Loading...
HomeMy WebLinkAboutDrainage Reports - 06/14/1991 (2)l 1L)W� 2 n" FINAL DRAINAGE AND EROSION CONTROL STUDY FOR THE GATES AT WOODRIDGE FIRST FILING AND THE OVERLOOK AT WOODRIDGE FIRST FILING 4�0 PROPERTY OF FORT COLLINS UTILITIES I E FINAL DRAINAGE AND EROSION CONTROL STUDY FOR THE GATES AT WOODRIDGE ' FIRST FILING AND THE OVERLOOK AT WOODRIDGE FIRST FILING t May 6, 1991 Revised June 5, 1991 ' Prepared for: Woodcraft Homes 1501 N. Cleveland Ave. ' Loveland, Co. 80538 Prepared by: ' RBD, Inc. Engineering Consultants 2900 South College Avenue Fort Collins, Colorado 80525 (303) 226-4955 ' RBD Job No. 434-002 L 1 RMINC. Engineering Consultants 2900 South College Avenue Fort Collins, Colorado 80525 303/226-4955 FAX:303/226-4971 June 5, 1991 Ms. Susan Hayes City of Fort Collins Utility Services Stormwater 235 Mathews Fort Collins, Colorado 80522 RE: Final Drainage and Erosion Control Study.for The Gates At Woodridge First Filing and The Overlook At Woodridge First Filing RBD Job No. 434-002 Dear Susan: We are pleased to resubmit to you, for your review and approval, this Final Drainage and Erosion Control Study for The Gates at Woodridge First Filing and The Overlook at Woodridge First Filing. All of your review comments have been addressed. Thank you for your time and consideration of this submittal. Please call if you have any questions. Respectfully, RBD Inc. Engineering Consultants *�o o` W1 REG/Ai''%/ Stan A. Myers, P.E. ��� �Q, ...... sl ; Project ManagerOle ?�O.��W• Gl,��t.F `- 7_ ,c 24766 Kevin W. Gingery, P.E. 90.� Project Engineer CC: Mr. John Hutchinson Mr. Gary Berger Other offices: Denver 303l778-7338 • Vail 303/476-6340 • Colorado Springs 719/598-4107 • Longmont 303/678-9584 TABLE OF CONTENTS DESCRIPTION PAGE I. GENERAL LOCATION AND DESCRIPTION 1 A. LOCATION 1 B. DESCRIPTION OF PROPERTY 1 II. DRAINAGE BASINS AND SUB -BASINS 1 A. MAJOR BASIN DESCRIPTION 1 B. SUB -BASIN DESCRIPTION 2 III. DRAINAGE DESIGN CRITERIA 2 A. REGULATIONS 2 B. DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS 2 C. HYDROLOGIC CRITERIA 3 D. HYDRAULIC CRITERIA 3 E. VARIANCES FROM CRITERIA 3 IV. DRAINAGE FACILITY DESIGN 3 A. GENERAL CONCEPTS 3 B. SPECIFIC DETAILS 3 V. EROSION CONTROL 5 A. GENERAL CONCEPTS 5 B. SPECIFIC DETAILS 5 VI. CONCLUSIONS 6 A. COMPLIANCE WITH STANDARDS 6 B. DRAINAGE CONCEPT 7 C. EROSION CONTROL CONCEPT 8 REFERENCES 8 APPENDIX VICINITY MAP 1 FIRST FILING HYDROLOGY 2 DETENTION 6 DESIGN OF INLETS, STORM SEWER AND SWALES 8 RIPRAP DESIGN 13 EROSION CONTROL 15 CHARTS, TABLES AND FIGURES 20 JUNE 5. 1991 REVISIONS 1. Temporary drainage swale locations and design 2. Erosion Control calculations and text 3. Clarifications of various calculations 4. Add storm sewer H.G.L and E.G.L. calculations /j 1 FINAL DRAINAGE AND EROSION CONTROL STUDY FOR THE GATES AT WOODRIDGE FIRST FILING AND THE OVERLOOK AT WOODRIDGE. FIRST FILING GENERAL LOCATION AND DESCRIPTION ' A. Location The Gates and The Overlook at Woodridge P.U.D.Is are. located east of Taft Hill Road (County Road 19) and north ' of the existing Harmony Road. The development is bounded by Webber Junior High School and Regency Park PUD to the east and open space (proposed future filings) ,and ' Imperial Estates to the north. The site location can also be described as situated in the Southwest 1/4 of Section 34, Township 7 North, Range 69 West of the 6th ' P.M., City of Fort Collins, Larimer County, Colorado. The site location can be seen on the Vicinity Map in the Appendix. ' B. Description of Property The First Filing of The Gates and The First Filing of The ' Overlook at Woodridge together contain 17.2 acres more or less. Presently, the property is undeveloped. The property is being proposed for planned unit development ' within the City of Fort Collins Zoning District PUD. Native Colorado grasses cover the property presently. The topography of the site generally slopes from the west to the east at approximately 1.3 percent. ' II. DRAINAGE BASINS AND SUB -BASINS ' A. Major Basin Characteristics The proposed developments lie within Basins 75 and 80 of the McClellands and Mail Creek Major Drainageway Plan prepared by Cornell Consulting Company. A natural drainageway runs west to east along the northern edge of The Gates at Woodridge First Filing boundary within Basin 80. Runoff from Basin 80 is routed by open_ channels and culverts along the north side of Seneca Street past Webber Junior High School and then along the east side of Regency Drive to the existing Regional Detention Pond. The Overlook at Woodridge development lies in both Basins 75 and 80. Runoff from Basin 75 is routed through the Regency Park development (east of the 1 I 1 1 Woodridge property) in an open channel along the north side of Harmony Road and eventually into the existing Regional Detention Pond. B. Sub -Basin Description The project site has been divided into eight (8) sub - basins of which three (3) were assumed to be developed and the other five (5) were off -site undeveloped. The three (3) developed sub -basins incorporated the proposed building lots and most of the street improvements. The five (5) undeveloped sub -basins consisted of natural ground cover and portions of the proposed street improvements. These sub -basins are shown on the Drainage and Erosion Control Plan in the back pocket of this report. III. DRAINAGE DESIGN CRITERIA A. Regulations The City of Fort Collins Storm Drainage Design Criteria is being used for the subject site. B. Development Criteria Reference and Constraints From The Final Drainage Report for Regency Park P.U.D., 100 year developed runoff from Basin 75 will be routed through the Regency Park subdivision in an open channel along the north side of Harmony Road. A 42 inch culvert lies under Regency Drive, but the outlet invert is a couple of feet lower than the surrounding ground. With enough flow in the pipe, the water would continue to flow to the east toward the Regional Detention Pond. From the Preliminary Drainage Report for the 1990 Junior High School, the channel and culvert system along the north side of Seneca Street and the east side of Regency Drive was sized for undetained on -site as well as undetained off -site 100 year developed runoff from Basins 79,80, and 85. A current SWMM model analysis for Basins 79,80, as recently obtained by the City of Fort Collins, has determined that the existing channel, culverts and Seneca Street (downstream of the subject site) will receive greater 100 year developed runoff than was originally anticipated. The City of Fort Collins is currently reviewing this matter. t4 I 1 C. Hydrologic Criteria ' The Rational Method for determining surface runoff was used for the project site. The 2 and 100 year storm event criteria, obtained by the City of Fort Collins, was ' utilized in calculating runoff, values. These calculations and criteria are included in the Appendix. ' D. Hydraulic Criteria All hydraulic calculations within this report have been prepared in accordance with the City of Fort Collins ' Drainage Criteria and are also included in the Appendix. E. Variances from Criteria ' No variances are being sought for the proposed project site. ' IV. DRAINAGE FACILITY DESIGN A. General Concept All on -site runoff produced by the proposed development of The Gates and The Overlook - First Filings will flow easterly to the existing natural drainageway and eventually arrive at the Regional Detention Pond. Included in the back pocket of this report are the proposed drainage and grading plans. B. Specific Details The 2 year and 100 year storm runoff produced from sub - basins 2 and 3 in The Overlook development and adjacent off -site historic sub -basins (0-4 & 0-5) are conveyed within Overlook Drive. At the intersection of Overlook Drive and realigned Harmony Road, this runoff splits north and southeast. Developed runoff from sub -basins 3 and 0-5 is directed north into a temporary Swale __Swale C-C) which runs northeast adjacent to the future Overlook Drive right_ -of -way. Swale C-C Joins with Swale B-B and e A -A (the natur U iFie � northern ei Woodridge First Fil C are sized for hJ ite at tlows. Developed runoff from sub -basins 2 and 0-4 is directed southeast along realigned Harmony Road and into an existing roadside ditch adjacent to existing Harmony Road. Per the Master Plan for the Arapahoe Farms development, no storm sewer is required wit in basins and 3 because £die streets can ad tel 100 years runoff o e future off -site collection 3 I poi�— The developed runoff that is conveyed by realigned Harmony Road and the runoff from the off -site sub -basin 0-3 is collected in the existing roadside ditch that runs along the north edge of Harmony Road. A 21 inch RCP culvert will be placed under the temporary entrance road into the developments to convey these flows toward the Regional Detention Pond which lies east of the subject site. The 2 year and 100 year storm runoff produced from sub - basin 1 in The Gates development and adjacent historic sub -basin 0-1 is conveyed in Seneca Street in a northeasterly direction. Per .the Master Plan for the Arapahoe Farms development, two 10 foot Type "R" curb inlets are located at the eastern boundary of the subject site where the proposed Seneca Street extension ties into the existing Seneca Street. One inlet is proposed on each side of the street. Per the Master Plan, the inlets will collect a portion of the 2 year storm runoff and redirect the runoff away from the street. Inlet #2 (south side) will initially collect 1.8 cfs and pass 0.6 cfs east on Seneca Street. Inlet #1 (north side) will collect 5.1 cfs and pass 4.2 cfs east on Seneca Street. The storm sewer system has been designed for the future developed condition of sub -basin O-1. An 18 inch diameter reinforced concrete pipe (RCP) will tlen take the collected runoff from the inlets and outlet the runoff upstream of two existing 42 inch diameter culverts which lead into a low area just south of Webber Junior High School. Sena Street can adequately transport the 100 levelopment to the eastern property line of he si e. to Storm water runoff through the existing 42 inch culverts travels east via 42" culverts and -open channels, and eventually reaches the Regional Detention Pond. The City. of Fort Collins is .currently studying the possible realignment of these two existing 42 inch culverts to provide a more efficient transmission of storm water to the east. For the subject developments, the developed runoff is proposed to be directed to the existing 42 inch culverts by the above described storm sewer system and temporary swales (Swales A -A, B-B and C-C). The existing 42 inch culverts have a combined capacity of approximately 114 cfs. For thts_development, swales A -A and B-B hay e_been_sized to_carr_y the_historic 100 year, flow o,f-5.2_4_c.fs_pl_us the developed 100 year flow of 20.9 n r cfs at design point 5. As the City of Fort Collins ' completes their study of the existing 42 inch culverts, their realignment and future use in the main drainageway of this development will be incorporated with future ' filings of the Woodridge development. V. EROSION CONTROL ' A. General Concepts Both developments, .The Gates and The Overlook First Filings, lie within the High Rainfall Erodibility Zone ' and the Moderate Wind Erodibility Zone per the City of Fort Collins' zone maps. The potential exists for moderate erosion problems after completing the First ' Filing improvements, due to the existing and proposed site slopes of 2.0 % more or less. It is also anticipated that project site improvements will be constructed during the summer of 1991. Thus, the new improvements will be subject to both wind and rainfall erosion before new vegetation can take hold or before the ' new residential lots are developed. The Erosion Control Performance Standard (PS) for both sites was computed to be 79.1% per the criteria in the City of Fort Collins Erosion Control Reference Manual for Construction Sites. The Effectiveness (EFF) of the proposed erosion control plan was calculated to be 80.7%. ' Therefore, the erosion control plan as detailed below meets the City of Fort Collins' requirements. B. Specific Details Sub -basins 0-1 through 0-5 consist mainly of native vegetation and grasses. These areas are presently open areas with future plans to be later developed. At this time, however, the existing ground cover should be maintained in these areas. Where temporary swales are to ' be graded in these areas, erosion hay bale check dams are to be installed at intervals of 500'±. All temporary offsite swales will be maintained by the Developer of the proposed projects. Sub -basin 1 incorporates The Gates at Woodridge First Filing of 29 residential lots and a portion of Seneca ' Street. Once Seneca Street has been rough cut in and prior to construction of the pavement, straw bale erosion barriers should be installed on alternating sides of the street. The bales should be perpendicular to the sides extending to the road centerline at 150' intervals. After the installation of the pavement, curbs and 5 L k gutters, and curb inlets, gravel filters should be installed around each 10 foot type R inlet. These gravel filters should consist of a combination of concrete cinder blocks, 1/2" wire mesh, and coarse gravel (3/4" diameter). These filters should also be cleaned often. After overlot grading has been completed in sub -basin 1, all disturbed areas should be roughened and seeded with a temporary seed mix to reduce rainfall erosion. To reduce the wind erosion in this sub -basin a perimeter barrier such as a silt —fence -or a —row of straw bales ' Sub -basin 2 incorporates The Overlook at Woodridge First Filing of 11 residential lots and a portion of Overlook Drive Street. Once Overlook Drive has been rough cut in and prior to construction of the pavement, straw bale erosion barriers should be installed on alternating sides of the street. The bales should be perpendicular to the ' sides extending to the road centerline at 150' intervals. After overlot grading has been completed, all disturbed areas should be roughened and seeded with a temporary seed mix to reduce rainfall erosion. In addition, a hay ' or straw mulch should be applied over the seed mixture at a rate of 2 tons/acre and should be adequately anchored, tacked, or crimped into the soil. VI. Sub -basin 3 incorporates The Overlook at Woodridge First Filing of 15 residential lots and a portion of Overlook Drive Street. Once Overlook Drive has been rough cut in and prior to construction of the pavement, straw bale erosion barriers should be installed on alternating sides of the street. The bales should be perpendicular to the sides extending to the road centerline at 150' intervals. After overlot grading.has been completed, all disturbed areas should be roughened and seeded with a temporary seed mix to reduce rainfall erosion. To reduce'the wind CONCLUSIONS A. Compliance with Standards All computations that have been completed within this report are in compliance with the City of Fort. Collins' Erosion Control Reference Manual for Construction Sites and Storm Drainage Design Criteria Manual. In addition, all computations are in compliance with the Master 0 J Drainage Study for Arapahoe Farms prepared by RBD in ' April 1991. B. Drainage Concepts ' The proposed drainage concepts adequately provide the transmission of developed on -site runoff to the existing drainage devices at the eastern property line of the ' subject site. The proposed storm sewer system will collect a portion of_the,2 year runoff carried_on_$ene-c-a an be -1 ies Mas . The 10 and streets The City of Fort Collins is currently studying the realignment of the existing 42 inch culverts at Webber Junior High School adjacent to Seneca Street. Depending on the outcome of this analysis, the existing 42 inch culverts may or may not be relocated. For this development, we have designed temporary swales that deliver developed runoff from The Gates at Woodridge First Filing and The Overlook at Woodridge First Filing to the existing 42 inch culverts along the east property line. The 18 inch storm sewer has been designed with an outlet eleva i� o�hat can accommodate a relocation of the existing 42 inch culverts to the north. Final grading of the main drainageway through the Woodridge. development is not being proposed at this time due to the current study underway with the existing 42 inch culverts along the east property line. In addition to the 42 inch culvert study, the City of Fort Collins is also evaluating the capacity of downstream existing improvements in regards to the new SWMM runoff flows which exceed the previously used downstream criteria. For the subject developments, adequate downstream capacity in the culverts, open channels, and street systems exists to safely convey developed runoff to the existing Regional Detention Pond. Developed runoff from The Overlook at Woodridge First Filing is proposed to be transported in the existing roadside ditch along the north side of Harmony Road to the east towards the City of Fort Collins Regional Detention Pond. A 42 inch culvert carries the flows under Regency Drive, but the outlet invert is a couple of feet lower than the surrounding ground. With enough flows in the pipe, the water would continue to flow to the east, toward the Regional Detention Pond. With the development of the property at the northwest corner of 7 I 1 Regency Drive and Harmony Road, the outlet of the ' existing 42 inch culvert under Regency Drive will be improved to enable storm water runoff to efficiently reach the Regional Detention Pond. It is our ' understanding that this corner property may be developed in the near future and therefore no improvements are proposed by this development., to the existing 42 inch culvert situation at Regency Drive and Harmony Road. Per ' the Master Plan for the subject site and the rearrangement of basin lines b_e__w.e.en_basins 75 and 80_, Road is not impacted with rester flows that him orically ' reached the cu ver Thus by the development of The Gates At Woodridge First Filing and The Overloo AE Woodridge First Filing the 42 inch culvert will not ' experience flows greater than historic. When development occurs in the future on the southeast corner of the Woodridge development adjacent to sub -basin 0-1, a temporary detention pond may be required within this development. The temporary detention pond may be required if the downstream improvements to the outlet of the existing 42 inch culvert under Regency Drive have not been completed to enable storm water runoff to efficiently reach the Regional Detention Pond. ' C. Erosion Control Concepts ' The proposed erosion control concepts adequately provide for the control of wind and rainfall erosion from The Gates at Woodridge First Filing and The Overlook at ' Woodridge First Filing. Through the construction of the proposed erosion control concepts, the City of Fort Collins performance standards will be met. The proposed erosion control concepts presented in this report and ' shown on the erosion control plan are in compliance with the City of Fort collins erosion control criteria. ' REFERENCES 1. Storm Drainage Design Criteria and Construction Standards by the City of Fort Collins, Colorado, May 1984. 2. Erosion Control Reference Manual for Construction sites by the City of Fort Collins, Colorado, January 1991. 3. Master Drainage Study for Arapahoe Farm by RBD, Inc., Engineering consultants, April 3, 1991. 4. The McClellands and Mail Creek Major Drainageway Plan by Cornell Consulting company, December 1980. 8 5. The Final Drainage Report for Regency Park P.U.D. by Parsons and Associates Consulting Engineers, March 30, 1987. 6. Preliminary Drainage Report for the 1990 Junior High School by RBD, Inc., February 5, 1988. 7. Final Drainage Report for Poudre School District R-1 Elementary School.by Engineering Professionals, Inc., April 1987. Vol I t 1 APPENDIX 1 1 L 1 1 1 t t 1 _�ry1 I W N V �,, .. I V r ^� ' r/ YO �. I tDIn �O co . I N N W co fLLfy�J N N i l N to cli OD Ln \ .. N I .,. � . (10 N LU � • � � x r t � av ar Y} 1�,�MS SS �o-� �'� _ CC .. s �, s ur,usa `2` i'ti , s {" 1 (VHIJ,�pyl'� t L• - ... _ ._ __ .— Y 0 !t l .� ; e��5�j"a' �'i'.}�s•�W s � r �°� t s'$e..nr'S.. s� i x x �z �I Y �t s ,, �) Y ;• w,.�q f'�,$� �'f,�su �& r R I<: z �� cc)M Ito , t > l E'� 'r � k•' .. .. $zf° " Y ♦ I .o o \a : f: Y 5+;� k �7 �A '�g�?�d} �L"- ° 5 d?kshr<� x 'ad�!'I Im s.S�b �'y.;ffi:R�i�� �y `��� ��'�r'�4Tit �R c�4t f '+➢3 a I v � 1///J / 4 3 v 0 t P " syr hx &'i�'i � rr r"� ♦ fO 6Vrx �f �,�.q E � � f• : {i% '1 • Y a . I o i •: Y i'F� fi' x �• 'r ia"'ar e ;k ti x^ 'n+"'�'^x r e > r. ' / - Z I 0— -U ROAD Ln � • o " � V�Sr � KrYA"3sy' � �� �:�1 a�'"�i 'ti e� e' . (i . Y to — _. , . • V ��.' i v/ Ln r. I ' I ; _l VICINITY MAP 2/3z I 1 FIRST FILING HYDROLOGY [l I n �N Q �� No � JIB°o c�v II 11 11 11 11 0' N 1 N 1 Z .F 'U^.. vI E"' Q cc v 1 (] CC Z LLO U b p z ZCC 0 U 0 o C o 3 �C ta— w } F- U w 5 Q J m U � J fA Q U. A 3/32 N cr o� a oc iz � � � ` h C @ 4, 0� Ili oc 4, 0( � Qom � jW > 4aQaeoeoQeQ -�y�'�J�I�v�a?a�a� Q Q _4,aR000Q Vj�C UJIN= N`N?(U�N,r NQN (q O� v pOZpZOp Ste. 8 J Q c G — [" � /J a- r C!J 1" a- cp a z Is" IL P; z" oW rnr�kn acn U LL a ¢o w c, a In h U U O o II p It V v V c 0 V Vl o 0 ('� 0 0 M �. •� h Na ry' Ul In UJ '12 J fn ►- W o. o, > to ,. M In a a T m sa-w o m m m a m o' O; J 00 zU- m a lOn o� v .o In Q M N N m m n= mN S md5 ° v , ' _ 1✓ � r 60 Iv In. aZ J— mN o Celt ON a= CC W, W Qv a OJ PIN Z Wo� ao 00 0 In H k1l l7 N cr- ._ I 1 N N N to to v, N N '� i Z ci D o b O O O M O O O o V o O OO N' Co Fa-- W u N � .9 M O cq� Q Q v 7 �9 41 �r1 N N 0 o In O N N CD 0 Iv N crl C WQ 1 I fn 1 T 1 _ N m _ 1 N 1 J �. 0 c .. p� O O O O O O o O Ip O -- N m � * 1 1 1 1 X zo �BIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII lz �BIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Zi �8�111111111�111111�1�1�1111111111111 cc �B�IIIIIIIIIOIIIIII�I�l�lllllllllllll �BIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII �BIIIIIIIIIIIIIIIIIIII@I�111111111111 �16181�I�IOI�I�I�II�IB1.1�11111111111 . �6�1�1�1�1�1�1�1�11�1�1�1�11111111111 �0�1�1�1�1�1�1�1�11�1���6�11111111111 = �0�1�1�1�1�1�1�1�11� �1�1�11111111111 091�191�1�1�1�1�11111111111111111111 �0�1�1�1�1�1�1�1011111111111111111111 �0�1�1�1�1�1�1�1�11111111111111111111 IIIII�IIIIIIIIIIIIIIII�li11111111111 MAY 1984 5-3 N/32 a 0 z c� In M W N Ir Z to s � 0) ,C J � If u CL a ,r Y� �W o N �L W cmw ay tL Z rn Q J ?� Q G j l C m � -c Ill cc z l OE 3 ;o* irLL O LL 2 2 O LL J U a DESIGN CRITERIA N x x 011111111111111111111111111111111111 �� �BIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII . �01111111111111111111�111111111111111 �01111111111111111111�111111111111111 LU �Bllllllllllllllllllll�l11111111111111 �91111111111111111111�111111111111111 �91111111111111111111�111111111111111 81111111111111111111 � 111111111111111 �E�1�1�1�161�IBI�II�I�I�i�11111111111 JIMM111 �0i1i1i1i1i1i1i1611@1011lolllllllllll 0111111111111111111111 B I g 11111111111 O�I�I�IBI�1�1�1�11111111111111111111 �0�1�1�1�1�191�1911111111111111111111 �O�I�I�I�I�I�IBI�11111111111111111111 Jill I Jilillllllllll 114 MAY 1984 5-3 n DESIGN CRITERIA 3/32 q3Z DETENTION 11 [J 0 RMNC Engineering Consultants CLIENT GUoni� �('a'�'f" HornC3 JOB NO 11.3el -00 Z. PROJECT W DOc�f'i d� Str����G CALCULATIONS fOR pe4cnfz o n MADE BV RU;6 DATE S-Z-V CHECKED BV DATE SHEET 7 OF I 313Z I 1 I n tDESIGN OF INLETS, STORM SEWER AND SWALES 1 I I I I I I I I I I I RWNC- Engineering Consultants CLIENT L)U06AC-1 Homcf, -JOBNO. 9314-06 PROJECT Wooetrdjc 1CFIvtj& CALCULATIONS FOR 1W LE71-'S MADE BYTE —DATE 1/34 CHECKED BY KW( DATE SHEET OF 37- PF, 7 TF ,f,VP FUTURE. �t -r'� q, 5,.r+ C: ' T:DNC Engineering Consultants 1 I U53r��:.a f [ _A erm'i CLIENT a)oodcrbff' //o",eS JOBNO. V31/-0D2 PROJECT 60001rid9c-15'-FIUN6 CALCULATIONS FOR MAOEBY%«0' DATES-Z-`V CHECKEDBY DATE SHEET 10 OF 31 y/o 7-e Pin /e / , ✓. yo 7j/�c, K; in/ci f ✓aiccpp�d:) ''' has 2 use as Q 3,Zl,ciS; S,ocfs .Co Ka _— Cheek a a lay�e_ �P• .ES^ r Bv.-f-rd I- ; a5504 Yo:. 5_oFPPP..I yai/o�13.25�/, y's .Fro.-.,i charF! /G(3SGLlar^%c /O�lS.Coi�).✓ i I ' 6.) 5e .Sior.Se�eC.b�fwec� ,rlet t/.2.v� exyZ',P�t„s Z ISM 1,-7 CQZ 'I O'S)ny i ,/82Pa_ir�; f"be /Ylani �nls �j. } P' 2?(ems'' i 2 f 1 /oPG bass '/o.l. cfS ( n .ela v ;s,9NFPs /O GhecK a11411.1, r hea�dw er ev rajn�eirensl,�✓i+ i cr ari' !I flw D 2 Z-T 73c{s Colt) 1 1 (.77 s /,DYoS iop/32 43 y-002 3YKWG ------------------------------------------------- ' REPORT OF STORM SEWER SYSTEM DESIGN ' USING UDSEWER—MODEL VERSION 2 DEVELOPED BY ' JAMES C.Y. GUO ,PHD, PE DEPARTMENT OF CIVIL ENGINEERING, UNIVERSITY OF COLORADO AT DENVER IN COOPERATION WITH ' URBAN DRAINAGE AND FLOOD CONTROL DISTRICT DENVER, COLORADO *** EXECUTED BY RBD, INC. ENGINEERING CONSULTANTS — FORT COLLINS, COLORADO ' ON DATA 06-01-1991 AT TIME.08:06:23 *** PROJECT TITLE : ' WOODRIDGE FIRST FILINGS STORM SEWER/INLETS ON SENECA @ EAST PROP. LINE ' *** RETURN PERIOD OF FLOOD IS 2 YEARS ' *** SUMMARY OF HYDRAULICS AT MANHOLES ------------------------------------------------------ ' MANHOLE CNTRBTING RAINFALL RAINFALL DESIGN ------------------------- GROUND WATER COMMENTS ID NUMBER AREA * C DURATION INTENSITY PEAK FLOW ELEVATION ELEVATION MINUTES INCH/HR CFS FEET FEET ---------------- 1 ------.... 0.10 N/A --- ----------------------------------------- N/A N/A 10.10 5114.50 --------- 5114.05 OK 34.00 N/A N/A N/A 10.10 5115.08 5113.49 OK 88.50 N/A N/A N/A 5.00 5115.33 5114.33 OK ' 90.00 N/A N/A N/A 5.00 5115.33 5115.24 OK ' OK MEANS WATER ELEVATION IS LOWER THAN GROUND ELEVATION ' log /3Z H34-602 ' BYKwG *** SUMMARY OF SEWER HYDRAULICS NOTE;: THE GTVT;N FLOW DEPTH -TO -SEWER SIZE RATIO= 1 ------------------------------------------------------------------------------- SEWER MAMHOLE NUMBER SEWER REQUIRED SUGGESTED EXISTING ' ID NUMBER UPSTREAM DNSTREAM SHAPE DIA(HIGH) DIA(HIGH) DIA(HIGH) WIDTH ID NO. ID NO. (IN) (FT) (IN) (FT) (IN) (FT) (FT) ------------------------------------------------------------------------------- 1.00 34.00 0.10 ROUND 17.01 18.00 18.00 0.00 2.00 88.50 34.00 ROUND 13.07 15.00 15.00 0.00 3.00 90.00 88.50 ROUND 13.07 15.00 15.00 0.00 DIMENSION UNITS FOR ROUND AND ARCH SEWER ARE IN INCHES UNITS FOR BOX SEWER ARE IN FEET 'DIMENSION REQUIRED DIAMETER = COMPUTED; SUGGESTED DIAMETER = COMMERCIAL FOR A NEW SEWER, FLOW IS ANALYZED BY THE SUGGESTED SEWER SIZE; OTHERWISE, EXISITNG SIZE IS USED ------------------------------------------------------------------------------- SEWER DESIGN Q P-FULL Q DEPTH CRTC DEPTH VELOCITY FROUDE COMMENTS ' ID NUMBER IN CFS IN CFS YN FEET YC FEET IN FPS NUMBER ' ------------------------------------------------------------------------------- 1.00 10.10 11.78 2.00 5.00 7.24 1.07 0.76 1.22 0.89 7.49 6.37 1.32 V-OK 1.40 V-OK 3.00 5.00 7.24 0.76 0.89 6.37 1.40 V-OK ' FROUDE NUMBER=O INDICATES THAT A PRESSURED FLOW OCCURS ' SEWER SLOPE--INVERT-ELEVATION BURIED DEPTH COMMENTS ID NUMBER UPSTREAM DNSTREAM UPSTREAM DNSTREAM ---------- ---------- o (FT) ---------- (FT) ---------- (FT) ---------- (FT) 1.00 1.25 5111.63 5111.21 1.95 -------------------- 0.29 OK 2.00 1.25 5112.31 5111.63 1.77 2.20 OK ' 3.00 1.25 5112.31 5112.31 1.77 1.77 OK ' OK MEANS BURIED DEPTH IS GREATER THAN REQUIRED SOIL COVER OF .2 FEET n u !oc13Z 43'1-oez BYKW& *** SUMMARY OF HYDRAULIC GRADIENT LINE ALONG SEWERS ------------------------------------------------------------------------------- SEWER SEWER SURCHARGED CROWN ELEVATION WATER ELEVATION FLOW ID NUMBER LENGTH LENGTH UPSTREAM DNSTREAM UPSTREAM DNSTREAM CONDITION FEET FEET FEET FEET FEET FEET ------------------------------------------------------------------------------- 1.00 34.00 34.00 5113.13 5112.71 5113.49 5114.05 PRSS'ED 2.00 54.50 54.50 5113.56 5112.88 5114.33 5113.49 PRSS'ED 3.00 0.10 0.00 5113.56 5113.56 5115.24 5114.33 JUMP PRSS'ED=PRESSURED FLOW; JUMP=POSSIBLE HYDRAULIC JUMP; SUBCR=SUBCRITICAL FLOW *** SUMMARY OF ENERGY GRAI?1 PN'I' LINE ALONG SEWERS ------------------------------------------------------------------------------- SEWER UPSTREAM MANHOLE FRICTION DOWNSTREAM MANHOLE ID NO. MANHOLE ENERGY WATER LOSS MANHOLE BEND MAIN JCT ENERGY ID NO. ELEV FT ELEV FT FT ID K K LOSS FT ------------------------------------------------------------------------------- 1.00 34.00 5114.36 5113.49 0.31 0.10 0.00 0.00 0.00 5114.05 2.00 88.50 5114.96 5114.33 0.32 34.00 0.00 0.95 0.27 5114.36 3.00 90.00 5115.87 5115.24 0.13 88.50 1.25 0.00 0.79 5114.96 BEND LOSS =BEND K* VHEAD IN SEWER. MAINLINE LOSS= OUTFLOW VHEAD-JCT LOSS K*INFLOW VHEAD JUNCTURE LOSS= 0 IF THE ABOVE DIFFERENCE IS LESS THAN ZERO FRICTION LOSS=O MEANS IT IS NEGLIGIBLE OR POSSIBLE ERROR DUE TO JUMP. FRICTION LOSS INCLUDES DROP AT MANHOLE 1 ' NC Engineering Consultants [1 1 r DESi/,� T�-mPaE A I :10z; � � t CLIENT WOO G�Gfu't 1T yom�.s JOBNO. PROJECT �%Oadr; o�9 e_15+FILIIV(7 CALCULATIONSFOR '>/ -:;4 4LE.S �' MADEBY'M'IO DATE ~~/L9�I_ CHECKEDBYKW6 DATE s-Z'�L SHEET 11 OF 5 �e ` Scw�'LF15 A -%a"i' 1 , cbAlGL.u6AiGE m D P. 5 20.It. c I 010i07 �� c/4tJJ6L.s%oE SLopi: ram' _�bSC. Qwo SZ4}209 73.3'C6 iLOjm sj oLunorJG MAar31�J6S r�SW t_•fI��jSY'A t� 1 ' TM,NC Engineering Consultants CLIENT wooA Gr'o4-* N6m5,S _JOBNO. V�?4-00--L PROJECT 6()00.4 MCIA G 16tFil-l" CALCULATIONS FOR TEMP MADEBVT� DATEµ bt CHECKEDBVKW6 DATES"Z-91 SHEET 12, OF 32 13/jZ I RIPRAP DESIGN L 1 1 1 ■r■/lrrc Engineering Consultants 1 1 1 CLIENT _JOBNO. PROJECT CALCULATIONSFOR MADEBYk-ajb DATES-Z-2/ CHECKED BY— DATE SHEET I'r OF 3Z' _I 1 ' G UeA.1 �'. 18"Q n P �eovt oF;rn/et /r 5-7,0,%t 6,11 ('1or come i evc1 oP de�.eloP.ent) ' O L✓71oNi U5 e_, Orbaln DrY+ Je ELF/aod Cun fio.(G ?er n.. I j ✓elea'ri� i 3' ,9o.�F� I I . ' .. ., ,., _' Tailwaicr tleP� i/i it vnKnvwn (�'erc�rrt�fi /evel,nt(''deue(ofir+le.+/), f .57EP l Dne.i i'Ire ,.PP� i/�a o{. riProf, fo/'.�eras�n� �ro/eri�an I � I iL'OK7aa ..P.$)fr, CAO C/ J �. .. IG,9'.. s —� s 3 �7(0 ✓ 1 �` �,�, STEPZ �Ci YhC' ex�tnhionl �a:ctor (�Tan9:) I j Q Z.SO; Frro F'�! 5 9 J %�fa,n9. SC I y 67EP.3 Gl f he- lend/h of ir),"7 f P�a�rc(ron . , I , I 19 ideal V'Sfjr) �� Iso_ / 38 ✓ o;Yo yt yLlso)I 0 6o f i. SO) _I STEP y theme ' ar ir, i / cr vnot be %e s {/ran 3D t L dPC6 Hof Inee 11"d excPcd d j 3�0 3e so) ^ /0tt0 _/O1,S0) i/5,0 J.03G _Sff /en:hYi_ni/7Gn«p- .. r7EPS dCti Met> Irip aPf �c.PYA MAW d ,ztre) II .-- I I i ; ` ci93s H �•/dln� �rf�l � � - ISTEP7 3C )I E u 5 e -S I Pt uri•!�h of rjorbd I A/oTEB QZ (0,9 efs aselL 1_10"o( of 16,1_c�i �.r Aydraelre d i9e Sewer be�tiuse .N,>s,n^�;n�t�t -%/•t )n. /e' %�{ .c 'f!t %8"p)pe �)//cen irf ')n�oibe 1Z; e. ehmM,744 / ' o%Fle.� PrPe and Ithe �7wra�!.will b' I I 11 j5132 EROSION CONTROL I RAINFALL PERFORMANCE STANDARD EVALUATION k8n1, /Nc. ------------------------------------------------------------- I PROJECT kJODR D6E - ;tisr l;a G # N341-0oz STANDARD FORM A I COMPLETED BY: DATE: -5/091 I 1 --------------------------------------------------------------------- IDEVELOPEDIERODIBILITY SUBBASIN I ZONE II I /-�► G I-( 3 1141 GI4 Lb S n(Lib xA, Lb - (1 .o x lzoo) + LL = 103 F�. ✓ ���� 6ill..ry ZorJG_ I Asb 1-(ac)--I 3 29 I Lsb (ft) 11200 1710 I Ssb I (%) 1,60 I Lb 1(feet) I I Sb I (%) I I PS I (�) I 115.soI � I g3o I l.aq I So.2�" I ACE. 1 1 I s`°PEs I SkM A% I I I ?. �'q x 710) i/1s.50 I I I '6,/S4n QSb � I I I I I I (a.21x I 1.92)+�(3.2a�I��o1�sl.so I I i 1 I I Futi Lo I I I .JO I-s f I I I Mo�G�Q I I I I I I I I j I I I I I i I I i I � I � I I -M-UE S- I (T."TERP.V` TEt� ---------------------------------------------------------------------I IDI/SF-A:1989 I 1 1 h L_ 1 1 1 1 1 1 1 EFFECTIVENESS CALCULATIONS K6 D I Zzw- c , --------------------------------------------------------------------� PROJECT: Woo92xo��- F �sT G•�:�1 #4311-o0Z STANDARD FORM B COMPLETED BY: T1'�o - 2 p - DATE: • S/z 9/ Erosion Control C-Factor P-Factor Method Value Value ---------------------- --------------------- (,eA-06L /.0-0 0.80 ESTAR, CRASS 0,i( /,6-0 Nay oa MA -La mutfh o.OL W/Jf EO , rFMP 066ErwnIwJ 6•JFS l,rrD �ou6Nu�ED6 -----------_-------------------------------------- /.6o b,90 MAJORI PS SUB AREA Comment PAJ F_O �- Gwl$T2N�.TEO AT rp�j Lf-T'S BASIN (%) BASIN (Ac) CALCULATIONS' ----- ------ ----- --- --- ------- ------------- ---------- 30•Z ( 13.6D PONDS 4-CuR3 +,jJ0fL.+e(k.S q,D AC TEMpoR4f-y �/G 6ETI.IT,o,J 6,D NL RO"GUEa II4SLOUAo 11.0 NC. ------------- ►JFT'C'GacroR c </,o(0.OI) 1 ba(0.45) r Io O fJLT , i Fac[e(L = 0.90 x o.80 � o'-la CxP)xl�o _�—lvalxo.,�l�xlw P-pA,05 1 4..Rg t51DF:Ip A�IcS = 0•5q Ac Ro�.9r,caeo (,rrLnrah /•re a A FDITDO :. 0.S9 ( D.01) 4- 1. 6_J- �.1 I Q.e,PL4ct q6, Y M"L.k FoR TF-MP. 14t"i n. � L c h I. (, 2- n L IJC1f'G' FALTnA _ a•Sq (o•ol) I.�Z(o.00) a.. a t,lr T'6 Fir n n. = 0. Os No•'10 f__FF C' - (o,o.T v O.c)P> x IJa = -------------------------------------------- I -7/3-Z D'I/SF-8:1989 EFFECTIVENESS CALCULATIONS k6b) /NG, --------------------------------------------------------- PROJECT: woDU6:,,Dc.v. F�ti�yi F;�;.�� *43y-o0Z STANDARD FORM B COMPLETED BY: —�r1� _ i 1ij DATE: -s1z 9 I MAJOR BASIN Erosion Control C-Factor P-Factor Method ValueComment --------------- �oa05 k 6uazs ----_�-Value 0.01 ---------_- 1.6-ln CaEAoEl �'Ts--a 1.c-0 0.80 nT cu2Q rQLLTS E5m6. 64A-ss a•�� •�� lfay f""ICA TF-Mr d%G. o. YS �•� ,2�U(ii/fp/ED (a�v..1D .---------------------------------------------------------------- /.moo a.90 PS SUB AREA (%) BASIN (Ac) CALCULATIONS ------ 90,2 ----- 3 ------ 3 9 ------------ ��s ------------ -------------------- G.2'1,: r5 0� Mks o• y� A� . , 3 3 A � Q o gt.Eae.p G�R�uaD .02. 3 3 a c. jJGT 'C r4cPoR = �U.�L)(O.Oi) 1 .33(0,#S) • 3.ay !156 D1 Sb (2;4L 1 t 9,,o;l > 60,2 Ole , `do:7 CFY��� rf'• ••� o � J 18/3Z -------------------------- )•I/SF-B:1989 ' CONSTRUCTION SEQUENCE 11132 PROJECT: Wo^o��o�E �RSr F�L���� (Z8D�rNG, STANDARD FORM C '#gm-ooz SEQUENCE. FOR 19 91 ONLY COMPLETED BY: V- w6 - R 8 0 DATE: .s/z /y j Indicate by use of a bar line or symbols when erosion control measures will be installed. ' Major modifications to an approved schedule may require submitting a new schedule for approval by the City Engineer. ' YEAR MONTH ---------------------------- 'OVERLOT GRADING WIND EROSION CONTROL Soil Roughing ' Perimeter Barrier Additional Barriers Vegetative Methods-Ev sri-i6 ' Soil Sealant Other ' RAINFALL EROSION CONTROL STRUCTURAL: Sediment Trap/Basin ' Inlet Filters Straw Barriers Silt Fence Barriers ' Sand Bags Bare Soil Preparation Contour Furrows Terracing Asphalt/Concrete Paving Other VEGETATIVE: Permanent Seed Planting Mulching/Sealant ' Temporary Seed Planting'I Sod Installation . Nettings/Mats/Blankets Other . ' STRUCTURES: INSTALLED BY 3 I S! AIS I o IN I D I�TIF I rn I Im ----------------------------------------------------------- VEGETATION/MULCHING CONTRACTOR. ' DATE SUBMITTED ' HDI/SF-C:1989 MAINTAINED BY APPROVED BY CITY OF FORT COLLINS ON �/3 Z I C 1 fl 1 1 CHARTS, TABLES AND FIGURES DRAINAGE CRITERIA MANUAL RUNOFF 21b2 50 30 I— 20 z w U cc ILI a 10 z W 0- 0 5 cn W cc 3 O UCMC 2 W F- Q Q 1 5 .1 MEN % IN FIE oil r � r ' 111111110 •, • 1, � I' 2 .3 .5 1 2 3 5 10 20 VELOCITY IN FEET PER SECOND FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR USE WITH THE RATIONAL FORMULA. *MOST FREQUENTLY OCCURRING"UNDEVELOPED" LAND SURFACES IN THE DENVER REGION. REFERENCE: "Urban Hydrology For Small Watersheds" Technical Release No..55, USDA, SCS Jan. 1975. 5-1-84 URBAN DRAINAGE E FLOOD CONTROL DISTRICT No Text '43z 19011 0 on .7 .2 irfil s=0.6 °/ F : 0.8 s=0.4% F=0.5 I I BELOW MINIMUM ALLOWABLE I STREET GRADE I 0 2 4 6 8 10 12 14 SLOPE OF GUTTER (%) Figure 4-2 REDUCTION FACTOR FOR ALLOWABLE GUTTER CAPACITY Apply reduction factor for applicable slope to the theoretical gutter capacity to obtain allowable gutter capacity. (From: U.S. Dept. of Commerce, Bureau of Public Roads, 1965) MAY 1984 4-4 DESIGN CRITERIA I I L! u lJ 11 1 1 CLIENT LUood) f'cn-F(' Ao'"es JOB NO. y3y de INC PROJECT tJJ0 A Y i d 1P__ CALCULATIONS FOR Engineering Consultants MADE BYXY-Yo DATESZ 9( CHECKED BY— DATE SHEETOF 32 MANNINCS EQUATION Q=C/nAR7/331/z. Q = Discharge C - Chezy Coefficient 1.486 n = Roughness factor A - Area R = Hydraulic Radius Area/WP WP = Wetted Perimeter - S = Slope Let X = C/n ARY3 then q = X Svz - - - Minor storm - (one side of road only) Area = 2.63 ft2 Mannings "n" 0.016 Wetted Perimeter = 16.65 ft. Hydraulic = 0.16 ft. X = 71.99 Major storm (both sides of road) Area = 42.52 ftz Mannings "n" (composite) (37 17ft)(0 0161 + (24 25ft)(0 035) = 0.026. 47.42 -- Wetted Perimeter = 94.96 Hydraulic radius = 0.45 X = 1427.08 To find "Q", multiply "X" by the square root of the slope and then by the reduction factor, Fig. 4.2 P. 4-4, of Fort Collins, specs. I C C 0 is for both gutters combined Reduction factor is included Minor Storm Major Storm Slope (X) V (fps) 0 (cfs) V (fps) 0 (cfs) RF 0.40 1.4 4.6 1.9 45.1 0.50 0.50 1.7 6.6 2.1 65.5 0.65 0.60 2.0 8.9 2.4 88.3 0.80 0.70 2.1 9.6 2.6 95.4 0.80 0.80 2.3 10.3 2.8 102.0 0.80 0.90 2.4 10.9 3.0 108.2 0.80 1.00 2.6 11.5 3.2 114.0 0.80 1.10 2.7 12.1 3.3 119.6 0.80 1.20 2.8 12.6 3.5 124.9 0.80 1.30 2.9 13.1 3.6 130.0 0.80 1.40 3.0 13.6 3.7 134.9 0.80 1.50 3.1 14.1 3.9 139.6 0.80 1.60 3.2 14.6 40 144.2 0.80 1.70 3.3 15.0 4.1 148.6 0.80 1.80 3.4 15.4 4.2 152.9 0.80 1.90 3.5 15.9 4.3 157.1 0.80 2.00 3.6 16.3 4.5 161.20 0.80 2.25 3.8 16.8 4.7 166.7 0.78 2.50 4.0 17.3 4.9 171.2 0.76 2.75 4.1 17.7 5.1 174.9 0.74 3.00 4.3 17.9 5.3 177.7 0.72 3.25 4.4 17.9 5.4 177.3 0.69 3.50 4.5 17.8 5.5 176.0 0.66 3.75 4.6 17.6 5.6 173.9 0.63 4.00 4.7 17.3 5.7 171.0 0.60 4.25 4.7 17.2 5.8 170.4 0.58 4.50 4.8 16.5 5.8 163.2 0.54 4.75 4.8 16.3 5.9 161.5 0.52 5.00 4.8 15.8 5.9 156.1 .049 5.25 4.9 15.2 6.0 150.2 0.46 5.50 4.9 14.8 6.0 147.0 0.44 5.75 4.9 14.5 6.0 143.5 0.42 6.00 4`.9 14.1 6.1 139.6 0.40 Minor: n = 0.016 A = 5.26 ft2 R = 0.16 C = 143.89 Major: n = 0.026 A = 42.47ft2 R = 0.45 ft C = 1,425.02 0 = 1_48 AR2/3S1/2 C = 1.486 AR2/3 n n 0 = CS1/2(RF) V = 0/A oCBv /NG. No Text CuC f/F2 r @ E�171zA. iLi 6+: 4-0 &00,D0 14A64-r+a d r,UOoo R lD6E ! �F►uNG Iola No . ysv-ooz CHART 1 0 I80 10,000 j3� TMd -PSP 166 e,000 EXAMPLE 'BYKwt�-'rlI) (2) (3) 6. I56 6,000 0.42 inches 13.5 four) 6. 5,000 0.120 cis S 144 6. S. 4,000 11A A "If 132 D feet 3,000 (1) 2.3 B.e S' 4. 4. 120 (2) 2.1 7.4 2.000 (3) 2.2 7.7 4• 108 3. 00 in feet 3' 96 1,000 3 800 84 600 S00 T2 400 2. . 39 _ 300 6 z rn / rc I.S 60 o zoo Z — Z / W o S4 a O� W 48 100 Z > K 80 _ x 60 a U 10 p rn SO HW ENTRANCE LE TYPE W � 36 30 (1) Sgu W 33 eodwall O Q 2 12) Groove and with m 30 hoodwoll x --B (3) Groove end •8 27 Qz projecting 10 2a 8 uoTEE PAss gico=ze.3 ers oVGr faze. access Rd • a-I'4&- Pf • 6 To use scale (2) or (3) project 21 S horizontally to scale (1), then J)�nrHta aP use stralaht Inclined line through 4 D and 0 seoles, or reverse as 3 Illustrated. 6 1�2 16 gut 2.—�= 2— I.S I- 1.5 1.0 1-f 1j/c) 6 r.6 L.s L--.s L.S 12 HEADWATER DEPTH FOR HEADWATER SCALES 253 CONCRETE PIPE CULVERTS REVISED MAY1964 WITH INLET CONTROL BUREAU OF PUBLIC ROA00 JAN. 1963 181 Z7/3Z Preceding page blank DRAINAGE CRITERIA MANUAL RIPRAP 2032 ENEENEEMEM NONE ► ME , E 0■■ • .N. rAM No.SO .2 A .6 8 1.0 Yt/D Use Do instead of D whenever flow is supercritical in the barrel. **Use Type L for a distance of 3D downstream.. FIGURE 5-7. RIPRAP EROSION PROTECTION AT CIRCULAR CONDUIT OUTLET. 11-15-82 URBAN DRAINAGE 8 FLOOD CONTROL DISTRICT DRAINAGE CRITERIA MANUAL RIPRAP . 29�32 [; 7 III 6 = Expansion Angle 0 rAd rAd VAA FA F Ap, F, PAN ", 0 EVIVAN FAAFIA 'Em m N m age. ' rREAME I, rAA ME lW)A'rff"j=mmm my,1AFA5,11momm :l .2 .3 A .5 .6 .7 .8 TAILWATER DEPTH/ CONDUIT HEIGHT, Yt/D FIGURE 5-9. EXPANSION FACTOR FOR CIRCULAR CONDUITS 11-15-82 URBAN DRAINAGE 6 FLOOD CONTROL DISTRICT PAGE 23 3413Z I 1 0 l rno+000 1 1 1 1 0 1 e1- v to Ir to 1 I L n I q q q q M I o mm(nC000000 I 1 1 I c I V 444 to Ln In Lrl to Ln I I CY I ggqMOD WOO qqq 1 i o i grnrna,rnrnrno+rnrna+rn000 1 I I . . . . . . . . . . . . . . . . 1 0 1 �rvvv�rvvd•vvvvLntnu: 1 I M 1 00 00 00 CO CC 00 00 00 00 CC CO 00 CC 00 q. 1 I 1 1 1 0 1 I�gccgrnrno,rnrnrnrnrna+rno<rnrnOio+rn - I I i I . . . . . . . . . . . . . . . . . . . . . I 0 1 00 V ct co e0co co Coco et 00 et ct et 00 M 00 cP ct 1 I N I g q q q 0000 q q q q q q q q q q q q q q 1 I 1 1 I O 1 O M et lI1 l0 lD l0 t0 n n^^ n,-� n^^ I., n n g q q q q q 1 I I 1 00 00 CO 00 00 CO 00 CO 00 00 00 00 00 00 00 CO 00 00 CO 00 CO 00 00 CO 00 CO I 1 1 I I O I . . . . In In . . t0 1 . LO LO t0 . . . . . . . . . . . . . I O 1 CT. I M-41 �r �ret et• et -cr et et ct eY et et -wet wr et et st et et et C• et et 1 Q 1 1 00 q W 00 0000 g 00 q 00 q 00 00 g 00 q q 00 00 00 q 00 q q q q 1 ce I 1 I O I O 1 t0 O N M -Cl- V Ln LO to Ln t0 t0 t0 t0 t0 t0 1.0 t0 t0 t0 n ^ n ^ n n I J I 1 I O I W 1 M V � e t e' e t e t c t e t c Y e Y e t c 1 V• e t e t e t e♦•� e t e t rr R I V I I g 00 CO 00 OC 00 00 00 00 CO 00 CO 00 g 00 00 00 00 00 00 00 W q q q q 1 1 ^ 1 CD1 �Olr•�INMM�et et et Ln Ln to to to to Ln Ln to LO LO t0 t0 t0t0n I to 1 I I Z 1 n I mM-cr lt:ret V'C}'-cr-zr et et et �'tt V d et �et��•et ct 1 WW W M W W WgWW W M g W q q' q W 000000 q q q 0000 1 J 1 1 I J 1 O I Ol0 qO.--I .--INN MMMMRd, d'-:r•01 Z:rd'd'lf'l In to In tO tO 1 O 1 I I U 1 t0 I M M M et ct et et ct 4 et et 44 4 et et et et 4 4 4 et 41 1 1 q q q q q q q q q q q q q q q q q q q q q q q q q q 1 1 �O 1 to N to n q M O O .-1 r-1 r-1 N NNNN M M M M M -Cl- -CrV Tr d• I O 1 bR 1 I U- 1 von 1 N M M M M M et ct .r et et et V• d• �' ct et et et C•V, � d' V' I I I g q q q 0000 g q q q q 00 00 W q q q q g q 00 q q 00 q 00 1 IY 1 W 1 I O I CX.to I .-I 'tn to to t01�1�1�gggqqqCT 01 /TOOOOO 1 La. I CD O 1 . . . VI I JI N N M M M M M M M M M M M M M M M M M M M4 e t d' V• t* I t/1 1 N M 1 I I OC 1 O I tO Ln W CD14 N M d• ct M Ln M t0 t0 t0 LO tO r� n r� r�W W Wm01 1 Q 1 1 1 t l I r ti N N f M f M M M M M c M Cr 1 f M M M C ••' / t' 1 f •' 1 CM M M M f M f M M M M 1 Z I Iq g q q q q q q q q q q q q q q q q q q q q q q q q l 1 I 1 F— 1 Ln 1 .-+ .••1 LO r qW C) 0 I N N M M M et dr �' �' to to Ln t0 t0 t0 n n I N 1 1 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 M I r--1 N N N N M M M m CM M C4 C••I M fM C4 C4 M M C4 CM M f•') M M M I W I I g q q q q q q q q q q q q q q q q q q q q q q q q q 1 U 1 1 I Z I O i MNtO W.O.O.--INNMMMet •7 et et ct •�ln In tl'. Ln lO lO tOI Q . I 1 1 I E I M t O.--I r-I r-I 1-1 N N N N N N N N N N N N N N N N N N N N N 1 I1' I 1 g 00 00 00 00 q g 00 CO 00 00 00 00 00 00 CO 00 q CO g 00 00 00 00 00 W I O 1 1 1 U- I Ln 1 LnLnO%N M tf'Ln t0 r�1\ 1� 00 q 00 ON Ol 07 Ot Om O1 O O O O O O I QL 1 1 1 . . . . . . . . . . . . . . . . . . . . . . . . . . W I N 1 O1 O O r-I .••1 9-4 V- V y ry rH V- r-I .-•1 .--I rti rti r-1 r• I r•1 r•1 N N N N N N 1 CL. 1 1 n g q q q q q q q q q q q q q q q q q q q q q q q q 1 1 I O I vm OMLn to W ON•0001-1 r- rot r�NNNNMMMMMM I 1 1 1 I N I q O1 O O O O O O O OD 00 00 00 00 00 N 00 00 OD 00 00 00 00 00 1 1 1 1� i, q q q q q q CO q q q q q COq q q q q q q q q COq q q I i I 1 I t!•1 I 00Ng1-1C'ln l�f�g01 Q1OOr-1r-1.--I rI r-1NNNMMMMM 1 I 1 1 q q 0101 CT 11 CT 01 CT Ot 0 00 O O O 0 00 00 00 00 1 I 1 n f� 1� r�t\ n 1� t\ n n n g q q q co co g q q q 0000 q q q I I O I to MO --iwr�m O r-/NMMd• d• Ln Ln Ln Ln t0 t0 t0 t01� I, t0 t0 t0 1 1 I 1 . . . . . . . . . . . .. . . . . . . . . . . . . . . I r-I I V' l0 n n n n g q q q q C6 q q q q q q q q q q q q q q 1 I Ln 1 CT O Crtongq^ n r� t0 t0 t0 LO et V• M MNN Ot t0 et rl ON lO I I I . . . . . . . . . . . . . . . . . . . . . . . . I I O I O N N N N N N N CNN N N N N N N N N N.--1 .--1 .•-I r~ CD CD 1 1 I nt\t\n nf� t\t\ nl�nnnn^f\t`nnn^n^^nn 1 1 S 1 I 10 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I I O= F— I CD CZ) O O O O O CD O O O O CD CD O CD CD CD CD O CD O CD O CD CD 1 J W I r-INM V l!')<D I,q ON CD r-INMet lntOl�gC71OU'1 OLnO tn0 I 1 lY W v I r-1 r-1 .--1 r-1 .••I rti r-1 r-1 .--1 e-1 N N M M et et In 1 I J 1 I TABLE 5.1 �I _J PAGE 24 31132 ' Table 5.2 ' Treatment 1 1 C-Factors and P-Factors for Evaluating EFF Values. C-Factor BARE SOIL, Packed and smooth . . . . . . . . . . . 1.00 Freshly disked. . . . . . . . . 1.00 Rough irregular surface . . . . . . . . . 1.00 SEDIMENT BASIN/TRAP. . . . . . . . . . . . . . 1.00 STRAW BALE BARRIER, GRAVEL FILTER, SAND BAG. .'1.00 SILT FENCE BARRIER . . . . . . . . . . . 1.00 P-Factor 1.00 0.90 0.90 0.50(1) 0.80 0.50 ' ASPHALT/CONCRETE PAVEMENT. . . . . . . . . . . 0.01 1.00 ESTABLISHED DRY LAND (NATIVE) GRASS. . . See Figure 1.00 ' 1.00 SOD GRASS . . . . . . . . . . . . . . . . . . . 0.01 ' TEMPORARY VEGETATION/COVER CROPS . . . . . . 0.45(2) 1.00 HYDRAULIC MULCH @ 2 TONS/ACRE. . . . ... . . . 0.10(3) 1.00 ' SOIL SEALANT . . . . . . . . . . . . . . 0.01-0.60(4) 1.00 EROSION CONTROL MATS/BLANKETS. . . . . . . . . 0.10 1.00 ' HAY OR STRAW DRY MULCH After lantin rass seed, apply mulch at a rate ot Z tons acre (minimum) and adequately anchor, tack or crimp material into the soil. Maximum Slope Length W (feet) 1 to 5 400 . . . . . . . 0.06 1.00 6 to 10 200 ... 0.06 1.00 11 to 15 150 . . . . . . . . 0.07 1.00 16 to 20 100 . . . . . . . 0.11 1.00 21 to 25 75 . 0.14 1.00 ' 25 to 33 50 . . . . . . . . 0.17 1.00 > 33 35 . . . . . . . . . 0.20 1.00 ' NOTE: Use of other C-Factor or P-Factor values reported in this table must be substantiated by documentation. ' (1) Must be constructed as the first step in overlot grading. (2) Assumes planting by dates identified in Table 7.4 thus dry or hydraulic mulches are not required. (3) Hydraulic mulches shall be used only between March 15 and ' May 15 unless irrigated. (4) Value used must be substantiated by documentation. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0.25 Q 0.20 6 0.15 32%3Z PACE 26 ESTABUSBED GRASS AND C-FACTORS FORT COMS, COLDRADO 10 20 30 40 50 60 70 80 90 100 ESTABLISHED GRASS GROUND COVER (7) FIGURE 5.1 ANNASIX. halo A s..N, I., ➢xPwW TV EROSION CONTROL NOTES CONSTRUCTION SEQUENCE Twi. 7 3, ashoo,hConal Sp,W, me Nglnlbn ane/o. fmx Cmer AlO-I THM05. THEEEY6,IN4 VIENTATION IESTa91J91C➢GRASEES115 TO TNM ON ad ,Ma I. a 'mm MIN sax„ S..a. a BE EXTA1 O. Mc„NE' OR MSJ IOW SEA on am is It SILT IT; _ tog,.,_ anyOI ROALI hWAS PRIOR TO CONATH tgN OF THE PAVEMENT Arl "Rem.Com, BUT SOFT TO SHALL AY£b Ox AttNNADING 40 SIDES _ TO mMEE $INS EXCLUDING rG THE IOW Cal"I rya °� AFTER INSTALLATION,LIT INS Whal cond so PAVEMENT. x OT GTHSIE Solve. WiM Wes EARNESPNh NSCURB GE,S LMILRS WILL TALLMAtE MYEL Fmand ,n'Y M, To FEY. AE STOCKS 1/2 ADobMa � m4ER B[ON 'Im Mxm C GRAVEL GOusE (3/4) OFTA' f CDCALL nx OEVER rvYD^e tw•^ 1STO EXISTINGStI O AWED WHERENED SarEx�m IYnm to 6NALL IVL E POSI or My x WS NMw Ina el MAR AND SEEDED ETENm IN TAMUN IN Ho IN TOBEAnw UI gas TrtN]A MULACVis IS TO REAR UMESLI UNLESS TABLESHEET O MDESIRED AND N[u EED X.. I OR NEW OF CALLS) SHALL SE PISSED Sry THE O SNORES ON waxx.Iln.Iwm.IN "STRAW mNDIITION 1. :iYx ETO P MGBERATEVEMS RwRITY IN THIS AREA. AlIII Sol MIND To, Inn hay wall" DMI IRCABNM IYN dE0 enEIM,vJLO4Y O C O I Eye I am i 9J des 12.5 w ON Ad 22 wMI,AN,.x„x�,eea.�•My.[.,xn 1LLINaAmRA �•m• •xrn1 IF ✓e City Roux. xm" ;Iwe' n I MI M 111 S 1 F 151 a I N I OI B 1 s I m 10 Im wunt Ia rlm�l x�.a ... -- mlww mxsxIO+. I Plo 1 e enSix 3. xOWnCUT MAOs, IN M',H'I SUIiN.. TALL LAVE STRAW UALE BARRIERSLINSTALLED E THE OR AIPAVEMENG Ina• II WIMM n ,n.x n,. ,n.Y.a eII N, m+lrn In N. m,wlalwY, E3PERPENDICULARIro*4 ,NE SIDES EttENryIX4 ,O ,xE ROAD nnAlwaE hwx n III FM•agaxxm -�` i \J I ,mnmml.11m,. Hat Wvl „EM'EU W DNOMIR �SSBIL.EYSTIM E� ANTER EM.LLL •F 7 //"Y/N E Ml so" o At mol on R.. nlnnm..,r,. WIT ACE:VIENED AND 3EEn[o3v HOME TEurORARY ohm haIaxC aM Mavl�%leven III CA WnwM O,lx]IFM w xl T.mwwPORTH cw Loan.. VEGETATION mx RAY/USTIESSTRAW wTP IS TO APLIED LIVER, w Ms &A TTw .. EAal OF 2sTx�S/MULCH A TO NDTHEsMoeR sEO� a s �A VIA s/ACREED.O M DMOM S a.3I. Ix hail -wlVweuVln CROP OR TUS SXracNEo.aR CRwEb lXram miVER one•• 1.z 3lac 1 //`\ AT A TR aR VEREXHW GEUD5E4 C 4w33F3 AnFOW,EIVA _._ f vnm S� ME METHODS OR LIEET rIa 0.1 I.u06 Eta NUW%MIX flesh SASS 3.. ROUSH CUT ROWS. PRIOR TO CONSTRUCTION OF TEE PAVWENT, Ann, File a• Y.. . W W SHALL HAVE STRAW SHALE BARS E O G M rx Mx 01 N.Y,D Sayhay . NREB NG.NTIW TO THE a TIO ROAD _.. Wyie WY31 Yx Yn w CFN,FJWNE Ai IWFWT x,ER 4Ox 5T0 �L_JL\ All }I„ E IMNTA M M. REVER PO AREAS SHALL = —' T_L InL9IT No Why say -M�;- D WAs BE No San as Yx AD W TO BE MPIIEO �NMO AND Y®11111ME,�FnT BY OPPMEN � LT I Ml9 l� Jmmnn Cm he M4MRx - ,%(\\ IFTESSIMUSITIR wE FIRST SPRICEC%R IN A N NORTHEAST ST US \ V V..CEB ON THE 1 S SOHDA1 RT TRro wuf<Vn uMO ERATE4wttNOEERJge NY wxOCTION IN TXhO`uF. E � xi. Dl. I 1—��—��' l . 51t3 To 1\ DIW-]3.3d3 = I r�-_ \\ �S ME eAf VIA L`MIN ; I lag 1A it �NShe SOP,-10]%—�, �_ Aop -41HAV l rye /' F°59sec�'cc \� � gm']3.3ae FIRw Dial Sells ` 5'tlB SIR1e • 9H:IV —\ VEL TP \ � IL •LN. 4 E SvreIe SIWB'0.4% L \ r I 1 _� X IF \ / `\ \ �CASRRMM NRN 6 1h 6 �r \1\ 1V / I�II`L I - :'H+9 1e-C. OND-3Z.3as 1\� HIVR�\/� 1 I I \ \�\\ /TI �P51 .� IL 4 FIpV DSPiM1•1GR 111— LF 15' ISA StlB SIRGB . <1.30 \ \\_ j Ji i • Ysiyn \ ` CI..'DL RE4EADE 1 1 \ I ,\ \ a �[ PIPES? 51PI SEE �C SwNa Skyre - 1.30% \ \ \ I\ C \ \ \ 1 \WBT 115'+5 �— le� CONTROL See/^11 \ �� I \ \ -_ \ \ ,\ I MP. 5`L E \ T5Ey/MpF�EbR/pRY ..1 � � Fv.1Gx .4. y III So. 1 N15TDR�1 \� 5NEEI �� V. keg HARMONY ROAD X A^,,•. P pro 221K (II BaeelEe \l '.1 (OILY GENC)F . ED OF BAI.Ey, STARED) 11 / 0-8 // / E%l5i-AdADS1DE —�L-1 I � J Ite"l R JR. HW.H SCHOOI l_ L SITE i SITE TO LI I;sL— �1 �'C" z-rrPE R MLRTS ID IF.NOTN� ' \WORD BARetOR K51LT FENCE OR Rolu 1 QP BALFh, 5TAKED) / " 4 .SEE FHA GRADING PLAN / SHEET R DETAILED Ii LOT F SHED ELEVATIONS EWPOPARJ eaiD IT FDRARr LINE \ II I `\`• oJ, ]Q \ W.INJ. 5128,E C, \ �\INV. SI]1b.D s EX 151. PO�DSIOE l _\I Zip G,i[N \ C1YfN I wivANLE To / 1 ` IS -� _ _ .. .. .. JBNNMAGION CESIGN IFG C DF= S.IDINE, D,w• xsAT cFE KWO m0 an Sunel03 Lmpmnl. CnbTaMb]dl DESIGNED CHECKED 333 re]trBSL .c Engineering Consultants 4D4-0O2 IDS Sown COUIR, AllalachaoONTS 11%Colo Kelly Johnson BIVLEWIe 1W Il Wl l8age NS. Nkat 501tt 301 Fort canna cawaaN N1szs co ,IR s M.M.. cdwaw RosxO D CdRxao a%n DATE PROJECT NO, rygygAl4% 30YT>GG3W e aH.• THE GATES AT WOODRIDGE - FIRST FILING THE OVERLOOK AT WOODRIDGE - FIRST FILING --- ���yyyyy/ p . / IN Eo 0 IN 30D 300 GRNPHIC SP E 1"=100' LEGEND: EXKT.4ZI Ed•S01 DESUSTA N � �CUWERTS ` qu Bp.SIN AREA �••� ppSIN 80UNDARY ® p651GFI POINT RTS \ \ DE!l.INAGE GLDW R£CT 1011 \� �\\ DI \\ \`\\Sv'S— ES'•IZTING <LT,ITOUR CGTENTON Fl^NO PARK / CI _ / \�_J EKKT. 42a 4i9ERT E%1ST. POADz1OE DrtcN 1 JUN 0 5 10 ----------- LLI_-- HARMONY ROAD PRELIMINARY— — — DO NOT use for WD51r on TEND BASED DN RBD FIELD SURVEY OF 4 23191 SHEETS SHEEI DRAINAGE AND EROSION CONTROL PLAN 20 3 �t