Loading...
HomeMy WebLinkAboutDrainage Reports - 10/21/2025October 16, 2025 Derek Lutz Stormwater Engineering City of Fort Collins 281 North College Avenue Fort Collins, CO RE: Spirit of Joy Landscape Improvements Drainage Analysis Lot 1, Spirt of Joy Lutheran Subdivision Dear Mr. Lutz: Bulldog Engineering has completed an analysis of the drainage design for Lot 1, Spirt of Joy Lutheran Subdivision to determine the changes from the original to the proposed design. Reference Exhibit A. The original design is defined within the following drainage report: • Storm Drainage Report for Lot 1, Spirit of Joy Lutheran Subdivision, prepared by Stewart & Associates, Inc., revised April 19, 1991 • Storm Water Run-off & Water Quality Calculations for the Spirt of Joy Church, prepared by Forbes Engineering, Civil & Structural Engineering, revised June 1, 2011 The original basin’s composite runoff coefficient from the Storm Drainage Report for Lot 1, Spirit of Joy Lutheran Subdivision & Storm Water Run-off & Water Quality Calculations for the Spirt of Joy Church have been compared to the composite runoff coefficient of the site after the proposed landscape improvements to determine if further analysis would be required. The original design’s composite runoff coefficient was determined to be 0.57 in the original report from 1991 and 0.45 in the Drainage Memo from 2011. Reference Exhibits C & D respectively. The overall composite runoff coefficient of the proposed lot, after the landscape improvements have been completed, is calculated to be 0.44. Reference Exhibit D. Based on the calculations, no increase in the developed runoff is anticipated and the proposed percent impervious and composite runoff value is less than what was used for the original design. Additional water quality will not be required. The intended drainage patterns will remain the same as the detailed analysis completed in the Storm Water Run-off & Water Quality Calculations for the Spirt of Joy Church, so detailed analysis of the changes will not be required. Reference Exhibit D. The proposed runoff patterns are consistent with the overall drainage report. Runoff from this site flows to the southwest into the private water quality pond for the site as it was originally designed. The existing infrastructure will convey the runoff from only the improved development to the existing private water quality pond. The existing water quality pond has previously been sized to accept developed runoff from this site and provide adequate storage based on the runoff coefficient values stated above. The pond outlet structure has been designed info@bulldogeng.com 970-460-0089PO Box 114 - 1540 Main Street - Suite 218, Windsor, CO 80550 BULLDOG ENGINEERING Grading/Stormwater Plan Accepted (Building Permit Released) Accepted by: Date: SW - DEREK LUTZ 10/21/2025 to treat and release the calculated water quality capture volume for the development within 40 hours to the existing storm system as detailed in the Storm Water Run-off & Water Quality Calculations for the Spirt of Joy Church, prepared by Forbes Engineering, Civil & Structural Engineering, revised June 1, 2011. Reference Exhibit E for the water quality capture volume design completed in 2011, which further demonstrates that the existing water quality pond provides more than the adequate volume for the proposed improvements. A new water quality capture volume calculation is not required or provided since the original design assumes a greater percent impervious area and higher composite runoff coefficient than what is being proposed. To demonstrate the details of the drainage design, the following exhibits have been provided. • Exhibit A - Vicinity Map • Exhibit B – Existing Drainage Plan & Original Design Runoff Coefficient from the Storm Drainage Report for Lot 1, Spirit of Joy Lutheran Subdivision • Exhibit C – Updated Design Runoff Coefficient from Storm Water Run-off & Water Quality Calculations for the Spirt of Joy Church • Exhibit D – Proposed Composite Runoff Coefficients (Using same coefficients from the original reports) • Exhibit E – Existing Water Quality Capture Volume Calculation from Storm Water Run- off & Water Quality Calculations for the Spirt of Joy Church • Exhibit F – Proposed Drainage Plan If you have any questions or need additional information, please contact me. Sincerely, Bulldog Engineering, LLC Mark Harris, PE Principal/Owner Enclosures BULLDOG ENGINEERING MARK EDWARD HARRIS PROFESSIONAL ENGINEER COLORADO LICENSED 56775 10/17/2025 Spirit of Joy Lutheran Church Landscape Improvements Exhibit A: Vicinity Map 970-502-6444 BULLDOG ENGINEERING N S W E Site COMPUTATIONS* Stewart & Associates, Inc. 214 N. Howes St. Ft. Collins, CO 80521 (303) 482-9331 BY: P) K Date z 9 Client,:2icli Q4 --Seel vf6errn Civ-CA Sheet No: 3 of 17 Chkd By: —Date cof'_ Le?mov4 1'or&Ar Subject S70rrn Drainage Si -Le rv/v 5AC2 0' is J 101 7 dk r: two; rd z k 0. 10, F S. II i A l..i i 0 Exhibit B (Sheet 1 of 2) n/o SCALE) 13LVEFIN COURTT- 3 tij rp Exis-r 4' cr3 OTC S. LEMAY EXIsT 4' cQ U EX I STl N G- —1 rIDriFIIN171TGy O N F GIfVFZG-J 517E FULL - = 4-.6 cis II ao DEVELOPED GA c 6.0 cfstooIY 18.6 Ex15T x F i Q c I ROLE a 2 I LL o Ia Ia Y r Q 2 O SHEET I ( of )Z Exhibit B (Sheet 2 of 2) SPIRIT OF JOY CHURCH FORT COLLINS, COLORADO DEVELOPED RUN-OFF CALCULATIONS CHECK OF PREVIOUS RUN—OFF CALC'S — FULLY DEVELOPED 3/28/1991 REPORT BY STEWART & ASSOC) 17 = 1.9 Q2 = 4.6 CFS THIS WAS DEVELOPED W/ TC = 18 MIN 1 t0= 3.3 Q10 = 8.0 CFS (14 MIN FOR TC100 ). COMPOSITE C = .57 1100 = 6.2 Q100 = 18.8 CFS & A 1.25 FACTOR FOR FOR THE 100 YEAR USING CURRENT FEQUENCY CURVE DATA, RUNOFF COEFFICIENTS & TC = 14 MIN COMPOSITE RUNOFF COEFFICIENT CALCULATIONS RUNOFF COEFFICIENTS PER TABLE 3-3 LAND USE RUN—OFF COEFFICIENT LAWNS, SANDY SOIL 0.10 LAWNS, HEAVY SOIL 0.20 CONCRETE 0.95 ROOFS 0.95 ASPHALT 0.95 PACKED GRAVEL 0.50 COMPOSITE RUNOFF COEFFICIENT WAS CALCULATED USING THE FOLLOWING FORMULA; n C= IE CI AI /At WHERE C = COMPOSITE RUNOFF COEFFICIENT C1= RUNOFF COEFFICIENT FOR SPECIFIC AREA Al A, = AREA OF SURFACE WITH RUNOFF COEFFICIENT OF C, n = NUMBER OF DIFFERENT SURFACES TO BE CONSIDERED At= TOTAL AREA OVER WHICH C IS APPLICABLE; THE SUM OF ALL A1's IS EQUAL TO At DEVELOPED SITE AREAS AL(LANDSCAPE) AC(CONC) AR(ROOFS) AG(GRAVEL) AG(PAVEMENT) At(TOTAL) SQ FT SQ FT SQ FT SQ FT SQ FT SQ FT 124,664 2.862 AC) 11,972 12,306 0 0.275 AC) (0.283 AC) 36,384 0.835 AC) 185,326 4.25 AC) COMPOSITE RUNOFF COEFFICIENT C = 0.45 Page 3 Exhibit C (Sheet 1 of 1) Exhibit D: Proposed Composite Runoff Coefficient 970-502-6444 BULLDOG ENGINEERING Spirit of Joy Lutheran Church Landscape Improvements Basin Roofs/Deck (C=0.95) Packed Gravel (C=0.5) Rubber Playground (C=0.95) Concrete (C=0.95) Asphalt (C=0.95) Landscape (C=0.20) Total Area Composite Runoff Coefficient Existing Lot (Per 2011 Drainage Report)12,306 0 0 11,972 36,384 124,664 185,326 0.45 Proposed Lot (With Landscape Improvements)12,616 1,160 2,150 12,609 31,714 126,237 185,326 0.44 Composite Runoff Coefficient Calculation 11 Design Procedure Form: Extended Detention Basin (EDB) - Sedimentation Facility 11 11 Designer. Kevin Forbes 1 of 3 Company: Forbes Engineering Date: REVISED MAYS. 2011 Project: Spirit of Joy Church Location: Ft Collins, CO 1. Basin Storage Volume A) TriblgaryArea's Imperviousness Ratio (i = I,/ 1D0 ) B) Contributing Watershed Area (Area) C) Water Quality Capture Volume (WQCV) WQCV = t0•(0.91 •0-1.19-P+0.78-D) D) Design Volume: Vol = (WQCV / 12) - Area' 1.2 2. Outlet Works A) Outlet Type (Check One) B) Depth at Outlet Above Lowest Perforation (H) C) Recommended Mapmum Outlet Area per Row, (AJ D) Perforation Dimensions: i) Cinwlar Perforation Diameter or ii) Width of 2" High Rectangular Perforations E) Number of Columns (nc, See Table 6a-1 For Ma)dmum) F) Actual Design Outlet Area per Row (Ao) G) Number of Rows (m) H) Total Outlet Area (A,) 3. Trash Rack A) Needed Open Area: Ah = 0.5 • (Figure 7 Value)' Ad B) Type of Outlet Opening (Check One) C) For 2", or Smaller, Round Opening (Ref.: Figure 6a): i) Width of Trash Rack and Concrete Opening (W.) from Table 6a-1 ii) Height of Trash Rack Screen (Hm) 1, = 12.00 % i= 1 0.12 I Area = 4.250 acres WOCV = 0.08 watershed inches Vol = 0.0332 acre-feet X Orifice Plate Perforated Riser Pipe Other. H = 1.83 feet Q Ao= squam Inches D= r o-jirhca, Of33 ke W = 1 l inc hes nc= F --- l---1 number Ao= 0.1 square inches nr = number Aa = 0.6 square inches A, = square inches 2" Diameter Round I -- IT High Rectangular Other W. = inches Hm = 52 inches Exhibit E (Sheet 1 of 1) ST ST ST ST ST ST ST ST ST ST ST ST SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W EE E E E E TELE TELE TELE TELE E E E ST ST ST ST SOUTHEAST CORNER SECTION 36, T.7N, R.69W, FOUND #6 REBAR WITH 2.5" ALUMINUM CAP LS 38318 COLORADO STATE HIGHWAY 68 (HARMONY ROAD) N0 0 ° 0 8 ' 5 9 " W 6 3 9 . 9 8 ' LE M A Y A V E N U E (1 0 0 ' R O W ) PE R G O L D E N M E A D O W S S E C O N D F I L I N G N89°52'29"E 2652.13' (BASIS OF BEARINGS) LOT 2 64,815 sq. ft. 1.488 acres LOT 1 120,026 sq. ft. 2.755 acres S0 0 ° 0 8 ' 5 9 " E 4 8 5 . 3 3 ' N89°52'31"E 357.55' N0 0 ° 0 8 ' 5 9 " W 5 2 0 . 0 0 ' S89°52'31"W 323.00'S44°45'46"W 48.94' N89°52'31"E 66.29' S0 0 ° 0 7 ' 2 9 " E 44 . 7 3 ' S0 0 ° 0 8 ' 5 9 " E 1 4 5 . 3 8 ' S0 0 ° 0 8 ' 5 9 " E 3 4 0 . 9 6 ' ROW DEDICATED BY THIS PLAT 486 sq. ft. 0.011 acres S89°52'31"W 290.24' SPIRIT OF JOY LUTHERAN SUBDIVISION 2ND FILING Existing Building Existing Building Existing Trash Enclosure Existing Sidewalk Existing Telephone Service Existing Light Pole (2) Proposed 2' Sidewalk Chases Existing 24" Storm Pipe Existing 24" Storm Pipe 2,660 SF of Proposed Lawn Area (PBSI Low Grow Mix per Separate Document provided by Owner) 2,150 SF of Proposed Tatonka Poured-In-Place Rubber Surface (Contractor to Coordinate with Owner) Proposed Ornamental Fence 1,160 SF of Crusher Fines Existing Low Point of Parking Lot Contractor to Grade Flowline from Edge of Existing Parking to Existing Outlet Structure @ 1% Minimum Slope Existing Outlet Structure Existing Detention & Water Quality Area Contractor to Grade Flowline from Edge of Existing Parking to Existing Outlet Structure @ 1% Minimum Slope Contractor to Grade Proposed Improvements to Slope to Proposed Flowline @ 1% Minimum Slope Existing 12" Storm Pipe Existing Concrete Pan Existing Concrete Pan Existing Storm Culvert Existing Storm Culvert Proposed Flowline Proposed Flowline Property Line Easement Major Contour Minor Contour 4800 4801 4800 4801 Legend Flowline Curb and Gutter Pavement Concrete Swale Flowline LODLimits of Disturbance Grade Break Spot Elevation4800 4800 ProposedExisting 0 Scale:1" = 40' 8040 N S W E NU M B E R RE V . DA T E RE V I S I O N D E S C R I P T I O N SHEET NUMBER ma r k @ b u l l d o g e n g . c o m 97 0 - 5 0 2 - 6 4 4 4 BULLDOG ENGINEERING, LLC ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATION OF ALL THE UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. JOB NUMBER DATE Sp i r i t o f J o y C h u r c h 25-005 10-17-2025 10 - 1 7 - 2 0 2 5 Re l e a s e d F o r C o n s t r u c t i o n 45 0 1 S . L e m a y A v e n u e Wo r s h i p S p a c e & P l a y g r o u n d Fo r t C o l l i n s , C O 0 C4 Pr o p o s e d D r a i n a g e P l a n B:\Bulldog Engineering\25-005 Church Improvements\CADD\Sheets\25-005 Drainage Plan.dwg, 10/17/2025 4:00:28 AM, Mark, Bulldog Engineering NU M B E R RE V . DA T E RE V I S I O N D E S C R I P T I O N SHEET NUMBER ma r k @ b u l l d o g e n g . c o m 97 0 - 5 0 2 - 6 4 4 4 BULLDOG ENGINEERING, LLC ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATION OF ALL THE UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. JOB NUMBER DATE NU M B E R RE V . DA T E RE V I S I O N D E S C R I P T I O N SHEET NUMBER ma r k @ b u l l d o g e n g . c o m 97 0 - 5 0 2 - 6 4 4 4 BULLDOG ENGINEERING, LLC ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS (HORIZONTAL OR VERTICAL). THE EXISTING UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS HOWEVER THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATION OF ALL THE UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITIES. JOB NUMBER DATE Exhibit F (Sheet 1 of 1) Basin Roofs/Deck (C=0.95) Packed Gravel (C=0.5) Rubber Playground (C=0.95) Concrete (C=0.95) Asphalt (C=0.95) Landscape (C=0.20) Total Area (SF) Composite Runoff Coefficient Existing Lot (Per 2011 Drainage Report)12,306 0 0 11,972 36,384 124,664 185,326 0.45 Proposed Lot (With Landscape Improvements)12,616 1,160 2,150 12,609 31,714 126,237 185,326 0.44 Net Change in Area from the Original Design to the Proposed Design 310 1,160 2,150 637 -4,670 1,573 0 NA Composite Runoff Coefficient Calculation Based on the Existing Conditions, less asphalt has been constructed than designed for in the original design of the Water Quality Pond, resulting in a net loss in asphalt area as shown above. There will not be any demolition of pavement or other existing elements for the proposed improvements.