HomeMy WebLinkAboutDrainage Reports - 04/11/2016Drainage Compliance Letter Date: April 5, 2016 Project: Value Plastics – Minor Amendment Project No. 207-015 Fort Collins, Colorado Attn: Mr. Dan Mogen City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Dear Dan: This letter serves to summarize the stormwater impacts of the above referenced project. The project is located at the northwest corner of Danfield Court and South Timberline Road. The project will consist of both Lots 1 & 2, Value Plastic PUD, City of Fort Collins, County of Larimer, State of Colorado. Lot 2 currently consists of a large office building, previously occupied by Value Plastics. It also consists of a drive aisle, associated walkways and a limited amount of parking area. Lot 1 is currently a vacant lot and consists of only native vegetation. These two lots were originaly designed by Water, Waste and Land, Inc. and approved on March 2, 1995. The originally plan divided the project into three design basins (Basins 1-3). At the time of the analysis, Basin 1 consisted of an existing building and was designed to include future parking area. The overall percent imperviousness calculated for this basin was 56.5 percent. Within the original design, Basin 1 was calculated to discharge at a runoff rate of 12.2 cfs during the 100-year runoff event. This basin will be affected slightly by a decrease in contributing area. Basin 2 included most of Lot 1 and was designed to include a future building located on Lot 1 with associated parking area and drive. Basin 2 also includes a portion of the main access drive to the west of the Value Plastics building and a parking area to the north this building. The overall percent imperviousness of this basin was calculated to be 66.5 percent. Within the original design, Basin 2 was calculated to discharge at a runoff rate of 14.9 cfs during the 100-year runoff event. Basin 3 includes the entire Value Plastics building, a portion of the access drive to the southwest of the building, and the landscaping surrounding the building to the south and east. The basin was designed to include area for future parking and was designed with an overall percent imperviousness of 86.8 percent. Within the original design, Basin 3 was calculated to discharge at a runoff rate of 15.1 cfs during the 100-year runoff event. Please see the select sheets from the original report attached within Appendix C. The minor amendment is proposing to construct two parking areas within the overall P.U.D. project limits. One parking area is proposed within Basin 2 and will be constructed with TRUEGRID Technology. The surfacing material for this parking lot is planned to be a fine aggregate. The ¾-inch washed aggregate is proposed to be installed on top of a larger granular section for maximum drainage within the subgrade. The TRUEGRID system is proposed to be installed with an underdrain system. Without including the anticipated improvements within Basin 2, the current percent imperviousness of this basin is 32 percent. With the proposed improvements, the overall percent imperviousness increases to 41.0 percent, which is well below the previously designed 66.5 percent approved within the original study. This increased percent imperviousness results in a runoff rate of 9.35 cfs during the 100-year event. The other parking area is proposed within Basin 3 and will also be constructed with TRUEGRID Technology. The surfacing material for this parking lot is planned to be grass seed. The grass seed and planting material is proposed to be installed on top of a larger granular section for maximum drainage within the subgrade. The TRUEGRID system is proposed to be installed with an underdrain system. Without including the anticipated improvements within Basin 3, the current percent imperviousness is 38 percent. With the proposed improvements, the overall percent imperviousness within Basin 3 increases to 41.4 percent, which is well below the previously designed 86.8 percent approved within the original study. This increase in percent imperviousness results in a runoff rate of 9.94 cfs during the 100-year event. All runoff rates were calculated utilizing the current rainfall intensities. Refer to the attached documents for all supporting calculations. With TRUEGRID being a new technology within this region, it has been agreed to use this site as a test project to understand if this is a viable option within this Arid Highplain Climate Region. If this system fails, these two parking areas will need to be reconstructed to incorporate all current LID Standards while draining properly within the constraints of the originally approved discharge rates. To look at future options, both basins were analyzed to represent the TRUEGRID system being removed and replaced by asphalt. With the proposed improvements within Basin 2 being converted to asphalt surfacing, the overall percent imperviousness increases to 55.0 percent, which is still below the previously designed 66.5 percent approved within the original study. This increase in percent imperviousness results in a runoff rate of 12.39 cfs during the 100-year event. With the proposed improvements within Basin 3 being converted to asphalt surfacing, the overall percent imperviousness increases to 45.0 percent, which is still below the previously designed 86.8 percent approved within the original study. This increase in percent imperviousness results in a runoff rate of 10.46 cfs during the 100-year event. All runoff rates were calculated utilizing the current rainfall intensities. Please see below for a comparison table summarizing the details from each scenario. Basin ID Original Percent Impervious Original Design Q Existing Percent Impervious Proposed Percent Impervious (w/ Paver Section) Proposed Design Q (w/ Paver Section) Percent Impervious (Converted to Asphalt) Proposed Design Q (Converted to Asphalt) 1 56.5% 12.2 cfs 51.1% 53.5% 11.7 cfs 53.5% 11.7 cfs 2 66.8% 14.9 cfs 32.3% 41.0% 9.4 cfs 55.0% 12.4 cfs 3 86.8% 15.1 cfs 38.4% 41.4% 9.9 cfs 45.0% 10.5 cfs Please do not hesitate to contact me if you have questions or require additional information. Sincerely, Cody N. Snowdon Project Engineer Nicholas W. Haws, PE, LEED AP Colorado Registration No. 39767 04.05.16 APPENDIX A HISTORIC & PROPOSED HYDROLOGY CALCULATIONS CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Value Plastics Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: Asphalt ……....……………...……….....…...……………….………………………………….0.. 95 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….0.. 50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. Basin 1 90169 2.070 0.565 0.250 0.298 0.000 0.000 0.957 0.58 0.58 0.72 51.1% Basin 2 90605 2.080 0.375 0.286 0.043 0.000 0.000 1.376 0.42 0.42 0.53 32.3% Basin 3 99317 2.280 0.144 0.112 0.700 0.000 0.000 1.324 0.49 0.49 0.61 38.4% TOTAL 280091 6.430 1.084 0.018 1.041 0.000 0.000 4.287 0.42 0.42 0.52 31.7% Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. HISTORIC % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS C. Snowdon CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Value Plastics Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: Asphalt ……....……………...……….....…...……………….………………………………….. 0.95 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….. 0.50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. Basin 1 86115 1.977 0.565 0.250 0.298 0.000 0.000 0.864 0.60 0.60 0.75 53.5% Basin 2 94659 2.173 0.375 0.303 0.043 0.507 0.000 0.944 0.50 0.50 0.62 41.0% Basin 3 99317 2.280 0.144 0.127 0.700 0.137 0.000 1.172 0.51 0.51 0.64 41.4% OVERALL TOTAL 280091 6.430 1.084 0.680 1.041 0.644 0.000 2.981 0.53 0.53 0.67 45.0% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 October 28, 2015 Overland Flow, Time of Concentration: Project: Value Plastics Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = T i + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Rational Method Equation: Project: Value Plastics Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: basin 1 Basin 1 1.98 12 12 10 0.60 0.60 0.75 2.09 3.57 7.88 2.48 4.23 11.68 basin 2 Basin 2 2.17 13 13 13 0.50 0.50 0.62 1.98 3.39 6.92 2.14 3.66 9.35 basin 3 Basin 3 2.28 14 14 14 0.51 0.51 0.64 1.95 3.34 6.82 2.27 3.90 9.94 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) DEVELOPED RUNOFF COMPUTATIONS C100 Notes Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) C. Snowdon October 28, 2015 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 Q = C f ( C )( i )( A ) Page 4 of 5 D:\Projects\207-015\Drainage\Hydrology\207-015_Rational-Calcs.xlsx\Direct-Runoff DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) basin 1 Basin 1 1.98 0.60 0.75 12 10 2.48 11.68 basin 2 Basin 2 2.17 0.50 0.62 13 13 2.14 9.35 basin 3 Basin 3 2.28 0.51 0.64 14 14 2.27 9.94 Page 5 of 5 D:\Projects\207-015\Drainage\Hydrology\207-015_Rational-Calcs.xlsx\SUMMARY-TABLE Required Minimum Impervious Area to be Treated (=50% of new impervious area) New Impervious Area 30838 sq. ft. Impervious Area Treated by LID Treatment Method #1 (TRUEGRID Gravel Pavers Northern Parking Lot) 22089 sq. ft. Impervious Area Treated by LID Treatment Method #2 (TRUEGRID Grass Pavers Northern Parking Lot) 5971 sq. ft. Total Impervious Area Treated 28060 sq. ft. Percent Impervious Area Treated 91.0% Required Minimum Area of Porous Pavement (=25% of new pavement area) New Pavement Area 30838 sq. ft. Area of Paver Section #1 22089 sq. ft. Run-on area for Paver Section #1 (up to 3:1 is permited) 8597 sq. ft. Area of Paver Section #2 5971 sq. ft. Run-on area for Paver Section #2 (up to 3:1 is permited) 16729 sq. ft. Impervious Area Treated 28060 sq. ft. Total Area Treated 56164 sq. ft. Percent Impervious Area Treated 91.0% Percent Total Area Treated 50.0% LID Table APPENDIX B HYDROLOGY CALCULATIONS WITH ASPHALT REPLACIMENT CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Value Plastics Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: Asphalt ……....……………...……….....…...……………….………………………………….. 0.95 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….. 0.50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. Basin 1 86115 1.977 0.565 0.250 0.298 0.000 0.000 0.864 0.60 0.60 0.75 53.5% Basin 2 94659 2.173 0.882 0.303 0.043 0.000 0.000 0.944 0.60 0.60 0.75 55.0% Basin 3 99317 2.280 0.281 0.127 0.700 0.000 0.000 1.172 0.54 0.54 0.67 45.0% OVERALL TOTAL 280091 6.430 1.728 0.680 1.041 0.000 0.000 2.981 0.58 0.58 0.72 51.0% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS (Parking Lots Converted to Asphalt) Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 Overland Flow, Time of Concentration: Project: Value Plastics Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = T i + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Rational Method Equation: Project: Value Plastics Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: basin 1 Basin 1 1.98 12 12 10 0.60 0.60 0.75 2.09 3.57 7.88 2.48 4.23 11.68 basin 2 Basin 2 2.17 13 13 11 0.60 0.60 0.75 1.98 3.39 7.57 2.59 4.44 12.39 basin 3 Basin 3 2.28 14 14 14 0.54 0.54 0.67 1.95 3.34 6.82 2.40 4.10 10.46 DEVELOPED RUNOFF COMPUTATIONS (Parking Lots Converted to Asphalt) C100 Notes Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) C. Snowdon October 30, 2015 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) Q = C f ( C )( i )( A ) Page 3 of 4 D:\Projects\207-015\Drainage\Hydrology\207-015_Rational-Calcs - Asphalt.xlsx\Direct-Runoff DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) basin 1 Basin 1 1.98 0.60 0.75 12 10 2.48 11.68 basin 2 Basin 2 2.17 0.60 0.75 13 11 2.59 12.39 basin 3 Basin 3 2.28 0.54 0.67 14 14 2.40 10.46 Page 4 of 4 D:\Projects\207-015\Drainage\Hydrology\207-015_Rational-Calcs - Asphalt.xlsx\SUMMARY-TABLE Basin ID Original Percent Impervious Original Design Q Existing Percent Impervious Proposed Percent Impervious (w/ Paver Section) Proposed Design Q (w/ Paver Section) Percent Impervious (Converted to Asphalt) Proposed Design Q (Converted to Asphalt) 1 56.5% 12.2 cfs 51.1% 53.5% 11.7 cfs 53.5% 11.7 cfs 2 66.8% 14.9 cfs 32.3% 41.0% 9.4 cfs 55.0% 12.4 cfs 3 86.8% 15.1 cfs 38.4% 41.4% 9.9 cfs 45.0% 10.5 cfs APPENDIX C SELECTED SHEETS FROM ORIGINAL DRAINAGE REPORT This unofficial copy was downloaded on Oct-12-2015 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Oct-12-2015 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Oct-12-2015 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Oct-12-2015 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Oct-12-2015 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Oct-12-2015 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Oct-12-2015 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA This unofficial copy was downloaded on Oct-12-2015 from the City of Fort Collins Public Records Website: http://citydocs.fcgov.com For additional information or an official copy, please contact City of Fort Collins Utilities 700 Wood Street Fort Collins, CO 80524 USA M CONTROL IRR CONTROL IRR UD UD UD UD UD UD 1 1.98 AC 3 2.28 AC 2 2.17 AC Q100 = 0.45 CFS DESIGN POINT A DESIGN POINT B EXISTING BUILDING EXISTING BUILDING EXISTING STORM OUTLET PIPE ORIGINAL BASIN LINE PROPOSED BASIN LINE EXISTING AREA DRAIN PROPOSED GRAVEL PAVER PARKING LOT PROPOSED GRASS PAVER PARKING LOT S.TIMBERLINE ROAD EASTBROOK DRIVE DANFIELD COURT No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 4.1.16 PROJECT: 207-015 Sheet Of 9 Sheets VALUE PLASTICS - MINOR AMENDMENT DRAWING FILENAME: D:rojects\207-015\Dwg\Drng\207-015_DRNG.dwg LAYOUT NAME: DR1 DATE: Apr 04, 2016 - 7:09am CAD OPERATOR: Cody LIST OF XREFS: [207-015_xEXST] [NES-xborder] [207-015_xPgrad] [207-015_xPutil] [207-015_xTOPO] E N G I N E E R I N G N O R T H E RN 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 www.northernengineering.com Phone: 970.221.4158 3325 S. TIMBERLINE ROAD 04.01.16 CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's below. Call before you dig. R LEGEND: 4953 PROPOSED CONTOUR 93 PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED PROPERTY BOUNDARY CURB & GUTTER PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL BASIN DESIGNATION BASIN AREA (AC) DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 1 1 B2 1.45 AC NORTH ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 DR1 DRAINAGE PLAN C. Snowden L. Seeber 1"=40' FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION NOTES: Date Date Date Date Date Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) basin 1 Basin 1 No 0.60 0.60 0.75 300 1.50% 14.1 14.1 9.9 N/A N/A N/A N/A N/A N/A 12 12 10 basin 2 Basin 2 No 0.60 0.60 0.75 330 2.30% 12.8 12.8 8.9 218 1.00% 2.00 1.8 N/A N/A N/A 13 13 11 basin 3 Basin 3 No 0.54 0.54 0.67 235 1.10% 15.6 15.6 11.8 N/A N/A N/A 483 3.25% 2.70 3.0 14 14 14 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS (Parking Lots Converted to Asphalt) Gutter Flow Swale Flow Design Point Basin Overland Flow C. Snowdon October 30, 2015 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = Page 2 of 4 D:\Projects\207-015\Drainage\Hydrology\207-015_Rational-Calcs - Asphalt.xlsx\Tc-10-yr_&_100-yr October 30, 2015 **Soil Classification of site is Sandy Loam** C. Snowdon Page 1 of 4 D:\Projects\207-015\Drainage\Hydrology\207-015_Rational-Calcs - Asphalt.xlsx\C-Values Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) basin 1 Basin 1 No 0.60 0.60 0.75 300 1.50% 14.1 14.1 9.9 N/A N/A N/A N/A N/A N/A 12 12 10 basin 2 Basin 2 No 0.50 0.50 0.62 330 2.30% 15.5 15.5 12.3 218 1.00% 2.00 1.8 N/A N/A N/A 13 13 13 basin 3 Basin 3 No 0.51 0.51 0.64 235 1.10% 16.3 16.3 12.8 N/A N/A N/A 483 3.25% 2.70 3.0 14 14 14 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow C. Snowdon October 28, 2015 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = Page 3 of 5 D:\Projects\207-015\Drainage\Hydrology\207-015_Rational-Calcs.xlsx\Tc-10-yr_&_100-yr **Soil Classification of site is Sandy Loam** C. Snowdon Page 2 of 5 D:\Projects\207-015\Drainage\Hydrology\207-015_Rational-Calcs.xlsx\C-Values October 28, 2015 **Soil Classification of site is Sandy Loam** 10-year Cf = 1.00 Page 1 of 5 D:\Projects\207-015\Drainage\Hydrology\207-015_Rational-Calcs.xlsx\Historic C-Values