HomeMy WebLinkAboutDrainage Reports - 11/28/1995T OF Final roved
FORT COLLDW ii�=a!e
I
FINAL DRAINAGE AND
EROSION CONTROL STUDY
FOR WILDWOOD TOWNHOMES
FORT COLLINS, COLORADO
,If
FINAL DRAINAGE AND
EROSION CONTROL STUDY
FOR WILDWOOD TOWN HOMES
FORT COLLINS, COLORADO
October 26, 1995
Prepared for:
James Company
2919 Valmont Road, Suite 109
Boulder, Colorado 80301
Prepared by:.
RBD, Inc. Engineering Consultants
209 South Meldrum Street
Fort Collins, Colorado 80521
(970) 482-5922
RBD Job No. 607-006
INC.
'
Engineering Consultants
209 S. Meldrum
Fort Collins, Colorado 80521
303/482-5922
FAX:303/482-6368
-'
October 26, 1995
Mr. Basil Harridan
City of Fort Collins
Utility Services, Stormwater
'
235 Matthews
Fort Collins, Colorado 80522
' RE: Final Drainage and Erosion Control Study for Wildwood Townhomes
Dear Basil:
,'
1
11
We are pleased to submit to you, for your review and approval, this Final Drainage
and Erosion Control Study for Wildwood Townhomes. All computations within this
report have been completed in compliance with the City of Fort Collins Storm
Drainage Design Criteria.
In response to the concerns voiced in the meeting on October 24, we have added a
5' curb cut in Timberwood that will intercept over half of the flows before they reach
the eastmost entrance into the site. This should alleviate. the concerns regarding
flows not "turning" into the site as intended.
We appreciate your time and consideration in reviewing this submittal
you have any questions.
Respectfully,
RBD Inc. Engineering Consultants
P ared by:
Patricia Kroetch
Project Engineer
Reviewed by:
)Kevin Gingery, E.
Project Manager
Water Resources
Please call if
' Denver303/458-5526
I. GENERAL LOCATION AND DESCRIPTION
A. LOCATION 1
B. DESCRIPTION OF PROPERTY 1
H. DRAINAGE BASINS AND SUB -BASINS
A. MAJOR.BASIN DESCRIPTION 1
B. SUB -BASIN DESCRIPTION 2
III. DRAINAGE DESIGN CRITERIA
A.
REGULATIONS 2
B.
DEVELOPMENT CRITERIA REFERENCE,
CONSTRAINTS, AND COMPARISON 2
C.
HYDROLOGICAL CRITERIA 3
D.
HYDRAULIC CRITERIA 3
E.
VARIANCES FROM CRITERIA 3
IV. DRAINAGE FACILITY DESIGN
A.
GENERAL CONCEPT 3
B.
SPECIFIC DETAILS 4
V. STORM WATER QUALITY
A.
GENERAL CONCEPT 5
VI. EROSION CONTROL
A.'
GENERAL CONCEPT 6
VII. CONCLUSIONS.
A.
COMPLIANCE WITH STANDARDS 6
B.
DRAINAGE CONCEPT 6
C.
STORMWATER QUALITY CONCEPT 7
D.
EROSION CONTROL CONCEPT 7
REFERENCES 1 8
VICINITY MAP 1
HYDROLOGY CALCULATIONS 3
EXCERPTS FROM PREVIOUS DRAINAGE REPORTS 9
SWALE AND SIDEWALK CULVERT SIZING 16
DETENTION POND SIZING 24
EROSION CONTROL CALCULATIONS 33
CHARTS, TABLES & FIGURES 41
FINAL DRAINAGE AND
EROSION CONTROL STUDY
FOR WILDWOOD TOWN HOMES
FORT COLLINS, COLORADO
1 I. GENERAL LOCATION AND DESCRIPTION
1 A. Location
'
The Wildwood Townhomes Site is located in the southeast part of Fort
Collins, South of Harmony Road and west of County Road 9. The site
location can also be described as situated in the Northeast Quarter of
Section 5, Township 6 North, Range 68 West of the 6th Principal Meridian,
City of Fort Collins, Larimer County, Colorado. The project site is shown on
the Vicinity Map in the Appendix.
The Wildwood Townhomes development is bounded by undeveloped land
(owned by Poudre Valley Hospital) on the west, Timberwood Drive on the
'
south, Corbett Drive on the east, and Mountain Crest Hospital on the north.
B. Description of Property
The Wildwood Townhomes P.U.D. contains approximately 10.47 acres and
is generally undeveloped at the present. The existing site is presently open
'
ground covered with native grasses. The site topography generally slopes
toward the southeast corner at approximately 1.4%. Runoff historically sheet
flows to Corbett Drive and south to the Timberwood Junior High detention
'
pond.
There is currently a concrete irrigation ditch on the western edge of the
project site. This ditch has been replaced by an 18" irrigation pipe west of
the project site, as shown on the plans. The concrete irrigation ditch has
' therefore been abandoned and is scheduled to be removed with this
construction.
II. DRAINAGE BASINS AND SUB -BASINS
' A. Major Basin Description
The project site is located in the McClellands Basin and is described in the
report entitled McClellands Basin Master Drainage Plan, prepared by
' 1
Greenhorn and O'Mara, Inc., 1986 and is further described in the Amended
Overall Drainage Study for Wild Wood Farm by RBD, 1992. A portion of the
latter report is included in the appendix.
B. Sub -Basin Description
1 Flows from the site, in a developed condition, were included as part of the
drainage study for the adjacent Southeast Junior High Site, as prepared by
' RBD, Inc. A portion of that report is included in the Appendix.
' In the Amended Overall Drainage Study for Wild Wood Farm by RBD, Inc.,
the site is designated as a medium density residential/professional office
with on -site detention. Further detailed in the drainage study for the
adjacent Southeast Junior High Site, the Wildwood Townhomes Site flows
were to be detained on -site with flows released onto Corbett Drive and
conveyed south by curb and gutter to a low point in Corbett Drive where it
will be intercepted by inlets. From there it will be conveyed to the Junior
High detention pond, and bypassed through the Junior High School
Detention Pond and released along with the detained developed flows from
' the Junior High Site.
III. DRAINAGE DESIGN CRITERIA
A. Regulations
1
The City of Fort Collins Storm Drainage Design Criteria is being used for the
subject site.
'
B. Development Criteria Reference, Constraints, and Comparison
'
The criteria established the Amended Overall Drainage Study for Wild Wood
Farm (dated June, 1992) and by the Final Drainage Report for the Southeast
'
Junior High School (dated April, 1993), both prepared by RBD, Inc., will be
used for this site. Densities and imperviousness are consistent with Basin
C of the approved Amended ODP for Wild Wood Farm.
Detention will be provided on the site and flows released at 0.2 cfs/acre in
the 10 year event (2.1 cfs total) and 0.5 cfs/acre in the 100 year event (5.3
' cfs total). Released flows will continue on Corbett Drive to a detention pond
on the Junior High School site. This information is taken from the drainage
report for the Southeast Junior High School.
' 2
'
Corbett Drive on the east boundary of the site is existing and Timberwood
Drive on the south side of the site is existing for approximately 350 feet. As
currently proposed, the site will not receive runoff from either of these
existing streets. Approximately 800 feet of Timberwood Drive will be
designed with this project. Flows from the north half of approximately 670
'
feet of Timberwood Drive will flow through the on site detention pond, but
these flows were accounted for in the design of the Preston JHS detention
pond (illustrated as Basin F in the drawing excerpt from the Amended
'
Overall Drainage Study for Wild Wood Farm included in the appendix) and,
therefore, will not be detained.
'
C. Hydrological Criteria
'
The Rational Method was used for determining surface runoff for the project
site. The 10-year and 100-year storm event criteria, obtained by the City of
'
Fort Collins, were used in calculating runoff values. These calculations and
criteria are included in the Appendix.
'
D. Hydraulic Criteria
All hydraulic calculations within this report have been prepared in
accordance with the City of Fort Collins Storm Drainage Criteria and are
'
included in the Appendix.
'
E. Variances from Criteria
No variances from City of Fort Collins Storm Drainage Criteria are being
'
sought for this project.
' IV. DRAINAGE FACILITY DESIGN
' A. General Concept
The on -site runoff produced by the proposed Wildwood Townhomes
' development will flow into an on -site detention pond and will be released at
a predetermined rate onto Corbett Drive. The released storm water will flow
on Corbett to the existing detention pond on the Timberwood Junior High
' School site. Flows from Corbett Drive and Timberwood Drive will be allowed
to flow undetained to the detention pond on the Junior High Site because the
flows were accounted for in the design of the Junior High Detention Pond.
' The proposed drainage and grading plan is included in the back pocket of
' 3
this report.
' B. Specific Details
The Wildwood Townhomes development has been broken down into 6 sub -
basins. All of the sub -basins will drain into the detention pond located in the
east corner of the site.
Sub -basin 1 contains the west one-third of the site. This sub -basin flows to
the westerly parking lot in the center of the sub -basin via small swales and
' then is directed, via curb and gutter, south into sub -basin 2.
Sub -basin 2 contains a small area to the north of Timberwood Drive. Runoff
from this sub -basin flows into sub -basin 2A.
Sub -basin 2A contains the north half of Timberwood Drive and slopes to the
' east at 0.53%. Runoff from this sub -basin (including runoff from sub -basin
2) flows via curb and gutter to the east and into the easterly parking lot in
sub -basin 3. These flows will be routed through the on -site detention pond,
' but will not be detained because they have been accounted for in the design
of the Junior High Detention Pond.
' Sub -basin 3, contains the middle one-third of the site. The flows from this
sub -basin drain to the easterly parking lot via small swales. These flows are
then directed south via curb and gutter. These flows join the runoff from
' sub -basin 2 (including runoff from sub -basin 1) and flow to a 8' concrete
sidewalk culvert in the southeast corner of the parking lot. The sidewalk
culvert will pass the 10 year flows (from sub -basins 1, 2, 2A, and 3 flows
' total 14.3 cfs) and the 100 year flows (31.3 cfs) will flow over the sidewalk.
Ponding will occur in the parking lot to approximately elevation 4941 but will
' not flow into Timberwood Drive. The sidewalk culvert empties into the
detention pond in sub -basin 5 via a concrete trickle pan.
' Sub -basin 4 contains a grassed swale that runs along the north boundary of
the site and flows into an 8" pipe which empties into sub -basin 5. This pipe
is sized to carry 10 year and 100 year flows.
' Sub -basin 5 contains the on -site detention pond. Flows from all of the on -
site sub -basins are directed to this sub -basin. Runoff from the south enters
' sub -basin 5 through an 8' concrete sidewalk culvert to a 4' trickle pan. The
runoff will flow through 2-12" pipes before entering the detention pond. The
12" pipes are sized to carry low flows and major flows will flow over the
' pipes. Runoff from the north enters sub -basin 5 from an 8" pipe from sub-
1 4
7
basin 4 and a sidewalk culvert from a swale in sub -basin 5. These flows
then enter the detention pond in a 4' trickle pan.
' The outlet for the pond is a concrete weir that has been designed to conform
' to the 10 year and 100 year release rates which are 0.2 cfs/acre for the 10
year storm event .(2.1 cfs plus runoff from sub -basin 2A totals an aggregate
release rate of 3.5 cfs) and 0.5 cfs/acre (5.2 cfs plus runoff from sub -basin
' 2A totals and aggregate release rate of 8.3 cfs) for the 100 year event.
The F.A.A. method was utilized to size the detention pond at the east corner
' of the site. The pond model for the 100 year event is included in the
appendix. The pond provides 0.73 acre-feet of storage at a WSEL of
4940.00. The pond is to be built with approximately one foot of freeboard.
Flows are carried via Corbett Drive to the detention pond on the Southeast
Junior High School site. This pond has been sized to accept flows from the
' Wildwood Townhomes site at the release rates discussed above and also
developed flows from Timberwood and Corbett Drives.
' V. STORM WATER QUALITY
' A. General Concept
The water quality of storm water runoff must be addressed on all final design
' utility plans. The Wildwood Townhomes development is anticipating
construction beginning in January of 1996. Best Management Practices for
the treatment of storm water runoff have been incorporated into the design
' for this project. The Wildwood Townhomes site will maintain a grassed
detention pond and Junior High Detention Pond will provide mechanisms for
' pollutants to settle out of the storm water runoff before being released
downstream.
All construction activities must comply with the State of Colorado permitting
process for Storm water Discharges Associated with Construction Activity.
A Colorado Department of Health NPDES Permit will be required before any
construction grading can begin.
' 5
.1
VI. EROSION CONTROL
A. General Concept
The Wildwood Townhomes Site is in the Moderate Rainfall and Moderate
' Wind Erodibility Zones per the City of Fort Collins zone maps. The potential
exists for erosion problems during construction, and after construction until
' the disturbed ground is revegetated or paved. It is anticipated that
construction will begin in January of 1996.
Calculations for erosion control performance standards were completed per
the City of Fort Collins Erosion Control Reference Manual for Construction
Sites and are included in the appendix. The construction on this site is
divided into two phases, therefore, an erosion control performance standard
was computed for each phase. The erosion control performance standard
for Phase 1 is 78.9%. The effectiveness of the proposed erosion control
' plan for Phase 1 construction is 79.3%. The erosion control performance
standard for Phase 2 was calculated to be 79.4%.The effectiveness of the
proposed erosion control plan during the construction of Phase 2 is 79.5%.
Therefore, the erosion control plan will meet the City of Fort Collins criteria.
' VII. CONCLUSIONS
A. Compliance with Standards
' All computations that have been completed within this report are in
compliance with the City of Fort Collins Erosion Control Reference Manual
' for Construction Sites and the Storm Drainage Design Criteria Manual. In
addition, this design is also consistent with the McClellands Basin Master
' Plan and Southeast Junior High School report prepared by RBD.
B. Drainage Concept
' The proposed drainage concepts presented in this report and on the
construction plans adequately provide for the conveyance and release of
' developed on -site flows into the existing curb and gutter on Corbett Drive.
The combination of on -site street capacities and the on -site minor swale
system will provide for the 10 and 100 year developed flows to reach the
' proposed on -site detention facility. The existing detention pond downstream
on the Timberwood Junior High School site has been designed and built to
account for flows released from the Wildwood Townhomes site.
' b
' If groundwater is encountered at the time of construction, a Colorado
Department of Health Construction Dewatering Permit will be required.
C. Storm Water Quality Concept
' Because storm water quality has become a requirement, the proposed
design has addressed this storm water aspect. A grass -lined detention pond
will provide an opportunity for storm water pollutants to filter out of the storm
water runoff before the runoff flows off site. The Junior High .Detention Pond
will further allow pollutants to settle out prior to release downstream.
' D. Erosion Control Concept
The proposed erosion control concepts adequately provide for the control of
wind and rainfall erosion from the Wildwood Townhomes. Through the
construction of the proposed erosion control concepts, the City of Fort
' Collins performance standard will be met. The proposed erosion control
concepts presented in this report and shown on the erosion control plan are
in compliance with the City of Fort Collins Erosion Control Criteria.
1
11
1
7
REFERENCES
1. Storm Drainage Design Criteria and Construction Standards, by the City of
Fort Collins, Colorado, May 1984,-revised January 1991.
2. Erosion Control Reference Manual for Construction Sites, by the City of Fort
Collins, Colorado, January 1991.
3. McClellands Basin Master Drainage Plan, by Greenhorn and O'Mara, Inc.,
1986.
4. Master Drainage Study for Wildwood Farm, by RBD, Inc., July, 1988.
5. Amended Overall Drainage Study for the Wildwood Farm, Fort Collins,
Colorado, by RBD, Inc., June, 1992.
6. Final .Drainage and Erosion Control Study for the Southeast Junior High
School Site, prepared by RBD, Inc., April 1993.
8
I
_••�I�U7/:1
u
1
t
I
VICINITY MAP
1
1
n
I
1
I
n
HARMONY ROAD
0
MOUNTAIN CREST
Q
HOSPITAL
O
ry
0')
W
z
Q
O
Ld
m
-
TI M BE2bk!
�F
DRiv�
O
PROJECT
PRESTON JUNIOR
SI TE
HIGH SCHOOL
HIGH
DJUNIOR
ETENTION POND
VICINITY MAP
NOT TO SCALE
2
1
I
1
1
1
1
1
1
1
1
1
t
1
HYDROLOGY CALCULATIONS
3
1
Y o
ao
d
0
L
N
LO
C
0
N
N
L
L
O
O
0)
O
03
U
0)
N
0
a
U
(A
aD
L
w
--
2
cn
z
U
O
L4
❑
O
a)
0
L
N
O
y
L
Mr�Ln
V-
�l,-
LO
Cl_
COITI�(DMM
�
E V
666666
6
0=
U
v,
0)co(D
LO
LO
00) 0
Lo
cc)
co
v
m
(o
IT(0Nv.rnco
LO
`.Z
O 0)
d �
.-
M
t7
(D
a7
Ln
Ln
C
IT
s
LO
00
(D
cM
8 O
LoMtiLoOL
�-
V
E
D0)
_ —
MOOLni�
(D
Q
1�-NM000M
V
0
00
'i
Q �
0
IT
N
co
0)
co
(D
N
0
'.T
Mt--
w
N
o m
rioocYio
�
o
Q
N
N
N
N
N
N
N
7
0-
.Z v
0
0
0
0
0
0
O
a�
a
m
o
rnrnrnrnrnrn
000000
0
� U
O_
E
�N<ce)
LO
N
-y N
Q
ui
�
�
U)
I
L'
H
Z
0
I-
Z
W
U
Z
O
L.L
O
W
(D
0
0
I
0
I
N
d
0
> LO
Q
i `)
O O
T•
W
O 1-
�0
N
N
0
L
C
I-
U
0
�Y
d
U m
W
U
w Q
CL U
QCM
W
�
t
cl V' r- O V; (O
w E
M
LO
� 0) LO N
Z
N
L v
U
Z
pi O
LU
2 U
NLU
O�`-
3
n.D�
w c5
O Q
U
a K
U.
U
w
to
I`
(O I,- CA N (0 V)
}
(O
M(O(OMI�M
CN
CA
W
0
v
W
W
W
I--
LO rl- PO (n 0 (n
o
O o �
O
O O C5 O (V O
(n
000(11�0
Oo~0O
C(0 VNM
ZglM
W
J
V
I,-Il-N000)�
W._._
(D
cM
T N
E
L
v
Z
W
M
V
0 0 0 0 0 Co
O O O O O O
A
o L
NNNNNCA
J
W
(n
O
N r,, c0 r- co o
F-
O
uO
CMOOV'LO
N r N CO N
Q
Z
LLJ
Z
J
c0
MII- (n V'� I�
M
N
(O V•I,-(0CO M
QU
O
0 0 0 C] 0 0
00
ON((00ITmr�cco
C)<
N
Z
w c N
O
M O O (h O
U
Q
Q
m
(�
W
Cn�
(n
NNM V•(n
5
u
Ln
0
U (`
x
U U)
r
U
F-
N
LL
!Y
O
LL
Q
Z
z O
F-
Z
W
Z
O
U-
w
_2
F-
N
fl.
O
N
N U')-00
L �
0
0
0 CA
r C)
W
0 Q
U U
to
N
0
L
c
F-
O
3
�Y
CL
Um
w
U
0 Q
aU
Y
W
E
J
Ln
I— (D O (O (`M Ln
M
O
Z w E
N
U v
U
UZ
N
H O
w a
F-
N U
W
Ogg
a �
D a
O >
n J
w U
OQ
a a
U U
w "
fA
..
ti
(OtiON(0 Ln
J.00
C6
1q'6(OLn1 V'
.- E �-
v
O
(M (D (D (M ti CM
CN
U n
0
U,JO
�
_j v
LLI
J
O O O O O O
;a
^
ti
LC)r�r�LnOL!)
O
O o 00
O
O O C; N C7
J .�
F-
U)
_
Ln
000(nI�- 0
cM
r` ti (D � U) (D
Z t`
00
M (D V N m
��
W
J
OR
T7rnoV•r�o
Lli
w
N
E
Z
W
M
V'
0 0 0 Cl 0 0
0 0 0 0 0 0
Q
O o Lin
N N N N N CN
-7
J v
W
(n
002
O
Lnr�ODr�000
F-
O
Ln
(Y) 0 - 0 V' LO
N N (M N
Q
F-
Z
ZJ
00
(Y)r�LOV•�r�
U N
N
� (DItl(00 C)
Q
O
O O O O O O
(0N(�O
pw
U
VN'M��
ZC.
ON
O
CM00ce)0 -
F
Q.
m
(�
m
U)
ar
Cn0
I
CO I
CNN() V'Ln
I
I
I
I
I
.1
I
�
I
I
I
}
k
�
§
m
�
�
f
§
§
§
�§
/|
� �
|
|!
�
�
G\
k
kk
�
7
�
)
■
k ®
2�
4`
2!�
�
m
wo
65
oo
2A
\�
�K�e
@
§
2§—
„
\
§
`
§z=
/§(,
on—
■�
|
!
•
S 9
n !
|
■ �
£!�
.
�
(
3!
S§!|
5
5!
o!
n;;
;;;
;
2;;
�|
■;�
.
�
.
k£!©
3
-
�
■
OEM
§§`
�
I
I
I
I
I
I
I
I
p
I
H
�
I
I
I
I
I
I
I
¥
|
k!
|k
,
| �
|�
m
!k�
-
aA
m
!`
-
!
§
|z�
;2
�k}
k
k
°
|)�
kOF
0
°
m
30
G S!!
5 S
;
■r
k§It
0
,
Q!�
) ~
K
2
Ci
=
®-
-
© ,
e
R
n
R,■
e a
§§`
m!
�
I
1
' EXCEPTS FROM PREVIOUS
DRAINAGE REPORTS
1
1
�^1
I
I
n
1
AMENDED OVERALL
DRAINAGE STUDY
FOR
WILD WOOD FARM
FORT COLLINS, COLORADO
June 26, 1992
Prepared for:
The Architects, Studio
117 E. Mountain Ave. Suite 200
Fort Collins, Colorado 80524
Prepared by:
RBD, Inc. Engineering Consultants
2900 South College Avenue
Fort Collins, Colorado 80525
(303) 226-4955
.RBD Job No. 330-003
m
City of Fort Collins Storm Drainage Criteria.
E. Variances from Criteria
A variance is being sought for the outfall of storm water runoff from the
upper portion of developed SWMM Basins 215 and 216 of the McClellands
Basin Master Plan.
IV. DRAINAGE FACILITY DESIGN
A. General Concept
As development occurs within the Wild Wood Farm site, the drainage
concepts shown on the Overall Drainage Plan, in the back pocket of this
report, should be followed. A detention pond is planned in the southeast
corner of the 1994 Junior High School Site. An existing detention pond lies
in the southeast corner of the Charter Hospital Site (Basin B) and
discharges storm water onto Corbett Drive at the required staged release
rate. As development occurs within the Wild Wood Farm, individual basins
are to have on -site detention ponds with staged release rates to drain
towards the McClellands Basin Drainageway located to the south of the Wild
Wood Farm site.
B. Specific Details
A permanent detention pond exists at the southeast corner of the Charter
Hospital site (Basin B) and discharges storm water onto Corbett Drive. A
temporary detention pond exists at the end of existing Corbett Drive.
Detained runoff leaving the two existing detention ponds currently drains
east across the existing farm land to County Road 9.
A detention pond is planned near the -southeast corner of the -Junior High
School site (Basin D) at the southern end of Corbett Drive. This detention
pond is intended to serve the 1994'Junior High School future Elementary
School and future City of Fort Collins Park. Storage provided is based on
the criteria of a release rate of 0.2 cfs/acre for the 1O.year storm and 0.5
rfs/acre for the 100 year storm.- Thison-site detention pond is sized to
provide storage for the permanent sireeis n inuHU[
he Junioro'
High School site, as well as theremainderof Corbett Drive from
the Junior High School site to Harmony Road (Basin F .
The existing detention facility for Charter Hospital contains a staged release
mechanism for the 10 and 100 year storm events. The temporary pond at
the south end of Corbett Drive can be eliminated as Corbett Drive is
3
11
p. RY,
'•-r
,..vim..-.�'....+:c+..:a'�'u°I<.
'eT' ''ll �'r-' a tv ;7R w,.�,.+..�. �.{.�..1'=•�Y.-•b�1!(,.::.:YtT.`.Mi.-�']."�
_N T a •> � � '•��,i WC1M2�1`A9M1M "+WM .W? v.2T'1 .MI`�t
' ralu <�•,,�_: 1,�...vr.,s_, — ---- HARMONY_R A _
}' r�-_•-,.�-` 'G
N �• _ { t� 1 yL7 Yam' �C�+_ + `t. L .a�r� +v. �'T'i .4 ��4t� r 'll
M1CA�IL�l:it•1Ep ')RKLGA7jpN LAYE2Al,
�. YIP'Cp
t I ��' °ice i w /,ny �/ •I
777 f:� a
S n
ut
< z __.._---'--"'-' � �.i r .,ti :rF : ih� ti• 1� r :TJ_'�, Nr- � .
,, D --� _ .._,n .. .. •._. I 1 Xs. m� t✓i FI'. TJ fit. )jQ .
J' �•� / D��.Tz-0 ---�'�- av . vs�s '�C } '.4Ylt,t, akr�r* a.��)M1t
71�Vi l.rj
te.i "
of
�: �. Z ,Gos.lt{X ialr )tL+{ '+ lr .ASV""< T� ,'i�E.•.-_%�Z''L
l `,. r l� { � ;�t �/z � r `� `r.a - • 1,a. ; 1,
., . 1...+} 1' i.�H hF .M1\�7'f • T�i� ..rt {,,j �, titi� J>A•. j,+f +T+^I�-"
�t ::�r•i �e ..� 4.:\.o.w .... 7..4L:.1T:�5jY.Yhr<Y>4aRYCwE!•SLkJ'JM��,r. ' YQ� ,•.1�. +, ...; ti s ._.:>•:`... n+.,rit �....'� ..._.. _ _...
FINAL DRAINAGE AND
EROSION CONTROL STUDY
FOR THE
SOUTHEAST JUNIOR HIGH SCHOOL SITE
FORT COLLINS, COLORADO
April 9, 1993
Prepared for:
Client:
The Architects' Studio
117 E. Mountain Avenue Suite 100
Fort Collins, Colorado. 80524
Prepared by:
RBD, Inc. Engineering Consultants
209 South Meldrum
Fort Collins, Colorado 80525
(303) 482-5922
RBD Job No. 330-003
mi
I
' D. Hydraulic Criteria
' All hydraulic calculations within this report have been prepared in
accordance with the City of Fort Collins Drainage Criteria and are also
included in the appendix.
E. Variances from Criteria
' No variances are being sought for the proposed project site.
' IV. DRAINAGE FACILITY DESIGN
' A. General Concept
' All on site runoff produced by the proposed development of the Southeast
Junior High School site will flow southeasterly to a detention pond located
at the southeast corner of the site. Also to be detained in the pond will be
' developed flows from the future Elementary School west of this project, and
from the future City Park, which is southwest of this project. Detained
developed staged released flows will be routed east to County Road 9, and
' then south to the McClellands Drainageway by a combination of open
channels and pipe flow.
' Detained flows from the Charter Hospital Site and from the parcel between
the Charter Hospital and the Junior High School site will be bypassed
throuah the project detention pond and released along with the detained
' developed flows from this site. Detained developed flows from the Charter
Hospital and the parcel to the south will be released onto Corbett Drive.
From there it will flow south in the curb and gutter to a low point in Corbett
' Drive. where it will be intercepted by this developments storm sewer system
and conveyed to the detention pond being built with this project.
' B. Specific Details
This project has been broken into 15 sub -basins; Basins A through J, and
' 0-1 through 0-5.
Basins A, C, E, and F represent the roof area of the proposed Junior High
' School. Runoff from the roof will be directed by gutters, downspouts, and
underground piping to the proposed inlets and piping system conveying
flows to the detention pond.
3
' I I 14
Basins B, D, G, H, I, and J represent the remainder of the site and are
composed of open space, access toads and parking lots, sports fields
(permeable and impermeable surfaces), concrete sidewalks, and the
detention pond. Developed runoff from these basins is conveyed to the
Detention Pond by any combination of overland flows, open channels, curb
and gutter, or storm sewer systems.
Offsite Basin 0-1 represents the drainage basin containing the Charter
Hospital Site and the parcel immediately south of the Charter Hospital and
north of Preston Parkway. Detained flows (0.2 cfs/acre for the 10 year storm
event and 0.5 cfs/acre for the 100 year event) will be released onto Corbett
Drive and conveyed south by curb and gutter to the curb inlets at the
southeast corner of the site, and bypassed through the Junior High School
Offsite Basins &2 and 0-3 represent the future Elementary School site and
the Future City Park. No construction is proposed on these parcels at this
time. The Detention Pond associated with this project will detain developed
flows from these two areas. Runoff from these undisturbed areas will be
routed to the Detention Pond.
Offsite Basin 0-4 and 0-5 represent Corbett Drive and Preston Parkway.
Developed runoff from these two public roads will be detained in the
I detention pond associated with this project.
The detention pond to be built for this project will contain approximately 7.72
ac.ft. of storage capacity. Only 4.22 ac.ft. of storage is required for
detention; the additional 3.5 ac. ft. of volume is being provided for the future
storage of irrigation water for the school. A staged release outlet structure
will be built in phase 2 construction, possibly in April 1993, with a calculated
release rate of 0.2 cfs/acre for the 10 year and 0.5 cfs/acre for the 100 year
events. An emergency overflow structure will also be built into the pond.
Irrigation water will be provided for by a lateral from Harmony Road that use
to supply irrigation water for this area. A pipe and headwall will be built on
the lateral and the irrigation water will be piped to the swale which runs from
the softball fields to the detention pond. A backup water supply tap has
been included in the domestic water supply system.
dPhase 1 construction will consist of overlot grading, the construction of
Corbett Drive and Preston Parkway, the installation of the water and sanitary
sewer, and the storm sewer and curb inlets at the south end of Corbett
IP Drive. Prior to overlot grading, the detention pond as shown will be
constructed to act as a temporary siltation basin. During the overlot grading
process, the entire 7.72 ac.ft. of volume will be excavated, and the pond will
4
j5
d
7
1
t
1
1
L
1
SWALE AND
SIDEWALK CULVERT SIZING
16
I
RBD INC. ENGINEERING CONSULTANTS
CHANNEL RATING INFORMATION
WILDWOOD SWALE A -A
STA ELEV
0.00 2.00
10.00 0.00
25.00 1.00
35.00 1.20
N VALUE SLOPE (ft/ft)
-----------------------
0.060 0.0200
ELEVATION AREA
VELOCITY
DISCHARGE FROUDE
(feet)
---------
(sq ft)
-------
(fps)
--------
(cfs) NO.
--------- ------
0.10
0.1
0.5
0.05
0.37
0.20
0.4
0.8
0.30 CJ�o p���
0.42
0.30
0.9
1.0
0.89 ,�Q�oo-� bcfs
0.45
0.40
1.6
1.2
1.92
0.47
0.50
2.5
1.4
3.47
0.49
0.60
3.6
1.6
5.65
0.50
0.70
4.9
1.7
8.52
0.52
0.80
6.4
1.9
12.16
0.53
0.90
8.1
2.1
16.64
0.54
1.00
10.0
2.2
26.39
0.55
I-7
RBD INC. ENGINEERING CONSULTANTS
CHANNEL RATING INFORMATION
WILDWOOD SWALE B-B
STA ELEV
0.00 3.33
10.00 0.33
12.00 0.00
14.00 0.33
24.00 3.33
W VALUE SLOPE (ft/ft)
-----------------------
0.030 0.0050
ELEVATION AREA VELOCITY
(feet) (sq ft) (fps)
DISCHARGE FROUDE
(cfs) NO.
0.20
0.2
0.8
0.18
0.42
0.40
1.0
1.2
1.19
0.47
0.60
2.0
1.7
3.36
0.51
0.80
3.3
2.1
6.73
0.53
1.00
4.8
2.4
Qp_ K3cF5,11.47
0.55
1.20
6.7
2.7
17.73
0.57
1.40
8.8
2.9
Q _ 31,2 > 5.64
i0O
0.58
1.60
11.1
3.2
35.37
0.59
1.80
13.7
3.4
47.04
0.60
2.00
16.6
3.7
60.78
0.61
2.20
19.8
3.9
76.74
0.62
2.40
23.2
4.1
95.02
0.63
2.60
26.9
4.3
115.77
0.64
2.80
30.9
4.5
139.09
0.65
3.00
35.1
4.7
165.11
0.65
3.20
39.6
4.9
193.94
0.66
i
r--
1
1
0
r-
L
------------------------------------------------------------------------------
UDINLET: INLET HYDARULICS AND SIZING
DEVELOPED BY
DR. JAMES GUO, CIVIL ENG DEPT. U OF COLORADO AT DENVER
SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD
------------------------------------------------------------------------------
USER:KEVIN GINGERY-RDB INC FT. COLLINS COLORADO ..............................
ON DATE 10-25-1995 AT TIME 16:45:35
*** PROJECT TITLE: WILDWOOD TOWNHOMES
*** CURB OPENING INLET HYDRAULICS AND SIZING:
INLET ID NUMBER: TR(C.KIx Ci AM WO_ ON T IMBiE:ei,J b tD2.
:5rA 12--t70 ,
INLET HYDRAULICS: IN A SUMP.
GIVEN INLET DESIGN INFORMATION:
GIVEN CURB OPENING LENGTH (ft)= 5.00
HEIGHT OF CURB OPENING (in)= 6.00
INCLINED THROAT ANGLE (degree)= 0.00
LATERAL WIDTH OF DEPRESSION (ft)= 2.00
SUMP DEPTH (ft)= 0.00
Note: The sump depth is additional depth to
STREET GEOMETRIES:
STREET
LONGITUDINAL
SLOPE ($) =
0.80
STREET
CROSS SLOPE
($) =
4.00
STREET
MANNING N
=
0.016
GUTTER
DEPRESSION
(inch)=
2.00
GUTTER
WIDTH
(ft) =
2.00
STREET FLOW HYDRAULICS:
WATER SPREAD ON STREET (ft) = 14.22
GUTTER FLOW DEPTH (ft) = 0.74
FLOW VELOCITY ON STREET (fps)= 4.51
FLOW CROSS SECTION AREA (sq ft)= 4.21
GRATE CLOGGING FACTOR (o)= 50.00
CURB OPENNING CLOGGING FACTOR(%)= 10.00
INLET INTERCEPTION CAPACITY:
flow depth.
IDEAL INTERCEPTION CAPACITY (cfs)= 11.53
BY FAA HEC-12 METHOD: DESIGN FLOW (cfs)= 19.10
FLOW INTERCEPTED (Cfs)= 10.37
CARRY-OVER FLOW (cfs)= 8 73�--
BY DENVER UDFCD METHOD: DESIGN FLOW (cfs)= 19.10
FLOW INTERCEPTED (Cfs)= 10.37
CARRY-OVER FLOW (cfs)= 8.73
19
UDINLET: INLET HYDARULICS AND SIZING
DEVELOPED BY
DR. JAMES GUO, CIVIL ENG DEPT. U OF COLORADO AT DENVER
SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD
----------------------- ----------------------------------------------
SER:KEVIN GINGERY-RDB INC FT. COLLINS COLORADO..............................
ON DATE 10-25-1995 AT TIME 16:51:44
I** PROJECT TITLE: WILDWOOD TOWNHOMES
*** CURB OPENING INLET HYDRAULICS AND SIZING:
tINLET
ID NUMBER: gg ZOA- EAST EhITEANCE (►'j-TO pg2KJWji
, LC5T o>rF
TlnagEZWOD-ID
DRY
'
INLET HYDRAULICS: IN A SUMP.
GIVEN INLET DESIGN INFORMATION:
GIVEN CURB OPENING LENGTH (ft)= 12.50
HEIGHT OF CURB OPENING (in)= 6.00
INCLINED THROAT ANGLE (degree)= 0.00
'
LATERAL WIDTH OF DEPRESSION (ft)= 2.00
SUMP DEPTH (ft)= 0.00
Note: The sump depth is additional depth to flow
depth.
'
STREET GEOMETRIES:
STREET LONGITUDINAL SLOPE (%) = 0.40
STREET CROSS SLOPE M = 4.00
STREET MANNING N = 0.016
'
GUTTER DEPRESSION (inch)= 2.00
GUTTER WIDTH (ft) = 2.00
STREET FLOW HYDRAULICS:
'
WATER SPREAD ON STREET (ft) = 11.88
GUTTER FLOW DEPTH (ft) = 0.64
FLOW VELOCITY ON STREET (fps)= 2.89
FLOW CROSS SECTION AREA (sq ft)= 2.99
GRATE CLOGGING FACTOR (%)= 50.00
CURB OPENNING CLOGGING FACTOR(%)= 10.00
'
INLET INTERCEPTION CAPACITY:
IDEAL INTERCEPTION CAPACITY (cfs)= 19.03
BY FAA HEC-12 METHOD: DESIGN FLOW (cfs)=
8.70,
FLOW INTERCEPTED (cfs)=
8.70'
CARRY-OVER FLOW (cfs)=
0.00
'
BY DENVER UDFCD METHOD: DESIGN FLOW (cfs)=
FLOW INTERCEPTED (cfs)=
8.70
8.70
CARRY-OVER FLOW (cfs)=
0.00
1
-----------------------------------------------------------------------------
UDINLET: INLET HYDARULICS AND SIZING
DEVELOPED BY
DR. JAMES GUO, CIVIL ENG DEPT. U OF COLORADO AT DENVER
SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD
-------------------------------------------- 7---------------------------------
tSER:KEVIN GINGERY-RDB INC FT. COLLINS COLORADO..............................
N DATE 09-01-1995 .AT TIME 11:11:41
**
WILDWOOD INLET 30 (iv -year)
PROJECT TITLE:
*** CURB OPENING INLET HYDRAULICS AND SIZING:
'
INLET ID NUMBER: 30
INLET HYDRAULICS: IN A SUMP.
GIVEN INLET DESIGN INFORMATION:
GIVEN CURB OPENING LENGTH (ft)=
8.00
HEIGHT OF CURB OPENING (in)=
6.00
INCLINED THROAT ANGLE (degree)=
45.00
'
LATERAL WIDTH OF DEPRESSION (ft)=
2.00
SUMP DEPTH (ft)=
0.20
Note: The sump depth is additional
depth to flow
depth.
'
STREET GEOMETRIES:
'
STREET LONGITUDINAL SLOPE (%)
STREET CROSS SLOPE (%) =
0.57
2.00
STREET MANNING N 0.016
GUTTER DEPRESSION (inch)=
2.00
'
GUTTER WIDTH (ft) =
1.50
STREET FLOW HYDRAULICS:
WATER SPREAD ON STREET (ft) =
21.06
GUTTER FLOW DEPTH (ft) =
0.59
FLOW VELOCITY ON STREET (fps)=
3.10
'
FLOW CROSS SECTION AREA (sq ft)=
4.59
GRATE CLOGGING FACTOR (%)=
50.00
CURB OPENNING CLOGGING FACTOR(%)=
10.00
'
INLET INTERCEPTION CAPACITY:
IDEAL INTERCEPTION CAPACITY (cfs)=
16.81
'
BY FAA HEC-12 METHOD: DESIGN FLOW
FLOW INTERCEPTED
(cfs)=
(cfs)=
14.30 �-1��r
14.30'
CARRY-OVER FLOW (cfs)=
0.00
BY DENVER UDFCD METHOD: DESIGN FLOW
(cfs)=
14.30
'
FLOW INTERCEPTED
(cfs)=
14.30
CARRY-OVER FLOW (cfs)=
0.00
C
I
ZI
I
t----------------------------------------------------------------------------
UDINLET: INLET HYDARULICS AND SIZING
DEVELOPED BY
DR. JAMES GUO, CIVIL ENG DEPT. U OF COLORADO AT DENVER
SUPPORTED BY METRO DENVER CITIES/COUNTIES AND UD&FCD
------------------------------------------------------------------------
CSER:KEVIN GINGERY-RDB INC FT. COLLINS COLORADO..............................
DATE 08-31-1995 AT TIME 16:59:00
I** PROJECT TITLE: WILDWOOD INLET (100- gear )
*** CURB OPENING INLET HYDRAULICS AND SIZING:
INLET ID NUMBER: 30
INLET HYDRAULICS: IN A SUMP.
'
GIVEN INLET DESIGN INFORMATION:
'
GIVEN CURB OPENING LENGTH (ft)=
8.00
HEIGHT OF CURB OPENING (in)=
6.00
'
INCLINED THROAT ANGLE (degree)=
LATERAL WIDTH OF DEPRESSION (ft)=
45.00
2.00
SUMP DEPTH (ft)=
0.20
Note: The sump depth is additional
depth to flow
depth.
'
STREET GEOMETRIES:
STREET LONGITUDINAL SLOPE (t) =
0.57
'
STREET CROSS SLOPE M =
2.00
STREET MANNING N =
0.016
GUTTER DEPRESSION (inch)=
2.00
'
GUTTER WIDTH (ft) =
1.50
STREET FLOW HYDRAULICS:
'
WATER SPREAD ON STREET (ft) =
28.75
GUTTER FLOW DEPTH (ft) =
0.74
'
FLOW VELOCITY ON STREET (fps)=
FLOW CROSS SECTION AREA (sq ft)=
3.74
8.42
GRATE CLOGGING FACTOR M =
50.00
CURB OPENNING CLOGGING FACTOR(%)=
10.00
'
INLET INTERCEPTION CAPACITY:
IDEAL INTERCEPTION CAPACITY (cfs)=
18.81
_
BY FAA HEC-12 METHOD: DESIGN FLOW
(cfs)=
31.30-4
'
FLOW INTERCEPTED
(cfs)=
16.93
CARRY-OVER
FLOW (cfs)=
14.37
BY DENVER UDFCD METHOD: DESIGN FLOW
(cfs)=
31.30
'
FLOW INTERCEPTED
(cfs)=
16.93
CARRY-OVER
FLOW (cfs)=
14.37
' 22
1
1
'
RBD INC. ENGINEERING CONSULTANTS
WEIR SECTION FLOW DATA
'
WILDWOOD TOWNHOMES
FLOW OVER SIDEWALK AT DESIGN POINT 30
'
WEIR COEF.
'
3.000
STA ELEV
'
0 0 41.71
101.0 41.14
140.0 40.77
154.0 40.95
170.0 41.19
1
ELEVATION DISCHARGE
'
(feet)_ _(cfs) _ _-
40.77 0.00
'
40.87 0.61
40.97 3.54
41.07 9.91 — I4.3C 5 @ EL' 4%1.09
Q1O0
41.17 20.55
y
:Lout S o vt�P- S I opvA Lv- F02 600 a. , '
M Ax oar H CA=
1
'
Z 3
1
DETENTION POND SIZING
r
1
29-
1
DETENTION POND SIZING BY FAA METHOD
DEVELOPED BY
JAMES C.Y. GUO, PHD, P.E.
DEPARTMENT OF CIVIL ENGINEERING
UNIVERSITY OF COLORADO AT DENVER
EXECUTED ON 09-05-1995 AT TIME 08:19:08
tPROJECT
TITLE: TYPE IN THE PROJECT TITLE
**** DRAINAGE BASIN DESCRIPTION
BASIN ID NUMBER = 5.00
BASIN AREA (acre)= 10.26
RUNOFF COEF = 0.55
' *****DESIGN RAINFALL STATISTICS
DESIGN RETURN PERIOD (YEARS) = 10.00
' INTENSITY(IN/H R)-DURATION(IvM TABLE IS GIVEN
DURATION 5 10 20 30 40 50 60 80 100 120 150 180
' INTENSITY. 5.6 4.4 3.2 2.6 2.2 1.9 1.6 1.3 1.1 0.9 0.8 0.6
' ***** POND OUTFLOW CHARACTERISTICS:
MAXIMUM ALLOWABLE RELEASE RATE ='3.5 CFS
' OUTFLOW ADJUSTMENT FACTOR = .95
AVERAGE RELEASE RATE = 3.325 CFS
' AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT FACTOR.
***** COMPUTATION OF POND SIZE
-----------------------------------------------------
RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED
' DURATION INTENSITY VOLUME VOLUME STORAGE
MINUTE INCH/HR ACRE -FT ACRE -FT ACRE -FT
0.00
0.00
0.00
0.00
0.00
'
5.00
5.60
0.22
0.02
0.20
10.00
4.40
0.34
0.05
0.30
15.00
3.81
0.45
0.07
0.38
20.00
3.22
0.50
0.09
0.41
25.00
2.91
0.57
0.11
0.46
30.00
2.60
0.61
0.14
0.47
'
35.00
2.39
0.66
0.16
0.50
'
25
40.00
2.18
0.68
0.18
0.50
45.00
2.02
0.71
0.21
0.50
50.00
1.85
0.72
0.23
0.30
55.00
1.74
0.75
0.25
0.50
60.00
1.62
0.76
0.27
0.49
65.00
1.54
0.78
0.30
0.49
70.00
1.46
0.80
0.32
0.48
75.00
1.38
0.81
0.34
0.47
-----------------------------------------------------
THE REQUIRED POND SIZE _ .5045704 ACRE -FT --eC- -10 geov-
THE RAINFALL DURATION FOR THE ABOVE POND STORAGE= 45 MINUTES
26
DETENTION POND SIZING BY FAA METHOD
'
DEVELOPED BY
JAMES C.Y. GUO, PHD, P.E.
DEPARTMENT OF CIVIL ENGINEERING
UNIVERSITY OF COLORADO AT DENVER
'
EXECUTED ON 09-01-1995 AT TIME 09:11:38
'
PROJECT TITLE: WILDWOOD DETENTION POND
DRAINAGE BASIN DESCRIPTION
' BASIN ID NUMBER = 5.00
BASIN AREA (acre)= 10.26
RUNOFF COEF = 0.55
' ***** DESIGN RAINFALL STATISTICS
DESIGN RETURN PERIOD (YEARS) = 100.00
' INTENSITY(INMR)-DURATION(MIN) TABLE IS GIVEN
DURATION 5 10 20 30 40 50 60 80 100 120 150 180
' INTENSITY 9.0 7.2 5.2 4.2 3.5 3.0 2.6 2.1 1.7 1.5 1.2 1.0
***** POND OUTFLOW CHARACTERISTICS:
MAXIMUM ALLOWABLE RELEASE RATE = 8.3 CFS
' OUTFLOW ADJUSTMENT FACTOR = .95
AVERAGE RELEASE RATE = 7.885 CFS
' AVERAGE RELEASE RATE = MAXIMUM RELEASE RATE * ADJUSTMENT FACTOR.
***** COMPUTATION OF POND SIZE
-----------------------------------------------------
RAINFALL RAINFALL INFLOW OUTFLOW REQUIRED
DURATION INTENSITY VOLUME VOLUME STORAGE
MINUTE INCH&M ACRE -FT ACRE -FT ACRE -FT
0.00
0.00
0.00
0.00
0.00
'
5.00
9.00
0.35
0.05
0.30
10.00
7.20
0.56
0.11
0.46
15.00
6.19
0.73
0.16
0.56
20.00
5.18
0.81
0.22
0.59
'
25.00
4.68
0.92
0.27
0.64
30.00
4.17
0.98
0.33
0.65
35.00
3.84
1.05
0.38
0.67
'
' 27
' 40.00 3.50 1.10 0.43 0.66
45.00 3.25 1.15 0.49 0.66
' 10.00 3.00 1.18 0.54 0.63
55.00 2.80 1.21 0.60 0.61
60.00 2.61 1.23 0.65 0.58
65.00 2.47 1.26 0.71 0.55
-----------------------------------------------------
THE REQUIRED POND SIZE _ .6718576 ACRE -FT 100
' THE RAINFALL DURATION FOR TIM ABOVE POND STORAGE= 35 MINUTES
fl
[]
r
1 23
' RBD, Inc., Engineering Consultants
Wildwood Townhomes
Detention Pond Area -Capacity Ratinq Curve
' Cumulative
Elev Area Area Storage
(ft) (
------------------ -- (ac) (ac-ft)
----- ---
' 4937.5 0
4938.0 1,917
4939.0 15,682
4940.0 291011
4941.0 40,685
1
' j 0.8
c0
CU
0.6
00.4
CU
(n 0.2
0
' 4937
' Area m Capacity
MIffiIIII:1
---------------------- V = d/6"(A+4ABm+B)
0.00 0
0.04 0.01 @ _ 4-9 39, f, 3
0.36 0.211-
0.67 0.73"� v 00 = 0 (07 AL- PTO wst-L = 49 39.1 iz
0.93 1.53
4938 4939 4940 4941
Stage (ft elevation)
w
v�-
U
w
U
lQ
d
M
A
' 29
05-Sep-95
RBD INC. ENGINEERING CONSULTANTS
WEIR SECTION FLOW DATA
WILDWOOD TOWNHOMES WEIR OUTLET
WEIR COEF
3.000
STA ELEV
0.0 41.00
0.0 39.63
2.2 39.63
2.2 37.47
2.6 37.47
2.6 39.63
4.8 39.63
4.8 41.00
ELEVATION DISCHARGE
(feet)
(cfs)
---------
37.47
---------
0.00
37.67
0.09
37.87
0.27
38.07
0.49
38.27
0.75
38.47
1.05
38.67
1.38
38.87
1.74
39.07
2.13
39.27
2.54
39.47
2.97
39.67
3.53
39.87
5.46
40.07
8.25
40.27
11.68
40.47
15.62
40.67
20.01
40.87
24.81
Program uses weir equation Q = CLH'n
ED
STORM DRAINAGE DESIGN AND TECHNICAL.CRITERIAI TABLE ',401
1
WEIR FLOW COEFFICIENTS
SHAPE
Sharp.Crested '
'
Projection Ratio (H/P = 0.4)
Projection Ratio (H/P = 2.0)
'
Broad Crested
W/Sharp U/S Corner
W/Rounded U/S Corner
1
Triangular Section
A) Vertical U/S Slope
1:1 D/S Slope
'
A:1-D15-S1gpe
10:1 D/S Slope
'
B) 1:1 U/S Slope
1:1 D/S Slope
3:1 D/S Slope
Trapezoidal Section
i:l U/S St(,pe, 2:; "'/S Slope
Road Crossings
'r Gravel.,
Paved
1
t
y
Y •.
o�
• Y J
�Y
' c
�o
COEFFICIENT
3.4
4.0
2.6
3.1
3.8
3.2
2.9
3.8
3.5
3.4
3.0
3.1
COMMENTS
HNC 1.0
H> 1.0
Minimum Value
Critical Depth
• M,.(L w ,u,YL"t"t w
SCHEMATIC
H>0.7 Hf
H> 0.7
H> 0.7 uu s o/s
H>0.5 r
H >0' S Ws o/s
u/s a/s
H>1.0
H:;-1.0
. ,
i
ADJUSTMENT FOR TAILWATER
D! te: NOV 11 S 4 ''isFF Rr- t
ii c•:: ' Book lU111t)tifly, 1701 ve51ly'11 la�J��ld11 Va0i5I uuacoU u. �)i: i.'i an.. 117r i 6
RBD, Inc., Engineering Consultants
Wildwood Townhomes 607-006
Detention Pond Capacity -Discharge Rating Curve
Elevation
Storage
(ft)
(ac-ft)
4937.47
0.00
4938.00
0.01
4938.50
0.11
4939.00
0.21
4939.50
0.47
4940.00
0.73
4940.50
1.13
4941.00
1.53
Weir Q
(cfs)
0.00
0.41
1.10
1.99
3.05
7.27 of= g,3cfs @ 4940. 06
16.28co
27.33
Storage: See Area -Capacity Rating Curve.
Weir Q: See outflow weir rating curve.
20 T
15
�L
0
L 10
5
0
4937 4937.5 4938 4938.5 4939 4939.5 4940 4940.5
Stage (ft et)
--a- Discharge , capacity
3Z
26-Oct-95
EROSION CONTROL CALCULATIONS
n
RBD, Inc.
RAINFALL PERFORMANCE STANDARD EVALUATION
ltFm_nna
PROJECT: Wildwood Townhomes (AHASEI) STANDARD FORM
CALCULATED BY: PPK DATE: 07/21/95
DEVELOPE
ERODIBILIT
Asb
Lsb
Ssb
Lb
Sb
PS
SUBBASIN
ZONE
(ac)
(ft
%
ft
1
moderate
3.11
530
1.3
2
moderate
1.06
670
0.7
3
moderate
3.33
622
0.9
4
moderate
2.46
663
1.4
0-1
moderate
0.68
480
0.8
Total
10.64
600
1.1
78.9
Wftl IT112 WWWW[_W9151AL\ ][ Nl ► h
Lb = sum(AiLi)/sum(Ai) = (3.11 x 530 +... + 0.68 x 480)/ 10.64
600 ft
Sb = sum(AiSi)/sum(Ai) = (3.11 x 1.25 +... + 0.68 x 0.80)/ 10.64
1.1 %
PS (during construction) = 78.9 (from Table 8A)
PS (after construction) = 78.9/0.85 = 92.8
M
RBD, Inc.
RAINFALL PERFORMANCE STANDARD EVALUATION
4607-006
PROJECT: Wildwood Townhomes (PHAn>E Z) STANDARD FORM
CALCULATED BY: PPK DATE: 07/21/95
DEVELOPE
ERODIBILIT
Asb
Lsb
Ssb
Lb
Sb
PS
SUBBASIN
ZONE
ac
ft
%
ft
1
moderate
3.11
605
1.0
2
moderate
1.06
670
0.7
3
moderate
3.33
622
0.9
4
moderate
2.46
883
1.4
0-1
moderate
0.68
480
0.8
Total
10.64
673
1.0
79.4
EXAMPLE CALCULATIONS
Lb = sum(AiLi)/sum(Ai) = (3.11 x 605 +... + 0.68 x 480)/ 10.64
673 ft
Sb = sum(AiSi)/sum(Ai) = (3.11 x 1.00 + ... + 0.68 x 0.80)/ 10.64
1.0 %
PS (during construction) = 79.4 (from Table 8A)
PS (after construction) = 79.4/0.85 = 93.5
35
u
RBD, Inc.
EFFECTIVENESS CALCULATIONS
PINT KITIIT..^
PROJECT: Wildwood Townhomes STANDARD FORM B
CALCULATED BY: PPK DATE: 07/21/95
Erosion Control
C-Facto
P-Facto
Comment
Number Method
Value
Value
4 Sediment/Basin Trap
1
0.5
installed at beginning of construction
5 Straw Bale Barrier
1
0.8
placed at swales
6 Gravel Filter
1
0.8
placed at inlets
8 Silt Fence Barrier
1
0.5
placed at outlets
9 Asphalt/Concrete Pavement
0.01
1
19 Established Grass Ground Cover- 100%
0.02
1
existing and undisturbed
38 Gravel Mulch
0.05
1
used on Timberwood Drive
39 Hay or Straw Dry Mulch (1-5% slope)
0.06
1
apply in detention pond area
SUB
PS
AREA
BASIN
%
ac
Site
78.9
10.64
SUB
SUB
AREA
Practice C"A P'A Remarks
BASIN
AREA
ac
DURING CONSTRUCTION (PHASE 1)
1
Total
3.11
Grassed Cover
3.11
19 0.06 3.11 Established Grass Ground Cover- 100%
Remain.
0.00
5 0.00 0.00 Straw Bale Barrier
2
Total
1.06
Grassed Cover
0.70
19 0.01 0.70 Established Grass Ground Cover - 100%
Impervious
0.15
9 0.00 0.15 Asphalt/Concrete Pavement
Remain.
0.21
8 0.21 0.11 Silt Fence Barrier
3
Total
3.33
Grassed Cover
0.60
19 0.01 0.60 Established Grass Ground Cover - 100%
Remain.
2.73
4 2.73 1.37 SedimenUBasin Trap
4
Total
2.46
Grassed Cover
0.30
19 0.01 0.30 Established Grass Ground Cover - 100%
Remain.
2.16
39 0.13 2.16 Hay or Straw Dry Mulch (1-5% slope)
0-1
Total
0.68
Impervious
0.35
9 0.00 0.35 Asphalt/Concrete Pavement
Remain.
0.33
39 0.02 0.33 Hay or Straw Dry Mulch (1-5% slope)
Cnet = 13.11 x0.02+,,,+0.33x0.06]/0.68
= 0.30
Pnet = 0.8x[3.11 x1.00+„ +0.33x1.00]/0.68
0.69
EFF = (1-C`P)100 = (1-0.30'0.69)100
= 79.34
> 78.9 (PS)
Assume paving not constructed within 6
weeks; use gravel inlet filters at aA-efes c0nGPG1c 61de
in ets & silt fence at swales & downstream
perimeters.
r2 I.L. cu/VCvT
G
RBD, Inc.
1
1
1
1
EFFECTNENESS CALCULATIONS
"i:3�ffid�b:
PROJECT: Wildwood Townhomes STANDARD FORM B
CALCULATED BY: PPK DATE: 07/21/95
Erosion Control
C-Facto
P-Factor
Comment
Number Method
Value
Value
4 Sediment/Basin Trap
1
0.5
installed at beginning of construction
5 Straw Bale Barrier
1
0.8
placed at swales
8 Silt Fence Barrier
1
0.5
placed at outlets
9 Asphalt/Concrete Pavement
0.01
1
20 Sod Grass
0.01
1
placed in Phase 1
38 Gravel Mulch
0.05
1
used on Timberwood Or and west p. lot
39 Hay or Straw Dry Mulch (1-5% slope)
0.06
1
apply in detention pond area
SUB
PS
AREA
BASIN
%
ac
Site
79.4
10.64
SUB
SUB
AREA
Practice C'A P'A Remarks
BASIN
AREA
ac
DURING CONSTRUCTION (PHASE 2)
1
Total
3.11
Impervious
0.00
9 0.00 0.00 Asphalt/Concrete Pavement
Area to be paved
0.93
38 0.05 .. 0.93 Gravel Mulch
Remain.
2.18
4 2.18 1.09 Sediment/Basin Trap
2
Total
1.06
Sod Cover
0.20
20 0.00 0.20 Sod Grass
Impervious
0.35
9 0.00 0.35 AsphalUConcrete Pavement
Remain.
0.51
38 0.03 0.51 Gravel Mulch
3
Total
3.33
Impervious
1.63
9 0.02 1.63 Asphalt/Concrete Pavement
Sod Cover
1.14
20 0.01 1.14 Sod Grass
Remain.
0.56
4 0.56 0.28 Sediment/BasinTrap
4
Total
2.46
Impervious
0.38
9 0.00 0.38 Asphalt/ConcretePavement
Sod Cover
1.78
20 0.02 1.78 Sod Grass
Remain.
0.30
4 0.30 0.15 Sediment/Basin Trap
0-1
Total
0.68
Impervious
0.53
9 0.01 0.53 Asphalt/Concrete Pavement
Remain.
0.15
39 0.01 0.15 Hay or Straw Dry Mulch (1-5% slope)
Cnet = 10.004.01+„ +0.15x0.061/0.68
= 0.30
Pnet = 0.8x[0.00x1.00+,,,+0.15xl.00]/0.68
= 0.69
EFF = (1-C"P)100 = (1-0.30-0.69)100
= 79.50
> 79.4 (PS)
Assume paving not constructed within 6
weeks; use gravel inlet filters at eN area Lp7C`CfC SIC�e�
inlets & silt fence at swales & downstream
perimeters.
37
' RBD, Inc.
' EFFECTIVENESS CALCULATIONS
' #607-006
1
PROJECT: Wildwood Townhomes STANDARD FORM B
CALCULATED BY: PPK DATE: 07/21/95
Erosion Control
C-Facto
P-Facto
Comment
Number Method
Value
Value
9 Asphalt/Concrete Pavement
0.01
1
paved and constructed
14 Established Grass Ground Cover - 50%
0.08
1
SUB
PS
AREA
BASIN
%
ac
Site
93.5
10.64
SUB
SUB
AREA
Practice C " A P' A Remarks
BASIN
AREA
ac
AFTER CONSTRUCTION
1
Total
3.11
Impervious
1.73
9 0.02 1.73 Asphalt/Concrete Pavement
Remain.
1.38
14 0.11 1.38 Established Grass Ground Cover - 50%
2
Total
1.06
Impervious
0.50
9 0.01 0.50 Asphalt/Concrete Pavement
Remain.
0.56
14 0.04 0.56 Established Grass Ground Cover-50%
3
Total
3.33
Impervious
1.85
9 0.02 1.85 Asphalt/Concrete Pavement
Remain.
1.48
14 0.12 1.48 Established Grass Ground Cover-50%
4
Total
2.46
Impervious
0.38
9 0.00 0.38 Asphalt/Concrete Pavement
Remain.
2.08
14 0.17 2.08 Established Grass Ground Cover- 50%
0-1
Total
0.68
Impervious
0.53
9 0.01 0.53 Asphalt/Concrete Pavement
Remain.
0.15
14 0.01 0.15 Established Grass Ground Cover-50%
C net = [1.73x0.01 +.. +0.53x0.01 ]/0.68
= 0.05
Pnet = [1.73x1.00+...+0.53x1.00]/0.68
= 1.00
EFF = (1-C-P)100 = (1-0.05-1.00)100
= 95.28
> 93.5 (PS)
•
RBD, Inc.
CALCULATED BY: , PPK
EROSION CONTROL CONSTRUCTION SEQUENCE
SEQUENCE FOR 1995 ONLY
Indicate by use of a bar line or symbols when erosion control measures will be installed.
Major modifications to an approved schedule may require submitting a new schedule for
approval by the City Engineer.
YEAR( 96
'STRUCTURES: INSTALLED BY
VEGETATION/MULCHING CONTRACTOR
' DATE SUBMITTED
MAINTAINED BY
APPROVED BY CITY OF FORT COLLINS ON
39
u
IRBD, Inc.
1
I
t
1
1
EROSION CONTROL COST ESTIMATE
PROJECT:
Wildwood Townhomes
#607-006
PREPARED BY:
PPK
DATE:
10/24/95
CITY RESEEDING COST
Unit
Total
Method
Quantity Unit
Cost
Cost
Notes
Reseed/mulch
10.64 ac
$500
$5,320
See Note 1.
Subtotal
$5,320
Contingency
50%
$2,660
Total
$7,980
EROSION CONTROL MEASURES
Unit
Total
Number Method
Quantity Unit
Cost
Cost
Notes
8 Silt Fence Barrier
1170 LF
$3
$3,510
4 Sediment/Basin Trap
1 ea
$150
$150
5 Straw Bale Barrier
3 ea
$150
$450
38 Gravel Mulch
1.44 ac
$1,350
$1,944
39 Hay or Straw Dry Mulch (1-5% slope)
0.33 ac
$500
$165
Subtotal
$6,219
Contingency
50%
$3,110
Total
$9,329
Total Secudty
$9,329
' Notes: 1. A<1 ac=$1300/ac; A=1-10 ac=$650/ac; A>10 ac=$500/ac.
1
L
r
I
CHARTS, TABLES, AND FIGURES
0
0
1
7
L
I
L
41
I
No Text
DRAINAGE CRITERIA MANUAL
RUNOFF
5C
3C
t- 20
Z
W
U
W
10
Z
W
a
O 5
N
W
cc 3
O
U 2
cc
W
F-
WOMEN
iAj
ii
i
i
UM
MEoil
�1111//����•
.2 .3 .5 1 2 3 5 10 20
VELOCITY IN FEET PER SECOND
FIGURE 3-2. ESTIMATE OF AVERAGE FLOW VELOCITY FOR
USE WITH THE RATIONAL FORMULA.
*MOST FREQUENTLY OCCURRING°UNDEVELQPED"
LAND SURFACES IN THE DENVER REGION.
REFERENCE: "Urban Hydrology For Small Watersheds" Technical
Release No. 55, USDA, SCS Jan. 1975.
5-1-84 43
URBAN DRAINAGE & FLOOD CONTROL DISTRICT
- DRCOG
0
0
4
4J
a�
O
O
w
O
0
w
O
a
w
c�
V
C.)
R'
14
4J
�
�
�
N
M
0
3
O
o
c4-
V
w
V
N
N
o
O
m
O
z
C's
\
o
00 (D Nt NON O 00 CO d- N 00
m rn rn rn 6 o DO DO 00 00 o
0 0 0 0 0 0 0 0
-4ua-cu4mfpv Moulnp
WO
' Calculations for Curb Capacities and Velocities
Major and Minor Storms
'per City of Fort Collins Storm Drainage Design Criteria
RESIDENTIAL w/ 61, Vertical curb and gutter Prepared by: R8D, Inc.
0 is for one side of the road only November 23, 1993
' V is based on theoretical capacities
Area = 3.37 sq.ft. Area = 18.495 sq.ft.
'Minor Storm : Major Storm
Slope Red. • Minor • C V Major • G V
(X). :Factor : X : (cfs) (fps) : X : (cfs) (fps)
'0.40 0.50 : 129.87 : 4.11 2.31 . 647.33 20.47 : 1.41 .
0.50 : 0.65 129.87 : 5.97 : 2.59 : 64733 • 29.75 1.58 :
0.60 : 0.80 : 129.87 : 8.05 2.83 : 647.33 : 40.11 1.73 : �-
'0.70 : 0.80 : 129.87 : 8.69 3.06 : 647.33 43.33 : 1.87 :
0.80 : 0.80 : 129.87 : 9.29 3.27 : 647.33 : 46.32 2.00 :
0.90 0.80 : 129.87 : 9.86 3.47 : 647.33 : 49.13 2.12 :
1.00 0.80 : 129.87 : 10.39 3.66 : 647.33 : 51.79 2.24 :
1.25 0.80 : 129.87 : 11.62 4.09 : 647.33 : 57.90 2.50 :
1.50 0.80 : 129.87 : 12.72 : 4.48 : 647.33 : 63.43 : 2.74 :
1.75 0.80 : 129.87 : 13.74 4.84 : 647.33 : 68.51 2.96 :
2.00 0.80 : 129.87 : 14.69 5.17 : 647.33 : 73.24r. 3.16 :
2.25 : 0.78 : 129.87 : 15.19 5.49 : 647.33 : 75.74 : 3.35 :
2.50 : 0.76 : 129.87 : 15.61 5.78 : 647.33 : 77.79 : 3.53 :
'2.75 : 0.74 : 129.87 : 15.94 6.07 : 647.33 : 79.44 : 3.71 :
3.00 0.72 : 129.87 : 16.20 6.34 : 647.33 : 80.73 : 3.87 :
3.25 0.69 : 129.87 : 16.15 : 6.60 : 647.33 : 80.52 : 4.03 :
3.50 0.66 : 129.87 : 16.04 : 6.84 : 647.33 : 79.93 : 4.18 :
'3.75 0.63 : 129.87 : 15.84 : 7.08 : 647.33 : 78.97 : 4.33 :
4.00 0.60 : 129.87 : 15.58 : 7.32 : 647.33 : 77.68 : 4.47 :
4.25 0.58 : 129.87 : 15.53 : 7.54 : 647.33 : 77.40 : 4.61 :
'4.50 0.54 : 129.87 : 14.88 : 7.76 : 647.33 : 74.15 : 4.74 :
4.75 0.52 : 129.87 : 14.72 : 7.97 : 647.33 : 73.36 : 4.87 :
5.00 0.49 : 129.87 : 14.23 : 8.18 : 647.33 : 70.93 : 5.00 :
5.25 : 0.46 : 129.87 : 13.69 : 8.38 : 647.33 : 68.23 : 5.12 :
5.50 : 0.44 : 129.87 : 13.40 : 8.58 : 647.33 : 66.80 : 5.24 :
5.75 : 0.42 : 129.87 : 13.08 : 8.77 : 647.33 : 65.19 : 5.36 :
6.00 : 0.40 : 129.87 : 12.72 : 8.96 : 647.33 : 63.43 : 5.48 :
1
1
4-5
No Text
RWINC
Engineering Consultants
CLIENT` 17"l 011—H T:7C>1> C-1 = 1 3 -�l JOBNO.
PROJECT CALCULATIONS FOR Or"'I ^p
MADE BY Eb(2- DATE CHECKED BY_ DATE —SHEET— OF —
-
-
it
_LJ! T-
L-T-
i i
T
;If
7
T
if
I U
+
V
7
L7
7
f
T
1-7
r
C>V. E=—�
J---
-:-
A P FE-JI
4-
ir
-7,
17
4
A
. . . . . . . . . . .
LI.
f fit!'
4
.7-
T H
I t 4
m..4-4 -
+
4
L
4
c"',
.....
..... .....
----- -
........
•
. .. .
..
....
I
,q7