Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutDrainage Reports - 03/15/1996 (2)PROPERTY OF
Carroll st Lange
Professional Engineers & Land Surveyors
Mr. Basil Hamden
City of Fort Collins
Utility Services, Stormwater
235 Matthews Street
Fort Collins, CO 80522
Re: Woodlands Family Apartments
Dear Basil:
FORT COLUNS
January15, 1996
JN: 1477
,l:ir%ice D'
This letter and the enclosed final drainage and erosion control report are
intended to satisfy the City of Fort Collins requirements for drainage and erosion
control regarding the Woodlands Family Apartments.
The final drainage study for the original Woodlands Condominium site was
prepared by Cornell Consulting Company and approved by the Stormwater Utility
Services in April, 1980. This report is in compliance with the City of Fort Collins
Storm Drainage Design Criteria and Construction Manual, dated 1984, within the
restraints imposed by the existing conditions of the Mail Creek Channel north of
Harmony Road.
All -previous comments have been addressed, with the exception of the SWMM
model of the entire basin, including our changes. We are awaiting an up-to-date
file of the.city's existing model and will complete this step as soon as the model is
provided.
We appreciate your time and consideration in reviewing this submitted document.
Please feel free to call us if you have any questions.
Prepared by
TiM. BeY�gin
Reviewed
St hen H Ison, P.E.
Pi
Encl.
cc: E / R
Carroll & Lange, Inc.
165 South Union Blvd., Suite 156
Lakewood, Colorado 80228
303/980-0200
303/980-0917 FAX
c
FINAL DRAINAGE AND EROSION CONTROL REPORT
FOR
WOODLANDS FAMILY APARTMENTS
JN:1477
October 6, 1995
Revised January 15, 1996
Prepared for:
Kaufman & Broad Multi -Housing Group, Inc.
Attn: Kipling S. Sheppard
109909 Wilshire Boulevard
Los Angeles, CA 90024
(fax) 231-4260
(310) 231-4000
Prepared by
"Carroll & Lange, Inc.
165 South Union Blvd., Suite 156
" Lakewood, Colorado 80228
(FAX) 980-0917
(303) 980-0200
TABLE OF CONTENTS
Page
I. GENERAL LOCATION AND DESCRIPTION 1
II. DRAINAGE BASINS 2
III. DRAINAGE FACILITY DESIGN 3
IV. EROSION CONTROL 4
V. CONCLUSIONS 5
VI. REFERENCES 6
Vicinity Map
Appendix A - Hydrologic and Hydraulic Calculations
Appendix B - Erosion Control Calculations
Drainage Map (map pocket)
Erosion Control Plan (map pocket)
FINAL DRAINAGE AND EROSION CONTROL REPORT
FOR
WOODLANDS FAMILY APARTMENTS
I. GENERAL LOCATION AND DESCRIPTION
The site is located northeast of the intersection of Harmony Road and
Shields Street in Fort Collins, Colorado. Specifically, the site is located
in the Southwest Quarter of Section 35, Township 7 North, Range 69
West of the Sixth Principal Meridian. This project is bounded on the
south by Harmony Road, on the west by Shields Street, on the north by
9
Wake -robin Lane, and on the east by a vacant field. The site is
covered with native grasses and slopes generally toward the southeast.
Some trees are present around the detention pond and along the
drainage channel along Harmony Road. Existing single family
residences are north of the property.
This site was partially developed in 1980 using plans prepared by
Cornell Consulting Company. Utility plans and a drainage and erosion
control plan were approved for construction by the City of Fort Collins
in 1980. At that time, the site was overlot graded and the parking area,
curb, and gutter were installed in the northwest comer of the site. The
building pads were shaped and water and sanitary sewer were installed
throughout the site. A detention pond was graded in the southeast
comer of the site. An inlet and storm sewer pipe were installed.
Construction was stopped and the site has remained vacant since
1980.
The report dated April 10, 1980, by Cornell Consulting Company was
prepared as an addition to the report entitled Storm Drainage and
Detention Report for the Woodlands PUD, February, 1979, Comell
Consulting Company. This report for the Woodlands PUD was
unavailable.
I
FINAL DRAINAGE AND EROSION CONTROL REPORT
FOR
WOODLANDS FAMILY APARTMENTS
Page 2
II. DRAINAGE ANALYSIS
The site is located in the Mail Creek basin. R.B.D., Inc. is preparing a
floodplain study for McClelland and Mail Creeks which includes a
SWMM analysis for this area. This study is currently under review with
the City of Fort Collins Storm Water Utility. A progress copy of the
study was provided to Carroll & Lange, Inc. by the City. Using the
SWMM hydrographs provided, an analysis of the existing detention
pond at the southeast comer of the site was performed.
A rational method analysis was performed on the site to predict
developed 2-year and 100-year flows. The C-Values used were taken
from the Fort Collins Storm Drainage Criteria Manual for High Density
residential zoning. The 100-year correction factor used was 1.25. The
calculations are included in the appendix.
The existing pond was constructed in the early 1980's. It is an on-line
pond, designed to release the upstream Mail Creek historic flow of
56 cfs. It does not explicitly detain Woodland developed flows but
detains them in a regional manner. Its outlet is a 36-inch RCP. The
draft regional study prepared by RBD for McClelland and Mail Creeks
give the following storage discharge relations for the pond:
Storage (Acre-feet)
Discharge (cfs)
0
0
0.01
8
0.11
19
0.35
35
0.68
50
1.06
62
1.50
72
2.01
110.8
FINAL DRAINAGE AND EROSION CONTROL REPORT
FOR
WOODLANDS FAMILY APARTMENTS
Page 3
In an effort to throttle the local flows an outlet structure will be
constructed in this detention pond. The SWMM hydrographs from the
RBD draft study (fully developed basin) were routed into this modified
detention pond to analyze its performance.
III. DRAINAGE FACILITY DESIGN
The drainage map shows a schematic of the SWMM model in the
Woodland area. Node 320 is a detention pond on the northwest corner
of Harmony and Shields and it collects the upstream flow from Mail
Creek. Node 27 is an offsite sub -catchment that flows across the
Woodland site, and Node 254 is the Woodlands sub -catchment.
Reach 19 represents the Mail Creek channel running on the Woodland
site along Harmony Road, and Reach 107 is the Starflower Pond. The
RBD draft master study gives hydrographs for Nodes 320, 27, and 254.
These hydrographs were routed through reaches 19 and 107, both
using the existing pond outlet and the proposed pond outlet. Several
proposed discharges were tried until a functional solution was found. It
is proposed to construct a box outlet structure. A schematic is shown
in the Appendix. The structure will modify the pond storage discharge
relations to the following:
Storage (Acre-feet) Discharge (cfs)
0 0
0.01
0
0.11
13.6
0.35
17.0
0.68
19.9
1.06
22.4
1.50
24.6
1.63
25.2
2.01
110.8
FINAL DRAINAGE AND EROSION CONTROL REPORT
FOR
WOODLANDS FAMILY APARTMENTS
Page 4
The structure will -throttle the flow by a rectangular orifice 0.80 square
feet in size (6 inches by 19 inches). As the pond fills to its existing
capacity, the water level will overtop the structure, bypass the orifice,
and be carried by the 36-inch pipe just as happens now. Outlet Control
was modeled using a tailwater depth of 2.5 feet, as shown at Cross -
Section 68 in the RBD HEC-2 run for the Mail Creek Basin on the north
side of Harmony Road. This design provides a degree of onsite
detention prior to the arrival of the upstream peak and also allows the
upstream peak to continue to be carried by existing facilities. The peak
outflow released by this pond in the 100-year storm is increased from
98 cfs to 106 cfs but outflows for smaller storms and during the early
and late stages of large storms are reduced.
A HEC-2 run was made to delineate the 100 year water surface of, the
Mail Creek Channel on the North side of Harmony Road. Using the
cross -sections from the RBD study (cross sections 71-73), and a pond
water surface elevation of 5073.0 feet, and a peak flow of 79 cfs (from
the modified pond SWMM run); a water surface profile was calculated.
This profile is shown on the drainage map, and supporting computer
output is attached in the appendix.
In an effort to improve the conveyance of the channel, the existing
trees will be trimmed below a height of 3.0 feet above the channel
bottom. The trunks of the trees will remain but branches below the
100-year normal depth of the channel will be removed.
IV. EROSION CONTROL
The most disruptive site work for the project was accomplished in 1980
according to the approved utility plans prepared by the Cornell
Consulting Company. Since that time the site has seen the growth of
native grasses and trees. Specifically, the drainage channel along
Harmony Road and the detention pond are well vegetated and in a
FINAL DRAINAGE AND EROSION CONTROL REPORT
FOR
WOODLANDS FAMILY APARTMENTS
Page 5
stable condition. It is anticipated that the site work necessary for this
apartment development will have minimal erosion impact.
This development lies within the Moderate Wind Erodibility Zone and
Moderate Rainfall Erodibility Zone according to the City of Fort Collins
zone maps. The erosion control Performance Standard (PS) for the
site tributary to the detention pond was computed to be 78.9%; while
the area tributary to the offsite area to the north and west was
computed to be 79.5%; according to the City of Fort Collins Erosion
Control Reference Manual for Construction Sites. The effectiveness
(EEF) of the proposed erosion control plan was calculated to be 90.8%
for the detained area and 97% for the area draining offsite. Therefore,
the erosion control plan as detailed in the map pocket meets the City of
Fort Collins requirements.
After the fine grading has been completed, the private drive, curb, and
gutter will be constructed. The apartments will be built and all areas
not paved will be seeded or sodded. The landscaping will be
accomplished to minimize erosion and sedimentation transport. A
combination of berms and tree groups will provide screening along
Harmony Road and Shields Avenue. The major active recreation areas
will be kept open and unobstructed. Deciduous trees will provide
shade in parking areas and will also sere to reduce wind erosion.
V. CONCLUSIONS
This is a retrofit of existing facilities. Detention release and storage
amounts comply with current city standards within the restraints
imposed by the existing facilities, in accordance with city staff
suggestions. During final construction, erosion ,control measures will
be utilized that minimize offsite effects of erosion and meet city criteria.
FINAL DRAINAGE AND EROSION CONTROL REPORT
FOR
WOODLANDS FAMILY APARTMENTS
Page 6
VI. REFERENCES
1. Storm Drainage Design Criteria and Construction Standards, City
of Fort Collins, Colorado, May, 1984.
2. Erosion Control Reference Manual for Construction Sites, City of
Fort Collins, Colorado, January, 1991.
3. The Woodlands Condominiums Drainage Report, Cornell
Consulting Group, April, 1980.
4. McClelland's and Mail Creek 100-year Floodplain Study of the Mail
Creek Tributary Along Harmony Road Between the Nordick
Property and the Ridge Subdivision, Fort Collins, Colorado, RBD,
Inc., August 7, 1995 (draft copy).
R7
MOUNTAIN VISTA
MULBERRY COLO 14
o
a
PROSPECT
CN
N
=
N
a
DRAKE RD
I
w
w
�
r
a
w
w
J
0
Mw
V1
U
\/
HARMONY RD
00
N
m
SITE
r
U
Vicinity Map
Appendix A
Hydrologic and
Hydraulic Calculations
■■/�///\//////////////�/////■ 1./ //■/I////I■/■■ ////////E///■
■■■■■■■■/■■/tt■/■■\■■■■■■■■■■ Ars
I■■\I■ '.t■/■ It■■■t/■■■tt■■
■■■////■/■/■■■■/\■///■///// Ann
■ II■ // I■//■ ■■t■■■//■■■/■►/
■ //■■OEM IAEENEEEEENENmvdm
I■ .\■■ ■■■■■■■■■ I.■■■■
1 I......w...../..■■..■/. ..wr wro .... ...■.v ■......■■ .. • .
■/i■
►u■
so
di ::P0!-�,dMMMMMP',dMMMMMMMP-AIM
MENNEMOMME ESE'
■//\/'.!.\■■■/■/■■//■%/i■/%//!/■■!/■■■/ter■■/■■!i■■■■/■■//■!i//■/■■
-err■■/■/■■■■■\/I►I■►/■►/■■Ii■■\■!.■1\/\!�\■\\\■\\\.�.\\■\■.■■
■■u.u■■ruo.r■u►o�ra r..■. u.■-.�... v_.0 ■■uu :�...a..uuo..
■\/\/■\/■■//■///■►/'�\!//it■!///!�■■/\!�■■■1/■\!i///■/■/■■/■■■■fir/■■
■■■■/■■■I■■■r.//:\i■!/■Ii/■I!■■■t■/-.■■■■■■■■/�'i.t■■■/ttttttttt�'i�J
■■■■■■I/.�/i/i/i/►i//■!i/■■■/■!it■■■■■■■■■■■\.•=i.■■■tttttt■.•�= ..r■
■■■■■I//.!/:/:■!.■■sir■■■■�a.■■■■■■\■■■■•��..■�■■//■.•�_�...■■■■■■■■■
moor
Nor
N..■■/■■■■/■■■■t■■■\■■■■■■■■■■■■■t■■■■■■■■■■■■■■■■//t/■■■■■■
. 3.1.6 Runoff Coefficients
The runoff coefficients to be used with the Rational Method referred to in Section 3.2
"Analysis Methodology" can be determined based on either zoning classifications or the
types of surfaces on the drainage area. Table 3-2 lists the runoff coefficients for the various
types of zoning along with the zoning definitions. Table 3-3 lists coefficients for the different
kinds of surfaces. Since the Land Development Guidance System for Fort Collins allows land
development to occur which may vary the zoning requirements and produce runoff coeffi-
cients different from those specified in Table 3-2, the runoff coefficients should not be based
solely on the zoning classifications.
The Composite Runoff Coefficient shall be calculated using the following formula:
C = (Y.C;A;)/At
,=t
Where C = Composite Runoff Coefficient _
C; = Runoff Coefficient for specific area A;
A; = Area of surface with runoff coefficient of C;
n = Number of different surfaces to be considered
At = Total area over which C is applicable; the sum of all A;'s is equal to At
Table 3-2
RATIONAL METHOD RUNOFF COEFFICIENTS FOR ZONING CLASSIFICATIONS
Description of Area or Zoning
Business: BP, BL........................................................................................
Business: BG, HB, C..................................................................................
Industrial: IL, IP..........................................................................................
Industrial: IG...............................................................................................
Residential: RE, RLP..................................................................................
Residential: RL, ML, RP.............................................................................
Residential: FILM, RMP............................. :................................................
Residential: RM, MM..................................................................................
............................................................
Parks, Cemeteries ............... :......... :::::........................................................
Playgrounds...............................................................................................
Railroad Yard Areas...................................................................................
UnimprovedAreas ................. :..................................................................
Coefficient
0.85
0.95
0.85
0.95
0.45
0.50
0.60
0.65
0.70
0.25
0.35
0.40
0.20
Zoning Definitions
R-E Estate Residential District — a low density residential area primarily in outlying
areas with a minimum lot area of 9,000 square feet.
R-L Low Density Residential District — low density residential areas located throughout
the City with a minimum lot area of 6,000 square feet.
R-M Medium Density Residential District — both low and medium density residential
areas with a minimum lot area of 6,000 square feet for one -family or two-family
dwellings and 9,000 square feet for a multiple family dwelling.
R-H High Density Residential District— high density residential areas with a minimum lot
area of 6,000 square feet for one -family or two-family dwellings, 9,000 square feet
for a multiple family dwelling, and 12,000 square feet for other specified uses.
R-P Planned Residential District —designation of areas planned as a unit (PUD) to pro-
vide a variation in use and building placements with a minimum lot area of 6,000
square feet.
R-L-P Low Density Planned Residential District —areas planned as a unit (PUD) to permit
variations in use, density and building placements, with a minumum lot area of 6,000
square feet.
MAY 1984 3-3 DESIGN CRITERIA
No Text
DRAINAGE CRITERIA MANUAL
RUNOFF
F�
3(
1— 2 (
z
W
()
cc
a 10
z
w
IL
O 5
W
W
3
O
U 2
W
H
Q
3
1
5
' s •5 1 2 3 5 10 20
VELOCITY IN FEET PER SECOND
FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR
USE WITH THE RATIONAL FORMULA.
*MOST FREQUENTLY OCCURRING "UNDEVELOPED"
LAND SURFACES IN THE DENVER REGION.
REFERENCE: "Urban Hydrology For Small Watersheds" Technical
Release No. 55, USDA, SCS Jan. 1975.
5 =1-84
URBAN DRAINAGE & FLOOD CONTROL DISTRICT
Ol
I
N
Z
O
LL
N
QC
W
H
o
W
C
u.
V
Z
Z
V�
Q
Z
p o
`3
a
N
Z
H O
�
..1
t»
�
L
i
L
Q
i
Le
°
Li
J
Q
M
h
Z
O "
+
_
rn
m
m C N
1
U
M
= W
N
11
U
wV
c o
�
N
w
^
WCLui
a�
o m
p
Hco
Z
Z U.
o
�^
q
�
0
M
J
�
�
W ^
W
aQJ
O
0
(�
47J
W
(j
Q
Z
W W
O
J
c v
M
N
M
Z_
Q
mQ
U
m G
N
N
O
�
v
f
�
�
Z
0
+
_
O
W C
= ui
11
�t> amp
=_
Q
C
J (L VV)
I 1
/`
J
�w
W
nn
C) u m
v
�
W
Ov
W
� `
^
W
rn
N
N
Z
yZj IL.
J
Q
KFn-
M
Z
Q
�
N
N
Wa
L
v�
W
C
Y
�
Q
N
LLI
Nrz
0:
M
3 O
(Nl�)
a
t- m
(Sdd)
o
Z
w c9
-j
>
U10013A
N
S
UZI)
�,
O
m O to
<
O'
m G
f-
H19N31
3ZIS
E
-N
3dld
d
M)
p
3dO1S
C7 W
MID) MOId
w
NJIS30
-
X
N
G G
WW
(SdO�M01d3al
M
W
1 S
N
W Q
U)
3dO S
Nd
LL
(SdO)
M
M
p
(7Z,b
(NH/NI)
O N Q
Z
W =
D
I
lV
N
0
(OV)
i5�
p`
Q
Z
Q
(V O)
_
N
ZQ J
Q
fY Q
!•-
(S30)
fi
M
C Z
N
2
0
m
s
N
o
8H/NI--
O Q
�,,, �
I
OD
(OV)
ti
fQ
�
p
d• 3
Z
(NIW)
Lr
3I
m
N
6l
!--
33303
O
(J
)Ln
�O
W
d'30Nn8
o
V38V=
N91S3O
V3UV
m
1NIOd
N
\
a
N9IS3CI
�-
I--
Lu m
p
W
W
W
U
Y
�
E- W
F �'
a
U
a x
C U
co
—
N
Lh
�t
U.)cD
ti
00
rn
—
=
V
�v
I
CY
U.
N
LL
Q
J
V)l
7s
eta
v
W
N
O
Q
CD
N
1
..gym
�
ozla• .�
w%-�
Q•'
"'
a o
r
p
r
p
F-
E] o
mco
0
M
r
1^
�J
z U-LLI
M
tM
-�
Z
wv
r
J
�
m
W ^
W
.�
\�
• v
S
W
Q�
2
z
Wti�
N
J
w Q rn
`r
N
Z
a
M
o
N
Q Q
0
I
IQ
ci
M
M
M
m0
•
•
v
m
�
�
o
U
z
z
w
w
z
CD
z
w
U
D:
C-
�v
11
V
7
a
N
Z
N
O
tI
p
N
In
In
Z i
LL
V
c
z S
Q
V
Z
°
OLIJ
H O
W
z
>
<
.J
in
a►�
AC
o
Y
3
a
v�
�
3
�
Q
_M
�
O
_Z
V)
X m
IDZ. c N
r.
(�
W
11
v
Q
=
z
=_
O
'um
�<O«
LL-
J
v
W a O)
> LL
J
Wv
Q
W
a
N
o D
O e
w
v
O
a
J
w-'
[W4�
O
�w
cn
a
_
if
6 .
Z
Wa�
p
S
J
�
M
z
c
mj Q
U
M
M
ma
U)
a
A
W
w
C
U
z
W
U
J
U
Z
2
U
W
F
0
z
a
z
0
N
W
O
W
Q
Z
G
-cc
0.
co
s O
t� a cc
O
F- N
Z W Z
U
co O co
o a o
M
IL
01
LL
G
N
a uw
N S
W
C
20
H 0
If
NO
0 F=-
ZLU
cc inZ
O22
N �
m
cl
Y
H W
O U
MENEM
MENNEN
mommommommom
ME
MONEMEMENE
MENEENNEM,
MEN
IBM
ME
MEN
ow,
,
POND #107 RATING CURVE INFORMATION
RwNc
Engineering Consultants
CLIENT G�� �� w�"•� JOB NO. Q22!�
PROJECT M/1 A C."La CALCULATIONS FOR
MADEBY+�DATE CHECKED BY DATE SHEET OF
10 ---
- -
ct
S
70
o.6g
I _
so .......
6os
- so
2,7
74.1
G2
Z 9
93.1
30:8.
iio.8
JT
M�
RBD INC. ENGINEERING CONSULTANTS
WEIR SECTION FLOW DATA
WEIR FLOW POND #107 UPSTREAM OF STARFLOWER DRIVE
WEIR COEF.
3.100
STA ELEV
0.0 73.00
3.0 72.25
18.0 72.25
21.0 73.00
ELEVATION
DISCHARGE
(feet)
(cfs)
---------
---------
72.25
0.0
72.35
1.5
72.45
4.3
72.55
8.1
72.65
12.7
72.75
18.0
72.85
24.1
72.95
30.8
RBD, Inc., Engineering Consultants
STARFLOWER POND #107
020-118
Detention Pond Rating
Curve
Cumulative
Elev
Area
Area
Storage
(ft)
(ft2)
(ac)
(ac-ft)
V = d/6"(A+4ABm+B)
66.0
148
0.00
0
67.0
958
0.02
0.01
68.0
7,405
0.17
0.11
69.0
13,504
0.31
0.35
70.0
15,246
0.35
0.68
71.0
17,860
0.41
1.06
72.0
201909
0.48
1.50
73.0
23,242
0.53
2.01
Qs
0.s -
0A
�R Q3
X
z
�i 12
Q1
0
68
Area -Capacity Curve
67 68 69 70 71 72 73
Sfts (1t e9
Area — Capacity
15-Mar-95
Carroll & Lange
" 165 South Union Blvd., Suite 156
Lakewood, Colorado 80228
303/980-0200
Fax:303/980-0917
PROJECT (A10006kIA rRmf$_�-gyp guts
Subject (20tfCf Sfryciur-e Si .
ftoWs 10 pus. W4 cop\cv--+e_.
'-o i�roit(c-- orI(er• 10...JS
+0 0,CCep-lV lVAaJb,r 4'(O.JS
C)Vec•i to t-J =
72.25
py;F'%Ce ce-4roS
rclevw4Pevin ".29
?Oki Bo # OM-- lv('. o
;Vf2>wN
l Le_ T2 S L) r N14,1
1If%lowe
re.Iciirovls Wrrn-
e tJq item:
6 . A- `'q t��-I
OV-47ice owlI•
�e_F-.I.
Voluw�e. l4•G
Colo
Q
Job. No. IL(77
Sheet of S
Date UC I -5tS—
By 5'J 1E
4Aesi re- fo %hCk+se p6mol
60f S/•// q//0w UP 6gsf•;%
6ax wi+\-
4.�Vd al Ia r _ io� q M IC
i s E a'1 %3 "b v%e P . tJ
r5,•
1
z^reeK- S f'71G(7 ) 4e- Z 110" Ji ADr
q IveN. Usi hJ fi / e- 04 1-t'ice-
U
A VNd w+vt Je. S0 tic "ra ?- (^Jqs Cat IctJl ies
Or,'-F:ce-
�I•+a e. GAS
&7
�a
.o1
9.90
Q=GA z
0.11
13.gg
l09'
O.3-5-
17.03
G:. 1•6
70
0.68
19.69
71
1.
39
9 _ 3Z. z �r�z
72
I , so
Z14. 63
4= 5�Ja— (o(o.ZS-
72.25
1 • (03
2S. i�
73
2.01
Z6. �9"
Carroll & Lange=
165 South Union Suite 156
"
Lakewood,LakColorado 80228
303/980-0200
Fax:303/980-0917
PROJECT w00dIgas 7 wiltr1kcti�3
Subject
As i 4e.
SI.43e
flow
occurs
73. d.
ro
= 53.31 c- Fs
Job. No. 114% %
Sheet Z- of T
Date 57 054• 5-5--
By S T4
4-coe-ises ctbouc- eIeval1-a., 7Z.2�5- weir
over- 4kr- toy' 0� - 6c bonnK. 1=c`oL-
S UO c� 80 1 S 'JggSed ' tm'
leaves -fL4' F>d" w 1,c-- + L.or, �er Sur Acce
COtltAe i -t4ts -Plow IN76 foe /SUXI 80-Z6.(.9
NA vS-r %G Cq rric� V f ot- b✓ e i r -p (o w
�SSJw� S�.ctrP- CIcS�ed Wei r- —
Q _ ZI. D 1- 3 (Z
D 6- ) (0, 7�) 3/L
L : 2o.s -F4.
e.Ap 09+
Co r oeo C-
Z--.z3.6,-F4
�= 757-" X -- 41-3�
Carroll&Langeos
" 165 South Union Suite 156
Lakewood,LakColorado
80228
303/980-0200
Fax:303/980-0917
PROJECT 1/JOOJ'ck'.o -s 5gwr,Y4, APIlr".,7s
Subject 00tIcf Sfiv�i,�,�c
Job. No. 1 y 7 Z
Sheet 3 of S
Date 5-Oci 9S
By S,T Fl
600sfruci- Co&Acr-p-+e Vgvl+_ grc
-r1,��lc
'watI15 tA), }4.
(-oUr.�e� iv.Fer�or
�p Cacner.
�Io•-�
r
— — —
Vat)
l
S,.
I 8.8
I
Wa11 Cross
Sec+iov�
%5 a.
tiHhl s+C?I
41ir-
Acl-"cy
cgp+c� r,/
}or {V1e
3G`r
PC-
ujas c1i►eckep)
to
ensure fil.-,t Ovtict Co.,Jrroc
w'15 41APr,1d.
3G" 2cP
TNIat—
Tq;IWIfer
de,
DJrle�'
36 GtP.
C,e,,,frol
—
6 (0
O
c�-
O
Z . 55 -
/: 5�
O
D
67
.33
6
Z-5�
1.9
6g
, fo7
19
2.5
?--I
Or
1.0
3.6
2.S
Z•Lf
S7.7
35-
70
/.33
So
2-s�
Z_(o
69.5
SD
71
7z
Z•o
7Z.
Z.S
Z.$
88:'S
7Z
72.25
2. ►
-741
Z.s
Z.8
'50.Q,
71
'73.0
2.3-s
So
Z.s
Z.g
96.6
go
Carroll & Lange=
" 165 South Union Blvd., Suite 156
Lakewood,LakColorado 80228
\ 303/980-0200 u
Fax: 303/980-0917 Job. No. /-(7-7
L
I ) Sheet -A-of
PROJECT L/'0O""' Date
Subjects f%r StO r Sri; Ka By ssN-
�Jt/c cq /cs pe r /Z ZD 5 ��
-Pp rn ar e l eJ = �o �.✓H.S�fevr✓� vr/� >L �L t �D
Ike
"_
. a/3
L =
6r
r
l.e_ — 6�- Fle0g14bh 7;� _ zr-
41,
-72 •.9,.s _ .6 q.s -t- //L f a -6
pt- _ q. 9-s--
NJ -- I . Q- VA- =- ao,s c�s.
Carroll & Lange=
" 165 South Union Blvd., Suite 156
Lakewood,LakColorado 80228
303/980-0200 1
Fax: 303/980-0917 Job. No. 1117 7
_ Sheet Soft
PROJECT a �°"� Date Z-7 AJd, �S
Subject stivc'Frure By �&3--W
SuK4KAAn.l 'T-B;x L�.tc
Ste��t
Ne+a wbJer
we r Ab&J
it Box
we ; f- Fh,,,
00cr 6.k
-r in l
Flo
GoN tout
arc. f •.
C Ft) _ ��3�
Ccfs)
.�--
O
O
O
O
r01
/ 8.9
O
O
O
13.6
69-
0.35
3 17.o
p
p
17.a
Io
0 6S
Li
-71
l•o(
S zZ.!f
O
O
22-�
7 Z
J.so
� Zy. 6
O
O
Z�f
O
Zs Z
73
Z.v!
7 ZG.7
53.3
3�•8
l l �- 8
o�(0.-7 -rS3.3 = Q>O
cis —
Ga
faC
,� o = -71
i
Carrol I & Lange
" South Union Blvd., Suite 156
Lakewood,LakColorado 80228
303/980-0200 7 —7
Fax:303/980-0917 Job. No. -1
Sheet —A— of
PROJECT t 20J Ia'AAS Avid s " Date 78 ►.OV- 9 s
Subject $W rvl�'1 c.�l^ew��'i By 5 I-{
E'K;ia;lij ponl oc t/e-�-
ENVIRONMENTAL PROTECTION AGENCY - STORM WATER MANAGEMENT MODEL - VERSION PC.1
DEVELOPED BY METCALF+ EDDY, INC.
UNIVERSITY OF FLORIDA
WATER RESOURCES ENGINEEERS, INC. (SEPTEMBER 1970)
UPDATED BY UNIVERSITY OF FLORIDA (JUNE 1973)
HYDROLOGIC ENGINEERING CENTER, CORPS OF ENGINEERS
MISSOURI RIVER DIVISION, CORPS OF ENGINEERS (SEPTEMBER 1974)
BOYLE ENGINEERING CORPORATION (MARCH 1985, JULY 1985)
OTAPE OR DISK ASSIGNMENTS
JIN(i) JIN(2) JIN(3) JIN(4) JIN(5) JIN(6) JIN(7) JIN(8) JIN(9) JIN(10)
2 1 0 0 0 0 0 0 0 0
JOUT(1) JOUT(2) JOUT(3) JOUT(4) JOUT(5) JOUT(6) JOUT(7) JOUT(8) JOUT(9) JOUT(10)
1 2 0 0 0 0 0 0 0 0
NSCRAT(1) NSCRAT(2)
3 4 0
WATERSHED PROGRAM CALLED
NSCRAT(3) NSCRAT(4) NSCRAT(5)
0 0
*** ENTRY MADE TO RUNOFF MODEL ***
WOODLANDS DETENTION POND SIZING
Carroll & Lange Inc.
ONUMBER OF TIME STEPS 78
OINTEGRATION TIME INTERVAL (MINUTES), 10.00
25.0 PERCENT OF IMPERVIOUS AREA HAS ZERO DETENTION DEPTH
WOODLANDS DETENTION POND SIZING
Carroll &. Lange Inc.
HYDROGRAPHS FROM UDSWM2-PC ARE LISTED FOR THE FOLLOWING 3 SUBCATCHMENTS (AVERAGE VALUES WITHIN
TIME INTERVALS)
TIME(HR/MN) 1
2 3
0 0. 0. 0.
0.
0 10. 0. 0.
1.
0 20. 5. 2.
10.
0 30. 26. 13.
47.
0 40. 51. 19.
61.
0 50. 58. 13.
36.
1 0. 61. 8.
22.
1 10. 61. 5.
13.
1 20. 60. 4.
8.
1 30. 59. 3.
6.
1 40. 58. 2.
4.
1 50. 56. 2.
3.
2 0. 55. 1.
3.
2 10. 54. 1.
2.
2 20. 53. 1.
1.
2 30. 52. 1.
1.
2 40. 50. 0.
1.
2 50. 49. 0.
0.
3 0. 48. 0.
0.
3 10. 46. 0.
0.
3 20. 45. 0.
0.
3 30. 43. 0. 0.
3 40. 40. 0. 0.
3 50. 38. 0. 0.
4 0. 36. 0. 0.
4 10. 35. 0. 0.
4 20. 33. 0. 0.
4 30. 31. 0. 0.
4 40. 30. 0. 0.
4 50. 28. 0. 0.
5 0. 26. 0, 0.
5 10. 25. 0. 0.
5 20. 24. 0. 0.
5 30. 24. 0. 0.
5 40. 23. 0. 0.
5 50. 23. 0. 0.
6 0. 23. 0. 0.
6 10. 23. 0. 0.
6 20. 23. 0. 0.
6 30. 23. 0. 0.
6 40. 22. 0. 0.
6 50. 22. 0. 0.
7 0. 22. 0. 0.
7 10. 22. 0. 0.
7 20. 22. 0. 0.
7 30. 22. 0. 0.
7 40. 22. 0. 0.
7 50. 22. 0. 0.
8 0. 22. 0. 0.
8 10. 22. 0. 0.
8 20. 22. 0. 0.
8 30. 21. 0. 0.
8 40. 21. 0. 0.
8 50. 21. 0. 0.
9 0. 21. 0. 0.
9 10. 21. 0. 0.
9 20. 21. 0. 0.
9 30. 21. 0. 0.
9 40. 21. 0. 0.
9 50. 21. 0. 0.
10 0. 21. 0. 0.
10 10. 21. 0. 0.
10 20. 21. 0. 0.
10 30. 21. 0. 0.
10 40. 21. 0. 0.
10 50. 21. 0. 0.
11 0. 21. 0. 0.
11 10. 21. 0. 0.
11 20. 21. 0. 0.
11 30. 20. 0. 0.
11 40. 20. 0. 0.
11 50. 20. 0. 0.
12 0. 20. 0. 0.
12 10. 20. 0. 0.
12 20. 20. 0. 0.
12 30.
20.
0.
0.
12 40.
20.
0.
0.
12 50.
20.
0.
0.
13 0.
0.
0.
0.
WOODLANDS DETENTION POND SIZING
Carroll & Lange Inc.
WIDTH INVERT SIDE SLOPES OVERBANK/SURCHARGE
GUTTER GUTTER NDP NP OR DIAM LENGTH SLOPE HORIZTO VERT MANNING DEPTH JK
NUMBER CONNECTION (FI) (FT) (FT/FT) L R N (FT)
320 19 0 3 .0 0. .0010 .0 .0 .001 10.00 0
27 19 0 3 .0 0. .0010 .0 .0 .001 10.00 0
19 107 0 1 CHANNEL 4.0 700. .0110 4.0 4.0 .035 6.00 0
254 107 0 3 .0 0. .0010 .0 .0 .001 10.00 0
107 318 8 2 PIPE .1 1. .1000 .0 .0 .020 .10 0
RESERVOIR STORAGE IN ACRE-FEET VS SPILLWAY OUTFLOW
.0 .0 .0 8.0 .1 19.0 .3 35.0 .7 50.0 1.1 62.0
1.5 72.0 2.0 110.8
OTOTAL NUMBER OF GUTTERS/PIPES, 5
WOODLANDS DETENTION POND SIZING
Carroll & Lange Inc.
ARRANGEMENT OF SUBCATCHMENTS AND GUTTERS/PIPES
GUTTER TRIBUTARY GUTTER/PIPE TRIBUTARY SUBAREA
19 320 27 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 275.2
107 19 254 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 291.9
WOODLANDS DETENTION POND SIZING
Carroll & Lange Inc.
HYDROGRAPHS ARE LISTED FOR THE. FOLLOWING 5 CONVEYANCE ELEMENTS
D.A.(AC)
THE UPPER NUMBER IS DISCHARGE IN CFS
THE LOWER NUMBER IS ONE OF THE FOLLOWING CASES:
() DENOTES DEPTH ABOVE INVERT IN FEET
(S) DENOTES STORAGE IN AC -FT FOR DETENSION DAM. DISCHARGE INCLUDES SPILLWAY OUTFLOW.
(1) DENOTES GUTTER INFLOW IN CFS FROM SPECIFIED INFLOW HYDROGRAPH
(D) DENOTES DISCHARGE IN CFS DIVERTED FROM THIS GUTTER
(0) DENOTES STORAGE IN AC -FT FOR SURCHARGED GUTTER
TIME(HR/MIN) 320 27 19 254 107
0
10.
0. 0. 0. 0. 0.
0() .0() .0() .0() AS)
0
20.
0. 0. 0. 2. 1.
�I
00 -00 -00 00 AS)
0
30.
10. 4. 7. 18. 15.
.0() .0() .5() .0() .1(S)
0
40.
43. 22. 49. 76. 49.
.0() .0() 1.3() .0() .7(S)
0
50.
60. 16. 79. 45. 74.
.0() .0() 1.7() .0() 1.5(S)
1
0.
57. 9. 67. 28. 98.
.0() .0() 1.5() .0() 1.8(S)
1
10.
65. 7. 70. 16. 93.
.0() .0() 1.6() .0() 1.8(S)
1
20.
58. 3. 65. 10. 84.
.0() .0() 1.5() .0() 1.7(S)
1
30.
63. 4. 64. 7. 76.
.0() .0() 1.5() .0() 1.6(S)
1
40.
55. 1. 61. 4. 71.
.0() .0() 1.5() .0() 1.5(S)
1
50.
60. 3. 59. 4. 69.
.0() .0() 1.5() .0() 1.4(S)
2
0.
52. 1. 58. 3. 67.
.0() .0() 1.4() .0() 1.3(S)
2
10.
58. 2. 56. 2. 65.
.0() .0() 1.4() .0() 1.2(S)
2
20.
50. 0. 55. 1. 63.
.0() .0() 1.4() .0() 1. I (S)
2
30.
56.
1.
53.
1.
60.
.0()
.0()
1.4()
.0()
1.0(S)
2
40.
48.
0.
52.
0.
58.
.0()
.0()
1.4()
.0()
.9(S)
2
50.
53.
1.
50.
1.
56.
.0()
.0()
1.4()
.0()
.9(S)
3
0.
45.
0.
49.
0.
54.
.0()
.0()
1.3()
.0()
.8(S)
3
10.
50.
1.
48.
0.
52.
.0()
.0()
1.3()
.0()
.7(S)
3
20.
43.
0.
46.
0.
50.
.0()
.0()
1.3()
.0()
.7(S)
3
30.
48.
0.
45.
0.
48.
.0()
.0()
1.3()
.0()
.6(S)
3
40.
38.
0.
42.
0.
46.
.0()
.0()
1.2()
.0()
.6(S)
3
50.
43.
0.
40.
0.
44.
.0()
.0()
1.2()
.0()
.5(S)
4
0.
33.
0.
38.
0.
41.
.0()
.0()
1.2()
.0()
.5(S)
4
10.
39.
0.
36.
0.
39.
.0()
.0()
1.2()
.0()
.4(S)
4
20.
30.
0.
34.
0.
37.
.0()
.0()
1.1()
.0()
.4(S)
4
30.
36.
0.
33.
0.
35.
.0()
.0()
1.1()
.0()
.4(S)
4
40.
27.
0.
31.
0.
33.
.0()
.0()
1.1()
.0()
.3(S)
4
50.
33.
0.
29.
0.
31.
.0()
.0()
1.0()
.0()
.3(S)
5
0.
23.
0.
27.
0.
29.
.0()
.0()
1.0()
.0()
.3(S)
5
10.
30.
0.
26.
0.
28.
.0()
.0()
1.0()
.0()
.2(S)
5
20.
21.
0.
25.
0.
26.
.0O
.0O
1.0()
.0O
.2(S)
5
30.
28.
0.
24.
0.
25.
.0()
.0()
1.0()
.0()
.2(S)
5
40.
20.
0.
24.
0.
24.
.0()
.0()
.9()
.0()
.2(S)
5
50.
27.
0.
23.
0.
24.
.0()
.0()
.9()
.0()
.2(S)
6
0.
19.
0.
23.
0.
24.
.0()
.0()
.9()
.0()
.2(S)
6
10.
27.
0.
23.
0.
23.
.0()
.0()
.9()
.0()
.2(S)
6
20.
19.
0.
23.
0.
23.
.0()
.0()
.9()
.0()
.2(S)
6
30.
27.
0.
23.
0.
23.
.0()
.0()
.9()
.0()
.2(S)
6
40.
18.
0.
22.
0.
23.
.0O
.0O
.9O
.0O
.2(S)
6
50.
26.
0.
22.
0.
23.
.0()
.0()
.9()
.0()
.2(S)
7
0.
18.
0.
22.
0.
22.
.0()
.0()
.9()
0()
.2(S)
7
10.
26.
0.
22.
0.
22.
.0()
.0()
.9()
.0()
.2(S)
7
20,
18.
0.
22.
0.
22.
.0()
.0()
.9()
.0()
.2(S)
7
30.
26.
0.
22.
0.
22.
.0()
.0()
.9()
.0()
.2(S)
7
40.
18.
0.
22.
0.
22.
.0()
.0()
.9()
.0()
.2(S)
7
50.
26.
0.
22.
0.
22.
.0()
.0()
.9()
.0()
.2(S)
8
0.
18.
0.
22.
0.
22.
.0()
.0()
.9()
.0()
.2(S)
8
10.
26.
0.
22.
0.
22.
.0()
.0()
.9()
.0()
.2(S)
8
20.
17.
0.
22.
0.
22.
.0()
0()
.9()
.0()
I(S)
8
30.
26.
0.
22.
0.
22.
.0()
.0()
.9()
.0()
AS)
8
40.
17.
0.
21.
0.
22.
.0()
.0()
.9()
.0()
AM
8
50.
25.
0.
21.
0.
21.
.0()
.0()
.9()
.0()
1(S)
9
0.
17.
0.
21.
0.
21.
.0()
.0()
.9()
.0()
AM
9
10.
25.
0.
21.
0.
21.
.0()
.0()
.9()
.0()
AM
9
20.
17.
0.
21.
0.
21.
.0()
.0()
9()
.0()
AM
9
30.
25.
0.
21.
0.
21.
.0()
.0()
.9()
.0()
1(S)
9
40.
17.
0.
21.
0.
21.
.0()
.0()
.9()
.0()
.1(S)
9
50.
25.
0.
21.
0.
21.
.0()
0()
.9()
.0()
l(S)
10
0.
17.
0.
21.
0.
21.
.0()
.0()
.9()
.0()
AS)
10
10.
25.
0.
21.
0.
21.
.0()
.0()
.9()
.0()
AS)
10
20.
17.
0.
21.
0.
21.
.0()
.0()
.9()
.0()
.1(S)
10
30.
25.
0.
21.
0.
21.
.0()
.0()
.9()
.0()
AS)
10
40.
17.
0.
21.
0.
21.
.0()
0()
.9()
.0()
AM
10
50.
25.
0.
21.
0.
21.
.0()
0()
9()
.0()
1(S)
11
0.
17.
0.
21.
0.
21.
.0()
.0()
.9()
.0()
.1(S)
it
10.
25.
0.
21.
0.
21.
.0()
.0()
.9()
.0()
AS)
11
20.
16.
0.
21.
0.
21.
.0()
.0()
.9()
.0()
AS)
11
30.
25.
0.
21.
0.
21.
.0()
.0()
.9()
.0()
AS)
11
40.
16.
0.
20.
0.
21.
.0()
0()
.9()
.0()
.1(S)
11
50.
25.
0.
20.
0.
20.
0()
.0()
9()
.0()
1(S)
12
0.
16.
0.
20.
0.
20.
.00
.0()
.9()
.0()
AS)
12
10.
24.
0.
20.
0.
20.
.0()
.0()
.9()
.0()
AS)
12
20.
16.
0.
20.
0.
20.
.0()
0()
.9()
0()
AS)
12
30.
24.
0.
20.
0.
20.
.00
00
90
.00
AS)
12
40.
16.
0.
20.
0.
20.
.0()
.0()
.9()
.0()
.1(S)
12
50.
24.
0.
20.
0.
20.
0()
.0()
.90
.00
AS)
13
0.
16.
0.
20.
0.
20.
.0()
.0()
9()
0()
AS)
1
WOODLANDS DETENTION POND SIZING
Carroll &. Lange Inc.
*** PEAK FLOWS, STAGES AND STORAGES OF GUI-FERS AND DETENSION DAMS ***
CONVEYANCE PEAK STAGE STORAGE TIME
ELEMENT (CFS) (FT) (AC -FT) (HR/MI1)
27 22. (DIRECT FLOW) 0 40.
320 65. (DIRECT FLOW) 1 10.
254 76. (DIRECT FLOW) 0 40.
19 79. 1.7 0 50.
107 98. .1 1.8 1 0.
318 98. (DIRECT FLOW) 1 0.
1
ENDPROGRAM PROGRAM CALLED
1
AMO Ae J
() Me-C
ENVIRONMENTAL PROTECTION AGENCY - STORM WATER MANAGEMENT MODEL - VERSION PC.1
DEVELOPED BY METCALF + EDDY, INC.
UNIVERSITY OF FLORIDA
WATER RESOURCES ENGINEEERS, INC. (SEPTEMBER 1970)
UPDATED BY UNIVERSITY OF FLORIDA (JUNE 1973)
HYDROLOGIC ENGINEERING CENTER, CORPS OF ENGINEERS
MISSOURI RIVER DIVISION, CORPS OF ENGINEERS (SEPTEMBER 1974)
BOYLE ENGINEERING CORPORATION (MARCH 1985, JULY 1985)
OTAPE OR DISK ASSIGNMENTS
JIN(1) JIN(2) JIN(3) JIN(4) JIN(5) JIN(6) JIN(7) JIN(8) JIN(9) JIN(10)
2 1 0 0 0 0 0 0 0 0
JOUT(1) JOUT(2) JOUTT(3) JOUT(4) JOUT(5) JOUT(6) JOUT(7) JOUTT(8) JOUT(9) JOUT(10)
1 2 0 0 0 0 0 0 0 0
NSCRAT(1) NSCRAT(2) NSCRAT(3) NSCRAT(4) NSCRAT(5)
3 4 0 0 0
1
WATERSHED PROGRAM CALLED
*** ENTRY MADE TO RUNOFF MODEL ***
WOODLANDS DETENTION POND SIZING
Carroll & Lange Inc.
ONUMBER OF TIME STEPS 78
OINTEGRATION TIME INTERVAL (MINUTES), 10.00
25.0 PERCENT OF IMPERVIOUS AREA HAS ZERO DETENTION DEPTH
I
WOODLANDS DETENTION POND SIZING
Carroll & Lange Inc.
HYDROGRAPHS FROM UDSWM2-PC ARE LISTED FOR THE FOLLOWING 3 SUBCATCHMENTS (AVERAGE
VALUES W1THIId TIME INTERVALS)
TIME(HRIMIN) 1 2 3
0 0. 0. 0. 0.
0 10. 0. 0. 1.
0 20. 5. 2. 10.
0 30. 26. 13. 47.
0 40. 51. 19. 61.
0 50. 58. 13. 36.
1 0. 61. 8. 22.
1 10. 61. 5. 13.
1 20. 60. 4. 8.
1 30. 59. 3. 6.
1 40. 58. 2. 4.
1 50. 56. 2. 3.
2 0. 55. 1. 3.
2 10. 54. 1. 2.
2 20. 53. 1. 1.
2 30. 52. 1. 1.
2 40. 50. 0. 1.
2 50. 49. 0. 0.
3 0. 48. 0. 0.
3 10. 46. 0. 0.
3 20. 45. 0. 0.
3 30.
43.
0.
0.
3 40.
40.
0.
0.
3 50.
38.
0.
0.
4 0.
36.
0.
0.
4 10.
35.
0.
0.
4 20.
33.
0.
0.
4 30.
31.
0:
0.
4 40.
30.
0.
0.
4 50.
28.
0.
0.
5 0.
26.
0.
0.
5 10.
25.
0.
0.
5 20.
24.
0.
0.
5 30.
24.
0.
0.
5 40.
23.
0.
0.
5 50.
23.
0.
0.
6 0.
23.
0.
0.
6 10.
23.
0.
0.
6 20.
23.
0.
0.
6 30.
23.
0.
0.
6 40.
22.
0.
0.
6 50.
22.
0.
0.
7 0.
22.
0.
0.
7 M
22.
0.
0.
7 20.
22.
0.
0.
7 30.
22.
0.
0.
7 40.
22.
0.
0.
7 50.
22.
0.
0.
8
0.
22.
0.
0.
8
10.
22.
0.
0.
8
20.
22.
0.
0.
8
30.
21.
0.
0.
8
40.
21.
0.
0.
8
50.
21.
0.
0.
9
0.
21.
0.
0.
9
10.
21.
0.
0.
9
20.
21.
0.
0.
9
30.
21.
0.
0.
9
40.
21.
0.
0.
9
50.
21,
0.
0.
10
0.
21.
0.
0.
10
10.
21.
0.
0.
10
20.
21.
0.
0.
10
30.
21.
0.
0.
10
40.
21.
0.
0.
10
50.
21.
0.
0.
11
0.
21.
0.
0.
11
10.
21.
0.
0.
11
20.
21.
0.
0.
11
30.
20.
0.
0.
11
40.
20.
0.
0.
11
50.
20.
0.
0.
12
0.
20.
0.
0.
12
10.
20.
0.
0.
12
20.
20.
0.
0.
12 30.
20.
0.
0.
12 40.
20.
0.
0.
12 50.
20.
0.
0.
13 0.
0.
0.
0.
1
WOODLANDS DETENTION POND SIZING
Carroll & Lange Inc.
WIDTH INVERT SIDE SLOPES OVERBANK/SURCHARGE
GUTTER GUTTER NDP NP OR DIAM LENGTH SLOPE HORIZ TO VERT MANNING
DEPTH JK
NUMBER CONNECTION (FT) (FT) (FT/FT) L R N (FTj
320 19 0 3 .0 0. .0010 .0 .0 .001 10.00 0
27 19 0 3 .0 0. .0010 .0 .0 .001 10.00 0
19 107 0 1 CHANNEL 4.0 700. .0110 4.0 4.0 .035 6.00 0
254 107 0 3 .0 0. .0010 .0 .0 .001 10.00 0
107 318 9 2 PIPE .1 1. .1000 .0 .0 .020 .10 0
RESERVOIR STORAGE IN ACRE-FEET VS SPILLWAY OUTFLOW
.0 .0 .0 .0 .1 13.6 .3 17.0 .7 19.9 1.1 22.4
1.5 24.6 1.6 25.2 2.0 110.8
OTOTAL NUMBER OF GUTTERS/PIPES, 5
1
WOODLANDS DETENTION POND SIZING
Carroll & Lange Inc.
ARRANGEMENT OF SUBCATCHMENTS AND GUTTERS/PIPES
GUTTER TRIBUTARY GUTTER/PIPE TRIBUTARY SUBAREA D.A.(AC)
19 320 27 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 275.2
107 19 254 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 291.9
1
WOODLANDS DETENTION POND SIZING
Carroll & Lange Inc.
HYDROGRAPHS ARE LISTED FOR THE FOLLOWING 5 CONVEYANCE ELEMENTS
THE UPPER NUMBER IS DISCHARGE IN CFS
THE LOWER NUMBER IS ONE OF THE FOLLOWING CASES:
() DENOTES DEPTH ABOVE INVERT IN FEET
(S) DENOTES STORAGE IN AC -FT FOR DETENSION DAM. DISCHARGE INCLUDES SPILLWAY
OUTFLOW.
(1) DENOTES GUTTER INFLOW IN CFS FROM SPECIFIED INFLOW HYDROGRAPH
(D) DENOTES DISCHARGE IN CFS DIVERTED FROM THIS GUTTER
(0) DENOTES STORAGE IN AC -FT FOR SURCHARGED GUTTER
TIME(HR/MIN) 320 27 19 254 107
0
10.
0. 0. 0. 0. 0.
.a) .00 .a) .a) AS)
0
20.
0. 0. 0. 2. 0.
.a) .a) .a) .00 AS)
0
30.
10. 4. 7. 18. 13.
.00 .a) -50 .00 AS)
0
40.
43. 22. 49. 76. 21.
.0() .0() 1.3() •0() •9(S)
0
50.
60. 16. 79. 45. 85.
.0O .0O 1.7O .0O 1.9(S)
1
0.
57. 9. 67. 28. 114.
.0() .0() 1.5() .0() 2.0(S)
1
10.
65. 7. 70. 16. 85.
.0() .0() 1.6() .0() 1.9(s)
1
20.
58. 3. 65. 10. 79.
.0() .0() 1.5() .0() 1.9(S)
1
30.
63. 4. 64. 7. 72.
.a) ,a) 1.5() .0() 1.$(s)
1
40.
55. 1. 61. 4. 67.
.0() .0() 1.5() .0() 1.8(S)
1
50.
60. 3. 59. 4. 64.
.0() .0() 1.5() .0() 1.8(s)
2
0.
52. 1. 58. 3. 61.
.a) .a) 1.4O .a) 1.8(S)
2
10.
58. 2. 56. 2. 59.
.0() .0() 1.4() •0() 1.8(S)
2
20.
50. 0. 55. 1. 57.
.0()
.0()
1.4()
.0()
1.8(S)
2 30.
56.
1.
53.
1.
55.
.a)
.0()
1.4()
.a)
1.8(S)
2 40.
48.
0.
52.
0.
53.
.0()
.0()
1.4()
.0()
1.7(S)
2 50.
53.
1.
50.
1.
51.
.0()
•0()
1.4()
•0()
1.7(S)
3 0.
45.
0.
49.
0.
50.
.0()
.0()
1.3()
.0()
1.7(S)
3 10.
50.
1.
48.
0.
48.
.0()
.0()
1.3()
.0()
1.7(S)
3 20.
43.
0.
46;
0.
47.
.0()
.0()
1.3()
.0()
1.7(S)
3 30.
48.
0.
45.
0.
46.
.0()
.0()
1.3()
•0()
1.7(S)
3 40.
38.
0.
42.
0.
43.
.0()
.0()
1.2()
.0()
1.7(S)
3 50.
43.
0.
40.
0.
41.
.0()
.0()
1.2()
.0()
1.7(S)
4 0.
33.
0.
38.
0.
39.
.0()
.0()
1.2()
.0()
1.7(S)
4 10.
39.
0.
36.
0.
37.
.0()
.0()
1.2()
.0()
1.7(S)
4 20.
30.
0.
34.
0.
35.
.0()
.0()
1.1()
.0()
1.7(S)
4 30.
36.
0.
33.
0.
33.
.0()
.0()
1.1()
•0()
1.7(S)
4 40.
27.
0.
31.
0.
32.
.a)
.a)
1.1()
.a)
1.6(S)
4 50.
33.
0.
29.
0.
30.
.a)
.0()
1.0()
.a)
1.6(S)
5 0.
23.
0.
27.
0.
28.
.a)
.0()
1.0()
.0()
1.6(S)
5 10.
30.
0.
26.
0.
26.
.a)
.a)
1.0()
.a)
1.6(S)
5 20.
21.
0.
25.
0.
25.
.a)
.a)
1.0()
.a)
1.6(S)
5 30.
28.
0.
24.
0.
25.
.a)
.a)
1.0()
.a)
1.6(S)
5 40.
20.
0.
24.
0.
25.
.0()
.0()
.9()
.0()
1.6(S)
5 50.
27.
0.
23.
0.
25.
.0()
.0()
.9()
.0()
1.6(S)
6 0.
19.
0.
23.
0.
25.
.0()
.0()
.9()
.0()
1.6(S)
6 10.
27.
0.
23.
0.
25.
-a)
-a)
.90
-a)
1.5(s)
6 20.
19.
0.
23.
0.
25.
.0()
•a)
-9()
•a)
1.5(s)
6 30.
27.
0.
23.
0.
25.
•0()
-0()
.9()
.0()
1.5(S)
6 40.
18.
0.
22.
0.
24.
.0()
.0()
.9()
.0()
1.5(S)
6 50.
26.
0.
22.
0.
24.
.a)
.a)
.x>
.0()
1-'1(S)
7 0.
18.
0.
22.
0.
24.
.a)
-a)
-9()
.a)
1-4(s)
7 10.
26.
0.
22.
0.
24.
.a)
.a)
.9()
.0()
IA(S)
7 20.
18.
0.
22.
0.
24.
.0()
•0()
-9()
.0()
1.3(S)
7 30.
26.
0.
22.
0.
24.
.0()
.0()
.9()
.0()
1.3(S)
7 40.
18.
0.
22.
0.
24.
.0()
.0()
.9()
.0()
1.3(S)
7 50.
26.
0.
22.
0.
24.
.a)
.a)
.9()
.0()
1.3(s)
8 0.
18.
0.
22.
0.
23.
•a)
-0()
•9()
.0()
1.3(S)
8 10.
26.
0.
22.
0.
23.
.0()
•a)
•9()
.0()
1.2(S)
8 20.
17.
0.
22.
0.
23.
.0()
.0()
.9()
.0()
1.2(s)
8
30.
26.
0.
22.
0.
23.
.0O
.0O
.9()
.0O
1.2(S)
8
40.
17.
0.
21.
0.
23.
-0O
.0O
.9O
.0O
1.2(s)
8
50.
25.
0.
21.
0.
23.
.00
.00
SO
.00
1.1(s)
9
0.
17.
0.
21.
0.
23.
.0()
-0()
.9()
.0()
LIM
9
10.
25.
0.
21.
0.
23.
.0()
-0()
.90
.0()
1.1(S)
9
20.
17.
0.
21.
0.
23.
-0()
.0()
SO
.0()
1.1(S)
9
30.
25.
0.
21.
0.
22.
.0()
.0()
SO
.0()
1.1(S)
9
40.
17.
0.
21.
0.
22.
.0()
.0()
SO
.0()
1.0(3)
9
50.
25.
0.
21.
0.
22.
.0()
.0()
SO
.0()
1.o(s)
10
0.
17.
0.
21.
0.
22.
.0()
.0()
SO
.0()
l.o(s)
10
10.
25.
0.
21.
0.
22.
.0()
•0()
SO
-0()
1.0(s)
10
20.
17.
0.
21.
0.
22.
.0()
.0()
.9()
.0()
1.0(s)
10
30.
25.
0.
21.
0.
22.
.0()
.0()
SO
.0()
1.o(s)
10
40.
17.
0.
21.
0.
22.
.0()
.0()
.9()
.0()
l.o(s)
10
50.
25.
0.
21.
0.
22.
.0()
.0()
.9()
.0()
AS)
11
0.
17.
0.
21.
0.
22.
.0()
•0()
-9()
-0()
AS)
11
10.
25.
0.
21.
0.
21.
.0()
.0()
-9()
.0()
.9(s)
11
20.
16.
0.
21.
0.
21.
•a()
-00
•9()
-00
9(s)
11
30.
25.
0.
21.
0.
21.
.0()
.0()
.9()
.0()
AS)
11
40.
16.
0.
20.
0.
21.
.0()
.0() .
.9()
•0()
AS)
11
50.
25.
0.
20.
0.
21.
.a)
.a)
.90
.00
.9(s)
12
0.
16.
0.
20.
0.
21.
.0()
.0()
.9()
.0()
AS)
12
10.
24.
0.
20.
0.
21.
.a)
.a)
.90
.a)
.9(S)
12
20.
16.
0.
20.
0.
21.
.0()
.0()
.9()
.0()
AM
12
30.
24.
0.
20.
0.
21.
.0()
.0()
.9()
.0()
.8(s)
12
40.
16.
0.
20.
0.
21.
.0()
.0()
.9()
.0()
.8(S)
12
50.
24.
0.
20.
0.
21.
.0()
.0()
.9()
.0()
AM
13
0.
16.
0.
20.
0.
21.
.a)
.a)
.9()
.0()
.8(S)
I
WOODLANDS DETENTION POND SIZING
CaaoIl & Lange Inc.
"" PEAK FLOWS, STAGES AND STORAGES OF GUTTERS AND DETENSION DAMS'"'
CONVEYANCE PEAK STAGE
STORAGE TIME
ELEMENT
(CFS) (FM (AC -FT) (HR/MIN)
27 22.
(DIRECT FLOW)
0 40.
320 65.
(DIRECT FLOW)
1 10.
254 76.
(DIRECT FLOW)
0 40.
19 79.
1.7 0 50.
107 114.
.1 2.0 1 0.
318 114.
(DIRECT FLOW)
1 0.
I
ENDPROGRAM PROGRAM CALLED
• HEG2 WATER SURFACE PROFILES U.S. ARMY CORPS OF ENGINEERS
' • HYDROLOGIC ENGINEERING CENTER
• Version 4.8.2; May 1091 • WS SECOND STREET. SUITE D
• • DAMS. CALIFORNIA 956184607 '
• RUN DATE I&AN96 TIME 14:31.21 (016)75&1,04
X X XgOWIX X)000( )0)00(
X XX X X X X
X XX X X
)0)0000( ))00( X )1000( )XX)O(
X XX X X
X XX X X X
X X )000000( )0000( )000000(
1
1&MM 14:33:21 PAGE 1
THIS RUN EXECUTED 15JANBB 14:33:21
HEC-2 WATER SURFACE PROFILES
Version 4.6.2; May 1991
TIMAIL CREEK FLOOOPLAIN ANALYSIS
T2FROM STARFLOWER POND TO SHIELDS WITH REVISED POND ELEVATION
T3NORTH SIDE OF HARMONY ROAD
J1 ICHECK 8NO NNV OR STRT METRIC HVINS O WSEL FO
3 0 0 6073.0
J3 VARIABLE CODES FOR SUMMARY PRINTOUT
150 101
OT 2 Be 78
NC B45 .045 .045 OA 0.0
NH 2 .045 176 .016 191.3
X, 71 8 73.A 191.3 70.0 70.0 80.0
X3 10
GR 6073.8 0.0 5073.6 73A 5089B 93.5 5988.2 100.5 5068.8 109.7
OR SOB8.2 142.9 5088.7 175.0 6072.6 191.3
N1 2 .045 195.1 015 218.E
X1 72 9 188.1 218B 325 325 316
X3 10
GR 5076.2 0.0 5078.8 522 5078.7 112.8 5076.6 168.1 5074.5 179.2
GR 5073.1 188.3 5076.5 190.1 50752 213.5 .5076.2 218.0
NH 2 .045 174.8 018 205.6
X1 73 9 120.1 1633 310 310 310
X3 10
GR 5080.6 0.0 WW.5 73 5080.A 120.1 5078.4 137.3 5080 149
GR 5080.7 153.5 SO A 182.1 5081.1 174.6 6082.2 205.8
1
15JAN96 14:33:21 PAGE 2
SECNO DEPTH CWSEL CRNVS WSELK EG W HL OLOSS L•SANK ELEV
O OLOB OCH OROB ALOB ACH AROB VOL TWA R43ANK ELEV
TIME VLOB VCH VROB )NL XNCH XNR WTN ELMIN SSTA
SLOPE XLOBL XLCH XLOBR ITRAL IDC ICON? CORAR TOPNAO ENDST
•PROF 1
0
1490 NH CARD USED
•SECNO 71.000
1530 MANBJGS N VALUES FOR CHANNEL COMPOSITED
3280 CROSS SECTION 71.00 EXTENDED AD FEET
3495 OVERBANK AREA ASSUMED NON-EFFECTNE. ELLEA= 5073.50 ELREA= 5072.60
71.000 4.80 5073.00 .00 5073.00 5073.00 .00 .00 .00 5073.50
79A 0 79.0 0 A 481.2 0 .0 0 5072.60
Z .00 .17 .00 .M0 .042 BW .000 5088.20 74.66
A00004 70. 80. 70. 0 (1 0 .W 118.84 191.30
1480 NH CARD USED
'SECNO 72.000
3885 20 TRIALS ATTEMPTED WSEL.CWSEL
3893 PROBABLE MINIMUM SPECIFIC ENERGY
3720 CRITICAL DEPTH ASSUMED
3495 OVERBANK AREA ASSUMED NONEFFECTIVE. ELLEA= 5078.80 ELREA= 5076.20
72.000 1.74 5074.84 5074.84 .00 5075.29 .44 .00 00 5076.00
79.0 .0 70.0 .0 .0 14.8 .0 1.7 .5 5076.20
A2 .00 5.34 .00 I= .045 .000 .000 5073.10 177.08
M2238 325. 315. 325. 20 18 0 .M 18.00 193.08
1490 NH CARD USED
•SECNO 73.000
3302 WARNING: CONVEYANCE CHANGE OUTSIDE OF ACCEPTABLE RANGE. KRAT1O = 2.22
3495 OVERBANK AREA ASSUMED NONEFFECTIVE, ELLEA= 5080.40ELREA= 5080.70
73.000 2.69 5078.99 .00 .00 5079.14 .15 3.88 00 5080.40
79.0 .0 79.0 .0 .0 25.A .0 1.9 .8 5080.70
.04 .00 3.11 .00 .000 .045 .000 .000 607BAO 128.14
.008550 310. 310. 310. 7 0 0 AD 19.59 145.73
1
151AN95 14:33:21 PAGE 3
THIS RUN EXECUTED 15JAN98 14:33:21
HEG2 WATER SURFACE PROFILES
Version 4.6.2; May 1991
NOTE. ASTERISK C) AT LEFT OF CROSS-SECTION NUMBER INDICATES MESSAGE IN SUMMARY OF ERRORS UST
SIDE OF HARMONY ROAD
SUMMARY PRINTOUT TABLE 101
SECNO EGOC ELLC EGIC ELTRD OCULV OWEIR CLASS H4 DEPTH CWSEL VCH EG
1
151ANSB 14:33:21 PAGE 4
SIDE OF HARMONY ROAD
SUMMARY PRINTOUT TABLE 150
SECNO
M.CH ELTRO ELLC ELMIN 0 CWSEL CRNVS EG
10'KS VCH AREA .01K
71.000
.00 .00
.00 5089.20 79.00 5073A0 .00 5073.00 .D9
.17 461.17 409.47
• 72.000
315RD .00
.00 5073.10 79.00 6074.84 6074.04 5075.29 322.38 5.34 14.79 4.40
• 73.000
310.00 .00
.DO 507BAD 79.00 5078.99 .00 5079.14 65.50
3AI 25.42 9.76
1
151A496
14:33:21
PAGE 5
SIDE OF HARMONY ROAD
SUMMARY PRINTOUT TABLE 150
SECNO
0 CWSEL
DIFWSP DFVVSX
OIFKVVS TOPWIO XLCH
71.000
79.00 5073.00
.00 .M
.M 116.84 .00
• 72.0W
79.00 5074.84
.00 1.04
.M 18.90 315.00
• 73.000
79.00 5079.99
.00 4.15
.00 19.59 310M
1
1&PM 14:33:21 PAGE 6
SUMMARY OF ERRORS AND SPECIAL NOTES
CAUTIONSECNO= T2.0W PROFLLE= I CRITICAL DEPTH ASSUMED
CAUTION SECNO= 72.000 PROFLE= 1 PROBABLE MINIMUM SPECIFIC ENERGY
CAUTION SECNO= 72.000 PROFLLE= 1 20 TRIALS ATTEMPTED TO BALANCE WSEL
WARNING SECNO= 73.000 PROFLLE= I CONVEYANCE CHANGE OUTSIDE ACCEPTABLE RANGE
Carroll & Lange
V,A0
165 South Union Blvd., Suite 156
Lakewood, Colorado 80228
303/980-0200
F1ax:303/980-0917
PROJECT
Subject j►1
BSc. lire" �ro-i%'�_ C� L 5
�N
S Wale_ CgP,tc CS —
Cveci "vh atS)I'l /t-
So �
c zoo
a 100 = le, a A�
Job. No. Z7 7 7
Sheet —L of
Date 28 n-b-V 9S-
By -T1A-
n h
V� ; ys��lJ . 01 L -33
y�. C
.o
5
Grp o ��o hJ t�J ' So w.e JL.-,�1 less '1 C
OS� -� -7r�-I. err0r if vas 0.4Z�
Carrol I & Lange uG
" 165 South Union Blvd., Suite 156
Lakewood,LakColorado 80228
303/980-0200 , 7
Fax: 303/980-0917 Job. No.
Sheet z'of3—
PROJECT Date
Subject By 45!!�"
l.q
by
AsSJV"-p_ p't f�1._ 0• 1S ! — S10?e. _ 7-%
(7,40)
2= - 4,0-25
0,07s�.y 9 Ps
(1 -14 9)( ,S�--
Carroll & Lange
165 South Union Blvd., Suite 156
'
Lakewood, Colorado 80228
303/980-0200
Fax:303/980-0917
PROJECT Wood blh?s 5
Subject M�'sc_ Dv�
J
co r L op f
Job. No. ' H7 7
Sheet -:3-- of
Date -0b 9�
By �r
,,,,;-� �. 6 �� �a• ; U� � : ► � � �s `-� Pei �'� So y
v
AEG �a ..
�C)
QlaJ-
p'/T, Siwve' <��o�� jij _ Slope=
So Zoo 0
STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA FIGURE 9047
No
PA
5
f-
w
J
Z
DEPTH OF PONDING (ft.)
0
TYPE-13 COMBINATION — —
— —
CURB INLET TYPE-R
0
Ile
/
g
V%
O0J
;
0 0.2 0.4 0.6 0.8 1.0
PEI!/O//9/BgPER ✓6o�. G4, DEPTH' OF PONDING. (ft.)
Date: NOV 1984 [REFERENCE:
Rev: JULY 1985 WRC ENGINEERING. INC.. TM-2 AUG. 1984
8000
7000
6000
5000
U l4l
04Z41f
1000
900
800
700
M11 600
500
O 400
300
BL
200
100
90
80
70
60
G141
40
30
20
IE
From BPR
C,
r
i
N IS ROUGHNESS COEFFICIENT IN MANNING
10
FORMULA APPROPRIATE TO MATERIAL IN
BOTTOM Of CHANNEL
.OB
2 15 RECIPROCAL OF CROSS SLOPE
REFERENCE:
H. R. G PROCEEDINGS ISM.
07
FADE 150. EQUATION 4141 '
.06
EL�
EXAMPLE (SEE DASHED LINES)
,.
.05
0.03
100
7O
\GIVEN
Cn
a0
41
1/0 IE00
^
LL
] • 0.22
20
FIND, O • 2.0 GFS
------
to -
__��_
Z
3
Z
rA.
v
1
.7
r�
a
N
.3
.03
2.0
IE
80
70
.60 4-4-:Z-
.50
- tL
40
Z
.30
.02
...
.20
INSTRUCTIONS 0 ( O1
Cr Z.07 w
I. CONNECT [/11 RATIO WITH SLOPE ISI Q ,05
AND CONNECT DISCHARGE (0) WITH = O3 Z •GOB
DEPTH (D). THESE TWO LINES MUST U .02 Q .007
INTERSECT AT TURNING LINE FOR VI T
COMPLETE SOLUTION. Q .01 U .006
2. FOR !MALLOW I - T - I LL .005
V-SHAPED CHANNEL O
AS SHOWN USC N00
0GRAPH .004
WLTN i 1
7 w
a
r ; O .003
].0' DETERMINE J
DISCNA RGE GP IN T ° N
PORTION OF CHANNEL _ (�
HAVING WIDTH [: I�-N--
OCT ERMINE DEPTH ] FOR TOTAL DISCHARGE 19
.002
ENTIRE SECTION 0. THEN USE NOMOGRAPH TO
DETERMINE OP 1N SECTION ° FOR DEPTH
.. • ,- (4)
r U
A. TO DETERMINE DISCHARGE
IN COMPOSITE SECTION:- a a
3
fOI LOW INSTRUCTION ! ( EP I
.001
TO OBTAIN OISCNARGE IN It_A 1.i -•iI
SECTION a At ASSUMED ZPIJ-ll
DEPTH ]; OBTAIN O FOR
SLOPE RATIO EP AND DEPTH )' THEN O, OP . 0.
Figure 4-1
NONOGRAPH FOR FLOW IN TRIANGULAR GUTTERS
(From U.S. Dept. of Commerce, Bureau of Public Roads, 1965)
%
_Z
a
I-
(n .10
W
0- .08
w
w .07
C3
/y .06
SL
0 .05
m
Q' .04
U
.03
Q
~ .02
a
w
G
MAY 1984 4-3 DESIGN CRITERIA
Appendix B
Erosion Control Calculations
RAINFALL
PERFORMANCE STANDARD EVALUATION
---------------------------------------------------------------------
PROJECT:
kxC)O�LRNAS 7=A1+i1..y (9PArzr 9FA/73
STANDARD FORM A
(COMPLETED
BY: `rMR
DATE: 10151 �I.S
1---------------------------------------------------------------------
IDEVELOPED�ERODIBILITYI
Asb I Lsb I Ssb I Lb
I Sb I PS
SUBBASIN
---------1-----------
ZONE I
I-------
MoD'cRR�
(ad)
63
I (ft)
I----- --1
1 1000'
I (%) .l(feet)
-------
I, a �b
1-------
WOO/
I (%)
I
I (%)
I-------
I � � %
I' II II I I I
I I I I I I
wlodct ,{L I ZOO 12.0% 7,00 75
-IA3LE SI
----------------
DI/SF-A:1989
EFFECTIVENESS CALCULATIONS
-------------------------------------------------------------------I
PROJECT: wwDl.AIvLn FRnll-y fi1*RT-ME5WrS STANDARD FORM B
I
COMPLETED BY: 1--, M, 6 . DATE: /o/Sl`/S
Erosion Control
Method
I
------------------
R.uufe bt;vt * Po.-k;Aly
!
a
U Co-t Su ; )
3.
GRaurt ,FILTERS
4
SILT I:E^W-B
s,
SrnRw AuLcH
MAJOR
BASIN
Afoot-
--------------
PS (Iwo) BASINSUBII
_I
78,9 I'�A;01� I
AREA
(Ac)_
G.3
-D I W-s 1 -0 10.9
C-Factor P-Factor
Value
Value
Comment
---------------------------------
0.61
1 vo
PAUE-Q),t Ga-rrRucrE'D
1. 00
/ -co
SAHVKr + COIJ4710A
�•C�O -
�0 `�0
/}l 1NLF7 1
U Sd
Dccvo57'71
I
o, ob
I, oo
RLL 3i57-( t3r-,) /ARiRS
--------------------------------------------
Nor P AUE6 I
CALCULATIONS
------------------------------
-06 3.83j-F 1.0(0)_ L•�3
.3
etc
E r- I GXA) I00
90.8
70
Chaf = O 9 X,O�
0,11
O,q l 0S0
c,qo
57c
----- ------- ------ ------- ---------------------------------------------
)I/SF-B:1989
CONSTRUCTION SEQUENCE
PROJECT: 11MILi ANDS ERMIV STANDARD FORM C
SEQUENCE. FOR 19 ONLY COMPLETED BY: ,'M R DATE:
Indicate by use of a bar line or symbols when erosion control measures will be installed.
Major modifications to an approved schedule may require submitting a new schedule for
approval by the City Engineer.
YEAR llg56
MONTH rl
---------------------------------------------------------- ----- ------------------ --- ---
�
OVERLOT GRADING iCoOMPLETFij AND 'i�1r5L'�: � ,1 �►J (`-�80
WIND EROSION CONTROL
Soil Roughing
Perimeter Barrier
Additional Barriers
Vegetative Methods
Soil Sealant
Other
RAINFALL EROSION CONTROL
STRUCTURAL:
Sediment Trap/Basin
Inlet Filters
Straw Barriers
Silt Fence Barriers
Sand Bags
Bare Soil Preparation
Contour Furrows
Terracing
Asphalt/Concrete Paving
Other
VEGETATIVE:
Permanent Seed Planting
Mulching/Sealant
Temporary Seed Planting
Sod Installation
Nettings/Mats/Blankets
Other
X
X
STRUCTURES: INSTALLED BY MAINTAINED BY
VEGETATION/MULCHING CONTRACTOR
DATE SUBMITTED
HDI/SF-C:1989
APPROVED BY CITY OF FORT COLLINS ON
PAGE 23
1
0 1 o)rnooc
1
O 1 4 4 Lc; Un Un
t.c) I q q 00 CO q
C I Ot m O) O) C C C O C C
1
G 1 c-cl: -c:r -zrtn t.n tt In tl: tf)
c I g q q q 00 q q q 00 q
1
C 1 q 0) G) O) Q1 0) G) 01 0). O) 0) 0) O O C
1
C 1 444444 ;11; 41;�; V UP UL Lf
M I g q q q q 00 q q q q q q q q 00
I
O 1 I,- OG q q O) 0) C) (n ON O) T a% cn 0) O+ O 0) m O) O
1
N 1 0000 00000 00 q co 00 00 g q q co q co co 00 00 00 '
1
C I C M c t.f)k0 k0 t0 t0 1� 1l 1, 1� 1-- I� I- r�, t-- 1-- 1--1, q q q q q q
1
O 1 44C'ctd'mtc�-tilC cr ct cr ct c C' ct ct C' cT ct C'-Z:r GY
.-r I q q co co g q q q CO co co 00 q 00 co 00 g 00 q 00 q 00 q q q q
I
O I gNMCtAlOtf)1010101010t01l1.-IlI�-Ilr�Il-1�I-1"a0gq
. 1
i g q q q W q q q q qco
q q q q q q q q q q q q
1
O 1 t0 O N M d' c7• u': t.[) 1.[) t.f) t0 l0 t0 kO t0 t0 t0 t0 t0 10 1� n n f` n n
• 1
q 1 Mccca'cl'CCVcct d'a'ccct •7 �'ccccccV'c
1 g q q q q q q q q q q q q q q q q q q q q q q q q q
1
O 1 ct O) r1 N M M C V to to to Ln In I!) l.C) Lf) If: l0 l0 i0 kO t0 l0 1�
• I
i qqq M W g q q M M q W M M q M q Cc M M M g CO CO q CO
1
O 1 OIDgO.--1 .--4NNMMMMca'c cl'Gt cf ct tf: lLi l0 In t01D
1
l0 IMMMC V'C'ccd'ct C'cY cT'c cct ct c st ctC �'cctcc
1 0000 00 00 CO CO CO 00 CC 00 00 CO q 00 00 q 00 CO 00 CO CO CO CO CO CO CO
1
^C 1 LO N U) 1� g M O O .--I r+ rl N N N N N M M CO M M c c c V c
vin I NMM(MMMccccca'ccccccccccccvc
I all q q 00 0000 q co 00 q CO 00 g q q 00 q q co co 00 co g q q q
W 1
0_t17 I q r1M Gt L['. �, tD lO I�r,I� ggqq 0.: gO)OI C)CCCOO
O . 1
Nc i qq q CC OO q qq qq qq qq qq g q q q q �q q q
1
O 1 t0 LO W OtiNMcrd LO LO In 110 t010 l0 l01l 1� n n qqq O: 01
• I
1 r+NNMMM
I q O0 M M M co M M M M M M M M M M c M
CG 0 q CO co 00 0000 00 00 00 co 00 00 00 00 00 00 00 co 00 co o
q
1
LO 1 r-1 r4 In I�qO C ryNNMMMd'-Zr C'c c}'1.[')10 Lo10 t0 k01-,1-,
• 1
M I e--1 N N N N M M M M M M M M M M M M M M M M M M M M M
1 g 00 00 q 00 00 co q CO 00 00 q 00 00 00 g q 00 q q q q 00 co 00 00
1
O I M NkO q O) C.- i N N co M M c c d' -zt10 LO 10 LO 0�Ok011 O
• I
M I C 00 00 N N N N N N N N N N N N N N N N N N N N N
I CO CC
q CO q q q q g CO q q q q q q q CO q CO CO q q CO q q q CO
Ln 1 LOUO0)NMcr t0101� I� 1� co co coO) O) O O) IT ) O) 000000
I .
N 1 O) O O '-1 .--1 r-1r+ .--I rl .--1 e-I N e-+ e-1 '-1 r•1 rl N N N N N N
1 t\NOO CO OO OO CC CO OO q OC q 000000ggqqqqqqqqq
1
O I ct In CD M LO l0 co co O)O CD O r-1 r"1 N N N N M M MM M M
I
N I q Q7 O O O O C O O .-+ N .--I e4 r/
t t\ r\ q OJ O0 00 N N GO q CO CO g q q q q q q q q q q q q q
I
LO 1 qN q.--Ict!'f 1�1,g0)O)00MMMMM
qq 0) O)O) O)O) 0) O) O) O 0000O O 00 O O O O 00
1 1� 1� 1, 1l 1� 1� I, Ih I -I 1-I 1� q q q q q 00 00 00.00 0000 0000 CO 00
1
O 1 t0 M O ct 1� O) O .--1 N M M mt c t!'f U'I I17 61"1 )0 k0 k0 l0 I, f\ tD lD t0
r 1 i �r l O 1� 1-� 9 1l g q q q q q q q q q q q q q q q q q q q
1 1-I I -I n n n n n n n 1\ 1` n n n n t\ n n n n n n n n n n
1
lf1 O)O .l01� . .t�l�I�1010 �0 t0 d. c(MM .N O)lO .r. O)lo
. .
I
O I O N N N N N SV N N N N N N N N N N N N N r-+ .-I e-y r•/ O O
1 i I
1 3 CD I ^ I O O O O O O C O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
I OF- CD CD O CD CD O O CD CD CD a) O CD O O O O CD CD CD CD CDC C CD CD
I J= LL. I .--IN MCY LO t01lq 0) O 14 N f4�'Ln l01-4 14r COCm Czr I)O
1 LL. W v 1 e-1 r-1 .--1 r1 e-I r-I � rl ."'1 ."'1 N N M M C' d' L[1
I _1 1
TABLE 5.1
PAGE 26
0.40
0.35
0.30
0.25
0.20
0.15
0.10
0.05
ESTABHED GRASS AND C-FACTORS
FORT CORNS, COLDRADO
i
.............
..............
................._.
7.
.:.
;.............
.............
............ ._...
.... ......
..........
I
I
.............
..............
:............. s.............
,..............
i
1.............
!
i.............
!
!....... .....:1.............i
......... .I.............
�
1
............................................
I.............�........:
.............1......
.............
i .............
.... ........
.............
....... ......i.........
.............
..........................
.............
�a 20 30 40 50 sa 70 80 90 100
ESTABUSHED CRASS GROUND- COVER (7)
FIGURE 5.1
PAGE 24
Table 5.2 C-Factors and P-Factors for Evaluating EFF Values.
Treatment
C-Factor
P-Factor
BARE SOIL
Packed and smooth . . . . . .
Freshly disked.
.1.00
1.00
. . . .
_Rough irregular surface . . . .
1.00
1.00
0.90
. .
. . .
0.90
SEDIMENT BASIN/TRAP. . . . . . . . . .
. . . . 1.00
0.50(1)
STRAW BALE BARRIER, GRAVEL FILTER, SAND
BAG. 1.00
0.80
SILT FENCE BARRIER . . . . . . . .
. . . . 1.00
0.50
ASPHALT/CONCRETE PAVEMENT. . . .
0.01
. .
. . . .
1.00
cSTABLISHED DRY LAND (NATIVE) GRASS. . .
See Figure
1.00
SOD GRASS .
. . . . . . . . . . . . . . .
. . . 0.01
1.00
TEMPORARY VEGETATION/COVER CROPS .
0.45(2)
. . .
. . .
1.00
HYDRAULIC MULCH @ 2 TONS/ACRE. . .
0.10(3)
. . .
. . .
1.00
SOIL SEALANT . . . . . . . . . . . . .
. 0.01-0.60(4)
1.00
EROSION CONTROL MATS/BLANKETS. . . . . .
. . . 0.10
1.00
HAY OR STRAW.DRY MULCH
After plancing rass seed, apply mulch
at
a rate o 2 tons acre minimum).and
adequately
anchor, tack or crimp material into
the soil.
Maximum
Slope. Length
(feet)
1 to 5 400
6 to 10 200 : *
0.06
1,00
11 to 15 150 . . .
0.06
0.07
1.'00
1.00
16 to 20 100 . .
21 to 25 75
0.11
1.00
.
25 to 33 50
. . . 0.14
1.00
..
> 33 35
0.17
1.00
0.
1.00
NOTE: Use of other C-Factor or P-Factor
table
values reported
in this
must be substantiated by documentation.
(1) Must be constructed as the first step
(2) Assumes planting by dates identified
in overlot grading.
or hydraulic mulches are not required.
in Table 7.4
thus dry
(3) Hydraulic mulches shall be used only
May 15
between March 15
and
unless irrigated.
(4) Value used must be substantiated by
documentation.
PAGE 25
Table 3.2 C-Factors and P-Factors for Evaluating EFF Values
(continued from previous page).
Treatment
C-Factor
'P-Factor
CONTOUR FURROWED SURFACE
Must be
maintained throughout
the construction
period,
otherwise P-Factor =
1.00. Maximum
length
refers to the down slope
length.
Basin
Maximum
Slope
Length
( o)
(feet)
1 to 2
400 . . .
. . . . . . 1.00
0.60
3 to 5
300 . . .
. . . . . . 1.00
0.50
6 to 8
200 . . .
. . . . . . 1.00
0.50
9 to 12
120 . . .
. . . . . . 1.00
0.60
13 to 16
80 . . .
. . . . . . 1.00
0.70
17 to 20
60 . . .
. . . . . . 1.00
0.80
> 20
50 . . .
. . . . . . 1.00
0.90
TERRACING
Must contain 10-year runoff volumes, without
overflowing, as determined by applicable
hydrologic methods, otherwise P-Factor = 1.00.
Basin
Slope
(%
1 to 2 . . . . . . . . .
. . . . . . . . 1.00
0.12
3 to 8 . . . . . . . . .
. . . . . . . . 1.00
0.10
9 to 12 . . . . . . . .
. . . . . . 1.00
0.12
13 to 16 . . . . .
1.00
0.14
17 to 20 . . . . . . . .
. . . . . . . . 1.00
0.16
> 20
1.00
0.18
NOTE: -Use of other C-Factor or P-Factor values reported in this
table must be substantiated by documentation.
Carroll & Lange
165 South Union Blvd., Suite 156
'
Lakewood, Colorado 80228
303/980-0200
Fax:303/980-0917
PROJECT WOO J10vlh)
Subject VmGinvl Ca.-d t—a Cask Flo
Job. No. I 'k `7 7
Sheet --I- of
DateU_ 9
By tip'
1200 L,� �c Z_DO�LF. 4v24ob
15-iN L'i -&-,1LVs
7S LF7 x 42.0614F
G, 7 Acres x 44100
S+ra ,U' , nit) le- -,-
6_77 Ace x4ZT01A
'.gt ism --
*/67Z--
ay
FsG � /OSSZ- S'a
--_ --v ----- OIL!
II I I L Ip 1\
F
x�
II I I II'
tM W xEEns xD rxass II III
L`\ ROM a+' s aT E s➢NL
ARE IN AS Git
ARMY SEA a T ON 11 1 1 III
POSTING VEMENT AREAS III II TGB 85.0
/i
x
SA
IN. Hit NO
/1
iG �c
n
Lil
W
R-
Do
(/)
LJ
L
REC BLDG
LEGEND
NOTE. A PORTION OF THE EXISTING PRIVATE DRIVE AND PARKING
-e: m'
EXISTING STORM SEWEa
AND ALL UTILITIES WERE CONSTRUCTED IN 1980 PER THE APPROVED
F. �. �.
UTILITY PLANS PREPARED BY THE CORNELL CONSULTING COMPANY.
CONSTRUCTION AT THIS TIME IS ONLY FOR THE COMPLETION OF THE
x -
EXELFING SPOT ELEVATION
PRIVATE DRIVE AND PARKING AND MODIFICATIONS TO EXISTING UTILITIES
AS NEEDED TO SERVE THE APARTMENT PROJECT.
-- -
EXISTING CONTWR
THESE UTILITY PLANS INDICATE THE ASBUILT INFORMATION FOR THE
- ._
PROPOSED FINISHED CONTOUR
EXISTING UTILITIES AND PRIVATE DRIVES AND INDICATE THE WORK
NECESSARY TO COMPLETE THE SITE DEVELOPMENT.
1 "c
PROPOSED TOP OF CURB ELEVATION
BENCE.MARK CENTER OF INTERSECTION ® HARMONY & SHIELDS
_y up
.�
PROPOSED UP OF VALLEY PAN ELEVAnCN
(FLONLINE ELEVATION 15 2" LOWER)
q" $T!�EL DISC, ELEV.=SBSS,O2
PROPOSED 6' VERTICAL CURB
-
W/I.0' SPILL GUTTER
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
IFF-�
EXISTING CURB IF CUTTER
APPROVED
TG19=85.0
PROPOSED TOP OF GRADE BEAM ELEVATION
Director of EnginIII Date
®
BUILDING IDENTIFICATION
CHECKED BY-
Water & W etenaler Utility Dale
CHECKED BY
-� 27 SWUM CONVEYANCE ELEMENT Stormwot r U`Ilit _ Date
i
- CHECKED BT'
Q EXISTING TREE Parks HE Recreati a Date
I
A BASIN LABEL, 'NTH RATIONAL CHECKED BY
Date
aa<A %.x C VALUES AND AREA NED BY
HE
Date
XX. He _ DAMAGE DEVELOPED 2-- \\\Syr
X.%. its AND 1Mr FLOWS
g ���✓ 6i
� DRAINAGE BASIN BOUNDARY $�0 \
J Y DIRECTION OF FLOW i
\ FP \� x \ HEC-2 ,OO YEAR FLOOD PLAIN uOOo RELMOVE EXISTING CURB OPENING -
B O�� _� •� AN CHASE AND REPI *RCP
Aa 15 TYPE R AND AND 15' RCP
AFF
0.89 732 MATr1,
All
EXISTING
It
A, s ERasm
RCT.TNE( TIRLET "a
I(VG 4rv.. 6 RWM� >�r RPAN - �. 7iGLeG,'NGTW WS M 1 d E Yi CURB) M a/- '.r0
F iRfP O 3.
INEPT
i0 EMSi. AREA NO
mN —
NOR
IN
fi A
vz -l5 8 f
.yv ,IgO 50' S.3 Or s I' III
I
FL
I �iii 96 UP
Xor CAN
I
0
EXIST. DETENTION POND
VI 2,01 OF
VANI 2-01 OF
HOOT RELEASE
100�E RELEASE
(PROPOSED) Us
_ ICaF W.S .= 50/30
Ewsr. x" rTs C _ u 6 4 u i-
3zD s/ B,/.r
L
�D
200 3 FM-N
fC -Scu - - — --�� - .. _ _ __.- - l "t , EXIST -13 ♦
NCC
i1
\\l r.�Mam:D 9T -
' HEC-2 � SqE} xIN
_ _ _ _ __ -_-eeeeeeeew EXISTING
u
HEC-2
�_ APPROXIMATE 100 %<
-
CROSS iEcilpry J'.- _.
- _ _ _ _ _ _ _ --
__ _. ROSS-SECBON-i? -
- _ >cF_YVA9ERS,MFACE'PfR-
WSE _ 7899
WSE 74B4---
HEC-2'WAFF MODIFIED POND
` QtOii- '
-
_- _.
___NR W@L44H€D---
73.0
___ ___
--
GLICR-E1RA1r
FOR 1HI5 ARE -�
-
- _ --
6Y
DRAINAGE SUMMARY
-� 43
A i` n'
BASIN
C/
CIGD
A
01
OIGG
Al
0J0
CHIP
400
5.9
21A
Az
¢To
-sae
D-2r-o.-a
Ts
B
0)0
0B6
089%q
52
C
070
- ON
2OO
2.9
198
"D-
_070
0.11
0.32
0.6'
20
aI ,6SAN aW ER eIa HARI ONY ROAD eEN,EN are B
Deco=PGH2 UDro1n-PA s' o 2q / 207 5
SWALE 4G z z R c« ceG I o C. 0 O O R% q o o B
__ ii!(
CROSS-SECTION -A--A - -._-. _- --- __._ _.-
N.E �34�C�77000 3
ITS .A —_
- LA1 2 BUSI PAYS ....._...�. 2 PER CITY COMMENTS 1/P
Revisions
Project
®
WOODLANDS
Carroll &
SawwwasENI Ned Lange
a m, ASK1S,,.p.
IM w shot u
FAMILY APARTMENTS_
-..
—
Ttle.
FINE GRADING
M DRAINAGE PLAN
Desgned
By, 1MB
Scale:
1'=30'
Shoo b
of 10
-
Rfic
s
Drawa B : TWK
y
Joe Na.
1QJ
By
CPecked
By
Date:
OC-'OBER, 1995
File No.
GRADING
WGODIANDS EAMILY ANI FINE GRADING k DRAINAGE
PLAN UN I
0
N q Ma
IN
J D\
EdI II I t
S
l Earn �./;, ci
pr dLGG
POOL
LEGEND
CITY Of FORT ,
-" -- - - _ -- -- UTILITY PLANAN APPROVAL
J4AL'
it
EXISTING STORM SEWER
OVERLOT GPA NG
APPROVED
EXISTING SPOT ELEVATION D E v 9 Jate
/
MND ER051 CONTROL
O v
Soil R gh I g_
-- - EXISTING CONTOUR water IS W t ter Uday Dote
Perimeter
AeBr
- --5081 PROP05ED FINISHED CONTOUR CRy*O) By
V It f M in
swmwa U j r
a9a 0s
7553 LIP
Y�
PROPOSED TOP OF CURB ELEVATION
cmm BY
Soil Seatfant
Other
PROPOSED LIP OF VALLEY PAN ELEVATION
Pwke k R,KOR onP.L.
RAINFALL EPDSION CONTROL
(FL09LNE ELEVATION IS 2' LOWER)
ECTED m
STRUCTURAL:
Ate
Sediment R p/B si a
PROPOSED fi CURB
Inlet
FltStraw
W/I D' WILL CUUTTERTTER
(SIGNED Wr
Barriers
-lT
EXISTING CURB &GUTTER
Silt F B rs
dBg
�.
TGBI
PROPOSED TOP OF GRACE BEAM ELEVATION
Bare 5 T yrenowaters
Ccnhour herowe
X
/p
CAT)
IDENTIFICATION
9
Aspholt/Concree Paving
Othe
AP
\�
SAVM CONVEYANCE ELEMENT
A PORTION OF pE EXISTING PTl DRIVE AND PARKING
V CETAT VE'
Pernfortent.seed
AND ALL UTILIGNES XEAE "STRUCTED IN USERS PER THE RAPPERROVED
PlanFng
Un ITY PLANS PREMED By nK (CORNER CONSULTING c`ryP NY
dulching/Strolant
EXISTING TREE
(Y1151RUC1NM AT Tltl MEW IS MLY PON M 4WPLEnON By, Ran
himpordie, Seed Planting
PERIEVATE MEW AND PARE AND MLdi1LAnCHSTO MISITING UTILITY
Sod InEmahotan
\\
®
AS NEEDED TO SERVE TM AP ERTNEIU 0.FKT.
TNESE URTATY PLANS M01CA2 INS TBNLT
Setting M is /Blankp<5
,��
SILT PENCE
MM
0AMI OR US
Other
II
x ��
ELSTMO ES UnUTAND PRIVATE [PETERS M D DCATE THE RERtt
`I
NECESSARY TO COMPLETE THE SITE 01WLCPMENT.
rF/, IP
INLET PROTECTION
CENTER OF INTERSECTION
©
KHICIE TRACKING CONTROL
AT HARMONY AND SHIELDS
A' STEEL DISC, ELEV.-5085.02
\\ ®Al8 STRAW BALES
FOR EROSION CONTROL NOTES AND
VEGETATION / COVER CROP SPECIES TgBLE
SEE DETAIL SHEET, SHEET 10 OF 10
\A\U Ys v
\ F a.
B
_ IN ep
dd
a
.,
IL,
hl
sH
ry
VA �1ILL� n
T553 he 1 1.55
II �� TA OI UP 1 `q TGB iB.D
II
d
I oQI.pa 2� / __ - •V tiN
� of /
wit" SIB
LI IS
a ° Hilt z,d w/ a • �," ^
i i 9 rAl6 e
I I I \ fh ._.E/ A� a
I o
�O
N TA1 - I Tn MRs.ee
Tf
STD e ��• wIs\
TIRE le _ r Y _ _ RED �IF Tl STRATEEN.67.9 AN
_ r
b/ A _ i.. OUTING DETENTON POND A
i�
T�• PROP�DOLD IItia GUBB
SMUcwRE
// Exls. E S J a E I
x
MK�6S9 AN -
w-_�w / Ss'- S .ry TO BE RFL O/Y£D
lz�x Is
__ (a CI a �- _ _ I(�+,1¢B�PfeU.Y�rdL�/ dlsi 36 EE
/ M
• s
_ X
o—
� Nv
E19S9NGAV
- iEvrtr
in
HARMONY ROAD � G wDN a shr troll & Lange a
7 PRE
o G 0040 o O B W _ _
--_ - —. -_ - — — ---- —.. _. _..� 5 Protest WOODLANDS FAMILY APARTMENTS
^^CC<< a<L. ARTMENTS
--- -- _ - _ - Sz i:O �ll OO on rne_EROSION CONTROL PLAN _
��21MDMI � GET' 2. PER Pit OOIMdrz TERMS III Des gned BY TMB Sheet > of 11
ED MVAIVS PER GTY WIYFHIS IN 5 RBC 5 ale: 1`=b0
OR M MUNNG rc- w nuwrz I UI /Y Drawn 3Y' TM( Job Na. 1477
DERouwD No Revisions Date By Cbacketl Bis Dote: -,TOBEA, 1995 File No. GRUDIN