No Yee No a Jun 01 -Jul No No Yee No Aug 01 - Au9 1 No Yea No Ym Sep 01 - Sep SD No No No Tea Oct 01 - DOE 31 Yes Yes No No Mulching ah011 be used to oaliat n estalishmeal of Wgel0lion. One or moreof Me a a following mulches shall be used man a Derennid dyfand grass seed mixture, or temporary vegetation or cover crap. S Mulch Acceptable Date" of use Application Rate Straw or Hay Jon 01 - Dec 31 1 1/2-2 tons/acre M 15 - Mo 15 1 1 2-2 tone acre Mat H ulio wood or a o Y / Ydm ( D D ) Eroalon central (mate or pianists) Jan Ol - Dec N Net applicable Hay ar Shaw mulch eANI be nee of noxious weeds and at lent SOR of Me fiber shall be 10 inch" or more BY Imglh. V.Mm seeding with native Tosses hay ham a native dlmg=mnmrvm THAT, canplebn dcmmuahn a[evem MewmmwaNpd marginalwb gross is a mggestetl mulang molerid, if avoilable. CURB INIET ra dandRs lya+pmMolgmto"umehgwwd WIRE SCREEN ItbJ Tanex•MM sWmed does not mane rem Md UM MOM or maeefee blM g If IrrlgaUcn is used, hydrou0c mulches may be applied from March 15 through Sep M. CRECK6DBY l0 GRAVEL FILTER a.mlmmayar[mid BMN shell b n"s and manakin Am Melde we WWK a adlsaq NDPES PERMIT NOTES 2"x4" WOOD SND +abmXrwegtneernion canal nspwM,(WMNn LawlsM Cn LEN+OMW. Hay a Show Mulch WIRE SCREEN a (a.) Belwn eugmbt dmtrspan+. 1. `+ITE its conP110N: DEMONEDBT'. lCoctb SECTION A W) Cd to dreinpe noes. a. Onsile ConsWdlon Whla eanaisla of Trading, utility work, and rootlway eomWdion' 1. Hey or straw mulch will per onchwetl to the soil by one of PLAN VIEW g.) Mmgld larirmp. Ins talowirp metnom: GENERAL NOTES: D. line major ngla des are planned in the r p following » Contra DRAWN Br. A. wil0rmuo 1. INSPECT AND REPAIR FILTERS AFTER EACH STORM EVENT. (JJ OMw botmailnwdetl. 1. ing oils f perimerofibbincyter neceseary far Deimelo mnhola a A crimper which will crimp the fiber lour inches or (1q CCHmmen Me fieM may wemmemdm cmtrd mapwnin »ibn rowM1et i+Mwmmmeea pars. 2. DamdliInstallation of perimeter controls. O re into Me soil. Al Meet 50%of the fiber REMOVE SEDIMENT WHEN ONE HALF T THE FILTER DEPTH Files awlNer Mah:npemnlwnam wm•rsuresw+dewmbamm�xay. e+bwldtl by Ma 3. Dradingan of existing asphalt, atrudogy and site items, as applicably. HAS BEEN FILLED. REMOVED SEDIMENT SMALL SI BE DEPOSITED C'nyFaan4 4. Grading of nmbowaatl in Te, Tclogy a Parkway, and sitlhrood !hall c 1e inches ea more In tailed FILTERING TE AREA TRIBUTARY TO A SEDIMENT BASIN OR OTHER 5. Utility cmture Impressionists within s (Sanitary Parkway and . Steam Se r). (p) or straw according mulch netting Installed over the nay fILTERINC MEASURE. 6. In do y Con Improvenmle (Sanitary Sewer. Water. Storm Sewer). r straw mcoPoing to monuladureri netrudbne ]. Roadway Construction ° 2. SEDIMENT AND GRAVEL SHALL BE IMMEDIATELY REMOVED A Sla ovoliof ontrol g weeding (c), morsuers sprayed an theme mule to the FRpA TRAVELED WAY Q ROADS. 9. Removal of control mwaurea nulwWrer's recommenml'wn. EROSION CONTROL CURR III GRAVEL FILTER CA The project contains approximately 6.05 acres. of which approxim°tery 8.61 acres is 2. All straw Or nay must be free of noxious weeds. b/ Is expected to undergo clearing and/c grading. Including ofsile gmtlng taking place to ei Bill to existing topography and to construct imberw°°d Drive, Technology Pakway N 1 PMC/CULVERT PROTECTION -WE nLL and future mosteplan steam coinage, sanitary sewer. end wdtenne improvements as CLASSIFICATION AND GRADATION OF ORDINARY RIPRAP _ LL P th HTP C Dmbowood Drive and eMnol orkwa ea e . agr r. campus. d. Rational "CA = 0.25 before construction with calculated Rational "C' values for basins •rgr- 1-10 (for storm sewer pine sizing only) varying from 0.60 l0 0.84; Howew, future MET risks r� �D AN row AN eve ATTo to Par. development of interior and adjacent lots shall adhere to the 80%Impervious Ratio, allowed otter construction, De Me HTP Moslerplan SWMM Model. Re site Iles within roe a nor a the ModeroM Rainfall Erodibility Zone and Low Wind Erodibility, Zone per Me City of Fort Collins zone maps. With the existing site doom of approximately 0.5E to fill, the new improvements will be subjected to both and d rainfall erosion. e. The predevelopment property far the die Consists of fallow lone that is cuuwUy being formed and irrigated. SECTION A -Aar L Soll and whicle fuel and fluids are anticipated pollution sources far the HTP Filth Filing r w Argo am uL no< roadway Improvements project. HowF these II be no vehicle store ggee or dforing on All AnnualTab , site. Chemical storage le t mticipoted on ite. Plasm refs to the Stormwaler Mmagemenl Plan for a complete IIBI of anticipated pollution amrces. trillTime nel THE boom OF RE "THE m 0 00 W Oho 0 J per Uri Z eal Z K yam a war m MTM mine `°eat`° •'a'T•c 0 There may be anticipated non-3tormwater mmpmmts of tlMcheage. Please refer to the - MAX PARTICLE SIZE. AT UNSf SO l W aF TXE w55 SW LL B[ SEw6 EWLL 10 OR W:fR RWI O ' e -�[It LT Slotmwalo Man°gemml Plan fa a complete list of anticipated pollution sources. Tubs wW Ni r AMR$nowa i.� A Awc U N WW ON 4 To t YOE STARS CR LfnAR ROCS 6 SLOPES ARE SIEEPG. INIET PROTECTION oAn 1 n r tow M1. The downebeam receiving wales a the Fossil Creek Drainage tea Storm wales runoff 1rI ham the curb E g potion of the site will be conveyed to d of Cobble pits and fiprap kL �yar a _. c.nroxX patls, pm curb ffi Tuner.' lets and piping. and cleTimnaa and rive and sheet flow. Upon �. O JI-`^IL- deveapmenl of Ma pie intea north bl smM of Tibe removed Drive and mat te west of I ` Technology Parkway, File Intent nibble pile beMl be remowtl and slam Notes, Wlmtletl V to regional ponds far Future ponds, m may De applicable far the rrep weal it ^ O Tecnnoogy Pokwoy). Future ponds will provide mtmtion one water quality far Me Z .J O PUN VIEW antldpoted, developed porcel(s). Tho future, regional, intention and water manly Monde M wn tl6charge to a future. outfall steam "ewe system, which will tie-in to the existing O W MINFE� OATS, MF�TM his downstream ysl s within Me HIP Campus, which ultimately discharge to the Fossil L W I Sol »...,..,SM. ..."IT"' IN w".CVIamwr.mmare emw .wm.e+w.r�VAMMESH o Mentea w Creek Dull Ditch. Please refer to the Drainage Basin Exhibit for clleas. � 1- r,. w VAnM T AND.m...... TIa MTM Fao[ [ L m eaAN u vlusa,m ii[°®irwh r�now THAT U) rx m 2 DIEe.MAPI+wED - /y :: o REP eesgiSILT sFENCE d. See Drainage ffi Erwim Conbd Plan. [r Ixar .emrmmr L.ea.ar. era a worn u rIey r+re w.rer tCI = 3. BMP'S FOR STORMWATER Pg1UPON PREVEFITON: TRAWW OR GRAVEL FILTER FOR PUyl INLETS, to SBRUCTUREBp1Fe. a. Ermbo and SedY mt Controls: See Efodm Con" Notes and Sequence Table (this CALL UTILITY NOTIFICATION Meet). CENTER OF COLORADO 1. VET R041W0 MATE BE LOCATED b. Matelda Handling and Spll Prevenllm: Meamrea Should De undertMm to control 1-800-922-1987 LLe AT EYERr ENIRNME/EMT AM DE m murn SIZE construction materiaa and waste. and di pawl of excess concrete (If applicable) to ORADOCALL 2 MXNEAG CAS IN ADVANCE1�- SLOPE 60 2. HXC1B 1edLI0N0 ear s1w1 BE u+INPrWn insure 1n18 and ono materials do not leave Me 911a and mlm lM1e tlalentlan pantl FOR x O I� Z M NEEDED To R RT Aug "Taal ROM RING which eventually ou6eM to Me Pmtlre River . Concrete. building maleial; waste, and BAHem HE UNI A W �+ .{� IP GXm COD) COY S U. deanup by-products should not be dischoged Into We on -site alarm sewer system Mm°n[MO°,MOER rRIDouiumrlc� wvxo O t 3. 56 T AND OTHER WRBML $pxl£D. CM'Wm nor should May interINS, any existing detention metls. la the Weill Of a 9pil (fan Ins O OR M KM CMO Cm STREET STWL BE WmF MY site into storm sewer system or existing datmli°n pczi appropriam mm+ures Mil ld ran be undertaken immediately to remove the speed matwlols and prWml future Skills from aamwM y aDyO a City of FOR Collins, Colorado who "R"r 0 = d50 = STATE CLASSIFICATION FOR tpIINAL SO. 4. FINAL STABIUTATION AND LONG-TERM STORMWAIER MANAGf1.1ENT: UTILRV PLAN APPROVAL LUECN. ENTRYSE FORECONCEPIBEEN EDNLIY.DTBY THE 000 dQHO STONE SITE. cap See Erosion Canlyd Notes this Meet fan final stabHkation measures to Contmi APPROVED: REVIEW DOES NOT IMPLY RESPONSIBILITY BY pollutants In steamwatw disaargea CityE imer Date n9 THE REVIEWING DEPARTMENT, THE LOCa1 ALL EDGES VILL BE 'TOED' INTO ABOVE DIMENSION. ENPTY ENGINEER, OR THE LOCAL ENTITY FORfall 5. OTHER CONTROLS: CHECKED BY: yIF RIP -RAP TO BE GROUTED a. Measures shmld be undertaken to remove excess waste products from the Bile antlMr 8 Woslewder UIiIM1yale pCCUIUCT PND CORRfCTNE55 OF THE WGROUt SHALL BE IN PCCO20ANCE 1➢dispose of MASON waste materials off -site in an appropriate manna. In oOdllon, CALCUUTIONS. FURTHERMORE, THE REVIEWQadpSTX[l10]-LpiEST REVISION. I (2• _ ]• ROCK �LIS mmsurm should De undwhahm to limit off -site ads tracking of mud and debris CHECKED Bff DOES NOT IMPLY THAT QUANTITIES OF ITEMS ilex GROUT SHALL BE VIBRPTEO IN PLACE. I/2 - 5/! MOM UYDl y" collage from v ides leaving the site. Mud and debris should not be tracked along 5lwmealer Utility Nte ON THE PLANS ARE THE FINAL QUANMES TOPS OF EXPOSED Rill WILL BE R`" mdways and mowed to ante nm-protected manage ways which dscharge eventually CHECKED ITS REQUIRED. THE REVIEW SHALL NOT BE VET BWSWD AND CLEANED OF GR T into the Cache La Padre Rive. TO EXPOSE RIP -RAP COLOR. 6- MM Perks k RMrmfpn Dote CONSTRUED IN ANY REASON 0.5 ACCEPTANCE 12/16/ S. INSPECTION AND MAINTENANCE: OF FINANCIALFOR RETIONAL QUA BY THE LOLL eci Tao 1]/1B/15 Inspection and maintenance should be undNtakm on a regular basis m Outlined In I]IECKED HT: SHOWENTITFOR ADDITIONAL O REQUIRED OF ITEMS $I ..F. TAA KING MATa. Traffic Engineer Gale SHOWN THAT MAY RF REQURED DURING THE SHEET NO: C-007 NIP RAP DRAWING section 6 of Ma Terms and candivana of me COPS cmwa Permit. CHECKED BY: CONSTRUCTION PHASE. Emwenmmtal Planner Dote 7 OF 36 RPRV IT BE Mlu YIFCiII MVxMR W" ERE AN. MSW ran IBM THE W WE (in PgMI) (NOTES) CIASs a" M - No a M - Io 35 25- b 10 e t - 10 <1 Cuba 12 m - am 40 Be - TD US 25 - M a 12 2- 10 3 DIASS IB )m 122E m - Te WE BE - SD she IB 2 - 10 10 LIASS M tan SE=O 25 - m 05 24 - 10 S5 v r� INTERIM COBSLE PIT ------ \ c\'-------- — -, �— J- I` 1 --Y---- y----=�-1�------~---�C----a— ----i--- ---------r--- \ 1 t � F- _______\ e i II r4--------��------- ----� II\\ N�'h AN \AN SITMOST i lip'ilw / `W ;Or - -L �aam-DRIVES I \\`O\�.. — I 2 am ON ! ' —f _ I ��\ I am oil e / oe� — — — — I f1IE11E1 ` I•i' P L �I it A\� // I COBBLE PR /\\F, __ _____u, d / I I / — / / \ INTERIM 1 I COBBLE PIT 1 1 Y ,It / r— — — — — — — — — all I I \ L__ �N FUTURE OIITF' I A 1 I I \ STRUCTURE TO ,[ vim{ _= _ _ _ — _ CTED _ _ _ CONSTRU .. IAA _ _ - {FlTUREREOONAL POND zri'I� r- 1 I I I I I I I COBBLE PIT a 1 /I / I / FUT _J RE FAUL STRUCTURE TOO STRUCTURE TO BE I I I NY \ AN \\ 1 412 am a" NUM I MGME T.,(e M® r qLR 1) THE DRAINAGE BASINS SHOWN ON THIS EXHIBIT ACCOUNT FOR 25.50 ACRES OF TOTAL ONSITE AND OFFSHE BASIN AREAS. THESE BASIN AREAS, ALONG NTH RATIONAL C' VALUES SHOWN BELOW AND IN THE NATIONAL CALCULATIONS ME BEING UTILMED TO SUE THE STORM SEWER INFRASTRUCTURE IN TIMBERWOOD DRIVE AND TECHNOLOGY PARKWAY ONLY; FUTURE DEVELOPMENT OF BASINS I AND 8 SHALL MEET THE 80%IMPERVIOUS RATIO FOR THE SAID BASIN$ EC' VALUES FOR FUTURE DEVELOPMENT SHALL ADHERE TO CORRESPONDING IMPERVIOUS RATIO OF M IMPERVIOUSNESS, NOT'C' VALUE OF STD, SHOULD THE DEVELOPED CONDITION OF BASINS 1 AND 8 EXCEED AN NOT, IMPERVIOUSNESS RATIO, ADDITIONAL WATER QUALITY AND DETENTION WALL BE REQUIRED, BEYOND THAT SHOWN IN THE HTP SWARM MODEL B HTPW TERPU 2) IN THE INTERIM CONDITION, BASINS 1 AND 8 WILL REMAIN IN THEIR HISTORIC CONDRIO6 WHICH IS EXISTING, PLANTED AGRICULTURAL FIELDS. FUTUREDEVELOPMENT SHALL PROVIDE FOR THE ENTIRETY OF BASIN$1 AND 8 BEING CONVEYED TO THE PROPOSED STORM DRAINAGE INFRASTRUCTURE, SHOWN IN THIS PLAN AND CONTAINED WATHIN THIS PLAN SET, FOR EACH ATTRIBUTABLE BASIN AND THE CORRESPONDING DESIGN POINT FOR EACH BASIN. 8) THE INTERIM COBBLE PITS IDSCHARGE POINTS (LOCATED SOUTH OF TIMBERN4V^O DRNE)ME PROVIDED FOR THE INTERIM CONDITION ONLY. WATER QUALITY AND DETENTION NEEDS FOR WINS 1 THROUGH 10 SHALL BE PROVIDED BY OTHERS WITH A REGIONAL DETENTION POND. MICH M L BE LOCATED SOUTH OF TIMBERNNOD DRIVE, AS MUM ABSCOND REGIONAL POND (OR ONSITE POND) NEST OF TECHNOLOGY PARKWAY MD SOUTH OF INTEL. NTH BOTH PONDS CONSTRUCTED WTH FUTURE DEVELOPMENT. 4) SEE MTIONAL METHOD CALCULATIONS FOR COMBINED/ ATTENUATED FLOW FROM COMBINED WINS FOR STORM SEWER PIPE BURNS PURPOSES ONLY FOR THE TIMBERVADOD DRIVE AND TECHNOLOGY PARKWAY INFRASTRUCTURE IMPROVEMENTS. S) RUNOFF FROM STORM INFRASTRUCTURE IN TECHNOLOGY PARKWAY AND TIMBERWNC) DRIVE MAY OUTFALL TO IMERIMMDTEMP YCMUEPIT6. FORMEAS MERE INTERIM COBBLE PITS ME UTLQEO FUTURE DEVELOPMENT SHALL CONNECT TO THE PROPOSED STORM SENSE STUBS AND EXTEND THE PIPE SYSTEMS TO THE CRETE OR REGIONAL PONDS, M MAY BE APPLICABLE. 6)12A OF CDOT CLASS'A' BEDDING MATERIAL SHALL BE PLACED UNDER ALL RIPRM SHOWN. ALL RIPRM SHALL BE COVEREDNIT I SS OF TOPSOIL. T) SEE SHEET COJ2 FOR MASTER LEGEND LEGEND awaim, ma ma Name DMINADE BASIN BOUNDARY ONE _ EARN to PROP IV VALUE ACRE9/G'VALUF Q PROPOSED MANAGE DESIGN POINT PROPOSED DRAINAGE ROW PATH 20 — PROPOSED INDEX CONTOUR -$FT INTERVAL — 21 — PROPOSED INTERMEDIATE CONTOUR-1 FT INTERVAL —(4920)— EXISTING INDEX CONTOUR -S FT INTERVAL ——(4919)— — EXISTING INTERMEDIATE CONTOUR-1 FT INTERVAL CALL UTILITY NOTIFICATION CENTER OF COLORADO 1R EXCAVATE ap800CT 2 ADVABCE TIC ERSDANDSO N922S DAYSIRADE O Or UTILITE1987 City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED: City Engineer Gate CHECKED RO Water k Wastewater UUMy Date CHECKED BY: Stormwoter Utility Date CHECKED BY: Parks A Recreation Data CHECKED BY: Traffic Engineer Date CHECKED Bf: Environmental Planner Date THESE PLANS HOVE BEEN REVIEWED BY THE LOCAL EIFITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS O THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PUNS PRE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY Bf THE LOCAL EMItt FOR ADDNIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. DESIGNED BY AW� VI NYN F- I1 Z aSW L 0. W o AS UDo 0Xo Ali JL J. p2z Z�J = W o WU X I T— :) O >.. U Z U�,�^^ V/ Tad i LL Z wilat _m K W z a m W V a z X 0 �2 reFX'f NO: ,1/IB/IS SHEET No: C-00 8 OF 36