Loading...
HomeMy WebLinkAboutDrainage Reports - 12/10/1995�i ved Repor 1#G L v L FINAL DRAINAGE AND EROSION CONTROL STUDY FOR THE GATES AT VVOODRIDGE q L FOURTH FILING PHASE ONE FORT COLLINS, COLORADO T:IDINC. PROPERTY OF Engineering FORT COLLINS UTUSM ':MINC. Engineering Consultants 209 S. Meldrum Fort Collins, Colorado 80521 303/482-5922 FAX: 303/482-6368 August 17, 1995 Mr. Glen Schlueter City of Fort Collins Utility Services Stormwater 235 Mathews Street Fort Collins, Colorado 80522 RE: Final Drainage and Erosion Control Study The Gates at Woodridge Fourth Filing Phase One Dear Glen: We are pleased to submit to you, for your review and approval, this revised Final Drainage and Erosion Control Study for the Gates at Woodridge Fourth Filing Phase One. This study includes an interim detention pond.for the Woodridge development. All computations within this report have been completed in compliance with the City of Fort Collins Storm. Drainage Design Criteria. We appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Respectfully, RBD Inc. Engineering Consultants Prepared by: ' v :LevJ. 4 ' David K. Thaemert, Water Resources Er ' cc: 1 Mr. Gary Berger Reviewed by: Kevin W. Ginger .;:.P. . Water Resources Project Manager ' Denver303/458-5526 TABLE OF CONTENTS DESCRIPTION PAGE I. GENERAL LOCATION AND DESCRIPTION 1 A. Location 1 B. Description of Property 1 II. DRAINAGE BASINS 1 A. Major Basin Description 1 B. Sub -Basin Description 1 C. SWMM Revisions 2 III. DRAINAGE DESIGN CRITERIA 2 A. Regulations 2 B. Development Criteria Reference and Constraints 2 C. Hydrological Criteria 3 D. Hydraulic Criteria 3 E. Variances from Criteria 3 IV. DRAINAGE FACILITY DESIGN 3 A. General Concept 3 B. Specific Details 3 V. STORM WATER QUALITY 4 A. General Concept 4 VI. EROSION CONTROL 4 A. General Concept 4 B. Specific Details 5 VH. CONCLUSIONS 6 A. Compliance with Standards 6 B. Drainage Concept 6 C. Storm Water Quality Concept 6 D. Erosion Control Concepts 6 REFERENCES 7 APPENDIX VICINITY MAP 2 FOURTH FILING HYDROLOGY 3 DESIGN OF PHASE ONE SWALES. 14 GATES FOURTH FILING PHASE ONE-100-YEAR SWMM MODEL 20 1 1 1 1 1 1 1 1 1 1 1 1 1 1 i i 1 1 TABLE OF CONTENTS (continued) DETENTION POND 230 EROSION CONTROL CHARTS, FIGURES AND TABLES 31 40 49 Total pages 54 0 I ' FL\'AL DRAINAGE AND EROSION CONTROL STUDY ' FOR THE GATES AT WOODRIDGE FOURTH FILING PHASE ONE FORT COLLINS, COLORADO I. GENERAL LOCATION AND DESCRIPTION 1 7 u A. Location The Gates at Woodridge P.U.D. is bounded by the future Harmony Road on the west, Imperial Estates on the north, Webber Junior High School and Regency Park PUD to the east, and by the Gates Second and Third Filings on the south. The site location can also be described as situated in the Southwest 1/4 of Section 34, Township 7 North, Range 69 West of the 6th P.M., City of Fort Collins, Larimer County, Colorado. The site location can be seen on Exhibit 1 in the Appendix. B. Description of Property The Fourth Filing of the Gates at Woodridge contains approximately 43.1 acres, more or less. Presently, the property is undeveloped. The property is being proposed for planned unit development within the City of Fort Collins Zoning District PUD, and will be developed consistent with the Gates First through Third Filings at Woodridge. Native grasses presently cover the property. The topography of the site generally slopes from west to east at approximately 1.5 percent. DRAINAGE BASINS ' A. Major Basin Description The proposed development lies within Basins 77, 79, 179, and 80 of the ' McClellands and Mail Creek Major Drainageway Plan prepared by Cornell Consulting Company. A natural drainageway runs from west to east along the southern edge of the project boundary within Basin 80. B. Sub -Basin Description ' Runoff from Basin 79 and the upstream Overlook Fourth Filing is routed by open channels and culverts along the northern boundary of the First through Third Filings of The Gates, along the north side of Seneca Street past Webber Junior ' High School, and then along the east side of Regency Drive to the existing 1 downstream regional detention pond. Only a portion of SWMM sub -basin 79 will be developed with Phase One; this portion includes rational method sub -basins 19, ' 20 (partial), 21A, 21B, and 24. During the interim period prior to construction of the MountainRidge regional t facilities, the small portion of the Gates Fourth Filing Phase One within Basin 77 will discharge to a temporary retention pond immediately downstream of the phase line. ' C. SWMAZ Revisions ' The portion of the City of Fort Collins' SWMM model for a 100-year storm event within the Mail Creek Basin --tributary to Seneca Street (conveyance element 24)--was updated to reflect field conditions, phasing, and proposed interim storm ' drainage system modifications. Basins 75, 77 through 80, 86, 175, 179, 179, and 186 were added or updated to ' account for the presently developed Woodridge subdivisions (Overlook and Gates First through Third Filings) and the proposed Overlook and Gates Fourth Filings ' Phase One. Conveyance elements 23, 26, 31, 34, 37, 44, 47, 49, and 230 were also added or updated to be consistent with present and proposed conditions. III. DRAINAGE DESIGN CRITERIA A. Regulations ' The City of Fort Collins Storm Drainage Design Criteria is being used for the subject site. ' B. Development Criteria Reference and Constraints ' The 1990 Preliminary Drainage Report for Webber Junior High School states that the channel and culvert system along the north side of Seneca Street and the east side of Regency Drive was sized for undetained off -site 100 year developed ' runoff from Basins 79, 80, and 85. Recent SWMM analysis for Basins 79 and 80, by the City of Fort Collins, has determined that the existing channel, culverts and Seneca Street (downstream of the subject site) will receive greater 100-year ' developed runoff than was originally anticipated. The 1991 Lidstone & Anderson study indicated that the existing downstream improvements may not be adequate to transport the entire 100-year developed runoff that could be produced from ' Basins 79, 80, 186, 86, and 176 at Seneca Street and the Woodridge east property line. An additional detention pond will be constructed as part of the Gates Fourth Filing. For Phase One of the Gates Fourth Filing, an interim detention pond will ' be constructed to satisfy downstream flow restrictions. According to the 1 2 ' McClellands and Mail Creek Basin Master Plan, the limiting flow in the downstream conveyance element (number 24) is 319 cfs. ' C. Hydrological Criteria ' The Rational Method for determining surface runoff was used for the project site. The 2-year and 100-year storm event criteria, obtained by the City of Fort Collins, were used in calculating runoff values. These calculations and criteria ' are included in the Appendix of this report. D. Hydraulic Criteria ' All hydraulic calculations within this report have been prepared in accordance with the City of Fort Collins Drainage Criteria and are also included in the ' Appendix. E. Variances from Criteria ' No variances are being sought for the proposed project site. IV. DRAINAGE FACILITY DESIGN ' A. General Concept During the interim period prior to construction of the MountainRidge regional ' facilities, the on -site runoff produced by the northern portion of the Gates at Woodridge Fourth Filing Phase One will discharge to a temporary retention pond immediately downstream of the phase line. ' All remaining on -site runoff produced by the proposed development of the Gates at Woodridge Fourth Filing Phase One will flow southeasterly to an interim ' detention pond 230, then to the existing drainageway along the north side of Seneca Street and eventually arrive at the Regency Park regional detention pond 22. This proposed detention pond 230 addresses the downstream flow restriction ' of 319 cfs along Seneca Street per the basin master plan. The undeveloped phases of the Gates Fourth Filing will continue to follow historic drainage patterns. The proposed drainage and grading plans are included in the back pocket of this report. B. Specific Details 1 The Gates at Woodridge Fourth Filing has been broken down into 10 subbasins: 19, 20, 21A, 21B, 22A, 22B, 23, 24, 26, and 27. These subbasin designations ' correspond to the basin designations of the Preliminary/Master Drainage Study 1 3 I ' for the Woodridge development. Only sub -basins 19, 21A, 21B, and parts of sub -basins 20, 23, and 24 are included in the Gates Fourth Filing Phase One. ' Runoff from basins 20, 21A, and 21B will be directed to Rolling Gate Road and will travel south-easterly to sheet flow toward the interim detention pond. 1 Runoff from Basins 19 and 23 will flow directly overland to the regional channel and continue to the interim detention pond 230. Sidewalk crossings will be ' installed over the trickle channel as required. Storm water runoff collected in the proposed detention pond will be directed ' easterly to the existing 42-inch culverts immediately north of Seneca Street at the Woodridge east property line. As detention exceeds elevation 5115.5, additional overflow to the south and east (into Seneca Street and the adjacent channel on the ' north side of the street) will occur. The pond discharge travels via open channels and additional 42-inch culverts to the existing regional detention pond at Wake ' Robin Lane and Regency Drive. Note that the peak runoff in the Seneca Street conveyance element (number 24) is approximately 315 cfs, less than the allowable 319 cfs according to the basin master plan. ' The existing downstream culverts, open channels and streets have the available capacity for the Gates at Woodridge Fourth Filing Phase One. V. STORM WATER QUALITY ' A. General Concept Beginning in October 1992, the water quality of storm water runoff was required ' to be addressed on all final design utility plans. The Gates at Woodridge Fourth Filing Phase One is anticipating construction beginning in Fall 1995. Therefore, for this project, we have sought to find various Best Management Practices for ' the treatment of storm water runoff. The Gates Fourth Filing Phase One will be providing grass swales and grassed detention or retention ponds. These grass - lined features will provide a mechanism for pollutants to settle out of the storm ' water runoff as runoff is directed to the McClellands Basin Drainageway. VI. EROSION CONTROL A. General Concept ' This development lies within:the High Rainfall Erodibility Zone and the Moderate Wind Erodibility Zone per the City of Fort Collins zone maps. The potential exists for moderate erosion problems after completion of the Fourth Filing Phase ' One improvements, due to some existing and proposed site slopes of greater than 1 4 1 I 2 percent. It is also anticipated that the project site improvements will be subject to both wind and rainfall erosion before new vegetation can take hold or before the new residential lots are developed. The Erosion Control Performance Standard (PS) during construction for this project was computed to be 82.7 percent per the criteria in the City of Fort Collins Erosion Control Reference Manual for Construction sites. The Effectiveness (EFF) of the proposed erosion control plan was calculated to be 85.3 percent. Therefore, the erosion control plan below meets the City of Fort Collins' requirements. A copy of the calculations has been included in the Appendix. An erosion control escrow cost estimate of $36,225 is also included in the Erosion Control section of the Appendix. B. Specific Details After the overlot grading has been completed, all disturbed areas not in a roadway or greenbelt area shall have temporary vegetation seed applied. After seeding, a hay or straw mulch shall be applied over the seed at a rate of 2 tons/acre minimum, and the mulch shall be adequately anchored, tacked, or crimped into the soil. Those roads that are to be paved as part of the Fourth Filing Phase One must have a 1-inch layer of gravel mulch ('/a" to 1'/z" gravel) applied at a rate of at least 135 tons/acre immediately after overlot grading is completed. The pavement structure shall be applied as soon as possible after the utilities have been installed. If the disturbed areas will not be built on within one growing season, a permanent seed shall be applied. After seeding, a hay or straw mulch shall be applied over the seed at a minimum rate of 2 tons/acre, and the mulch shall be adequately anchored, tacked or crimped into the soil. In the event a portion of the roadway pavement surface and utilities will not be constructed for an extended period of time after overlot grading, a temporary vegetation seed and mulch shall also be applied to the roadway areas as discussed above. ' All the erosion control measures and structures installed with the Gates First through Third Filings shall remain in place and in effect until the erosion control plan specified within the Fourth Filing plans has been established. ' All construction activities must also comply with the State of Colorado permitting process for Stormwater Discharges Associated with Construction Activity. A ' Colorado Department of Health NPDES permit will be required before any construction grading can begin within this development. 1 5 ' VII. CONCLUSIONS ' A. Compliance with Standards All computations that have been completed within this report are in compliance with the City of Fort Collins Erosion Control Reference Manual for Construction Sites and the Storm. Drainage Design Criteria Manual. In addition, all computations are in compliance with the Preliminary/Master Drainage Study for tWoodridge prepared by RBD, Inc. in December 1991. B. Drainage Concept The proposed drainage concepts adequately provide for the transmission of developed on -site runoff to the existing drainage devices at the eastern property ' line of the subject site. Basins 19 and 23 will discharge directly into the proposed detention pond. The 100-year runoff generated by development of this site will be carried to the proposed Woodridge detention pond and then to the existing off - site regional detention pond by a series of existing culverts, open channels and streets per the Preliminary/Master Drainage Study for Woodridge. ' For the Gates Fourth Filing Phase One, adequate downstream capacity in the culverts, open channels, and street systems exists to safely convey developed runoff to the regional detention pond east of Regency Drive. ' If for some unforeseen reason groundwater is encountered at the time of ' construction, a Colorado Department of Health Construction Dewatering Permit would be required. ' C. Storm Water Quality Concept Because storm water quality has become a requirement, the site has addressed this ' storm water aspect. Grass -lined swales and detention ponds will provide an opportunity for storm water pollutants to filter out of the storm water runoff before the runoff enters the McClellands Basin Drainageway. ' D. Erosion Control Concepts ' The proposed erosion control concepts adequately provide for the control of wind and rainfall erosion from the Gates Fourth Filing Phase One.r Through the construction of the proposed erosion control concepts, trw� City of Fort Collins ' performance standards will be met. The proposed erosion control concepts presented in this report and shown on the erosion control plan are in compliance with the City of Fort Collins erosion control criteria. ' 6 REFERENCES 1. Storm Drainage Design Criteria and Construction Standards by the City of Fort Collins, Colorado, May 1984. 2. Erosion Control Reference Manual for Construction Sites by the City of Fort Collins, Colorado, January 1991. 3. Preliminary/Master Drainage Study for Woodridge by RBD, Inc. Engineering Consultants, December 27, 1991. 4. Final Drainage and Erosion Control Study for the Gates at Woodridge Third Filing, by RBD, Inc. Engineering Consultants, December 14, 1992. 5. The McClellands and Mail Creek Major Drainageway Plan by Cornell Consulting Company, December 1980. 6. The Final Drainage Report for Regency Park PUD by Parsons and Associates Consulting Engineers, March 30, 1987. 7. Preliminary Drainage Report for the 1990 Junior High School by RBD, Inc. Engineering Consultants, February 5, 1988. 8. Final Drainage Report for Poudre School District R-1 Elementary School by Engineering Professionals, Inc. April 1987. 9. Technical Memorandum for Woodcraft Homes Drainage Study, by Lidstone & Anderson, November 13, 1991 (and related calculations of February and March 1992). 10. Final Drainage and Erosion Control Study for the Overlook at Woodridge Fourth Filing, by RBD, Inc. Engineering Consultants, January 30, 1995. 7 I APPENDIX U 1 1 F- p,.ul.�k O m W. HORSETOOTH ROAD I, LKA PROJECT SITE HARMONY ROAD 1 VICINITY MAP HYDROLOGY I N LL U) 2 Cc 0 LL Q Q 0 Z F- Cn U C O m Ir ME H II U '6 N 0 0 N Un > W GI 1 -Q N N Z T ED O 0 N Q fL H Z O O U LL O W O Z U) Q Y U 0 U) Y < Q ch pp 8 6 W � a N N O of r (o n V r 0 N ZCl) coN O (D M N M N O V ° E LL — U U) Z W 0 O -j s a s s O v o U) n n (D to O U) o co C O CD O O (D N (0 O Oi N co to J E Fr O N to Un O N Cl) C0 CO r (O UN r N r r r r r r r r N U 0) J ` W W > F= n n o 0 o rn o v n v o W Un cD (O O O O (0 0) to co N O W 0 CO 0 O r o O O O O O O O r Q Q CO H = O O O N O O 0 O O O (D O F 0 03 O N rn O N O Cl) (O N C7 .� C) (o n m 0 m 0 n Cl) (0 (n Z n W J 0) O N C O r IT (p O (D (n of � Co o v ai of Co rn (n 6 W F W N o O o O O c0 O n (D 0 Z 0_ 0 o N co o N 0 o n o N N N O N rn 0)m O (O rn o N N O J CO Q W > O in O N O O O O co Un 0 O 0� N (O n (0 O r o 0 O n 0 ^ (n r LO U)w Q •^ V F Z N co C m Q O N Cl) n O V O V R (n N Un c7 N Un O (M U Cl) 0 0 0 0 0 0 0 0 0 0 0 0 rno (MmvN0 (on 0(n0 Q .-� V N V V N O (D V N to 0) WW N N ('7 m m N N r N V N (O Q v N Q Q O Z (7 mo m W a m¢ m v 0) O N N N N CO C (O n (n r N N N N N N N N N N N ro U 0 E O U) Y E, Q N N 9 i O O O Z Z Z m O y 0 Z mu n.10m,� Um C7 m % N 0 y' N V � %& 0 O O W W gN a� D N N N P U fV lV fV N vi w Z l7�m N m 0 o r m w 0 ei0 m mp U %m o m m N V � P U O ^ N n 6 0 V FL a_ 8 8 O�e o 0 N w ¢ 14 N w oa u -- N aU OW p p 0 m o P b O O N . Nm m q N m N O 0 m 0 0 n o H j Q o m p ^ W Z N D o� U N m m D D % Z 0 N O m Ih W N 2 V O , 2 O O n N InD O iD W y O O O O ^. pO O tl p p W 0 O; Zm W m N N lV N lV r u Z U D o o e o c o e E 4 Ci D O D J w i f O 3 W C D O p¢ E J N LL D N a D m P D P f m N Z�N m 2 q y N a am m o s mmmm aJ 11 U LL V N N N § U !` 4q• U N C V C_ C ._ V V V II P P d 0 b V O O S NO.`. ry0� NO T OyRly? p y t p Up p n OOU�00 C C- o n`- ^ q L N q L O 1'1 J N t1 .. b N 17 l7 U Li P U O q J F J d y d W 6 J N 0 9 J 0 J C N W ` l W U N N y > u l'1 n N of ri .- m m d n U .-• Q x 0 O Vj b N ^ b P m lV ¢ V U W N N ry 4 0 v ^ a w d 1O b O m N N O ae ^ o o � o 0 N W Q N yl 0 0 O b O b 0 O 0 0 w ¢ a u ^ Q F- b u a m umIo ID Imo lmm o Io � m � O X 00. . 0 .0 0 0 ^ N J LL m OI l7 VI O m t7 Cl P 0 C! P ^ N 0 m In O 0q F p x Irl N lV m N m O N O m ry N O Ov O 0 0 tO n O j U ^ Ib 1- ¢ F Z U O � p y lV fV N t'1 b O fV q O T H 0 O ¢ Z y ^ O 0 O Q V Q OI Q P b P ^ N N N O I'1 In b 0, p P IO mm l9 b 100 N 1nD P n W V O . Q ^ 0 O O b p 17 mp IbV {� N m N v O Om p H C Z Q v PP P N 4 O N N b C 0 0 Q N 1� P P 0 b p N O l7 0 P n n m N b U 0 O O O O O O O O O O O O O 0 O O O O O N IR 1� m 0 b IV N 0 m b P 17 C p 0 fV N N b N I� N N N N l7 0 n C1 ' y� N n 1•1 O P 6 0 (7 ^ O r T T W N W b N W C 0 E fV _ fV t7 p � d b V W J N (y N 8 jn N N N a N N P' O O e jy P O N O N O Q m Q m Q Q Q Q N N (L U b Q Q U N N N N N p N m m p V d C g S O y d 2 O V C U C q O d C W C IV m m yyII IIr�k1 q ry aj N N N N N N N N N N N N N N {.J 6 L Z (J Z 6� Z 6_ Z VV 8N ON N o _ N # d N 6 S O O R n d _O V ry O N) O 69 O N 6 V V V N N V jp J � 0 N J = N W � w it ❑ u — a=R wZ u~i 0V' N u m o w m vi q m Q V u a o n w N C n N N a w m cm 0 O O N J N ~ N q wa ¢a �- N yWy O K Q g N J 1 wC N N N Cl q Q o q w O m m N N O= d' F � v ¢ W 0 n N O m ti z V O¢ ¢ w Ri, nn m m u0 ¢ V Q O 00 0 m Z 0 o Q U m e e o c 0. _ _ E � 7.1 R m R 01. O N V i 5 m o m m w w 3 W = m p F E LL 0 �Ev RmR <Re = 0 0 7 — C O N 0 Z W J N Z N J o w q R N R m d, rD C N N N N N 6 N a U' p O b o N N O o 0 N N N ❑ J N LL. 0 LL Q ❑ Z H 0 c 0 m Q R- E U t- tO u U 'O N Q O d a rn N j. N Z O O � r Q W Q W ZO O o U LL O W F- v O Z CO ¢ Y 0 ❑ r Z W U F- �g m J D U 1' LU LU e cc p E m O N r N V N O .- n r O N ¢ n `° Cl) o co(0U N M mv roi z E r E LL U U Z w U D a - o ¢ o v O LO n n O ro o t0 o m co V N O O N O O W cli Cl) LO J � O E r (o to m to m to m m O r D Nr NI r 0 J v W W J n n o o O o r LO n c o W N com O O O C1 O 0) LO co N O J w O o O O r O O O O O O O O r ¢ J Q U) H = O O O N O O N 0 0 (O O O F.., c7 O) O N O . CO tD O Cl) (D N iz-n O (0 n D) O CO N n Cl) O tD Z v W J O O N O n LO D) to n to O R tD N O n n (D rn n tO V 6 C Cl) N Cl) _ O w FClio O o O m o CDO n (D w w o ONMO O)rn O (DO) IL N N N N O N O (D N N O Z O '0-0 0 r ¢ J J U) Q W 7 O t0 t0 N O O O O O O LO O O J F r N r O n CO O r N r O O LO o n O U) ¢ Z H W ,It N V IT ID N 1N M N to O co U Cl) 0 0 0 0 0 0 0 0 0 0 6 0 D) O m O g N O co n O N O ¢ .-. V N C C N c� r O C N N D) WW N N M [7 c7 N N r to R O (D ¢ v N ¢ ¢ ❑ Z Q d m cn m W ❑ ¢_ m_ ¢ m U O) O N N N LO Cl) V O n (n r N N N N N N N N N N N m U E 0 U) H O Y G P W N Y ' N Q g = 2 OO > O ' � C V OTC 8 N O N � W �? o m 5 N m� m Q 4 N Y QP � N E QN q 17 LL ^ N Z Z Z P P N Z q P 6d^ G�3 a0J � N N � N W " a D a N (V 1 2 y 0 0 o d W W V N N a � O ^ lV (V lV lV 00 N O ~ O 0 0 U W � n O q N N IUN 1 W g g e g M 0 N v ^ 0 0 W ~ U 6 P N 0 N N O q �p �p qq qq N N a n NU W gas pp p p p �P N N b o^tea p 10 IOD .: N < g m fV fV N b O 1� O Z V ^ m 2 LLW » 0 U N F Z y ^ N LL (qryy D D �It qN n N P O S won`vZ 0 e W nnia� $n n^ q 2 c 0 D D D D N N p p p N N N N p N N U 0 O O O O O O 6 c n O^ 0 0 g N q y E _ a`D < D WF W q W E 0 E O J y LL E F p 0 Z �N 0 N N O N m 0 0 0 0 0 1^ 1 O J O = y N O p O OI ¢ i C d C N E E e° a R C _ a p 3 m c z z° o ° m u c ¢ R N T Q N 0 ^• N d O O O O 3 R U Yp p OI O N N O N n c N n c H N n _ V p O n O O n 2= O w U N U N N U V N n N ry N C N N N U OI J n 6 N U N - N U m m R J F N V V 6 U 4 J p N d J Q Q � N W n O m N b N n N n O W W V N n a a � F N N N W 2 N m b n W� m OI O N N 6 N 6 N O y N QVT P U W N_ N tD N n W E a _C b ... w b b N m N Im0 W Q N N N N N N N N N N O O N w ¢ a u a r b U 0 1mD b p m 10 p 10 1mD 1m0 N N b 0 LL .� P 0 �! N O O O 00 00 O 00 O J LL N P m N b m OI OI P GI N yO�I 1Np F � V ¢ ¢ LL O m m n = Q O N Z U n N N N • N F O 2 V f LL^ N P m N 1O IO N b v 1� Ip OI W P N IQ v n fV b b O O ¢ Z U O C V n n N N a O) m I� P P OI 4 N N N O n n m n R m OI m P m m n m n IQ IQ n n P 1� W U O n n �ti I•j O N N 0 N m N 1�1 N � � N N O� N •• Z O N ^� ONi q (N'! 0 R 0 e b m 1. h 1. m F COI N N N m P t0 b tl m n 10 O n n P m N N 6 Z P O P P N Q m N N P N P P P N N n N N N N U m .0. O O O O O O O 00 O O O O O O O N b P h N b N N m O m O O IR m N n O b T J a c c 3 W C N W V N N 0.E J y LL N P b N m N N N N O m O b OI 1� O U C P R IP•1 N n {Pl N pO Cl IQ b Im'1 E R] h O O N N ^ n N b N N N m J Z m 0 QI N Q ( Qy N p a6 ] O ad ] p`• °'J ] Q ] ] N ry ry O m ] N N U N C 0 IpiV Qm Q Oi Q N N a N N N N Q N N m N R OI zN O 2 p d C q p yI d m m m p U N N N N N N N Nl N N N N N N U Z 6 C V Z 6 C Z 6 O. = O. R N N Z m U yry 8R ENO b - s N 1 y O U O y U O � s N N b y U V O N O N 6 u V n g N V N V N H O N N CV_ v m J � N W " _ � m U N n P R a W � V 'gyp N � N W " LL N as q N N ❑ ~ QN N m O m a V w n n aN `' W Q aP b O O (V N W U .. Q N N N N N w ¢ a u a �U N W N O O o O O F N N V Z u m ry m m F ¢ ¢ LL O ^ W 0b N N {J O ¢ n m P N m ULL W O N e R q m Q N FC q O m O N N N m m fl t9 U m m m o 0 0 fJ c o c C O n m n m N n N o q m a E w W 3QEN O �,r LL y � p N Z�q J N Z N m = N N N N N N O J N N N N N No Text I DESIGN OF PHASE ONE SWALES ' 1= 1 1 1 1 1 RBD INC. ENGINEERING CONSULTANTS CHANNEL RATING INFORMATION (using Manning's equation) Drainage channel (D.P. 190) STA ELEV 0.00 4.66 16.00 0.66 19.00 0.60 24.00 0.50 24.00 0.00 28.00 0.00 28.00 0.50 28.50 0.50 45.14 4.66 'N' VALUE ---------- SLOPE ------------- (ft/ft) 0.030 0.0056 ELEVATION AREA VELOCITY DISCHARGE FROUDE (feet) (sq ft) (fps) (cfs) NO. 0.20 0.8 1.2 0.96 0.47 0.40 1.6 1.8 2.86 0.50 0.60 2.7 1.5 4.01 0.50 0.80 5.3 1.8 9.81 0.53 1.00 8.3 2.3 19.32 0.56 1.20 11.7 2.7 31.80 0.59 1.40 15.3 3.1 47.29 0.61 1.60 19.3 3.4 65.90 0.62-• "_ - 1.80 23.6 3.7 87.74 0.64 2.00 28.2 4.0 112.94 0.65 2.20 33.1 4.3 141.62 0.66 2.40 38.4 4.5 173.92 0.6 2.60 44.0 4.8 209.97 0.68�C� 2.80 49.8 5.0 249.90 0.69 3.00 56.1 5.2 293.85 0.70 " 3.20 62.6 5.5 341.94 0.70 3.40 69.4 5.7 394.30 0.71'- 3.60 76.6 5.9 451.07 0.72"-- i 3.80 84.1 6.1 512.37 0.72 4.00 91.9 6.3 578.33 0.73 4.20 100.1 6.5 649.07 0.74 4.40 108.5 6.7 724.71 0.74 4.60 117.3 6.9 805.39 0.75 I r I 1 1 u I - ------------------------------------------------ DETENTION POND SIZING BY FAA METHOD DEVELOPED BY JAMES C.Y. GUO, PHD, P.E. DEPARTMENT OF CIVIL ENGINEERING UNIVERSITY OF COLORADO AT DENVER ------------------------------------------------------------------------------ ------------------------------------------------------------------------------ EXECUTED ON 06-22-1995 AT TIME 15:08:01 PROJECT TITLE: Gates #4 Phase 2 temporary retention pond **** DRAINAGE BASIN DESCRIPTION BASIN ID NUMBER = 2.00 BASIN AREA (acre)= 2.85 �- _ ? - _ _- r' �..� RUNOFF COEF = 0.73 DESIGN RAINFALL STATISTICS DESIGN RETURN PERIOD (YEARS) = 100.00 INTENSITY(IN/HR)-DURATION(MIN) TABLE IS GIVEN DURATION 5 10 20 30 40 50 60 80 100 120 150 180 INTENSITY 9.0 7.2 5.2 4.2 3.5 3.0 2.6 2.1 1.7 1..5 1.2 1.0 ***** POND OUTFLOW CHARACTERISTICS: MAXIMUM ALLOWABLE RELEASE RATE = 0 CFS OUTFLOW ADJUSTMENT FACTOR = 1 AVERAGE RELEASE RATE = 0 CFS AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT FACTOR. ***** COMPUTATION OF POND SIZE ----------------------------------------------------- RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED DURATION INTENSITY VOLUME VOLUME STORAGE MINUTE INCH/HR ACRE -FT ACRE -FT ACRE -FT 0.00 -------------------------------------------- 0.00 0.00 0.00 0.00 5.00 9.00 0.13 0.00 0.13 10.00 7.20 0.21 0.00 0.21 15.00 6.19 0.27 0.00 0.27 20.00 5.18 0.30 0.00 0.30 25.00 4.68 0.34 0.00 0.34 30.00 4.17 0.36 0.00 0.36 35.00 3.84 0.39 0.00 0.39 40.00 3.50 0.40 0.00 0.40 45.00 3.25 0.42 0.00 0.42 50.00 3.00 0.43 0.00 0.43 55.00 2.80 0.45 0.00 0.45 60.00 2.61 0.45 0.00 0.45 65.00 2.47 0.46 0.00 0.46 70.00 2.34 0.47 0.00 0.47 75.00 2.20 0.48 0.00 0.48 80.00 2.06 0.48 0.00 0.48 85.00 1.97 0.48 0.00 0.48 90.00 1.88 0.49 0.00 0.49 95.00 1.79 0.49 0.00 0.49 100.00 1.70 0.49 0.00 0.49 105.00 1.64 0.50 0.00 0.50 110.00 1.58 0.50 0.00 0.50 115.00 1.51 0.50 0.00 0.50 120.00 1.45 0.50 0.00 0.50 I C 1 0 I I 125.00 1.41 0.51 0.00 0.51 130.00 1.36 0.51 0.00 0.51 135.00 1.32 0.51 0.00 0.51 140.00 1.28 0.52 0.00 0.52 145.00 1.23 0.52 0.00 0.52 150.00 1.19 0.52 0.00 0.52 155.00 1.17 0.52 0.00 0.52 160.00 1.14 0.53 0.00 0.53 165.00 1.12 0.53 0.00 0.53 170.00 1.10 0.54 0.00 0.54 175.00 1.07 0.54 0.00 0.54 180.00 1.05 0.55 0.00 0.55 185.00 1.05 0.56 0.00 0.56 ------------------------------------------------- THE REQUIRED POND SIZE = .5613015 ACRE -FT THE RAINFALL DURATION FOR THE ABOVE POND STORAGE= 185 MINUTES ***** GEOMETRIES OF AN EQUIVALENT CIRCULAR POND ----------------------------------------------------- STAGE CONTOUR CONTOUR POND POND (DEPTH) DIAMETER AREA SIDE SLP STORAGE FEET ----------------------------------------------------- FEET ACRE FT/FT ACRE -FT 0.00 128.99 0.30 4.00 0.00 0.50 132.99 0.32 4.00 0.15 1.00 136.99 0.34 4.00 0.32 1.50 140.99 0.36 4.00 0.49 2.00 144.99 0.38 4.00 0.68 2.50 ----------------------------------------------------- 148.99 0.40 4.00 0.87 L RBD, Inc., Engineering Consultants ' Gates at Woodridge Fourth Filing Temporary Retention Pond V = d/6*(A+4ABm+B) ' Stage Width Length Area (ft2)------ ' ------ ---------- ------ ---------- ------ ---- - --- ----- 0.0 60 130 7,800 ' 0.5 1.0 64 68 134 138 8,576 9,384 1.5 72 142 10,224 2.0 76 146 11,096 ' 2.5 80 150 12,000 3.0 84 154 12,936 1 ' 0.3 i 0.28 U i v I 03 0) 0.24 i -------------- Q i ' U 0.22 ---------- 0.2 0.18--- I 0.16 0 0.5 1 Area (ac) ------------ 0.18 0.20 0.22 0.23 0.25 0.28 0.30 0.8 i 1 1.5 2 2.5 3 Stage (ft elevation) -■- Area Capacity 434-011 Cumulative Storage (ac-ft) 0 0.09 0.20 0.31 0.43 0.56 0.71 26-Jun-95 l ***************************************** ***** CHANNEL LINING ANALYSIS ***** ***** North American Green ***** ***************************************** DESIGNER: dkt PROJECT: Gates #4 Phase 1 DRAINAGE AREA: 0.0 Acres CHANNEL DESCRIPTION: Bottom Width: 2.00 ft Left Side Slope: 10.0 Right Side Slope: 10.0 DATE: 07-03-1995 PROJECT NO.: 434-011 TO STATION: DESIGN FREQUENCY: 0100 Years CHANNEL SLOPE: 0.083 ft/ft Min. Lining Permissible Discharge Hydraulic Manning Recommended ----------- Shear (lb/sf) ------------- -(cfs)-- Radius (ft) ----------- Coefficient ----------- C125/C 2.15 18.9 0.24 0.021 Normal Area Velocity Calculated Remarks Depth (ft) ---------- (sf) -------- (ft/sec) -------- Shear (lb/sf) ------------------------- 0.40 2.49 7.58 2.11 Stable i 1 I 1 1 1 L r 1 1 1 1 h 0 1 1 1 1 100-YEAR SWMM MODEL 1 e"v II I 1 � r b - N ih C o 1 77 cli i �Il •�� ." �' p c� � li .1� �I , I F /• �V � I' 1 ' � _ sir• /!�j I � N � � � � `,��. \ � /� 1 CLIENT V'�Id�c.Gr0.T-(J JOB NO.�% -D �I 1 J INC PROJECT ,ONye,-100O ///k � CALCULATIONS FOR 5 W IN /m Engineering Consultants MADE BY ! DATECHECKEDBY DATE SHEETOF CA C t a) CD c .rn c W m I 0 C .N R m Y d U Cm C N M C d (i co LLI co m .a (B O 0-1 i E � N i = N N " U u _ a) C� //C��a j (D V //id�s V i Otf 0 N X N i ca i .N^... ."^.. co O. R W ^... X 1. W �CONNU-)CANNN i 0r CO0� 0000 C O^ D O O D 0 0 0 0 0 O Q O O i 0 0 O O O 7 i o 0 0 0 0 0 0 0 0 O ON 0 0 0 000 0 .. ' (OC�NN6 Lf;M(D .T 0 vMM�tMM� (D E ' I i mmmmO (O(000 cu i N N �- U ' Q i �0NNLo'TW0M C �oI�000�MCOOM CU�-'.-. i r'NI��lOMt7' F j M O "a ,.. Q.-0 O m > O N > O Q O C N a O > O (6 O N C a) N -0 E .c O O > a)>+M N0 � 6 -O N t a) a) O a N N N (0 M = N O -C O 0- d f 6 �- c a .. s cc'd n N Co is = = cm u- c a> c u- c MCcLL U- It It 'IT O O Ita) O N O O N 0ap ` ` >> N 0 m :? (6 > > m Q cca (7 0 0 (D C i CAO0r�to00i-0 CU � 7 i Z i 0 , O i Z N 0) 7 (7 O 4 co N t' U) Y a) vio a) U O C f�E L OCDLn000')0LOO (OOt.C)O OOMOOMOCOO (00(00 M(O� 0 0 � 0 � 0 c (Oc (O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 O O O O i t O 00 O O O 0000 NLO NEON �0N(ON " N > i C p) a CL i O a U N i C ' O C i t O 00 O O O O O O O O i N LO N LO N CD U')N (O N O a) > a J O = E V% N i a) v I w+ I 1 v i 0NIf)lf)0000mm NNCOCO i 0000a0c 00--t-Kr OOOO O O CD C,O r� C)C) $ � 00 0 0 o 00 0 00 O O O 'O^ i 0 C) C)O O O C)VJ v i OO000CD000 - 0 0 0 0 i 0N(O(O0tO0(O0 ���� L ; mmr�t-0mmmw 00aC)i-11- c r- Cuj m 1 ' i N�(OOOtOOtOO (OOU')O W `- M~�i`.i`O0 LO LO O ♦+ I r �+ E 1 Q W �i � (Q 1 � 1 1 030 �0-0 m a) _0— EEa)a)a(D CD a ) C ) a)C CCW a)> a)> >M> zO O_ O O L > OLO O C U U (1 U Q. U C U U Z a) i M co N Nr r- C) c- N Q U.. L C i NNM C)M co co co M C a) N N N a> E E � i 1 Z >a)� Q CWZ U U a a) O U � C O Co >, C a) — C UN O_ O (0 O_ a� to (B CD a) f6 '� C � 7 U C a E a f° O N O U) C co CO a) C a) N O a) Ca U N C >+ U) a)C > 3r C U a L U) L a) oE _— a) Q a) y O VA LO M DRAINAGE CRITERIA MANUAL 50 56 O Lu 30 cr- I-u) 2— 0— cc 20 Ili a. r- 10 0 C, FIGURE. 2-1 RUNOFF I I TEST AREA LOCATIONS I 0 ARAPAHOE COUNTY ❑ LITTI-ElON LOW1 DENSITY MEDIUM DENSITY I 2 Z 5 3 4 HOUSING:' DENSITY :UNITS ;PER ACRE 3 : Z- 1,6 RESIDENTIAL HOUSING DENSITY VS. IMPERVIOUS AREA 5-1-84 URBAN DRAINAGE & FLOOD CONTROL DISTRICT 0 SWMM input rile 434011G1.DAT: 2 1 1 2 3 4 TERSHED 0 AIL CREEK BASIN, DEVELOPED CONDITIONS 1995 100-YEAR STORM (FILE: 434011G1.DAT) GATES AT WOODRIDGE FOURTH FILING PHASE 1 -- RBD, INC. (dkt) -- 03 AUG 95 1 200 000 2. 1 10. 1 25 5. .60 .96 1.44 1.68 3.00 5.40 9.00 3.72 2.16 1.56 1.20 .84 .60 .48 .36 .36 .24 .24 .24 .24 .24 .24 .12 .12 0.0 '2 .016 .250 .1 .3 .51 .5 .0018 Existing Webber JHS 1 175 247175. 28.0 39.0 .015 * Existing Gates at Woodridge '1 176 375314. 14.6 45.0 .019 1 286 2314338. 12.0 44.0 .020 Gates #4 Phase 2 (tributary to Seneca) undeveloped 1 79 23 591. 16.3 6.0 .010 * Gates #4 Phase 1 developed only '1 277 2323080. 9.9 36.0 .020 Overlook #4 Phase 2 undeveloped 1 80 32 709. 16.3 9.2 .018 * Overlook #4 Phase 1 developed only '1 186 265648. 15.6 33.0 .032 1 87 3112092 6.9 32.0 .020 Existing Overlook at Woodridge 1 86 3411852 29.9 42.0 .032 ' 0 0 23 230 0 1 12.0 1300. .0056 4.0 4.0 .030 10.0 * Existing 42" RCPs and interim detention pond above Webber JHS ' 230 24 8 2 0.1 1. .005 0.0 0.0 .013 0.0 0.0 0.0 0.04 8.48 0.27 18.43 0.73 72.57 1.32 120.49 1.70 140.31 2.07 210.83 2.45 340.30 * Seneca Street 24 222 0 5 2.0 1600. .004 0.0 0.0 .013 2.0 ' 1.0 1600. .010 20.0 20.0 .060 5:0 26 23 0 1 1.0 1320. .02 10.0 5.0 .060 10.0 31 23 0 5 3.5 750. .0085 0.0 0.0 .013 3.5 70.0 750. .0085 20.0 20.0 .060 10.0 ' 32 31 0 1 10.0 1000. .018 50.0 50.0 .060 10.0 34 23 0 5 1.75 950. .0065 0.0 0.0 .013 1.75 70.0 950. .0065 20.0 20.0 .060 10.0 37 24 0 4 0.5 850. .0149 50.0 50.0 .016 0.5 50.0 850. .0149 20.0 20.0 .060 10.0 231 23 0 4 0.5 870. .02 50.0 50.0 .016 0.5 50.0 870. .02 20.0 20.0 .060 10.0 232 23 0 4 0.5 710. .006 50.0 50.0 .016 0.5 50.0 710. .006 20.0 20.0 .060 10.0 0 10 4 32 31 26 23 230 24 34 37 231 232 ENDPROGRAM 1 I ' SWMM output file 434011G1.OUT: ' ENVIRONMENTAL PROTECTION AGENCY - STORM WATER MANAGEMENT MODEL - VERSION PC.1 DEVELOPED BY METCALF + EDDY, INC. ' UNIVERSITY OF FLORIDA WATER RESOURCES ENGINEEERS, INC. (SEPTEMBER 1970) ' UPDATED BY TAPE OR DISK ASSIGNMENTS ' JIN(1) JIN(2) JIN(3) 2 1 0 JOUT(1) JOUT(2) JOUT(3) ' 1 2 0 NSCRAT(1) 3 IATERSHED PROGRAM CALLED I** ENTRY MADE TO RUNOFF MODEL *** UNIVERSITY OF FLORIDA (JUNE 1973) HYDROLOGIC ENGINEERING CENTER, CORPS OF ENGINEERS MISSOURI RIVER DIVISION, CORPS OF ENGINEERS (SEPTEMBER 1974) BOYLE ENGINEERING CORPORATION (MARCH 1985, JULY 1985) JIN(4) JIN(5) JIN(6) JIN M JIN(8) JIN(9) JINGO) 0 0 0 0 0 0 0 JOUT(4) JOUT(5) JOUT(6) JOUT(7) JOUT(8) JOUT(9) JOUT0 0) 0 0 0 0 0 0 0 NSCRAT(2) NSCRAT(3) NSCRAT(4) NSCRAT(5) 4 0 0 0 AIL CREEK BASIN, DEVELOPED CONDITIONS 1995 100-YEAR STORM (FILE: 434011G1.DAT) ATES AT WOODRIDGE FOURTH FILING PHASE 1 -- RBD, INC. (dkt) -- 03 AUG 95 NUMBER OF TIME STEPS 200 INTEGRATION TIME INTERVAL (MINUTES) 2.00 0.0 PERCENT OF IMPERVIOUS AREA HAS ZERO DETENTION DEPTH FOR 25 RAINFALL STEPS, THE TIME INTERVAL IS 5.00 MINUTES �OR RAINGAGE NUMBER 1 RAINFALL HISTORY IN INCHES PER HOUR .60 .96 1.44 1.68 3.00 5.40 9.00 3.72 1.20 .84 .60 .48 .36 .36 .24 .24 .24 .24 .12 .12 .00 MAIL CREEK BASIN, DEVELOPED CONDITIONS 1995 100-YEAR STORM (FILE: 434011G1.DAT) IATES AT WOODRIDGE FOURTH FILING PHASE 1 -- RBD, INC. (dkt) -- 03 AUG 95 2.16 1.56 .24 .24 SUBAREA GUTTER WIDTH AREA PERCENT SLOPE RESISTANCE FACTOR SURFACE STORAGE(IN) UMBER OR MANHOLE (FT) (AC) IMPERV. (FT/FT) IMPERV. PERV. IMPERV. PERV. -2 0 .0 .0 .0 .0300 .016 .250 .100 .300 175 24 7175.0 28.0 39.0 .0150 .016 .250 .100 .300 176 37 5314.0 14.6 45.0 .0190 .016 .250 .100 .300 286 231 4338.0 12.0 44.0 .0200 .116 .250 .100 .300 INFILTRATION RATE(IN/HR) GAGE MAXIMUM MINIMUM DECAY RATE NO .51 .50 .00180 .51 .50 .00180 1 .51 .50 .00180 1 .51 .50 .00180 1 79 23 591.0 16.3 6.0 .0100 .016 .250 .100 277 232 3080.0 9.9 36.0 .0200 .016 .250 .100 80 32 709.0 16.3 9.2 .111110 .016 .250 .100 186 26 5648.0 15.6 33.0 .0320 .016 .250 .100 87 31 12092.0 6.9 32.0 .0200 .016 .250 .100 86 34 11852.0 29.9 42.0 .0320 .016 .250 .100 TOTAL NUMBER OF SUBCATCHMENTS, 9 ,TOTAL TRIBUTARY AREA (ACRES), 149.50 MAIL CREEK BASIN, DEVELOPED CONDITIONS 1995 100-YEAR STORM (FILE: 434011G1.DAT) IATES AT WOODRIDGE FOURTH FILING PHASE 1 -- RBD, INC. (dkt) -- 03 AUG 95 ** CONTINUITY CHECK FOR SUBCATCHMEMT ROUTING IN UDSWM2-PC MODEL *** WATERSHED AREA (ACRES) 149.500 OTAL RAINFALL (INCHES) 2.864 DIAL INFILTRATION (INCHES) .606 �OTAL WATERSHED OUTFLOW (INCHES) 2.028 OTAL SURFACE STORAGE AT END OF STROM (INCHES) .230 ERROR IN CONTINUITY, PERCENTAGE OF RAINFALL .000 MAIL CREEK BASIN, DEVELOPED CONDITIONS 1995 100-YEAR STORM (FILE: 434011G1.DAT) IATES AT WOODRIDGE FOURTH FILING PHASE 1 -- RBD, INC. (dkt) -- 03 AUG 95 .300 .51 .50 .00180 1 .300 .51 .50 .00180 1 .300 .51 .50 .00180 1 .300 .51 .50 .00180 1 .300 .51 .50 .00180 1 .300 .51 .50 .00180 1 WIDTH INVERT SIDE SLOPES OVERBANK/SURCHARGE UTTER GUTTER NDP NP OR DIAM LENGTH SLOPE HORIZ TO VERT MANNING DEPTH JK UMBER CONNECTION (FT) (FT) (FT/FT) L R N (FT) 23 230 0 1 CHANNEL 12.0 1300. .0056 4.0 4.0 .030 10.00 0 ' 230 24 8 2 PIPE .1 1. 0050 .0 .0 .013 .10 0 RESERVOIR STORAGE IN ACRE-FEET VS SPILLWAY OUTFLOW .0 .0 .0 8.5 .3 18.4 .7 72.6 1.3 120.5 1.7 140.3 2.1 210.8 2.5 340.3 24 222 0 5 PIPE 2.0 1600. .0040 .0 .0 .013 2.00 0 OVERFLOW 1.0 1600. .0040 20.0 20.0 .060 5.00 26 23 0 1 CHANNEL 1.0 1320. .0200 10.0 5.0 .060 10.00 0 31 23 0 5 PIPE 3.5 750. .0085 .0 .0 .013 3.50 0 OVERFLOW 70.0 750. .0085 20.0 20.0 .060 10.00 32 31 0 1 CHANNEL 10.0 1000, .0180 50.0 50.0 .060 10.00 0 ' 34 23 0 5 PIPE 1.8 950. .0065 .0 .0 .013 1.75 0 OVERFLOW 70.0 950. .0065 20.0 20.0 .060 10.00 37 24 0 4 CHANNEL .5 850. .0149 50.0 50.0 .016 .50 0 OVERFLOW 50.0 850. .0149 20.0 20.0 .060 10.00 1 231 23 0 4 CHANNEL .5 870. .0200 50.0 50.0 .016 .50 0 OVERFLOW 50.0 870. .0200 20.0 20.0 .060 10.00 232 23 0 4 CHANNEL .5 710. .0060 50.0 50.0 .016 .50 0 OVERFLOW 50.0 710. .0060 20.0 20.0 .060 10.00 �OTAL NUMBER OF GUTTERS/PIPES, 10 MAIL CREEK BASIN, DEVELOPED CONDITIONS 1995 100-YEAR STORM (FILE: 434011Gi.DAT) 'ATES AT WOODRIDGE FOURTH FILING PHASE 1 -- RBD, INC. (dkt) -- 03 AUG 95 ARRANGEMENT OF SUBCATCHMENTS AND GUTTERS/PIPES GUTTER TRIBUTARY GUTTER/PIPE TRIBUTARY SUBAREA D.A.(AC) 23 26 31 34 231 232 0 0 0 0 0 79 0 0 0 0 0 0 0 0 0 106.9 24 230 37 0 0 0 0 0 0 0 0 175 0 0 0 0 0 0 0 0 0 149.5 ' 26 0 0 0 0 0 0 0 0 0 0 186 0 0 0 0 0 0 0 0 0 15.6 31 32 0 0 0 0 0 0 0 0 0 87 0 0 0 0 0 0 0 0 0 23.2 32 0 0 0 0 0 0 0 0 0 0 80 0 0 0 0 0 0 0 0 0 16.3 34 0 0 0 0 0 0 0 0 0 0 86 0 0 0 0 0 0 0 0 0 29.9 ' 37 0 0 0 0 0 0 0 0 0 0 176 0 0 0 0 0 0 0 0 0 14.6 ' 230 23 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 106.9 231 0 0 0 0 0 0 0 0 0 0 286 0 0 0 0 0 0 0 0 0 12.0 232 0 0 0 0 0 0 0 0 0 0 277 0 0 0 0 0 0 0 0 0 9.9 MAIL CREEK BASIN, DEVELOPED CONDITIONS 1995 100-YEAR STORM (FILE: 434011G1.DAT) 'GATES AT WOODRIDGE FOURTH FILING PHASE 1 -- RBD, INC. (dkt) -- 03 AUG 95 'HYDROGRAPHS ARE LISTED FOR THE FOLLOWING 10 CONVEYANCE ELEMENTS THE UPPER NUMBER IS DISCHARGE IN CFS THE LOWER NUMBER IS ONE OF THE FOLLOWING CASES: ( ) DENOTES DEPTH ABOVE INVERT IN FEET (S) DENOTES STORAGE IN AC -FT FOR DETENTION DAM. DISCHARGE INCLUDES SPILLWAY OUTFLOW. (I) DENOTES GUTTER INFLOW IN CFS FROM SPECIFIED INFLOW HYDROGRAPH (D) DENOTES DISCHARGE IN CFS DIVERTED FROM THIS GUTTER (0) DENOTES STORAGE IN AC -FT FOR SURCHARGED GUTTER 'TIME(HR/MIN) 0 2. ' 0 10 0 18. 0 26. 0 34. 0 42. 0 50. ' 0 58. 1 6. 1 14. ' 1 22. 1 30. ' 1 2 ' 2 2 2 ' 2 2 ' 2 2 ' 3 3 3 ' 3 3 38. 46. 54. 2. 10. 18. 26. 34. 42. 50. 58. 6. 14. 22. 30. 38. tX«zl .00 .DO .00( ) .02( ) 12 .69 .03( ) .30( ) 13.46 15.57 .47( ) 2.15( ) 45.81 24.81 .95( ) 2.73( ) 219.86 94.07 2.18( ) 3.66( ) 321.80 223.23 2.64( ) 4.39( ) 237.65 311.85 2.27( ) 4.74( ) 165.60 295.16 1.88( ) 4.68( ) 115.68 244.93 1.56( ) 4.49( ) 82.66 198.48 1.31( ) 4.28( ) 62.31 160.09 1.12( ) 4.09( ) 49.38 127.18 .99( ) 3.89( ) 40.68 100.25 .89( ) 3.70( ) 30.39 79.67 .75( ) 3.53( ) 25.34 63.87 .68( ) 3.38( ) 21.05 51.73 .61( ) 3.23( ) 17.00 42.20 .54( ) 3.10( ) 13.89 34.83 .48( ) 2.97( ) 11.75 29.46 .44( ) 2.86( ) 10.19 25.38 .40( ) 2.75( ) 9.00 22.18 .37( ) 2.65( ) 8.04 19.63 .35( ) 2.54( ) 7.25 17.62 .33( ) 2.42( ) 6.58 16.09 .31( ) 2.26( ) 6.01 12.69 .30( ) 1.47( ) 5.52 7.08 .28( ) 99( ) 5.08 5.77 .27( ) .88( ) 4.70 5.18 .26( ) .83( ) 26 31 .00 .01 .00( ) .02( ) .17 .63 .13( ) .21( ) 3.47 3.91 .50( ) .49( ) 12.05 17.28 .83( ) 1.02( ) 57.92 63.57 1.54( ) 2.13( ) 61.18 33.55 1.57( ) 1.46( ) 39.82 26.28 1.33( ) 1.27( ) 25.04 21.75 1.11( ) 1.15( ) 15.58 18.25 .92( ) 1.05( ) 9.78 15.33 .76( ) .96( ) 6.52 13.22 .64( ) .89( ) 4.51 11.42 .55( ) .83( ) 3.38 10.07 .49( ) .78( ) 2.71 8.96 .45( ) .73( ) 2.21 7.80 .41( ) .69( ) 1.68 6.83 .36( ) .64( ) 1.16 5.89 .31( ) .60( ) .80 5.21 .26( ) .56( ) .56 4.66 .22( ) .53( ) .40 4.18 .19( ) .51( ) .29 3.77 .16( ) .48( ) .21 3.42 .14( ) .46( ) .15 3.11 .12( ) .44( ) .11 2.83 .10( ) .42( ). .08 2.59 .09( ) AN ) .06 2.37 .08( ) .39( ) .05 2.18 .07( ) .37( ) .04 2.00 .06( ) .36( ) 32 34 .00 .01 .00( ) .04( ) .01 2.23 .01( ) .49( ) .38 13.98 .06( ) 1.77( ) 1.70 21.84 .14( ) 1.93( ) 8.03 101.62 .30( ) 2.47( ) 14.36 114.96 .39( ) 2.53( ) 16.64 79.03 .41( ) 2.36( ) 16.73 52.39 .41( ) 2.20( ) 15.48 34.89 .40( ) 2.07( ) 13.71 24.07 .38( ) 1.96( ) 12.00 17.99 .36( ) 1.87( ) 10.48 14.63 .34( ) 1.80( ) 9.22 7.99 .32( ) 1.00( ) 8.17 4.12 .30( ) .68( ) 7.28 3.09 .28( ) .59( ) 6.47 2.00 .27( ) .47( ) 5.72 .81 .25( ) .30( ) 5.08 .41 .24( ) .22( ) 4.54 .24 .23( ) .17( ) 4.08 .14 .22( ) .13( ) 3.69 .08 .21( ) .10( ) 3.34 .04 .20( ) .07( ) 3.04 .02 .19( ) .06( ) 2.77 .01 .18( ) .04( ) 2.53 .01 .17( ) .04( ) 2.32 .01 .16( ) .03( ) 2.13 .01 .16( ) .03( ) 1.96 .00 .15( ) .03( ) 37 230 .00 .00 .01( ) .00( ) .46 .04 .08( ) .00(S) 8.17 6.57 .24( ) .03(S) 23.32 15.68 .35( ) .21(S) 79.03 90.74 .55( ) .95(S) 57.89 291.91 .50( ) 2.31(S) 29.62 260.88 .39( ) 2.22(S) 17.70 191.49 .32( ) 1.97(S) 10.64 139.71 .26( ) 1.69(S) 6.58 120.80 .22( ) 1.33(S) 4.57 90.92 .19( ) .96(S) 3.22 68.07 .17( ) .69(S) 2.63 50.66 .15( ) .54(S) 2.32 38.48 .15( ) .44(S) 1.94 30.27 .14( ) .37(S) 1.37 24.74 .12( ) .32(S) .76 20.25 .09( ) .29(S) .44 17.55 .08( ) .25(S) .28 15.70 .06( ) .21(S) .18 13.87 .05( ) - _ .16(S) .12 12. .05( ) .13(S) .08 10.80 .04( ) .09(S) .05 9.59 .03( ) .07(S) .03 8.56 .03( ) .04(S) .02 6.44 .02( ) .03(S) .02 5.75 .02( ) .03(S) .01 5.27 .02( ) .02(S) .01 4.86 .01( ) .02(S) 231 .00 .01( ) .39 .07( ) 6.71 .21( ) 19.12 .31( ) 69.71 .51( ) 44.42 .43( ) 24.10 .34( ) 14.42 .28( ) 8.66 .23( ) 5.34 .19( ) 3.71 .17( ) 2.61 .14( ) 2.13 .13( ) 1.88 .13( ) 1.57 .12( ) 1.11 .10( ) .61 .08( ) .35 .07( ) .22 .05( ) .14 .05( ) .10 .04( ) .06 .03( ) .04 .03( ) .03 .02( ) .02 .02( ) .01 .02( ) .01 .01( ) .01 .O1( ) 232 .00 .01( ) .19 .07( ) 3.70 .21( ) 11.21 .32( ) 43.08 .52( ) 38.66 .51( ) 22.44 .42( ) 13.80 .35( ) 8.51 .29( ) 5.34 .24( ) 3.65 .21( ) 2.57 .18( ) 2.01 .17( ) 1.69 .15( ) 1.40 .14( ) 1.04 .13( ) .66 .11( ) .43 .09( ) .30 .08( ) .21 .07( ) .16 .06( ) .11 .05( ) .08 .05( ) .06 .04( ) .04 .04( ) .03 .03( ) .02 .03( ) .01 .02( ) 3 46. 4.36 4.75 .03 1.84 1.80 .00 .24( ) .79( ) .05( ) .34( ) .14( ) .02( ) 3 54, 4,01 4,39 .03 1.70 1.66 .01 .23( ) .76( ) .05( ) .33( ) .14( ) .02( ) 4 2. 3.77 4.08 .02 1.57 1.54 .00 .22( ) .73( ) .04( ) .32( ) .13( ) .02( ) 4 10. 3.51 3.79 02 1.45 1.42 .00 .21( ) .70( ) .04( ) .31( ) .13( ) .02( ) ' 4 18. 3.28 3.54 .01 1.35 1.32 .00 .21( ) .68( ) .04( ) .29( ) .12( ) .02( ) 4 26. 3.07 3.31 .01 1.25 1.22 .00 .20( ) .65( ) .03( ) .28( ) .12( ) .02( ) 4 34. 2.87 3.09 .01 1.16 1.13 .00 ' .19( ) .63( ) .03( ) .27( ) .11( ) .02( ) 4 42. 2.69 2.90 .01 1.08 1.05 .00 .18( ) .61( ) .03( ) .27( ) .11( ) .02( ) 4 50. 2.52 2.71 .01 1.00 .98 .00 .18( ) .59( ) .02( ) .26( ) .11( ) .02( ) 4 58. 2.37 2.55 .01 .93 .91 .00 .17( ) .57( ) .02( ) .25( ) .10( ) .01( ) 5 6. 2.22 2.39 .01 .87 .85 .00 ) .55( ) .02( ) .24( ) .10( ) .01( ) '.16( 5 14. 2.09 2.25 .01 .81 .79 .00 .16( ) .54( ) .02( ) .23( ) .09( ) .01( ) 5 22. 1.97 2.12 .00 .75 .73 .00 .15( ) .52( ) .02( ) .22( ) .09( ) .01( ) ' 5 30. 1.85 1.99 .00 .70 .68 .00 .15( ) .50( ) .02( ) .22( ) .09( ) .01( ) 5 38. 1.74 1.88 .00 .66 .64 .00 .14( ) .49( ) .02( ) .21( ) .08( ) .01( ) 5 46. 1.64 1.77 .00 .61 .60 .00 .14( ) .47( ) .01( ) .20( ) .08( ) .01( ) 5 54. 1.55 1.67 .00 .57 .56 .00 .13( ) .46( ) .01( ) .20( ) .08( ) .01( ) 6 2. 1.46 .13( ) 1.57 .45( ) .00 .01( .53 ) .19( ) .52 .07( ) .00 .01( ) 6 10. 1.38 1.48 .00 .50 .48 .00 .12( ) .43( ) .01( ) .18( ) .07( ) .01( ) 6 18. 1.30 1.40 .00 .47 .45 .00 .12( ) .42( ) .01( ) .18( ) .07( ) .01( ) 6 26. 1.23 1.32 .00 .43 .42 .00 .12( ) .41( ) .01( ) .17( ) .07( ) .01( ) 6 34. 1.16 1.25 .00 .40 .39 .00 .11( ) .40( ) .01( ) .17( ) .06( ) .01( ) HE FOLLOWING CONVEYANCE ELEMENTS HAVE NUMERICAL TABILITY PROBLEMS THAT LEAD TO HYDRAULIC OSCILLLATIONS DURING THE SIMULATION. 230 MAIL CREEK BASIN, DEVELOPED CONDITIONS 1995 100-YEAR STORM (FILE: 434011G1.DAT) IATES AT WOODRIDGE FOURTH FILING PHASE 1 -- RBD, INC. (dkt) -- 03 AUG 95 *** PEAK FLOWS, STAGES AND STORAGES OF GUTTERS AND DETENSION DAMS *** ' CONVEYANCE PEAK STAGE STORAGE TIME ELEMENT (CFS) (FT) (AC -FT) (HR/MIN) .01 4.50 .00 .01 .01( ) .02(S) .01( ) .02( ) .01 4.18 .00 .01 .01( ) .02(S) .01( ) .02( ) .00 3.89 .00 .01 .01( ) .02(S) .01( ) .02( ) .00 3.62 .00 .00 .01( ) .02(S) .01( ) .01( ) .00 3.38 .00 .00 .01( ) .02(S) .01( ) .01( ) .00 3.16 .00 .00 .01( ) .01(S) .01( ) .01( ) .00 2.95 .00 .00 .01( ) .01(s) .01( > .01( ) .00 2.77 .00 .00 .01( ) .01(S) .01( ) .01( ) .00 2.59 .00 .00 .01( ) .01(S) .01( ) .01( ) .00 2.43 .00 .00 .01( ) .01(S) .00( ) .01( ) .00 2.28 .00 .00 .01( ) .01(S) .00( ) .01( ) .00 2.15 .00 .00 .01( ) .01(s) .00( ) .01( ) .00 2.02 .00 .00 .01( ) .01(S) .00( ) .01( ) .00 1.90 .00 .00 .01( ) .01(S) .00( ) .01( ) .00 1.79 .00 .00 .01( ) .01(S) .00( ) .01( ) .00 1.69 .00 .00 .01( ) .01(S) .00( ) .01( ) .00 1.59 .00 .00 .01( ) .01(S) .00( ) .01( ) .00 1.50 .00 .00 .01( ) .01(S) .00( ) .01( ) .00 1.41 .00 .00 .01( ) .01(S) .00( ) .01( ) .00 1.33 .00 .00 .00( ) .01(S) .00( ) .01( ) .00 1.26 .00 .00 .00( ) .01(S) .00( ) .01( ) .00 1.19 .00 .00 .00( ) .01(s) .00( ) .01( ) ' 23 24 325.9 314.6 2.7 4.7 0 0 40. 52. �. 31 63.6 2.1 0 34. - 32 16.9 .4 0 54. 34 120.3 2.6 0 40 ' 37 79.9 .6 0 36 222 230 314.6 306.0 - -- (DIRECT FLOW) -.1--- -- 2.3 ..._._.0.. 0 52 44 F i n c. u r ' 231 232 69.7 45.7 .5 .5 0 0 34. 36. w<G INDPROGRAM PROGRAM CALLED P I WOODRIDGE DETENTION POND 230 H 1 0 M (g-oe) Apedeo m N N � O O w n N a r Z O O O O co (OD V N (s;o) 96Je4osla \` (, O OD M a000 (J I OITlq*0'gMMMC0I�r O 666(-N0000(OI-_ i qT";r00 �<-NM(OI� w A' 0 0 0 0 0 0 0 0 0 0 i 0 0 0 0 0 0 t O M 0 0 Ci O O O O O O N M 6 N tn(OCCO06 N U t N ai i OOOMInITmma �� U 11, O w wNO(D w 6 6 6 O OcJ N ... C 0 ✓) i �N�� CL Q + ca �0 O�Il-MN0r-LONCD O O }, a) p� C)OOONNN(M N > � O U ; 7 QU > 3 Op 0 cU O 0 0 0 0 0 0 0 0 0 C i- 0 0 0 0 0 a M a 0 O_ 1 �NMITU')LO(D(DI-I-- Co Ln0LnLO0LnU6(OLO0 Ca N� O w W ( U) 0 �: 0 LO Q 0 O f. tRBD, Inc., Engineering Consultants tGates at Woodridge Fourth Filing Phase One 434-011 ' Interim Detention Pond 230 Area -Capacity Rating Curve Cumulative ' Elev Area Area Storage (ft) (ft2) (ac) (ac-ft) - --------------------------------------------------------- V = d/6*(A+4ABm+B) 5111.1 0 0.00 0 ' 5112.0 3,606 0.08 0.04 5113.0 17,107 0.39 0.27 5114.0 22,768 0.52 0.73 ' 5115.0 28,635 0.66 1.32 5116.0 36,732 0.84 2.07 1 1 ^ 0.8 U ca @ 0.6 0) Q U 0.4 7 rj) 0.2 F f--------1---------+1 F---------/-------7--�--- L 0.5 0 4- 5111 0 5112 5113 5114 5115 5116 Stage (ft elevation) -.- Area � Capacity 4; U M �U M d 1B A 03-Aug-95 a r `D > n D U E ' 6 c 3 j p CV N U S L O O Q oU rnJ ' mL C U N J � , v po0 i + QN+ U L.. _0 an d Co N CAC o p y +.0 7-Q 'O >,.p 7 O Q,U Q N U J d u2 U N-O W O M u1 [Z O.-O U O N > II 0) O? L J C O F > N " O W m O N U N N N i � o.O �i$> ow E X E QJ 300= 2 a�`�Yw2 ca N 1T Caw>-�w > (�Zcu + N-� pW�•� > i M(D(D N CO CO D) D) M 10 '-•-r�M V r v �nrnvc-o�(DDMr-OI- n mN Y o J .r ri (o (o le a6 a666 � LL ., NvNv I I II ' DY u Wa=C) W W U I yy I O(D(O MMMDI (r00 V V w O V a I Oc- V .-u70) V I�(D Ma f��0 V M m n L J V O M CMM V V V 6 6Mr W m 6 6 -: i ��--'-e-NN O I ' 000 I)N(O r r rM VNO0V,N C> I Cl) (O�.- Io�D70NM V (O 0 MI�f� O N COi> v o 00 000 .... . Y N w F a) I a�i y a to Oe- N � I N V 10 t--W M0 C14 MM V'7 V IZ @-O 2O pv i (V NNNNNM M("1M MMMM M N a)a)N O I 0 LL iO O O O (O O o O O s- e- O I O N N N N N M M M M M M ' V v U 3! N II N ' OMMMOM MMOMMWOMMM U J 0, Nor- �-oao( h(ON�O C Y J 'co i O O O O O N N M M V (O CD 1: N N N ' O 1+ W O 2 O V (ANCDONNMMMMITMtnrn Y � O O.- � N N N M M M V V (O to ( O ' .0 in { V to tD lh C6 6 6 N 6 V to — LO0(Dv U') I0V1,-0Na0 r--oM0LONn I -.MO (�0°00 I V O(OO V mMM V �1, 00 V V 11-: c I �C'j6644'i0 06r- l 666 d W 0 I i.: II II II II II I OOMN1�(D �I�(D N(O W lO OOOM d .O 0— O Q' CO W C O I M Of V N N t-- , h M M (O Cl V N CO �-�-NNMM V V NN(D r(D O)O ' � USv �f a _ OI�(O W NM(D O7(O N O t1 V CDM M (OOtO O)OMtnr 00� V (D O) ' V (D O OOOOON N N N 5 (v > 2 Uzf U N N M N N O O 0000000000000000 U C V (D .-(D ON c-NM V tOOt` OO)O�NM V N 'o CD d 3 0 O m I W Q II II II II II 11 II U O O O O O O O O CD O O O O O O O ' O O O CJZ O(�j ❑ I N V Oa00�� (�D�N NNNNM _ p Q W 2 m 3ul > rn M CHART :10 180 10,000 . 168 8,000 EXAMPLE (2) (3) 156 6 000 0.42 Incnee (3.5 feet) Q. 120 cf a 5:000144 5. 4,000 t1w nw 6. 5. 152 D feat 4 3,000 (1) 2.5 8.8 5' 4. 120 (2) 2.1 7.4 108 2,000 (3) 2.2 7.7 4• 3. aD in feel 3, 96 1,000 3• 800 84 600 2' 2 /� 500 / 72 400 2' u a� 300 E+�/ Z N N / 60 cLL7 200 / F 1.5 = z / � g 34 a / a Cr w 48 /w 100 J —�— 2 __� 80 � � _,__._.__.._ F U - -- —U _60- —.. — - ..... a _-uw ---� Ls! 1.0 1.0 o --�L—SO ENTRANCE 0 40 p-SCALE �.�TYPE— 1.0 Ix f" 36 �,W_ �., 30 "�-` (1) savor. edge with Q . 9 33 headwall 30 9 a 0 (2) Groot end with W 20�� a 30 heodwall'—, x .8 .8 j3) Groove and 8 27 Projecting � 10 _ \ � T ,7 24 \ 6 To vat sca a (2) or (3) prole ct 21 5 nori: onta117 to tcalo (1),then y _._. .. 4 wLe straight inclined line through ' 6 D and 0 state,,, or rerun as 3 ii)uatrofee. \ 6 .6 18 \ Lo .5 S 12 'HEADWAT ER DEPTH FOR CONCRETE PIPE CULV RTS . HEADWATER SCALES 293 y REVISED MAY1964 -WITH IN ET CONT BUREAU OF 7V6LIC ROA D3 JAK 1963 \ �q 181 Prece ng page a k �.SZ .?Z TABLE 12 - ENTRANCE LOSS COEFFICIENTS Outlet Control, Full or Partly Full Entrance head loss He = ke V 2 2g Type of Structure and Design of Entrance Coefficient ka Pipe. Concrete Projecting from fill, socket end (groove -end) . . . . . . . 0.2 Projecting from fill, sq. cut end . . . . . . . . . . . 0.5 Headwall or headwall and wingwalls Socket end of pipe (groove -end) . . . . . . . . . . . 0.2 Square -edge 0.5 Rounded (radius = 1/12D) . . . . . . . . . . . . . 0.2 Mitered to conform to fill slope 0.7 4'_J 0.5- 'End -Section conforming to fill slope . . . . . . . .. . . Beveled edges, edges, 33.70 or 450 bevels . . . . . . . . . . . 0.2 Side -or slope -tapered inlet . . . . . . . . . . . . 0.2 Pipe or Pioe-Arch Corrugated Metal Projecting from fill (no headwall) . . . . . . . . . . . 0.9 Headwall or headwall and wingwalls square -edge . . . . . . . 0.5 Mitered to conform to fill slope, paved or unpaved slope 0.7 'End -Section conforming to fill slope . . . . . . . . . . 0.5 Beveled edges, 33.71 or 451 bevels . . . . . . . . . . . 0.2 Side -or slope -tapered inlet . . . . . . . . . . . . . 0.2 Box Reinforced Concrete Headwall parallel to embankment (no wingwalls) Square -edged on 3 edges . . . . . . . . . . . . . 0.5 Rounded on 3 edges to radius of 1/12 barrel dimension, or beveled edges on 3 sides . . . . . . . 0.2 Wingwalls at 30° to 75° to barrel Square -edged at crown . . . . . . . . . . . 0.4 Crown edge rounded to radius of 1/12 barrel dimension, or beveled top edge . . . . . ... .. 0.2 Wingwall at 100 to 250 to barrel Square -edged at crown . . . — 0.5 Wingwalls parallel (extension of sides) Square -edged at crown . . . . . . ... . . . . 0.7 . Side -or slope-tapered inlet . . . . . . . . . . . . . 0.2 'Note: "End Section conforming to fill slope," made of either metal or concrete, are the sections commonly available from manufacturers. From limited hydrau- 'n� lic tests they are equivalent in operation to a headwall in both let and outlet control. Some end sections, incorporating a to ed taper in their be esign have a superior hydraulic performance. These latter sections can 179 1 1 1 1 I c N c 0 U m c .c d a> c c W 00 0 LO O Q V' < � N C O' N Lo U O 5 0)N c6 C O U ❑ >, x r- .� Lo U O II L Of '6 � O ❑ N Q .. x y�o O x ❑O U U❑ c 0 N r ❑ 1 x o U II N II E U II �I V O ❑ Osia I/1 w � N 2 O Lo O Oq- N 0 0 0 D M N N -,t M Lo M tY' 0 O *K .-. I O M CM O V' q O M O V M M r N V' �t M M x U v i mNm0Nr-OONf--M* NNMM V'LO01i, M M0M* 1 rIC i i OOOOLoMNm V' T q V V•m0mmmoww OONLn�OMLnf�O�-MLnl�O.- V COOMN �QQ _0 � OOr-�--r-NNNNNMMMMM V' V' V Lf)Lf)CO d ' 1 1 i MM0M0M0M0Op0MMMOCO-Lo CO000LO ISM V Nomf,-LoM�o�Mmr,-M(DN V Oil - cm O �����00000000000��•-� r j it 4 i OLO i ommmomomomu-)MOMMMOMLOMO LOr- i O�-MLnI�00ON V LnI�O�N V (Oo0O�Mlf� QC6 Ov 0000NNNNNNMCMM 0 ' II II O i omo0o00Loa0o 0 aLoC)0a 0 o 0 o O OOr c-NNMM V V Lnll�COCflI�I�o0c00)OO r ❑� � � 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r- L ❑ j U RBD INC. ENGINEERING CONSULTANTS CHANNEL RATING INFORMATION Existing channel D/S of Gates detention pond, based on Lidstone & Anderson HEC-2 model of 11 Nov 91 STA - ELEV -- 100.00 115.00 114.00 113.00 117.00 112.00 121.00 111.00 123.00 110.90 136.00 110.90 138.00 111.00 141.00 112.00 144.00 113.00 148.00 114.00 151.00 114.80 'N' VALUE SLOPE (ft/ft) ----------------------- 0.029 0.0140 ELEVATION AREA VELOCITY DISCHARGE FROUDE (feet) --------- (sq ft) ------- (fps) -------- (cfs) --------- NO. ------ 111.10 3.2 2.0 6.33 0.81 111.30 6.9 3.1 21.30 0.90 111.50 10.9 4.0 43.13 0.96 111.70 15.1 4.7 71.34 1.00 111.90 19.6 5.4 105.72 1.03 112.10 24.4 6.0 146.55 1.06 112.30 29.5 6.6 193.81 1.08 112.50 34.7 7.1 247.16 1.10 112.70 40.3 7.6 306.63 1.12 112.90 46.0 8.1 372.28 1.14 113.10 52.1 8.5 440.00 1.15 113.30 58.5 8.7 510.65 1.16 113.50 65.4 9.0 589.01 1.17 113.70 72.7 9.3 6-75.40 1.18 113.90 80.5 9.6 770.15 1.19 114.10 88.7 9.9 873.89 1.20 114.30 97.3 10.1 986.88 1.21 114.50 106.3 10.4 1109.11 1.21 114.70 115.8 10.7 1240.86 1.22 Program uses Manning's equation. 1 1 1 1 t RBD INC. ENGINEERING CONSULTANTS WEIR SECTION FLOI DATA Sidewalk overflow to Seneca Street at Webber JHS U/S culverts WEIR COEF. 3.200 STA ELEV 0.0 17.00 24.0 16.00 26.0 15.50 71.0 15.50 73.0 16.00 114.0 17.00 ELEVATION DISCHARGE (feet) (cfs) --------- 15.50 --------- 0.0 15.60 4.6 15.70 13.0 15.80 24.1 15.90 37.3 16.00 52.5 16.10 69.8 16.20 89.5 16.30 111.9 16.40 137.1 16.50 165.3 16.60 196.7 16.70 231.3 16.80 269.3 16.90 310.8 17.00 356.0 Program uses weir equation Q = CLH312 p 1 I] 7 EROSION CONTROL 1 1 1 iIJ ' RBD, Inc. RAINFALL PERFORMANCE STANDARD EVALUATION ' #434-011 PROJECT: Gates No. 4 STANDARD FORM CALCULATED BY: DKT DATE: 02/14/95 DEVELOPE ERODIBILIT Asb Lsb Ssb Lb Sb PS SUBBASIN ZONE (ac) (ft) (%) (ft) (%) (%) 19 high 2.49 640 2.5 20 high 2.20 715 1.9 21A high 3.49 865 0.9 21B high 3.63 994 0.7 22A high 3,05 770 1.1 22B high 2.32 810 1.0 22C high 2.14 695 0.8 23 high 5.47 808 1.4 24 high 4.20 1435 1.2 25 high 1.68 550 0.9 26 high 5.55 1741 1.3 27 high 6.90 2020 1.2 Off -site tmp. high 5.18 1365 1.0 channel Total 48.30 1192 1.2 83.9 EXAMPLE CALCULATIONS Lb = sum(AiLi)/sum(Ai) _ (2.49 x 640 +... + 5.18 x 1365)/ 48.30 1192 ft Sb = sum(AiSi)/sum(Ai) _ (2.49 x 2.50 +... + 5.18 x 1.00)/ 48.30 1.2 % ' PS (during construction) = 83.9 (from Table 8A) PS (after construction) = 83.9/0.85 = 98.7 ' RBD, Inc. EFFECTIVENESS CALCULATIONS u u n #434-011 PROJECT: Overlook No. 4 STANDARD FORM B CALCULATED BY: DKT DATE: 06/23/95 Erosion Control Method C-Factor P-Factor Comment Value Value 1 Roads & curb 0.01 1.00 paved & constructed 2 Temporary vegetation 0.45 1.00 3 Gravel filters 1.00 0.80 placed at inlets 4 Silt fence barrier 1.00 0.50 5 Bare soil (rough) 1.00 0.90 6 Straw mulch w/ seed 0.06 1.00 all areas not in roadway 7 Straw bales 1.00 0.80 Iswales, channels MAJOR PS SUB AREA Practice C * A P * A Remarks BASIN N BASIN (ac) DURING CONSTRUCTION Site 83.9 48.30 Roads 5.98 3 5.98 4.78 Gravel filte Remain. 42.32 6 2.54 42.32 Straw mul Cnet =[5.98x1.00+...+42.32x0.06]/48.30 = 0.18 Pnet = 0.8x[5.98x0.80+...+42.32x1.00]/48.30 = 0.78 EFF = (1-C*P)100 = (1-0.18*0.78)100 = 86.24 > 83.9 (PS) Assume roads not constructed within 6 weeks; use gravel inlet filters at all curb inlets & straw bales at swales & channels. ' EC/SF-6:1991 RBD, Inc. EFFECTIVENESS CALCULATIONS 1 n 1 1 #434-011 PROJECT: Overlook No. 4 STANDARD FORM B CALCULATED BY: DKT DATE: 06/23/95 Erosion Control Method C-Factor P-Factor Comment Value Value 1 Roads & curb 0.01 1.00 paved & constructed 2 Sod grass 0.01 1.00 3 Straw bales 1.00 0.80 4 Silt fence barrier 1.00 0.50 5 Straw mulch w/ seed 0.06 1.00 all areas not in roadway 6 Estab. grass (80%) 0.03 1.00 7 Hydraulic mulch 1 0.10 1.00 MAJOR PS SUB AREA Practice C * A P * A Remarks BASIN (%) BASIN (ac) AFTER CONSTRUCTION 98.7 48.30 Roads & i 11.06 1 0.11 11.06 Roads & c Yards 22.50 2 0.23 22.50 Sod grass Remain. 14.74 6 0.44 14.74 Estab. gra Cnet =[11.060.01+...+14.74x0.03]/48.30 = 0.02 Pnet = 0.8x[11.06x1.00+...+14.74x1.00]/48.30 — 0.80 EFF = (1-C*P)100 = (1-0.02*0.80)100 = 98.71 > 98.7 (PS) EC/SF-6:1991 I I 1 11 11 rl O C1M 000 O 4 4 L; Ln L4 L� pco=coca p 01 C1 Crt 0/000000 O C C r Cln L4 L4 L4 LnN r q co co= CD co= cD= CD O qc%C1 a%m cl L%C1m Ct C1 c, 000 O r44r444444«In Ln Ln n co co co co co co co co Ca co CD= O CD CD O C` LD CD CD c1 C1 C1 C1 C1 C1 C1 C1 C1 C1 C1 cl cl c1 C.� C1 . . . . . . . . . . . O . . . . . . . . . . C< C r C C r< C 'C C< C C r IT C r< r N cacacococococococococaCD co cococococococa O onClno) okov9l-I-I-r- rI I-I-t- I- I-I-coCJ co co co co • . . . • . O . O • . . . . r « C C C C C r r C « r r r C C C r r r r r r C rt cocococacacococococococoMcoCDCDCDCDCocacacocacacaco O C)NnCLnV1L71D%.0t.D0 V 1DI,I-t-I,t-t-IlI-t,I,CD coca O ,] c� n444C«4r444Crr4«444Cr444 O cacococoCJcoca co cy co CD cD ca co co co co co co co co ca co CD CO co U O 170NnC<L71nInIle) 110 Q o 110 Q0 kD %-D 1o1D V I-I,I-Il- I-t- tn c7 n C C C C C C C C C C« r r C C 41;4 r r r C Cr z co co co co cD co co co co cD co O co co Co co co co co co co co cD co co co H a O CC1 ri Ln L7 Ln L71n Ln Ln in oO D %D 00 I` aU O r «o n n«. r.<r.r r< r< rrr r r r r .Nnn««r< co co CD ca co«co CD co Co co co coD co Co coco co co cococOCD co O O O CD O r♦ ri N N n n c'1 n C C C Cr« r In to In to voto P • . Vn nnr C<< r C CCC C C r< r r r r r r rrr rO P-4 CO co coJDDOm=cococDm=mcococa O NNUII-COC100.-1'-(HNNNNNnnnnnCrCCr 1 O � . co L'r �—Ln Nnnnnn CCa 44444 CCr 4CCrrrr rr CD co co co co co co co co co co Co CD Co CD co co CD CD CD CJ c0 co Co co co W CO w ti70 Gln "IcDrinCUlLei l %Dr-t-I,cocom CD CO coMc%c%00000 q O . . . . . . . . . . . . . . . . L4 q NNnnnnnmclr)mnnnnnnnnnnrrrrr E-40 In CD co co co co co co= m m = = co**=* m m 0 m co co w= .c„ O 0 In co O rt N n C r Ln In l'11D �.o 0vo 7I`I`I`I`ca coca C1 C1 H cn r 4 N N n n n n n n n n n n n n n n n n n n n n n n n co = CD co - m co co w cD CD q q CD q q cD CD q O CD m p q co co co W u Ln ri rt In t` Co 00.i N N n n n<r rrr Ln Ln In Vo%-00I-t- . n . . . . . . . . . . . . . • . ri N N N N n n n n n n n n n n n n n n n n n n n n n coCDco c7 b Co co co co co cD co co co co CD co co co co CD co=CD CD W O O n N 10 co n O rt N N n n n< r< C C Cln n to In 0 Vo%. 0 G-i n O 4 ri ri ri N NNNNNNNNNNNNNNNNNNNN L7 CDm cD co W p m cD co cD CD p CD m m= co m= co m CD co CDC �1 In 00 n N n< Ln %D I` I` t- ca co co n C1 C1 D1 C1 c1 0 0 0 0 0 0 a........ L-a N C1OO rHr1HHr.r.4r44444rri4NN N N NN I` co CD CD Co co co co co co CD co co co co co co co co CD CD co co co co co z O <L70ncn1')cocoC1000rtrlririNNNNnCO) n n nn •"y N CD C1 o O 0 O 00 O rt ri 4 ri ri ri ri .-1 ri ri ri 4 4 ri ri ri ri �i [. I� W Q q CD 0 O CD m CD 0 4 m co co 0 co co tl co, co CD co Co co L7 gNcoriCL7I-I-coClfl00.4i iririr♦NNNnn'n_nn ri 'V C cDc4c4 1c;(1c1C1 C1000000000000000 I` I` t- I` I` I` I` I` I` t- I` co co co co co CD c0 co co co co Co co co co O U' r-i o -gr r- m o r4 N n n ,v .;- In In n n %D QtDoI`I`17Uo . . . . . . . . . . . . . . . . ri CID t`t`I`I`co co CD Co co co CD co M CD co* Co coca CJ co co co co I` t` t` t- t` I` I` I` I,- I` I` t` I` t` I` I` I` t` I` t` t` I` t- I` I` I` N C10CU I` CD co I` I` I` 1-o 'D 'V In CCnnNNM0r -1 C117 • . . . . . . . . . . . . . . . • • O 0NNNNNNNNNNNNNNNNNNNrlriri4 w gH.. 00000000000000000000000000 Ot9H 00000000000000000000000000 �7zt. HNnrLn�or caQm0riNnrinlorcDrno0000in0 (�(]� riege-{ririririrlrlrtNNn nrr0 MARCH 1991 a 8.4 DESIGN CRITERIA ' Table 86 C-Factors and P-Factors for Evaluating EFF Values. Treatment C-Factor P-Factor BARE SOIL Packedand smooth................................................................ 1.00 1.00 Freshlydisked........................................................................ 1.00 0.90 Rough irregular surface........................................................... 1.00 0.90 ' SEDIMENT BASIN/TRAP................................................................. 1.00 0.5011 STRAW BALE BARRIER, GRAVEL FILTER, SAND BAG ........................ 1.00 0.80 ' 1.00 0.50 SILTFENCE BARRIER..................................................................... ' ASPHALT/CONCRETE PAVEMENT .................................................. 0.01 1.00 ESTABLISHED DRY LAND (NATIVE) GRASS .......................... See Fig. 8-A 1.00 ' SOD GRASS................................................................................. 0.01 1.00 TEMPORARY VEGETATION/COVER CROPS .................................... 0.451.) 1.00 HYDRAULIC MULCH @ 2 TONS/ACRE........................................... 0.1013) 1.00 SOIL SEALANT....................................................................0.01-0.60"' 1.00 EROSION CONTROL MATS/BLANKETS............................................ 0.10 1.00 GRAVEL MULCH Mulch shall consist of gravel having a diameter of approximately ' 114" to 1 1/2" and applied at a rate of at least 135 tons/acre.............. 0.05 1.00 HAY OR STRAW DRY MULCH After olantino orass seed, apply mulch at a rate of 2 tons/acre (minimum) and adequately anchor, ' tack or crimp material into the soil. Slope M ' 1 to 05.............................................................................0.06 6 to 10 ........................................................................ 0.06 100 1.00 11 to 15............................................................................. 0.07 1.00 16 to 20............................................................................. 0.11 1.00 21 to 25.............................................................................0.14 25 to 33.............................................................................0.17 1.00 1.00 > 33.......................................................................... 0.20 1.00 ' NOTE: Use of a-zher C-Factor or P-Fa~or values reponed in this taUe must be substaniicated by dDcument tion. (1) Must be constructed as the first step in overlot grading. (2) Assumes planting by dates identified in Table 11-4, thus dry or hydraulic mulches are not required. (3) Hydraulid mulches shall be used only between March 15 and May 15 unless irrigated. (4) Value used must be substantiated by documentation. i 1 1 ' MARCH 1991 8.6 DESIGN CRITERIA o. o.� 0.30 0 0.25 Q 0.20 0..15 0.10 0.05 ESTABLEBED GRASS AND C—FACTORS FORT COWS, COLORADO li i........ III ............. i TO -20 � 0 50 60 -70 80. 90 100 ESTABLSHED GRASS GROUND COVER (%) FIGURE 5.1 RBD, Inc. EROSION CONTROL CONSTRUCTION SEQUENCE ' #434-011 1 1 1 YKUJtI. I: 1iales IVo. 4 J 1ANUANU r-UNIVI U CALCULATED BY: DKT DATE: 08/04/95 SEQUENCE FOR 1995 ONLY Indicate by use of a bar line or symbols when erosion control measures will be installed. Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. PHASE IONLY YEAR 95 96 MONTH J I A S I O I N D J F M I A I M J STRUCTURES: INSTALLED BY 'VEGETATION/MULCHING CONTRACTOR DATE SUBMITTED MAINTAINED BY APPROVED BY CITY OF FORT COLLINS O RBD, Inc. EROSION CONTROL COST ESTIMATE HHUJIzu 1: a es at Woodridge Fourth Filing 434-011 PREPARED BY: DKT DATE: 06/23/95 Item Quantity Units Unit Cost Total Comments CITY RESEEDING COST Reseed/mulch 48.3 ac 5500 $24,150 See Note 1. Subtotal $24,150 Contingency 50% $12,075 Total $36,225 EROSION CONTROL MEASURES Reseed/mulch 42.32 ac $500 $21,160 Gravel inlet filters 7 ea $300 $2,100 Straw bale check dam 4 ea S150 $600 Subtotal $23,860 Contingency 50% $11,930 Total $35,790 Total Security $36,225 Notes: 1. A<1 ac=$1300/ac; A=1-10 ac=$650/ac; A>10 ac=$500/ac. 1 1 1 i r P I CHARTS, TABLES AND FIGURES DRAINAGE CRITERIA MANUAL RUNOFF 50 30 F- 20 Z W U W CL 10 Z W a O 5 N W En 3 O U 2 W Q 1 �WWWWWI�/ /IWI�U1/ �WWWWm s�WW �W►ir��.,� MUM ,cilium �iWr�W�rn■ri�W��WW��■■� 5' .1 2 .3 .5 1 2 3 5 10 20 VELOCITY IN FEET PER SECOND FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE WITH THE RATIONAL FORMULA. *MOST FREQUENTLY OCCURRING "UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technical Release No. 55, USDA, SCS Jan. 1975. 5-1-84 URBAN DRAINAGE & FLOOD CONTROL DISTRICT 1 1 N1AY 1984 rn .9 W .7 .3 .2 °/ F=0.8 s : 0.4 F=0.5 I I I I I BELOW MINIMUM ALLOWABLE I STREET GRADE O 2 4 6 8 10 12 14 SLOPE OF GUTTER (%) Figure 4-2 REDUCTION FACTOR FOR ALLOWABLE GUTTER CAPACITYS Apply reduction factor for applicable slope to the theoretical gutter capacity to obtain allowable gutter capacity. (From: U.S. Dept. of Commerce, Bureau of Public Roads, 1965) 4-4 DESIGN CRITERIA [J 0 Calculations for Curb Capacities and velocities Major and Minor Storrs per City of Fort Collins Storm Drainage Design Criteria RESIDENTIAL with drive over curb and cutter Prepared by: RED, Inc. C is for one side of the road only February 28, 1992 V is based on theoretical capacities Area = 2.63 sq.ft. Area = 20.11 sq.ft. Minor Storm : Y.ejor Storm Slope Red. . M.in_r . 0 V . Major . 1 V (%) :Factor . X . (cfs) (fps) , X . (cfs) (fps) 0.40 , 0.50 . M.71 . 2.74 2.D9 : 696.73 . 22.03 2.19 . 0.50 : 0.65 : 55.71 : 3.99 2.33 : 696.73 : 32.02 2.45 : 0.60 0.80 : 66.71 : 5.37 2.55 : 696.73 : 43.17 : 2.68 : 0.70 0.80 : &6.71 : 5.60 2.76 : 696.73 : 46.63 2.90 : 0.80 0.50 : 56.71 :- 6.20 2.95 : 696.73 : 49.E5 3.10 : 0.90 0.80 : 56.71 : 6.58 3.13 : 696.73 : _`2.68 3.29 : 1.00 0.80 86.71 6.94 3.30 : 696.73 : 55.74 3.46 : 1.25 0.80 56.71 7.76 3.69 : 696.73 : 62.32 3.87 : 1.50 0.80 56.71 8.50 4.C•4 : 696.73 : 68.27 : 4.24 : 1.75 0.80 85.71 9.18 4.36 : 696.73 : 73.73 4.58 : 2.00 0.50 85.71 9.81 4.65 : 696.73 : 78.E3 4.90 : 2.25 0.78 MM : 10.15 4.9S : 696.73 : E1.52 5.20 : 2.50 0.76 66.71 : 10.42 5.21 : 696.73 : E3.72 5.48 : 2.75 0.74 : 66.71 : 10.64 5.47 : 696.73 : 85.50 5.75 : 3.00 0.72 : 56.71 : 10.81 5.71 : 696.73 : E6.E9 6.00 : 3.25 0.69 : 56.71 : 10.79 5.94 : 696.73 : 56.67 : 6.25 : 3.50 0.66 : 56.71 : 10.71 6.17 : 696.73 : 56.03 6.48 : 3.75 : 0.63 : 56.71 : 10.58 : 6.38 : 696.73 : E5.00 : 6.71 : 4.00 : 0.60 : 56.71 : 10.41 : 6.59 : 696.73 : E3.61 : 6.93 : 4.25 : 0.58 : 86.71 : 10.37 : 6.80 : 696.73 : E3.31 : 7.14 : 4.50 : 0.54 : 56.71 : 9.93 : 6.99 : 696.73 : 79.61 : 7.35 : 4.75 : 0.52 : M M : 9.83 : 7.19 : 696.73 : 78.96 : 7.55 : 5.00 : 0.49 : E6.71 : 9.50 : 7.37 : 696.73 : 76.34 : 7.75 : 5.25 : 0.46 : 56.71 : 9.14 : 7.55 : 696.73 : 73.43 : 7.94 : 5.50 : 0.44 : 56.71 : 8.95 : 7.73 : 696.73 : 71.E9 : 8.13 : 5.75 0.42 : 56.71 : 8.73 : 7.91 : 696.73 : 70.17 : 8.31 : 6.00 0.40 : 86.71 : 8.50 : 8.08 : 696.73 : 68.27 : 8.49 : Engineering Consultants CLIENT C ' CI 1 ti'c_, JCE NO. PROJECT CRLCULATIONSFORGu-TaZ rtLALLI N.ADEEY -DATE%•'�7 CHECKEDEY DATE SHEET —OF _z— �=�.11I��..._.__--L!/—�2.'V.r_L`V. 1 i . ?=Z._S �o�.J_"-,�.Z.Z.Z._.c___1�..0�,.. �J Z..T_. L'7LLSVS.__�=57:�•V �i-�=—l.J l.`bt.:_ _.; 7^l_. _ kJ C-j -0 3� _...:...: -- : • ; ..._ - _ _ -- - - I 1 _ _ o a 1 0l j 77 - �`.�T__ 17 -f-- -- -.TL.31 J. U. �y � �i0 SQ 1 ��J C�C_J �/•3 1 - � I�J�Z T � 1 1 t J_- 1 1 oolL�: 1 - JJI IT- ._ti%1.1uo� K_-�� IZ__IZ.4-5�— �87�z-_�J'o,3Z-_fi._:_Lb.-3L•;.i ---- _-- 1 • orm Zook. CLIENT J� n= ZT nI 1 `US JOB NO. 1 I!.jtr PROJECT CALCULATONS FOR[ �1 ? .1111 Engineering Consultants NaOE EYy �DA7 E 7•o7 CHECKED BY :ATE SHEET Z OF Z oGe- 7M. C.L" Z-� *yL.-- i 1 ' - L' •ZICvi-ciO-r=_W.'SY�—`^o_��..�UJUU��� �=1171J1_:>.:�__ -- _ ___ _ i - - 1 _ -- - rJ r .. . .:... . . -. • o 1 _ ..C..otsJN .S4•-I�.11.:- ?.!oT E�sr-c ]_. �I�.:.. U�� �-1�-= UJdT"�-�. L.IV....._EL 1 ^ --- ----- - - ---- - -- ._.-- Z.3.IZ� r 16.S3 o:Sc� 1 - - =--_- -- 17 ==_ I - - ------------- 17:Z3.1-�XO p35> � o7S — - - • T._ .? I — 1 .�.-.- _ .1 _ 1i j _ zl3 1 I /z X S 1 _- ---- -- - -- -- I L J i --